KR100590178B1 - Fixing apparatus of cast using a dirt wall - Google Patents

Fixing apparatus of cast using a dirt wall Download PDF

Info

Publication number
KR100590178B1
KR100590178B1 KR1020030060345A KR20030060345A KR100590178B1 KR 100590178 B1 KR100590178 B1 KR 100590178B1 KR 1020030060345 A KR1020030060345 A KR 1020030060345A KR 20030060345 A KR20030060345 A KR 20030060345A KR 100590178 B1 KR100590178 B1 KR 100590178B1
Authority
KR
South Korea
Prior art keywords
fixture
formwork
wall
fixing
vertical
Prior art date
Application number
KR1020030060345A
Other languages
Korean (ko)
Other versions
KR20050022709A (en
Inventor
강현구
Original Assignee
주식회사 중앙건설
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 중앙건설 filed Critical 주식회사 중앙건설
Priority to KR1020030060345A priority Critical patent/KR100590178B1/en
Publication of KR20050022709A publication Critical patent/KR20050022709A/en
Application granted granted Critical
Publication of KR100590178B1 publication Critical patent/KR100590178B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/06Tying means; Spacers ; Devices for extracting or inserting wall ties
    • E04G17/07Tying means, the tensional elements of which are fastened or tensioned by means of wedge-shaped members
    • E04G17/0728Tying means, the tensional elements of which are fastened or tensioned by means of wedge-shaped members the element consisting of several parts
    • E04G17/0735Tying means, the tensional elements of which are fastened or tensioned by means of wedge-shaped members the element consisting of several parts fully recoverable

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

본 발명은 토목공사 또는 건축물을 건축하기 위한 땅파기 작업으로 발생된 토류벽내측부에 콘크리트벽을 형성시키기 위하여 거푸집을 형성하고 이 거푸집을 고정하는 토류벽용 거푸집 고정구로서, 아파트, 오피스텔, 상업용빌딩등의 지하층 콘크리트 구조물이 합벽일 경우 합벽거푸집에 폼타이 및 티 바를 거취 및 지지하는 기존의 방식대신 콘크리트 타설시 발생되는 측압을 견지하여 H빔의 상부와 하부를 고정함으로써 방수문제의 해결과 합벽공사기간의 단축과 자재비와 인건비의 절감과 공사위험률의 감소 및 작업공간의 확보등의 효과가 있다.The present invention is to form a formwork to form a concrete wall in the earth wall inside the earthwork generated by the excavation work for civil engineering or building as a formwork for earth wall fixing fixture, basement concrete such as apartment, officetel, commercial building, etc. If the structure is plywood, instead of the existing method of fixing and supporting the form tie and tee bar in the plywood formwork, the upper and lower parts of the H-beams are fixed by fixing the upper and lower parts of the H-beam in order to solve the waterproof problem and shorten the plywood construction period. It has the effect of reducing material and labor costs, reducing construction risk and securing working space.

제1고정구, 제2고정구, 조인트 핀1st fixture, 2nd fixture, joint pin

Description

토류벽용 거푸집 고정구{Fixing apparatus of cast using a dirt wall}Fixing apparatus of cast using a dirt wall}

도1은 본 발명의 중요구조를 개략적으로 도시한 부품상세도. Figure 1 is a detailed view of the parts schematically showing the important structure of the present invention.

도2는 본 발명의 수직H빔의 구조를 개략적으로 도시한 도면.2 is a view schematically showing the structure of the vertical H-beam of the present invention.

도3a는 본 발명의 설치를 개략적으로 도시한 장착도.Figure 3a is a mounting view schematically showing the installation of the present invention.

도3b는 본 발명의 주요구성인 제1고정구, 제2고정구, 및 조인트 핀의 결합상태를 개략적으로 도시한 도면.Figure 3b is a schematic view showing the coupling state of the first fixture, the second fixture, and the joint pin of the main configuration of the present invention.

