KR100705608B1 KR1020040057460A KR20040057460A KR100705608B1 KR 100705608 B1 KR100705608 B1 KR 100705608B1 KR 1020040057460 A KR1020040057460 A KR 1020040057460A KR 20040057460 A KR20040057460 A KR 20040057460A KR 100705608 B1 KR100705608 B1 KR 100705608B1
Authority
KR
South Korea
Prior art keywords
vertical
slab formwork
formwork
tube
pipe
Prior art date
Application number
KR1020040057460A
Other languages
Korean (ko)
Other versions
KR20060009463A (en
Inventor
박정진
박정호
Original Assignee
박정진
박정호
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 박정진, 박정호 filed Critical 박정진
Priority to KR1020040057460A priority Critical patent/KR100705608B1/en
Publication of KR20060009463A publication Critical patent/KR20060009463A/en
Application granted granted Critical
Publication of KR100705608B1 publication Critical patent/KR100705608B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G25/00Shores or struts; Chocks
    • E04G25/04Shores or struts; Chocks telescopic
    • E04G25/06Shores or struts; Chocks telescopic with parts held together by positive means
    • E04G25/065Shores or struts; Chocks telescopic with parts held together by positive means by a threaded nut
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/36Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
    • E04G11/48Supporting structures for shutterings or frames for floors or roofs

Abstract

본 발명의 슬래브거푸집의 조기탈형이 가능한 시스템동바리의 가변지지재는 건설구조물 시공 시 거푸집널의 일부가 분리되어 잔존되는 슬래브거푸집을 지지하며, 수직재, 수평재, 및 경사재로 조립되는 시스템동바리에서, 상부수직내관의 외주면 길이방향을 따라 상하로 이동되는 높이조절용 소켓관으로 슬래브거푸집을 받침하는 슬래브거푸집받침관 및 수평재의 설치높이를 용이하게 조절하여 분리되어 잔존되는 거푸집널을 제외한 슬래브거푸집을 하강시켜 콘크리트의 설계기준강도가 60% 이상 발현되는 조기 양생 후 잔여 양생기간의 제약없이 슬래브거푸집의 분리를 가능하게 함으로써 거푸집의 재사용율을 향상시키고, 공비를 절감할 수 있으며, 시공성이 높은 슬래브거푸집의 조기탈형이 가능한 시스템동바리의 가변지지재를 제공하는 것을 목적으로 하는 발명으로서, 이를 위하여 본 발명의 슬래브거푸집의 조기탈형이 가능한 시스템동바리의 가변지지재는 건설구조물 시공 시 거푸집널의 일부가 분리되어 잔존되는 슬래브거푸집을 지지하며, 수직재, 수평재, 및 경사재로 조립되는 시스템동바리에서, 하부수직외관; 상부수직내관; 슬래브거푸집받침관; 및 높이조절용 소켓관;을 특징적인 구성으로 하는 슬래브거푸집의 조기탈형이 가능한 시스템동바리의 가변지지재를 제공한다.The variable support member of the system copper bar which enables early demoulding of the slab formwork of the present invention supports the remaining slab formwork by separating part of the formwork when constructing the construction structure, and in the system copper bar assembled with vertical materials, horizontal materials, and inclined materials, the upper part It is a height-adjustable socket pipe that moves up and down along the longitudinal direction of the outer circumferential surface of the vertical inner pipe, and the slab formwork supporting pipe supporting the slab formwork and the slab formwork except for the remaining formwork are separated by removing the remaining formwork. It is possible to separate the slab formwork without limiting the remaining curing period after the early curing, which shows the design reference strength of 60% or more, thereby improving the reuse rate of the formwork, reducing the cost, and premature demolition of the high slab formability. To provide variable support material for this possible system As the invention, for this purpose, the variable support material of the system copper bar which enables early demoulding of the slab formwork of the present invention supports the slab formwork which is partially separated from the formwork during construction of the construction structure, and supports vertical, horizontal and inclined materials. In the system assembly assembled with a lower vertical appearance; Upper vertical inner tube; Slab formwork tube; And a height-adjustable socket tube; provides a variable support material of the system club that can be early demoulding the slab formwork with a characteristic configuration.

Description

슬래브거푸집의 조기탈형이 가능한 시스템동바리의 가변지지재{Level adjustable vertical member of the system support for early stripping slab forms} Level adjustable vertical member of the system support for early stripping slab forms}             

도 1a는 종래의 시스템동바리의 일예를 도시한 사시도이다.1A is a perspective view showing an example of a conventional system club.

도 1b는 종래의 높이조절이 가능한 동바리 수직재의 일예를 도시한 사시도이다.Figure 1b is a perspective view showing an example of a conventional vertically adjustable group of vertical bar.

도 2a는 본 발명의 슬래브거푸집의 조기탈형이 가능한 시스템동바리의 가변지지재의 일 실시예가 해체된 상태를 도시한 측면도이다.Figure 2a is a side view showing a state in which one embodiment of the variable support of the system club that can be demoulded early slab formwork of the present invention is dismantled.

도 2b는 도 2a가 조립된 상태를 도시한 단면도이다.2B is a cross-sectional view illustrating a state in which FIG. 2A is assembled.

도 2c는 도 2a의 하부수직외관, 높이조절용 소켓관, 및 미세높이조절용 수직관과 상부수직내관의 결합 전(a), 후(b) 상태를 도시한 평면도이다.Figure 2c is a plan view showing a state before (a) and after (b) the coupling of the lower vertical appearance, the height adjustment socket tube, and the fine height adjustment vertical tube and the upper vertical inner tube of Figure 2a.

도 3a는 본 발명의 슬래브거푸집의 조기탈형이 가능한 시스템동바리의 가변지지재의 다른 실시예가 해체된 상태를 도시한 측면도이다.Figure 3a is a side view showing a disassembled state of another embodiment of the variable support of the system club that can be demoulded early of the slab formwork of the present invention.

도 3b는 도 3a가 조립된 상태를 도시한 단면도이다.3B is a cross-sectional view illustrating a state in which FIG. 3A is assembled.

도 4a는 본 발명의 슬래브거푸집의 조기탈형이 가능한 시스템동바리의 가변지지재의 또 다른 실시예가 해체된 상태를 도시한 측면도이다.Figure 4a is a side view showing a state in which another embodiment of the variable support material of the system club that can be demoulded early of the slab formwork of the present invention is dismantled.

도 4b는 도 4a가 조립된 상태를 도시한 단면도이다.4B is a cross-sectional view illustrating a state in which FIG. 4A is assembled.

도 5a 내지 도 5c는 본 발명의 슬래브거푸집의 조기탈형이 가능한 시스템동바리의 가변지지재의 일 시공예의 시공과정을 간략히 도시한 부분단면도이다.Figures 5a to 5c is a partial cross-sectional view briefly showing the construction process of an example of the construction of the variable support material of the system club that can be demoulded early slab formwork of the present invention.

도 6은 본 발명의 슬래브거푸집의 조기탈형이 가능한 시스템동바리의 가변지지재의 하부수직외관의 하단부를 도시한 단면도이다.Figure 6 is a cross-sectional view showing the lower vertical portion of the lower vertical appearance of the variable support of the system club that can be demoulded early of the slab formwork of the present invention.

도 7a는 본 발명의 슬래브거푸집의 조기탈형이 가능한 시스템동바리의 가변지지재의 또 다른 실시예가 해체된 상태를 도시한 측면도이다.Figure 7a is a side view showing a state in which another embodiment of the variable support material of the system club that can be demoulded early of the slab formwork of the present invention is dismantled.

도 7b는 도 7a가 조립된 상태를 도시한 단면도이다.FIG. 7B is a cross-sectional view illustrating a state in which FIG. 7A is assembled.

도 8a 내지 도 8c는 본 발명의 슬래브거푸집의 조기탈형이 가능한 시스템동바리의 가변지지재의 다른 시공예의 시공과정을 간략히 도시한 부분단면도이다.8a to 8c is a partial cross-sectional view briefly showing the construction process of another construction example of the variable support material of the system club that can be early demolding the slab formwork of the present invention.

<도면의 주요 부분에 대한 부호의 설명><Explanation of symbols for the main parts of the drawings>

1, 1a : 수평재 10 : 슬래브거푸집1, 1a: horizontal material 10: slab formwork

11 : 분리되어 잔존되는 거푸집널 11: formwork remaining apart

100, 100a, 100b, 100c : 슬래브거푸집의 조기탈형이 가능한 100, 100a, 100b, 100c: Early demoulding of slab formwork is possible

시스템동바리의 가변지지재Variable support material for system club

110, 110a, 110b : 하부수직외관110, 110a, 110b: Lower vertical appearance

110a' : 결합관(하부수직외관) 110b' : 결합공110a ': Combined pipe (bottom vertical appearance) 110b': Combined hole

110c : 볼케스터 110d : 받침캡110c: ball caster 110d: base cap

120, 120a, 120b : 상부수직내관120, 120a, 120b: Upper vertical inner tube

120c : 상부수직관 120a' : 결합관(상부수직내관)120c: upper vertical pipe 120a ': coupling pipe (upper vertical pipe)

120b' : 고정공(상부수직내관) 130, 130a, 130b : 슬래브거푸집받침관120b ': Fixed hole (upper vertical inner tube) 130, 130a, 130b: Slab formwork support pipe

130a' : 결합공(슬래브거푸집받침관) 130a ': Combined hole (slab formwork)

140, 140a, 140b : 높이조절용 소켓관140, 140a, 140b: height adjustable socket pipe

150 : 미세높이조절용 수직관 151 : 걸림체(미세높이조절용 수직관)150: vertical height adjustment vertical pipe 151: locking body (fine height adjustment vertical pipe)

160, 160a : 수평재높이조절용 수직관160, 160a: vertical pipe for horizontal height adjustment

160a' : 결합공(수평재높이조절용 수직관)160a ': Combined hole (Horizontal pipe height control vertical pipe)

200 : 고정너트 210 : 고정핀200: fixing nut 210: fixing pin

300 : 현수봉300: suspension rod

본 발명은 건축 구조물 축조 시 상부거푸집을 지지하는 동바리에 관한 것으로, 상부수직내관의 외주면 길이방향을 따라 상하로 이동되는 높이조절용 소켓관으로 슬래브거푸집을 받침하는 슬래브거푸집받침관 및 수평재의 높이를 용이하게 조절하여 분리되어 잔존되는 거푸집널을 제외한 슬래브거푸집을 용이하게 하강시킴으로써 콘크리트의 설계기준강도가 60% 이상 발현되는 조기 양생 후 잔여 양생기간의 구애없이 슬래브거푸집의 분리를 가능하게 하여 거푸집의 재사용율을 향상시키고, 공비를 절감할 수 있으며, 시공성이 높은 슬래브거푸집의 조기탈형이 가능한 시스 템동바리의 가변지지재에 관한 것이다.The present invention relates to a copper bar for supporting the upper formwork when building a building structure, the height of the slab formwork support pipe and the horizontal member supporting the slab formwork with a height-adjustable socket pipe moved up and down along the longitudinal direction of the outer peripheral surface of the upper vertical inner tube. The slab formwork can be easily lowered except for the remaining formwork to be separated, so that the slab formwork can be separated without premature curing after early curing, which gives more than 60% of the design standard strength of concrete. The present invention relates to a variable support member of a system club that can improve the performance, reduce the cost, and enable early demoulding of the slab formwork with high workability.

일반적으로 건축구조물 시공 시에는 거푸집 설치 후 상기 거푸집의 내부에 콘크리트를 타설하여 양생함으로서 안정된 콘크리트 건축구조물을 형성하게 된다. 특히 슬래브를 형성하기 위해서는 콘크리트를 타설하기 위한 거푸집의 설치와 동시에 거푸집의 하단에 다수개의 동바리(지주대)를 설치하여 콘크리트의 하중에 대한 거푸집의 일정높이가 유지되도록 하는 것은 주지된 사실이다. 즉, 거푸집에 타설된 굳지 않은 콘크리트의 하중을 연직방향으로 지지하여 줌으로서, 콘크리트를 양생 시 슬래브의 처짐이나 균열을 방지하여 안전한 건축이 이루어지도록 하는 것이다.In general, during the construction of the building structure, by placing concrete in the formwork after the formwork is installed to form a stable concrete building structure. In particular, to form a slab, it is well known that a certain height of the formwork for the load of concrete is maintained by installing a plurality of clubs (holders) at the bottom of the formwork at the same time as the formwork for placing concrete. In other words, by supporting the load of the solid concrete placed in the formwork in the vertical direction, to prevent sagging or cracking of the slab when curing the concrete to ensure a safe construction.

이와 같이 콘크리트 구조물을 건축 시 거푸집을 지지하기 위한 종래의 건축용 동바리 중 도 1a에 도시된 바와 같은 시스템동바리는 수직재, 수평재, 경사재 등으로 이루어지는 지주를 부품화, 조립화함으로써 설치가 간편하고 작용하는 하중을 안전하게 전달할 수 있게 만든 가설구조물로서 부재의 단순화로 시공이 용이하며, 수직, 수평재의 확실한 체결로 좌굴을 방지할 수 있고, 동바리(수직재)간격을 설치 계획에 따라 정확히 하여 자재의 과다 투입을 방지할 수 있으며, 대형구조물의 동바리로 사용시 수평재 간격을 쉽게 조절하여 수직재의 허용내력을 증가시킬 수 있고, 비계용 부품을 동바리에 연결 사용함으로써 작업의 안전성을 높일 수 있다는 장점이 있다. Thus, among the conventional building clubs for supporting the formwork when building a concrete structure, the system club as shown in Figure 1a is easy to install and work by forming and assembling the struts made of vertical members, horizontal members, inclined members, etc. It is a temporary structure that makes it possible to transmit load safely. It is easy to construct by simplifying the member, and it is possible to prevent buckling by reliably fastening vertical and horizontal members, and to overload the material by precisely adjusting the gap between vertical and vertical members according to the installation plan. It can be prevented, it is easy to adjust the horizontal member spacing when used as a copper bar of a large structure to increase the allowable strength of the vertical material, and there is an advantage that can increase the safety of work by connecting the scaffolding parts to the copper bar.

그러나 상기와 같은 종래의 시스템동바리는 그 높이가 규격화되어 제작됨으로 시공위치별로 각기 다른 층고에 능동적으로 대처할 수 없어 그 사용성이 떨어진 다는 단점이 있다. However, the conventional system bar as described above has a disadvantage that the usability is lowered because the height is standardized and can not actively cope with different floor heights by construction location.

이러한 문제점을 극복하기 위해 도 1b에 도시된 바와 같이 높이가 조절되는 시스템동바리 수직재가 개발되기도 하였다. 상기와 같은 시스템동바리의 수직재는 고정되는 하부수직재와 시공하고자 하는 높이에 맞게 상하로 이동되면서 설치높이가 조절되는 상부수직재 및 상기 하부수직재와 상부수직재를 결합시키는 결합관으로 구성되며, 상기 하부수직재와 상부수직재는 체결을 위해 외주면 둘레를 따라 연속하는 암나사산이 길이방향으로 형성되어 있고, 상기 결합관은 내주면 둘레를 따라 연속하며 상기 암나사산과 암수결합 가능한 수나사산이 형성되어 있다. In order to overcome this problem, as shown in FIG. The vertical member of the system bar as described above consists of a lower vertical material to be fixed and the upper vertical material and the coupling pipe for coupling the lower vertical material and the upper vertical material, the installation height is adjusted while moving up and down according to the height to be installed, and the lower vertical material and The upper vertical member has a female thread continuous in the longitudinal direction along the outer circumference of the outer peripheral surface for fastening, and the coupling pipe is continuous along the inner circumferential surface and has a male thread capable of male and female coupling.

그러나 상기와 같은 동바리 수직재는 시공하고자 하는 동바리 높이를 만족시키기 위해서 상부수직재 전체를 상하로 이동시켜가며 설치높이를 조절하여야 함으로 취급이 용이하지 않고 작업이 불편하여 시공성이 떨어진다는 문제점이 있다.However, there is a problem in that the vertical bar such as the vertical bar to move the whole vertical material up and down to adjust the installation height in order to satisfy the height of the copper bar to be installed, the handling is not easy and the work is inconvenient and the workability is inferior.

또한 상기와 같은 동바리 수직재나 전술된 시스템동바리는 상부의 양생되는 슬래브가 소정의 설계기준강도를 발현할 때까지 슬래브거푸집 하부에 반드시 존치되어야 함으로 상층의 슬래브 시공을 위해서는 별도의 슬래브거푸집을 필요로 하게 되며 따라서 많은 수의 거푸집을 소요하게 됨으로 시공비가 상승하게 되고, 건축 폐자재의 증가를 가져오게 된다는 문제점이 있다.In addition, the above vertical vertical members or the above-mentioned system clubs must be kept under the slab formwork until the upper cured slab expresses a predetermined design standard strength, so that a separate slab formwork is required for the upper slab construction. As a result, a large number of formwork is required, resulting in an increase in construction cost and an increase in construction waste materials.

