KR100729620B1 - Apparatus and method for controlling the power consumption of an electrical load - Google Patents
Apparatus and method for controlling the power consumption of an electrical load Download PDFInfo
- Publication number
- KR100729620B1 KR100729620B1 KR1020040030896A KR20040030896A KR100729620B1 KR 100729620 B1 KR100729620 B1 KR 100729620B1 KR 1020040030896 A KR1020040030896 A KR 1020040030896A KR 20040030896 A KR20040030896 A KR 20040030896A KR 100729620 B1 KR100729620 B1 KR 100729620B1
- Authority
- KR
- South Korea
- Prior art keywords
- power
- control
- load
- information
- target
- Prior art date
Links
Images
Classifications
-
- C—CHEMISTRY; METALLURGY
- C01—INORGANIC CHEMISTRY
- C01B—NON-METALLIC ELEMENTS; COMPOUNDS THEREOF; METALLOIDS OR COMPOUNDS THEREOF NOT COVERED BY SUBCLASS C01C
- C01B13/00—Oxygen; Ozone; Oxides or hydroxides in general
- C01B13/02—Preparation of oxygen
- C01B13/0229—Purification or separation processes
- C01B13/0248—Physical processing only
- C01B13/0259—Physical processing only by adsorption on solids
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B01—PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
- B01D—SEPARATION
- B01D53/00—Separation of gases or vapours; Recovering vapours of volatile solvents from gases; Chemical or biological purification of waste gases, e.g. engine exhaust gases, smoke, fumes, flue gases, aerosols
- B01D53/02—Separation of gases or vapours; Recovering vapours of volatile solvents from gases; Chemical or biological purification of waste gases, e.g. engine exhaust gases, smoke, fumes, flue gases, aerosols by adsorption, e.g. preparative gas chromatography
- B01D53/04—Separation of gases or vapours; Recovering vapours of volatile solvents from gases; Chemical or biological purification of waste gases, e.g. engine exhaust gases, smoke, fumes, flue gases, aerosols by adsorption, e.g. preparative gas chromatography with stationary adsorbents
- B01D53/047—Pressure swing adsorption
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B01—PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
- B01D—SEPARATION
- B01D2201/00—Details relating to filtering apparatus
- B01D2201/20—Pressure-related systems for filters
- B01D2201/204—Systems for applying vacuum to filters
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B01—PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
- B01D—SEPARATION
- B01D2256/00—Main component in the product gas stream after treatment
- B01D2256/12—Oxygen
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B01—PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
- B01D—SEPARATION
- B01D2257/00—Components to be removed
- B01D2257/10—Single element gases other than halogens
- B01D2257/102—Nitrogen
-
- C—CHEMISTRY; METALLURGY
- C01—INORGANIC CHEMISTRY
- C01B—NON-METALLIC ELEMENTS; COMPOUNDS THEREOF; METALLOIDS OR COMPOUNDS THEREOF NOT COVERED BY SUBCLASS C01C
- C01B2210/00—Purification or separation of specific gases
- C01B2210/0043—Impurity removed
- C01B2210/0046—Nitrogen
Landscapes
- Chemical & Material Sciences (AREA)
- Analytical Chemistry (AREA)
- Organic Chemistry (AREA)
- Inorganic Chemistry (AREA)
- Engineering & Computer Science (AREA)
- General Chemical & Material Sciences (AREA)
- Oil, Petroleum & Natural Gas (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Supply And Distribution Of Alternating Current (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Abstract
본 발명은 수용가의 부하를 제어하는 부하 전력 제어 장치 또는 방법에 관한 것으로, 보다 상세하게는 수용가에서 사용하고 있는 부하 중 전력의 사용량이 많은 제어 대상 부하를 미리 선정하고, 상기 수용가의 전력 사용이 어느 한도를 넘어가면 상기 제어 대상 부하의 전력 사용을 제어함으로써 수용가의 전체 전력량을 제어하는 장치 또는 방법에 관한 것이다.The present invention relates to a load power control device or method for controlling a load of a consumer, and more particularly, to select a control target load with a large amount of power among the loads used by the customer, When the limit is exceeded, the present invention relates to an apparatus or method for controlling the total amount of power of a customer by controlling the power use of the load to be controlled.
본 발명에 의한 부하 전력 제어 장치는, 전력량계로부터 수용가에 대한 전력 정보를 수신하는 전력 정보 수신부; 상기 전력 정보에 기초하여 상기 제어 대상 부하에 대한 전력을 제어하기 위한 부하 제어 전력 정보를 생성하는 전력 제어 연산부; 및 상기 부하 제어 전력 정보를 상기 제어 대상 부하로 전송하기 위한 인터페이스부를 포함하는 것을 특징으로 한다.Load control device according to the present invention, the power information receiving unit for receiving power information about the customer from the electricity meter; A power control calculator configured to generate load control power information for controlling power of the control target load based on the power information; And an interface unit for transmitting the load control power information to the control target load.
본 발명에 따르면, 제어 대상 부하의 제어 응답 시간을 고려하여 실시간으로 예측 전력을 계산하고 보다 정교하게 전력 제어 명령을 생성할 수 있는 효과를 얻을 수 있다.According to the present invention, it is possible to obtain an effect of calculating the predicted power in real time and generating a power control command more precisely in consideration of the control response time of the control target load.
부하 제어 전력 정보, 전력 정보, 목표 전력, 예측 전력, 부하전력제어장치Load control power information, power information, target power, predicted power, load power control device
Description
도 1은 종래 기술에 따른 최대 수요 전력 제어 시스템의 네트워크 구성도를 도시한 도면이다.1 is a diagram illustrating a network configuration of a maximum demand power control system according to the prior art.
도 2는 본 발명에 따른 부하 전력 제어 장치의 네트워크 구성을 나타내는 도면이다. 2 is a diagram illustrating a network configuration of a load power control device according to the present invention.
도 3은 본 발명에 부하 전력 제어 장치(200)의 내부 구성을 도시한 블록도이다.3 is a block diagram showing the internal configuration of the load
도 4는 전력 제어 연산부(302)에서 부하 제어 전력 정보를 생성하는 방법의 일례를 도시한 도면이다.4 is a diagram illustrating an example of a method of generating load control power information by the
도 5는 전력 제어 연산부로부터 경보 출력부로 전달된 경보 정보에 대한 해당 경보를 발령하는 블록도이다.5 is a block diagram for issuing a corresponding alarm for the alarm information transferred from the power control operation unit to the alarm output unit.
도 6a는 본 발명에 따른 부하 전력 제어 방법을 도시한 흐름도이다. 6A is a flowchart illustrating a load power control method according to the present invention.
도 6b은 상기 부하 전력 제어 장치가 부하를 제어하는 동작 원리를 나타내는 흐름도이다.6B is a flowchart illustrating an operating principle in which the load power control device controls a load.
도 7은 본 발명의 구성에 따른 상기 프로토콜 변환기의 구성을 나타내는 블록도이다.7 is a block diagram showing a configuration of the protocol converter according to the configuration of the present invention.
도 8은 본 발명의 바람직한 일실시예에 따른 부하 전력 제어 장치에서, 제어 대상 부하로 에어컨을 예로한 도면이다.8 is a diagram illustrating an example of an air conditioner as a load to be controlled in a load power control apparatus according to an embodiment of the present invention.
도 9는 본 발명의 바람직한 일실시예로서, 원격 단말 장치와 부하 전력 제어 장치의 통신의 절차를 나타낸 흐름도이다.9 is a flowchart illustrating a communication procedure between a remote terminal device and a load power control device according to an embodiment of the present invention.
도 10은 본 발명에 따른 부하 전력 제어 장치를 구성하는 데 채용될 수 있는 범용 컴퓨터 시스템의 내부 블록도이다. 10 is an internal block diagram of a general purpose computer system that may be employed to construct a load power control device in accordance with the present invention.
<도면의 주요 부분에 대한 부호의 설명><Explanation of symbols for the main parts of the drawings>
200: 부하 전력 제어 장치200: load power control device
210: 전력량계210: power meter
220: 제어 대상 부하220: control target load
230: 프로토콜 변환기 230: protocol converter
240: 네트워크240: network
본 발명은 수용가의 부하를 제어하는 부하 전력 제어 장치 또는 방법에 관한 것으로, 보다 상세하게는 수용가에서 사용하고 있는 부하 중 전력의 사용량이 많은 제어 대상 부하를 미리 선정하고, 상기 수용가의 전력 사용이 어느 한도를 넘어가면 상기 제어 대상 부하의 전력 사용을 제어함으로써 수용가의 전체 전력량을 제어하는 장치 또는 방법에 관한 것이다.The present invention relates to a load power control device or method for controlling a load of a consumer, and more particularly, to select a control target load with a large amount of power among the loads used by the customer, When the limit is exceeded, the present invention relates to an apparatus or method for controlling the total amount of power of a customer by controlling the power use of the load to be controlled.
