KR100670675B1 - Continuous construction method of multi span prestressed steel composite beam - Google Patents
Continuous construction method of multi span prestressed steel composite beam Download PDFInfo
- Publication number
- KR100670675B1 KR100670675B1 KR1020060024334A KR20060024334A KR100670675B1 KR 100670675 B1 KR100670675 B1 KR 100670675B1 KR 1020060024334 A KR1020060024334 A KR 1020060024334A KR 20060024334 A KR20060024334 A KR 20060024334A KR 100670675 B1 KR100670675 B1 KR 100670675B1
- Authority
- KR
- South Korea
- Prior art keywords
- continuous
- composite beam
- concrete
- lower flange
- steel
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D2/00—Bridges characterised by the cross-section of their bearing spanning structure
- E01D2/02—Bridges characterised by the cross-section of their bearing spanning structure of the I-girder type
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D2101/00—Material constitution of bridges
- E01D2101/20—Concrete, stone or stone-like material
- E01D2101/24—Concrete
- E01D2101/26—Concrete reinforced
- E01D2101/28—Concrete reinforced prestressed
- E01D2101/285—Composite prestressed concrete-metal
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D22/00—Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
Description
도 1a, 도 1b 및 도 1c는 종래의 프리스트레스트 프리플렉스 강합성빔을 이용한 다경간 프리스트레스트 프리플렉스 강합성빔의 시공방법을 도시한 것이다.1A, 1B and 1C illustrate a method of constructing a multi-span prestressed preflex composite beam using a conventional prestressed preflex composite beam.
도 2a는 본 발명의 다경간 프리스트레스트 강합성빔의 I형 강재를 도시한 것이다.Figure 2a shows the type I steel of the multi-span prestressed steel composite beam of the present invention.
도 2b는 본 발명의 다경간 프리스트레스트 강합성빔의 연속연결부로부터 돌출된 종방향 연결철근을 도시한 것이다.Figure 2b shows a longitudinal connecting reinforcing bar projecting from the continuous connection of the multi-span prestressed rigid composite beam of the present invention.
도 2c 및 도 2d는 본 발명의 다경간 프리스트레스트 강합성빔의 연결지점부의 처리상태를 도시한 것이다.2C and 2D show processing conditions of the connection point portion of the multi-span prestressed rigid composite beam of the present invention.
도 3a, 도 3b 및 도 3c는 본 발명의 다경간 프리스트레스트 강합성빔의 정착블록의 설치상태도를 도시한 것이다. Figures 3a, 3b and 3c is a diagram showing the installation of the fixing block of the multi-span prestressed rigid composite beam of the present invention.
<도면의 주요부분에 대한 부호의 설명><Description of the symbols for the main parts of the drawings>
100:연속연결부 110:하부지지판100: continuous connection 110: lower support plate
120:중간연결재 130:수직보강판120: intermediate connector 130: vertical reinforcing plate
140:긴장재정착판 150:연속연결부철근140: tension reset plate 150: continuous connecting rod
200:I형 강재 300:긴장재200: Type I steel 300: Tension material
400:정착블록400: fixing block
본 발명은 다경간 연속 프리스트레스트 강합성빔의 연결 및 연속시공방법에 관한 것이다. 더욱 구체적으로 다경간 프리스트레스트 강합성빔의 시공에 있어서, 복부 및 바닥판콘크리트 타설에 앞서 교각 위에 설치되는 연속지점부에서 프리스트레스트 강합성빔을 연속 결합시킬 수 있는 방법 및 상기 연속지점부 경계면의 하부플랜지콘크리트에서 발생하는 압축응력을 경감시킬 수 있는 다경간 프리스트레스트 강합성빔의 연속시공방법에 관한 것이다.The present invention relates to a method of connecting and continuous construction of a multi-span continuous prestressed rigid composite beam. More specifically, in the construction of multi-span prestressed composite beams, a method of continuously coupling the prestressed composite beams in a continuous point portion installed on the piers prior to placing the abdominal and bottom plate concrete, and the boundary of the continuous point portion interface The present invention relates to a continuous construction method of multi-span prestressed rigid composite beams that can reduce the compressive stress generated in the lower flange concrete.
프리스트레스트 강합성빔은 I형 강재와 I형 강재의 하부플랜지 주변에 콘크리트를 타설,양생시켜 I형 강재와 하부플랜지콘크리트가 합성된 강합성빔에 프리플렉션(Preflexion)과 PC 강연선을 포함하는 긴장재에 의해 또는 프리플렉션없이 긴장재만에 의해 하부플랜지콘크리트에 소요의 압축 프리스트레스를 도입시킨 강합성빔을 의미한다.Prestressed steel composite beam is a tension material including preflexion and PC strands in a steel composite beam composed of I-type steel and lower flange concrete by placing and curing concrete around I-type steel and lower flange of I-type steel. By a tension material only by means of or without pre-fraction means a rigid composite beam in which required compression prestress is introduced into the lower flange concrete.
