KR100743145B1 - Electromagnetic waves shielding room and construction method - Google Patents
Electromagnetic waves shielding room and construction method Download PDFInfo
- Publication number
- KR100743145B1 KR100743145B1 KR1020070006029A KR20070006029A KR100743145B1 KR 100743145 B1 KR100743145 B1 KR 100743145B1 KR 1020070006029 A KR1020070006029 A KR 1020070006029A KR 20070006029 A KR20070006029 A KR 20070006029A KR 100743145 B1 KR100743145 B1 KR 100743145B1
- Authority
- KR
- South Korea
- Prior art keywords
- shield
- shielding body
- unit
- coupling hole
- partition
- Prior art date
Links
Images
Classifications
-
- H—ELECTRICITY
- H05—ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR
- H05K—PRINTED CIRCUITS; CASINGS OR CONSTRUCTIONAL DETAILS OF ELECTRIC APPARATUS; MANUFACTURE OF ASSEMBLAGES OF ELECTRICAL COMPONENTS
- H05K9/00—Screening of apparatus or components against electric or magnetic fields
- H05K9/0001—Rooms or chambers
- H05K9/0003—Shielded walls, floors, ceilings, e.g. wallpaper, wall panel, electro-conductive plaster, concrete, cement, mortar
-
- A—HUMAN NECESSITIES
- A61—MEDICAL OR VETERINARY SCIENCE; HYGIENE
- A61B—DIAGNOSIS; SURGERY; IDENTIFICATION
- A61B5/00—Measuring for diagnostic purposes; Identification of persons
- A61B5/05—Detecting, measuring or recording for diagnosis by means of electric currents or magnetic fields; Measuring using microwaves or radio waves
- A61B5/055—Detecting, measuring or recording for diagnosis by means of electric currents or magnetic fields; Measuring using microwaves or radio waves involving electronic [EMR] or nuclear [NMR] magnetic resonance, e.g. magnetic resonance imaging
-
- H—ELECTRICITY
- H05—ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR
- H05K—PRINTED CIRCUITS; CASINGS OR CONSTRUCTIONAL DETAILS OF ELECTRIC APPARATUS; MANUFACTURE OF ASSEMBLAGES OF ELECTRICAL COMPONENTS
- H05K9/00—Screening of apparatus or components against electric or magnetic fields
- H05K9/0073—Shielding materials
- H05K9/0081—Electromagnetic shielding materials, e.g. EMI, RFI shielding
- H05K9/0088—Electromagnetic shielding materials, e.g. EMI, RFI shielding comprising a plurality of shielding layers; combining different shielding material structure
Landscapes
- Health & Medical Sciences (AREA)
- Physics & Mathematics (AREA)
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Nuclear Medicine, Radiotherapy & Molecular Imaging (AREA)
- Microelectronics & Electronic Packaging (AREA)
- Pathology (AREA)
- Medical Informatics (AREA)
- High Energy & Nuclear Physics (AREA)
- Biophysics (AREA)
- Electromagnetism (AREA)
- Biomedical Technology (AREA)
- Heart & Thoracic Surgery (AREA)
- Radiology & Medical Imaging (AREA)
- Molecular Biology (AREA)
- Surgery (AREA)
- Animal Behavior & Ethology (AREA)
- General Health & Medical Sciences (AREA)
- Public Health (AREA)
- Veterinary Medicine (AREA)
- Shielding Devices Or Components To Electric Or Magnetic Fields (AREA)
- Building Environments (AREA)
Abstract
Description
도 1은 본 발명에 따른 전자파 차폐실 및 그 시공 방법의 아연실드체, 하부지지대, 지지판의 분해 사시도,1 is an exploded perspective view of a zinc shield body, a lower supporter, and a support plate of an electromagnetic shielding chamber and a construction method thereof according to the present invention;
도 2는 본 발명에 따른 전자파 차폐실 및 그 시공 방법의 지지판 상부에 플로어부의 제1하부차폐체가 설치되는 분해 사시도,Figure 2 is an exploded perspective view of the first lower shield is installed on the floor of the electromagnetic shielding room and the support plate of the construction method according to the present invention,
도 3은 본 발명에 따른 전자파 차폐실 및 그 시공 방법의 제1하부차폐체 상부로 제2하부차폐체가 설치되는 분해 사시도,Figure 3 is an exploded perspective view of the second lower shield is installed above the first lower shield of the electromagnetic shielding room and the construction method according to the present invention,
도 4는 본 발명에 따른 전자파 차폐실 및 그 시공 방법의 제2하부차폐체 상부로 제3하부차폐체가 설치되는 분해 사시도,Figure 4 is an exploded perspective view of the third lower shield is installed above the second lower shield of the electromagnetic shielding room and the construction method according to the present invention,
도 5는 본 발명에 따른 전자파 차폐실 및 그 시공 방법의 플로어부의 결합 사시도,5 is a perspective view of the combined floor of the electromagnetic shielding room and the construction method according to the present invention;
도 6은 본 발명에 따른 전자파 차폐실의 및 그 시공 방법의 게이트웨이부의 분해 사시도,6 is an exploded perspective view of a gateway of an electromagnetic shielding room and a construction method thereof according to the present invention;
도 7은 본 발명에 따른 전자파 차폐실 및 그 시공 방법의 게이트웨이부의 결합 사시도,7 is a perspective view of the coupling of the gateway of the electromagnetic shielding room and the construction method according to the present invention;
도 8은 본 발명에 따른 전자파 차폐실 및 그 시공 방법의 파티션부의 분해 사시도,8 is an exploded perspective view of a partition of an electromagnetic shielding room and a construction method thereof according to the present invention;
도 9는 본 발명에 따른 전자파 차폐실 및 그 시공 방법의 파티션부의 결합 사시도,9 is a perspective view of the combined portion of the electromagnetic shielding room and the construction method according to the present invention,
도 10은 본 발명에 따른 전자파 차폐실 및 그 시공 방법의 루프부의 분해 사시도,10 is an exploded perspective view of a loop portion of an electromagnetic shielding room and a construction method thereof according to the present invention;
도 11은 본 발명에 따른 전자파 차폐실 및 그 시공 방법의 루프부의 결합 사시도,11 is a perspective view of the coupling of the loop portion of the electromagnetic shielding room and the construction method according to the present invention;
도 12는 본 발명에 따른 전자파 차폐실 및 그 시공 방법의 전자파 차폐실의 분해 사시도,12 is an exploded perspective view of an electromagnetic shielding room of the electromagnetic shielding room and a construction method thereof according to the present invention;
도 13은 본 발명에 따른 전자파 차폐실 및 그 시공 방법의 전자파 차폐실의 결합 사시도,13 is a perspective view showing a combined electromagnetic shielding room of the electromagnetic shielding room and the construction method according to the present invention;
도 14는 본 발명에 따른 전자파 차폐실 및 그 시공 방법의 도 13의 A측 결합 단면도,14 is a cross-sectional view of the A side coupling of FIG. 13 of the electromagnetic shielding chamber and its construction method according to the present invention;
도 15는 본 발명에 따른 전자파 차폐실 및 그 시공 방법의 도 13의 B측 결합 단면도,FIG. 15 is a cross-sectional view at the side B of FIG. 13 illustrating an electromagnetic shielding chamber and a construction method thereof according to the present invention; FIG.