오늘날 산업의 발전과 생활 수준의 향상에 따라 전력 사용량이 급격히 증가하는 추세이다. 늘어나는 전력 사용량을 무리 없이 지원하기 위해서는, 전력 사용량 증가에 상응하여 발전 용량 또한 증가 하여야 하는데 발전 및 송전설비 확충에 막대한 예산과 시간 소요로 인하여 현재 전력 공급 예비율이 그 한계점에 다다른 실정이다. 특히, 하절기의 경우 냉방 부하가 일시적으로 최고치를 보임에 따라 하절기 전력계통의 첨두 부하가 지속적으로 상승하고 있어 안정적인 전력 공급에 있어 큰 장해 요인으로 지적되고 있다. 정부에서는 하절기 피크전력 억제 및 예비 전력확보 등의 안정적인 전력 수급을 위해 여러 시책을 시행하여야 한다. Today, power consumption is increasing rapidly as the industry develops and the standard of living improves. In order to support the increased power consumption without difficulty, power generation capacity should also increase in accordance with the increase in power consumption. Due to the huge budget and time required for expansion of power generation and transmission facilities, the current power supply reserve rate has reached its limit. In particular, the peak load in the summer power system is steadily rising as the cooling load temporarily peaks in summer, which is pointed out as a major obstacle to stable power supply. The government should implement various measures to ensure stable power supply, such as suppressing peak power in summer and securing reserve power.
또한, 전력 요금 산출 방법의 일례로서, 검침 당월을 포함한 직전 12개월 중 소정의 월(예를 들어, 7월, 8월, 9월) 및 검침 당월 중의 전력 사용량의 피크치가 사용되고 있다. 또달리, 계약 종별에 따라 계절별 및 시간대별로 피크치를 구분하여 요금을 계산할 수도 있다. 결국, 피크치를 사용하는 전력 요금 체계하에서는, 전력 사용량이 한 번이라도 피크치를 초과하여 측정되었을 경우 수용가 측에서는 전력 요금이 급격히 상승하게 되는 불이익을 받게 된다.In addition, as an example of the electric power bill calculation method, the peak value of the electric power consumption in predetermined month (for example, July, August, September) and the month of meter reading among 12 months immediately before including the month of meter reading is used. Alternatively, rates can be calculated by dividing peaks by season and by time of contract. As a result, under the electric power rate system using the peak value, when the power consumption is measured more than the peak value even once, the customer side receives a disadvantage that the electric power rate is rapidly increased.
따라서, 피크 전력을 효율적으로 제어하여 전력 공급의 안정성을 확보하고 전력 요금을 절약할 필요가 있다. 이에, 피크 전력을 적정 범위 내에서 제어하기 위한 여러 가지 방법 및 시스템들이 제안되고 있다.Therefore, it is necessary to efficiently control the peak power to ensure the stability of the power supply and to save the power bill. Accordingly, various methods and systems for controlling peak power within an appropriate range have been proposed.
피크 전력 제어 시스템의 일례로서, 최대 수요 전력 제어기가 널리 사용되고 있다. 도 1은 오늘날 널리 쓰이는 최대 수요 전력 제어기의 네트워크 구성도를 도시한 것이다. 최대 수요 전력 제어기는 계절별 및 시간대별로 목표 전력을 각각 다르게 설정하고 실시간으로 사용 전력 및 수요 시한을 측정하여 수요 시한 종료시까지의 사용 전력이 설정된 목표 전력 이내로 유지될 수 있도록 부하를 제어하게 된다. 예를 들어, 냉방기 부하 사용이 증가하는 여름철의 경우 전기 사용량의 증가를 감시하여 예측 전력이 목표 전력을 초과할 경우가 발생하면 수용가의 부하를 자동으로 차단하여 수요 전력 사용량을 줄이는 대신에, 수요 전력 사용량이 감소하여 예측 전력이 목표 전력보다 작아지거나 수요 시한이 종료하면 부하를 다시 투입하게 된다.As an example of a peak power control system, the peak demand power controller is widely used. Figure 1 shows a network diagram of the maximum demand power controller widely used today. The maximum demand power controller sets the target power differently according to seasons and time zones, and measures the power used and the demand time limit in real time to control the load so that the power used until the demand time limit is maintained within the set target power. For example, in summer, when the use of air conditioner loads increases, the increase in power consumption is monitored so that when the predicted power exceeds the target power, the load of the customer is automatically cut off to reduce the demand power. When the usage decreases and the predicted power is lower than the target power or the demand time limit ends, the load is re-input.
그러나, 종래의 최대 수요 전력 제어기는 제어 명령에 대한 응답 시간이 느려 신속한 부하 제어가 힘들다는 단점이 있다. 따라서, 특정 시점에서의 예측 전력을 계산하여 제어 명령을 내리더라도 이러한 제어 명령이 실제 부하 차단에 소요되기까지 적지 않은 시간이 소요되고, 그 시간 동안에 사용 전력이 실시간으로 계속 변동하는 경우 그 변동치를 예측 전력에 즉시 반영하기 힘들었고 따라서 목표 전력에 대한 제어 동작이 효과적으로 이루어지지 못하는 문제점을 내포하고 있다.However, the conventional maximum demand power controller has a disadvantage in that it is difficult to quickly control the load due to a slow response time for the control command. Therefore, even if a control command is calculated by calculating the predicted power at a specific point in time, it takes a considerable amount of time before the control command is required to cut off the actual load. It was difficult to immediately reflect on the power, and thus the problem is that the control operation on the target power is not effectively performed.
이에, 전력 제어 명령에 대한 응답 시간을 고려하여 보다 정교하게 예측 전력을 계산하고 이에 따른 전력 제어 명령을 실시간으로 생성할 수 있는 새로운 부하 전력 제어 장치 및 방법이 요구되고 있다.Accordingly, there is a need for a new load power control apparatus and method capable of more precisely calculating the predicted power in consideration of the response time to the power control command and generating the power control command in real time.
본 발명은 상기와 같은 종래 기술을 개선하기 위해 안출된 것으로서, 전력 사용량이 많은 제어 대상 부하의 피크 전력을 효과적으로 제어하는 것을 목적으로 한다. SUMMARY OF THE INVENTION The present invention has been made to improve the prior art as described above, and an object thereof is to effectively control peak power of a load to be controlled to which power consumption is high.
본 발명의 다른 목적은 제어 대상 부하의 제어 응답 시간을 고려하여 실시간으로 예측 전력을 계산하고 보다 정교한 전력 제어 명령을 생성하는 것을 목적으로 한다.Another object of the present invention is to calculate the predicted power in real time and generate a more sophisticated power control command in consideration of the control response time of the control target load.
본 발명의 또 다른 목적은 복수의 전력 사용 장치를 포함하는 제어 대상 부하를 제어함에 있어, 각 전력 사용 장치별로 제어 명령을 생성할 수 있도록 하는 것이다.Still another object of the present invention is to control a load to be controlled including a plurality of power using devices, so that it is possible to generate a control command for each power using device.
상기의 목적을 이루고 종래기술의 문제점을 해결하기 위하여, 본 발명의 일면에 따르면, 제어 대상 부하가 설치된 수용가에서 소비되는 전력을 소정의 목표 전력 이하로 제어하기 위하여, 전력량계로부터 수용가에 대한 전력 정보를 수신하는 전력 정보 수신부; 상기 전력 정보에 기초하여 상기 제어 대상 부하에 대한 전력을 제어하기 위한 부하 제어 전력 정보를 생성하는 전력 제어 연산부; 및 상기 부하 제어 전력 정보를 상기 제어 대상 부하로 전송하기 위한 인터페이스부를 포함하는 부하 전력 제어 장치가 제공된다.In order to achieve the above object and solve the problems of the prior art, according to an aspect of the present invention, in order to control the power consumed in the customer installed the control target load is below a predetermined target power, power information about the customer from the electricity meter Receiving power information receiving unit; A power control calculator configured to generate load control power information for controlling power of the control target load based on the power information; And an interface unit for transmitting the load control power information to the control target load.