<도면의 주요부분에 대한 부호의 설명><Description of the symbols for the main parts of the drawings>

5 : 빔홀 10 : 제1고정구5: beamhole 10: first fixture

20 : 제2고정구 30 : 수직H빔20: second fixture 30: vertical H beam

35 : 유로폼 40 : 수평H빔 35: Euroform 40: Horizontal H beam

45 : 플랜지부 47 : 강관파이프45: flange portion 47: steel pipe pipe

50 : 플랜지홈부 55 : 서포터50: flange groove 55: supporter

60 : 제1홀 65 : 앵글 60: first hole 65: angle

70 : 제2홀 75 : 철근 70: Hall 2 75: Rebar

80 : 사각박스 85 : 플레이트홀 80: rectangular box 85: plate hole

90 : 플레이트 95 : 볼트90 plate 95 bolt

100 : 조인트 핀 114 : 합판100: joint pin 114: plywood

115 : 스티로폼 115: Styrofoam

본 발명은 토목공사 또는 건축물을 건축하기 위한 땅파기 작업으로 발생된 토류벽내측부에 콘크리트벽을 형성시키기 위하여 거푸집을 형성하고 이 거푸집을 고정하는 토류벽용 거푸집 고정구에 관한 것이다.  The present invention relates to a formwork for earth wall formwork for forming a formwork to form a concrete wall in the earth wall inner side generated by the excavation work for civil engineering or building a building and fixing the formwork.

종래의 고정구는 적층된 수평보와 보 사이에 걸림판이 형성되고 끝단에 체결고리를 일체로 구성한 고정구를 삽입고정하여 고정시키고 이 고정구에 철사 또는 기다란 간격봉으로 콘크리트 벽체의 두께로 형성되는 거푸집을 고정하게된다. 이러한 작업은 거푸집의 간격 및 지지하는 철사를 고정구의 고리에 체결할 때에 작업이 어려운 단점이 있으므로 본 발명은 이를 개선함을 목적으로 한 것이다. Conventional fixture is fixed by inserting a fastener formed integrally with a fastening ring formed at the end between the laminated horizontal beam and the beam fixed to the end fixed to the formwork to form the thickness of the concrete wall with a wire or elongated bar Will be done. This operation has the disadvantage of difficult to work when fastening the spacing of the formwork and the supporting wire to the hook of the fixture, the present invention aims to improve this.

주지하는 바와 같이 토목공사(건축공사를 포함한 땅파기로 형성된 토류벽)를 할 때에 땅을 파게됨으로서 흙벽이 형성된다. 이러한 흙벽을 지지하는 토류방지벽 또는 건축물의 기초에서 토사가 흘러내리거나 붕계이 위험성을 막기 위한 콘크리트벽을 구성하여 안전벽을 구성하여 왔다. As is well known, an earth wall is formed by digging ground when performing civil works (earth wall formed by digging, including construction work). A safety wall has been constructed by constructing a concrete wall to prevent the soil from flowing out of the earth barrier or the foundation of a building that supports such a soil wall, or to prevent a boric system from danger.

일반적으로 콘크리트 구조물을 지상에 건설하기 위해서는 구조물의 기초가 되는 지하층을 건설하여야 하는 바, 이 지하층을 건설하기 위해서는 먼저 지하에 옹벽을 구축하여 지하층의 외벽을 형성한다.In general, in order to build a concrete structure on the ground, it is necessary to construct a basement layer that is the basis of the structure. To construct the basement layer, a retaining wall is first constructed in the basement to form an outer wall of the basement layer.

상기와 같은 옹벽은 토압에 저항하여 흙이 무너지지 않도록 예방하는 벽체 구조물로써 벽 자체의 무게와 바닥면의 마찰력 등을 이용하여 안정을 유지하는 항토압 구조물이며, 벽에 작용하는 토압과 그 흙 위에 실린 하중, 지반의 지지력 등을 조건으로 하여 구조부재의 안정성과 벽 전체가 쓰러지거나 미끄러지는데에 대한 안정성이 확보되도록 설계된다.The retaining wall as described above is a wall structure that prevents soil from collapsing by preventing earth pressure. It is an anti-earth pressure structure that maintains stability by using the weight of the wall itself and the frictional force of the bottom surface. It is designed to ensure the stability of structural members and the stability of the whole wall falling or slipping under the condition of load and ground bearing capacity.

