KR100563718B1 - Installation Method of Deck for Girder Bridges Using Precast Panel of Trapezoidal Hollow Section Made with Glass Fiber Reinforced Composites - Google Patents

Installation Method of Deck for Girder Bridges Using Precast Panel of Trapezoidal Hollow Section Made with Glass Fiber Reinforced Composites Download PDF

Info

Publication number
KR100563718B1
KR100563718B1 KR1020030037663A KR20030037663A KR100563718B1 KR 100563718 B1 KR100563718 B1 KR 100563718B1 KR 1020030037663 A KR1020030037663 A KR 1020030037663A KR 20030037663 A KR20030037663 A KR 20030037663A KR 100563718 B1 KR100563718 B1 KR 100563718B1
Authority
KR
South Korea
Prior art keywords
panel
precast
bottom plate
girder
bridge
Prior art date
Application number
KR1020030037663A
Other languages
Korean (ko)
Other versions
KR20040106813A (en
Inventor
이성우
Original Assignee
주식회사 국민씨아이
두산산업개발 주식회사
주식회사 건일엔지니어링
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 국민씨아이, 두산산업개발 주식회사, 주식회사 건일엔지니어링 filed Critical 주식회사 국민씨아이
Priority to KR1020030037663A priority Critical patent/KR100563718B1/en
Publication of KR20040106813A publication Critical patent/KR20040106813A/en
Application granted granted Critical
Publication of KR100563718B1 publication Critical patent/KR100563718B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/12Grating or flooring for bridges; Fastening railway sleepers or tracks to bridges
    • E01D19/125Grating or flooring for bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2/00Bridges characterised by the cross-section of their bearing spanning structure
    • E01D2/02Bridges characterised by the cross-section of their bearing spanning structure of the I-girder type
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/10Railings; Protectors against smoke or gases, e.g. of locomotives; Maintenance travellers; Fastening of pipes or cables to bridges
    • E01D19/103Parapets, railings ; Guard barriers or road-bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

본 발명은 제형 단면형상을 가진 유리섬유 강화 복합소재 바닥판 튜브를 상호 병렬 연결하여 제작한 프리캐스트 바닥판 패널을 현장에서 순차적으로 조립하여 거더와 연결 또는 결합하므로써 교량의 바닥판을 시공하는 공법에 관한 것이다.The present invention is a method for constructing a bridge bottom plate by assembling sequentially or pre-assembled precast floor panel panel produced by connecting the glass fiber reinforced composite bottom plate tube having the cross-sectional shape of the formulation in parallel with the girder. It is about.

본 발명에서는 상부판, 하부판 및 복부판으로 구성된 사디리꼴 단면을 가진 튜브 형태의 유리섬유 복합소재 바닥판 튜브(1)를 상호 연결하여 판형구조의 프리캐스트 바닥판 패널(6)을 제작하고; 사전 제작된 상기 프리캐스트 바닥판 패널(6)을 현장으로 이송하여 거더(10) 위에 거치하여 순차적으로 연결 접합하므로써 교량 전체의 바닥판을 형성하는 것을 특징으로 하는 제형 중공단면의 유리섬유 강화 복합소재 프리캐스트 바닥판 패널을 이용한 교량 바닥판 시공방법이 제공된다. In the present invention, by connecting the tube-shaped glass fiber composite bottom plate tube (1) having a quadrilateral cross section consisting of a top plate, a bottom plate and an abdominal plate to produce a precast bottom plate panel (6) having a plate-like structure; The glass fiber reinforced composite material of the hollow fiber cross-section of the formulation, characterized in that the precast bottom plate panel 6 is transported to the site, mounted on the girder 10, and subsequently connected and bonded to form the bottom plate of the entire bridge. A bridge deck construction method using a precast deck panel is provided.

본 발명의 시공방법에 따라 교량 바닥판을 건설하면, 교량의 수명을 2∼3배 이상 연장시킬 수 있으며 공용중 유지관리비를 대폭 절감할 수 있고, 교통량이 많은 도심구간 교량공사 등에서 공기를 현저히 단축할 수 있어 교량의 생애주기비용을 대폭 절감할 수 있게 된다. 또한, 콘크리트 바닥판 교량에 비해 바닥판 자중을 현저하게 경감하여 거더와 하부구조를 경제적으로 건설할 수 있고 내진에도 유리하다.Construction of the bridge deck according to the construction method of the present invention can extend the life span of the bridge 2 to 3 times or more, can significantly reduce the maintenance cost during public use, and significantly shorten the air in the construction of bridges in urban areas with heavy traffic This can significantly reduce the life cycle cost of the bridge. In addition, it is possible to economically construct the girder and the substructure by remarkably reducing the weight of the bottom plate compared to the concrete deck plate bridge, it is also advantageous to earthquake-resistant.

유리섬유, 복합소재, 제형 중공단면, 교량 바닥판, 프리캐스트, 바닥판 공법Glass fiber, composite, formulation hollow section, bridge deck, precast, deck method

Description

제형 중공단면의 유리섬유 강화 복합소재 프리캐스트 바닥판 패널을 이용한 거더 교량의 바닥판 시공방법{Installation Method of Deck for Girder Bridges Using Precast Panel of Trapezoidal Hollow Section Made with Glass Fiber Reinforced Composites} Formation Method of Deck for Girder Bridges Using Precast Panel of Trapezoidal Hollow Section Made with Glass Fiber Reinforced Composites             

도 1a 및 도 1b는 본 발명에 따른 교량 바닥판용 유리섬유 강화 복합소재 프리캐스트 바닥판 패널을 구성하는 유리섬유 강화 복합소재 바닥판 튜브의 사시도이다. 1A and 1B are perspective views of a glass fiber reinforced composite bottom plate tube constituting a glass fiber reinforced composite precast bottom panel for a bridge deck according to the present invention.

도 2a 및 도2b는 바닥판 튜브를 상호 연결 접합하여 제작되는 교량 바닥판용 유리섬유 강화 복합소재 프리캐스트 바닥판 패널의 단면도이다.2A and 2B are cross-sectional views of glass fiber reinforced composite precast deck plates for bridge decks fabricated by interconnecting bottom plate tubes.

도 3은 본 발명에 따른 유리섬유 강화 복합소재 프리캐스트 바닥판 패널을 이용한 거더 교량의 바닥판 설치공법에 의하여 시공된 합성형 거더 교량의 사시도이다. 3 is a perspective view of a composite girder bridge constructed by the bottom plate installation method of the girder bridge using the glass fiber reinforced composite material precast deck panel according to the present invention.

도 4는 도 3의 선A-A에 따른 단면도이다. 4 is a cross-sectional view taken along the line A-A of FIG.

도 5a는 도 4에서 원B의 상세도이며, 도 5b는 도 3의 선B-B에 따른 부분 단면도이다. FIG. 5A is a detailed view of circle B in FIG. 4, and FIG. 5B is a partial cross-sectional view taken along line B-B in FIG. 3.

도 6a는 도 4의 원C에서의 확대도이고, 도 6b는 방호벽 설치 구조 및 방법의 또다른 실시예를 보여주는 부분 단면도이다. FIG. 6A is an enlarged view in circle C of FIG. 4, and FIG. 6B is a partial cross-sectional view showing yet another embodiment of a firewall installation structure and method.