도 16은 본 발명에 따른 전자파 차폐실 및 그 시공 방법에 따른 시공 흐름도.16 is a construction flowchart according to an electromagnetic shielding room and a construction method thereof according to the present invention.
< 도면의 주요부분에 대한 부호의 설명><Description of reference numerals for main parts of the drawings>
100 : 플로어부 200 : 게이트웨이부100: floor part 200: gateway part
110 : 아연실드체 210 : 제1출입차폐체110: zinc shield body 210: first access shield
120 : 하부지지대 220 : 제2출입차폐체120: lower support 220: second access shield
130 : 지지판 230 : 제3출입차폐체130: support plate 230: third access shield
140 : 제1하부차폐체 240 : 볼트140: first lower shield 240: bolt
150 : 제2하부차폐체 250 : 너트150: second lower shield 250: nut
160 : 제3하부차폐체 260 : 결합공160: third lower shield 260: coupling hole
170 : 볼트170: Bolt
180 : 결합공180: coupling hole
300 : 파티션부 400 : 루프부300: partition portion 400: loop portion
310 : 제1벽체차폐체 410 : 제1상부차폐체310: first wall shield 410: first upper shield
320 : 제2벽체차폐체 420 : 제2상부차폐체320: second wall shield 420: second upper shield
330 : 제3벽체차폐체 430 : 재3상부차폐체330: third wall shield 430: third upper shield
340 : 볼트 440 : 볼트340: Bolt 440: Bolt
350 : 너트 450 : 너트350: nut 450: nut
360 : 결합공 460 : 결합공360: coupling hole 460: coupling hole
본 발명은 전자파 차폐실 및 그 시공방법에 관한 것으로, 더욱 상세하게는 내부로 각각 단차지게 형성된 플로어부, 게이트웨이부, 파티션부, 루프부 각각 설치 결합하여 전자파 차폐실을 시공함으로써, 환자의 두부를 자기공명영상 촬영시 발생되는 전자파를 전자파 차폐실 외부로의 방출을 차단하며, 전자파의 파형을 전자파 차폐실 내부에서 고르게 유지함으로 촬영된 자기공명영상의 선명도와 정확성을 향상시켜 환자의 상태를 정확히 진단함으로써 오진으로 인한 의료사고를 예방하며 이에 적절한 치료가 가능한 전자파 차폐실 및 그 시공 방법에 관한 것이다.The present invention relates to an electromagnetic shielding room and a construction method thereof, and more particularly, to install the electromagnetic shielding room by installing and combining the floor, gateway, partition, and loop, respectively, which are formed stepped inside. Accurate diagnosis of the patient's condition by improving the clarity and accuracy of the MRI image by blocking the emission of electromagnetic waves generated outside the MRI outside the electromagnetic shielding room and maintaining the waveform of the electromagnetic wave evenly inside the electromagnetic shielding room. The present invention relates to an electromagnetic shielding room and a construction method thereof, which can prevent medical accidents caused by misdiagnosis and can appropriately treat them.
일반적으로 자기공명영상 촬영은 환자의 두부를 촬영하여 이를 통하여 환자의 뇌에 흐르는 혈관의 상태를 파악하여 뇌졸증, 뇌출혈 또는 뇌종양등의 다양한 뇌혈관계질환을 진단하여 이에 맞는 시술과 처방을 통하여 환자를 치료하는 것으로써, 촬영된 영상의 선명도와 정확도를 높여 환자의 상태를 정확히 진단하여 오진에 의한 안전사고를 미연에 예방하고, 환자의 상태에 맞는 효과적인 치료를 위하여 7테라(Terra) 엠알아이(MRI:magnetic resonance imaging)등 다양한 자기공명영상 장치가 개발되어 이용되고 있다.In general, magnetic resonance imaging is performed by capturing the head of a patient to determine the state of blood vessels flowing through the brain of the patient, thereby diagnosing various cerebrovascular diseases such as stroke, cerebral hemorrhage, or brain tumor, and treating the patient through appropriate procedures and prescriptions. By increasing the sharpness and accuracy of the captured images, the patient's condition can be accurately diagnosed to prevent safety accidents caused by misdiagnoses, and for effective treatment according to the patient's condition, 7 Terra MRI: Various magnetic resonance imaging devices such as magnetic resonance imaging have been developed and used.
특히, 자기공명영상 촬영시에는 다량의 전자파가 발생하게 되며, 전자파가 외부로 방출되지 않고 내부에서 일정한 파형을 유지해야만 정확도와 선명도가 높은 환자의 두부촬영 영상을 얻을 수 있다.In particular, when taking MRI, a large amount of electromagnetic waves are generated, and a head image of a patient having high accuracy and clarity can be obtained only by maintaining a constant waveform inside without emitting electromagnetic waves to the outside.