본 발명의 다른 일면에 따르면, 제어 대상 부하가 설치된 수용가에서 소비되는 전력을 소정의 목표 전력 이하로 제어하기 위하여, 전력량계로부터 수용가에 대한 전력 정보를 수신하는 단계, 상기 전력 정보에 기초하여 상기 제어 대상 부하에 대한 전력을 제어하기 위한 부하 제어 전력 정보를 생성하는 단계, 및 상기 부하 제어 전력 정보를 상기 제어 대상 부하로 전송하는 단계를 포함하는 것을 특징으로 하는 부하 전력 제어 방법이 제공된다.According to another aspect of the present invention, in order to control the power consumed by the customer to be installed under the control target load to a predetermined target power or less, receiving power information about the customer from the electricity meter, the control target based on the power information A load power control method is provided, comprising generating load control power information for controlling power of a load, and transmitting the load control power information to the control target load.
이하, 첨부된 도면들을 참조하여 본 발명에 따른 부하 전력 제어 장치 및 방법에 대하여 상세히 설명한다.Hereinafter, an apparatus and method for controlling a load power according to the present invention will be described in detail with reference to the accompanying drawings.
도 2는 본 발명에 따른 부하 전력 제어 장치의 네트워크 구성을 나타내는 도면이다. 도 2에서 보는 바와 같이, 부하 전력 제어 장치(200)는 전력량계(210)와 제어 대상 부하(220) 사이에 위치하여, 전력량계로부터 수신되는 전력 정보에 기초하여 부하 제어 전력 정보를 생성하고 이를 제어 대상 부하에 전송함으로써 전력 제어가 가능하도록 한다.2 is a diagram illustrating a network configuration of a load power control device according to the present invention. As shown in FIG. 2, the load
부하 전력 제어 장치(200)는 수용가 내에 위치하거나 또는 수용가와 떨어져서 인터넷 등의 통신망을 통하여 제어 대상 부하(220)와 접속할 수 있다. 통신망을 이용할 경우, 프로토콜 변환기(230)를 통하여 부하 제어 전력 정보가 제어 대상 부하(220)에 전송될 수 있다.The load
전력량계(210)는 수용가에서 사용되는 전력량(제어 대상 부하에서 소비되는 전력 포함)을 측정하기 위한 장치로서, 각 수용가 내에 설치되거나 또는 전력 공급 회사에 설치되어 통신망을 통하여 수용가의 전력량 정보를 수집할 수도 있다.The
수용가는 제어 대상 부하 이외에도 다수의 부하를 포함하고 있으며, 따라서 제어 대상 부하(220)는 본 발명에 따른 부하 전력 제어 장치를 운용하는 사용자에 의해서 자유로이 선정될 수 있다. 일례로서 수용가의 부하 중 전력 사용량이 평균적으로 가장 많은 부하를 선정하거나 또는 피크 전력 사용에 가장 큰 요인이 되는 부하로서 전력 사용의 변동량이 큰 부하가 선정될 수도 있다. The customer includes a plurality of loads in addition to the load to be controlled, and therefore, the load to be controlled 220 may be freely selected by a user who operates the load power control device according to the present invention. For example, the load of the consumer may be selected to have the largest amount of power usage on average, or a load having a large amount of fluctuation in power usage may be selected as the load that is the biggest factor in peak power use.
도 3은 본 발명에 부하 전력 제어 장치(200)의 내부 구성을 도시한 블록도이 다. 도 3에서 보는 바와 같이, 부하 전력 제어 장치(200)는 전력 제어 연산부(302), 전력 정보 수신부(301), 인터페이스부(303), 경보 출력부(304)를 포함한다. 이하, 각 구성 요소별로 그 기능을 상세히 설명하기로 한다.3 is a block diagram showing the internal configuration of the load
전력 정보 수신부(301)는 전력량계로부터 수용가에 대한 전력 정보를 수신하게 된다. "전력 정보"라 함은 수용가에서 사용되는 전력량에 대한 정보로서, 제어 대상 부하뿐만 아니라 수용가 내에 위치한 모든 부하에서 사용되는 전력량에 대한 정보를 의미한다. 이러한 전력 정보는 전력 공급 회사에서 각 수용가의 전력 사용에 대한 정보를 측정 또는 수집하기 위하여 설치한 전력량계를 통하여 얻을 수 있다. 본 발명에서는 전력 정보를 얻기 위한 장치로서 전력량계를 예시하고 있지만, 전력량계 이외에도 전력 정보를 제공할 수 있는 다른 형태의 전력 측정 장치가 사용될 수 있음은 본 발명이 속하는 기술 분야의 당업자에게는 자명하다.The
전력 정보 수신부(301)로 입력되는 전력 정보의 일례로서, WP 신호 및 EOI 신호를 이용할 수 있다. WP 신호는 전력량계의 PCT 비율(합성변수비)에 대하여 누적된 전력의 적산펄스 형태의 유효전력량을 나타내는 것으로, 일반적으로 전력량계는 전력량을 펄스 형태의 WP 신호로 출력한다. EOI신호는 상기 전력 제어 연산부(302)에서의 산출 값 계산시 주기적으로 측정되는 수요 시한의 초기화 신호이다.As an example of power information input to the
전력 정보 수신부(301)로 입력된 상기 전력 정보에 기초하여, 전력 제어 연산부(302)는 제어 대상 부하에 대한 전력을 제어하기 위한 부하 제어 전력 정보를 생성하게 된다. 부하 제어 전력 정보의 생성 방법에 대해서는 도 4를 참고하여 후술하기로 한다.Based on the power information input to the
인터페이스부(303)는 전력 제어 연산부(302)에서 생성된 부하 제어 전력 정보를 제어 대상 부하로 전송하게 된다. 제어 대상 부하가 통신망을 통하여 부하 전력 제어 장치와 연결되어 있는 경우, 인터페이스부(303)는 상기 통신망과의 접속을 위한 인터페이스 수단을 포함할 수 있다. 또달리, 제어 대상 부하와 서로 다른 통신망을 통하여 접속하는 경우, 이종 통신망간의 프로토콜 변환을 위하여 상기 인터페이스부(303) 이외에 프로토콜 변환부가 추가될 수 있다.The
본 발명에 따른 또다른 실시예로서, 부하 전력 제어 장치는 경보 출력부(304)를 더 포함할 수 있다. 경보 출력부(304)는 전력 제어 연산부(302)에서 생성된 제어 전력에 기초하여 여러 가지 형태의 경보를 발생시킬 수 있다.As another embodiment according to the present invention, the load power control device may further include an
도 4는 전력 제어 연산부(302)에서 부하 제어 전력 정보를 생성하는 방법의 일례를 도시한 도면이다. 이하, 부하 제어 전력 정보를 생성하는 일련의 과정들을 순서대로 설명하기로 한다.4 is a diagram illustrating an example of a method of generating load control power information by the
본 발명에 따른 부하 전력 제어 장치에서는 먼저 수용가에서 소비되는 전력에 대한 목표 전력(R) 설정을 필요로 한다. "목표 전력"이라 함은 수용가의 수요 전력을 전력 소비 상태와 제어 가능 부하의 용량에 따라 제어하고자 하는 제어 전력의 목표량을 의미한다. 목표 전력 설정은 전력 수용 형태를 고려하여, 평일(workday)과 공휴일(holiday)로 구분하거나, 또는 계절별로 최소 부하 시간대(MIN Time Zone), 중간 부하 시간대(MID Time Zone), 최대 부하 시간대(MAX Time Zone)로 구분하여 다양하게 설정될 수 있다.The load power control apparatus according to the present invention first needs to set a target power (R) for the power consumed by the consumer. "Target power" means the target amount of control power to control the demand power of the customer according to the power consumption state and the capacity of the controllable load. The target power setting can be divided into workday and holiday, considering the power acceptance type, or the minimum load time zone (MIN Time Zone), mid-load time zone (MID Time Zone), and maximum load time zone (MAX) by season. Time Zone) can be set in various ways.
상기한 목표 전력(R)이 설정되면, 소정의 수요 시한에 대하여 소비 전력이 목표 전력 이하로 지속적으로 유지되도록 전력 제어가 수행된다. "수요 시한"은 또달리 평균 전력을 구하기 위해 정해진 시간의 길이로 본 발명에 따른 부하 전력 제어 장치가 사용 전력을 연산하고 부하를 제어하는데 기본이 되는 시간이다. 수요 시간의 일례로서, 종래 최대 수요 전력 제어기에서 사용되는 5분, 15분, 30분의 시간 값들이 사용될 수 있다.When the target power R is set, power control is performed such that power consumption is continuously maintained below the target power for a predetermined demand time limit. The "demand time limit" is again the time when the load power control device according to the present invention calculates the used power and controls the load with a predetermined length of time to find the average power. As an example of the demand time, time values of 5 minutes, 15 minutes, and 30 minutes used in the conventional maximum demand power controller may be used.