도 7a 및 도 7b는 본 발명에 따른 유리섬유 강화 복합소재 프리캐스트 바닥판 패널을 이용한 바닥판 시공방법의 실시예로서 거더와 프리캐스트 바닥판 패널의 비합성형 연결부에 대한 실시예의 상세를 보여주는 단면도이다. 7a and 7b is a cross-sectional view showing the details of the embodiment of the non-synthetic connection of the girder and the precast deck panel as an embodiment of the bottom plate construction method using a glass fiber reinforced composite precast deck panel according to the present invention to be.

도 8은 본 발명에 따른 유리섬유 강화 복합소재 프리캐스트 바닥판 패널을 이용한 거더 교량의 바닥판 시공방법에 있어서, 프리캐스트 바닥판 패널 사이에 설치되는 신축이음구조를 보여주는 단면도이다. 8 is a cross-sectional view showing the expansion joint structure installed between the precast deck panel in the construction method of the bottom plate of the girder bridge using the glass fiber reinforced composite precast deck panel according to the present invention.

도 9a 내지 도 9e는 거더와 프리캐스트 바닥판 패널이 합성형으로 결합된 실시예에 관한 것으로서, 각각 교량 바닥판의 각 시공단계에서의 거더와 패널의 연결부를 보여주는 부분단면도와 측면도이다. 9A to 9E are embodiments in which a girder and a precast deck panel are combined in a composite form, and are partial cross-sectional views and side views showing the connection portions of the girder and the panel at each construction stage of the bridge deck.

도 10a 내지 도 10e는 각각 Z형 플레이트를 이용하여 거더와 프리캐스트 바닥판 패널을 비합성형으로 연결하여 교량 바닥판을 시공하는 각 시공단계에서의 거더와 패널의 연결부를 보여주는 부분단면도와 측면도이다.10A to 10E are partial cross-sectional views and side views showing the connection portions of the girder and the panel at each construction stage in which the bridge bottom plate is constructed by connecting the girder and the precast sole plate panel by non-synthesizing using a Z-shaped plate, respectively. .

<도면의 주요부분에 대한 간단한 설명><Brief description of the main parts of the drawing>

1 바닥판 튜브 2 상부판1 bottom plate tube 2 top plate

3 하부판 4 복부판3 Lower Plate 4 Abdominal Plate

10 거더 15 간격부재10 girder 15 spacer

본 발명은 교량의 바닥판 시공방법에 관한 것으로, 구체적으로는 제형(사다리꼴) 단면형상을 가진 유리섬유 강화 복합소재 바닥판 튜브를 상호 병렬 연결하여 제작한 프리캐스트 바닥판 패널을 현장에서 순차적으로 조립하여 거더와 연결 또는 결합하므로써 교량의 바닥판을 시공하는 방법에 관한 것이다.The present invention relates to a method for constructing a bridge bottom plate, and in particular, precast deck panel panels manufactured by connecting the glass fiber reinforced composite bottom plate tubes having a formulation (trapezoid) cross-section in parallel to each other in sequence. The present invention relates to a method of constructing a bridge deck by connecting or coupling with a girder.

현재 교량의 바닥판은 주로 철근 콘크리트를 사용하여 시공되고 있다. 콘크리트 바닥판은 배기가스 영향, 제설제 살포 등의 각종 유해환경에 의해 콘크리트가 심하게 열화되고 철근이 부식되며, 차륜의 직접하중을 받으므로 콘크리트 바닥판의 피로로 인하여 내구수명이 20∼30년 정도로 현격히 감소되고, 손상된 콘크리트 바닥판은 구조적인 안전성에도 문제를 발생시킨다. 또한 콘크리트 바닥판 교량인 경우 교량의 수명기간 동안 손상된 바닥판의 교체로 인한 보수비용과 공용시 유지관리비용이 현저히 증대되며, 보수 및 교체공사시 교통통제의 장기화로 인한 시민불편과 간접비용이 크게 부담된다. 그 뿐만 아니라 콘크리트 바닥판은 과다한 자중으로 인해 하부구조가 상대적으로 커지는 단점이 있다.Currently the bridge deck is constructed using reinforced concrete. Concrete slabs are degraded severely by various harmful environments such as exhaust gas effects and snow spraying, corrosion of reinforcing bars and direct loads of wheels. Significantly reduced, damaged concrete decks also present problems with structural safety. In addition, in the case of concrete deck bridges, the maintenance and public maintenance costs are greatly increased due to the replacement of damaged decks during the life of the bridge, and civil discomfort and indirect costs due to prolonged traffic control during repair and replacement work are greatly increased. It is burdened. In addition, the concrete deck has a disadvantage that the infrastructure is relatively large due to the excessive weight.

종래의 콘크리트 바닥판은 일반적으로 거푸집 설치, 철근배근, 콘크리트 타설 및 양생 등의 과정에 의한 현장타설공법으로 시공된다. 이러한 현장타설공법은 최근 건설산업이 3D산업으로 인식되면서 숙련된 노동력의 부족 및 노동인력의 고령화로 인해 노동생산성이 저하되어 불량시공의 우려가 늘 존재하며, 구조물의 품질관리에도 여러 가지 어려운 점이 있다. 또한, 중장비의 사용으로 필요한 공간을 확보해야 하는 문제점이 있으며, 도심구간 공사시 공사 장기화로 인하여 우회도로를 확보해야 하는 추가적 부담을 안게 된다. Conventional concrete floorboards are generally constructed by a site casting method by a process such as formwork installation, reinforcement, concrete placement and curing. As the construction industry is recently recognized as a 3D industry, there is a concern of poor construction due to the lack of skilled labor and the aging of manpower. . In addition, there is a problem to secure the necessary space by the use of heavy equipment, there is an additional burden of securing a bypass road due to the prolonged construction during the construction of the downtown section.

이러한 철근 콘크리트 바닥판의 대안으로서 경량, 고강도, 고내구성 특성을 보유한 유리섬유 강화 복합소재를 이용하는 방안이 제시되고 있다. 그러나, 이러한 유리섬유 강화 복합소재를 이용하여 교량의 바닥판을 효과적으로 시공하는 방안에 대해서는 구체적으로 제시되지 않고 있는 실정이다. As an alternative to the reinforced concrete deck, a method of using a glass fiber reinforced composite material having light weight, high strength, and high durability has been proposed. However, the method of effectively constructing the bottom plate of the bridge by using the glass fiber reinforced composite material is not presented in detail.

본 발명은 위와 같은 업계의 요구에 부응하여 경량, 고강도, 고내구성 특성을 보유한 유리섬유 강화 복합소재 프리캐스트 바닥판 패널을 이용하여 거더 교량의 바닥판을 시공하는 방법을 제공하는 것을 목적으로 한다.An object of the present invention is to provide a method for constructing the bottom plate of the girder bridge using a glass fiber reinforced composite material precast bottom plate panel having light weight, high strength, and high durability in response to the demands of the industry as described above.