상기 문제점을 해결하고자 안출된 본 발명의 슬래브거푸집의 조기탈형이 가능한 시스템동바리의 가변지지재는 상부수직내관의 외주면 길이방향을 따라 상하로 이동되는 높이조절용 소켓관으로 슬래브거푸집을 받침하는 슬래브거푸집받침관 및 수평재의 높이를 용이하게 조절하여 분리되어 잔존되는 거푸집널을 제외한 슬래브거푸집을 하강시킴으로써 콘크리트의 설계기준강도가 60% 이상 발현되는 조기 양생 후 잔여 양생기간의 제약없이 슬래브거푸집의 분리가 가능하게 됨으로 거푸집의 재사용율이 향상되고 시공비를 절감할 수 있는 슬래브거푸집의 조기탈형이 가능한 시스템동바리의 가변지지재를 제공하는데 목적이 있다.The variable support member of the system copper bar which can be released early to the slab formwork of the present invention devised to solve the above problems is the slab formwork receiving tube supporting the slab formwork with a height-adjustable socket tube that moves up and down along the longitudinal direction of the outer circumferential surface of the upper vertical inner tube. And slab formwork except for the remaining formwork by easily adjusting the height of the horizontal member, so that the slab formwork can be separated without the limitation of the remaining curing period after the early curing that expresses the design standard strength of concrete more than 60%. It is an object of the present invention to provide a variable support material for system clubs that enables early demolding of slab formwork that can improve the formwork reuse rate and reduce construction costs.

또한 본 발명의 슬래브거푸집의 조기탈형이 가능한 시스템동바리의 가변지지재는 높이조절용 소켓관만을 상하로 이동시켜 가며 시공하고자 하는 동바리 설치높이를 만족시킬 수 있게 됨으로 취급이 용이하고 작업이 간편하여 시공성이 높은 슬래브거푸집의 조기탈형이 가능한 시스템동바리의 가변지지재를 제공하는데 다른 목적이 있다.
In addition, the variable support member of the system club that can be prematurely demolition of the slab formwork of the present invention can satisfy the installation height of the copper bar to be installed by moving only the height adjustment socket pipe up and down, easy to handle and easy to work Another object is to provide a variable support material for a system club that enables early demolding of slab formwork.

상기 목적을 달성하고자 하는 본 발명은 슬래브거푸집의 조기탈형이 가능한 시스템동바리의 가변지지재는 건설구조물 시공 시 슬래브거푸집의 조기탈형을 위해 거푸집널의 일부가 분리되어 잔존되는 슬래브거푸집을 지지하며, 수직재, 수평재, 및 경사재로 조립되는 시스템동바리에서, 상기 시스템동바리의 하단에 위치되는 하부수직외관; 상기 하부수직외관의 상단에 하단부가 내측삽입되어 하부수직외관의 상부에 위치되며, 하부수직외관과 결합되는 상부수직내관; 상기 상부수직내관의 상단부에 외측끼움될 수 있는 관경을 가지고, 상기 슬래브거푸집의 분리되어 잔존되 는 거푸집널의 하부에 설치되며, 전후좌우 외측면에는 슬래브거푸집의 하부를 받치는 수평재가 결합되어 있는 일정길이의 슬래브거푸집받침관; 및 상기 상부수직내관에 외측끼움되어 결합되는 소켓관으로, 상기 소켓관은 슬래브거푸집받침관의 하부를 받치도록 위치되어 슬래브거푸집받침관 및 상기 슬래브거푸집받침관에 결합된 수평재의 설치높이를 조절하도록 상부수직내관의 외주면 길이방향을 따라 상하로 이동되는 높이조절용 소켓관;을 포함하는 슬래브거푸집의 조기탈형이 가능한 시스템동바리의 가변지지재를 제공한다. The present invention to achieve the above object is a variable support member of the system copper bar capable of early demoulding slab formwork to support the slab formwork to be separated part of the formwork for premature demolding of the slab formwork during construction construction, vertical members, In the system club assembled from the horizontal member and the inclined member, the lower vertical appearance is located at the bottom of the system club; An upper vertical inner tube inserted into an upper end of the lower vertical outer tube and positioned on an upper portion of the lower vertical outer tube, the upper vertical inner tube coupled to the lower vertical outer tube; It has a tube diameter that can be fitted to the upper end of the upper vertical inner tube, the slab formwork is installed in the lower portion of the remaining remaining slab, the front and rear left and right outer surface is coupled to the horizontal member supporting the lower portion of the slab formwork Slab formwork tubes of length; And a socket pipe fitted outside and fitted to the upper vertical inner pipe, wherein the socket pipe is positioned to support a lower portion of the slab formwork support pipe to adjust the installation height of the slab formwork support pipe and the horizontal member coupled to the slab formwork support pipe. It provides a variable support member of the system club that can be prematurely demolished slab formwork; including; height adjustment socket pipe moved up and down along the longitudinal direction of the outer peripheral surface of the upper vertical inner tube.

또한 본 발명의 슬래브거푸집의 조기탈형이 가능한 시스템동바리의 가변지지재는 상기 상부수직내관에 하단이 내측삽입 되어 상기 슬래브거푸집의 분리되어 잔존되는 거푸집널의 하부를 받치도록 위치되며, 상부수직내관과 결합되는 일정길이의 수직관으로, 상기 수직관은 상단에 상부수직내관과 동일한 관경을 가지는 걸림체가 장착되어 있는 미세높이조절용 수직관; 및 상기 상부수직내관에 외측끼움되어 하부수직외관과 슬래브거푸집받침관 사이에 위치되며, 전후좌우 외측면에 수평재가 결합되는 수직관으로, 상기 수직관의 하부는 높이조절용 소켓관이 받치고 있는 수평재높이조절용 수직관;을 더 포함하여 제공한다.In addition, the variable support member of the system club that can be early demolding the slab formwork of the present invention is positioned so as to support the lower part of the remaining formwork to be separated from the slab formwork by inserting the lower end in the upper vertical inner tube, coupled with the upper vertical inner tube A vertical tube of a predetermined length, the vertical tube is fine height adjustment vertical tube is mounted on the top has a locking body having the same diameter as the upper vertical inner tube; And a vertical pipe fitted outside the upper vertical inner tube and positioned between the lower vertical outer tube and the slab formwork receiving tube, wherein the horizontal member is coupled to the front, rear, left and right outer surfaces, and the lower portion of the vertical tube is supported by the height adjusting socket tube. It provides a further comprising a vertical pipe for adjustment.

또 본 발명의 슬래브거푸집의 조기탈형이 가능한 시스템동바리의 가변지지재는 건설구조물 시공 시 슬래브거푸집의 조기탈형을 위해 거푸집널의 일부가 분리되어 잔존되는 슬래브거푸집을 지지하며, 수직재, 수평재, 및 경사재로 조립되는 시스템동바리에서, 상기 시스템동바리의 하단에 위치되며, 상단에는 내측 둘레면을 따라 연속하는 수나사산이 형성되어 있고 좌우 외측면에 손잡이부가 형성되어 있는 고정너트가 외측끼움되어 결합될 수 있는 암나사산이 외측 둘레면을 따라 연속하여 형성되어 있고, 암나사산이 형성된 적소에는 고정핀이 삽입될 수 있는 장공형의 결합공이 길이방향으로 형성되어 있는 하부수직외관; 상기 하부수직외관의 상단에 하단부가 내측삽입되어 하부수직외관의 상부에 위치되고, 상기 고정핀이 삽입되는 고정공이 길이방향으로 일정간격을 두고 다수개 형성되어 있으며, 상단부에는 내측 둘레면을 따라 연속하는 암나사산이 형성된 결합관이 설치되어 있는 상부수직내관; 상기 상부수직내관의 상단부에 외측끼움될 수 있는 관경을 가지며, 상기 슬래브거푸집의 분리되어 잔존되는 거푸집널의 하부에 설치되고, 전후좌우 외측면에는 슬래브거푸집의 하부를 받치는 수평재가 결합되어 있는 일정길이의 수직관으로, 상기 수직관은 하단부에는 내측 둘레면을 따라 연속하는 수나사산이 형성되어 있고 좌우 외측면에 손잡이부가 형성되어 있는 고정너트가 외측끼움되어 결합될 수 있는 암나사산이 외측 둘레면을 따라 연속하여 형성되어 있고, 암나사산이 형성된 적소에는 고정핀이 삽입될 수 있는 장공형의 결합공이 길이방향으로 형성되어 있는 슬래브거푸집받침관; 및 상기 상부수직내관에 하단이 내측삽입 되어 상기 슬래브거푸집의 분리되어 잔존되는 거푸집널의 하부를 받치도록 위치되고, 상부수직내관의 결합관 암나사산과 암수결합되며 외측 둘레면을 따라 연속하는 수나사산이 길이방향으로 형성되어 있는 일정길이의 수직관으로, 상기 수직관은 상단부에 상부수직내관과 동일한 관경을 가지는 걸림체가 형성되어 있는 미세높이조절용 수직관;을 포함하는 슬래브거푸집의 조기탈형이 가능한 시스템동바리의 가변지지재를 제공한다. In addition, the variable support material of the system copper bar which enables early demoulding of the slab formwork of the present invention supports the slab formwork which is partially separated from the formwork for premature demolding of the slab formwork during construction of the construction, and supports vertical materials, horizontal materials, and inclined materials. In the system club that is assembled into, the bottom of the system club is located at the bottom, the upper end is formed with a continuous male thread along the inner circumferential surface and the fixing nut is formed on the left and right outer surface can be coupled to the outside fitting A female vertical thread is formed continuously along the outer circumferential surface, and a lower vertical outer shell having a female thread formed therein is formed with a long hole-shaped coupling hole into which a fixing pin can be inserted; The lower end is inserted into the upper end of the lower vertical appearance is located in the upper portion of the lower vertical appearance, the fixing pin is inserted into a plurality of fixed holes are formed at a predetermined interval in the longitudinal direction, the upper end is continuous along the inner circumferential surface An upper vertical inner tube in which a coupling pipe formed with a female thread is installed; It has a tube diameter that can be fitted to the upper end of the upper vertical inner tube, the slab formwork is installed in the lower portion of the remaining remaining formwork, and the front and rear left and right outer surface is coupled with a horizontal length for supporting the lower portion of the slab formwork The vertical pipe of the vertical pipe is formed in the lower end of the continuous male thread is formed along the inner circumferential surface and the handle nut is formed on the left and right outer surface along the outer circumferential surface that can be coupled to the outer nut. Slab formwork receiving tube which is formed continuously, the threaded hole is formed in the longitudinal direction of the long hole-shaped coupling hole into which the fixing pin can be inserted; And a lower end inserted into the upper vertical inner tube to support a lower portion of the remaining formwork of the slab formwork, and a male thread coupled to the female pipe thread of the upper vertical inner pipe and contiguous along the outer circumferential surface thereof. A vertical tube of a predetermined length is formed in the longitudinal direction, the vertical tube is a vertical height adjustment tube having a fastening member having the same diameter as the upper vertical inner tube at the upper end; It provides a variable support material.

또한 이때 본 발명의 슬래브거푸집의 조기탈형이 가능한 시스템동바리의 가 변지지재는 상기 상부수직내관에 외측끼움되어 하부수직외관과 슬래브거푸집받침관 사이에 위치되며, 하단부에는 내측 둘레면을 따라 연속하는 수나사산이 형성되어 있고 좌우 외측면에 손잡이부가 형성되어 있는 고정너트가 외측끼움되어 결합될 수 있는 암나사산이 외측 둘레면을 따라 연속하여 형성되어 있고, 암나사산이 형성된 적소에 고정핀이 삽입될 수 있는 장공형의 결합공이 길이방향으로 형성되어 있는 수평재높이조절용 수직관을 더 포함하는 슬래스거푸집의 조기탈형이 가능한 시스템동바리의 가변지지재를 제공한다.In this case, the variable support member of the system club that enables early demoulding of the slab formwork of the present invention is fitted between the lower vertical outer tube and the slab formwork tube, which is externally fitted to the upper vertical inner tube, and the bottom portion is continuous along the inner circumferential surface. A female thread that is formed with a thread and a handle nut formed on the left and right outer surfaces is continuously formed along the outer circumferential surface, and the fixing nut can be inserted into a place where the female thread is formed. It provides a variable support member of the system bar which can be prematurely demolished slab formwork further comprises a vertical tube for adjusting the horizontal height is formed in the longitudinal coupling hole of the ball.

또 본 발명의 슬래브거푸집의 조기탈형이 가능한 시스템동바리의 가변지지재는 건설구조물 시공 시 슬래브거푸집의 조기탈형을 위해 거푸집널의 일부가 분리되어 잔존되는 슬래브거푸집을 지지하며, 수직재, 수평재, 및 경사재로 조립되는 무지주 역타설용 시스템동바리에서, 하단은 상기 슬래브거푸집의 분리되어 잔존되는 거푸집널을 관통하고, 상단은 지상에 고정되는 현수봉; 상기 현수봉의 하단에 외측끼움되어 고정되며, 분리되어 잔존되는 거푸집널의 하부를 받치는 수직관으로, 상기 수직관은 외측 둘레면을 따라 길이방향으로 수나사산이 형성되어 있는 상부수직관; 상기 상부수직관에 외측끼움되어 분리되어 잔존되는 거푸집널의 하부에 위치되며, 전후좌우 외측면에는 슬래브거푸집의 하부를 받치는 수평재가 결합되어 있는 슬래브거푸집받침관; 및 상기 상부수직관에 외측끼움되며 상부수직관의 수나사산과 암수결합되는 암나사산이 내측 둘레면을 따라 형성되어 있는 소켓관으로, 상기 소켓관은 슬래브거푸집받침관의 하부를 받치도록 위치되어 슬래브거푸집받침관 및 상 기 슬래브거푸집받침관에 결합된 수평재의 설치높이가 조절되도록 상부수직관의 외주면 길이방향을 따라 상하로 이동되는 높이조절용 소켓관;을 포함하는 슬래부거푸집의 조기탈형이 가능한 시스템동바리의 가변지지재를 제공한다.In addition, the variable support material of the system copper bar which enables early demoulding of the slab formwork of the present invention supports the slab formwork which is partially separated from the formwork for premature demolding of the slab formwork during construction of the construction, and supports vertical materials, horizontal materials, and inclined materials. In the non-backlash system scoop assembly assembled with, the lower end penetrates the remaining remaining formwork of the slab formwork, the upper end is suspended rod fixed to the ground; A vertical pipe which is fixed to the lower end of the suspension rod and is fixed to the lower part of the remaining formwork, wherein the vertical pipe includes an upper vertical pipe having a male screw thread formed in a longitudinal direction along an outer circumferential surface thereof; Slab formwork support pipe is located in the lower portion of the formwork to be separated and separated from the upper vertical pipe, the horizontal member supporting the lower portion of the slab formwork in front, rear, left and right outer surface; And a socket tube having an outer thread fitted to the upper vertical pipe and having a female thread coupled to the male thread of the upper vertical pipe along the inner circumferential surface, wherein the socket tube is positioned to support the lower portion of the slab formwork support pipe. A system that enables early demolition of slab formwork, including; height adjustment socket pipe which is moved up and down along the longitudinal direction of the outer circumferential surface of the upper vertical pipe so that the installation height of the horizontal material coupled to the support pipe and the slab formwork support pipe is adjusted. It provides a variable support material.