하지만 종래에는 전자파 차폐실을 사용하지 아니하고 사방이 막힌 밀폐형 공간에서 자기공명영상을 촬영하는 방법이 사용되고 있는데, 이는 자기공명영상 촬영 시 발생하는 다량의 전자파가 외부로 방출되는 경우가 발생하며, 전자파의 파형의 변화를 가져와 환자의 두부를 촬영한 영상의 선명도와 정확도를 떨어뜨리는 문제점이 있었다.However, conventionally, a method of photographing a magnetic resonance image in an enclosed closed space without using an electromagnetic shielding room is used, which causes a large amount of electromagnetic waves emitted during the magnetic resonance imaging to be emitted to the outside. There was a problem that the change in the waveform to reduce the sharpness and accuracy of the image taken of the patient's head.
또한, 선명도와 정확도가 떨어진 영상을 통하여 미세한 뇌혈관질환의 정학한 진단에 어려운 문제점이 있었다.In addition, there was a difficult problem in the precise diagnosis of the cerebrovascular disease through the image of less sharpness and accuracy.
특히, 선명도와 정확도가 떨어진 영상을 통하여 환자의 상태를 진단함으로써, 오진에 의한 의료사고의 위험성이 항상 존재하는 문제점이 있었다.In particular, by diagnosing the patient's condition through the image of less sharpness and accuracy, there is a problem that there is always a risk of a medical accident due to a misdiagnosis.
본 발명은 상기와 같은 종래의 문제점을 해결하기 위하여, 내부에 단차지게 형성된 플로어부, 게이트웨이부, 파티션부, 루프부를 각각 설치 결합하여 전자파 차폐실을 구성함으로써 자기공명영상 촬영시 발생하는 다량의 전자파가 전자파 차폐실 외부로 방출되지 아니하며, 내부에 형성된 단차으로 인해 전자파가 내부에서 일정한 파형을 유지하여 환자의 두부를 촬영한 영상의 선명도와 정확도를 유지하여 환자의 상태를 정확히 진단하여 이에 맞는 시술과 처방을 통해 환자를 치료하며, 오진에 의한 의료사고를 미연에 방지할 수 있는 전자파 차폐체실 및 시공방법을 제공하는 데 그 목적이 있다.The present invention is to solve the conventional problems as described above, by installing and combining the floor, gateway, partition, loop portion formed stepped inside each of the electromagnetic shielding room to generate a large amount of electromagnetic waves generated by magnetic resonance imaging Is not emitted to the outside of the electromagnetic shielding room, and due to the step formed inside, the electromagnetic wave maintains a constant waveform inside to maintain the clarity and accuracy of the image of the patient's head, thereby accurately diagnosing the patient's condition. It aims to provide a electromagnetic shielding chamber and construction method that can treat patients through prescription and prevent medical accidents due to misunderstanding.
상기와 같은 목적을 달성하기 위하여, 본 발명의 구성은, 바닥면에 설치되는 아연실드체와, 상기 아연실드체에 상부에 결합되는 다수개의 하부지지대와, 상기 하부지지대의 상부에 결합되는 지지판과, 상기 지지판의 상부에 결합되는 제1하부차폐체와, 상기 제1하부차폐체의 상부에 단차지게 결합되는 제2하부차폐체와, 상기 제2하부차폐체의 상부에 단차지게 결합되는 제3하부차폐체로 이루어지는 플로어부;In order to achieve the above object, the configuration of the present invention, the zinc shield body is installed on the bottom surface, a plurality of lower supports coupled to the upper portion of the zinc shield body, and the support plate coupled to the upper portion of the lower support and The first lower shielding body coupled to the upper portion of the support plate, the second lower shielding body coupled stepwise to the upper portion of the first lower shielding body, and the third lower shielding body to be stepped on the upper portion of the second lower shielding body. Floor portion;
상기 제1하부차폐체의 상단의 테두리에 결합되어, 사람이 입출입 가능하도록 출입구를 갖는 제1출입차폐체와, 상기 제1출입차폐체에 단차지게 결합되어 사람이 입출입이 가능하도록 출입구를 갖는 제2출입차폐체와, 상기 제2출입차폐체에 단차지게 결합되어 사람이 입출입이 가능하도록 출입구를 갖는 제3출입차폐체로 이루어져 대향됨과 동시에 서로 마주보게 설치되는 한 쌍의 게이트웨이부; 상기 플로어부의 제1하부차폐체의 상단의 테두리에 결합되는 제1벽체차폐체와, 상기 제1벽체차폐체에 단차지게 결합되는 제2벽체차폐체와, 상기 제2벽체차폐체에 단차지게 결합되는 제3벽체차폐체로 이루어져 서로 마주보게 설치되는 한 쌍의 파티션부; 및 상기 게이트웨이부 및 파티션부 상단에 안착되어 결합되는 제1상부차폐체와, 상기 제1상부차폐체에 하부로 단차지게 결합되는 제2상부차폐체와, 상기 제2상부차폐체의 하부로 단차지게 결합되는 제3상부차폐로 이루어지는 루프부; 로 구성되는 것을 특징으로 한다.A first entrance and exit shielding body coupled to an upper edge of the first lower shielding body and having a doorway to allow a person to enter and exit; and a second entrance and exit shielding body having a doorway to be connected to a first entrance and exit body to allow a person to enter and exit And a pair of gateway units coupled to the second entry / exit shielding step so as to be configured to face each other at the same time as the third entry / exit shielding bodies having entrances and exits so that a person can enter and exit from each other; A first wall shield coupled to an edge of an upper portion of the first lower shield of the floor, a second wall shield coupled to the first wall shield, and a third wall shield coupled to the second wall shield. Consisting of a pair of partitions installed facing each other; And a first upper shielding body seated on and coupled to an upper end of the gateway unit and a partition unit, a second upper shielding body coupled to the first upper shielding body to be stepped downward, and a stepped step coupled to a lower portion of the second upper shielding body. A loop part comprising three upper shields; Characterized in that consists of.