다음으로, 현재 수용가에서 소비되는 현재 전력(Pt)이 계산된다. 현재 전력 계산을 위하여 앞서 설명한 바와 같이 전력량계로부터 수신된 전력 정보로서, WP 신호값이 이용될 수 있다. 식 (1)은 현재 전력을 계산하기 수식의 일례이다.Next, the current power Pt consumed at the current consumer is calculated. As the power information received from the electricity meter as described above for the current power calculation, the WP signal value may be used. Equation (1) is an example of a formula for calculating the current power.
현재 전력(Pt)=(합성변수비/펄스정수)*적산펄스수*(60/수요 시한) ...식 (1)Current power (Pt) = (synthesis variable ratio / pulse constant) * integrated pulse number * (60 / demand time) ... Equation (1)
식 (1)에서 보는 바와 같이, 전력량계(210)에 결선된 PCT비율(합성변수비), 전력량계(210)의 적산펄스수, 수용가의 부하에서 사용한 전력 정보에 대한 kWh당 펄스 수(pulse/kWh)로서 일반적으로 전력량계 전면에 표시되어 있는 펄스정수를 이용하여 현재 전력(Pt)을 구한다. 이와 같이, 계산된 현재 전력(Pt)은 수용가 내의 모든 부하에서 소비되는 전력이다.As shown in Equation (1), the number of pulses per kWh (pulse / kWh) for the PCT ratio (synthesis variable ratio) connected to the
상기 (1)에 의하여 산출된 현재 전력(Pt)에 기초하여, 일정 주기의 수요 시한(T) 종료시의 제1 예측 전력(Q1)을 산출한다. 제1 예측 전력(Q1)의 산출은 단위 시간(t1)동안 변화한 현재 전력의 전력량에 기초하며, 다음의 식 (2)와 같이 계산될 수 있다.Based on the current power Pt calculated by said (1), the 1st estimated power Q1 at the time of completion | finish of the demand time limit T of a fixed period is computed. The calculation of the first prediction power Q1 is based on the amount of power of the current power changed during the unit time t1 and may be calculated as in Equation 2 below.
제1 예측 전력(Q1) =First predicted power Q1 =
현재 전력(Pt) * (단위 시간당 전력 변화량/단위 시간) * 남은 수요 시한(T') Current power (Pt) * (power change per unit time / unit time) * remaining demand time limit (T ')
...식 (2)... Equation (2)
식 (2)에 의하여 산출된 제1 예측 전력(Q1)이 목표 전력(R)을 초과하는 경우, 이는 곧 현재의 전력 소비 추세라면 수요 시한 종료 후의 소비 전력이 목표 전력을 초과하는 것으로 예측됨을 의미한다. 따라서, 소비 전력이 목표 전력 이하로 유지될 수 있도록 전력 제어가 필요하며, 이때 제어되어야 할 전력량으로서 제1 제어 전력을 제1 예측 전력(Q1)과 목표 전력(R)의 차로 정의할 수 있다.If the first predicted power Q1 calculated by Equation (2) exceeds the target power R, this means that the current power consumption trend is expected to exceed the target power after the end of the demand time limit, if the current power consumption trend. do. Therefore, power control is required to maintain the power consumption below the target power. In this case, the first control power may be defined as a difference between the first prediction power Q1 and the target power R as the amount of power to be controlled.
종래의 최대 수요 전력 제어기는 특정 시점에서의 예측 전력을 계산하여 제어 명령을 내리더라도 이러한 제어 명령이 실제 부하 차단에 소요되기까지 적지 않은 응답 시간이 소요되고, 그 시간 동안에 사용 전력이 실시간으로 계속 변동하는 경우 그 변동치가 예측 전력 계산에 다시 반영(feedback)되기가 힘들다는 문제점이 있었다.The conventional maximum demand power controller calculates the predicted power at a specific point in time and gives a control command, but it takes a lot of response time until the control command is required to cut the actual load, and the power used continuously fluctuates in real time. In this case, there is a problem that the change is difficult to be fed back to the prediction power calculation.
그러나, 본 발명에 따르면, 제어 전력을 계산함에 있어 앞서 제1 제어 전력의 산출 방법 이외에도 추가적으로 제어 응답 시간을 고려하여 제2 제어 전력을 산출하는 방법을 제시한다. 이하에서는, 제2 제어 전력의 산출 방법을 순서대로 설명하기로 한다.However, according to the present invention, in addition to the method for calculating the first control power, the method for calculating the second control power in consideration of the control response time is further provided. Hereinafter, the method of calculating the second control power will be described in order.
먼저, 수용가의 목표 전력(R)과 제1 예측 전력(Q1)의 산출 시점으로부터 수요 시한(T)에 대한 종료시점까지의 남은 수요 시한(T')으로부터 기준 전력(Pr)을 산출한다. 기준 전력(Pr)은 수요 시한(T)에 대한 목표 전력의 가상의 선형 증가량으로서First, the reference power Pr is calculated from the remaining demand time limit T 'from the time of calculating the target power R and the first predicted power Q1 of the customer to the end time of the demand time T. The reference power Pr is a hypothetical linear increase in the target power with respect to the demand time limit T.
수요 시한(T) : 목표 전력(R) = Demand time limit (T): target power (R) =
경과 시간(= 수요 시한- 남은 수요 시한) : 기준 전력(Pr)Elapsed time (= demand limit-remaining demand limit): reference power (Pr)
의 비율관계가 있으며, 다음의 식 (3)에 의해서 계산될 수 있다.There is a ratio relationship of and can be calculated by the following equation (3).
기준 전력(Pr)=(목표 전력(R)/남은 수요 시한(T')) * 경과 시간 ...식 (3)Reference Power (Pr) = (Target Power (R) / Remaining Demand Time Limit (T ')) * Elapsed Time ... Equation (3)
제1 제어 전력을 산출한 시점으로부터 소정의 단위 제어 시간(t3) 경과 후의 제2 예측 전력(Q2)을 산출한다. 그리고, 상기 산출된 제2 예측 전력(Q2)이 기준 전력(Pr)을 초과하는 경우, 이는 곧 단위 제어 시간 경과 후의 예측 전력이 목표 전력과 같은 비율로 증가하는 기준 전력을 초과한 것으로 전력 제어의 필요성을 의미한다. 따라서, 제어되어야 할 또 다른 전력량으로서 제2 제어 전력을 제2 예측 전력(Q2)과 기준 전력(Pr)의 차로 정의한다.The second predicted power Q2 after the predetermined unit control time t3 has elapsed is calculated from the time point at which the first control power is calculated. When the calculated second predicted power Q2 exceeds the reference power Pr, this means that the predicted power after the unit control time elapses exceeds the reference power that increases at the same rate as the target power. It means a need. Therefore, the second control power is defined as the difference between the second predicted power Q2 and the reference power Pr as another amount of power to be controlled.
단위 제어 시간의 일례로서, 제어 대상 부하에 대한 부하 제어 명령에 대한 응답 시간이 단위 제어 시간으로 설정될 수 있다. 응답 시간은 제어 대상 부하에 대한 부하 제어 명령을 현장에서 직접 수행하여 얻은 실험 결과값으로, 사용자에 의하여 적절하게 설정될 수 있다. 이와 같이, 제2 제어 전력은 수요 시한(T)보다 훨씬 짧은 단위 제어 시간마다 지속적으로 산출된다.As an example of the unit control time, the response time for the load control command for the load to be controlled may be set as the unit control time. The response time is an experimental result obtained by directly performing a load control command for a load to be controlled in the field, and may be appropriately set by a user. As such, the second control power is continuously calculated at every unit control time much shorter than the demand time limit T.
마지막으로, 앞서 구한 제1 제어 전력과 제2 제어 전력을 서로 비교하여 부하 제어 전력을 최종적으로 결정한다. 부하 제어 전력의 일례로서, 제1 제어 전력과 제2 제어 전력 중에서 큰 값으로 결정할 수 있다. 큰 값으로 결정할 경우 제어 대상 부하의 응답 시간에 관계없이 최소한 목표 전력 이하로 소비 전력이 유지되는 것을 보다 확실히 보장할 수 있게 된다.Finally, the load control power is finally determined by comparing the first control power and the second control power previously obtained. As an example of the load control power, it is possible to determine a larger value among the first control power and the second control power. Determining a larger value can more reliably ensure that power consumption is maintained at least below the target power, regardless of the response time of the load under control.
부하 제어 전력 설정에 대한 또다른 실시예로서, 제1 제어 전력과 제2 제어 전력을 평균하거나 또는 소정의 가중치를 곱하여 부하 제어 전력을 결정할 수도 있다.As another embodiment of the load control power setting, the load control power may be determined by averaging the first control power and the second control power or multiplying a predetermined weight.