종래의 프리스트레스트 프리플렉스 강합성빔(10)은 1차 프리스트레스(I형 강재에 프리플렉션 하중이 가해진 상태에서 I형 강재의 하부플랜지주변에 콘크리트를 타설, 양생한 후 프리플렉션 하중을 제거하여 I형 강재의 탄성복원력에 의하여 하부플랜지콘크리트에 도입되는 압축응력)가 도입된 상태에서, PC 강연선을 이용하여 2차 프리스트레스를 하부플랜지콘크리트에 도입하는 방식으로 제작되는 교량용 강 합성빔이다. Conventional prestressed preflex steel
즉, 도 1a 같이 하부플랜지 콘크리트(20)의 타설 전, 하부플랜지 콘크리트 내부에 형성된 하부플랜지, 복부 및 상부플랜지로 구성된 I형 강재(10)의 하부플랜지(13) 주위에 일정간격을 두고 미리 다수의 PC 강연선(30)을 분산 배치시키고, 하부플랜지 주변에 거푸집을 이용하여 콘크리트를 타설,양생시킨 후, 프리플렉션 하중을 제거(릴리즈)하여 하부플랜지콘크리트(20)에 1차 프리스트레스를 도입시킨 상태에서, 하부플랜지콘크리트(20)에 배치된 다수의 PC 강연선을 긴장하여 하부플랜지콘크리트(20) 단부에 정착시킴으로서, 2차 프리스트레스를 추가로 더 도입되도록 한다.That is, before placing the
이에 종래 프리플렉스 강합성빔에서 확보되는 낮은 형고를 그대로 유지하면서 I형 강재 사용량을 절감하여 경제성을 충분히 확보할 수 있는 장점과 하부플랜지콘크리트의 인장균열 및 과도한 처짐 발생과 피로강도저하 등이 발생되지 않는 등 구조적 안전성이 높은 장점이 있다.Therefore, while maintaining the low mold height secured by the conventional preflex steel composite beam, it is possible to reduce the use of I-type steel to secure sufficient economic feasibility, and do not cause tensile cracking, excessive deflection and fatigue strength reduction of the lower flange concrete. It does not have the advantage of high structural safety.
이러한 프리스트레스트 프리플렉스 강합성빔(10)을 다경간 교량에 적용하는 경우, 도 1b와 같이 교대 또는 교각(40)위에 상기 강합성빔(10)을 연속되지 않는 단순구조계로 각 경간에 걸쳐 반복 설치하기도 하나, 이 때 각 경간의 경계인 지점부에는 신축이음장치(50)를 설치하여야 하는바, 이로 인하여 차량의 주행성이 저하될 뿐만 아니라 신축이음 장치의 지속적인 유지보수에 많은 노력과 비용이 소요되므로, 도 1c와 같이 2경간 또는 3경간에 걸쳐 바닥판(60)을 연속 시공하는 경우가 많았다.When the prestressed preflex rigid
즉, 도 1c와 같이 연속 시공하는 경우, 프리스트레스트 프리플렉스 강합성빔(10)을 교각 위에 설치한 후, 바닥판 및 복부콘크리트를 타설, 양생하는 시공과정의 특성상, 그리고 연속지점부에서 교각의 크기가 제한되므로 프리스트레스트 프리플렉스 강합성빔(10)이 10㎝ 내외의 이격거리를 가진 협소한 인접공간에서 연결시공 하여야 하는 특성상,That is, in the case of continuous construction as shown in FIG. 1c, the prestressed preflex steel
하부플랜지콘크리트의 연결이 실제 거의 불가능하여, 하부플래지콘크리트 연결이 이루어지지 않은 상태에서 하부플랜지콘크리트의 상면에서부터 복부와 바닥판 상면에 걸쳐서만 연속이 이루어짐으로써, 연속지점부(A)의 높이가 프리스트레스트 프리플렉스 강합성교의 다른 부분 높이보다 하부플랜지콘크리트 높이만큼 작아 복부 및 바닥판 콘크리트의 타설, 양생 후에 재하 되는 아스팔트, 방호벽, 보도, 난간 등의 합성후 고정하중 및 차량하중 등에 의해 연속지점부(A)에 발생하는 부모멘트에 대한 저항단면이 부족하게 되어 강합성빔의 높이를 높게 하여야 하는데, 이는 단면높이를 낮게 유지한다는 프리스트레스트 프리플렉스 강합성빔의 근본적인 장점을 상실할 수 있다는 문제점이 있었다.Since the connection of the lower flange concrete is almost impossible, the continuous operation is performed only from the upper surface of the lower flange concrete to the upper surface of the abdomen and the bottom plate in the state where the lower flange concrete is not connected, so that the height of the continuous branch portion A is increased. Continuous point part due to fixed load and vehicle load after composite of asphalt, barrier, sidewalk, railing, etc. There is a problem that the height of the composite beam should be increased due to the lack of the resistance section against the parent moment generated in A), which may cause the loss of the fundamental advantage of the prestressed preflex steel composite beam to keep the cross-sectional height low. .