또 본 발명의 슬래브거푸집의 조기탈형이 가능한 시스템동바리의 가변지지재는 건설구조물 시공 시 슬래브거푸집의 조기탈형을 위해 거푸집널의 일부가 분리되어 잔존되는 슬래브거푸집을 지지하며, 수직재, 수평재, 및 경사재로 조립되는 무지주 역타설용 시스템동바리에서, 하단은 상기 슬래브거푸집의 분리되어 잔존되는 거푸집널을 관통하고, 상단은 지상에 고정되는 현수봉; 상기 현수봉의 하단에 외측끼움되어 고정되며, 분리되어 잔존되는 거푸집널의 하부를 받치는 수직관으로, 상기 수직관은 측면에 길이방향을 따라 고정핀이 삽입되는 다수개의 고정공이 일정간격을 두고 형성되어 있는 상부수직관; 및 상기 상부수직관에 외측끼움되어 분리되어 잔존되는 거푸집널의 하부에 위치되며, 전후좌우 외측면에는 슬래브거푸집의 하부를 받치는 수평재가 결합되어 있는 수직관으로, 상기 수직관은 하단부에는 내측 둘레면을 따라 연속하는 수나사산이 형성되어 있고 좌우 외측면에 손잡이부가 형성되어 있는 고정너트가 외측끼움되어 결합될 수 있는 암나사산이 외측 둘레면을 따라 형성되어 있고, 암나사산이 형성된 적소에는 고정핀이 삽입될 수 있는 장공형의 결합공이 길이방향으로 형성되어 있는 슬래브거푸집받침관;을 포함하는 슬래브거푸집의 조기탈형이 가능한 시스템동바리의 가변지지재를 제공한다.In addition, the variable support member of the system copper bar which can be demolded early of the slab formwork of the present invention supports the slab formwork to be separated part of the formwork for premature demolding of the slab formwork during construction construction, vertical, horizontal, and inclined In the non-backlash system scoop assembly assembled with, the lower end penetrates the remaining remaining formwork of the slab formwork, the upper end is suspended rod fixed to the ground; It is fixed to the lower end of the suspension rod is fixed to the vertical tube to support the lower part of the remaining formwork, the vertical tube is formed with a plurality of fixing holes in which a fixed pin is inserted along the longitudinal direction on the side at a predetermined interval Upper vertical pipe; And a vertical tube which is located at the lower portion of the formwork remaining separated by being fitted outwardly to the upper vertical pipe, and the horizontal tube supporting the lower portion of the slab formwork is coupled to the front, rear, left and right outer surfaces, and the vertical pipe has an inner circumferential surface at the lower end thereof. A continuous male thread is formed along the female thread which can be coupled to the fixing nut which is formed on the left and right outer surfaces by the outer side, and is formed along the outer circumferential surface, and the fixing pin is inserted in the place where the female thread is formed. It provides a variable support material for the system club which can be prematurely demolished slab formwork; including; slab formwork receiving tube is formed in the longitudinal direction of the long hole-shaped coupling hole.

본 발명의 슬래브거푸집의 조기탈형이 가능한 시스템동바리의 가변지지재는 건설구조물 시공 시 거푸집널의 일부가 분리되어 잔존되는 슬래브거푸집을 지지하며, 수직재, 수평재, 및 경사재로 조립되는 시스템동바리에서, 상부수직내관의 외주면 길이방향을 따라 상하로 이동되는 높이조절용 소켓관으로 슬래브거푸집을 받침하는 슬래브거푸집받침관 및 수평재의 높이를 용이하게 조절하여 분리되어 잔존되는 거푸집널을 제외한 슬래브거푸집을 하강시킴으로써 콘크리트의 설계기준강도가 60% 이상 발현되는 조기 양생 후 잔여 양생기간의 제약없이 슬래브거푸집의 분리를 가능하게 함으로 거푸집의 재사용율이 향상되고 시공비를 절감할 수 있으며, 높이조절용 소켓관만을 상하로 이동시켜 가며 시공하고자 하는 동바리 설치높이를 만족시킬 수 있게 됨으로 취급이 용이하고 작업이 간편하여 시공성이 높아지게 되는 바, 이와 같은 구성에 의하여 상기한 본 발명의 기술적 과제를 달성할 수 있게 된다.The variable support member of the system copper bar which enables early demoulding of the slab formwork of the present invention supports the remaining slab formwork by separating part of the formwork when constructing the construction structure, and in the system copper bar assembled with vertical materials, horizontal materials, and inclined materials, the upper part It is a height-adjustable socket pipe that is moved up and down along the longitudinal direction of the outer circumferential surface of the vertical inner pipe to easily adjust the height of the slab formwork supporting pipe and the horizontal member to lower the slab formwork except for the remaining formwork. It is possible to separate the slab formwork without limiting the remaining curing period after early curing, which shows the design standard strength more than 60%, thereby improving the reuse rate of the formwork and reducing the construction cost, and moving only the height-adjustable socket pipe up and down. Satisfy the installation height of the clubs to be installed As a result, the handling is easy and the operation is simple, so that the workability is increased. Accordingly, the above technical problem of the present invention can be achieved.

이하 첨부한 도면과 함께 상기와 같은 본 발명의 개념이 바람직하게 구현된 실시예를 통하여 본 발명을 더욱 상세하게 설명한다. 다만 이는 이 기술 분야에서 통상의 지식을 가진 자가 본 발명을 더욱 명확하게 이해하고 용이하게 실시할 수 있도록 하기 위한 것이며, 전술한 사항들 이외에 본 발명이 가지는 또 다른 기술적 특징 및 장점들은 후술하는 본 발명에 따른 바람직한 실시예에 대한 설명을 통하여 당업자에게 더욱 확실하게 이해될 수 있을 것이다.Hereinafter, the present invention will be described in more detail with reference to the accompanying drawings. However, this is intended to enable those of ordinary skill in the art to more clearly understand and easily implement the present invention, and other technical features and advantages of the present invention other than the foregoing are described below. It will be more clearly understood by those skilled in the art through the description of the preferred embodiment according to.

도 2a는 본 발명의 슬래브거푸집의 조기탈형이 가능한 시스템동바리의 가변지지재(100)의 일 실시예가 해체된 상태를 도시한 측면도이며, 도 2b는 도 2a가 조립된 상태를 도시한 단면도이며, 도 2c는 도 2a의 하부수직외관(110), 높이조절용 소켓관(140), 및 미세높이조절용 수직관(150)과 상부수직내관(120)의 결합 전(a), 후(b) 상태를 도시한 평면도이고, 도 3a는 본 발명의 슬래브거푸집의 조기탈형이 가능한 시스템동바리의 가변지지재(100a)의 다른 실시예가 해체된 상태를 도시한 측면도이며, 도 3b는 도 3a가 조립된 상태를 도시한 단면도이고, 도 4a는 본 발명의 슬래브거푸집의 조기탈형이 가능한 시스템동바리의 가변지지재(100b)의 또 다른 실시예가 해체된 상태를 도시한 측면도이며, 도 4b는 도 4a가 조립된 상태를 도시한 단면도이고, 도 5a 내지 도 5c는 본 발명의 슬래브거푸집의 조기탈형이 가능한 시스템동바리의 가변지지재(100)의 일 시공예의 시공과정을 간략히 도시한 부분단면도이고, 도 6은 본 발명의 슬래브거푸집의 조기탈형이 가능한 시스템동바리의 가변지지재(100, 100a, 100b)의 하부수직외관(110, 110a, 110b)의 하단부를 도시한 단면도이고, 도 7a는 본 발명의 슬래브거푸집의 조기탈형이 가능한 시스템동바리의 가변지지재(100c)의 또 다른 실시예가 해체된 상태를 도시한 측면도이며, 도 7b는 도 7a가 조립된 상태를 도시한 단면도이고, 도 8a 내지 도 8c는 본 발명의 슬래브거푸집의 조기탈형이 가능한 시스템동바리의 가변지지재(100c)의 다른 시공예의 시공과정을 간략히 도시한 부분단면도이다.Figure 2a is a side view showing a disassembled state of one embodiment of the variable support member 100 of the system club that is capable of early demoulding slab formwork of the present invention, Figure 2b is a cross-sectional view showing a state in which Figure 2a is assembled, Figure 2c is a state before (a), after (b) the coupling of the lower vertical appearance 110, the height adjustment socket tube 140, and the fine height adjustment vertical tube 150 and the upper vertical inner tube 120 of Figure 2a. Figure 3a is a plan view, Figure 3a is a side view showing a disassembled state of another embodiment of the variable support member (100a) of the system club that enables early demoulding of the slab formwork of the present invention, Figure 3b is a state in which Figure 3a is assembled 4 is a side view showing a disassembled state of another embodiment of the variable support member 100b of the system club capable of early demoulding of the slab formwork of the present invention, and FIG. 4B is an assembled state of FIG. 4A. 5 is a cross-sectional view illustrating the present invention. Figure 6 is a partial cross-sectional view schematically showing the construction process of a construction example of the variable support member 100 of the system club that enables early demoulding of the slab formwork, Figure 6 is a variable support member of the system club capable of early demolding the slab formwork of the present invention It is sectional drawing which shows the lower end part of the lower vertical appearances 110, 110a, 110b of (100, 100a, 100b), and FIG. 7A shows the variable support material 100c of the system club which enables early demoulding of the slab formwork of this invention. Another embodiment is a side view showing a disassembled state, Figure 7b is a cross-sectional view showing a state in which Figure 7a is assembled, Figures 8a to 8c is a variable support member of the system bar which can be prematurely demolished slab formwork of the present invention ( Partial cross-sectional view briefly showing the construction process of another construction example of 100c).

이하 본 발명의 슬래브거푸집의 조기탈형이 가능한 시스템동바리의 가변지지 재(100, 100a, 100b, 100c)의 바람직한 실시예 및 시공예를 설명하면 다음과 같다. 이때 본 실시예 및 시공예에서 시스템동바리는 거푸집널의 일부가 분리되어 잔존되는 슬래브거푸집(10)을 지지하며, 수직재, 수평재, 및 경사재로 조립되는 시스템동바리인 것을 기준으로 설명한다. Hereinafter, preferred embodiments and construction examples of the variable support members 100, 100a, 100b, and 100c of the system clubs capable of early demolding of the slab formwork of the present invention will be described. At this time, the system bar in the present embodiment and construction example will be described based on the part of the formwork to support the remaining slab formwork (10), which is a system bar assembled with vertical, horizontal and inclined.

본 발명의 슬래브거푸집의 조기탈형이 가능한 시스템동바리의 가변지지재(100, 100a, 100b)에서 상기 하부수직외관(110, 110a, 110b)은 시스템동바리의 하단부에 위치되어 상부수직내관(120, 120a, 120b)과 결합되는 수직관으로, 후술되는 상부수직내관(120, 120a, 120b), 슬래브거푸집받침관(130, 130a), 높이조절용 수직관(140, 140a), 미세높이조절용 수직관(150), 및 수평재높이조절용 수직관(160, 160a)이 장착되어 형성되는 시스템동바리를 이루기 위한 기초역할을 한다. In the variable support member (100, 100a, 100b) of the system club that enables early demolding of the slab formwork of the present invention, the lower vertical appearance (110, 110a, 110b) is located at the lower end of the system club upper vertical pipe (120, 120a) , 120b) coupled to the vertical pipe, which will be described later in the vertical vertical pipes (120, 120a, 120b), slab formwork support pipes (130, 130a), height control vertical pipes (140, 140a), fine height control vertical pipe (150 ), And the horizontal pipe height adjustment vertical pipe (160, 160a) is mounted to serve as a foundation for forming a system club formed.

또한 도 6에 도시된 바와 같이 상기 하부수직외관(110, 110a, 110b)의 하단 에는 외측 둘레면을 따라 암나사산이 형성되고, 하단 끝에는 볼케스터(110c)가 장착될 수 있으며, 상기 하부수직외관(110, 110a, 110b)의 하단에는 하부수직외관(110, 110a, 110b)의 하단부가 내측삽입될 수 있는 내부공간을 가지며 하부수직외관(110, 110a, 110b)의 하단 암나사산과 암수결합되는 수나사산이 내측 둘레면을 따라 형성되어 있고, 일방향으로 회전되며 하부수직외관(110, 110a, 110b)의 외주면을 따라 길이방향으로 상하이동하면서 볼케스터(110c)의 노출정도를 조절하는 받침캡(110d)이 덧 씌어질 수 있다. In addition, as shown in FIG. 6, female threads are formed along the outer circumferential surface at the lower ends of the lower vertical appearances 110, 110a, and 110b, and a ball caster 110c may be mounted at the lower ends thereof. 110, 110a, 110b at the lower end of the lower vertical appearance (110, 110a, 110b) has an inner space that can be inserted into the inner male thread of the lower vertical appearance (110, 110a, 110b) male and female threads The support cap 110d is formed along the inner circumferential surface and rotates in one direction and adjusts the exposure degree of the ball caster 110c while moving in the longitudinal direction along the outer circumferential surfaces of the lower vertical facades 110, 110a and 110b. This can be overwritten.

따라서 시공 시 본 발명의 슬래브거푸집의 조기탈형이 가능한 시스템동바리 의 가변지지재(100, 100a, 100b)가 슬래브거푸집(10)을 지지하도록 설치 될 때에는 도 6의 (a)에 도시된 바와 같이 상기 받침캡(110d)이 바닥에 맞닿게 위치되어 하부수직외관(110, 110a, 110b)에 장착된 볼케스터(110c)가 노출되지 않도록 함으로써 하부수직외관(110, 110a, 110b)의 이동을 방지하며, 슬래브거푸집(10)을 탈형하여 동바리를 수평이동시킬 때에는 도 6의 (b)에 도시된 바와 같이 상기 받침캡(110d)을 일방향으로 회전시켜 하부수직외관(110, 110a, 110b)의 외주면을 따라 상승되도록 하여 하부수직외관(110, 110a, 110b)의 하단에 설치된 볼케스터(110c)를 노출되게 함으로써 동바리의 수평이동을 용이하게 한다. 이때 상기와 같은 받침캡(110d) 및 볼케스터(110c)가 장착된 하부수직외관(110, 110a, 110b)은 테이블폼 형태의 시스템동바리에 적용되는 것이 바람직하다.Therefore, when the variable support member (100, 100a, 100b) of the system bar that can be early demolding of the slab formwork of the present invention during installation is installed to support the slab formwork 10 as shown in Figure 6 (a) The support cap 110d is positioned in contact with the floor to prevent the ball caster 110c mounted on the lower vertical facades 110, 110a and 110b from being exposed, thereby preventing the movement of the lower vertical facades 110, 110a and 110b. When demolding the slab formwork 10 to horizontally move the copper bar, as shown in Figure 6 (b) by rotating the support cap (110d) in one direction to the outer peripheral surface of the lower vertical appearance (110, 110a, 110b) As it rises along, the ball caster 110c installed at the lower end of the lower vertical appearances 110, 110a, and 110b is exposed, thereby facilitating horizontal movement of the group. At this time, the lower vertical appearance (110, 110a, 110b) equipped with the support cap (110d) and the ball caster (110c) as described above is preferably applied to the system club of the table form.

본 발명의 슬래브거푸집의 조기탈형이 가능한 시스템동바리의 가변지지재(100, 100a, 100b)에서 상기 상부수직내관(120, 120a, 120b)은 하부수직외관(110, 110a, 110b)의 상단에 하단부가 내측삽입되어 하부수직외관(110, 110a, 110b)의 상부에 위치되며, 하부수직외관(110, 110a, 110b)과 결합되는 관으로, 후술되는 슬래브거푸집받침관(130, 130a), 높이조절용 소켓관(140, 140a), 미세높이조절용 수직관(150), 및 수평재높이조절용 수직관(160, 160a)이 장착될 수 있는 지주의 역할을 한다.The upper vertical inner tube (120, 120a, 120b) in the variable support member (100, 100a, 100b) of the system club that enables early demoulding of the slab formwork of the present invention is the lower portion at the top of the lower vertical appearance (110, 110a, 110b) Is inserted into the inner and is positioned at the top of the lower vertical appearance (110, 110a, 110b), the pipe is coupled to the lower vertical appearance (110, 110a, 110b), slab formwork support pipes (130, 130a), height adjustment will be described later The socket tube 140, 140a, the fine height adjustment vertical pipe 150, and the horizontal height adjustment vertical pipe (160, 160a) serves as a prop that can be mounted.

본 발명의 슬래브거푸집의 조기탈형이 가능한 시스템동바리의 가변지지재 (100, 100a, 100b)에서 상기 슬래브거푸집받침관(130, 130a)은 상부수직내관(120, 120a, 120b)의 상단부에 외측끼움될 수 있는 관경을 가지고, 상기 슬래브거푸집(10)의 분리되어 잔존되는 거푸집널(11)의 하부에 설치되며, 전후좌우 외측면에는 슬래브거푸집(10)의 하부를 받치는 수평재(1)가 결합되어 있는 일정길이의 수직관이다. 상기와 같은 슬래브거푸집받침관(130, 130a)은 후술되는 바와 같이 높이조절용 소켓관(140, 140a)으로 설치높이가 용이하게 조절되며 설치됨으로 본 발명의 슬래브거푸집의 조기탈형이 가능한 시스템동바리의 가변지지재(100, 100a, 100b)는 각각의 시공상황에 맞게 동바리의 설치높이가 손쉽게 조절되며, 분리되어 잔존되는 거푸집널(11)을 제외한 슬래브거푸집(10)의 조기탈형이 가능하게 된다. In the variable support member (100, 100a, 100b) of the slab formwork of the present invention can be demolished slab formwork of the slab formwork receiving pipe (130, 130a) is fitted to the upper end of the upper vertical inner pipe (120, 120a, 120b) It has a diameter that can be, is installed in the lower portion of the formwork 11 remaining separated from the slab formwork 10, the horizontal member (1) supporting the lower portion of the slab formwork 10 is coupled to the front and rear, left and right outer surface It is a vertical pipe of constant length. The slab formwork receiving tube as described above (130, 130a) is a height adjustment socket tube (140, 140a) as described below, the height of the installation is easily adjusted and installed by the variable slab form of the system can be prematurely demolished The support material (100, 100a, 100b) is easily adjusted to the installation height of the copper bar according to the construction situation, it is possible to premature demoulding of the slab formwork 10 except for the remaining formwork (11).