이와 같이, 본 발명에 따르면 제어 대상 부하의 응답 시간을 고려한 제2 제어 전력을 짧은 시간마다 지속적으로 산출하고, 산출된 제2 제어 전력을 수요 시한 전체에 대한 제1 제어 전력과 비교하여 최종 부하 제어 전력을 결정함으로써, 보다 정밀하고 신속한 전력 제어가 가능하게 된다.As described above, according to the present invention, the second control power considering the response time of the control target load is continuously calculated for each short time, and the final load control is performed by comparing the calculated second control power with the first control power for the entire demand time limit. By determining the power, more precise and faster power control is possible.
본 발명에 따르면, 부하 제어 전력 이외에도 조정 전력(U)을 산출하여 제어 대상 부하에 전송할 수 있다. 조정 전력(U)은 남은 수요 시한(T')및 수요 시한(T)를 이용하여, 제어 대상 부하의 제어량 계산을 목적으로 다음의 식(4)와 같이 계산될 수 있다.According to the present invention, in addition to the load control power, the adjusted power U may be calculated and transmitted to the control target load. The adjusted power U can be calculated using the remaining demand time limit T 'and the demand time limit T as shown in the following equation (4) for the purpose of calculating the control amount of the load to be controlled.
조정 전력(U)= (부하 제어 전력/남은 수요 시한) * 수요 시한 ...식 (4)Regulated Power (U) = (Load Control Power / Remaining Demand Limit) * Demand Limit ... Equation (4)
상기 조정 전력(U) 정보는 인터페이스부를 통하여 상기 프로토콜 변환기를 통해 제어 대상 부하로 전송된다.The regulated power U information is transmitted to the control target load through the protocol converter through an interface unit.
본 발명에 따른 부하 전력 제어 장치는 경보 출력부를 더 포함할 수 있으며, 도 5는 경보 출력부(304)의 경보 출력에 관한 일례를 도시한 블록도이다.The load power control apparatus according to the present invention may further include an alarm output unit, and FIG. 5 is a block diagram illustrating an example of an alarm output of the
도 4에서 부하 제어 전력(또는 조정 전력)이 생성되면, 이는 제어 대상 부하의 전력 제어가 필요하다는 것을 의미하는 것으로, 부하 제어 전력 정보가 전력 제어 연산부(302)로부터 인터페이스부(303)를 통하여 제어 대상 부하로 전송됨과 동시에 상기 전력 제어 연산부(302)로부터, 경보 출력부(304)로 경보 정보가 전달 된다. 본 발명에 따른 경보는 부하 제어 상태에 따라 단계적으로 여러 형태의 경보가 발생될 수 있다. 일례로서, 이하에서는 3단계의 경보 형태에 대하여 설명하기로 한다.When the load control power (or regulated power) is generated in FIG. 4, this means that power control of the load to be controlled is required, and the load control power information is controlled from the power
1단 경보는 제1 제어 전력 또는 제2 제어 전력이 산출되어 부하 제어 전력(또는 조정 전력)이 발생하면, 1단 경보의 접점이 닫혀 경보가 발령된다. 다음으로, 2단 경보는 1단 경보에 의해 부하가 하나 이상 차단 되었을 경우 2단 경보의 접점이 닫혀 경보가 발령된다. 마지막으로, 3단 경보는 수용가내의 모든 부하가 차단 되었을 경우 3단 경보의 접점이 닫혀 경보가 발령된다. When the first control power or the second control power is calculated and the load control power (or the adjusted power) is generated, the first stage alarm generates a contact by closing the contact of the first stage alarm and issues an alarm. Next, in case of more than one load cut off by the 1st stage alarm, the alarm of 2nd stage alarm is closed and the alarm is issued. Finally, the three-stage alarm is triggered by closing the contact of the three-stage alarm when all loads in the customer are cut off.
도 6a는 본 발명에 따른 부하 전력 제어 방법을 도시한 흐름도이다. 도 6a의 실시예에 따른 부하 전력 제어 방법은 도 2 내지 도 5에서 상술한 부하 전력 제 어 장치에 의하여 수행된다. 이하, 도 6a를 참고하여, 각 단계별로 수행되는 과정들을 상세히 설명하기로 한다.6A is a flowchart illustrating a load power control method according to the present invention. The load power control method according to the embodiment of FIG. 6A is performed by the load power control apparatus described above with reference to FIGS. 2 to 5. Hereinafter, referring to FIG. 6A, processes performed in each step will be described in detail.
먼저, 단계(S610)에서는 부하 전력 제어 장치가 전력량계로부터 수용가에 대한 전력 정보를 수신하게 된다. 다음으로, 단계(S620)에서는 상기 수신한 전력 정보에 기초하여 상기 제어 대상 부하에 대한 전력을 제어하기 위한 부하 제어 전력 정보를 생성하게 된다. 부하 제어 전력을 생성하기 위하여 제1 제어 전력 및 제2 제어 전력이 산출되며, 이러한 제어 전력들은 전력 정보에 기초하여 소정의 수요 시한 종료시 또는 단위 제어 시간 경과 후의 전력값을 예측한 예측 전력을 이용하여 계산될 수 있다.First, in step S610, the load power control device receives power information about the customer from the electricity meter. Next, in step S620, load control power information for controlling power for the control target load is generated based on the received power information. The first control power and the second control power are calculated to generate the load control power, and the control powers are estimated based on the power information by using the predicted power predicted at the end of a predetermined demand time limit or after a unit control time elapses. Can be calculated.
마지막으로, 단계(S630)에서는 상기 부하 제어 전력 정보를 상기 제어 대상 부하로 전송함으로써 부하 제어가 가능하게 된다.Finally, in step S630, the load control is possible by transmitting the load control power information to the control target load.
예측 전력 및 제어 전력의 산출 방법, 단위 제어 시간의 설정 방법, 부하 제어 전력의 최종 결정 방법 등은 앞서의 부하 전력 제어 장치와 관련한 실시예들에서 설명한 내용들이 그대로 적용될 수 있으므로, 여기서의 상세한 설명은 생략하고 앞서의 실시예들을 참고하기로 한다.The method of calculating the predicted power and the control power, the method of setting the unit control time, and the method of finally determining the load control power may be applied as described above in the embodiments related to the load power control device. Omitting and referring to the above embodiments.
도 6b는 본 발명에 따른 전력 제어 연산부(302)의 흐름을 나타내는 흐름도이다.6B is a flowchart illustrating a flow of the
전력 제어 연산부(302)는 수용가의 부하를 감시하고(S601), 이때 상기 제1 제어 전력 또는 제2 제어 전력이 생성 되면(S602), 부하 제어 전력(또는 조정 전력)의 산출 후(S603), 수용가의 부하 중에서 제어 대상 부하를 제어 하게 된다. 따라서, 수용가의 부하는 목표 전력을 초과 하지 않는 범위의 전력을 사용함으로써, 부하가 안정 된다(S605). 참고적으로, 상기 과정에 의하여 발령된 경보는 부하 전력 제어 장치의 각 산출값 및, 수용가의 전력 정보에는 전혀 영향을 미치지 않는다.The power
도 7은 본 발명의 일례에 따른 상기 프로토콜 변환기의 기능 블록도를 도시한 것이다. 본 발명에 따르면, 부하 전력 제어 장치는 인터넷 등의 통신망을 통하여 제어 대상 부하와 접속할 수 있다. 다만, 부하 전력 제어 장치의 경우 통상적으로 인터넷과 접속되어 TCP/IP 등의 인터넷 프로토콜을 사용하는 반면에, 제어 대상 부하는 근거리 통신 케이블과 접속되어 RS-485 등의 통신 프로토콜을 사용할 수 있다. 따라서, 부하 전력 제어 장치와 제어 대상 부하 사이의 통신망이 이종 통신망으로 서로 결합되어 있는 각각의 통신망에서 서로 다른 프로토콜이 혼재하기에 원활한 부하 제어 전력 정보의 전송을 위해서 프로토콜 변환기의 도입이 필요하다. 도 7은 TCP/IP 프로토콜과 RS-485 프로토콜 사이의 프로토콜 변환 기능을 수행하기 위한 프로토콜 변환기 내에서의 기능 블록도를 도시하고 있다.7 is a functional block diagram of the protocol converter according to an example of the present invention. According to the present invention, the load power control device can be connected to the control target load through a communication network such as the Internet. However, in the case of the load power control apparatus, it is usually connected to the Internet to use an Internet protocol such as TCP / IP, while the load to be controlled can be connected to a short-range communication cable to use a communication protocol such as RS-485. Therefore, a protocol converter is required for smooth transmission of load control power information because different protocols are mixed in each communication network in which the communication network between the load power control device and the control target load is coupled to each other as a heterogeneous communication network. 7 shows a functional block diagram in a protocol converter for performing protocol conversion functions between the TCP / IP protocol and the RS-485 protocol.