본 발명은 상술한 문제점을 해결하기 위한 것으로써,The present invention is to solve the above problems,
본 발명의 목적은 프리스트레스트 강합성빔의 다경간 시공에 있어서 하부플랜지콘크리트 연결시공방안을 도출하여 바닥판 및 복부콘크리트 타설 후 연속지점부의 높이를 프리스트레스트 강합성교의 다른 부분 높이와 동일하게 유지시켜 강합성빔의 단면높이를 낮게 유지한다는 프리스트레스트 강합성빔의 근본적인 장점을 고수하는 것이다.The purpose of the present invention is to derive a plan for connecting lower flange concrete in multi-span construction of prestressed rigid composite beams, so that the height of the continuous point portion after the bottom plate and the abdominal concrete is placed equal to the height of other parts of the prestressed steel composite bridge Adhering to the fundamental advantage of prestressed composite beams is to keep the cross-sectional height of the composite beams low.
본 발명의 다른 목적은 프리스트레스트 강합성빔의 단부인 PC 강연선 정착부가 설치되는 하부플랜지콘크리트에서 PC 강연선 정착시 또는 바닥판 및 복부콘크리트 타설이후 합성단계에서 고정하중 및 차량하중에 의해 추가적으로 발생하는 압축응력 등에 의한 영향 고려 시, 하부플랜지콘크리트에서 허용압축응력을 초과할 때 프리스트레스트 강합성빔의 단면높이 증가없이 연속결합부의 하부플랜지콘크리트가 허용압축응력범위내에 있도록 하는 연속결합부 하부플랜지콘크리트 압축응력 저감 방안을 제시하여, 강합성빔의 단면높이를 낮게 유지한다는 프리스트레스트 강합성빔의 장점을 고수함과 동시에 경우에 따라서는 프리플렉션 및 릴리즈 등의 시공과정을 생략 가능할 수도 있도록 하여 시공성 및 경제성을 향상시키는 것이다. Another object of the present invention is to further compress the compression caused by the fixed load and the vehicle load in the lower flange concrete, which is the end of the prestressed steel composite beam is installed in the lower flange concrete is installed on the PC strand wire or in the synthesis step after the bottom plate and abdominal concrete is placed In consideration of the effects of stress, the lower flange concrete compressive stress of the continuous coupling part is such that the lower flange concrete of the continuous coupling part is within the allowable compressive stress range without increasing the cross-sectional height of the prestressed composite beam when the allowable compressive stress is exceeded in the lower flange concrete. By presenting a reduction plan, we adhere to the advantages of prestressed composite beams to keep the cross-sectional height of the composite beams low, and in some cases, the construction process such as preflection and release can be omitted. To improve.
이에 본 발명은 다경간으로 가설되는 프리스트레스트 강합성빔의 연속시공시 연속지점부가 설치되는 교각부에서 프리스트레스트 강합성빔을 연속으로 결합시키기 위한 연결시공방법에 관한 것과 Accordingly, the present invention relates to a connection construction method for continuously coupling a prestressed steel composite beam at a piers provided with continuous point portions during continuous construction of prestressed steel composite beams that are hypothesized by multi-span.
연속지점부 하부플랜지콘크리트 연결결합면에서의 압축력 저감방안에 관한 것으로서 연속지점부가 완전연속으로 결합됨으로써 구조적으로 더욱 안전하고 단면높이가 증대되어 효율성이 향상되어 경제성도 향상되는 다경간 프리스트레스트 강합성교를 건설하고자 함에 있으며, 경우에 따라서는 프리플렉션 및 릴리즈 과정을 생략함으로써 시공성 및 경제성을 향상시키고자 하였다.Multi-span prestressed steel composite bridge that is designed to reduce the compressive force at the joint surface of the lower flange of the continuous branch part. In this case, the construction process and economic feasibility were improved by omitting the preflection and release process.
이하 본 발명의 최적 실시예를 도 2 내지 도 3을 기준으로 살펴본다.Hereinafter, an exemplary embodiment of the present invention will be described with reference to FIGS. 2 to 3.