본 발명의 슬래브거푸집의 조기탈형이 가능한 시스템동바리의 가변지지재(100, 100a, 100b)에서 상기 높이조절용 소켓관(140, 140a)은 상부수직내관(120, 120a)에 외측끼움되어 결합되는 소켓관으로, 슬래브거푸집받침관(130)의 하부를 받치도록 위치되어 슬래브거푸집받침관(130) 및 상기 슬래브거푸집받침관(130)에 결합된 수평재(1)의 설치높이를 조절하며 상부수직내관(120, 120a)의 외주면 길이방향을 따라 상하로 이동되며 설치된다. 따라서 상기와 같은 높이조절용 소켓관(140, 140a)은 시공 시 각각의 시공상황에 알맞는 설치높이를 가지는 가변되는 동바리 시공을 가능하게 하고, 분리되어 잔존되는 거푸집널(11)을 제외한 슬래브거푸집(10)을 조기탈형하고자 할 때는 슬래브거푸집받침관(130) 및 슬래브거푸집받침관(130)에 결합된 수평재(1)를 용이하게 하강시켜 슬래브거푸집(10)이 탈형될 수 있는 여 유공간이 생성되게 한다.In the variable support member (100, 100a, 100b) of the system club that enables early demoulding of the slab formwork of the present invention, the height-adjustable socket pipe (140, 140a) is a socket that is coupled to the upper vertical inner pipe (120, 120a) outside As the pipe, it is positioned to support the lower portion of the slab formwork support tube 130 and adjusts the installation height of the horizontal member (1) coupled to the slab formwork support tube 130 and the slab formwork support tube 130 and the upper vertical inner tube ( 120 and 120a are installed while being moved up and down along the longitudinal direction of the outer circumferential surface. Therefore, as described above, the height-adjustable socket pipes 140 and 140a enable variable copper construction having a height suitable for each construction situation during construction, and slab formwork except for the remaining formwork 11 being separated. 10) When premature demoulding is carried out, the slab formwork receiving tube 130 and the slab formwork supporting tube 130 are easily lowered by the horizontal member 1 coupled to the slab formwork 10 to create a free space for demolding. To be.

또한 상기와 같은 높이조절용 소켓관(140, 140a)은 후술되는 수평재높이조절용 수직관(160)의 하부도 받치도록 설치되어, 시공상황에 맞게 수평재(1a)의 설치높이를 용이하게 조절할 수 있고, 후술되는 실시예에서와 같이 하부수직외관(110a)의 상부에도 설치되어 하부수직외관(110a)과 상부수직내관(120a)의 결합을 가능하게 한다.In addition, the height-adjustable socket pipes 140 and 140a as described above are installed to support the lower portion of the horizontal pipe height adjustment vertical pipe 160 to be described later, and can easily adjust the installation height of the horizontal material 1a according to the construction situation. It is also installed in the upper portion of the lower vertical appearance (110a) as in the embodiment to be described later to enable the coupling of the lower vertical appearance (110a) and the upper vertical inner tube (120a).

또 본 발명의 슬래브거푸집의 조기탈형이 가능한 시스템동바리의 가변지지재(100, 100a, 100b)는 기존의 높이가 가변되는 동바리 수직재에서 상부수직관 전체를 상하로 이동시켜가며 시공상황에 맞게 동바리의 높이를 조절하던 것과는 달리 상기 높이조절용 소켓관(140, 140a)만을 상하로 이동시켜가며 슬래브거푸집받침관(130) 및 수평재높이조절용 수직관(160)의 설치높이를 조절하여 시공상황에 맞는 동바리의 높이를 형성함으로 취급이 간편하고 용이하여 시공성이 높게 된다.In addition, the variable support member (100, 100a, 100b) of the system club that enables early demoulding of the slab formwork of the present invention is to move the entire upper vertical pipe up and down in the vertical bar of the variable vertical height of the copper bar according to the construction situation Unlike adjusting the height, only the height adjustment socket pipe (140, 140a) is moved up and down while adjusting the installation height of the slab formwork support pipe 130 and the vertical pipe for adjusting the horizontal ash height 160 of the copper bar according to the construction situation By forming the height, the handling is simple and easy, and the workability is high.

본 발명의 슬래브거푸집의 조기탈형이 가능한 시스템동바리의 가변지지재(100, 100a, 100b)에서 상기 미세높이조절용 수직관(150)은 상부수직내관(120, 120a, 120b)에 하단이 내측삽입되어 슬래브거푸집(10)의 분리되어 잔존되는 거푸집널(11)의 하부를 받치도록 위치되며, 시스템동바리 설치 시 미세하게 발생되는 설치높이의 오차를 극복하며 고품질의 시공을 가능하게 한다. 또한 상기와 같은 미세높이조절용 수직관(150)은 상부수직내관(120, 120a, 120b)을 관통하지 않고 상부수직내관(120, 120a, 120b)의 상단에 위치될 수 있도록 상부수직내관(120, 120a, 120b)과 동일한 관경을 가지는 걸림체(151)가 상단에 장착되어 있다.In the variable support member (100, 100a, 100b) of the system club that enables early demoulding of the slab formwork of the present invention, the fine height adjustment vertical pipe 150 is inserted into the upper vertical inner pipe (120, 120a, 120b) the inner side The slab formwork (10) is positioned to support the lower part of the remaining formwork (11) remaining, and overcomes the error of the installation height generated finely during the installation of the system bar and enables high-quality construction. In addition, the fine height adjustment vertical pipe 150 as described above does not penetrate through the upper vertical inner pipe (120, 120a, 120b) the upper vertical inner pipe (120, 120) to be located on the top of the upper vertical pipe (120, 120a, 120b) A locking body 151 having the same diameter as 120a and 120b is mounted on the top.

본 발명의 슬래브거푸집의 조기탈형이 가능한 시스템동바리의 가변지지재(100, 100a, 100b)의 수평재높이조절용 수직관(160, 160a)은 상부수직내관(120, 120a, 120b)에 외측끼움되며, 전후좌우 외측면에 수평재(1a)가 결합되는 수직관으로, 하부수직외관(110, 110a, 110b)과 슬래브거푸집받침관(130, 130a) 사이에 위치되며, 하부를 높이조절용 소켓관(140, 140a)이 받치도록 설치된다. 따라서 상기와 같은 수평재높이조절용 수직관(160, 160a)은 전술된 바와 같이 상부수직내관(120, 120a, 120b)의 외주면을 따라 길이방향으로 상하로 이동되는 높이조절용 소켓관(140, 140a)으로 설치높이가 용이하게 조절됨으로 각각의 시공상황별로 알맞은 수평재(1a)의 설치높이로 설치될 수 있다. The vertical tube height adjustment vertical pipe 160, 160a of the variable support member (100, 100a, 100b) of the system club that can be prematurely demolished slab formwork of the present invention is fitted outside the upper vertical inner pipe (120, 120a, 120b), The vertical pipe is a horizontal pipe (1a) is coupled to the front, rear, left and right outer surface, it is located between the lower vertical appearance (110, 110a, 110b) and the slab formwork receiving pipe (130, 130a), the lower portion of the socket tube for height adjustment 140, 140a) is installed to support. Therefore, the horizontal height adjustment vertical pipe (160, 160a) as described above as the height-adjustable socket pipe (140, 140a) is moved vertically along the outer circumferential surface of the upper vertical inner pipe (120, 120a, 120b) as described above Since the installation height is easily adjusted, the installation height of the horizontal member 1a suitable for each construction situation can be installed.

이하 첨부도면에 따라 본 발명의 슬래브거푸집의 조기탈형이 가능한 시스템동바리의 가변지지재(100, 100a, 100b)의 바람직한 실시예 및 시공예를 설명하면 다음과 같다. 이때 본 실시예 및 시공예는 본 발명의 하부수직외관(110, 110a, 110b), 높이조절용 수직관(140, 140a), 미세높이조절용 수직관(150), 및 수평재높이조절용 수직관(160 ,160a)과 상부수직내관(120, 120a, 120b)의 결합방식에 따라 분류하여 설명한다.Hereinafter, preferred embodiments and construction examples of the variable support members 100, 100a, and 100b of the system club which can be demoulded early according to the accompanying drawings of the present invention will be described. At this time, the present embodiment and the construction example is the lower vertical appearance of the present invention (110, 110a, 110b), height adjustment vertical pipes (140, 140a), fine height adjustment vertical pipe 150, and the vertical height adjustment vertical pipe (160, 160a) and will be described by classifying according to the coupling method of the upper vertical inner tube (120, 120a, 120b).

도 2a 내지 도 2c에 도시된 바와 같은 본 발명의 슬래브거푸집의 조기탈형이 가능한 시스템동바리의 가변지지재(100)의 일 실시예를 설명하면 다음과 같다. Referring to an embodiment of the variable support member 100 of the system club that can be demoulded early of the slab formwork of the present invention as shown in Figures 2a to 2c.

도 2a 및 도 2c에 도시된 바와 같은 본 발명의 슬래브거푸집의 조기탈형이 가능한 시스템동바리의 가변지지재(100)의 상기 하부수직외관(110)은 상단에 내측 둘레면을 따라 일정간격을 두고 분할되는 암나사산이 형성되어 후술되는 상부수직내관(120)의 수나사산과 결합된다. 이때 상기 하부수직외관(110)의 암나사산은 내측 둘레면을 따라 일정간격을 두고 분할되어 형성됨으로써 기존의 높이가 가변되는 동바리 수직재에서 상부수직재, 하부수직재, 및 결합관의 내주면 및 외주면의 둘레를 따라 연속하여 형성되는 암나사산 및 수나사산을 이용하여 결합 및 해체를 조절할 때 상부수직재, 및 하부수직재의 둘레면을 따라 결합관을 일방향으로 계속 회전시키며 작업하던 것과는 달리 분할되어 형성된 암나사산 부분에서만 하부수직외관을 일방향으로 회전시켜 결합 및 해체를 조절하게 됨으로 작업공수가 적게 들며 손쉽게 하부수직외관(110) 및 상부수직내관(120)의 결합 및 해체를 조절할 수 있게 되어 시공이 간편하다. 2A and 2C, the lower vertical appearance 110 of the variable support member 100 of the system club that enables early demoulding of the slab formwork of the present invention is divided at regular intervals along the inner circumferential surface at the top thereof. The female thread is formed is coupled to the male thread of the upper vertical inner tube 120 to be described later. At this time, the female thread of the lower vertical appearance 110 is formed by being divided at regular intervals along the inner circumferential surface, and thus, along the periphery of the inner and outer circumferential surfaces of the upper vertical material, the lower vertical material, and the joining pipe in the copper vertical member whose existing height is variable. When adjusting the joining and disassembly by using the female thread and the male thread which are formed continuously, the lower vertical part only is formed in the female thread part which is divided and formed, unlike the work that continues to rotate the coupling pipe in one direction along the circumferential surface of the upper vertical material and the lower vertical material. Rotating the exterior in one direction to control the coupling and disassembly, less labor and easy to control the coupling and disassembly of the lower vertical appearance 110 and the upper vertical inner tube 120 is easy to construct.

본 발명의 슬래브거푸집의 조기탈형이 가능한 시스템동바리의 가변지지재(100)에서 전술된 바와 같은 상부수직내관(120)은 도 2a 및 도 2c에 도시된 바와 같이 하부수직외관(110)의 암나사산과 암수결합되는 수나사산이 외측 둘레면을 따라 일정간격을 두고 분할되어 길이방향으로 형성되어 있고, 내측 둘레면을 따라 일정간격을 두고 분할되어 길이방향으로 암나사산이 형성되어 있다. 따라서 시공 시 상기 상부수직내관(120)은 외측 둘레면에 형성된 수나사산으로 하부수직외관(110) 및 높이조절용 수직관(140)과 결합되며, 내측 둘레면에 형성된 암나사산으로 미세높이조절용 수직관(150)과 결합된다. The upper vertical inner tube 120 as described above in the variable support member 100 of the system club that enables early demoulding of the slab formwork of the present invention is the female thread of the lower vertical outer tube 110, as shown in Figures 2a and 2c. Male and female threads that are male and female are divided at regular intervals along the outer circumferential surface and formed in the longitudinal direction, and female threads are formed in the longitudinal direction by being divided at regular intervals along the inner circumferential surface. Therefore, during construction, the upper vertical inner tube (120) is a male thread formed on the outer circumferential surface and is coupled with the lower vertical outer tube (110) and the height adjusting vertical tube (140), and the vertical height for fine height adjustment with the female thread formed on the inner circumferential surface. Combined with 150.

본 발명의 슬래브거푸집의 조기탈형이 가능한 시스템동바리의 가변지지재(100)에서 전술된 바와 같은 높이조절용 소켓관(140)은 상부수직내관(120)에 외측끼움되어 결합되는 소켓관으로, 도 2a 및 도 2c에 도시된 바와 같이 상부수직내관(120)의 수나사산과 암수결합되는 암나사산이 내측 둘레면을 따라 일정간격을 두고 분할되어 길이방향으로 형성되어 있다.Height-adjustable socket tube 140 as described above in the variable support member 100 of the system club that enables early demoulding of the slab formwork of the present invention is a socket tube coupled to the upper vertical inner tube 120, Fig. 2a As shown in FIG. 2C, the female screw thread that is male and female coupled to the male screw thread of the upper vertical inner tube 120 is divided in the longitudinal direction along the inner circumferential surface and formed in the longitudinal direction.

본 발명의 슬래브거푸집의 조기탈형이 가능한 시스템동바리의 가변지지재(100)에서 상기 미세높이조절용 수직관(150)은 전술된 바와 같이 상부수직내관(120)에 하단이 내측삽입되어 슬래브거푸집(10)의 분리되어 잔존되는 거푸집널(11)의 하부를 받치도록 위치되며, 상부수직내관(120)과 결합되기 위해 상부수직내관(120)의 내측면 암나사산과 암수결합되는 수나사산이 외측 둘레면을 따라 일정간격을 두고 분할되어 길이방향으로 형성되어 있다. In the variable support member 100 of the system club that enables early demoulding of the slab formwork of the present invention, the fine height adjustment vertical pipe 150 is inserted into the upper vertical inner tube 120 as described above and the slab formwork 10 ) Is positioned to support the lower part of the remaining formwork (11) of the separation, and the male thread that is male and female coupled to the inner side of the upper vertical inner tube (120) to be coupled to the upper vertical inner tube (120). It is divided at regular intervals and formed in the longitudinal direction.

도 3a 및 도 3b에 도시된 바와 같은 본 발명의 슬래브거푸집의 조기탈형이 가능한 시스템동바리의 가변지지재(100a)의 다른 실시예를 설명하면 다음과 같다. Another embodiment of the variable support member 100a of the system club which enables early demoulding of the slab formwork of the present invention as shown in Figs. 3a and 3b is as follows.

본 발명의 슬래브거푸집의 조기탈형이 가능한 시스템동바리의 가변지지재(100a)에서 상기 하부수직외관(110a)은 전술된 바와 같이 시스템동바리의 하단에 위치되는 수직관으로, 후술되는 바와 같이 시공하고자 하는 높이에 맞게 설치높이가 조절된 후 하부수직외관(110a)의 상부에 위치된 높이조절용 소켓관(140a)으로 상부수직내관(120a)과 결합된다.In the variable support member 100a of the system club which enables early demoulding of the slab formwork of the present invention, the lower vertical appearance 110a is a vertical pipe which is located at the bottom of the system club as described above. After the installation height is adjusted according to the height is coupled to the upper vertical inner tube (120a) to the height adjustment socket tube (140a) located on the upper portion of the lower vertical appearance (110a).

본 발명의 슬래브거푸집의 조기탈형이 가능한 시스템동바리의 가변지지재(100a)에서 상기 하부수직외관(110a)의 상부에 위치되는 상부수직내관(120a)은 외측 둘레면을 따라 연속되는 수나사산이 길이방향으로 형성되어 있으며 상단부에는 내측 둘레면을 따라 연속되는 암나사산이 형성된 결합관(120a')이 설치되어 있다. 상기 상부수직내관(120a)은 외측 둘레면에 형성된 수나사산으로 하부수직외관(110a), 및 높이조절용 소켓관(140a)과 결합되며, 상기 결합관(120a')으로 미세높이조절용 수직관(150)과 결합된다.The upper vertical inner tube (120a) is located in the upper portion of the lower vertical appearance (110a) in the variable support member (100a) of the system club that enables early demoulding of the slab formwork of the present invention, the male thread is continuous along the outer peripheral surface length It is formed in the direction and the upper end portion is provided with a coupling pipe (120a ') formed with a continuous female thread along the inner peripheral surface. The upper vertical inner tube (120a) is a male thread formed on the outer circumferential surface and is coupled with the lower vertical outer tube (110a), and the height adjustment socket tube (140a), the vertical pipe for fine adjustment of height by the coupling pipe (120a ') ) Is combined.