또한 , 상기 플로어부에는, 상기 하부지지대에 볼트가 삽입 결합되도록 제1,2,3하부차폐체와 지지판과 하부지지대에 일면에 결합공이 일정하게 배치되어 관통 형성되는 것을 특징으로 한다.In addition, the floor portion, characterized in that the first, second, second lower shielding body and the support plate and the lower support to the coupling hole is uniformly disposed through the first support so that the bolt is inserted into the lower support.
또한, 상기 게이트웨이부는, 볼트와 너트가 삽입 결합되도록 일정하게 배치되는 결합공이 제1,2,3출입차폐체의 일측면에 일정하게 배치되어 관통 형성되는 것 을 특징으로 한다.In addition, the gateway portion, characterized in that the coupling hole is constantly arranged to be inserted and coupled to the bolt and the nut is formed through the uniformly arranged on one side of the first, second, third access shield.
또한, 상기 파티션부에는, 볼트와 너트가 삽입 결합되도록 일정하게 배치되는 결합공이 제1,2,3벽체차폐체의 일측면에 관통 형성되는 것을 특징으로 한다.In addition, the partition portion, characterized in that the coupling hole which is arranged to be inserted and coupled to the bolt and nut is penetratingly formed on one side of the first, second, third wall shielding body.
또한, 상기 루프부에는, 볼트와 너트가 삽입 결합되도록 일정하게 배치되는 결합공이 제1,2,3상부차폐체의 일측면에 관통 형성되는 것을 특징으로 한다.In addition, the loop portion, characterized in that the coupling hole which is arranged to be inserted and coupled to the bolt and nut is formed through one side of the first, second, third upper shield body.
이하, 첨부된 도면을 참조로 본 발명의 구성을 설명하면 다음과 같다.Hereinafter, the configuration of the present invention with reference to the accompanying drawings.
도 1은 본 발명에 따른 전자파 차폐실 및 그 시공 방법의 아연실드체, 하부지지대, 지지판의 분해 사시도이고, 도 2는 본 발명에 따른 전자파 차폐실 및 그 시공 방법의 지지판 상부에 플로어부의 제1하부차폐체가 설치되는 분해 사시도이며, 도 3은 본 발명에 따른 전자파 차폐실 및 그 시공 방법의 제1하부차폐체 상부로 제2하부차폐체가 설치되는 분해 사시도이고, 도 4는 본 발명에 따른 전자파 차폐실 및 그 시공 방법의 제2하부차폐체 상부로 제3하부차폐체가 설치되는 분해 사시도이며, 도 5는 본 발명에 따른 전자파 차폐실 및 그 시공 방법의 플로어부의 결합 사시도이고, 도 6은 본 발명에 따른 전자파 차폐실 및 그 시공 방법의 게이트웨이부의 분해 사시도이며, 도 7은 본 발명에 따른 전자파 차폐실 및 그 시공 방법의 게이트웨이부의 결합 사시도이고, 도 8은 본 발명에 따른 전자파 차폐실 및 그 시공 방법의 파티션부의 분해 사시도이며, 도 9는 본 발명에 따른 전자파 차폐실 및 그 시공 방법의 파티션부의 결합 사시도이고, 도 10은 본 발명에 따른 전자파 차폐 실 및 그 시공 방법의 루프부의 분해 사시도이며, 도 11은 본 발명에 따른 전자파 차폐실 및 그 시공 방법의 루프부의 결합 사시도이고, 도 12는 본 발명에 따른 전자파 차폐실 및 그 시공 방법의 전자파 차폐실의 분해 사시도이며, 도 13은 본 발명에 따른 전자파 차폐실 및 그 시공 방법의 전자파 차폐실의 결합 사시도이고, 도 14는 본 발명에 따른 전자파 차폐실 및 그 시공 방법의 도 13의 A측 결합 단면도이며, 도 15는 본 발명에 따른 전자파 차폐실 및 그 시공 방법의 도 13의 B측 결합 단면도이며, 도 16은 본 발명에 따른 전자파 차폐실 및 그 시공 방법에 따른 시공 흐름도이다.1 is an exploded perspective view of a zinc shield body, a lower supporter, and a support plate of an electromagnetic shielding chamber and a construction method thereof according to the present invention, and FIG. 2 is a first portion of a floor portion on the support plate of the electromagnetic shielding chamber and a construction method thereof according to the present invention. Figure 3 is an exploded perspective view of the lower shield is installed, Figure 3 is an exploded perspective view of the second lower shield is installed on top of the first lower shield of the electromagnetic shielding room and the construction method according to the invention, Figure 4 is an electromagnetic shield according to the present invention The exploded perspective view of the third lower shielding body is installed above the second lower shielding body of the seal and its construction method, Figure 5 is a perspective view of the electromagnetic wave shielding chamber according to the present invention and the floor of the construction method combined, Figure 6 is 7 is an exploded perspective view of a gateway part of an electromagnetic shielding room and a construction method thereof, and FIG. 8 is an exploded perspective view of a partition portion of an electromagnetic shielding chamber and a construction method according to the present invention, FIG. 9 is a perspective view of a partition portion of an electromagnetic shielding chamber and a construction method thereof according to the present invention, and FIG. 11 is an exploded perspective view of the loop portion of the electromagnetic shielding chamber and the construction method thereof, and FIG. 11 is a combined perspective view of the loop portion of the electromagnetic shielding chamber and the construction method thereof according to the present invention, and FIG. 13 is an exploded perspective view of an electromagnetic shielding chamber, and FIG. 13 is a combined perspective view of an electromagnetic shielding chamber of the electromagnetic shielding chamber and a construction method thereof according to the present invention, and FIG. 14 is a view of FIG. 13A of the electromagnetic shielding chamber and the construction method according to the present invention. Fig. 15 is a side coupling cross-sectional view of Fig. 13 of the electromagnetic shielding chamber and a construction method thereof according to the present invention, and Fig. 16 is an electromagnetic shielding chamber and its construction according to the present invention. It is a construction flowchart according to the construction method.