다경간 프리스트레스트 프리플렉스 강합성빔를 시공하기 위하여 연속지점부가 설치되는 교각 위에 설치하는 프리스트레스트 프리플렉스 강합성빔의 연속연결부(100) 구성은 In order to construct a multi-span prestressed preflex composite beam, the
하부플랜지콘크리트(240) 하부에 설치하는 하부지지판(110);A
하부지지판과 I형 강재(또는 강형)의 하부플랜지(230) 사이에 설치되는 중간지지판(120); An
I형 강재(200)의 상부플랜지(210)와 하부플랜지(230) 사이에 설치되는 수직보강재(130);,
하부플랜지콘크리트에 2차프리스트레스를 도입하기 위한 PC강연선을 포함하는 긴장재(300)가 정착되는 긴장재정착판(140);A
프리스트레스트 강합성빔의 하부플랜지콘크리트에서 연장되어 나온 종방향 철근(151), 종방향 연결철근(152), 종방향으로 연결된 프리스트레스트 프리플렉스 강합성빔을 횡방향으로 연결시키는 횡방향 연결철근(153)을 포함하는 연속연결부철근(150);을 포함하여 구성된다.
본 발명은 우선적으로 I형 강재(200)를 제작하게 되는데 I형 강재 제작시 연속지점부(A)에 해당되는 양 단부 또는 일단부는 도 2a와 같이 I형 강재(200)에 하부지지판(110), 중간지지판(120), 수직보강재(130), 긴장재정착판(140)을 부착시켜 제작하게 된다.The present invention preferentially produces the I-
하부지지판(110)은 I형 강재의 단부 하부면에 위치되도록 하는 지지판으로써 그 하부면에는 교량받침(SHOE)이 설치되며, 소정의 크기를 가진 판재를 이용하여 설치하면 된다. 이때 하부지지판은 교량받침의 받침중심부에 지지되도록 하고, 이러한 받침중심부는 프리플렉션 하중 재하 시 역시 지점부로 기능하게 된다.The
중간지지판(120)은 하부플랜지콘크리트 콘크리트가 연통될 수 있도록 관통공이 형성된 판재를 양측면에 관통공이 형성되지 않은 판재를 중간부에 하부지지판(110)과 I형 강재(200)의 하부플랜지(230) 사이에 배치하여 고정되도록 설치한다.The
수직보강재(130)는 상부플랜지(210)와 하부플랜지(230) 사이에 위치하도록 한 일종의 지점보강재 역할을 하는 것으로써 다양한 형상으로써 설치될 수 있다.The vertical reinforcing
긴장재정착판(140)은 하부지지판(110) 위에 수직판 형태로 설치되도록 하며, 도 2a와 같이 개략 중앙부가 I형 강재의 하부플랜지(230)에 삽입되도록 설치하며, 긴장재(300)가 삽입 후, 긴장, 정착될 수 있도록 다수의 긴장홀이 형성된다.The
이때 복부 및 바닥판 콘크리트(260,270) 타설시, 연속지점부가 타설 되고 나서, 연속지점부의 콘크리트 양생 후 콘크리트의 건조수축 등으로 인하여 프리스트레스트 강합성빔의 하부플랜지콘크리트와 연속지점부 콘크리트의 결합경계면에서 균열 등이 발생하지 않도록 긴장재 정착판(140)을 하부지지판(110) 위에 설치하며, 필요에 의해서는 추가적으로 하부지지판 또는 I형 강재, 긴장재정착판에 완전결합 작용을 이루도록 도 2a와 같이 전단연결재(160)를 설치한다.At this time, when placing the abdominal and bottom plate concrete (260,270), after the continuous point part is poured, the dry flange shrinkage of the concrete after the curing of the continuous part of the concrete at the joint boundary between the lower flange concrete and the continuous part concrete The tension
이러한 긴장재정착판(140)은 I형 강재(200)의 단부가 아닌 단부로부터 이격되어 중앙부쪽에 설치되도록 하여 연속지점부의 하부플랜지콘크리트 부위에 블록아웃된 연속연결부(100)가 형성되도록 한다.The
즉 프리스트레스트 강합성빔이 교각 위에 설치될 때 교량받침의 받침중심점 위치에 중간지지판(120), 수직보강재(130)를 설치하고 긴장재정착판(140)은 프리스트레스트 강합성빔의 양단으로부터 안쪽(이격거리 D 만큼)에 설치하는데, That is, when the prestressed rigid composite beam is installed on the bridge piers, the
이와 같이 하는 이유는 프리스트레스트 강합성빔에 전체하중 재하시의 반력을 받침중심점에서 원활하게 처리할 수 있도록 하고,The reason for doing this is to allow the prestressed composite beam to smoothly handle the reaction force under the full load load at the center of support.
