KR100655761B1 - Drilling machine for anchor and soil nailing with an outlet for sludge - Google Patents

Drilling machine for anchor and soil nailing with an outlet for sludge Download PDF

Info

Publication number
KR100655761B1
KR100655761B1 KR1020060006750A KR20060006750A KR100655761B1 KR 100655761 B1 KR100655761 B1 KR 100655761B1 KR 1020060006750 A KR1020060006750 A KR 1020060006750A KR 20060006750 A KR20060006750 A KR 20060006750A KR 100655761 B1 KR100655761 B1 KR 100655761B1
Authority
KR
South Korea
Prior art keywords
casing
auger
flight
balancing rod
rotator
Prior art date
Application number
KR1020060006750A
Other languages
Korean (ko)
Inventor
이갑희
Original Assignee
주식회사 세이프씨앤이
두리토건 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 세이프씨앤이, 두리토건 주식회사 filed Critical 주식회사 세이프씨앤이
Priority to KR1020060006750A priority Critical patent/KR100655761B1/en
Application granted granted Critical
Publication of KR100655761B1 publication Critical patent/KR100655761B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads
    • E02D5/80Ground anchors
    • E02D5/803Ground anchors with pivotable anchoring members
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
    • E02D7/28Placing of hollow pipes or mould pipes by means arranged inside the piles or pipes
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B10/00Drill bits
    • E21B10/44Bits with helical conveying portion, e.g. screw type bits; Augers with leading portion or with detachable parts

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Earth Drilling (AREA)

Abstract

A drilling machine for anchor and nailing construction with an earth removing structure in the auger and casing horizontal work is provided to increase the working speed and reduce the unnecessary load according to the smooth earth removing work by forming the flight at the balancing rod. A drilling machine for anchor and nailing construction with an earth removing structure in the auger and casing horizontal work is compose of a rotator(20) and a drift(80) fixed at a master(10) to generate the rotary force; a wear-piece(50) mounted in a plate(30) of the rotator to receive the rotary force by the rotator; a balancing rod(40) transferring the rotary force of the drift; a casing(60) combined with the wear-piece; and an auger drill(70) combined with the balancing rod and formed with a flight(71) for removing the earth. An earth removing hole(51) is formed at the wear-piece. A balancing rod flight is formed at the balancing rod.

Description

오거 및 케이싱 병행 작업시의 배토구조를 구비한 앵커 및 네일링 시공을 위한 천공장비{Drilling machine for anchor and soil nailing with an outlet for sludge}Drilling equipment for anchoring and nailing construction with a clay structure at the same time auger and casing work {Drilling machine for anchor and soil nailing with an outlet for sludge}

도 1은 본 발명에 의한 앵커 및 네일링 시공을 위한 천공장비의 구성을 보인 요부 단면도.1 is a cross-sectional view showing a main portion of the drilling equipment for anchoring and nailing construction according to the present invention.

도 2는 본 발명에 의한 앵커 및 네일링 시공을 위한 천공장비의 배토구조를 보인 요부 단면도.Figure 2 is a cross-sectional view showing the main structure of the drilling equipment for the anchor and nailing construction according to the present invention.

<도면의 주요부분에 대한 부호의 설명><Description of the symbols for the main parts of the drawings>

10 : 마스터 11 : 흙받침대10: master 11: mudguard

20 : 로테이터 30: 플레이트20: rotator 30: plate

40 : 밸런싱 로드 50 : 웨어 피스40: balancing rod 50: wear piece

51 : 배토홀 60 : 케이싱51: toehole 60: casing

70 : 오거 드릴 71 : 오거드릴 플라이트70: Auger Drill 71: Auger Drill Flight

100 : 밸런싱로드 플라이트 80 : 드리프트100: balancing rod flight 80: drift

본 발명은 지중으로의 앵커 및 네일링 시공을 위한 천공장비에 관한 것으로서, 특히 2단으로 동력장치를 설치하고, 밸런싱 로드에 오거 드릴을, 웨어피스에 케이싱을 결합시켜 케이싱 및 오거(Auger) 병행 작업이 가능하고, 케이싱 및 오거 병행 작업시 웨어피스에 형성한 배토홀로 배토가 이루어질 수 있도록 한 오거 및 케이싱 병행 작업시의 배토구조를 구비한 앵커 및 네일링 시공을 위한 천공장비를 제공하기 위한 것이다.The present invention relates to a drilling equipment for the construction of anchoring and nailing to the ground, and in particular to install the power unit in two stages, the auger drill on the balancing rod, the casing on the wear piece combined with the casing and auger (Auger) To provide perforation equipment for the construction of anchors and nailings, which are capable of working, and have a toping structure for auger and casing parallel work, which enables topography to be made through the toping hole formed in the wear piece when the casing and auger parallel work is performed. .