따라서, 지하에 옹벽을 설치하기 위해서는 지반을 파서 H형빔을 옹벽이 형성되는 지주부분에 타설하고, 지하층의 확보된 넓이의 지반을 파내려 가면서 각목을 수평으로 끼워 조립함으로써, 토사의 붕괴를 막아주는 토류벽을 형성한 다음, 상기 거푸집과 일정한 간격이 유지되도록 하여 거푸집을 고정구로 고정한 후, 토류벽과 거푸집 사이에 콘크리트를 타설하여 옹벽을 형성한다.Therefore, in order to install the retaining wall in the basement, digging the ground and placing the H-beam on the supporting part where the retaining wall is formed, and digging each ground horizontally while digging the ground of the secured area of the basement layer, prevents the collapse of the soil. After the earth wall is formed, the mold is fixed to the mold by maintaining a constant distance from the formwork, and then the concrete is poured between the earth wall and the formwork to form the retaining wall.

즉, 땅을 파 흙벽이 형성된 흙벽내측으로 'H'빔의 지주를 일정한 간격으로 박고 이 지주의 'H'빔과 빔사이에 토사방지용 목재수평보를 적층시켜 벽체를 구성함으로서 토사가 유출되는 것을 방지함과 함께 상기 토사방지벽을 지지체로 하는 콘크리트의 외벽을 구성하게 된다. 이때에 상기 적층된 수평보와 보 사이에 걸림판이 형성되고 끝단에 체결고리를 일체로 구성한 고정구를 삽입고정하여 고정시키고 이 고정구에 철사 또는 기다란 간격봉으로 콘트리트벽체의 두께로 형성되는 거푸집을 고정하게 된다. 이상에 의해 고정된 토류벽과 거푸집 사이에 철근과 콘크리트몰탈을 충진하여 양생함으로서 콘크리트벽을 형성하게 되는 것이다. That is, digging the ground into the soil wall where the soil wall is formed, and striking the 'H' beams at regular intervals, and layering the timber horizontal beams for preventing soil between the 'H' beams and the beams of the pillars to prevent the outflow of soil. In addition, to constitute the outer wall of the concrete supporting the anti-soil wall. At this time, a locking plate is formed between the stacked horizontal beams and the beams, and fixed by inserting and fixing the fasteners having integrally formed fastening rings at the ends thereof, and fixing the formwork formed to the thickness of the concrete wall with a wire or an elongated spacer bar. do. The concrete wall is formed by filling the reinforcing bars and concrete mortar between the fixed earth wall and the formwork.

상기에서의 고정구는 고리가 형성된 선단부에 삼각 또는 사각체의 고정판을 형성하여 선단의 고정판이 수평보사이에서 걸리는 목적과 거푸집의 간격 및 지지하는 철사를 고정구의 고리에 체결할 수 있도록 함으로써 종래에 비하여 편리함이 증 대하고 있으나 이러한 구성에서는 굵은 철사(지름이 약 5mm로 휨성이 양호하지 않은 철선)를 작업자가 거리에 맞게 절단하고 고정시키는 번잡성이 있다. 또한 상기 고정판에 기다란 체결봉을 형성하여 나사로 결합하는 것에 있어서는 나사 조임의 단점이 있다. The fastener in the above form a fixed plate of a triangular or square body at the end of the ring is formed to enable the fastening plate of the tip between the horizontal beam and the spacing of the formwork and the supporting wire to fasten the hook of the fastener compared to the conventional convenience In this configuration, however, the coarse wire (iron wire of about 5 mm in diameter, which is not good in bending) has the complexity of being cut and fixed by the worker at a distance. In addition, there is a drawback of screw tightening when coupling with screws by forming an elongate fastening rod on the fixing plate.