본 발명의 슬래브거푸집의 조기탈형이 가능한 시스템동바리의 가변지지재(100a)에서 상기 높이조절용 소켓관(140a)은 상부수직내관(120a)의 수나사산과 암수결합되며 내축 둘레면을 따라 연속되는 암나사산이 길이방향으로 형성되어 있다. 상기와 같은 높이조절용 소켓관(140a)은 전술된 실시예에서와 마찬가지로 슬래브거푸집받침관(130) 및 수평재높이조절용 수직관(160)의 설치높이를 조절하며 상부수직내관(120a)과 결합될 뿐 만 아니라 하부수직외관(110a)의 상부에도 위치되어 용 이하게 하부수직외관(110a)과 상부수직내관(120a)의 결합을 완성한다.The height-adjustable socket tube 140a in the variable support member 100a of the system club that enables early demoulding of the slab formwork of the present invention is female and female coupled with the male thread of the upper vertical inner tube 120a and is continuous along the inner circumference of the inner shaft. The acid is formed in the longitudinal direction. The height-adjustable socket pipe 140a as described above adjusts the installation height of the slab formwork receiving pipe 130 and the horizontal pipe height adjusting vertical pipe 160 as in the above-described embodiment, and is only combined with the upper vertical inner pipe 120a. It is located in the upper portion of the lower vertical appearance (110a) as well as to easily complete the coupling of the lower vertical appearance (110a) and the upper vertical inner tube (120a).

본 발명의 슬래브거푸집의 조기탈형이 가능한 시스템동바리의 가변지지재(100a)에서 상기 미세높이조절용 수직관(150)은 전술된 바와 같이 상부수직내관(120a)에 하단이 내측삽입되어 슬래브거푸집(10)의 분리되어 잔존되는 거푸집널(11)의 하부를 받치도록 위치되며, 상부수직내관(120a)과 결합되기 위해 상부수직내관(120a)의 결합관(120a') 암나사산과 암수결합되며 외측 둘레면을 따라 연속하는 수나사산이 길이방향으로 형성되어 있다.In the variable support member (100a) of the system club that can be prematurely demolished slab formwork of the present invention, the fine height adjustment vertical pipe 150 is inserted into the upper vertical inner tube (120a) as described above the inner slab formwork (10) ) Is positioned to support the lower part of the remaining formwork (11), and the male and female coupling pipe 120a 'of the upper vertical inner tube (120a) and male and female to be coupled to the upper vertical inner tube (120a) and the outer peripheral surface A continuous male thread is formed along the lengthwise direction.

도 4a 및 도 4b에 도시된 바와 같은 본 발명의 슬래브거푸집의 조기탈형이 가능한 시스템동바리의 가변지지재(100b)의 또 다른 실시예를 설명하면 다음과 같다. Another embodiment of the variable support member 100b of the system club which enables early demoulding of the slab formwork of the present invention as shown in FIGS. 4A and 4B is as follows.

도 4a 및 도 4b에 도시된 바와 같이 본 발명의 슬래브거푸집의 조기탈형이 가능한 시스템동바리의 가변지지재(100b)의 상기 하부수직외관(110b)은 상단의 외측 둘레면을 따라 연속하는 암나사산이 형성되어 있고, 암나사산이 형성된 적소에 고정핀(210)이 삽입될 수 있는 장공형의 결합공(110b')이 길이방향으로 형성되어 있다.4A and 4B, the lower vertical appearance 110b of the variable support member 100b of the system club capable of early demoulding of the slab formwork of the present invention has a female thread continuous along the outer circumferential surface of the upper end thereof. And, a long hole type coupling hole 110b 'into which the fixing pin 210 can be inserted in place where the female thread is formed is formed in the longitudinal direction.

또한 암나사산이 형성된 상기 하부수직외관(110b)의 상단에는 고정너트(200)가 외측끼움되어 있다. 이때 상기 고정너트(200)는 내측 둘레면을 따라 연속하는 수나사산이 형성되어 있고 좌우 외측면에 손잡이부가 형성되어 있는 형태로, 후술되는 바와 같이 하부수직외관(110b)의 결합공(110b')과 상부수직내관(120b)의 고정공(120b')을 관통하여 설치되는 고정핀(210)의 하부에 위치되어 하부수직외관(110b)과 상부수직내관(120b)의 결합을 더욱 견고하게 한다.In addition, the fixing nut 200 is fitted to the upper end of the lower vertical appearance (110b) formed with a female thread. At this time, the fixing nut 200 is a continuous male thread is formed along the inner circumferential surface and the handle portion is formed on the left and right outer surface, the coupling hole (110b ') of the lower vertical appearance (110b) as will be described later And located in the lower portion of the fixing pin 210 is installed through the fixing hole (120b ') of the upper vertical inner tube (120b) to further strengthen the coupling of the lower vertical outer tube (110b) and the upper vertical inner tube (120b).

본 발명의 슬래브거푸집의 조기탈형이 가능한 시스템동바리의 가변지지재(100b)에서 상기 상부수직내관(120b)은 전술된 바와 같이 하부수직외관(110b)의 상단에 하단부가 내측삽입되어 하부수직외관(110b)의 상부에 위치되고, 상기 고정핀(210)이 삽입되는 고정공(120b')이 길이방향으로 일정간격을 두고 다수개 형성되어 있으며, 상단부에는 내측 둘레면을 따라 연속하는 암나사산이 형성된 결합관(120a')이 설치되어 있다. In the variable support member (100b) of the system club that can be early demolding the slab formwork of the present invention, the upper vertical inner tube (120b) is inserted into the upper end of the lower vertical outer tube (110b) as described above, the lower vertical outer tube ( Located in the upper portion of 110b, a plurality of fixing holes 120b 'into which the fixing pin 210 is inserted are formed at a predetermined interval in the longitudinal direction, and the upper end portion is formed with a continuous female thread along the inner circumferential surface. The pipe 120a 'is provided.

따라서 상기 상부수직내관(120b)은 시공하고자하는 설치높이에 맞게 하부수직외관(110b)의 상부에서 높이조절된 후, 상기 하부수직외관(110b)의 결합공(110b')과 상부수직내관(120b)의 소정의 고정공(120b')을 관통하는 고정핀(210)이 삽입되어 하부수직외관(110b)과 상부수직내관(120b)의 결합이 이루어지게 된다.Therefore, the upper vertical inner tube (120b) is adjusted in the upper portion of the lower vertical appearance (110b) according to the installation height to be installed, the coupling hole (110b ') and the upper vertical inner tube (120b) of the lower vertical appearance (110b) A fixing pin 210 penetrating a predetermined fixing hole (120b ') of the) is inserted to be coupled to the lower vertical appearance (110b) and the upper vertical inner tube (120b).

본 발명의 슬래브거푸집의 조기탈형이 가능한 시스템동바리의 가변지지재(100b)에서 상기 슬래브거푸집받침관(130a)은 상기 상부수직내관(120b)의 상단부에 외측끼움될 수 있는 관경을 가지며, 상기 슬래브거푸집(10)의 분리되어 잔존되는 거푸집널(11)의 하부에 설치되고, 전후좌우 외측면에는 슬래브거푸집(10)의 하부를 받치는 수평재(1)가 결합되어 있는 일정길이의 수직관으로, 상기 수직관은 하단부의 외측 둘레면을 따라 연속하는 암나사산이 형성되어 있고, 상기 암나사산이 형성된 적소에는 고정핀(210)이 삽입될 수 있는 장공형의 결합공(130a')이 길이방향으로 형성되어 있다. In the variable support member (100b) of the system club that can be early demolding the slab formwork of the present invention, the slab formwork support tube (130a) has a diameter that can be fitted outside the upper end of the upper vertical inner pipe (120b), the slab It is installed in the lower part of the formwork 11 remaining separated formwork 10, the front and rear left and right outer surface of the vertical pipe of a predetermined length to which the horizontal member (1) for supporting the lower part of the slab formwork 10 is coupled, The vertical tube is formed with a continuous female thread along the outer circumferential surface of the lower end, and the long hole-shaped coupling hole 130a 'into which the fixing pin 210 can be inserted is formed in the longitudinal direction in which the female thread is formed. .

또한 상기 슬래브거푸집받침관(130a)의 하단부에는 상기 하부수직외관(120b)에서 전술된 바와 같은 고정너트(200)가 외측끼움된다. 따라서 상기와 같은 고정너트(200)는 슬래브거푸집받침관(130a)의 결합공(130a')과 상부수직내관(120b)의 소정의 고정공(120b')을 관통하는 고정핀(210)의 하부에 설치되어 슬래브거푸집받침관(130a)과 상부수직내관(120b)의 결합을 더욱 견고하게 한다. In addition, the lower end of the slab formwork receiving tube (130a), the fixing nut 200 as described above in the lower vertical appearance (120b) is fitted outside. Therefore, the fixing nut 200 as described above is the lower portion of the fixing pin 210 penetrating the predetermined fixing hole (120b ') of the coupling hole (130a') and the upper vertical inner tube (120b) of the slab formwork receiving tube (130a). Is installed in the slab formwork receiving tube (130a) and the upper vertical inner tube (120b) is more firmly coupled.

본 발명의 슬래브거푸집의 조기탈형이 가능한 시스템동바리의 가변지지재(100b)에서 상기 미세높이조절용 수직관(150)은 상기 상부수직내관(120b)에 내측삽입 되어 상기 슬래브거푸집(10)의 분리되어 잔존되는 거푸집널(11)의 하부를 받치도록 위치되며, 상부수직내관(120b)의 결합관(120a') 암나사산과 암수결합되며 외측 둘레면을 따라 연속하는 수나사산이 길이방향으로 형성되어 있는 일정길이의 수직관으로, 상단부에 상부수직내관(120b)과 동일한 관경을 가지는 걸림체(151)가 형성되어 있다.In the variable support member (100b) of the system club that can be demoulded early of the slab formwork of the present invention, the fine height adjustment vertical pipe 150 is inserted into the upper vertical inner tube (120b) is separated from the slab formwork (10) It is positioned to support the bottom of the remaining formwork (11), the male and female coupling of the coupling pipe (120a ') of the upper vertical inner tube (120b) is a constant male thread is formed along the outer circumferential surface in the longitudinal direction. As a vertical tube of length, a locking member 151 having the same diameter as the upper vertical inner tube 120b is formed at the upper end.

본 발명의 슬래브거푸집의 조기탈형이 가능한 시스템동바리의 가변지지재(100b)의 수평재높이조절용 수직관(160a)은 상기 상부수직내관(120b)에 외측끼움되 어 하부수직외관(110b)과 슬래브거푸집받침관(130a) 사이에 위치되며, 하단부의 외측 둘레면을 따라 연속하는 암나사산이 형성되어 있고, 상기 암나사산이 형성된 적소에 고정핀(210)이 삽입될 수 있는 장공형의 결합공(160a')이 길이방향으로 형성되어 있다. 또한 상기 수평재높이조절용 수직관(160a)은 전술된 바와 같은 내측 둘레면을 따라 연속하는 수나사산이 형성되어 있고 좌우 외측면에 손잡이부가 형성되어 있는 고정너트(200)가 결합되어 있다. 상기와 같은 고정너트(200)는 수평재높이조절용 수직관(160a)의 결합공(160a') 및 상부수직내관(120b)의 소정의 고정공을 관통하는 고정핀(210)의 하부에 위치되어 수평재높이조절용 수직관(160a) 및 상부수직내관(120b)의 결합을 더욱 견고하게 한다.Vertical tube 160a for horizontal height adjustment of the variable support member 100b of the system club which enables early demoulding of the slab formwork of the present invention is fitted outside the upper vertical inner tube 120b so that the lower vertical appearance 110b and the slab formwork Located between the support pipe (130a), a continuous female thread is formed along the outer circumferential surface of the lower end, the long hole-shaped coupling hole (160a ') that can be inserted into the fixing pin 210 in place where the female thread is formed It is formed in the longitudinal direction. In addition, the horizontal height adjustment vertical pipe (160a) is a continuous male thread is formed along the inner circumferential surface as described above, and the fixing nut 200 is formed with a handle portion formed on the left and right outer surface. The fixing nut 200 is positioned in the lower portion of the fixing pin 210 penetrating a predetermined fixing hole of the coupling hole (160a ') and the upper vertical inner tube (120b) of the horizontal tube height adjustment vertical pipe (160a) horizontal member The height of the vertical pipe 160a and the upper vertical pipe 120b is more firmly coupled.

본 발명의 슬래브거푸집의 조기탈형이 가능한 시스템동바리의 가변지지재(100, 100a, 100b)는 상기와 같은 다양한 실시예 중에서 시공상황에 맞는 것을 택일되어 시행될 수 있다.Variable support material (100, 100a, 100b) of the system club that can be demoulded early of the slab formwork of the present invention can be implemented to be selected to suit the construction situation among the various embodiments as described above.

도 5a 내지 도 5c에 도시된 바와 같이 본 발명의 슬래브거푸집의 조기탈형이 가능한 시스템동바리의 가변지지재(100, 100a, 100b)의 일 시공예를 설명하면 다음과 같다. 이때 본 시공예에서 슬래브거푸집의 조기탈형이 가능한 시스템동바리의 가변지지재는 도 2a 내지 도 2c에 도시된 바와 같은 가변지지재(100)인 것을 기준으로 설명한다.As shown in Figure 5a to 5c illustrating a construction example of the variable support member (100, 100a, 100b) of the system club that can be demoulded early of the slab formwork of the present invention. At this time, in the present construction example, the variable support material of the system club that can be early demolding the slab formwork will be described on the basis of the variable support material 100 as shown in Figures 2a to 2c.

본 발명의 슬래브거푸집의 조기탈형이 가능한 시스템동바리의 가변지지재(100)의 하부수직외관(110)의 상단에 상부수직외관(120)의 하단부를 내측삽입하고 시공하고자 하는 높이에 맞게 상부수직외관(120)의 높이를 조절한 후, 상기 상부수직외관(120)을 일방향으로 45도 회전시켜 상기 하부수직외관(110)의 암나사산과 상부수직내관(120)의 수나사산을 암수결합되도록 하여 하부수직외관(110)과 상부수직내관(120)을 결합시킨다.Insert the lower vertical part of the upper vertical outer shell 120 to the upper end of the vertical vertical outer shell 110 of the variable support member 100 of the system club that enables early demoulding of the slab formwork of the present invention and the upper vertical outer shell to match the height to be constructed. After adjusting the height of the 120, the upper vertical shell 120 is rotated 45 degrees in one direction so that the male thread of the lower vertical shell 110 and the male thread of the upper vertical tube 120 are male-female coupled. Combine the exterior 110 and the upper vertical inner tube (120).

이후 상기 상부수직내관(120)의 상부에 미세높이조절용 수직관(150)의 하단을 내측삽입 하고, 상기 상부수직내관(120)의 외측에 수평재높이조절용 수직관(160) 및 슬래브거푸집받침관(130)과 상기 수평재높이조절용 수직관(160)과 슬래브거푸집받침관(130)의 하부를 각각 받치는 높이조절용 소켓관(140)을 외측끼움한다. 이때 상기 상부수직내관(120)의 외측끼움은 상부수직내관(120)의 상방을 향하여 수평재높이조절용 수직관(160) 및 슬래브거푸집받침관(130) 순으로 위치되게 설치한다.After inserting the lower end of the fine height adjustment vertical tube 150 to the upper portion of the upper vertical inner tube 120, the horizontal vertical height adjustment vertical tube 160 and the slab formwork tube (outside the upper vertical inner tube 120) 130) and the height adjustment socket tube 140 for supporting the lower portion of the horizontal pipe height adjustment vertical pipe 160 and the slab formwork support pipe 130, respectively. At this time, the outer fitting of the upper vertical inner tube 120 is installed to be positioned in the order of the upper vertical vertical tube 120 and the slab formwork receiving tube 130 for adjusting the horizontal height.

이후 상기와 같이 결합되는 본 발명의 슬래브거푸집의 조기탈형이 가능한 시스템동바리의 가변지지재(100)를 슬래브거푸집(10)의 분리되어 잔존되는 거푸집널(11) 하부에 위치시키고, 상부수직내관(120)의 상단에 내측삽입되어 있는 미세높이조절용 수직관(150)을 상방으로 상승시켜 상기 분리되어 잔존되는 거푸집널(11)의 하부에 맞닿게 위치시킨뒤 상기 상부수직내관(120)과 미세높이조절용 수직관(150)을 결합시킨다. 따라서 상기와 같이 설치되는 미세높이조절용 수직관(150)은 슬래브거푸집(10)과 시스템동바리 사이의 미세한 설치높이 오차를 용이하게 극복하며 고품질의 시공을 가능하게 한다.Thereafter, the variable support member 100 of the system club that enables early demolding of the slab formwork of the present invention coupled as described above is positioned below the remaining formwork 11 of the slab formwork 10, and the upper vertical inner tube ( The vertical height adjusting vertical pipe 150 inserted into the upper end of the upper portion 120 is upwardly positioned to be brought into contact with the lower portion of the separated formwork 11, and the upper vertical inner pipe 120 and the fine height are positioned. Combine the adjustable vertical pipe 150. Therefore, the vertical height adjustment tube 150 installed as described above easily overcomes the fine installation height error between the slab formwork 10 and the system club and enables high-quality construction.