일반적으로, 지중의 보강구조물로서 앵커 구조물과 네일링 구조물로 크게 나뉘어지고 이러한 지중의 보강구조물은 토목 흙막이 공사에 있어서는 지반을 안정화시키기 위해 설치되는 토목시설물이다. 이러한 보강구조물은 이를 시공하고자 하는 위치의 지반에 그라우팅 홀을 소정깊이까지 천공하고, 상기 그라우팅 홀에 앵커, 네일 등의 보강재를 삽입하고 그라우트를 주입하여 양생시킨 후, 보강재의 외부측을 견인하여 보강재에 인장(프리스트레스)력을 부여함으로써 가시설 및 영구적으로 발생하는 응력, 변형, 변위 등에 대하여 구조물과 지반을 보강하고 안정화하는 것이다.In general, as a reinforcement structure of the ground is divided into an anchor structure and a nailing structure, such a reinforcement structure of the ground is a civil engineering facility installed to stabilize the ground in civil earthquake construction. This reinforcing structure drills the grouting hole to a predetermined depth in the ground where the construction is to be constructed, inserts a reinforcing material such as an anchor and a nail into the grouting hole and injects the grout to cure, and then pulls the outer side of the reinforcing material to reinforce the reinforcing material. By applying tensile (pre-stress) force to the structure and the ground and reinforcement and stabilization of temporary stress, deformation, displacement, etc. occurring.

상기와 같은 앵커 및 네일링 시공을 위해서 지반에 그라우팅 홀을 천공하기 위한 시공방법은, 보통은 오거 작업을 한 후에 그 오거 작업에 의해 천공된 홀에 케이싱 작업을 다시 하여 앵커 또는 네일링 구조물을 설치하는 시공방법을 사용하고 있다. 그러나 이와 같은 시공방법에서의 불편함을 해소시키고자 오거 및 케이싱 작업을 동시에 병행할 수 있도록 하는 방법이 알려져 있다.The construction method for drilling the grouting hole in the ground for the anchor and nailing construction as described above, usually after the auger work to install the anchor or nailing structure by re-casing the hole drilled by the auger work Construction method is used. However, a method for simultaneously performing auger and casing work is known to eliminate the inconvenience in such a construction method.

그 일례로, 대한민국 공개특허공보 공개번호 제10-2004-0046591호에는, 대구 경의 케이싱과 소구경의 오거 드릴을 준비하여 천공장비의 로터리 장치에 케이싱과 오거 드릴을 각각 설치하되, 케이싱에 오거 드릴이 관입 되도록 설치한 다음, 상기 케이싱이 미리 설정된 일정 하향각도를 취하도록 천공장비의 지지부재를 조정하고, 상기 케이싱을 구동하여 케이싱 및 케이싱 내에 관입된 오거 드릴을 각각 회전시키면서 함께 전진시켜 토류벽의 지반 내에 구멍을 천공하면서 동시에 오거 드릴을 통해 고압으로 그라우팅 재를 그라우팅 홀 주변부의 지반 내에 주입하는 것이 그 특징이다.As an example, Korean Patent Laid-Open Publication No. 10-2004-0046591, a large diameter casing and a small diameter auger drill are prepared to install a casing and auger drill on a rotary device of a drilling equipment, respectively, and auger drill on a casing. After installation so as to penetrate, the support member of the drilling equipment is adjusted so that the casing takes a predetermined downward angle, and the casing is driven to move forward while rotating the auger drill inserted into the casing and the casing, respectively. It is characterized by injecting grouting material into the ground around the grouting hole at high pressure through an auger drill while drilling holes in it.