아울러 거푸집과 토류벽을 고정하는 수단으로 각목 등을 거푸집과 토류벽사이에 끼워 넣거나 한다. 그러나, 상기와 같은 고정수단에 의해 고정된 거푸집과 토류벽 사이에 콘크리트를 타설할 경우, 타설되는 콘크리트의 압력에 의해 상기 거푸집과 토류벽 사이에 장입한 각목이 빠져 나가거나 하여 거푸집이 외측으로 밀려나게 되어 구축된 옹벽의 두께가 일정하지 못하고 배부름 현상이 발생됨에 따라 옹벽의 외부면이 일정면을 유지하지 못하게 된다.In addition, as a means for fixing the formwork and the earth wall, the wood or the like is sandwiched between the formwork and the earth wall. However, when placing concrete between the formwork and the earth wall fixed by the fixing means as described above, due to the pressure of the concrete to be poured, the lumber loaded between the formwork and the earthen wall is pulled out or the formwork is pushed outward. As the thickness of the retaining wall is not constant and the filling phenomenon occurs, the outer surface of the retaining wall does not maintain a constant surface.

상기와 같은 문제들을 해결하기 위하여 여러 가지 장치들이 고안되어 왔다. 예를들면, 대한민국 실용신안 공개공보 제 20-1998-017205는 옹벽을 타설할 때 거푸집을 고정시키는 타이볼트를 흙막이벽에 용이하고 견고하게 고정시킬 수 있도록 고정볼트가 삽입되는 볼트결합구를 형성한 고정부와, 암나사를 형성한 결합부와, 상기 고정부와 결합부를 연결하는 연결부로 구성된 거푸집 고정용 타이볼트 고정구를 소개하고 있다. 그러나 상기와 같은 고안은 구성면에서는 간단하나 콘크리트의 타설양이 많을 때는 배불림현상의 우려가 있으며, 또한 실용신안 등록번호 20-0157465는 복수의 체결구멍이 형성되어 토류판에 밀착된 상태에서 고정스크류로 고정되는 고정면과 이 고정면의 일단으로부터 직각으로 절곡되는 중간부와 이 중간부의 선단에 고정면과 반대방향으로 직각으로 절곡되며 관통공의 이 천공된 연결부로 이루어진 몸체와, 이 몸체의 연결부에 형성된 관통공에 끼워진 상태에서 용접되어 앵커볼트의 선단이 나사결합되는 너트로 이루어진 거푸집고정용 토류판 앵커를 소개하고 있다. 그러나 상기와 같은 앵커도 다량의 콘크리트 타설시에는 배불림현상을 방지하기 어려우며, 콘크리트의 타설시 거푸집의 두께조절이 어렵다는 단점이 있다. Various devices have been devised to solve the above problems. For example, Republic of Korea Utility Model Publication No. 20-1998-017205 forms a bolt coupler into which a fixing bolt is inserted to easily and firmly fix a tie bolt fixing the formwork to the retaining wall when placing the retaining wall. The formwork fixing tie bolt fastener which consists of a fastening part, the coupling part which formed the female screw, and the connection part which connects the said fixing part and the coupling part is introduced. However, the above design is simple in terms of construction, but when there is a lot of concrete pouring, there is a risk of full stomach. Also, Utility Model Registration No. 20-0157465 has a plurality of fastening holes and is fixed to the earth plate by fixing screws. A body consisting of a fixed surface to be fixed, a middle portion bent at right angles from one end of the fixing surface, and a perforated connection of the through-hole to the front end of the middle portion at a right angle in the opposite direction to the fixing surface, It introduces a formwork fixing earth plate anchor consisting of a nut that is welded in the state formed in the through hole formed and the tip of the anchor bolt is screwed. However, the anchor as described above is difficult to prevent the hungry phenomenon when placing a large amount of concrete, there is a disadvantage that it is difficult to control the thickness of the formwork when placing concrete.

상술한 종래의 문제점을 해결하기 위하여 본 발명은 시공의 간소화로 자재비의 절감 및 공사기간의 단축과 아울러 방수문제 및 공사위험율의 감소를 이룰 수 있는 거푸집고정구를 제공하고자 한다.In order to solve the above-mentioned problems, the present invention is to provide a formwork that can achieve a reduction in material costs and construction periods as well as waterproofing problems and construction risks by simplifying construction.