도 1내지 도 15 에 도시된 바와 같이, 본 발명에 따른 전자파 차폐실의 구성은, 크게 플로어부(100), 게이트웨이부(200), 파티션부(300), 루프부(400)로 나누어진다.1 to 15, the configuration of the electromagnetic shielding room according to the present invention is largely divided into a
- 플로어부(100)는, 바닥면에 아연실드체(110)가 설치되고, 상기 아연실드체(110)의 상부에 다수개의 하부지지대(120)가 설치된다.-
또한, 상기 하부지지대(120)의 상부에 지지판(130)이 설치되고, 상기 지지판(130)의 상부에 제1하부차폐체(140)가 결합된다. In addition, the
또한, 상기 제1하부차폐체(140)의 상부로 단차지게 결합되는 제2하부차폐체(150)가 연이어 결합되며, 상기 제2하부차폐체(150)의 상부에 단차지게 결합되는 제3하부차폐체(160)가 연이어 결합된다.In addition, the second
또한, 상기 하부지지대(120)에 볼트(170)가 삽입 결합되도록 제1,2,3하부차폐체(140,150,160)와 지지판(130)과 하부지지대(120)에 일면을 일정한 간격으로 배치하여 천공된 결합공(180)이 구비되고, 상기 결합공(180)에는 볼트(170)가 삽입되어 상기 제1,2,3,하부차폐체(140,150,160)와 지지판(130)과 하부지지대(120)가 상호 견고히 결합하게 된다. In addition, the first and second
- 게이트웨이부(200)는 , 상기 제1하부차폐체(140)의 상단의 테두리에 결합되어, 사람이 입출입 가능하도록 출입구를 갖는 제1출입차폐체(210)가 구비되고, 상기 제1출입차폐체(210)에 단차지게 연이어 결합되어 사람이 입출입이 가능하도록 출입구를 갖는 제2출입차폐체(220)가 구비된다. - the
또한, 상기 제2출입차폐체(220)에 단차지게 결합되어 사람이 입출입이 가능하도록 출입구를 갖는 제3출입차폐체(230)가 연이어 결합되어 이루어진 게이트웨이부(200)는 한 쌍으로 서로 마주보게 동시에 대향되게 상기 제1하부차폐체(140)의 상단의 테두리에 결합되게 된다.In addition, the
특히, 상기 게이트웨이부(200)에는 볼트(240)와 너트(250)가 삽입 결합되도록 제1,2,3출입차폐체(210,220,230)의 일측면에 일정하게 배치되어 관통 형성되는 결합공(260)이 구비된다. In particular, the
- 파티션부(300)는, 상기 플로어부(100)의 제1하부차폐체(140)의 상단의 테두리에 결합되는 제1벽체차폐체(310)가 구비되고, 상기 제1벽체차폐체(310)에 단차 지게 연이어 결합되는 제2벽체차폐체(320)가 구비된다. The
또한, 상기 제2벽체차폐체(320)에 단차지게 연이어 결합되는 제3벽체차폐체(330)로 이루어진 파티션부(300)는 한 쌍으로 서로 마주보게 동시에 대향되게 상기 제1하부차폐체(140)의 상단의 테두리에 결합되게 된다.In addition, the
특히, 상기 파티션부(300)에는 볼트(340)와 너트(350)가 삽입 결합되도록 제1,2,3벽체차폐체(310,320,330)의 일측면에 일정한 간격으로 배치되어 관통 형성된 결합공(360)이 구비된다.In particular, the
-루프부(400)는, 상기 게이트웨이부(200) 및 파티션부(300) 상단에 안착되어 결합되는 제1상부차폐체(410)가 구비되고, 상기 제1상부차폐체(410)에 하부로 단차지게 결합되는 제2상부차폐체(420)가 구비된다.The
또한, 상기 제2상부차폐체(420)의 하부로 단차지게 결합되는 제3상부차폐(430)가 구비된다.In addition, a third
특히, 상기 루프부(400)에는 볼트(440)와 너트(450)가 삽입 결합되도록 제1,2,3상부차폐체(410,420,430)의 일측면에 일정하게 배치되어 관통 형성된 결합공(460)이 구비된다.In particular, the
상기와 같은 구성으로 본 발명인 전자파 차폐실의 시공방법을 살펴보면,Looking at the construction method of the electromagnetic shielding room of the present invention with the configuration as described above,
도 16에 도시된 바와같이, 전자파 차폐실의 시공 방법은,As shown in Figure 16, the construction method of the electromagnetic shielding room,
a) 바닥면에 아연실드체(110)를 설치하는 단계;(S100)a) installing a
b) 아연실드체(110) 상부로 다수개의 하부지지대(120)를 설치하는 단계;(S200)b) installing a plurality of
c) 하부지지대(120)의 상부로 지지판(130)을 설치하는 단계;(S300)c) installing the
d) 지지판(130)의 상부에 단차지게 플로어부(100)를 제작하여 설치하는 단계;(S400)d) manufacturing and installing the
e) 플로어부(100)의 상부에 사람이 입출입이 가능하도록 출입구를 가지며 내부로 단차지게 한 쌍의 게이트웨이부(200)를 제작하여 서로 대향됨과 동시에 마주보게 설치하는 단계;(S500)e) manufacturing a pair of
f) 플로어부(100)의 상부에 내부로 단차지게 한쌍의 파티션부(300)를 제작하여 상기 게이트웨이부(200) 사이로 서로 대향됨과 동시에 마주보게 설치하는 단계;(S600) 및f) manufacturing a pair of
g) 게이트웨이부(200) 및 파티션부(300)의 상부에 하부로 단차지게 루프부(400)를 제작하여 설치하는 단계;(S700) 를 거치게 된다.g) manufacturing and installing the
이때, 상기 d) 단계의 플로어부(100)의 시공방법은,At this time, the construction method of the
d-1) 플로어부(100)의 제1하부차폐체(140), 지지판(130) 및 하부지지대(120)의 각각에 결합공(180)을 천공하는 단계;d-1) drilling a
d-2) 플로어부(100)의 제1하부차폐체(140)의 상부에 플로어부(100)의 제2하부차폐체(150)를 제작하여 단차지게 결합하는 단계;d-2) manufacturing a second