그러나 위와 같은 지중에의 앵커 시공방법은 케이싱과 그 내부에 관입 되도록 설치된 오거 드릴을 회전시키면서 천공함과 동시에 오거 드릴을 통해 고압으로 그라우팅 재의 주입을 병행한 천공작업을 계획 심도까지 실시한다고 하나, 이는 케이싱과 오거 드릴로 지반을 천공할 때에는 토사가 발생되기 때문에 케이싱의 끝단을 통해 지속적으로 배출하여야 함에도 불구하고 상기 오거 드릴 선단을 통해 고압으로 그라우팅 재를 주입하면 그라우팅재 또한 케이싱의 내면과 오거 드릴 외면 사이의 공간으로 토사와 함께 배출되므로 그라우팅이 제대로 이뤄질 수 없다는 문제점이 있었다.However, the above-mentioned anchor construction method in the above ground performs drilling by rotating the auger drill installed to penetrate the casing and the inside, and at the same time performing the drilling work by injecting grouting material at high pressure through the auger drill. When the ground is drilled through the casing and the auger drill, soil is generated, so that the grouting material is injected at high pressure through the auger drill tip even though it must be discharged continuously through the end of the casing. There was a problem that the grouting can not be made properly because it is discharged together with the soil to the space between.

이와 같은 종래의 천공장비에서 케이싱과 오거 작업을 병행할 시에 배토가 원활하지 못하다는 문제점을 해결하기 위하여 본 발명에서는 웨어피스에 배토홀을 형성하여 케이싱 내부의 오거 드릴의 플라이트에 의해 올라오는 슬라임을 배토홀을 통해 원활하게 배토시킬 수 있도록 한 오거 및 케이싱 병행 작업시의 배토구조를 구비한 앵커 및 네일링 시공을 위한 천공장비를 제공하기 위한 것이다.In the present invention, in order to solve the problem that the top is not smooth when the casing and auger work in parallel in the conventional drilling equipment, in the present invention by forming a top hole in the wear piece, the slime coming up by the flight of the auger drill inside the casing It is to provide a drilling equipment for the construction of the anchor and nailing provided with a topological structure at the time of auger and casing parallel work to be able to smoothly spread through the tophole.

또한, 본 발명은, 상기한 천공장비에서 웨어피스 내부의 밸런싱 로드에 플라이트를 형성함으로써 오거드릴의 플라이트와 연계되어 배토가 원활하게 이루어질 수 있도록 한 오거 및 케이싱 병행 작업시의 배토구조를 구비한 앵커 및 네일링 시공을 위한 천공장비를 제공하기 위한 것이다.In addition, the present invention, by forming a flight on the balancing rod inside the wear piece in the above-mentioned drilling equipment anchors having a structure of auger and casing at the same time when the auger and casing parallel work to be smoothly linked to the flight of the auger drill And to provide a drilling equipment for nailing construction.

본 발명에 의한 앵커 및 네일링 시공을 위한 천공장비는, Drilling equipment for the anchor and nailing construction according to the present invention,

천공장비에 로테이터와 드리프트가 설치되고, 그 로테이터와 드리프트에 의해 회전력이 각각 전달되는 웨어 피스와 밸런싱 로드가 로테이터가 고정되는 플레이트에 설치되고, 상기 웨어피스에는 케이싱을 상기 밸런싱 로드에는 오거 드릴을 각각 분리/장착 가능하도록 이루어진 천공장비로서, 상기 웨어 피스에 배토 홀을 형성하여 케이싱 및 오거 병행 작업시에 오거 드릴의 플라이트에 의해 올라오는 슬라임을 배토시키도록 구성된 것을 특징으로 한다.The rotator and the drift are installed in the drilling equipment, and the wear piece and the balancing rod are respectively installed on the plate to which the rotator is fixed by the rotator and the drift, and the auger drill is attached to the balancing rod, respectively. As a punching equipment made to be detachable / mountable, characterized in that to form a clay hole in the wear piece and to discharge the slime coming up by the flight of the auger drill in the casing and auger parallel operation.

또한, 본 발명은, 상기 밸런싱 로드에 상기 오거드릴의 플라이트에 의해 올라오는 슬라임을 상기 웨어 피스의 배토홀을 통해서 배토시키도록 하는 밸런싱 로드 플라이트를 더 형성하여 구성됨을 특징으로 한다.
상기 웨어피스(wear-piece)는, 상기 플레이트에 설치되고 타단에 케이싱이 결합되는 일종의 회전력 전달 어댑터로서 밸런싱 로드가 관입 형태로 설치되는 구성입니다.
In addition, the present invention is characterized in that the balancing rod is formed by further forming a balancing rod flight to discharge the slime coming up by the flight of the auger drill through the top cover hole of the wear piece.
The wear-piece is a rotational force transmission adapter that is installed on the plate and the casing is coupled to the other end, and the balancing rod is installed in a penetrating form.