도 7에서 보는 바와 같이 TCP/IP 모듈(703)은 이더넷(ETHERNET)을 통해 들어온 정보를 RS-485 시리얼 포트를 통해 제어 대상 부하로 전송하고, 또달리 RS 485 모듈(701)은 시리얼 포트를 통해 들어온 정보를 ETHERNET을 통해 부하 전력 제어 장치로 전송한다. 그러므로, TCP/IP 모듈은 상기 전력 정보 수신부(301), 상기 전력 제어 연산부(302), 상기 인터페이스부(303) 및 상기 경보 출력부(304)를 포함하는 상기 부하 전력 제어 장치(200)의 직렬포트를 통해서 ETHERNET을 기반으로 하는 TCP/IP방식의 프로토콜로 통신을 가능하게 해준다.As shown in FIG. 7, the TCP /
TCP/IP 모듈에는 telnet, http, NetBIOS 모듈이 내장 되어 있기 때문에 상기 부하 전력 제어 장치(200)에 장착되어 있는 직렬 포트와 연결되어 telnet이나 웹브라우져 및 인터넷 관련 어플리케이션으로 장비 제어 또는 모니터링할 수 있는 손쉬운 방법을 제공한다.Since the TCP / IP module has built-in telnet, http, and NetBIOS modules, it is connected to the serial port installed in the load
상기 인터페이스부(303)로부터 상기 프로토콜 변환기(230)로의 부하 제어 전력(또는 조정 전력(U))의 전송은 TCP/IP방식의 통신 프로토콜을 사용하며, 상기 프로토콜 변환기(230)로부터 상기 제어 대상 부하(220)로의 조정 전력(U)의 전송은 RS-485방식의 통신 프로토콜을 사용한다.Transmission of load control power (or regulated power U) from the
TCP/IP방식의 프로토콜은 주로 고속의 근거리 통신망(Lan)에 사용되며 케이블의 길이는 약 2.5km까지 연장될 수 있다. TCP/IP(Transmission Control Protocol/Internet Protocol)는 Wan(Wide Area Network)시스템을 위하여 설계된 산업 표준 프로토콜이다. 이러한 네트워크에 응용 가능한 TCP/IP방식의 프로토콜을 사용하여 상기 부하 전력 제어 장치(105)를 네트워크로 연결되어 있는 원격지에서 도 제어가 가능하다.TCP / IP protocol is mainly used for high speed LAN, and the cable can be extended up to 2.5km. Transmission Control Protocol / Internet Protocol (TCP / IP) is an industry standard protocol designed for wide area network (WAN) systems. Using the TCP / IP protocol applicable to such a network, the load power control device 105 can be controlled at a remote location connected to a network.
또한, RS-485방식의 프로토콜 역시 그 사용이 매우 보편화되어 있다. RS-485방식의 프로토콜은 RS-232방식의 프로토콜에서는 불가능 하였던 멀티드롭 연결이 가능하다. 따라서 공장 또는 기업체, 학교 등의 공공 시설에 있어서 복수의 전력 사용 장치를 포함하는 제어 대상 부하에서도 본 발명에 따른 부하 전력 제어 장치와 접속할 수 있게 된다.In addition, the use of the RS-485 protocol is also very popular. The RS-485 protocol enables multidrop connections that were not possible with the RS-232 protocol. Therefore, the load to be controlled with the load power control device according to the present invention can be connected to a load to be controlled including a plurality of power devices in public facilities such as factories, businesses, schools and the like.
도 8은 수용가의 제어 대상 부하로서 다수의 에어컨 장치가 포함된 경우의 실시예를 도시한 것이다.FIG. 8 illustrates an embodiment in which a plurality of air conditioner devices are included as a load to be controlled by a customer.
에어컨은 하절기에 수용가에서 전력 소비가 가장 많은 전력 사용 장치로서, 도 8에서 보는 바와 같이, 에어컨 장치는 크게 실내기와 실외기로 구성되어 있으며, 하나의 실외기에 여러 대의 실내기가 부착되어 있다. 큰 냉방 용량을 필요로 하는 경우, 여러 개의 실외기를 설치하여 보다 많은 실내기를 제어할 수 있다. 실외기는 컴프레서(compressor)라는 냉매를 압축하는 펌프와 더운 공기를 라지에타에 부딪혀 외부 공기로 식혀주는 팬(fan)으로 이루어지고, 실내기는 컴프레서에서 차게 만든 냉매를 이용하여 증발기에서 실내의 더운 공기를 찬 공기로 바꿔 주는 기능을 수행한다.The air conditioner is a power consumption device that consumes the most power in the summer. The air conditioner is composed of an indoor unit and an outdoor unit, and several indoor units are attached to one outdoor unit. If a large cooling capacity is required, more outdoor units can be controlled by installing several outdoor units. The outdoor unit consists of a pump that compresses the refrigerant, a compressor, and a fan that cools the outside air by hitting the radiator. It performs the function of converting to air.
실외기는 다수의 실내기와 RS-485 통신 프로토콜을 이용하여 제어 신호를 전송할 수 있고, 마찬가지로 다수의 실외기 간에도 RS-485 통신 프로토콜이 사용될 수 있다. 따라서, 도 8에서 보는 바와 같이, 프로토콜 변환기(230)는 TCP/IP 프로토콜과 RS-485 프로토콜 간의 변환 작업을 수행하게 된다.The outdoor unit may transmit control signals using a plurality of indoor units and an RS-485 communication protocol, and likewise, an RS-485 communication protocol may be used between a plurality of outdoor units. Accordingly, as shown in FIG. 8, the
또한, 본 발명에 따르면, 제어 대상 부하를 구성하는 복수의 실내기는 앞서 상술한 부하 전력 제어 장치 및 방법에 의하여 전력 제어가 가능하며, RS-485 프로토콜에 의하여 각각의 실내기에 대하여 부하 전력 제어 장치로부터 부하 제어 전력 정보를 개별적으로 수신하여, 제어될 수 있다.In addition, according to the present invention, a plurality of indoor units constituting the load to be controlled can be controlled power by the above-described load power control apparatus and method, from the load power control device for each indoor unit by the RS-485 protocol The load control power information can be individually received and controlled.
도 8의 실시예에서는 전력 사용 장치로 에어컨을 예시하고 있지만, 에어컨 이외에도 복수의 전력 사용 장치가 RS-485 등의 통신 프로토콜을 통하여 서로 연결 되어 있는 제어 대상 부하에 대해서도, 부하 전력 제어 장치로부터 부하 제어 전력 정보를 개별적으로 전송하여 각각의 전력 사용 장치의 전력을 개별적으로 제어할 수 있음은 본 발명이 속하는 기술 분야의 당업자에게는 자명하다.Although the air conditioner is illustrated as the power usage device in the embodiment of FIG. 8, load control from the load power control device also applies to a load to be controlled in which a plurality of power use devices are connected to each other via a communication protocol such as RS-485 in addition to the air conditioner. It is apparent to those skilled in the art that the power information can be individually transmitted to individually control the power of each power-using device.
또한, 본 발명의 바람직한 실시예로서, 부하 전력 제어 장치는 원격 단말 장치 (801)를 더 포함할 수 있다. 원격 단말 장치(801)는 사용자가 원격에서 제어 대상 부하의 제어에 필요한 부하 제어 명령을 수동으로 내리거나 또는 수용가내의 전력 정보 등의 정보를 관찰할 수 있다. 또한, 원격 단말 장치(801)를 통해 특정 제어 대상 부하의 전력 사용량이 증가하는 계절, 시간, 요일 등의 전력 사용량 정보를 사용자 임의로 설정할 수 있다.In addition, as a preferred embodiment of the present invention, the load power control device may further include a remote terminal device (801). The remote
전력 제어 연산부를 포함한 부하 전력 제어 장치는 인터넷 통신망을 통해서 원격 단말 장치와의 접속도 가능하다. 또한, 무선 인터넷 접속 기능을 갖춘 이동 통신 단말기 또는 PDA기기와 무선 인터넷을 통하여 무선으로 연결하여 부하의 감시 또는 관리 제어가 이루어질 수 있도록 하는 것도 얼마든지 가능하다.The load power control device including the power control operation unit can also be connected to a remote terminal device through an internet communication network. In addition, it is also possible to monitor or manage the load by wirelessly connecting to a mobile communication terminal or PDA device having a wireless Internet access function through the wireless Internet.
도 9는 원격 단말 장치와 부하 전력 제어 장치의 데이터 통신의 일례를 나타내는 흐름도이다.9 is a flowchart illustrating an example of data communication between a remote terminal device and a load power control device.