또한, 본 발명은 유리섬유 강화 복합소재 프리캐스트 바닥판 패널을 이용하여 거더 교량의 바닥판을 시공함에 있어서 바닥판과 교량 거더를 효과적으로 연결하는 방법을 제공하는 것을 목적으로 한다. In addition, an object of the present invention is to provide a method for effectively connecting the bottom plate and the bridge girder in the construction of the bottom plate of the girder bridge using a glass fiber reinforced composite precast bottom plate panel.

또한, 본 발명은 유리섬유 강화 복합소재 프리캐스트 바닥판 패널을 이용하여 거더 교량의 바닥판을 시공함에 있어서 방호벽을 효과적으로 설치하는 방법을 제공하는 것을 목적으로 한다.
In addition, an object of the present invention is to provide a method for effectively installing a barrier in the construction of the bottom plate of the girder bridge using a glass fiber reinforced composite precast bottom plate panel.

본 발명에서는, 상기한 목적을 달성하기 위하여, 상부판, 하부판 및 복부판 으로 구성된 사디리꼴 단면을 가진 튜브 형태의 유리섬유 복합소재 바닥판 튜브를 상호 연결하여 판형구조의 프리캐스트 바닥판 패널을 제작하고; 사전 제작된 상기 프리캐스트 바닥판 패널을 현장으로 이송하여 거더 위에 거치하여 순차적으로 연결 접합하므로써 교량 전체의 바닥판을 형성하는 것을 특징으로 하는 제형 중공단면의 유리섬유 강화 복합소재 프리캐스트 바닥판 패널을 이용한 교량 바닥판 시공방법이 제공된다. In the present invention, in order to achieve the above object, by connecting the tube-like glass fiber composite bottom plate tube having a quadrilateral cross section consisting of the top plate, the bottom plate and the abdominal plate to produce a precast bottom plate panel of the plate structure ; The glass fiber reinforced composite material precast bottom plate panel of the hollow fiber cross-section of the formulation, characterized in that to form the bottom plate of the entire bridge by transporting the pre-fabricated prefabricated floor panel panel to the site, mounted on the girder and connected sequentially Provided is a bridge deck construction method.

또한, 본 발명에서는 상기한 교량 바닥판 시공방법의 구체예로서, 상기 프리캐스트 바닥판 패널에는 전단연결재가 삽입되는 전단포켓을 형성하고; 상기 프리캐스트 바닥판 패널이 거더에 거치된 상태에서, 상기 전단포켓이 형성되는 위치의 프리캐스트 바닥판 패널에 형성된 홀을 통하여 전단연결재를 상기 전단포켓 내로 삽입하여 상기 전단연결재가 상기 전단포켓 내에 위치되도록 상기 전단연결재를 거더의 상면에 일체로 설치하고; 상기 전단포켓 내에 전단연결재가 위치한 상태에서 상기 전단포켓에 충진재를 충진하여 양생시키므로써 거더와 프리캐스트 바닥판 패널이 합성형 연결구조에 의하여 일체로 연결되도록 하는 것을 특징으로 하는 교량 바닥판 시공방법이 제공된다.In addition, in the present invention, as a specific example of the bridge deck construction method described above, the precast deck panel is formed with a shear pocket into which a shear connector is inserted; In the state where the precast deck panel is mounted on the girder, the shear connector is inserted into the shear pocket through a hole formed in the precast deck panel at the position where the shear pocket is formed, so that the shear connector is positioned in the shear pocket. Integrally installing the shear connector on the upper surface of the girder; Bridge deck plate construction method characterized in that the girder and the precast deck panel panel is integrally connected by a composite connection structure by filling and curing the filler in the shear pocket while the shear connector is located in the shear pocket. Is provided.

위와 같은 본 발명에 따르면, 전단연결재를 이용하여 바닥판과 거더를 합성구조로 교량의 상부구조를 설계함으로써, 바닥판과 거더의 구조적 일체화를 도모하여 재하 하중에 저항하도록 함으로써 경제적 단면설계가 가능하게 된다. According to the present invention as described above, by designing the upper structure of the bridge in the composite structure of the bottom plate and the girder using the shear connection material, to achieve structural integration of the bottom plate and the girder to resist the loading load, economic cross-sectional design is possible do.

또한, 본 발명에서는 상기한 교량 바닥판 설치공법의 다른 구체예로서, 거더의 상부에는 프리캐스트 바닥판 패널의 하부면이 손상되는 것을 방지하기 위한 탄 성패드를 설치하고, 연결플레이트의 일측은 거더의 상부플랜지에 고정 설치되고 타측은 상기 탄성패드의 하면에 맞닿도록 연결플레이트를 설치하고, 상기 연결플레이트, 상기 탄성패드가 및 상기 프리캐스트 바닥판 패널의 하부면을 하향으로부터 관통하도록 연결 볼트를 체결하여, 상기 프리캐스트 바닥판 패널과 거더를 비합성형으로 연결하는 것을 특징으로 하는 교량 바닥판 시공방법이 제공된다. In addition, in the present invention, as another embodiment of the bridge bottom plate installation method described above, an elastic pad is installed on the upper part of the girder to prevent the lower surface of the precast deck plate panel from being damaged, and one side of the connecting plate is provided. The connection plate is fixedly installed on the upper flange of the other side to install a connecting plate to abut the lower surface of the elastic pad, and the connecting plate, the elastic pad and fastening the connecting bolt to penetrate the lower surface of the precast bottom plate panel from below Thus, there is provided a bridge deck construction method comprising connecting the precast deck panel and the girder in a non-synthetic form.

또한, 본 발명에서는 상기한 교량 바닥판 설치공법의 또다른 구체예로서, 상기 거더의 상부에는 튜브형 너트를 고정 설치하고, 상기 튜브형 너트가 관통하도록 상기 거더의 상부에 베딩 블록을 설치한 후, 프리캐스트 바닥판 패널을 상기 거더의 상부에 거치하며, 상기 프리캐스트 바닥판 패널이 거더에 거치된 상태에서 상기 프리캐스트 바닥판 패널의 상면에 형성된 홀을 통하여 연결 볼트를 삽입하여 상기 튜브형 너트에 체결하므로써 상기 프리캐스트 바닥판 패널과 거더를 비합성형으로 연결하는 것을 특징으로 하는 교량 바닥판 시공방법이 제공된다. In addition, in the present invention, as another specific example of the bridge bottom plate installation method, a tubular nut is fixedly installed on the upper part of the girder, and a bedding block is installed on the upper part of the girder so that the tubular nut passes therethrough, The cast bottom plate panel is mounted on the top of the girder, and the connecting bolt is inserted into the tubular nut through a hole formed in the upper surface of the precast bottom plate panel while the precast bottom panel is mounted on the girder. There is provided a bridge deck construction method, wherein the precast deck panel and the girder are connected in a non-molded manner.

위와 같이, 본 발명에 따라 교량의 바닥판을 거더에 단순 연결하는 비합성 연결방식을 이용하여 바닥판과 거더를 연결하면 바닥판의 신속시공이 가능하게 된다. As described above, by connecting the bottom plate and the girder using a non-synthetic connection method for simply connecting the bottom plate of the bridge to the girder in accordance with the present invention enables the rapid construction of the bottom plate.