상기 기술한 목적을 달성하기 위하여, 토류벽의 고정장치에 있어서 일측이 수평H빔의 플랜지부가 삽입되도록 플랜지홈부가 형성되어 있으며, 타측에는 다수의 제1홀이 형성되어 있는 제1고정구와 일측이 상기 제1고정구의 제1홀과 조인트 핀을 매개로 체결장착 될 수 있도록 제2홀이 형성되고 타측은 수직H빔이 삽입장착되는 사각박스가 형성된 제2고정구가 각각 수평방향의 H빔과 수직방향의 H빔에 슬라이딩 가능하게 장착되어 콘크리트를 타설하는 것을 특징으로 하는 토류벽용 거푸집 고정구를 제공한다.In order to achieve the above object, in the fixing device of the earth wall, a flange groove portion is formed so that one side of the flange portion of the horizontal H beam is inserted, and the other side of the first fixture and one side is formed with a plurality of first holes A second hole is formed so that the second hole is formed to be fastened and mounted through the first hole of the first fixture and the joint pin, and the second fixture is formed with a rectangular box into which the vertical H beam is inserted. It is slidably mounted to the H-beam provides a formwork for earth walls, characterized in that to cast concrete.

이하 첨부된 도면을 참조하여 본 발명의 구성과 이에 따른 작용효과를 구체적으로 설명하면 다음과 같다. Hereinafter, with reference to the accompanying drawings will be described in detail the configuration and the effects of the present invention.

도1은 본 발명의 중요구조를 개략적으로 도시한 부품상세도이고, 도2는 본 발명의 수직H빔의 구조를 개략적으로 도시한 도면이며, 도3a는 본 발명의 설치를 개략적으로 도시한 장착도이고, 도3b는 본 발명의 주요구성인 제1고정구, 제2고정구, 및 조인트 핀의 결합상태를 개략적으로 도시한 도면이다.Fig. 1 is a detailed view of a part schematically showing the important structure of the present invention, Fig. 2 is a view schematically showing the structure of the vertical H-beam of the present invention, and Fig. 3a is a mounting schematically showing the installation of the present invention. FIG. 3B is a view schematically showing the engagement state of the first fastener, the second fastener, and the joint pin which are the main components of the present invention.

상술한 부품상세도를 도시한 도1에서 알 수 있듯이, 본 발명은 제1고정구(10)와 제2고정구(20), 수직H빔(30), 수평H빔(40), 플레이트(90)와 조인트 핀(100)을 주요 구성요소로 하고 있다. As can be seen in Figure 1 showing the above-mentioned parts detail, the present invention, the first fixture 10 and the second fixture 20, the vertical H beam 30, the horizontal H beam 40, the plate 90 And joint pin 100 is the main component.

그리고 본 발명의 수직H빔의 구조를 도시한 도2에서 알 수 있듯이, 수직H빔(30)의 하단의 플랜지부(45)에 2개의 철근(75)을 용접하여 상기 수직H빔(30)이 바닥의 홈에 삽입고정되도록 한 구조가‘A’에 도시되어 있으며, 또 다른 실시예는 ‘B’와 같이 수직H빔(30)의 하단에 플레이트홀(85)이 형성된 플레이트(90)를 용접취부하고 상기 플레이트홀(85)에 볼트(95)를 장착하여 바닥의 홈에 상기 볼트(95)를 삽입하여 상기 수직H빔(30)을 고정시킬 수 있고, 수직H빔(30) 상부에는 빔홀(5)이 형성된다.And as can be seen in Figure 2 showing the structure of the vertical H beam of the present invention, the vertical H beam 30 by welding two reinforcing bars 75 to the flange portion 45 of the lower end of the vertical H beam 30 The structure to be inserted into the groove of the bottom is shown in 'A', another embodiment is a plate 90 formed with a plate hole 85 at the bottom of the vertical H beam 30, such as 'B' Welding mounting and mounting the bolt 95 in the plate hole 85 can be fixed to the vertical H beam 30 by inserting the bolt 95 in the groove of the bottom, the vertical H beam 30 The beam hole 5 is formed.