이하, 본 발명의 실시 예를 첨부된 도면을 참조해서 상세히 설명하면 다음과 같다.Hereinafter, exemplary embodiments of the present invention will be described in detail with reference to the accompanying drawings.

도 1에 도시된 바와 같이, 천공장비의 마스터(10)에 고정설치되어 회전동력 을 발생하는 로테이터(20) 및 드리프트(80)와, 그 로테이터(20)의 플레이트(30)에 설치되고 중간부에 배토홀(51)이 형성되며 상기 로테이터(20)에 의해 회전 동력을 전달받는 웨어피스(50)와, 그 웨어피스(50)의 관입 형태로 설치되어 상기 드리프트(80)의 회전동력을 전달하는 밸런싱 로드(40)와, 상기 웨어피스(50)에 결합되는 케이싱(60)과, 그 케이싱(60) 내측에 관입되고 상기 밸런싱 로드(40)에 결합되며 배토를 위한 플라이트(71)가 형성되어 있는 오거드릴(70)을 포함하여 구성된다. 여기서 미설명부호 11은 흙받이로서 상기 배토홀(51)로부터 배출되는 배출물을 천공장비 외측으로 방출하기 위한 가이드역할의 흙받이이다.As shown in FIG. 1, the rotator 20 and the drift 80 are fixed to the master 10 of the drilling equipment to generate rotational power, and are installed on the plate 30 of the rotator 20. A top hole 51 is formed in the wear piece 50 which receives the rotational power by the rotator 20, and is installed in a penetration form of the wear piece 50 to transfer the rotational power of the drift 80. A balancing rod 40, a casing 60 coupled to the wear piece 50, a casing 60 inserted into the casing 60, coupled to the balancing rod 40, and a flight 71 for toping. It is configured to include an auger drill (70). Here, reference numeral 11 denotes a fender as a guide for discharging the discharge discharged from the clay hole 51 to the outside of the drilling equipment.

이와 같이 구성된 천공장비는, 밸런싱 로드(40)에 오거드릴(70)을 결합하고 그 오거 드릴(70) 외 측에 케이싱(60)을 끼워서 웨어피스(50)에 결합한 후 오거드릴(70)과 케이싱(60)을 각각 회전시켜 지반을 파고 들어가게 된다. 이때 케이싱(60)은 오거드릴(70)이 파고 들어가는 천공된 홀의 외측부에 삽입되면서 천공 및 케이싱 작업을 동시에 하게 된다. 즉, 오거드릴(70)이 회전되면서 고압의 에어나 이수를 공급함으로써 지반을 파고 들어가고 이렇게 파고 들어가는 만큼 케이싱(60)도 회전에 의해 파고들어가서 삽입하는 과정을 소정깊이까지 수행한다.The drilling device configured as described above, the auger drill 70 is coupled to the balancing rod 40 and the casing 60 is fitted to the outer side of the auger drill 70, and then coupled to the wear piece 50. Each of the casings 60 is rotated to dig into the ground. At this time, the casing 60 is inserted into the outer portion of the drilled hole through which the auger drill 70 is to be drilled and the casing work at the same time. That is, as the auger drill 70 is rotated, the ground is dug into the ground by supplying high pressure air or dihydrate, and the casing 60 is also dug and inserted by the rotation to a predetermined depth.

오거드릴(70)과 고압의 에어나 이수에 의해 배출물(일명, "슬라임"이라 한다)이 오거드릴(70)의 플라이트(71)를 통해서 케이싱(60) 내부에서 위로 올라오게되고, 웨어피스(50)의 배토홀(51)을 통해서 배토된다.Due to the auger drill 70 and high pressure air or distillation, the discharge (also called “slime”) is lifted up inside the casing 60 through the flight 71 of the auger drill 70, and the wear piece ( Discharge through the discharging hole 51 of 50).

따라서, 종래의 천공장비에서는 오거드릴과 케이싱 하단부를 통해 밀려 나가 배토되던 문제점을 보완하여 웨어 피스(50)의 배토홀로 배토되기 때문에 배토가 원 활하여 오거 및 케이싱 병행작업 효과가 더욱 향상된다.Therefore, in the conventional drilling equipment, the auger and the casing parallel working effect is further improved because the clay is discharged into the topdressing hole of the wear piece 50 to compensate for the problem of being pushed out through the bottom of the auger drill and the casing.