또한, 본 발명에서는 상기한 교량 바닥판 설치공법에 있어서, 교량의 방호벽을 설치하는 단계를 더 구비한 실시예가 제공되는데, 구체적으로 콘크리트 방호벽이 설치되는 부분의 프리캐스트 바닥판 패널에는 철근설치 및 충진재 충진용 홀을 형성하고, 콘크리트 방호벽에 배근되는 연결 철근의 하단부를 상기 홀을 통하여 프리캐스트 바닥판 패널 내부에 배근되도록 설치하고; 상기 홀을 통하여 충진재를 프 리캐스트 바닥판 패널의 내부에 주입하여 양생시키고; 상기 홀의 상부에 방호벽용 철근을 배근하고 거푸집을 설치한 뒤 콘크리트를 타설 양생하여 콘크리트 방호벽을 설치하는 단계를 더 포함하는 것을 특징으로 하는 교량 바닥판 시공방법이 제공된다. In addition, the present invention provides an embodiment further comprising the step of installing the protective wall of the bridge in the bridge bottom plate installation method, specifically, the precast deck panel of the portion where the concrete barrier is installed, the rebar installation and filling material Forming a filling hole and installing a lower end portion of the connecting reinforcing bar which is reinforced to the concrete barrier wall to be disposed inside the precast deck panel through the hole; Injecting and filling the filler into the interior of the precast deck panel through the hole; A bridge deck plate construction method is provided, further comprising installing a concrete barrier by placing concrete for curing the reinforcing bar for reinforcing the upper part of the hole and installing the formwork.

또한, 본 발명에서는 상기한 교량 바닥판 설치공법에 있어서, 교량의 방호벽을 설치하는 단계를 더 구비한 또다른 실시예가 제공되는데, 구체적으로 교량 방호벽의 연석이 설치되는 부분의 프리캐스트 바닥판 패널에는 철근설치 및 충진재 충진용 홀을 형성하고; 방호벽의 연석에 배근되는 연결 철근의 하단부를 상기 홀을 통하여 프리캐스트 바닥판 패널 내부에 배근되도록 설치하고; 사전 제작된 방호벽을 체결할 수 있는 앵커 볼트를 설치하고; 상기 홀을 통하여 상기 프리캐스트 바닥판 패널 내에 충진재를 주입하여 양생시키고; 상기 홀의 상부에 연석의 시공을 위한 거푸집을 설치하고 콘크리트를 타설 양생하여 콘크리트 연석을 완성하고; 상기 콘크리트 연석 상면 밖으로 노출된 앵커 볼트에 사전 제작된 방호벽을 체결하여 사전 제작된 방호벽을 시공하여 조립하는 단계를 더 포함하는 것을 특징으로 하는 교량 바닥판 시공방법이 제공된다. In addition, in the present invention, in the above-described bridge bottom plate installation method, there is provided another embodiment further comprising the step of installing a barrier of the bridge, specifically, the precast bottom plate of the portion where the curb of the bridge barrier is installed Forming holes for installing reinforcing bars and filling materials; A lower end portion of the connecting reinforcing bars arranged on the curb of the security barrier is installed to be reinforced into the precast deck panel through the holes; Install an anchor bolt capable of fastening a prefabricated security barrier; Injecting and filling a filler into the precast deck panel through the hole; Installing a formwork for curbstone construction on top of the hole and curing concrete to finish the curbstone; There is provided a bridge deck construction method further comprising the step of assembling the prefabricated security barrier by fastening the prefabricated security barrier to the anchor bolt exposed outside the upper surface of the curb curb.

본 발명에 있어서, 제형(사다리꼴) 단면형상으로 구성된 형태의 유리섬유 강화 복합소재 바닥판 튜브를 상호 병렬 연결하여 복합소재 프리캐스트 바닥판 패널을 공장 제작하고, 이를 현장의 거더 위로 이송하여 상기 패널을 순차적으로 서로 결합하여 거더 교량의 바닥판을 설치하게 된다. 상기 교량의 바닥판 구조로 사용되는 유리섬유 강화 복합소재 프리캐스트 바닥판 패널의 재질은 고강도 유리섬유와 폴리에스터, 비닐에스터, 패놀 또는 에폭시로부터 선택되는 수지를 그 구성재료로 한다.In the present invention, the fiberglass-reinforced composite bottom plate tube formed in the form of a cross-sectional formulation (trapezoidal) is connected to each other in parallel to produce a composite precast bottom plate panel factory, and transported to the field girder to the panel The bottom plate of the girder bridge is installed by combining with each other sequentially. The material of the glass fiber reinforced composite material precast deck panel used as the bottom plate structure of the bridge is made of high strength glass fiber and resin selected from polyester, vinyl ester, panol or epoxy as its constituent material.

이하, 첨부도면을 참조하여 본 발명의 상세한 구성 및 실시 예에 대하여 설명한다.Hereinafter, with reference to the accompanying drawings will be described in detail the configuration and embodiment of the present invention.

도 1a 및 도 1b는 본 발명에 따른 교량 바닥판용 유리섬유 강화 복합소재 프리캐스트 바닥판 패널을 구성하는 유리섬유 강화 복합소재 바닥판 튜브(1)의 개략도로서, 도 1a는 상기 바닥판 튜브(1)의 일측 상하부에서 동일한 방향의 외부로 연장되는 채널형 연결부(7)가 구비되어 있는 형태의 바닥판 튜브(1)의 사시도이며, 도 1b는 상기 바닥판 튜브(1)의 일측 상부와 타측 하부에서 외부로 연장되는 Z형 연결부(7')가 구비되어 있는 형태의 바닥판 튜브(1)의 사시도이다.1A and 1B are schematic views of a glass fiber reinforced composite bottom plate tube 1 constituting a glass fiber reinforced composite precast bottom plate panel for a bridge deck according to the present invention, and FIG. 1A is a bottom plate tube 1 ) Is a perspective view of a bottom plate tube (1) having a channel-shaped connection portion (7) extending from one side up and down in the same direction to the outside, Figure 1b is one top and the other bottom of the bottom plate tube (1) Is a perspective view of the bottom plate tube (1) of the type provided with a Z-shaped connection portion (7 ') extending to the outside.

도 2a 및 도2b는 바닥판 튜브를 상호 연결 접합하여 제작되는 교량 바닥판용 유리섬유 강화 복합소재 프리캐스트 바닥판 패널(6) 의 단면도로서, 도 2a는 도 1a의 채널형 연결부가 구비된 바닥판 튜브(1)를 연결 접합한 프리캐스트 바닥판 패널(6)의 단면도이며, 도 2b는 도 1b의 Z형 연결부가 구비된 바닥판 튜브(1)를 연결 접합한 패널(6)의 단면도이다.2A and 2B are cross-sectional views of a glass fiber reinforced composite precast deck plate 6 for a bridge deck produced by interconnecting bottom plate tubes, and FIG. 2A is a bottom plate with channeled connection of FIG. It is sectional drawing of the precast bottom plate panel 6 which joined and bonded the tube 1, and FIG. 2B is sectional drawing of the panel 6 which joined and joined the bottom plate tube 1 with Z-shaped connection part of FIG.