또한 본 발명의 전체적인 설치구조를 도시한 도3a와 본 발명의 주요구성인 제1고정구, 제2고정구, 및 조인트 핀의 결합상태를 개략적으로 도시한 도3b에서 알 수 있듯이, 일측이 수평H빔(40)의 플랜지부(45)가 삽입되도록 플랜지홈부(50)가 형성되어 있으며, 타측에는 다수의 제1홀(60)이 지그재그로 형성되어 있는 제1고정구(10)와 일측이 상기 제1고정구(10)의 제1홀(60)과 조인트 핀(100)을 매개로 체결장착 될 수 있도록 제2홀(70)이 지그재그로 형성되고 타측은 수직H빔(30)이 삽입장착되는 사각박스(80)가 형성된 제2고정구(20)를 주요 구성요소로 하며, 상기 제1고정구(10)는 수평H빔(40)에 제2고정구(20)는 수직H빔(30)에 슬라이딩 가능하게 장착되게 된다. In addition, as can be seen in Figure 3a showing the overall installation structure of the present invention and Figure 3b schematically showing the coupling state of the first fixture, the second fixture, and the joint pin of the main configuration of the present invention, one side is a horizontal H beam The flange groove part 50 is formed so that the flange part 45 of the 40 may be inserted, and on the other side, the first fixing tool 10 in which a plurality of first holes 60 are formed in a zigzag shape and one side thereof is the first fixing tool 10. Square box in which the second hole 70 is formed in a zigzag shape and the other side of the vertical H beam 30 is inserted and mounted so that the first hole 60 and the joint pin 100 of the fixture 10 can be fastened and mounted. The second fixture 20 is formed as a main component, the first fixture 10 is the horizontal H beam 40, the second fixture 20 is slidable to the vertical H beam (30) To be mounted.

이상과 같이 구성된 본 발명의 시공순서를 상세히 설명하면 다음과 같다.Referring to the construction sequence of the present invention configured as described above in detail as follows.

우선 H빔의 하단을 상기 기술한 철근용접방식 또는 플레이트 부착방식의 2가지 실시예중에서 선택해서 수직H빔(30)을 제작한 후 유로폼(35) 및 기타 형틀을 설치한 후 강관파이프(47)을 설치하고 상기 제작된 수직H빔(30)을 바닥에 고정하는 작업을 마친 후 상기 수직H빔(30)에 앵글(65)을 용접하고 나서 용접된 앵글(65)에 중간지지대인 서포터(55)를 거치하고 이미 설치된 수평H빔(40)의 플랜지부(45)에 제1고정구(10)의 일측에 형성되어 있는 플랜지홈부(50)를 삽입장착 하고 수직H빔(30)은 제2고정구(20)의 일측에 형성된 사각박스(80)를 삽입장착하며, 상기 제1고정구(10)의 제1홀(60)과 제2고정구(20)의 제2홀(70)을 콘크리트를 타설할 거푸집의 폭을 결정한 후 조인트 핀(100)을 관통시켜 체결하게 된다. 그리고 나서 수평,수직 연결부위등을 확인한 후 콘크리트를 타설하게 되는 것이다.First, the lower end of the H beam is selected from the two embodiments of the above-described rebar welding method or plate attaching method to manufacture the vertical H beam 30, and then the Euroform 35 and other molds are installed, and then the steel pipe pipe 47 After the installation and fixing the produced vertical H beam 30 to the floor after welding the angle 65 to the vertical H beam 30, the supporter 55 which is an intermediate support to the welded angle 65 The flange groove part 50 formed on one side of the first fixing tool 10 is inserted into the flange part 45 of the horizontal H beam 40, which is already installed, and the vertical H beam 30 is the second fixing tool. The rectangular box 80 formed at one side of the 20 is inserted and mounted, and the first hole 60 of the first fixture 10 and the second hole 70 of the second fixture 20 can be poured. After determining the width of the formwork is fastened through the joint pin 100. The concrete is then poured after checking the horizontal and vertical joints.