도 2는 본 발명에 의한 앵커 및 네일링 시공을 위한 천공장비의 배토구조를 보인 요부 단면도이다.Figure 2 is a cross-sectional view showing the main structure of the drilling structure for the anchor and nailing construction according to the present invention.

천공장비의 마스터(10)에 고정설치되어 회전동력을 발생하는 로테이터(20) 및 드리프트(80)와, 그 로테이터(20)의 플레이트(30)에 설치되고 중간부에 배토홀(51)이 형성되며 상기 로테이터(20)에 의해 회전 동력을 전달받는 웨어피스(50)와, 그 웨어피스(50)의 관입 형태로 설치되어 상기 드리프트(80)의 회전동력을 전달하는 밸런싱 로드(40)와, 상기 웨어피스(50)에 결합되는 케이싱(60)과, 그 케이싱(60) 내측에 관입되고 상기 밸런싱 로드(40)에 결합되며 배토를 위한 플라이트(71)가 형성되어 있는 오거드릴(70)을 포함하여 구성되고, 상기 밸런싱 로드에 상기 오거드릴(70)의 플라이트(71)에 의해 올라오는 슬라임을 상기 웨어 피스(50)의 배토홀(51)을 통해서 배토시키도록 하는 밸런싱 로드 플라이트(100)를 더 형성하여 구성된다.The rotator 20 and the drift 80 are fixed to the master 10 of the drilling equipment to generate rotational power, and are disposed on the plate 30 of the rotator 20. A balancing rod 40 configured to transmit a rotational force of the drift 80 by being installed in a piercing form of the wear piece 50 and the wear piece 50 receiving rotational power by the rotator 20, Casing 60 coupled to the wear piece 50, and the auger drill 70 is inserted into the casing 60, coupled to the balancing rod 40, the flight 71 for the soil is formed And a balancing rod flight 100 for discharging the slicing up by the flight 71 of the auger drill 70 through the topdressing hole 51 of the wear piece 50 to the balancing rod. It is formed by forming more.

여기서 도면의 미설명부호 11은, 흙받침 플레이트이다.Reference numeral 11 in the drawings is a mudguard plate.

여기서 상기 밸런싱 로드(40)에 형성되는 플라이트(100)는, 오거드릴(70)을 밸런싱 로드(40)에 결합하였을 때 오거드릴(70)의 플라이트(71)와 연속되는 구조가 되도록 형성한다. 그리고 웨어 피스(50)의 배토홀(51)의 중간부위까지만 밸런싱 로드 플라이트(100)가 형성됨을 특징으로 한다.Here, the flight 100 formed on the balancing rod 40 is formed to have a structure continuous with the flight 71 of the auger drill 70 when the auger drill 70 is coupled to the balancing rod 40. And it is characterized in that the balancing rod flight 100 is formed only up to the middle portion of the topdressing hole 51 of the wear piece 50.

이와 같이 구성된 본 발명에 의한 천공장비는,Drilling equipment according to the present invention configured as described above,

케이싱(60)을 웨어피스(50)에 장착하고, 아울러 오거드릴(70)을 밸런싱 로드 (40)에 장착하여 오거드릴(70)이 케이싱(60) 내부에 관입된 구조로 장비를 천공위치에 로딩한다. 드리프트(80)를 작동시켜 오거드릴(70)을 회전시키면서 로테이터(20)를 작동시켜 케이싱(60)을 회전시키면서 천공하게 되고, 케이싱(60)이 천공에 따라 오거드릴(70)과 함께 내려가면서 케이싱 작업과 천공작업이 동시에 이루어진다.The casing 60 is mounted on the wear piece 50, and the auger drill 70 is mounted on the balancing rod 40 so that the auger drill 70 is inserted into the casing 60. Load. By operating the drift 80 to rotate the auger drill 70 while operating the rotator 20 to be perforated while rotating the casing 60, the casing 60 goes down with the auger drill 70 in accordance with the drilling Casing work and drilling work are done at the same time.

이때, 오거드릴(70)의 플라이트(71)를 통해서 케이싱(60) 내부에서 흙이 위로 올라오게 되고, 웨어피스(50) 내에서는 밸런싱 로드(40) 플라이트(100)에 의해 위로 올라와서 웨어피스(50)의 배토홀(51)로 배토되게 된다.At this time, the soil is raised from the inside of the casing 60 through the flight 71 of the auger drill 70, in the wear piece 50 is raised up by the balancing rod 40, flight 100 to wear It is made to be discharged | emitted to the discharging hole 51 of 50. As shown to FIG.