도 1a 및 도 1b에 도시된 바와 같이 상기 바닥판 튜브(1)는 상부 하중의 지지 및 전달에 유리하도록 상부판(2), 하부판(3) 및 복부판(4)으로 구성되어 복수 개의 사다리꼴 형상의 튜브형 단면을 가진다. 상기 유리섬유 복합소재 바닥판 튜브는, 폴리에스터, 비닐에스터, 패놀 또는 에폭시로부터 선택되는 수지와, 유리섬 유로 제작된다. As shown in FIGS. 1A and 1B, the bottom plate tube 1 is composed of a top plate 2, a bottom plate 3, and an abdominal plate 4 to facilitate the support and transfer of an upper load, thereby forming a plurality of trapezoidal shapes. It has a tubular cross section. The glass fiber composite bottom plate tube is made of a resin selected from polyester, vinyl ester, panol or epoxy, and a glass island flow path.

위와 같은 단면 구성을 가진 바닥판 튜브(1)가 그 측면에서 병렬로 일체 연결되어 조립되므로써 유리섬유 강화 복합소재 프리캐스트 바닥판 패널(6)을 형성하게 된다. 이를 위하여 상기 바닥판 튜브(1)의 측면에는 연결부(5, 5')가 구비되어 있는데, 상기 연결부(5, 5')는 도 1a에 도시된 바와 같이 바닥판 튜브(1)의 일측에서 상기 상부판(2)과 하부판(3)에서 각각 동일 방향으로 연장된 형태로 구비되거나 또는 도 1b에 도시된 바와 같이 바닥판 튜브(1)의 일측에서는 상부판(2)에서 연장되고 타측에서는 하부판(3)에서 연장되어 영문자 Z자와 같은 형태를 가지도록 구비될 수 있다. The bottom plate tube (1) having the cross-sectional configuration as described above is assembled by integrally connected in parallel on its side to form a glass fiber reinforced composite material precast bottom plate panel (6). To this end, the side of the bottom plate tube (1) is provided with a connecting portion (5, 5 '), the connecting portion (5, 5') is shown at one side of the bottom plate tube (1) as shown in Figure 1a The upper plate 2 and the lower plate 3 are provided in the form of extending in the same direction, respectively, or as shown in Figure 1b extends from the upper plate 2 on one side of the bottom plate tube (1) and the lower plate on the other side ( Extending from 3) may be provided to have a shape such as the letter Z.

이와 같은 구성을 가지는 바닥판 튜브(1)는 도 2a 및 도 2b에 도시된 것과 같이 동일한 형태의 이웃하는 바닥판 튜브가 그 측면으로 나란하게 끼워 맞추어져 결합된다. 이때, 바닥판 튜브간의 일체화된 접합을 위하여 연결부(5, 5')의 내면 등과 같이 이웃하는 바닥판 튜브와 접촉하는 면에 에폭시 또는 우레탄계 접착제를 도포할 수도 있다. 한편, 이웃하는 바닥판 튜브의 외면에는 상기 연결부(5, 5')와 완전하게 끼워 맞추어지도록 요철부가 형성되어 있다. 바닥판 튜브(1)를 결합하여 복합소재 프리캐스트 바닥판 패널(6)을 제작하는 공정은 주로 공장에서 이루어진다. In the bottom plate tube 1 having such a configuration, as shown in FIGS. 2A and 2B, neighboring bottom plate tubes of the same type are fitted side by side and coupled to each other. In this case, an epoxy or urethane adhesive may be applied to a surface in contact with a neighboring bottom plate tube, such as an inner surface of the connection portion 5, 5 ′, for integrated bonding between the bottom plate tubes. On the other hand, an uneven portion is formed on the outer surface of the adjacent bottom plate tube so as to fit completely with the connecting portions 5 and 5 '. The process of manufacturing the composite precast bottom plate panel 6 by combining the bottom plate tube 1 is mainly performed in a factory.

이와 같이, 복수개의 바닥판 튜브(1)가 조립되어 복합소재 프리캐스트 바닥판 패널(6)이 제작되면, 이러한 복합소재 프리캐스트 바닥판 패널(6)이 현장으로 이송되어 교량 거더(10) 위에 거치되어 서로 연결되므로써 교량의 바닥판을 구성하 게 된다. As such, when the plurality of bottom plate tubes 1 are assembled to produce the composite precast bottom plate panel 6, the composite precast bottom plate panel 6 is transferred to the site and placed on the bridge girder 10. It is mounted and connected to each other to form the bottom plate of the bridge.

도 3은 본 발명에 따른 유리섬유 강화 복합소재 프리캐스트 바닥판 패널(6)을 이용한 거더 교량의 바닥판 설치공법에 의하여 시공된 합성형 거더 교량의 사시도이다. 도 3에 도시된 바와 같이, 본 발명의 시공방법에 의하여 만들어진 거더 교량은 바닥판 튜브(1)의 조립으로 제작된 프리캐스트 바닥판 패널(6)을 거더(10)에 설치하여 서로 연결되어 교량 바닥판을 이루게 되며(프리캐스트 바닥판 패널을 연결하여 전체적인 교량 바닥판을 구성하는 과정에 대해서는 후술한다), 상기 바닥판에는 콘크리트 방호벽(20)이 설치되고 바닥판의 상부에는 아스팔트 포장(25)이 포설되므로써 거더 교량이 완성된다. 3 is a perspective view of a composite girder bridge constructed by the bottom plate installation method of the girder bridge using the glass fiber reinforced composite material precast deck plate panel 6 according to the present invention. As shown in FIG. 3, the girder bridge made by the construction method of the present invention is connected to each other by installing a precast bottom plate panel 6 manufactured by the assembly of the bottom plate tube 1 to the girder 10. A bottom plate is formed (a process of constituting the entire bridge deck by connecting precast deck panels will be described later). The concrete deck 20 is installed on the bottom board, and the asphalt pavement 25 is formed on the top of the floor board. This installation completes the girder bridge.

다음에서는 위와 같이 바닥판 튜브(1)의 조립으로 제작된 프리캐스트 바닥판 패널(6)을 거더(10)에 설치하여 서로 연결하는 구조 및 방법의 실시예에 대하여 구체적으로 설명한다. 우선, 프리캐스트 바닥판 패널(6)과 거더(10)가 일체로 합성되도록 연결하는 합성형 연결구조의 실시예부터 살펴본다. Next, an embodiment of a structure and a method of installing the precast deck panel 6 manufactured by assembling the bottom plate tube 1 to the girder 10 and connecting to each other will be described in detail. First, an embodiment of a composite connection structure for connecting the precast deck panel 6 and the girder 10 to be integrally synthesized will be described.

도 4는 프리캐스트 바닥판 패널(6)과 거더(10)가 일체로 합성되도록 합성형으로 연결하는 구조를 보여주기 위한 것으로서, 도 3의 선A-A에 따른 단면도이다. 도 5a는 도 4에서 원B의 상세도이며, 도 5b는 도 3의 선B-B에 따른 부분 단면도로서 거더(10)와 프리캐스트 바닥판 패널(6)이 연결되는 부위의 종방향 부분 단면도이다. FIG. 4 is a cross-sectional view taken along line A-A of FIG. 3 to show a structure in which the precast deck panel 6 and the girder 10 are integrally combined so as to be synthesized. FIG. 5A is a detailed view of circle B in FIG. 4, and FIG. 5B is a partial cross-sectional view taken along line B-B in FIG. 3, showing a longitudinal cross-sectional view of the portion where the girder 10 and the precast bottom panel 6 are connected.