또 상기 상부수직내관(120)에 설치된 높이조절용 소켓관(140)은 상부수직내관(120)의 외주면 길이방향을 따라 상하로 이동되면서 시공하고자 하는 높이에 맞게 슬래브거푸집받침관(130) 및 수평재높이조절용 수직관(160)의 설치높이를 조절하며 상부수직내관(120)과 결합된다.In addition, the height-adjustable socket pipe 140 installed in the upper vertical inner pipe 120 is moved up and down along the longitudinal direction of the outer vertical surface of the upper vertical inner pipe 120, the slab formwork support pipe 130 and the horizontal ash height to fit the height Adjust the installation height of the vertical pipe for adjustment 160 and is coupled to the upper vertical inner tube (120).

이후 상기와 같이 설치되는 수직재(100)의 좌우 측면에 수평재(1, 1a) 및 경사재를 결합시키며 시스템동바리를 완성한다.Since the horizontal member (1, 1a) and the inclined member is coupled to the left and right sides of the vertical member 100 installed as described above to complete the system club.

도 5a에 도시된 바와 같이 상기 시스템동바리의 상부에 슬래브거푸집(10)을 설치하고 콘크리트를 타설하여 슬래브를 형성한다. As shown in FIG. 5a, the slab formwork 10 is installed on the upper part of the system club, and the concrete is poured to form the slab.

이후 상기와 같이 형성된 슬래브가 설계기준강도를 만족할 만큼은 아니지만 설계기준강도의 60% 이상 발현되면 도 5b에 도시된 바와 같이 상부수직내관(120)에 외측끼움되어 있는 높이조절용 소켓관(140)을 소정 높이만큼 하강시킨다. Since the slab formed as described above is not enough to meet the design reference strength, but when more than 60% of the design reference strength is expressed as shown in Figure 5b the height-adjustable socket tube 140 is fitted outside the upper vertical inner tube 120 Descend by height.

따라서 상기와 같이 높이조절용 소켓관(140)이 하강되게 되면 자연스럽게 슬래브거푸집받침관(130) 및 수평재높이조절용 수직관(160)도 하강되어 추후 슬래브거푸집(10)의 탈형이 이루어질 수 있는 여유공간이 생성되게 되며, 슬래브거푸집(10)의 탈형이 용이하게 이루어진다.Therefore, when the height-adjustable socket tube 140 is lowered as described above, the slab formwork support tube 130 and the horizontal pipe height adjustment vertical tube 160 are also lowered, so that the free space for demoulding the slab formwork 10 can be made later. Will be produced, the demoulding of the slab formwork 10 is made easily.

이후 도 5b에 도시된 바와 같이 상기 슬래브거푸집받침관(130) 및 수평재높이조절용 수직관(160)에 결합되어 있는 수평재(1, 1a)를 해체하고, 본 발명의 슬래브거푸집의 조기탈형이 가능한 시스템동바리의 가변지지재(100)가 지지하고 있는 분리되어 잔존되는 거푸집널(11)을 제외한 슬래브거푸집(10)을 탈형한다. 이때 슬래브는 슬래브거푸집(10)이 탈형되더라도 도 5c에 도시된 바와 같이 상기 분리되어 잔존되는 거푸집널(11) 및 본 발명의 슬래브거푸집의 조기탈형이 가능한 시스템동바리의 가변지지재(100)가 슬래브의 하부를 지지하고 있으므로 강도의 저하 없이 설계기준강도를 만족할 수 있게 된다. 또한 상기와 같이 조기탈형된 슬래브거푸집(10)은 상층으로 이동되어 슬래브 시공에 이용됨으로써 거푸집의 재사용율은 향상되며 공비의 증가가 억제된다.After dismantling the horizontal member (1, 1a) is coupled to the slab formwork support tube 130 and the horizontal member height control vertical tube 160, as shown in Figure 5b, the system capable of early demolition of the slab formwork of the present invention The slab formwork 10 is demolded except for the separated and remaining formwork 11 supported by the variable support member 100 of the copper bar. At this time, even if the slab formwork 10 is demolded as shown in Figure 5c the slab formwork (11) and the variable support member 100 of the system bar which is capable of early demoulding the slab formwork of the present invention is slab Since it supports the lower part of, it is possible to satisfy the design standard strength without degrading the strength. In addition, the slab formwork (10) prematurely demolished as described above is moved to the upper layer to be used in the slab construction, the reuse rate of the formwork is improved and the increase in azeotropy is suppressed.

이후 설계기준강도를 만족시킬 수 있는 슬래브 양생기간이 완료되면 본 발명의 슬래브거푸집의 조기탈형이 가능한 시스템동바리의 가변지지재(100)와 슬래브의 하부에 잔존하는 거푸집널(11)을 제거하여 슬래브 시공을 완료한다.After the slab curing period that can satisfy the design standard strength is completed, the slab by removing the variable support member 100 and the formwork (11) remaining in the lower part of the slab to allow early demoulding of the slab formwork of the present invention Complete construction.

상기까지는 적층식으로 시공되는 본 발명의 슬래브거푸집의 조기탈형이 가능한 시스템동바리의 가변지지재(100, 100a, 100b)의 실시예 및 시공예를 설명하였다.Up to this point, the embodiments and construction examples of the variable support members 100, 100a, and 100b of the system clubs capable of early demolding of the slab formwork of the present invention, which are constructed in a lamination type, have been described.

하기부터는 무지주 역타설식으로 시공되는 본 발명의 슬래브거푸집의 조기탈형이 가능한 시스템동바리의 가변지지재(100c)의 실시예 및 시공예를 설명한다.Hereinafter, the embodiment and the construction example of the variable support member 100c of the system club which enables early demoulding of the slab formwork of the present invention, which is constructed by an unsupported reverse casting method, will be described.

도 7a 내지 도 8c를 기준으로 본 발명의 슬래브거푸집의 조기탈형이 가능한 시스템동바리의 가변지지재(100c)의 일 실시예를 설명하면 다음과 같다.7A to 8C, one embodiment of the variable support member 100c of the system club capable of early demoulding of the slab formwork according to the present invention will be described.

본 발명의 슬래브거푸집의 조기탈형이 가능한 시스템동바리의 가변지지재(100c)의 현수봉(300)은 하단이 상기 슬래브거푸집(10)의 분리되어 잔존되는 거푸집널(11)을 관통하고, 상단이 지상에 고정되는 일정 길이의 봉이다.Suspension rod 300 of the variable support material (100c) of the system club that can be prematurely demolished slab formwork of the present invention, the lower end penetrates the remaining formwork 11 of the slab formwork (10), the upper end is It is a rod of fixed length fixed to the ground.

본 발명의 슬래브거푸집의 조기탈형이 가능한 시스템동바리의 가변지지재(100c)의 상부수직관(120c)은 상기 현수봉(300)의 하단에 외측끼움되어 고정되며, 분리되어 잔존되는 거푸집널(11)의 하부를 받치는 수직관으로, 외측 둘레면을 따라 길이방향으로 수나사산이 형성되어 있어 시공 시 높이조절용 소켓관(140d)과 용이하게 결합 및 해체될 수 있다. 이때 도면에는 상기 상부수직관(120c)의 수나사산이 외측 둘레면을 따라 연속되는 것으로 도시되어 있지만, 외측 둘레면을 따라 일정간격으로 분할되어 있는 형태로도 제작될 수 있으며, 상기 암나사산의 형성 형태는 제작상황 및 시공상황에 따라 택일되어 제작되어도 무방하다. Upper vertical pipe (120c) of the variable support member (100c) of the slab formwork of the present invention can be demolished slab formwork of the present invention is fixed to the lower end of the suspension rod 300 is fixed, the remaining formwork (11) As a vertical pipe supporting the bottom of the), the male thread is formed in the longitudinal direction along the outer circumferential surface can be easily coupled and dismantled with the height-adjustable socket tube (140d) during construction. At this time, the male thread of the upper vertical pipe (120c) is shown to be continuous along the outer circumferential surface, but may be manufactured in a form divided into a predetermined interval along the outer circumferential surface, the formation of the female thread The shape may be alternatively produced according to the production situation and construction situation.

본 발명의 슬래브거푸집의 조기탈형이 가능한 시스템동바리의 가변지지재(100c)의 슬래브거푸집받침관(130b)은 상기 상부수직관(120c)에 외측끼움되어 분리되어 잔존되는 거푸집널(11)의 하부에 위치되며, 전후좌우 외측면에는 슬래브거푸집의 하부를 받치는 수평재(1)가 결합되는 수직관이다. 상기 슬래브거푸집받침관(130b)은 전술된 실시예 및 시공예에서와 같이 높이조절용 소켓관(140b)으로 설치높이가 용이하게 조절됨으로 본 발명의 슬래브거푸집의 조기탈형이 가능한 시스템동바리의 가변지지재(100c)는 각각의 시공상황에 맞게 동바리의 설치높이를 용이하 게 조절할 수 있으며, 분리되어 잔존되는 거푸집널(11)을 제외한 슬래브거푸집(10)의 조기탈형이 가능하게 된다.The slab formwork receiving tube 130b of the variable support member (100c) of the system club that enables early demoulding of the slab formwork of the present invention is fitted to the upper vertical pipe (120c) to the outside of the lower formwork 11 remaining separated Located in the front, rear, left and right outer surface is a vertical pipe that is coupled to the horizontal member (1) supporting the lower portion of the slab formwork. The slab formwork receiving tube (130b) is a variable support member of the system club that can be prematurely demolished slab formwork of the present invention as the height of the installation is easily adjusted to the height adjustment socket tube (140b) as in the above-described embodiment and construction example (100c) can easily adjust the installation height of the copper bar according to each construction situation, it is possible to premature demolition of the slab formwork 10 except for the remaining formwork (11) separated.

본 발명의 슬래브거푸집의 조기탈형이 가능한 시스템동바리의 가변지지재(100c)의 높이조절용 소켓관(140b)은 상기 상부수직관(120c)에 외측끼움되며 상부수직관(120c)의 수나사산과 암수결합되는 암나사산이 내측 둘레면을 따라 형성되어 있다. 이러한 높이조절용 소켓관(140b)의 암나사산은 전술된 상부수직관(120c)에서와 같이 내측 둘레면을 따라 연속하는 형태로 제작될 수 도 있고, 내측 둘레면을 따라 일정간격으로 분할된 형태로 제작될 수 있다.Height adjustment socket tube (140b) of the variable support member (100c) of the system club that can be prematurely demolished slab formwork of the present invention is fitted outside the upper vertical pipe (120c) and male thread and male and female of the upper vertical pipe (120c) A female thread to be joined is formed along the inner circumferential surface. The female thread of the height-adjustable socket tube 140b may be manufactured in a continuous form along the inner circumferential surface as in the upper vertical pipe 120c described above, or manufactured in a divided form along the inner circumferential surface at regular intervals. Can be.

또한 상기 높이조절용 소켓관(140b)은 슬래브거푸집받침관(130b)의 하부를 받치도록 위치되어 슬래브거푸집받침관(130b) 및 상기 슬래브거푸집받침관(130b)에 결합된 수평재(1)의 설치높이가 조절되도록 상부수직관(120c)의 외주면 길이방향을 따라 상하로 이동된다. 따라서 상기 높이조절용 소켓관(140b)은 전술된 실시예 및 시공예에서와 같이 시공 시 각각의 시공상황에 맞게 알맞은 설치높이의 동바리 시공을 가능하게 하고, 분리되어 잔존되는 거푸집널(11)의 일부를 제외한 슬래브거푸집(10)을 조기탈형하고자 할 때에는 슬래브거푸집받침관(130b) 및 슬래브거푸집받침관(130b)에 결합된 수평재(1)를 용이하게 하강시켜 슬래브거푸집(10)이 탈형될 수 있는 여유공간이 생성되게 한다. In addition, the height-adjustable socket tube (140b) is positioned to support the lower portion of the slab formwork receiving tube (130b) installed height of the horizontal member (1) coupled to the slab formwork receiving tube (130b) and the slab formwork receiving tube (130b). It is moved up and down along the longitudinal direction of the outer peripheral surface of the upper vertical pipe (120c) to be adjusted. Therefore, the height-adjustable socket tube (140b) is to enable the installation of the copper bar of the installation height suitable for each construction situation, as in the above-described embodiment and construction example, part of the formwork 11 remaining separated When the slab formwork (10) except for the premature demolding, the slab formwork support pipe (130b) and the slab formwork support pipe (130b) to easily lower the horizontal member (1) coupled to the slab formwork (10) can be demoulded Allow free space to be created.

도면에 도시되지는 않았지만 본 발명의 슬래브거푸집의 조기탈형이 가능한 시스템동바리의 가변지지재의 다른 실시예를 설명하면 다음과 같다.Although not shown in the drawings will be described another embodiment of the variable support material of the system club that can be early demolding the slab formwork of the present invention.

본 발명의 슬래브거푸집의 조기탈형이 가능한 시스템동바리의 가변지지재에서 현수봉(300)은 앞선 전술된 실시예의 현수봉(300)과 동일한 것임으로 이에 대한 설명은 생략한다.Suspension rod 300 in the variable support material of the system club that can be prematurely demolished slab formwork of the present invention is the same as the suspension rod 300 of the above-described embodiment, so a description thereof will be omitted.

본 발명의 슬래브거푸집의 조기탈형이 가능한 시스템동바리의 가변지지재의 상부수직관은 상기 현수봉(300)의 하단에 외측끼움되어 고정되며, 분리되어 잔존되는 거푸집널(11)의 하부를 받치는 수직관으로, 측면에 길이방향으로 고정핀이 삽입되는 다수개의 고정공이 일정간격으로 형성되어 있다. The upper vertical pipe of the variable support member of the system club that enables early demoulding of the slab formwork of the present invention is vertically fitted to the lower end of the suspension rod 300, the vertical pipe supporting the bottom of the remaining formwork (11) separated As a result, a plurality of fixing holes into which the fixing pin is inserted in the longitudinal direction are formed at regular intervals.

따라서 상기 상부수직관은 시공하고자 하는 높이에 상기 상부수직관의 고정공과 후술되는 슬래브거푸집받침관의 결합공을 관통하는 고정핀을 삽입함으로써 슬래브거푸집받침관과 용이하게 결합된다.Therefore, the upper vertical pipe is easily coupled to the slab formwork tube by inserting a fixing pin penetrating the fixing hole of the upper vertical tube and the coupling hole of the slab formwork tube to be described later.

본 발명의 슬래브거푸집의 조기탈형이 가능한 시스템동바리의 가변지지재의 슬래브거푸집받침관은 상기 상부수직관에 외측끼움되어 분리되어 잔존되는 거푸집널(11)의 하부에 위치되며, 전후좌우 외측면에는 슬래브거푸집의 하부를 받치는 수평재(1)가 결합되는 수직관이다. 상기 슬래브거푸집받침관은 하단부에 외측 둘레면을 따라 암나사산이 형성되어 있고, 상기 암나사산이 형성된 적소에는 고정핀이 삽입될 수 있는 장공형의 결합공이 길이방향으로 형성되어 있다.The slab formwork support pipe of the variable support material of the system group that enables early demoulding of the slab formwork of the present invention is located in the lower portion of the formwork 11 remaining separated by the outer vertical fitting to the upper vertical pipe, the slab on the front and rear, right and left outer surface It is a vertical pipe to which the horizontal member (1) supporting the lower part of the formwork is coupled. The slab formwork receiving tube is formed with a female thread along the outer circumferential surface at the lower end, and the long hole-shaped coupling hole into which the fixing pin can be inserted is formed in the longitudinal direction in which the female thread is formed.

또한 상기 슬래브거푸집받침관의 하단부에는 슬래브거푸집받침관과 암수결합 되며 내측 둘레면을 따라 연속하는 수나사산이 형성되어 있고 좌우 외측면에 손잡이부가 형성되어 있는 고정너트가 외측끼움된다. 따라서 상기와 같은 고정너트는 슬래브거푸집받침관의 결합공과 상부수직관의 고정공을 관통하는 고정핀의 하부에 설치되어 슬래브거푸집받침관과 상부수직관의 결합을 더욱 견고히 한다.In addition, the lower end of the slab formwork receiving tube is male and female coupled with the slab formwork receiving tube is formed with a continuous male thread along the inner circumferential surface and the fixing nut having a handle portion formed on the left and right outer surface is fitted. Therefore, the fixing nut as described above is installed in the lower portion of the fixing pin passing through the coupling hole of the slab formwork receiving tube and the fixing hole of the upper vertical pipe to further solidify the coupling of the slab formwork support tube and the upper vertical pipe.