S924는 원격 단말 장치(801)의 프로세스의 시작을 의미하며, S925는 수용가 측의 부하 전력 제어 장치(200)의 전력 제어 연산부(302)의 시작을 의미한다.S924 denotes the start of the process of the remote
먼저, 원격 단말 장치의 프로세스는 해당 전력 제어 연산부(302)의 IP 및 포트를 지정하고(S910), IP 소켓을 여는 작업을 진행하게 된다(S911).First, the process of the remote terminal device designates the IP and the port of the power control operation unit 302 (S910), and proceeds to open the IP socket (S911).
그 상태에서 상기 원격 단말 장치(801)의 프로세스는 IP소켓이 열렸는지의 여부를 판단하여 소켓이 열렸다고 판단되면(S912), 네트워크(240)와 상기 프로토콜 변환기(230)를 통하여 전력 제어 연산부(302)로 제어 대상 부하의 전력을 제어하는 명령, 또는 기타 정보를 전송 한다(S913).In this state, if the process of the remote
이어서, 전력 제어 연산부(302)에서는 상기 원격 단말 장치(801)로부터 각종 명령을 수신 받고(S914), 상기 수신한 명령에 대한 에러를 체크하게 된다(S915). 상기 에러 체크의 판단 결과, 상기 전력 제어 연산부(302)에서는 상기 원격 단말 장치(801)로부터 수신 받은 명령에 대한 에러 체크가 이루어지면, 부하에 대한 현재 전력, 기준 전력, 목표 전력, 예측 전력 등의 정보와 각 정보와의 연산으로 산출되는 결과값의 처리를 수행하거나, 상기 원격 단말 장치(801)로부터의 상기 제어 대상 부하에 대한 제어 등을 수행하게 되고(S916), 그에 따른 전력 정보 또는 결과 값을 상기 네트워크(206)로 연결된 원격 단말 장치(801)의 전력 관리용 소프트웨어로 전송된다(S917).Subsequently, the power
상기 과정에서, 원격 단말 장치(801)에 전송되는 정보에 대한 에러체크가 이루어졌는가에 대한 여부를 판단하여, 에러체크가 이루어 졌다고 판단되면(S918), 각 데이터를 수신 받게 되고(S919), 상기 수신 받은 데이터를 TCP/IP방식의 프로토콜의 데이터로 변환하는 데이터 처리를 수행하여 전력 제어 연산부(302)로 전송하게 된다(S920).In the process, it is determined whether an error check has been performed on the information transmitted to the remote
다음으로, 상기 전력 제어 연산부(302)에서는 미리 할당된 버퍼를 클리어 시킨 다음에(S921), TCP/IP소켓을 닫게 된다. 또한, 상기 전력 제어 연산부(302)의 경우에도 상기 S917의 과정에 따라 소망하는 데이터의 전송이 완료되면, 내부의 버 퍼를 클리어 시키고(S923), 원격 단말 장치(801)로부터의 또 다른 명령을 대기하는 상태로 전환하게 된다.Next, the power
본 발명의 실시예들은 다양한 컴퓨터로 구현되는 동작을 수행하기 위한 프로그램 명령을 포함하는 컴퓨터 판독 가능 매체를 포함한다. 상기 컴퓨터 판독 가능 매체는 프로그램 명령, 데이터 파일, 데이터 구조 등을 단독으로 또는 조합하여 포함할 수 있다. 상기 매체는 본 발명을 위하여 특별히 설계되고 구성된 것들이거나 컴퓨터 소프트웨어 당업자에게 공지되어 사용 가능한 것일 수도 있다. 컴퓨터 판독 가능 기록 매체의 예에는 하드 디스크, 플로피 디스크 및 자기 테이프와 같은 자기 매체, CD-ROM, DVD와 같은 광기록 매체, 플롭티컬 디스크와 같은 자기-광 매체, 및 롬, 램, 플래시 메모리 등과 같은 프로그램 명령을 저장하고 수행하도록 특별히 구성된 하드웨어 장치가 포함된다. 상기 매체는 프로그램 명령, 데이터 구조 등을 지정하는 신호를 전송하는 반송파를 포함하는 광 또는 금속선, 도파관 등의 전송 매체일 수도 있다. 프로그램 명령의 예에는 컴파일러에 의해 만들어지는 것과 같은 기계어 코드뿐만 아니라 인터프리터 등을 사용해서 컴퓨터에 의해서 실행될 수 있는 고급 언어 코드를 포함한다.Embodiments of the invention include a computer readable medium containing program instructions for performing various computer-implemented operations. The computer readable medium may include program instructions, data files, data structures, etc. alone or in combination. The media may be those specially designed and constructed for the purposes of the present invention, or they may be of the kind well-known and available to those having skill in the computer software arts. Examples of computer-readable recording media include magnetic media such as hard disks, floppy disks, and magnetic tape, optical recording media such as CD-ROMs, DVDs, magnetic-optical media such as floppy disks, and ROM, RAM, flash memory, and the like. Hardware devices specifically configured to store and execute the same program instructions are included. The medium may be a transmission medium such as an optical or metal wire, a waveguide, or the like including a carrier wave for transmitting a signal specifying a program command, a data structure, or the like. Examples of program instructions include not only machine code generated by a compiler, but also high-level language code that can be executed by a computer using an interpreter or the like.
도 10은 본 발명에 따른 부하 전력 제어 방법을 수행하는 데 채용될 수 있는 범용 컴퓨터 장치의 내부 블록도이다.10 is an internal block diagram of a general purpose computer device that may be employed to perform the load power control method in accordance with the present invention.
컴퓨터 장치(1000)는 램(RAM: Random Access Memory)(1020)과 롬(ROM: Read Only Memory)(1030)을 포함하는 주기억장치와 연결되는 하나 이상의 프로세서(1010)를 포함한다. 프로세서(1010)는 중앙처리장치(CPU)로 불리기도 한다. 본 기술분야에서 널리 알려져 있는 바와 같이, 롬(1030)은 데이터(data)와 명령(instruction)을 단방향성으로 CPU에 전송하는 역할을 하며, 램(1020)은 통상적으로 데이터와 명령을 양방향성으로 전송하는 데 사용된다. 램(1020) 및 롬(1030)은 컴퓨터 판독 가능 매체의 어떠한 적절한 형태를 포함할 수 있다. 대용량 기억장치(Mass Storage)(1040)는 양방향성으로 프로세서(1010)와 연결되어 추가적인 데이터 저장 능력을 제공하며, 상기된 컴퓨터 판독 가능 기록 매체 중 어떠한 것일 수 있다. 대용량 기억장치(1040)는 프로그램, 데이터 등을 저장하는데 사용되며, 통상적으로 주기억장치보다 속도가 느린 하드 디스크와 같은 보조기억장치이다. CD 롬(1060)과 같은 특정 대용량 기억장치가 사용될 수도 있다. 프로세서(1010)는 비디오 모니터, 트랙볼, 마우스, 키보드, 마이크로폰, 터치스크린 형 디스플레이, 카드 판독기, 자기 또는 종이 테이프 판독기, 음성 또는 필기 인식기, 조이스틱, 또는 기타 공지된 컴퓨터 입출력장치와 같은 하나 이상의 입출력 인터페이스(1050)와 연결된다. 마지막으로, 프로세서(1010)는 네트워크 인터페이스(1070)를 통하여 유선 또는 무선 통신 네트워크에 연결될 수 있다. 이러한 네트워크 연결을 통하여 상기된 방법의 절차를 수행할 수 있다. 상기된 장치 및 도구는 컴퓨터 하드웨어 및 소프트웨어 기술 분야의 당업자에게 잘 알려져 있다.The
상기된 하드웨어 장치는 본 발명의 동작을 수행하기 위해 하나 이상의 소프트웨어 모듈로서 작동하도록 구성될 수 있다.The hardware device described above may be configured to operate as one or more software modules to perform the operations of the present invention.
지금까지 본 발명에 따른 구체적인 실시예에 관하여 설명하였으나, 본 발명의 범위에서 벗어나지 않는 한도 내에서는 여러 가지 변형이 가능함은 물론이다.While specific embodiments of the present invention have been described so far, various modifications are possible without departing from the scope of the present invention.
그러므로, 본 발명의 범위는 설명된 실시예에 국한되어 정해져서는 안되며, 후술하는 특허 청구의 범위뿐 아니라 이 특허 청구의 범위와 균등한 것들에 의해 정해져야 한다.Therefore, the scope of the present invention should not be limited to the described embodiments, but should be defined not only by the claims below, but also by the equivalents of the claims.