d-3) 플로어부(100)의 제1하부차폐체(140) 결합공(180)과 일직선상으로 상기 플로어부(100)의 제2하부차폐체(150)의 결합공(180)을 천공하는 단계;d-3) drilling the
d-4) 플로어부(100)의 제2하부차폐체(150)의 상부에 플로어부(100)의 제3하부차폐체(160)를 제작하여 단차지게 결합하는 단계;d-4) manufacturing a third
d-5) 플로어부(100)의 제2하부차폐체(150)) 결합공(180)과 일직선상으로 상기 플로어부(100)의 제3하부차폐체(160)의 결합공(180)을 천공하는 단계; 및d-5) drilling the
d-6) 플로어부(100)의 제1,2,3하부차폐체(140,150,160), 지지판(130) 및 하부지지대(120)의 각각의 결합공(180)에 볼트(170)를 삽입 결합하는 단계; 로 시공되게 된다.d-6) inserting and
특히, 상기 플로어부(100)는 볼트(170)가 상기 제1,2,3하부차폐체(140,10,160), 지지판(130) 및 하부지지대(120)에 관통된 결합공(180)에 삽입 결합되어, 상기 플로어부(100)의 상기 제1,2,3하부차폐체(140,150,160), 지지판(130) 및 하부지지대(120)가 상호 견고히 결합되게 된다.In particular, the
또한, 상기 플로어부(100)의 상부에 테두리에 설치되는 상기 e)단계의 게이트웨이부(200)의 시공방법은,In addition, the construction method of the
e-1) 플로어부(100)의 제1하부차폐체(140)의 테두리에 결합되어 사람이 입출입 가능하도록 출입구를 갖는 케이트웨이부(200)의 제1출입차폐체(210)를 제작하는 단계;e-1) manufacturing the
e-2) 게이트웨이부(200)의 제1출입차폐체(210)의 일측면에 일정하게 배치되는 결합공(260)을 천공하는 단계;e-2) drilling a
e-3) 게이트웨이부(200)의 제1출입차폐체(210)의 내측으로 사람이 입출입 가능하도록 출입구를 갖는 제2출입차폐체(220)를 제작하여 게이트웨이부(200)의 제1출입차폐체(210)에 내부로 단차지게 제2출입차폐체(220)가 설치되는 단계;e-3) The first entrance and
e-4) 게이트웨이부(100)의 제1출입차폐체(210) 결합공(260)과 일직선상으로 상기 게이트웨이부(200)의 제2출입차폐체(220)의 결합공(260)을 천공하는 단계;e-4) drilling the
e-5) 게이트웨이부(200)의 제2출입차폐체(220)의 내측으로 사람이 입출입 가능하도록 출입구를 갖는 제3출입차폐체(230)를 제작하여 게이트웨이부(200)의 제2출입차폐체(220)에 내부로 단차지게 제3출입차폐체(230)가 설치되는 단계; e-5) The third entrance and
e-6) 게이트웨이부(200)의 제2출입차폐체(220) 결합공(260)과 일직선상으로 상기 게이트웨이부(200)의 제3출입차폐체(230)의 결합공(260)을 천공하는 단계;e-6) drilling the
e-7) 한쌍의 게이트웨이부(200)의 제1,2,3출입차폐체(210,220,230) 각각의 결합공(260)에 볼트(340)와 너트(350)를 삽입 결합하는 단계; 및e-7) inserting and coupling a
e-8) 플로어부(100)의 제1하부차폐체(140)의 테두리 상부에 한 쌍의 게이트웨이부(200)를 서로 대향됨과 동시에 마주보게 설치하는 단계; 로 시공된다.e-8) installing a pair of
특히, 상기 게이트웨이부(200)의 제작시 게이트웨이부(200)가 넘어지지 않도록 별도의 지지부재를 각각의 게이트웨이부(200)의 양측에 각각 설치하여 작업중 안전사고를 미연에 방지하는 것이 바람직하다.In particular, it is preferable to install separate supporting members on both sides of each
또한, 상기 제1,2,3출입차폐체(210,220,230)는 볼트(240)와 너트(250)로 인해 상호 결합 되는데, 이때, 플로어부(100)의 제1하부차폐체(140) 테두리에 설치되는 상기 제1출입차폐체(210)의 하단과 상기 플로어부(100)의 제1하부차폐체(140) 테두리에 맞닿는 부분을 용접하여 상기 제1출입차폐체(210)와 제1하부차폐체(140)가 상호 견고하게 결합 되도록 한다.In addition, the first, second, third access shields 210, 220, 230 are coupled to each other due to the
또한, 상기 플로어부(100)의 상부에 결합되는 상기 f)단계의 파티션부(300)의 시공방법은,In addition, the construction method of the
f-1) 플로어부(100)의 제1하부차폐체(140)의 테두리에 결합되는 파티션부(300)의 제1벽체차폐체(310)를 제작하는 단계;f-1) manufacturing a first
f-2) 파티션부(300)의 제1벽체차폐체(310)의 일측면에 일정하게 배치되는 결합공(360)을 천공하는 단계;f-2) drilling a
f-3) 파티션부(300)의 제1벽체차폐체(310)의 내측에 설치되는 제2출입차폐체(220)를 제작하여 파티션부(300)의 제1벽체차폐체(310)에 내부로 단차지게 제2벽체차폐체(320)가 설치되는 단계;f-3) The
f-4) 파티션부(300)의 제1벽체차폐체(310) 결합공(360)과 일직선상으로 상기 파티션부(300)의 제2벽체차폐체(320)의 결합공(360)을 천공하는 단계;f-4) drilling the
f-5) 파티션부(300)의 제2벽체차폐체(320)의 내측에 설치되는 제3벽체차폐체(330)를 제작하여 파티션부(300)의 제2벽체차폐체(320)에 내부로 단차지게 제3벽체차폐체(330)가 설치되는 단계; f-5) The
f-6) 파티션부(330)의 제2벽체차폐체(320) 결합공(360)과 일직선상으로 상기 파티션부(300)의 제3벽체차폐체(330)의 결합공(360)을 천공하는 단계;f-6) drilling the
f-7) 한쌍의 파티션부(300)의 제1,2,3벽체차폐체(310,320,330) 각각의 결합 공(360)에 볼트(340)와 너트(350)를 삽입 결합하는 단계; 및f-7) inserting the