프리플렉션 하중 재하시 긴장재 정착부가 아닌 받침중심점이 지점이 되도록 함으로써 프리플렉션 하중에 대한 팔길이를 길게 하여 프리플렉션 도입 효율을 높이고, By raising the arm length to the preflection load by increasing the length of the support center, not the tension fixing unit, during the preflection load, the preflection introduction efficiency is increased.
받침중심점과 프리플렉션 하중재하시의 지점이 일치함으로써 하중집중부에 대한 중복보강을 피하고자 함이다.This is to avoid overlapped reinforcement of the load focusing point by coinciding with the point of the bearing center and the preflection load.
또한 긴장재 정착판을 I형 강재의 양 단부로부터 이격시켜 빔의 중앙쪽에 위치시킴으로써 연속지점부에서 하부플랜지콘크리트가 연속결합시킬 수 있도록 하기 위한 공간(연속연결부)이 확보되도록 함과 더불어In addition, the tension fixing plate is spaced apart from both ends of the I-type steel to be located at the center of the beam, thereby ensuring a space (continuous connection) for continuous coupling of the lower flange concrete at the continuous point.
긴장재정착판을 중앙쪽으로 이동시킴으로 인하여 아스팔트, 난간, 연석 등 합성 후 고정하중 및 활하중 등에 의해 연속지점부에서 발생하는 최대부모멘트부를 피함으로써 연속연결부에서 발생하는 압축응력에 대한 저항효율을 높이고자 함이다.By moving the tension reset plate toward the center, it aims to improve the resistance efficiency against the compressive stress generated in the continuous connection part by avoiding the maximum part moment generated at the continuous point part by the fixed load and live load after synthesizing asphalt, handrail, curb, etc. to be.
위와 같이 I형 강재(200)의 제작 후 철근 및 긴장재(300)인 PC 강연선을 하부플랜지 주변에 조립하고 프리플렉션 하중을 재하하고, 하부플랜지 콘크리트를 타설, 양생한 후, 프리플렉션 하중을 제거하여 하부플랜지콘크리트(240)에 1차 프리스트레스를 도입하게 된다. After the fabrication of the I-
이때 연속지점부(A)는 도 2b와 같이 종방향 연결을 위한 종방향 연결철근(151)을 미리 노출시켜 놓는다.In this case, the continuous point portion A exposes the longitudinal connecting
또한 복부 및 바닥판 콘크리트 타설시 보호캡으로 보호된 PC강연선 정착구에 손상이 가지 않도록 PC 강연선 정착구 주위의 하부플랜지콘크리트는 테이퍼(T) 처리하여 PC 강연선 정착구(141)와 보호캡(142) 보다 길게 돌출시키고 PC 강연선 정착구와 보호캡은 홈(143)에 의하여 결합되도록 하여 완전 밀착이 이루어져 외부충격에 의해 분리되지 않도록 한다. In addition, the lower flange concrete around the PC strand anchorage is tapered (T) to prevent damage to the PC strand anchorage protected by the protective cap when placing the abdominal and bottom plate concrete.The longer length than the
긴장재(300)인 PC 강연선을 긴장,정착하여 제작된 프리스트레스트 프리플렉스 강합성빔을 도 2c와 같이 교각(B) 위 연속지점부(A)에 설치하는데, 이때 교량받침(C)은 연속지점부(A)에 설치되는 프리스트레스트 프리플렉스 강합성빔 각각에 설치하여 시공의 편의성을 도모하며, 프리스트레스트 프리플렉스 강합성빔에서 돌출된 종방향 연결용철근(152)과 종방향 연결철근(151)을 겹이음 방법으로 연결시켜 철근의 종방향 연결결합을 시키게 된다.The prestressed preflex composite beam manufactured by tensioning and fixing the PC strand, which is the