상기에서 제1홀(60)과 제2홀(70)이 지그재그로 형성됨으로써 거푸집의 폭을 조절할 때 조임의 오차를 줄일 수 있게 된다. 그리고 상기 도3a에서 수직H빔(30)의 상단부에 합판(114)을 거치하고 상기 합판(114)위에 스티로폼(115)을 삽입장착하여 다음 단계의 상층부 공사시 공간확보의 기능을 하게 된다. The first hole 60 and the second hole 70 is formed in a zigzag to reduce the error of tightening when adjusting the width of the formwork. In FIG. 3a, the plywood 114 is mounted on the upper end of the vertical H beam 30, and the styrofoam 115 is inserted and mounted on the plywood 114 to secure space during the construction of the upper layer of the next step.

상기 작업이 끝나면 제1고정구(10)와 제2고정구(20)를 결착하고 있는 조인트 핀(100)을 풀고 상기 제1고정구(10)와 제2고정구(20)를 수직 또는 수평으로 이동하여 콘크리트 타설작업을 계속 하게된다. After the operation is completed, the joint pin 100 that binds the first fixture 10 and the second fixture 20 is loosened, and the first fixture 10 and the second fixture 20 are moved vertically or horizontally. Continue pouring.

본 발명은 건설공사에서 흙파기로 인하여 토사 유출 및 토목 공사에서 토류유출방지벽을 구성하는 거푸집 작업을 할때에 거푸집의 견고한 고정수단과 작업의 편리성을 얻기 위하여 안출된 것으로서 특히 수평보에 체결이 용이함과 함께 거푸집고정용 지지간과의 체결과 조절이 편리하게 구성됨으로써 작업자가 쉽게 작업을 할 수 있는 특징과 그 구성이 간단하여 제작이 용이하여 대량생산될 수 있는 유용한 발명이다. The present invention has been conceived in order to obtain a solid fixing means of the formwork and the convenience of the work when the formwork constituting the earth leakage prevention wall in the earth and sand outflow and civil works due to the excavation in the construction work, especially fastening to the horizontal beam It is a useful invention that can be easily mass-produced because the ease and ease of configuration and its configuration are easy to work by the operator and easy to configure the fastening and adjustment between the support for the formwork fixed with ease.

또한 건설공사에서 흙파기로 인하여 토사유출 및 토목공사에서 토류유출방지벽을 구성하는 거푸집 작업을 할 때에 거푸집의 견고한 고정수단과 작업의 편리성 및 거리조절이 편리하게 구성되어 작업이 용이한 효과가 있다. In addition, it is easy to work because it is composed of solid fastening means of the formwork, convenience of work and distance control conveniently when the formwork constituting the earth leakage prevention wall in the soil excavation and civil works due to the excavation of soil in construction works. have.

Claims (5)

삭제delete 삭제delete 삭제delete 삭제delete 제1고정구(10)와 제2고정구(20)가 각각 수평H빔(40)과 수직H빔(30)에 슬라이딩 가능하게 장착되고, 상기 수직H빔(30)의 하단 일측에 철근(75)이 용접되어 돌출되고 상기 철근(75)이 바닥에 고정되며, 홈(85)이 형성된 플레이트(90)가 용접취부되어 볼트(95)로 체결되는 토류벽의 고정장치에 있어서,The first fastener 10 and the second fastener 20 are slidably mounted to the horizontal H beam 40 and the vertical H beam 30, respectively, and the rebar 75 is disposed at one side of the lower end of the vertical H beam 30. In the fixing device of the earth wall is welded and protruded and the reinforcing bar 75 is fixed to the bottom, the plate 90 with the groove 85 is welded and fastened by bolts 95, 상기 제1고정구(10)는 일측이 수평H빔(40)의 플랜지부(45)가 삽입되도록 플랜지홈부(50)이 형성되어 있으며, 타측에는 다수의 제1홀(60)이 지그재그로 형성되고,The first fixture 10 has a flange groove portion 50 is formed so that one side of the flange portion 45 of the horizontal H beam 40 is inserted, the other side of the first hole 60 is formed in a zigzag , 상기 제2고정구(20)는 일측이 상기 제1고정구(10)의 제1홀(60)과 조인트 핀(100)을 매개로 체결장착 될 수 있도록 제2홀(70)이 지그재그로 형성되고 타측은 수직H빔(30)이 삽입장착되는 사각박스(80)가 형성된 구조를 특징으로 하는 토류벽용 거푸집 고정구.The second fixture 20 is formed in a zigzag and the second hole 70 is zigzag so that one side can be fastened and mounted through the first hole 60 and the joint pin 100 of the first fixture (10) The side is a formwork fixture for earth wall, characterized in that the vertical box H (30) is inserted into the rectangular box 80 is formed.
KR1020030060345A 2003-08-29 2003-08-29 Fixing apparatus of cast using a dirt wall KR100590178B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020030060345A KR100590178B1 (en) 2003-08-29 2003-08-29 Fixing apparatus of cast using a dirt wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020030060345A KR100590178B1 (en) 2003-08-29 2003-08-29 Fixing apparatus of cast using a dirt wall