프리캐스트 바닥판 패널(6)과 거더(10)를 합성형으로 연결하는 경우, 우선 프리캐스트 바닥판 패널(6)을 거더(10) 위에 거치하지 전에 거더(10)의 상부 플랜 지에 소정 높이의 간격부재(15)를 설치하고, 그 위에 프리캐스트 바닥판 패널(6)을 거치하므로써 상기 프리캐스트 바닥판 패널(6)과 거더(10) 사이의 공간을 두어 헌치부를 형성한다. 도면에 도시된 실시예에서 간격부재(15)는 ㄱ형으로 절곡된 강재 앵글로 만들어져 거더(10)의 상부플랜지 양측에 용접 설치되는 것으로 구체화되어 있다. 그러나 간격부재(15)는 이러한 강재 앵글에 한정되는 것이 아니라, 목재, 폴리스티렌, 고무발포재 등의 재료로 만들어져 접착제에 의하여 거더(10)에 부착될 수 있다.  In the case where the precast sole plate panel 6 and the girder 10 are connected in a synthetic manner, first, the precast sole plate panel 6 is placed on the upper flange of the girder 10 before being mounted on the girder 10. The spacing member 15 is provided, and the precast bottom plate panel 6 is mounted thereon, thereby leaving a space between the precast bottom plate panel 6 and the girder 10 to form a haunting portion. In the embodiment shown in the drawings, the spacer member 15 is made of a steel angle bent in the a-shape is embodied to be welded on both sides of the upper flange of the girder 10. However, the spacer 15 is not limited to such steel angles, but may be made of a material such as wood, polystyrene, rubber foam, etc. and attached to the girder 10 by an adhesive.

상기한 간격부재(15)가 설치된 거더(10)의 상부에 프리캐스트 바닥판 패널(6)이 거치되면, 프리캐스트 바닥판 패널(6)과 거더(10)의 합성거동을 위한 전단연결재(31)가 프리캐스트 바닥판 패널(6) 상부에 형성된 홀(35)을 통하여 전단포켓 내에 삽입되어 거더(10)의 상부플랜지에 용접 등의 방법에 의하여 설치된다. When the precast deck panel 6 is mounted on the girder 10 on which the spacer 15 is installed, the shear connector 31 for the composite behavior of the precast deck panel 6 and the girder 10 is mounted. ) Is inserted into the front end pocket through the hole 35 formed in the upper part of the precast bottom panel 6 and installed in the upper flange of the girder 10 by welding or the like.

전단연결재(31)의 설치가 완료되면 상기 홀(35)을 통하여 전단포켓 내에 무수축 몰탈 등의 충진재(33)를 주입하여 양생시킴으로써 거더(10)와 프리캐스트 바닥판 패널(6)을 합성형으로 연결하게 된다. 상기 충진재(33)를 담아 두는 전단포켓을 형성하기 위하여 프리캐스트 바닥판 패널(6)의 바닥판 튜브 내에는 양측으로 폼댐(50)이 사전에 설치되어 있다. 부재번호 25는 바닥판이 완성된 후 그 상부에 포설되는 아스팔트 포장(25)이다. When the installation of the shear connector 31 is completed, the girder 10 and the precast bottom panel 6 are synthesized by injecting and curing the filler 33 such as non-shrink mortar through the hole 35 through the hole 35. Will be connected. In order to form a shear pocket for storing the filler 33, the foam dam 50 is installed in both sides in the bottom plate tube of the precast bottom panel 6. Reference numeral 25 is an asphalt pavement 25 that is installed on the top after the bottom plate is completed.

다음에서는 본 발명에 따른 거더(10)와 교량의 콘크리트 방호벽(20)의 설치구조 및 방법을 살펴본다. Next, look at the installation structure and method of the concrete barrier 20 of the girder 10 and the bridge in accordance with the present invention.

도 6a는 본 발명에 따른 유리섬유 강화 복합소재 프리캐스트 바닥판 패널을 이용한 거더 교량의 바닥판 설치공법에 있어서 거더와 콘크리트 방호벽과 프리캐스트 바닥판 패널의 연결구조를 보여주는 부분 단면도로서, 도 4의 원C에서의 확대도이다. Figure 6a is a partial cross-sectional view showing the connection structure of the girder, the concrete firewall and the precast deck panel in the bottom plate installation method of the girder bridge using the glass fiber reinforced composite material precast deck panel according to the present invention, It is an enlarged view at circle C.

콘크리트 방호벽(20)의 하단과 바닥판의 구조적 일체화를 도모하기 위하여, 바닥판 단부 외측 거더(10)의 간격부재(15) 위에 프리캐스트 바닥판 패널(6)이 설치된 상태에서, 앞서 도 5a 및 도 5b에서 살펴본 방법을 통하여 전단연결재(31)를 거더(10)의 상면에 설치한다. 이때, 콘크리트 방호벽(20)이 설치되는 부분의 프리캐스트 바닥판 패널(6)에는 철근설치용 홀을 형성하고, 콘크리트 방호벽(20)에 배근되는 연결 철근(41)의 하단부를 상기 철근설치용 홀을 통하여 프리캐스트 바닥판 패널(6) 내부에 배근되도록 한다. 상기 철근설치용 홀은 별도로 형성할 수도 있으며, 경우에 따라서는 도면에 도시된 바와 같이 전단연결재(31) 설치를 위한 홀(35)을 확장하여 철근설치용 홀로서 활용할 수도 있다. 상기 연결 철근(41)은 용접 등의 방법을 이용하여 전단연결재(31)에 고정시킨다. In order to achieve structural integration between the bottom of the concrete barrier wall 20 and the bottom plate, with the precast bottom plate panel 6 installed on the spacer 15 of the bottom plate outer girder 10, FIG. 5A and FIG. The shear connector 31 is installed on the upper surface of the girder 10 through the method described with reference to FIG. 5B. At this time, the precast deck panel 6 of the portion where the concrete barrier wall 20 is installed to form a reinforcing bar for the installation, and the lower end of the connection reinforcing bar 41 is reinforced to the concrete firewall 20 through the reinforcing bar mounting hole It is placed inside the precast bottom panel 6. The reinforcing bar installation hole may be formed separately, and in some cases, as shown in the drawing, the reinforcing bar mounting hole 31 may be expanded to be used as the reinforcing bar mounting hole. The connecting reinforcing bar 41 is fixed to the shear connecting member 31 using a method such as welding.

이와 같이 전단연결재(31)와 연결 철근(41)을 설치한 후 상기 홀(35) 또는 철근설치용 홀을 통하여 프리캐스트 바닥판 패널(6) 내에 무수축 몰탈 등의 충진재(33)를 주입하여 양생시킨다. 후속하여 상기 연결 철근(41)의 상부에 겹이음 등의 이음방법을 통하여 방호벽 철근(40)을 배근하고 거푸집을 설치한 뒤 콘크리트를 타설 양생하여 콘크리트 방호벽(20)을 시공한다.After the shear connector 31 and the connecting reinforcing bar 41 is installed in this way, the filler 35 such as non-contraction mortar, etc., is injected into the precast deck panel 6 through the hole 35 or the reinforcing bar installation hole for curing. Let's do it. Subsequently, through the joint method such as lap joints on the upper part of the connecting reinforcing bar 41, the reinforcing bar reinforcing bar 40 is installed, the formwork is installed, and the concrete is poured to cure the concrete protection wall 20.