또한 종방향으로 결합된 연속지점부(A)를 횡방향 철근(153)을 이용하여 횡방향으로도 연결결합시키고, 도 2d와 같이 복부 및 바닥판콘크리트 타설시 연속지점부 하부플랜지콘크리트(250)를 타설하고 양생하여 블록아웃된 연속연결부(100)에 의하여 양 하부플랜지콘크리트가 서로 일체화되어 연결되도록 하고, 연속지점부(A)가 형성되도록 함으로써 결국,연속지점부(A)의 높이가 프리스트레스트 프리플렉스 강합성교의 다른 부분 높이와 동일하게 형성되도록 하여 연속지점부에 있어 소요의 강성을 충분히 확보할 수 있도록 하고, 강합성빔을 횡방향 및 종방향으로 모두 일 체화되어 연결되도록 함으로써 실질적인 연속 방식으로 시공이 가능한 프리스트레스트 프리플렉스 강합성교의 시공이 가능하도록 한다.In addition, the longitudinally coupled continuous point portion (A) using the transverse reinforcing
또한 연속지점부 하부플랜지콘크리트(250)의 긴장재정착판 및 연속연결부에서의 응력이 PC강연선 정착시 발생하는 압축응력 및 강합성빔과 복부콘크리트, 바닥판콘크리트의 합성 후 고정하중 및 활하중 등에 의해 발생하는 휨 부모멘트에 의해 수반되는 압축응력 등에 의해 허용치를 초과하는 경우 In addition, the stress in the tension reset plate and the continuous connection of the
도 3a, 도 3b, 도 3c와 같이 프리스트레스트 강합성빔의 지점으로부터 지간(받침간거리)의 10% ~ 25% 정도 이격된 거리에 콘크리트 정착블럭(400)을 설치하여 콘크리트 정착블럭(400)에 긴장재(300)인 PC강연선의 일부를 분산시켜 인장, 정착시킴으로써 연속연결부의 압축응력에 대한 저항효율을 향상시켜, 프리스트레스트 강합성빔의 단면높이를 증가시키지 않아도 되도록 한다.3A, 3B, and 3C, the
도 3a 및 도 3b는 정착블록(400)을 강합성빔의 일단부 또는 양 단부로부터 지간의 10%~25%정도 이격된 거리의 복부에 형성되도록 한 후, 긴장재(300)인 PC강연선의 일부가 하부플랜지콘크리트 상부로 인출되어 상기 정착블록(400)에 긴장 후, 정착되도록 하는 방식으로서 2경간 연속 및 3경간 이상 연속시 외측경간에 적용하는 방식이며, 정착블럭(400)에 PC강연선의 일부가 긴장,정착되도록 하고, 나머지 PC강연선을 강합성빔의 긴장재 정착판에 긴장 후 정착되도록 한다.3A and 3B illustrate a part of the PC strand, which is a
3경간 이상 연속시 내측경간에서의 정착블럭(400)의 경우 강합성빔의 양 측 단부로부터 도 3c와 같이 지간의 10%~25%정도 이격된 복부에 설치되도록 하고, 정착블럭(400)에 PC 강연선의 일부가 긴장, 정착되도록 하고, 나머지 PC 강연선은 강 합성빔의 긴장재정착판(140)에 긴장 후 정착되도록 한다.In the case of the fixing
이때 정착블록(400)은 콘크리트로 형성시킬 수 있으나 달리 재질에 있어 한정되는 것은 아니며, 위와 같이 PC 강연선의 일부를 정착블록에 긴장, 정착시킴으로써 PC 강연선에 의하여 도입되는 압축응력이 연속연결부에 집중되지 않도록 하여 하부플랜지콘크리트의 허용압축응력을 초과하지 않도록 할 수 있게 된다.At this time, the fixing
정착블럭(400)을 설치하여 PC 강연선의 일부를 콘크리트 정착블럭에 인장, 정착하여 하부플랜지콘크리트에 압축력을 도입하는 경우 필요에 따라서는 I형 강재의 프리플렉션 및 릴리즈에 의해 하부플랜지 콘크리트에 압축력을 도입시키는 과정을 생략하고, PC 강연선 만에 의해 하부플랜지 콘크리트에 압축력을 도입시켜 프리스트레스트 강합성빔 제작시 시공성 향상을 도모할 수 있도록 한다.When the fixing
이러한 의미에서 강합성빔은 프리스트레스트 강합성빔이라 하여 프리스트레스트 프리플렉스 강합성빔과 구별하여 지칭하며, 프리스트레스트 프리플렉스 강합성빔을 포함하는 광의의 의미이다.In this sense, the composite beam is referred to as a prestressed composite beam separately from the prestressed preflex composite beam, and is a broad meaning including a prestressed preflex composite beam.
본 발명에 의하여 다경간 프리스트레스트 강합성빔에서 프리스트레스트 강합성빔이 설치되는 연속지점부에서 신축이음장치를 사용치 않아 차량의 주행감을 향상시키고, 신축이음장치의 유지를 위한 지속적인 유지관리 비용을 절감할 수 있다. In accordance with the present invention, it is possible to improve the driving comfort of the vehicle by not using the expansion joint in the continuous point portion in which the prestressed composite beam is installed in the multi-span prestressed composite beam, and to maintain the maintenance cost for maintaining the expansion joint. Can be saved.