본 발명의 슬래브거푸집의 조기탈형이 가능한 시스템동바리의 가변지지재를 무지주 역타설식의 공사에 사용할 경우, 상기와 같은 다양한 실시예 중에서 시공상황에 맞는 것을 택일하여 시행하여도 무방하다.In the case of using the variable support member of the system club which enables early demoulding of the slab formwork of the present invention in the construction of the unsupported inverse pouring type, it may be performed by selecting one suitable for the construction situation from the above various embodiments.

도 8a 내지 도 8c를 기준으로 본 발명의 슬래브거푸집의 조기탈형이 가능한 시스템동바리의 가변지지재의 시공예를 설명하면 다음과 같다. 이때 본 시공예에서 슬래브거푸집의 조기탈형이 가능한 시스템동바리의 가변지지재는 도 7a 및 도 7b에 도시된 바와 같은 가변지지재(100c)인 것을 기준으로 설명한다.Referring to the construction of the variable support material of the system club that can be early demolding the slab formwork of the present invention with reference to Figure 8a to 8c as follows. At this time, in the present construction example, the variable support member of the system club that can be demoulded early slab formwork will be described on the basis of the variable support member 100c as shown in Figure 7a and 7b.

도 8a에 도시된 바와 같이 상단은 지상에 고정되어 있고 하단은 슬래브거푸집(10)의 일부분이며 분리되어 잔존되는 거푸집널(11)을 관통하는 현수봉(300)을 설치한다.As shown in FIG. 8a, the upper end is fixed to the ground and the lower end is a part of the slab formwork 10 and installs a suspension rod 300 penetrating through the remaining formwork 11.

상기와 같은 현수봉(300)의 하단에 상부수직관(120c)을 외측끼움하고, 상기 현수봉(300)과 상부수직관(120c)을 고정시킨다.The upper vertical pipe 120c is fitted to the lower end of the suspension rod 300 as described above, and the suspension rod 300 and the upper vertical pipe 120c are fixed.

이때 상기 상부수직관(120c)에는 도 8a에 도시된 바와 같이 슬래브거푸집 (10)의 분리되어 잔존되는 거푸집널(11)의 하부를 지지하도록 설치되며, 슬래브거푸집(10)을 받침하는 수평재(1)의 설치위치와 대응되는 위치에 슬래브거푸집받침관(130b)이 외측끼움되어 있고, 상기 슬래브거푸집받침관(130b)의 하부에는 높이조절용 소켓관(140b)이 설치되어 있다. 이때 높이조절용 소켓관(140b)은 슬래브거푸집받침관(130b)의 하부를 받치도록 설치되며 상부수직관(120c)과 결합된다. 따라서 상기 높이조절용 소켓관(140b)은 상부수직관(120c)의 외주면 길이방향을 따라 상하로 이동되면서 설치하고자 하는 동바리의 높이에 맞게 슬래브거푸집받침관(130b)의 설치높이를 조절하며, 추후 슬래브거푸집(10)의 조기탈형 시 슬래브거푸집(10) 및 슬래브거푸집(10)을 받침하는 수평재(1)가 탈형될 수 있는 여유공간이 생성되게 한다. At this time, the upper vertical pipe (120c) is installed to support the lower portion of the remaining formwork (11) separated from the slab formwork as shown in Figure 8a, the horizontal member (1) supporting the slab formwork (10) The slab formwork receiving tube (130b) is fitted outside the position corresponding to the installation position of the), and the height adjustment socket tube (140b) is installed in the lower portion of the slab formwork support tube (130b). At this time, the height adjustment socket tube (140b) is installed to support the lower portion of the slab formwork receiving tube (130b) is coupled to the upper vertical pipe (120c). Therefore, the height-adjustable socket pipe (140b) is to move up and down along the longitudinal direction of the outer circumferential surface of the upper vertical pipe (120c) to adjust the installation height of the slab formwork receiving pipe (130b) to fit the height of the copper bar to be installed, and later slab When the mold 10 is demolished early, the slab formwork 10 and the horizontal member (1) for supporting the slab formwork 10 is allowed to create a free space that can be demolded.

이후 도 8a에 도시된 바와 같이 상기와 같이 설치되는 슬래브거푸집받침관(130b)에 슬래브거푸집(10)을 받침하는 수평재(1)를 결합시키고, 상기 슬래브거푸집(10)의 상부에 콘크리트를 타설하여 슬래브를 형성한다.Thereafter, as shown in FIG. 8A, the horizontal member 1 supporting the slab formwork 10 is coupled to the slab formwork receiving tube 130b installed as described above, and the concrete is poured on the upper portion of the slab formwork 10. Form a slab.

이후 상기 타설된 슬래브 콘크리트가 설계기준강도 60% 이상 발현되면 도 8b에 도시된 바와 같이 상부수직관(120c)에 외측끼움되어 있는 높이조절용 소켓관(140b)을 소정 높이만큼 하강시킨다.Then, when the cast slab concrete is expressed over 60% of the design reference strength, as shown in FIG. 8B, the height-adjusting socket pipe 140b which is fitted to the upper vertical pipe 120c is lowered by a predetermined height.

따라서 상기와 같이 높이조절용 소켓관(140b)이 하강되면 자연스럽게 슬래브거푸집받침관(130b) 및 슬래브거푸집받침관(130b)에 결합되어 있는 수평재(1)도 하 강되어 추후 슬래브거푸집(10) 탈형 시 작업이 이루어질 수 있는 여유공간이 생성되며, 슬래브거푸집(10)의 탈형이 용이하게 이루어진다.Therefore, when the height-adjustable socket tube 140b is lowered as described above, the horizontal member 1, which is naturally coupled to the slab formwork support tube 130b and the slab formwork support tube 130b, is also lowered so that the slab formwork 10 can be demolished later. A free space in which work can be made is created, and the slab formwork 10 is easily demolded.

이후 도 8c에 도시된 바와 같이 슬래브거푸집받침관(130b)에 결합되어 있는 수평재(1)를 해체하고 슬래브거푸집(10)을 탈형한다. 이때 슬래브거푸집(10)은 분리되어 잔존되는 거푸집널(11)을 제외한 나머지 부분만 탈형되게 되고, 슬래브의 하부는 상부수직관(120c)이 지지하게 됨으로, 슬래브는 강도의 저하없이 설계기준강도를 만족할 수 있게 된다. Then, as shown in FIG. 8c, the horizontal member 1 coupled to the slab formwork support tube 130b is dismantled, and the slab formwork 10 is demolded. At this time, the slab formwork 10 is separated from the remaining formwork except the remaining formwork 11, the upper part of the slab is supported by the upper vertical pipe (120c), the slab is the design reference strength without deterioration You will be satisfied.

또한 상기와 같이 탈형되는 슬래브거푸집(10)은 하층으로 이동되어 슬래브 시공에 이용됨으로 거푸집의 재사용율이 향상되게 되고 공비의 증가를 억제할 수 있게 된다.In addition, the slab formwork 10 that is demolded as described above is moved to the lower layer to be used for the construction of the slab so that the reuse rate of the formwork is improved and the increase in azeotropy can be suppressed.

이후 설계기준강도를 만족시킬 수 있는 슬래브 양생기간이 완료되면 슬래브의 하부에 잔존되는 거푸집널(11)을 제거하여 슬래브 시공을 완성한다.After completion of the slab curing period to satisfy the design reference strength, the slab construction to remove the remaining formwork (11) at the bottom of the slab to complete the slab construction.

본 발명의 슬래브거푸집의 조기탈형이 가능한 시스템동바리의 가변지지재는 상부수직내관의 외주면 길이방향을 따라 상하로 이동되는 높이조절용 소켓관으로 슬래브거푸집을 받침하는 슬래브거푸집받침관 및 수평재의 높이를 용이하게 조절하여 거푸집널 일부를 제외한 슬래브거푸집을 하강시킴으로써 콘크리트의 설계기준강 도가 60% 이상 발현되는 조기 양생 후 잔여 양생기간의 제약없이 슬래브거푸집의 분리가 가능하게 됨으로 거푸집의 재사용율이 향상되고 시공비를 절감할 수 있는 슬래브거푸집의 조기탈형이 가능한 시스템동바리의 가변지지재를 제공하는데 효과가 있다.The variable support member of the system copper bar capable of early demolition of the slab formwork of the present invention is easy to heighten the height of the slab formwork support pipe and the horizontal member supporting the slab formwork with the height-adjustable socket pipe moved up and down along the longitudinal direction of the outer circumferential surface of the upper vertical inner tube. By lowering the slab formwork except for part of the formwork, the slab formwork can be separated without limiting the remaining curing period after early curing, which results in more than 60% of the design standard strength of concrete, thereby improving the reuse rate of formwork and reducing the construction cost. It is effective to provide a variable support material for the system club which enables early demoulding of the slab formwork.

또한 본 발명의 슬래브거푸집의 조기탈형이 가능한 시스템동바리의 가변지지재는 높이조절용 소켓관만을 상하로 이동시켜 가며 시공하고자 하는 동바리 설치높이를 만족시킬 수 있게 됨으로 취급이 용이하고 작업이 간편해져 시공성이 높은 슬래브거푸집의 조기탈형이 가능한 시스템동바리의 가변지지재를 제공하는데 다른 효과가 있다.In addition, the variable support material of the system club that can be prematurely demolished slab formwork of the present invention is to move the height adjustment socket pipe only up and down to satisfy the installation height of the copper bar to be installed, easy to handle and easy to work, high construction There are other effects to provide a variable support material for system clubs that enables early demolding of slab formwork.

또 본 발명의 슬래브거푸집의 조기탈형이 가능한 시스템동바리의 가변지지재는 적층식으로 이루어지는 건축 공사뿐 만 아니라 무지주 역타설식으로 이루어지는 건축 공사에도 적용가능함으로 사용율이 높게 되고 시공성이 뛰어난 슬래브거푸집의 조기탈형이 가능한 시스템동바리의 가변지지재를 제공하는데 또 다른 효과가 있다.In addition, the variable support material of the system copper bar which enables early demoulding of the slab formwork of the present invention is applicable to not only laminated construction work but also to construction work consisting of an unsupported reverse pouring type, so that the use rate is high and the workability of the slab formwork is excellent. Another effect is to provide a variable support material for the moldable system club.

Claims (9)