Related Child Applications (1)

Application Number Title Priority Date Filing Date
KR20-2003-0027865U Division KR200348605Y1 (en) 2003-08-29 2003-08-29 Fixing apparatus of cast using a dirt wall

Publications (2)

Publication Number Publication Date
KR20050022709A KR20050022709A (en) 2005-03-08
KR100590178B1 true KR100590178B1 (en) 2006-06-14

Family

ID=37230527

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020030060345A KR100590178B1 (en) 2003-08-29 2003-08-29 Fixing apparatus of cast using a dirt wall

Country Status (1)

Country Link
KR (1) KR100590178B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101657296B1 (en) 2015-04-29 2016-09-30 주식회사 천일정밀 Beam joint

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102299680B1 (en) * 2019-10-14 2021-09-07 김걸 Finishing formwork for gap

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101657296B1 (en) 2015-04-29 2016-09-30 주식회사 천일정밀 Beam joint

Also Published As

Publication number Publication date
KR20050022709A (en) 2005-03-08

Similar Documents

Publication Publication Date Title
US9217248B2 (en) Column assembly for use in building foundation systems and methods of assembling same
KR102243984B1 (en) Non-supporting formwork system for retaining wall using self-supporting form and construction method thereof
US20120047822A1 (en) Earthquake force absorption system
KR20080001711A (en) The construction method of retaining wall
KR101221970B1 (en) Construction Method for Basement Structure without Temporary Structure
KR20110128396A (en) Pre-embedded anchor frame equipped with coupler and anchoring method of steel column thereof
KR20080100740A (en) Strut system of temporary plate with opening supporting temporary retaining wall and subgrade external wall construction method utilizing the same
KR100679301B1 (en) A pile head reinforcement structure of precastconcrete pile
KR20030064063A (en) reinforced earth retaining wall construction method
KR102269141B1 (en) Deck plate wall installation method using underground pavement
JP3107716B2 (en) Soil retaining wall
KR200443476Y1 (en) Structure for supporting wall
KR100590178B1 (en) Fixing apparatus of cast using a dirt wall
JP6283906B2 (en) Prop foundation
JPH08189042A (en) Structure of h-section continuous footing beam for tying in building member
JP5184393B2 (en) Protective wall and protective wall forming method
JP5280150B2 (en) Yamadome retaining wall and method of forming Yamadome retaining wall
KR20100007721A (en) Reinforcement
KR200348605Y1 (en) Fixing apparatus of cast using a dirt wall
JP3612600B2 (en) Unit anchor and structural steel foundation beam
JP6736830B2 (en) Reconstruction method for concrete structure with underground structure
KR101058982B1 (en) Middle beam for earth retaining wall using phc pile and construction method of the same
JP3116990B2 (en) Precast reinforced concrete foundation structure
KR20010028793A (en) Precast Retaining Wall Using High Strength Micro Pile
JP3595070B2 (en) Basic structure of simple building

Legal Events

Date Code Title Description