또한 프리스트레스트 강합성빔의 연속지점부 높이가 프리스트레스트 강합성빔의 단면높이와 같게 유지되면서 연속지점부가 완전 연속으로 결합됨으로써, 프리스트레스트 강합성빔의 단면높이를 크게 하지 않을 수 있어 프리스트레스트 강합성 빔의 최대장점인 낮은 단면높이의 유지라는 특성 효율을 극대화시켜 발휘할 수 있다.In addition, since the continuous point portion of the prestressed composite beam is kept at the same height as the cross-sectional height of the prestressed steel composite beam, the continuous point portions are completely continuous, so that the cross-sectional height of the prestressed steel composite beam can not be increased. This can be achieved by maximizing the characteristic efficiency of maintaining the low cross-sectional height, which is the greatest advantage of the composite beam.
또한 연속지점부의 단면높이가 종래 기술에 비해 커짐으로써 연속지점부에 발생하는 부모멘트에 대처하기 위한 연속지점부 바닥판에 사용되는 PC강연선 또는 철근사용을 줄일 수 있어 경제적이면서도, 연속결합 효과를 통하여 구조적 내구성이 향상된 효율적인 다경간 프리스트레스트 강합성교를 가설할 수 있다. In addition, the cross-sectional height of the continuous branch portion is larger than that of the prior art, thereby reducing the use of PC strands or reinforcing bars used in the bottom plate of the continuous branch portion to cope with the parental forces occurring in the continuous branch portion. Efficient multi-span prestressed steel composite bridge with improved structural durability can be hypothesized.
또한 PC강연선 정착부(긴장재 정착판)가 연속지점부의 최대 부모멘트 발생부를 벗어남으로써 프리스트레스트 강합성빔의 하부플랜지콘크리트에서 발생하는 압축력에 대한 저항효율성을 증대시킬 수 있다.In addition, since the PC strand fixing unit (tension member fixing plate) deviates from the maximum parental portion generating portion of the continuous point portion, it is possible to increase the resistance efficiency against the compressive force generated in the lower flange concrete of the prestressed rigid composite beam.
또한 경우에 따라서는 프리스트레스트 강합성빔의 지간내부측에 콘크리트 정착블럭을 설치하고 콘크리트 정착블럭에 PC강연선의 일부를 분산시켜 인장,정착함으로써 하부플랜지 콘크리트의 연속결합면에 발생하는 압축력을 경감시켜 연속결합면의 압축에 대한 저항 효율성을 향상시켜 하부플랜지 콘크리트에 발생하는 압축력으로 인해 단면높이를 증가시키는 일이 없도록 하며, 이와 같은 경우 필요에 의해서는 I형강재의 프리플렉션,릴리즈과정을 생략한채 PC강연선만에 의해 압축력을 하부플랜지 콘크리트에 도입시켜 시공성을 향상시킴과 동시에 경제성을 향상시킬 수 있다.In some cases, the concrete anchoring block is installed inside the span of the prestressed rigid composite beam, and a part of the PC strand is distributed and tensioned and fixed on the concrete anchoring block to reduce the compressive force generated in the continuous engagement surface of the lower flange concrete. It improves the resistance efficiency against the compression of the continuous mating surface so that the cross-sectional height is not increased due to the compressive force generated in the lower flange concrete.In this case, the pre-flection and release process of the I-shaped steel is omitted if necessary. Compression force is introduced into the lower flange concrete by PC strand only to improve the constructability and economical efficiency.
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020060024334A KR100670675B1 (en) | 2006-03-16 | 2006-03-16 | Continuous construction method of multi span prestressed steel composite beam |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020060024334A KR100670675B1 (en) | 2006-03-16 | 2006-03-16 | Continuous construction method of multi span prestressed steel composite beam |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR2020060007176U Division KR200418183Y1 (en) | 2006-03-17 | 2006-03-17 | Joint Structure of Continuous Multi Span Prestressed Steel Composite Beam |
Publications (1)
Publication Number | Publication Date |
---|---|
KR100670675B1 true KR100670675B1 (en) | 2007-01-19 |
Family
ID=38014061
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020060024334A KR100670675B1 (en) | 2006-03-16 | 2006-03-16 | Continuous construction method of multi span prestressed steel composite beam |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100670675B1 (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101200563B1 (en) * | 2008-07-14 | 2012-11-13 | 한국건설기술연구원 | A Steel Composite Bridge Having Steel Plates Connected by Using Concrete Cross Beams and Its Constructing Method |
CN108018991A (en) * | 2016-11-03 | 2018-05-11 | 重庆大学 | A kind of Self-resetting viscoplasticity energy dissipating girder steel |
CN108360742A (en) * | 2018-04-05 | 2018-08-03 | 南京林业大学 | A kind of prestressing with bond bamboo H-beam |
WO2024045588A1 (en) * | 2022-09-02 | 2024-03-07 | 中铁七局集团有限公司 | Continuous-beam-support-method-based one-time cast-in-place construction method |
-
2006
- 2006-03-16 KR KR1020060024334A patent/KR100670675B1/en active IP Right Review Request