도 6b는 방호벽 설치 구조 및 방법의 또다른 실시예를 보여주는 부분 단면도로서, 본 발명에 따른 유리섬유 강화 복합소재 프리캐스트 바닥판 패널을 이용한 거더 교량의 바닥판 설치공법에 있어 강재 방호벽(60)과 방호벽 연석(65)을 설치하는 것을 보여주는 부분 단면도이다. Figure 6b is a partial cross-sectional view showing another embodiment of the firewall installation structure and method, the steel barrier 60 and the bottom plate installation method of the girder bridge using the glass fiber reinforced composite material precast deck panel according to the present invention A partial cross-sectional view showing the installation of the firewall curb 65.

일반적으로 강재 방호벽(60)은, 교량의 바닥판 상부에 현장타설 콘크리트로 만들어진 연석(65) 상부에 앵커 볼트를 이용하여 설치된다. 본 발명에서는, 우선 바닥판 단부 외측 거더(10)의 간격부재(15) 위에 프리캐스트 바닥판 패널(6)이 설치된 상태에서, 앞서 도 5a 및 도 5b에서 살펴본 방법을 통하여 전단연결재(31)를 거더(10)의 상면에 설치한다. 방호벽 연석(65)이 설치되는 부분의 프리캐스트 바닥판 패널(6)에는 철근설치용 홀을 형성하여 방호벽 연석(65) 내에 배근될 연결 철근(41)의 하단부를 상기 철근설치용 홀을 통하여 프리캐스트 바닥판 패널(6) 내부에 배근되도록 한다. 상기 철근설치용 홀의 형성 및 연결 철근(41)의 전단연결재(31)와의 연결에 대한 사항은 앞서 살펴본 도 6a의 내용이 그대로 적용되므로 반복 설명은 생략한다. In general, the steel barrier 60 is installed using an anchor bolt on the curb 65 made of cast-in-place concrete on the bottom plate of the bridge. In the present invention, first, in the state where the precast bottom plate panel 6 is installed on the gap member 15 of the bottom plate end outer girder 10, the shear connector 31 is formed through the method described with reference to FIGS. 5A and 5B. It is installed in the upper surface of the girder 10. Precast bottom plate panel 6 in the portion where the security barrier curb 65 is installed is formed in the reinforcing bar installation hole, the lower end of the connecting reinforcing bar 41 to be reinforced in the security barrier curb 65 through the reinforcing hole installation Reinforce the inside of the plate panel (6). The details of the formation of the reinforcing hole for installation and connection of the shear reinforcing material 31 of the connecting reinforcing bar 41 are repeated as the contents of FIG.

한편, 연결 철근(41)의 설치가 완료되면, 연석 상부에서 강재 방호벽(60)을 체결할 수 있는 앵커 볼트(61)를 설치한다. 이 때, 상기 앵커 볼트(61)의 하단부는 상기 철근설치용 홀을 통하여 프리캐스트 바닥판 패널(6)의 내부에 위치하는 것이 바람직하다. 이와 같이 연결 철근(41) 및 앵커 볼트(61)가 설치된 상태에서 바닥판 패널(6) 상부에 구비된 홀(35)을 통해 프리캐스트 바닥판 패널(6) 내에 무수축 몰탈 등의 충진재(33)를 주입하여 양생시킨다. 후속하여 콘크리트 연석(65)의 시공을 위한 거푸집을 설치하고 콘크리트를 타설 양생하여 콘크리트 연석(65)을 완성하고, 콘크리트 연석(65)의 상면 밖으로 노출된 앵커 볼트(61)에 강재 방호벽(60)을 체결하여 강재 방호벽 시공을 완료한다.On the other hand, when the installation of the connecting reinforcing bar 41 is completed, the anchor bolt 61 that can fasten the steel barrier 60 in the upper curb is installed. At this time, it is preferable that the lower end of the anchor bolt 61 is located inside the precast bottom plate panel 6 through the reinforcing bar mounting hole. In this way, in the state in which the connecting reinforcing bar 41 and the anchor bolt 61 is installed, the filler 33 such as non-contraction mortar in the precast deck panel 6 through the hole 35 provided on the bottom panel panel 6. Inject to cure. Subsequently, the formwork for the construction of the concrete curb (65) is installed and the concrete is cured to complete the concrete curb (65), the steel barrier 60 to the anchor bolt 61 exposed outside the upper surface of the concrete curb (65) To complete the construction of the steel firewall.

다음에서는 도 7a 및 도 7b를 참조하여 프리캐스트 바닥판 패널(6)과 거더(10)가 비합성형으로 연결하는 구조의 실시예에 대하여 설명한다. Next, an embodiment of a structure in which the precast deck panel 6 and the girder 10 are connected in a non-synthetic form will be described with reference to FIGS. 7A and 7B.

도 7a 및 도 7b는 본 발명에 따른 유리섬유 강화 복합소재 프리캐스트 바닥판 패널을 이용한 바닥판 시공방법의 실시예로서 바닥판과 거더가 합성되지 아니한 것으로 간주하여 설계되는 거더와 프리캐스트 바닥판 패널의 비합성형 연결부에 대한 실시예의 상세를 보여주는 단면도로서, 도 7a는 Z형 플레이트(100)를 이용하여 거더(10)와 프리캐스트 바닥판 패널(6)을 비합성형으로 연결한 실시예의 연결상세를 보여주는 단면도이며, 도 7b는 배딩 블록(76)을 이용하여 거더(10)와 프리캐스트 바닥판 패널(6)을 비합성형으로 연결한 실시예의 연결상세를 보여주는 단면도이다.7a and 7b is an embodiment of the construction method of the bottom plate using the glass fiber reinforced composite material precast deck panel according to the present invention girders and precast deck panels designed to be considered that the bottom plate and the girder is not synthesized 7A shows a cross-sectional view of an embodiment of a non-synthetic connection of FIG. 7A, in which the girder 10 and the precast deck panel 6 are non-synthesically connected using a Z-shaped plate 100. Figure 7b is a cross-sectional view showing the details, Figure 7b is a cross-sectional view showing the connection details of the embodiment in which the girder 10 and the precast deck panel 6 is connected in a non-synthetic manner using a bedding block 76.