따라서, 케이싱(60) 내부에서는 오거드릴(70)의 플라이트(71)에 의해 흙이 위로 올라오고 웨어피스(50) 내부에서는 밸런싱 로드의 플라이트(100)에 의해 흙이 위로 올라오게 되어 웨어피스(50)의 배토홀(51)로 원활하게 배토된다.Therefore, in the casing 60, the soil is raised by the flight 71 of the auger drill 70, and in the wear piece 50, the soil is raised by the flight 100 of the balancing rod. 50 is smoothly discharged to the discharge hole 51 of.

그러므로 본 발명에 의한 천공장비를 사용하게 되면, 원활한 배토 작업이 이루어지기 때문에 천공과 함께 케이싱 작업을 동시에 하는 경우에 작업속도가 향상되고, 장비에 불필요한 부하가 걸리지 않게 되는 등의 효과가 있다.Therefore, when the drilling equipment according to the present invention is used, the work speed is improved when the casing work is carried out at the same time as the drilling work is carried out smoothly, and the unnecessary load is not applied to the equipment.

이상에서 상세히 설명한 바와 같이 본 발명에 의한 천공장비는 밸런싱 로더에 오거 드릴을 장착하고 웨어피스에 케이싱을 장착하여 천공과 동시에 케이싱 작업을 하기 위한 천공장비에서 웨어피스에 배토홀을 형성하여 오거 및 케이싱 병행작업시 배토가 원활하게 이루어지고, 밸런싱 로드에도 플라이트를 형성하여 원활한 배토가 이루어지도록 구성함으로써, 작업속도의 향상과 불필요한 부하가 걸리지 않도록 하는 효과가 있다.As described in detail above, the drilling equipment according to the present invention is equipped with an auger drill on a balancing loader and a casing on a wear piece to form a top hole in the wear piece in the drilling equipment for drilling and casing work at the same time. The parallel work is made smoothly, and by forming a flight on the balancing rod is configured to smooth the top, there is an effect of improving the work speed and avoid unnecessary loads.

Claims (2)

앵커 및 네일 시공을 위한 천공장비에 있어서,In the drilling equipment for anchor and nail construction, 천공장비의 마스터(10)에 고정설치되어 회전동력을 발생하는 로테이터(20) 및 드리프트(80)와, 그 로테이터(20)의 플레이트(30)에 설치되고 상기 로테이터(20)에 의해 회전 동력을 전달받는 웨어피스(wear-piece)(50)와, 그 웨어피스(50)의 관입 형태로 설치되어 상기 드리프트(80)의 회전동력을 전달하는 밸런싱 로드(40)와, 상기 웨어피스(50)에 결합되는 케이싱(60)과, 그 케이싱(60) 내측에 관입되고 상기 밸런싱 로드(40)에 결합되며 배토를 위한 플라이트(71)가 형성되어 있는 오거드릴(70)을 포함하여 구성되고, 상기 웨어피스(50)에 배토홀(51)이 형성되어 상기 케이싱(60) 내부에서 오거드릴(70)의 플라이트(71)에 의해 올라오는 흙을 배토시키도록 구성되되,The rotator 20 and the drift 80 are fixed to the master 10 of the drilling equipment to generate rotational power, and are installed on the plate 30 of the rotator 20 and rotate the rotational power by the rotator 20. The wear-piece 50 to be transmitted, and the balancing rod 40 is installed in the penetration form of the wear piece 50 to transfer the rotational power of the drift 80, and the wear piece 50 And an auger (70) coupled to the casing (60) coupled to the inside of the casing (60) and coupled to the balancing rod (40) and having a flight (71) for discharging. The clay hole hole 51 is formed in the wear piece 50 and is configured to dissipate the soil which is raised by the flight 71 of the auger drill 70 in the casing 60. 상기 밸런싱 로드(40)에, 상기 오거드릴(70)의 플라이트(71)에 의해 올라오는 슬라임을 상기 웨어 피스(50)의 배토홀(51)을 통해서 배토시키도록 하는 밸런싱 로드 플라이트(100)를 더 형성하여 구성된 것을 특징으로 하는 오거 및 케이싱 병행 작업시의 배토구조를 구비한 앵커 및 네일링 시공을 위한 천공장비.Balancing rod flight 100 to the top of the balancing rod 40 to discharge the slime by the flight 71 of the auger drill 70 through the top cover hole 51 of the wear piece 50. Drilling equipment for anchoring and nailing construction provided with a clay structure when the auger and casing at the same time, characterized in that further formed. 삭제delete
KR1020060006750A 2006-01-23 2006-01-23 Drilling machine for anchor and soil nailing with an outlet for sludge KR100655761B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020060006750A KR100655761B1 (en) 2006-01-23 2006-01-23 Drilling machine for anchor and soil nailing with an outlet for sludge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020060006750A KR100655761B1 (en) 2006-01-23 2006-01-23 Drilling machine for anchor and soil nailing with an outlet for sludge