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101200563B1 (en) * | 2008-07-14 | 2012-11-13 | 한국건설기술연구원 | A Steel Composite Bridge Having Steel Plates Connected by Using Concrete Cross Beams and Its Constructing Method |
CN108018991A (en) * | 2016-11-03 | 2018-05-11 | 重庆大学 | A kind of Self-resetting viscoplasticity energy dissipating girder steel |
CN108018991B (en) * | 2016-11-03 | 2023-08-11 | 重庆大学 | Self-resetting viscoelastic energy dissipation steel beam |
CN108360742A (en) * | 2018-04-05 | 2018-08-03 | 南京林业大学 | A kind of prestressing with bond bamboo H-beam |
WO2024045588A1 (en) * | 2022-09-02 | 2024-03-07 | 中铁七局集团有限公司 | Continuous-beam-support-method-based one-time cast-in-place construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100536489B1 (en) | Manufacturing method for prestressed steel composite girder and prestressed steel composite girder thereby | |
KR100941066B1 (en) | Prestressed-precast-segmental open spendral concrete arch bridge and its constructing method | |
KR101202416B1 (en) | Structual member making method using preflex baem and psc beam and the bridge construction method threrewith | |
KR101275754B1 (en) | Psc girder with shear block, psc girder making method with shear block and bridge construction method using psc girder with shear block | |
KR100885663B1 (en) | A prestressed concrete composite girder using cross-beam and constructing method thereof | |
KR101222620B1 (en) | Prestressed concrete girder and it's manufacture and construction method which used pretensioning steel plate | |
KR100982974B1 (en) | Method for manufacturing multi-span continuous re-prestressed preflex composite bridge | |
KR101693256B1 (en) | Construction method of prefabricated psc bridge | |
KR100988074B1 (en) | Girder bridge connected to abutment and the construction method thereof | |
KR100974305B1 (en) | Continuous beam bridge construction method using girder for multi-span | |
KR100670675B1 (en) | Continuous construction method of multi span prestressed steel composite beam | |
KR200407182Y1 (en) | Precasted concrete plate | |
KR100875248B1 (en) | Steel composite prestressed concrete beam using prestressed steel member and manufacturing method of the same | |
KR101200563B1 (en) | A Steel Composite Bridge Having Steel Plates Connected by Using Concrete Cross Beams and Its Constructing Method | |
KR20130077191A (en) | Prestressed concrete girder with half-depth cantilever and construction method using the same | |
KR200418183Y1 (en) | Joint Structure of Continuous Multi Span Prestressed Steel Composite Beam | |
JP5716117B1 (en) | Hinge reinforcement method and reinforcement structure for existing girder bridge | |
KR100937252B1 (en) | Prestressed steel composite beam and a manufacturing method thereof | |
KR200342287Y1 (en) | A structure of prestressed preflex steel composite beam prestressed by each construction steps | |
KR100456471B1 (en) | Open-type steel wire holding device and Metod for construction of continuous bridge using of prestressed concret beam having it | |
KR101374701B1 (en) | Concrete beam construction method with anchorage apparatus for bi-pressing compression member | |
KR20060017949A (en) | Field-fabricated prestressing steel-composed girder and construction method of continuous bridge using the girder | |
KR20070001410A (en) | Mounting structure of steel cross-beam in multi-girder concrete bridge and its construction method | |
KR100712622B1 (en) | Continuous Preflex Girder Structure Using Prestress in Parent Section Using Expanded Concrete and Its Construction Method | |
KR200419013Y1 (en) | Temporary bridge consruction system using composite slab girder |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
J204 | Invalidation trial for patent | ||
J121 | Written withdrawal of request for trial | ||
FPAY | Annual fee payment |
Payment date: 20140108 Year of fee payment: 8 |
|
J204 | Invalidation trial for patent | ||
FPAY | Annual fee payment |
Payment date: 20150107 Year of fee payment: 9 |
|
J301 | Trial decision |
Free format text: TRIAL DECISION FOR INVALIDATION REQUESTED 20140114 Effective date: 20150205 |
|
J2X1 | Appeal (before the patent court) |
Free format text: INVALIDATION |
|
J302 | Written judgement (patent court) |
Free format text: JUDGMENT (PATENT COURT) FOR INVALIDATION REQUESTED 20150310 Effective date: 20150918 |
|
FPAY | Annual fee payment |
Payment date: 20160112 Year of fee payment: 10 |
|
FPAY | Annual fee payment |
Payment date: 20180201 Year of fee payment: 12 |
|
FPAY | Annual fee payment |
Payment date: 20190130 Year of fee payment: 13 |
|
FPAY | Annual fee payment |
Payment date: 20200201 Year of fee payment: 14 |