건설구조물 시공 시 슬래브거푸집의 조기탈형을 위해 거푸집널의 일부가 분리되어 잔존되는 슬래브거푸집을 지지하며, 수직재, 수평재, 및 경사재로 조립되는 시스템동바리에서,Part of the formwork is separated to support the remaining slab formwork for early demolding of the slab formwork when constructing the construction structure. 상기 시스템동바리의 하단에 위치되는 하부수직외관;A lower vertical appearance located at the bottom of the system club; 상기 하부수직외관의 상단에 하단부가 내측삽입되어 하부수직외관의 상부에 위치되며, 하부수직외관과 결합되는 상부수직내관;An upper vertical inner tube inserted into an upper end of the lower vertical outer tube and positioned on an upper portion of the lower vertical outer tube, the upper vertical inner tube coupled to the lower vertical outer tube; 상기 상부수직내관의 상단부에 외측끼움될 수 있는 관경을 가지고, 상기 슬래브거푸집의 분리되어 잔존되는 거푸집널의 하부에 설치되며, 전후좌우 외측면에는 슬래브거푸집의 하부를 받치는 수평재가 결합되어 있는 일정길이의 슬래브거푸집받침관; 및It has a pipe diameter that can be fitted to the upper end of the upper vertical inner tube, the slab formwork is installed in the lower portion of the remaining remaining formwork, the front and rear left and right outer surface is coupled to the horizontal member supporting the lower portion of the slab formwork Of slab formwork; And 상기 상부수직내관에 외측끼움되어 결합되는 소켓관으로, 상기 소켓관은 슬래브거푸집받침관의 하부를 받치도록 위치되어 슬래브거푸집받침관 및 상기 슬래브거푸집받침관에 결합된 수평재의 설치높이를 조절하도록 상부수직내관의 외주면 길이방향을 따라 상하로 이동되는 높이조절용 소켓관; The socket pipe is fitted to the outer vertical pipe in the upper vertical pipe, the socket pipe is positioned so as to support the lower portion of the slab formwork support pipe to adjust the installation height of the slab formwork support pipe and the horizontal member coupled to the slab formwork support pipe. Height-adjustable socket pipe moved vertically along the longitudinal direction of the outer circumferential surface of the inner tube; 을 포함하는 슬래브거푸집의 조기탈형이 가능한 시스템동바리의 가변지지재.Variable support material of the system club that enables early demoulding of the slab formwork comprising a. 제1항에서, 상기 상부수직내관에 하단이 내측삽입 되어 상기 슬래브거푸집의 분리되어 잔존되는 거푸집널의 하부를 받치도록 위치되며, 상부수직내관과 결합되 는 일정길이의 수직관으로, 상기 수직관은 상단에 상부수직내관과 동일한 관경을 가지는 걸림체가 장착되어 있는 미세높이조절용 수직관; 및 The vertical pipe of claim 1, wherein a lower end is inserted into the upper vertical inner tube to support a lower portion of the remaining formwork of the slab formwork, and is a vertical length of a predetermined length coupled to the upper vertical inner tube. The vertical height adjustment vertical pipe is equipped with a locking body having the same diameter as the upper vertical inner tube at the top; And 상기 상부수직내관에 외측끼움되어 하부수직외관과 슬래브거푸집받침관 사이에 위치되며, 전후좌우 외측면에 수평재가 결합되는 수직관으로, 상기 수직관의 하부는 높이조절용 소켓관이 받치고 있는 수평재높이조절용 수직관;The upper vertical inner tube is fitted between the lower vertical outer tube and the slab formwork receiving tube, the vertical tube is coupled to the horizontal member on the front, rear, left and right outer surface, the lower portion of the vertical tube for the horizontal height adjustment that is supported by the height adjustment socket tube Vertical tube; 을 더 포함하는 슬래브거푸집의 조기탈형이 가능한 시스템동바리의 가변지지재.Variable support material of the system club that can be prematurely demolished slab formwork further comprising a. 제2항에서, 상기 하부수직외관은 상단의 내측 둘레면을 따라 일정간격을 두고 분할되는 암나사산이 형성되어 있으며, 상기 상부수직내관은 하부수직외관의 암나사산과 암수결합되는 수나사산이 외측 둘레면을 따라 일정간격을 두고 분할되어 길이방향으로 형성되어 있고 내측 둘레면을 따라 일정간격을 두고 분할되어 길이방향으로 암나사산이 형성되어 있으며, 상기 높이조절용 소켓관은 상부수직내관의 수나사산과 암수결합되는 암나사산이 내측 둘레면을 따라 일정간격을 두고 분할되어 길이방향으로 형성되어 있으며, 상기 미세높이조절용 수직관은 상부수직내관의 내측면 암나사산과 암수결합되는 수나사산이 외측 둘레면을 따라 일정간격을 두고 분할되어 길이방향으로 형성되어 있는 것을 특징으로 하는 슬래브거푸집의 조기탈형이 가능한 시스템동바리의 가변지지재.In claim 2, wherein the lower vertical appearance is formed with a female thread is divided at a predetermined interval along the inner circumferential surface of the upper, the upper vertical inner tube is a male thread that is male and female coupled to the outer circumferential surface of the lower vertical appearance. It is divided at regular intervals and is formed in the longitudinal direction, and is divided at regular intervals along the inner circumferential surface to form a female thread in the longitudinal direction, and the height adjusting socket tube is a female screw coupled to the male thread of the upper vertical inner tube. The acid is divided along the inner circumferential surface at regular intervals and is formed in the longitudinal direction. The micro-height adjustment vertical pipe is divided into a male thread which is male and female coupled to the inner side of the upper vertical inner tube at regular intervals along the outer circumferential surface. Premature release of the slab formwork, characterized in that formed in the longitudinal direction Variable support material for system club. 제2항에서, 상기 상부수직내관은 외측 둘레면을 따라 연속하는 수나사산이 길이방향으로 형성되어 있으며 상단부에는 내측 둘레면을 따라 연속하는 암나사산이 형성되어 있는 결합관이 설치되어 있고, 상기 높이조절용 소켓관은 상부수직내관의 수나사산과 암수결합되며 내측 둘레면을 따라 연속하는 암나사산이 길이방향으로 형성되어 있으며 상기 하부수직외관의 상부에도 위치되고, 상기 미세높이조절용 수직관은 상부수직내관의 결합관 암나사산과 암수결합되며 외측 둘레면을 따라 연속하는 수나사산이 길이방향으로 형성되어 있으며 상단부에 상부수직내관과 동일한 관경을 가지는 걸림체가 장착되어 있는 것을 특징으로 하는 슬래브거푸집의 조기탈형이 가능한 시스템동바리의 가변지지재.In claim 2, wherein the upper vertical inner tube is formed with a continuous male thread along the outer peripheral surface in the longitudinal direction, the upper end is provided with a coupling tube is formed with a continuous female thread along the inner peripheral surface, the height adjustment The socket tube is male and female coupled to the male thread of the upper vertical inner tube, and the female thread is formed along the inner circumferential surface in the longitudinal direction, and is also located at the upper portion of the lower vertical outer tube. The fine height adjusting vertical tube is coupled to the upper vertical inner tube. The male and female threaded pipes are male and female, and the male threads are formed along the outer circumferential surface in the longitudinal direction, and the upper end of the slab formwork is equipped with a locking body having the same diameter as the upper vertical inner pipe. Variable support material. 건설구조물 시공 시 슬래브거푸집의 조기탈형을 위해 거푸집널의 일부가 분리되어 잔존되는 슬래브거푸집을 지지하며, 수직재, 수평재, 및 경사재로 조립되는 시스템동바리에서,Part of the formwork is separated to support the remaining slab formwork for early demolding of the slab formwork when constructing the construction structure. 상기 시스템동바리의 하단에 위치되며, 상단에는 내측 둘레면을 따라 연속하는 수나사산이 형성되어 있고 좌우 외측면에 손잡이부가 형성되어 있는 고정너트가 외측끼움되어 결합될 수 있는 암나사산이 외측 둘레면을 따라 연속하여 형성되어 있고, 암나사산이 형성된 적소에는 고정핀이 삽입될 수 있는 장공형의 결합공이 길이방향으로 형성되어 있는 하부수직외관;Located in the lower end of the system club, the upper male thread is formed along the inner circumferential surface and the female nut that can be coupled to the outer side of the fixing nut is formed with the handle portion formed on the left and right outer surface along the outer peripheral surface It is continuously formed, the lower vertical appearance is formed in the longitudinal direction of the long hole-shaped coupling hole that can be inserted into the pinned female thread formed in place; 상기 하부수직외관의 상단에 하단부가 내측삽입되어 하부수직외관의 상부에 위치되고, 상기 고정핀이 삽입되는 고정공이 길이방향으로 일정간격을 두고 다수개 형성되어 있으며, 상단부에는 내측 둘레면을 따라 연속하는 암나사산이 형성된 결 합관이 설치되어 있는 상부수직내관;The lower end is inserted into the upper end of the lower vertical appearance is located in the upper portion of the lower vertical appearance, the fixing pin is inserted into a plurality of fixed holes are formed at a predetermined interval in the longitudinal direction, the upper end is continuous along the inner circumferential surface An upper vertical inner pipe in which a union pipe formed with a female thread is installed; 상기 상부수직내관의 상단부에 외측끼움될 수 있는 관경을 가지며, 상기 슬래브거푸집의 분리되어 잔존되는 거푸집널의 하부에 설치되고, 전후좌우 외측면에는 슬래브거푸집의 하부를 받치는 수평재가 결합되어 있는 일정길이의 수직관으로, 상기 수직관은 하단부에는 내측 둘레면을 따라 연속하는 수나사산이 형성되어 있고 좌우 외측면에 손잡이부가 형성되어 있는 고정너트가 외측끼움되어 결합될 수 있는 암나사산이 외측 둘레면을 따라 연속하여 형성되어 있고, 암나사산이 형성된 적소에는 고정핀이 삽입될 수 있는 장공형의 결합공이 길이방향으로 형성되어 있는 슬래브거푸집받침관; 및 It has a tube diameter that can be fitted to the upper end of the upper vertical inner tube, the slab formwork is installed in the lower portion of the remaining remaining formwork, and the front and rear left and right outer surface is coupled with a horizontal length for supporting the lower portion of the slab formwork The vertical pipe of the vertical pipe is formed in the lower end of the continuous male thread is formed along the inner circumferential surface and the handle nut is formed on the left and right outer surface along the outer circumferential surface that can be coupled to the outer nut. Slab formwork receiving tube which is formed continuously, the threaded hole is formed in the longitudinal direction of the long hole-shaped coupling hole into which the fixing pin can be inserted; And 상기 상부수직내관에 하단이 내측삽입 되어 상기 슬래브거푸집의 분리되어 잔존되는 거푸집널의 하부를 받치도록 위치되고, 상부수직내관의 결합관 암나사산과 암수결합되며 외측 둘레면을 따라 연속하는 수나사산이 길이방향으로 형성되어 있는 일정길이의 수직관으로, 상기 수직관은 상단부에 상부수직내관과 동일한 관경을 가지는 걸림체가 형성되어 있는 미세높이조절용 수직관;A lower end is inserted into the upper vertical inner tube to be positioned to support the lower part of the remaining formwork of the slab formwork, and the male thread is coupled with the female thread of the upper vertical inner tube and the male thread is continuous along the outer circumferential surface. A vertical tube having a predetermined length formed in a direction, the vertical tube including: a fine height adjustment vertical tube having a locking body having the same diameter as the upper vertical inner tube at an upper end thereof; 을 포함하는 슬래브거푸집의 조기탈형이 가능한 시스템동바리의 가변지지재.Variable support material of the system club that enables early demoulding of the slab formwork comprising a. 제5항에서, 상기 상부수직내관에 외측끼움되어 하부수직외관과 슬래브거푸집받침관 사이에 위치되며, 하단부에는 내측 둘레면을 따라 연속하는 수나사산이 형성되어 있고 좌우 외측면에 손잡이부가 형성되어 있는 고정너트가 외측끼움되어 결합될 수 있는 암나사산이 외측 둘레면을 따라 연속하여 형성되어 있고, 암나사산이 형성된 적소에 고정핀이 삽입될 수 있는 장공형의 결합공이 길이방향으로 형성되어 있는 수평재높이조절용 수직관을 더 포함하는 슬래스거푸집의 조기탈형이 가능한 시스템동바리의 가변지지재.In the upper vertical inner tube is fitted between the lower vertical outer tube and the slab formwork tube, the lower end is formed with a continuous male thread along the inner circumferential surface and the handle portion is formed on the left and right outer surface The number of horizontal thread height adjustments, in which a female thread that can be engaged by being fitted with an outer nut, is continuously formed along the outer circumferential surface, and a long hole-shaped coupling hole in which the fixing pin can be inserted into the position where the female thread is formed is formed in the longitudinal direction. A variable support member for a system club that enables early demoulding of the slab formwork further comprising a straight pipe. 제1항 내지 제6항 중 어느 한 항에서, 상기 하부수직외관의 하단에는 외측 둘레면을 따라 암나사산이 형성되어 있고, 하단 끝에는 볼케스터가 장착되어 있으며, 상기 하부수직외관의 하단에는 하부수직외관의 하단부가 내측삽입될 수 있는 내부공간을 가지며 하부수직외관의 암나사산과 암수결합되는 수나사산이 내측 둘레면을 따라 형성되어 있고, 일방향으로 회전되며 하부수직외관의 외주면을 따라 길이방향으로 상하이동되면서 볼케스터의 노출정도를 조절하는 받침캡이 덧 씌어져 있는 것을 특징으로 하는 슬래브거푸집의 조기탈형이 가능한 시스템동바리의 가변지지재.According to any one of claims 1 to 6, the lower vertical appearance of the lower thread is formed with a female thread along the outer peripheral surface, the lower end is equipped with a ball caster, the lower vertical appearance of the lower vertical appearance The lower end of the inner thread has an inner space that can be inserted into the inner thread and the male thread of the lower vertical outer shell is formed along the inner circumferential surface, rotated in one direction, and moved in the longitudinal direction along the outer circumferential surface of the lower vertical outer tube. A variable support material for the system club which enables early demoulding of the slab formwork, characterized in that the support cap is added to adjust the exposure degree of the ball caster. 건설구조물 시공 시 슬래브거푸집의 조기탈형을 위해 거푸집널의 일부가 분리되어 잔존되는 슬래브거푸집을 지지하며, 수직재, 수평재, 및 경사재로 조립되는 무지주 역타설용 시스템동바리에서,Part of the formwork is separated to support the remaining slab formwork for early demolding of the slab formwork during construction of the construction structure. 하단은 상기 슬래브거푸집의 분리되어 잔존되는 거푸집널을 관통하고, 상단은 지상에 고정되는 현수봉;A lower end penetrates the remaining remaining formwork of the slab formwork, and the upper end is a suspension rod fixed to the ground; 상기 현수봉의 하단에 외측끼움되어 고정되며, 분리되어 잔존되는 거푸집널의 하부를 받치는 수직관으로, 상기 수직관은 외측 둘레면을 따라 길이방향으로 수 나사산이 형성되어 있는 상부수직관;A vertical pipe that is fixed to the lower end of the suspension rod and fixed to the bottom of the formwork to remain separated; the vertical pipe includes an upper vertical pipe having a male thread in a longitudinal direction along an outer circumferential surface thereof; 상기 상부수직관에 외측끼움되어 분리되어 잔존되는 거푸집널의 하부에 위치되며, 전후좌우 외측면에는 슬래브거푸집의 하부를 받치는 수평재가 결합되어 있는 슬래브거푸집받침관; 및 Slab formwork support pipe is located in the lower portion of the formwork to be separated and separated from the upper vertical pipe, the horizontal member supporting the lower portion of the slab formwork in front, rear, left and right outer surface; And 상기 상부수직관에 외측끼움되며 상부수직관의 수나사산과 암수결합되는 암나사산이 내측 둘레면을 따라 형성되어 있는 소켓관으로, 상기 소켓관은 슬래브거푸집받침관의 하부를 받치도록 위치되어 슬래브거푸집받침관 및 상기 슬래브거푸집받침관에 결합된 수평재의 설치높이가 조절되도록 상부수직관의 외주면 길이방향을 따라 상하로 이동되는 높이조절용 소켓관;An outer thread fitted to the upper vertical pipe and a female thread that is male and female coupled to the male thread of the upper vertical pipe is formed along the inner circumferential surface. A height adjusting socket tube which is moved up and down along the longitudinal direction of the outer circumferential surface of the upper vertical pipe so that the installation height of the horizontal member coupled to the pipe and the slab formwork support tube is adjusted; 을 포함하는 슬래브거푸집의 조기탈형이 가능한 시스템동바리의 가변지지재.Variable support material of the system club that enables early demoulding of the slab formwork comprising a. 건설구조물 시공 시 슬래브거푸집의 조기탈형을 위해 거푸집널의 일부가 분리되어 잔존되는 슬래브거푸집을 지지하며, 수직재, 수평재, 및 경사재로 조립되는 무지주 역타설용 시스템동바리에서,Part of the formwork is separated to support the remaining slab formwork for early demolding of the slab formwork during construction of the construction structure. 하단은 상기 슬래브거푸집의 분리되어 잔존되는 거푸집널을 관통하고, 상단은 지상에 고정되는 현수봉;A lower end penetrates the remaining remaining formwork of the slab formwork, and the upper end is a suspension rod fixed to the ground; 상기 현수봉의 하단에 외측끼움되어 고정되며, 분리되어 잔존되는 거푸집널의 하부를 받치는 수직관으로, 상기 수직관은 측면에 길이방향을 따라 고정핀이 삽입되는 다수개의 고정공이 일정간격을 두고 형성되어 있는 상부수직관; 및 It is fixed to the lower end of the suspension rod is fixed to the vertical tube to support the lower part of the remaining formwork, the vertical tube is formed with a plurality of fixing holes in which a fixed pin is inserted along the longitudinal direction on the side at a predetermined interval Upper vertical pipe; And 상기 상부수직관에 외측끼움되어 분리되어 잔존되는 거푸집널의 하부에 위치 되며, 전후좌우 외측면에는 슬래브거푸집의 하부를 받치는 수평재가 결합되어 있는 수직관으로, 상기 수직관은 하단부에는 내측 둘레면을 따라 연속하는 수나사산이 형성되어 있고 좌우 외측면에 손잡이부가 형성되어 있는 고정너트가 외측끼움되어 결합될 수 있는 암나사산이 외측 둘레면을 따라 형성되어 있고, 암나사산이 형성된 적소에는 고정핀이 삽입될 수 있는 장공형의 결합공이 길이방향으로 형성되어 있는 슬래브거푸집받침관; It is located in the lower part of the formwork remaining separated by the outer vertical fitting to the upper vertical pipe, the front and rear left and right outer surface is a vertical pipe combined with a horizontal member supporting the lower part of the slab formwork, the vertical pipe is the inner peripheral surface at the lower end A continuous male thread is formed, and a female nut is formed along the outer circumferential surface of the female nut which can be coupled to the outside by a fixing nut having a handle portion formed on the left and right outer surfaces thereof, and a fixing pin can be inserted into the place where the female thread is formed. Slab formwork receiving pipe is formed in the longitudinal direction of the coupling hole therein; 을 포함하는 슬래브거푸집의 조기탈형이 가능한 시스템동바리의 가변지지재.Variable support material of the system club that enables early demoulding of the slab formwork comprising a.
KR1020040057460A 2004-07-23 2004-07-23 Level adjustable vertical member of the system support for early stripping slab forms KR100705608B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020040057460A KR100705608B1 (en) 2004-07-23 2004-07-23 Level adjustable vertical member of the system support for early stripping slab forms

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020040057460A KR100705608B1 (en) 2004-07-23 2004-07-23 Level adjustable vertical member of the system support for early stripping slab forms

Publications (2)

Publication Number Publication Date
KR20060009463A KR20060009463A (en) 2006-02-01
KR100705608B1 true KR100705608B1 (en) 2007-04-10

Family

ID=37120060

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020040057460A KR100705608B1 (en) 2004-07-23 2004-07-23 Level adjustable vertical member of the system support for early stripping slab forms

Country Status (1)

Country Link
KR (1) KR100705608B1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20210006160A (en) 2019-07-08 2021-01-18 주식회사 폼웍스 A support unit for forming a slab of a reinforced concrete building structure
KR20210056561A (en) 2019-11-11 2021-05-20 주식회사 위드폼 Support for mold to form building sleeve and its maintenance unit utilizing the support thereof
KR20210146620A (en) 2020-05-27 2021-12-06 폼으로 주식회사 Retaining Support Unit of Formwork for Building Slab Formation

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101974517B1 (en) * 2017-04-20 2019-05-03 삼광선재 주식회사 Method for constructing slab concrete form to reduce the stripping time

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20210006160A (en) 2019-07-08 2021-01-18 주식회사 폼웍스 A support unit for forming a slab of a reinforced concrete building structure
KR20210056561A (en) 2019-11-11 2021-05-20 주식회사 위드폼 Support for mold to form building sleeve and its maintenance unit utilizing the support thereof
KR20210146620A (en) 2020-05-27 2021-12-06 폼으로 주식회사 Retaining Support Unit of Formwork for Building Slab Formation

Also Published As

Publication number Publication date
KR20060009463A (en) 2006-02-01

Similar Documents

Publication Publication Date Title
CN100434640C (en) Concrete slab form system
CN110485713B (en) Roofing cornice and escape canal once only pour template reinforcing apparatus
KR100705608B1 (en) Level adjustable vertical member of the system support for early stripping slab forms
CN102912996A (en) Steel tube concrete column high-altitude construction safety protection system
US6568140B2 (en) Apparatus and method for making a sloped floor
KR101559988B1 (en) An early stripping slab forms and method for constructing slab using the same
KR200400346Y1 (en) Zenith Mold Installation Structure
KR200462716Y1 (en) Curbstone constructing equipment
JP4623570B2 (en) Construction method of jack base and formwork support
KR20080101581A (en) Supporting post for construction
US6921501B2 (en) Method of forming a circumferentially closed concrete wall having the same cross-section over the entire height thereof
CN211368398U (en) Frame climbing structure
KR101731297B1 (en) Bottom frameform panel supporting apparatus height adjustable type by which bottom frameform is early detatchable
CN112814294A (en) Novel tongue-and-groove connecting structure of precast concrete ladder beam and construction process thereof
KR100482272B1 (en) A supprot pipe for construction
CN110242096B (en) Communication tower bottom column foot
KR100697302B1 (en) Method for building and removing mould of bridge and multistage mould
CN217758734U (en) Bored concrete pile structure
CN215977338U (en) Prefabricated core mould is used in construction of basement sump pit
KR102121363B1 (en) Functional supporter and constructing method for a protrusion of construction structure using the same, and the construction structure constructed by the method
CN215291442U (en) Support frame system for reinforcing narrow space template
CN216865989U (en) Lower-demolding preformed hole mold
CN215368713U (en) A hang mould for bathroom falls board construction
TWI695107B (en) Building stair forming method and forming module
KR200358791Y1 (en) Timbering system for construction

Legal Events