Publications (1)

Publication Number Publication Date
KR100655761B1 true KR100655761B1 (en) 2006-12-14

Family

ID=37732707

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020060006750A KR100655761B1 (en) 2006-01-23 2006-01-23 Drilling machine for anchor and soil nailing with an outlet for sludge

Country Status (1)

Country Link
KR (1) KR100655761B1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102030173B1 (en) * 2018-04-20 2019-10-08 (주)노아중기계 soil inflow prevention and discharge structure in auger gear box
KR102241933B1 (en) * 2020-07-30 2021-04-19 (주)강호지엔씨 Boring angle adjusting system of drill equipment and method of the same
CN112695754A (en) * 2020-12-23 2021-04-23 北京城建华夏基础建设工程有限公司 Underwater anchor rod construction method

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20050049463A (en) * 2005-05-04 2005-05-25 강익희 Drilling apparatus with an onebody shank and swivel

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20050049463A (en) * 2005-05-04 2005-05-25 강익희 Drilling apparatus with an onebody shank and swivel

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102030173B1 (en) * 2018-04-20 2019-10-08 (주)노아중기계 soil inflow prevention and discharge structure in auger gear box
KR102241933B1 (en) * 2020-07-30 2021-04-19 (주)강호지엔씨 Boring angle adjusting system of drill equipment and method of the same
CN112695754A (en) * 2020-12-23 2021-04-23 北京城建华夏基础建设工程有限公司 Underwater anchor rod construction method
CN112695754B (en) * 2020-12-23 2022-09-13 北京城建华夏基础建设工程有限公司 Underwater anchor rod construction method

Similar Documents

Publication Publication Date Title
US8857537B2 (en) Method and apparatus for down-the-hole drilling
WO2010058933A3 (en) Tunnel excavation method
KR100655761B1 (en) Drilling machine for anchor and soil nailing with an outlet for sludge
KR200384053Y1 (en) Casing structure of drilling equipment
CN107002379A (en) Utilize the excavating gear of excavator
KR20120034432A (en) Grouting apparatus for direct-boring and grouting method using that
KR20090078054A (en) Earth-supported structure using pile with screw
CN112982400A (en) Pile casing follow-up type drilling bored concrete pile drilling tool
KR20150145209A (en) Vibration hammer of a boring machine and boring method using the same
JP2007332559A (en) Removal method for existing underground pile
US20020071726A1 (en) Tool and apparatus incorporating the same and method for constructing cylindrical columns and wall using the same
JP4478348B2 (en) Steel pipe pile driving method and apparatus
KR20110079475A (en) Apparatus for constructing pile using spray type excavating bit
CN110273413A (en) A kind of efficient construction method of prefabricated pile
KR101951745B1 (en) Boring machine having Gear-Box of two rod
JP4550792B2 (en) Construction method of underground wall
KR101286128B1 (en) Method for reaming vertical tunnel
KR0145495B1 (en) Underground drilling method and device by multi and hammer auger machine
KR101946930B1 (en) Method for Excavating Vertical Hole using Raise Boring Machine and Packed Steel Pipe
KR101224440B1 (en) Construction method of screw file
KR20170033728A (en) The pile foundation construction method that can build bulb of various type
KR101546231B1 (en) Selfboring sea eco-friendly pile construction method
KR200355984Y1 (en) A boring equipment for an excavator
KR101166873B1 (en) Earth drilling method for preventing soil from emitting by casing and earth reinforcement method thereof
KR0146450B1 (en) Pipe insertion device of boring machine

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
N231 Notification of change of applicant
FPAY Annual fee payment

Payment date: 20111031

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20121203

Year of fee payment: 7

LAPS Lapse due to unpaid annual fee