f-8) 플로어부(100)의 제1하부차폐체(140)의 테두리 상부에 상기 게이트웨이부(200) 사이로 서로 대향됨과 동시에 마주보게 한 쌍의 파티션부(300)를 설치하는 단계; 로 시공된다.f-8) installing a pair of
특히, 상기 파티션부(300)의 제작시 파티션부(300)가 넘어지지 않도록 별도의 지지부재를 각각의 파티션부(300)의 양측에 각각 설치하여 작업중 안전사고를 미연에 방지하는 것이 바람직하다.In particular, it is preferable to install separate supporting members on both sides of each
또한, 상기 제1,2,3벽체차폐체(310,320,330)는 볼트(340)와 너트(350)로 인해 상호 결합 되는데, 이때, 상기 플로어부(100)의 제1하부차폐체(140) 테두리에 설치되는 상기 제1벽체차폐체(310)의 하단과 상기 플로어부(100)의 제1하부차폐체(140) 테두리에 맞닿는 부분을 용접함과 동시에, 상기 제1출입차폐체(210)의 양측면에 맞닿는 부분을 용접하여 상기 제1벽체차폐체(310)와 제1하부차폐체(140) 및 상기 제1출입구차폐체(140)가 상호 견고하게 결합 되도록 한다.In addition, the first, second and third wall shields 310, 320 and 330 are coupled to each other due to the
또한, 상기 게이트웨이부(100)와 파티션부(400)의 상부에 결합되는 상기 g)단계의 루프부(500) 시공방법은,In addition, the construction method of the roof unit 500 of the step g) coupled to the upper portion of the
g-1) 게이트웨이부(200), 상기 파티션부(300)의 상부로 설치되는 제1상부차폐체(410)를 제작하는 단계;g-1) manufacturing a gateway
g-2) 루프부(400)의 제1상부차폐체(410)의 일측면에 일정하게 배치되는 결합공(460)을 천공하는 단계;g-2) drilling a
g-3) 루프부(400)의 제1상부차폐체(410)의 하부에 설치되는 제2상부차폐체(420)를 제작하여 루프부(400)의 제1상부차폐체(410)에 하부로 단차지게 제2상부차폐체(420)가 설치되는 단계;g-3) a second
g-4) 루프부(400)의 제1상부차폐체(410) 결합공(460)과 일직선상으로 상기 루프부(400)의 제2상부차폐체(420)의 결합공(460)을 천공하는 단계;g-4) drilling the
g-5) 루프부(400)의 제2상부차폐체(420)의 내측에 설치되는 제3상부차폐체(430)를 제작하여 루프부(400)의 제2상부차폐체(420)에 하부로 단차지게 제3상부차폐체(430)가 설치되는 단계; g-5) a third
g-6) 루프부(400)의 제2상부차폐체(420) 결합공(460)과 일직선상으로 상기 루프부(400)의 제3상부차폐체(430)의 결합공(460)을 천공하는 단계;g-6) drilling the
g-7) 루프부(400)의 제1,2,3상부차폐체(410,420,430) 각각의 결합공(460)에 볼트(440)와 너트(450)를 삽입 결합하는 단계; 및g-7) inserting the
g-8) 게이트웨이부(200), 상기 파티션부(300)의 상부로 상기 루프부(400)를 설치하는 단계;로 시공된다.g-8) a
특히, 상기 제1,2,3상부차폐체(410,420,430)는 볼트(440)와 너트(450)로 인해 상호 견고히 결합되고, 상기 게이트웨이부(200)의 제1출입차폐체(210)의 상부에 과 상기 파티션부(300)의 제1벽체차폐체(310)의 상부에 상기 루프부(400)의 테두리에 설치됨과 동시에 상기 게이트웨이부(200)와 상기 파티션부(300) 및 상기 루프부상호 견고하게 결합되도록 상기 게이트웨이부(200), 파티션부(300), 루프부(400)의 맞닿는 부분을 용접하게 된다.In particular, the first, second and third
특히, 상기 제1,2,3하부차폐체(140,150,160), 상기 제1,2,3출입차폐체(210, 220,230), 상기 제1,2,3벽체차폐체(310,320,330), 상기 제1,2,3상부차폐체(410,420.430)를 다양한 크기로 절단하여 사용함은 본 기술 분야의 통상의 지식을 가진자의 균등한 변형 및 타실시 이므로 이는 첨부된 특허 청구범위 안에 속한다 해야 할 것이다.In particular, the first, second and third
이상에서 상술한 본 발명에 따르면, 내부로 각각 단차지게 형성된 플로어부, 게이트웨이부, 파티션부, 루프부 각각 설치 결합하여 전자파 차폐실을 시공함으로써, 환자의 두부를 자기공명영상 촬영시 발생되는 전자파를 전자파 차폐실 외부로의 방출을 차단하며, 전자파의 파형을 전자파 차폐실 내부에서 고르게 유지함으로 촬영된 자기공명영상의 선명도와 정확성을 향상시켜 환자의 상태를 정확히 진단함으로써 오진으로 인한 의료사고를 예방하며 이에 적절한 치료가 가능한 효과가 있다.According to the present invention described above, by installing the electromagnetic shielding room by installing the floor, the gateway, the partition, and the loop unit respectively formed stepped inside, the electromagnetic wave generated during the magnetic resonance imaging of the head of the patient It blocks the emission to the outside of the electromagnetic shielding room and improves the clarity and accuracy of the magnetic resonance images taken by keeping the waveform of the electromagnetic waves evenly inside the electromagnetic shielding room. Appropriate treatment is possible to this effect.