이상과 같이 본 발명은 비록 한정된 실시예와 도면에 의해 설명되었으나, 본 발명은 상기의 실시예에 한정되는 것은 아니며, 이는 본 발명이 속하는 분야에서 통상의 지식을 가진 자라면 이러한 기재로부터 다양한 수정 및 변형이 가능하다. 따라서, 본 발명 사상은 아래에 기재된 특허 청구 범위에 의해서만 파악되어야 하고, 이의 균등 또는 등가적 변형 모두는 본 발명 사상의 범주에 속한다고 할 것이다.As described above, the present invention has been described by way of limited embodiments and drawings, but the present invention is not limited to the above-described embodiments, which can be variously modified and modified by those skilled in the art to which the present invention pertains. Modifications are possible. Accordingly, the spirit of the present invention should be understood only by the claims set forth below, and all equivalent or equivalent modifications thereof will belong to the scope of the present invention.
상기와 같은 구성을 포함하는 부하 전력 제어 장치를 사용함으로써, 수용가에서 소비하는 전력량을 목표 전력 이내로 관리할 수 있는 효과적인 방법을 제공할 뿐만 아니라, 수용가와 사전에 협의된 제어 대상 부하에 대해 직접 제어를 할 수 있는 효과를 얻을 수 있다. By using the load power control device including the above configuration, not only does it provide an effective way to manage the amount of power consumed by the customer within the target power, but also directly controls the load to be controlled in advance with the customer. The effect can be obtained.
또한, 본 발명에 따른 부하 전력 제어 장치는 다양한 통신 방식에 의한 제어 대상 부하의 제어가 가능하게 된다.In addition, the load power control apparatus according to the present invention can control the control target load by a variety of communication methods.
또한, 본 발명에 따른 부하 전력 제어 장치에 의한 제어 대상 부하의 제어를 수행하기 위해서 필요한 선결 조건으로는 시스템을 원활하게 운용하기 위한 통신 방식의 선정이 중요한 부분을 차지하게 된다. 공단 또는 기업체 등의 LAN을 이용한 시스템의 구축으로 기존의 ON/OFF 제어에 의한 부하 제어에서 제어 대상 부하의 직접적인 제어의 효과를 얻을 수 있다. 이상과 같이 본 발명의 실시예에 따르면, 소정의 전력을 사용하는 수용가에서 각종 부하를 부하 전력 제어 장치로부터 유.무선 네트워크를 통하여 감시 또는 제어가 가능하게 되어, 전력의 소비가 많은 특정 시간, 계절, 요일 별로 전력의 효율적 사용이 가능해 진다.In addition, selection of a communication scheme for smoothly operating the system is an important part of the preconditions necessary for performing the control of the load to be controlled by the load power control apparatus according to the present invention. By constructing a system using a LAN such as a corporation or an enterprise, it is possible to obtain the effect of direct control of the load to be controlled in the load control by the existing ON / OFF control. As described above, according to the embodiment of the present invention, it is possible to monitor or control various loads from a load power control device through a wired / wireless network in a consumer using a predetermined power, and thus, at a specific time and season when power consumption is high. As a result, the power can be used efficiently by day.
또한, 본 발명에 따르면 제어 대상 부하의 제어 응답 시간을 고려하여 실시간으로 예측 전력을 계산하고 보다 정교한 전력 제어 명령을 생성할 수 있다.In addition, according to the present invention, it is possible to calculate the predicted power in real time and generate a more sophisticated power control command in consideration of the control response time of the control target load.
또한, 본 발명에 따르면, 복수의 전력 사용 장치를 포함하는 제어 대상 부하를 제어함에 있어, 각 전력 사용 장치 별로 제어 명령을 개별적으로 생성할 수 있다.In addition, according to the present invention, in controlling a load to be controlled including a plurality of power using devices, a control command may be individually generated for each power using device.
Claims (12)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020040030896A KR100729620B1 (en) | 2004-05-03 | 2004-05-03 | Apparatus and method for controlling the power consumption of an electrical load |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020040030896A KR100729620B1 (en) | 2004-05-03 | 2004-05-03 | Apparatus and method for controlling the power consumption of an electrical load |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20050105673A KR20050105673A (en) | 2005-11-08 |
KR100729620B1 true KR100729620B1 (en) | 2007-06-18 |
Family
ID=37282812
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020040030896A KR100729620B1 (en) | 2004-05-03 | 2004-05-03 | Apparatus and method for controlling the power consumption of an electrical load |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100729620B1 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101012145B1 (en) * | 2008-12-11 | 2011-02-07 | 서울특별시도시철도공사 | method for managing peak power |
KR101432589B1 (en) * | 2007-12-10 | 2014-08-21 | 엘지전자 주식회사 | Method for controlling load of air conditioner for electric power controlling system |
Families Citing this family (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101495158B1 (en) * | 2007-12-13 | 2015-02-24 | 엘지전자 주식회사 | Method and equipment for protecting multi type air conditioner system |
WO2011162553A2 (en) * | 2010-06-22 | 2011-12-29 | 엘지전자 주식회사 | Network system |
US9836803B2 (en) * | 2010-06-25 | 2017-12-05 | Lg Electronics Inc | Network system |
WO2011162587A2 (en) * | 2010-06-26 | 2011-12-29 | 엘지전자 주식회사 | Network system |
KR20130030707A (en) * | 2011-09-19 | 2013-03-27 | 최창준 | Cutting system or method or electric circuits for cutting or reconnecting the terminal electric power load to incoming electric power according to the quality of supplied incoming electricity for preventing of wide blackout crisis |
KR101692316B1 (en) * | 2016-04-15 | 2017-01-03 | 임병천 | Appararatus for electric energy control, switchgear and panelboard comprising the same |
KR102625178B1 (en) * | 2023-08-31 | 2024-01-15 | 주식회사 아이디알서비스 | Real-time status monitoring-based maximum demand power management system remotely controlled |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20020087735A (en) * | 2001-05-16 | 2002-11-23 | 주식회사 젤파워 | system for monitoring management of power using Demand Controller |
-
2004
- 2004-05-03 KR KR1020040030896A patent/KR100729620B1/en not_active IP Right Cessation
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20020087735A (en) * | 2001-05-16 | 2002-11-23 | 주식회사 젤파워 | system for monitoring management of power using Demand Controller |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101432589B1 (en) * | 2007-12-10 | 2014-08-21 | 엘지전자 주식회사 | Method for controlling load of air conditioner for electric power controlling system |
KR101012145B1 (en) * | 2008-12-11 | 2011-02-07 | 서울특별시도시철도공사 | method for managing peak power |
Also Published As
Publication number | Publication date |
---|---|
KR20050105673A (en) | 2005-11-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US11146030B2 (en) | Techniques for integrating wireless functionality in a power outlet | |
US9146548B2 (en) | System and method for energy consumption management | |
US20150339159A1 (en) | Systems, methods, and media for online server workload management | |
KR100729620B1 (en) | Apparatus and method for controlling the power consumption of an electrical load | |
US20140371939A1 (en) | Direct-to-consumer challenges for encouraging energy conscious behavior | |
US8682491B2 (en) | Systems and methods for energy management and device automation system | |
US20140339316A1 (en) | Using customer premises to provide ancillary services for a power grid | |
KR102103483B1 (en) | Techniques for adaptive demand/response energy management of electronic systems | |
US9466201B2 (en) | Alarm output device and alarm output method | |
EP2746787A1 (en) | Energy management device and program | |
JP2011129085A (en) | Apparatus and method for smart energy management for controlling power consumption | |
WO2013040853A1 (en) | Cloud computing-based system and method for management and control of water pump | |
JP2010075015A (en) | Demand control system for household electric appliance | |
US9547317B2 (en) | Information processing device, information processing method, and storage medium | |
US20130211614A1 (en) | Apparatus and method for controlling smart appliance using smart terminal | |
KR101286190B1 (en) | Program Logic Demand Control System | |
US20170083987A1 (en) | Real-time cost management for utilities | |
KR20150037410A (en) | Building energy management system with distributed energy resources of scheduling and real time control | |
US9323271B2 (en) | Electricity management apparatus and electricity management method | |
KR102130464B1 (en) | System for managing building with smart user orientation | |
CN113188363A (en) | Cooling tower monitoring method, device, equipment and storage medium | |
KR102183942B1 (en) | Building heating control device and method for improving the efficiency of floor heating | |
JP6778891B2 (en) | Power management system, power management method and program | |
KR101841990B1 (en) | Apparatus and method for power capping | |
JP2002186054A (en) | Device controller |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
G170 | Publication of correction | ||
FPAY | Annual fee payment |
Payment date: 20130610 Year of fee payment: 7 |
|
FPAY | Annual fee payment |
Payment date: 20140609 Year of fee payment: 8 |
|
LAPS | Lapse due to unpaid annual fee |