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020070006029A KR100743145B1 (en) | 2007-01-19 | 2007-01-19 | Electromagnetic waves shielding room and construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020070006029A KR100743145B1 (en) | 2007-01-19 | 2007-01-19 | Electromagnetic waves shielding room and construction method |
Publications (1)
Publication Number | Publication Date |
---|---|
KR100743145B1 true KR100743145B1 (en) | 2007-07-27 |
Family
ID=38499657
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020070006029A KR100743145B1 (en) | 2007-01-19 | 2007-01-19 | Electromagnetic waves shielding room and construction method |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100743145B1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109526195A (en) * | 2018-12-29 | 2019-03-26 | 北京邦维高科特种纺织品有限责任公司 | A kind of airtight electromagnetic shield |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH08107287A (en) * | 1994-10-06 | 1996-04-23 | Nakao Kinzoku Kk | Electromagnetic shield room |
JPH09162585A (en) * | 1995-12-05 | 1997-06-20 | Kanazawa Kogyo Univ | Magnetic shielding room and its assembling method |
JPH09289393A (en) * | 1996-04-23 | 1997-11-04 | Hisashi Kato | Magnetic shield room and assembling method therefor |
KR20190000910U (en) * | 2019-04-04 | 2019-04-16 | 주식회사 알씨엔이 | parallel link type robot |
-
2007
- 2007-01-19 KR KR1020070006029A patent/KR100743145B1/en active IP Right Grant
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH08107287A (en) * | 1994-10-06 | 1996-04-23 | Nakao Kinzoku Kk | Electromagnetic shield room |
JPH09162585A (en) * | 1995-12-05 | 1997-06-20 | Kanazawa Kogyo Univ | Magnetic shielding room and its assembling method |
JPH09289393A (en) * | 1996-04-23 | 1997-11-04 | Hisashi Kato | Magnetic shield room and assembling method therefor |
KR20190000910U (en) * | 2019-04-04 | 2019-04-16 | 주식회사 알씨엔이 | parallel link type robot |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109526195A (en) * | 2018-12-29 | 2019-03-26 | 北京邦维高科特种纺织品有限责任公司 | A kind of airtight electromagnetic shield |
CN109526195B (en) * | 2018-12-29 | 2023-11-07 | 北京邦维高科特种纺织品有限责任公司 | Airtight electromagnetic shielding body |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Minoshima et al. | Metabolic reduction in the posterior cingulate cortex in very early Alzheimer's disease | |
Leys et al. | Periventricular and white matter magnetic resonance imaging hyperintensities do not differ between Alzheimer's disease and normal aging | |
Nestor et al. | Limbic hypometabolism in Alzheimer's disease and mild cognitive impairment | |
Huff et al. | Risk of dementia in relatives of patients with Alzheimer's disease | |
Bahri et al. | Measuring brain synaptic vesicle protein 2A with positron emission tomography and [18F] UCB‐H | |
KR102215119B1 (en) | Method, program and computing device for predicting alzheimer's disease by quantifying brain features | |
Julkunen et al. | Differences in cortical thickness in healthy controls, subjects with mild cognitive impairment, and Alzheimer's disease patients: a longitudinal study | |
House et al. | Magnetic resonance imaging in acoustic neuroma diagnosis | |
Duara et al. | Sensitivity and specificity of positron emission tomography and magnetic resonance imaging studies in Alzheimer’s disease and multi-infarct dementia | |
KR102414974B1 (en) | Apparatus for diagnosis alzheimer's disease using PET-CT image and method for operationg the same | |
Woods et al. | Visual stimulation increases technetium-99m-HMPAO distribution in human visual cortex | |
Nakano et al. | Relationship between delusions and regional cerebral blood flow in Alzheimer’s disease | |
Choo et al. | Topographic patterns of brain functional impairment progression according to clinical severity staging in 116 Alzheimer disease patients: FDG-PET study | |
Dille et al. | Development and validation of a cisplatin dose-ototoxicity model | |
CN108198630A (en) | A kind of airport Disease Warning Mechanism and preventing control method | |
KR100743145B1 (en) | Electromagnetic waves shielding room and construction method | |
Kharabian Masouleh et al. | Functional connectivity alterations in patients with chronic hepatitis C virus infection: a multimodal MRI study | |
Schäfer et al. | Predicting brain atrophy from tau pathology: a summary of clinical findings and their translation into personalized models | |
Jang et al. | The impact of amyloid-β or tau on cognitive change in the presence of severe cerebrovascular disease | |
Tousseyn et al. | A reliable and time‐saving semiautomatic spike‐template–based analysis of interictal EEG–f MRI | |
Terada et al. | Mitochondrial complex I abnormalities underlie neurodegeneration and cognitive decline in Alzheimer’s disease | |
Kudr et al. | Ictal SPECT is useful in localizing the epileptogenic zone in infants with cortical dysplasia | |
Wahlund et al. | Inheritance of the ApoE ε4 allele increases the rate of brain atrophy in dementia patients | |
Zubal et al. | Influence of technetium-99m-hexamethylpropylene amine oxime injection time on single-photon emission tomography perfusion changes in epilepsy | |
Korf et al. | Blood pressure, white matter lesions and medial temporal lobe atrophy: closing the gap between vascular pathology and Alzheimer’s disease? |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
A302 | Request for accelerated examination | ||
E902 | Notification of reason for refusal | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20130531 Year of fee payment: 7 |
|
FPAY | Annual fee payment |
Payment date: 20140530 Year of fee payment: 8 |
|
FPAY | Annual fee payment |
Payment date: 20150720 Year of fee payment: 9 |
|
FPAY | Annual fee payment |
Payment date: 20160720 Year of fee payment: 10 |
|
FPAY | Annual fee payment |
Payment date: 20170720 Year of fee payment: 11 |
|
FPAY | Annual fee payment |
Payment date: 20180726 Year of fee payment: 12 |