도 7a에 도시된 실시예에서는, Z형 연결 플레이트(100)를 이용하여 거더(10)의 상부 플랜지와 프리캐스트 바닥판 패널(6)의 하부를 연결하게 되는데, 구체적으로는 거더(10)의 상부에 고무 또는 플라스틱재 등으로 이루어진 탄성패드(70)를 설치하고, 거더(10)의 상부플랜지 양측면에는 Z형상의 연결 플레이트(100)를 용접하여 고정시킨다. 상기 탄성패드(70) 위로 프리캐스트 바닥판 패널(6)을 거치한 후, 상기 상기 연결 플레이트(100)의 하단을 통하여 상기 탄성패드(70)와 프리캐스트 바닥판 패널(6)을 관통하도록 연결 볼트(75)를 체결하여 상기 프리캐스트 바닥판 패널(6)과 거더(10)를 비합성형으로 연결한다. 상기 연결 볼트(75)의 체결을 위해서 상기 프리캐스트 바닥판 패널(6)의 거치전에 미리 내부에 너트(78)를 부착 시켜 놓을 수도 있으며, 또다른 방법으로는 프리캐스트 바닥판 패널(6)의 상부면에 홀(도시되지 않음)을 형성하고 그 홀을 통하여 너트(78)를 삽입하여 연결 볼트(75)와 체결되도록 할 수도 있다. In the embodiment shown in FIG. 7A, the upper flange of the girder 10 and the lower part of the precast bottom plate panel 6 are connected by using the Z-shaped connecting plate 100, specifically, the girder 10. An elastic pad 70 made of rubber or plastic material is installed on the upper portion, and the Z-shaped connecting plate 100 is welded and fixed to both sides of the upper flange of the girder 10. After mounting the precast bottom panel 6 over the elastic pad 70, the connection through the bottom of the connecting plate 100 and the elastic pad 70 and the precast bottom panel 6 The precast bottom plate panel 6 and the girder 10 are connected to each other by fastening the bolts 75 in a non-molded manner. In order to fasten the connecting bolt 75, the nut 78 may be attached to the inside of the precast bottom plate panel 6 before mounting thereof. A hole (not shown) may be formed in the upper surface, and the nut 78 may be inserted through the hole to be coupled to the connecting bolt 75.

도 7b에 도시된 비합성형 연결 실시예에서는, 거더(10)의 상부플랜지 상면에는 튜브형 너트(77)를 용접 등의 방법에 의하여 일체로 설치한 상태에서 거더(10)의 상부플랜지와 프리캐스트 바닥판 패널(6) 하부 사이에 프리캐스트 베딩 블록(76)을 설치한 후, 프리캐스트 바닥판 패널(6)에 형성된 홀(79)을 통해 하향식으로 연결 볼트(75)를 상기 너트(77)에 체결하므로써 거더(10)와 프리캐스트 바닥판 패널(6)을 비합성형으로 연결한다. In the non-synthetic connection embodiment shown in FIG. 7B, the upper flange and the precast of the upper flange of the girder 10 are integrally installed on the upper surface of the upper flange of the girder 10 by a welding or the like method. After the precast bedding block 76 is installed between the bottom of the bottom plate panel 6, the nut 77 is connected to the connecting bolt 75 downward through the hole 79 formed in the precast bottom plate panel 6. The girder 10 and the precast deck panel 6 are connected in a non-synthetic manner by fastening to the.

한편, 도 7a 및 도 7b와 같이 거더(10)와 프리캐스트 바닥판 패널(6)이 비합성형 연결되는 교량 바닥판의 경우에도, 앞서 도 6a 및 도 6b에서 살펴본 바와 같은 구조의 방호벽이 설치될 수 있다. 이 경우, 방호벽(20)과 프리캐스트 바닥판 패널(6)에 걸쳐지는 연결 철근(41)은 전단연결재(31)에 고정될 필요가 없이 단순히 프리캐스트 바닥판 패널(6) 내에 위치하여 충진재(33) 내에 매립되면 충분하다. Meanwhile, even in the case of a bridge deck in which the girder 10 and the precast deck panel 6 are non-synthesically connected as shown in FIGS. 7A and 7B, a barrier having a structure as described above with reference to FIGS. 6A and 6B is installed. Can be. In this case, the connecting reinforcing bar 41 spanning the barrier 20 and the precast deck panel 6 need not be secured to the shear connector 31, but simply located within the precast deck panel 6 to fill the filler ( It is sufficient if it is buried in 33).

도 8은 본 발명에 따른 유리섬유 강화 복합소재 프리캐스트 바닥판 패널을 이용한 거더 교량의 바닥판 시공방법에 있어서, 프리캐스트 바닥판 패널을 연결하여 바닥판을 형성할 때, 프리캐스트 바닥판 패널 사이에 설치되는 신축이음구조를 보여주는 단면도이다. 8 is a bottom plate construction method of the girder bridge using a glass fiber reinforced composite material precast deck plate according to the present invention, when the precast deck panel is connected to form a bottom plate, between the precast deck panel This section shows the expansion joint structure installed in the

본 발명에서는 프리캐스트 바닥판 패널 사이에 설치되는 신축이음구조로는 다양한 구조가 사용될 수 있는데, 도 8에 도시된 구조는 레일형 신축이음구조로서, 서로 연결될 양측의 프리캐스트 바닥판 패널(6)의 마주보는 바닥판 튜브의 중공 셀에 신축이음장치(85)의 각종 보강재를 설치한 후 무수축 콘크리트와 같은 충진재(33)로 충진한다. 이때, 신축이음부의 상부에 포설되는 포장 역시 무수축 콘크리트와 같은 충진재(33)로 구성한다. In the present invention, a variety of structures can be used as the expansion joint structure installed between the precast deck panels. The structure shown in FIG. 8 is a rail-type expansion joint structure, and the precast deck panels 6 on both sides to be connected to each other. After the installation of the various reinforcement of the expansion joint device 85 in the hollow cell of the bottom plate tube of the filling is filled with a filler 33 such as non-contraction concrete. At this time, the pavement installed on the expansion joint is also composed of a filler 33, such as non-condensed concrete.

다음에서는 도 9a 내지 도 9e를 참조하여 본 발명에 따른 유리섬유 강화 복합소재 프리캐스트 바닥판 패널을 이용한 교량 바닥판 시공순서에 대하여 설명한다. Next, a bridge deck construction procedure using a glass fiber reinforced composite material precast deck panel according to the present invention will be described with reference to FIGS. 9A to 9E.

도 9a 내지 도 9e는 거더와 프리캐스트 바닥판 패널이 합성형으로 결합된 실시예에 관한 것으로서, 각각 교량 바닥판의 각 시공단계에서의 거더와 패널의 연결부를 보여주는 부분단면도와 측면도이다. 우선, 앞서 도 5a 및 도 5b와 관련하여 살펴본 바와 같이, 거더(10) 상부에 간격부재(15)를 설치하고(도 9a 참조), 바닥판 튜브의 양측에 폼댐(50)을 구비한 프리캐스트 바닥판 패널(6)을 상기한 간격부재(15) 위에 거치시킨다(도 9b 참조).9A to 9E are embodiments in which a girder and a precast deck panel are combined in a composite form, and are partial cross-sectional views and side views showing the connection portions of the girder and the panel at each construction stage of the bridge deck. First, as described above with reference to FIGS. 5A and 5B, the spacer 15 is disposed on the girder 10 (see FIG. 9A), and the precast having the form dam 50 on both sides of the bottom plate tube. The bottom panel 6 is mounted on the spacer 15 described above (see FIG. 9B).

첫 번째 프리캐스트 바닥판 패널(6)이 거치되면, 밀림을 방지할 수 있도록 고정을 시킨 후, 패널 간 연결부에 접착재를 도포하고 두 번째 프리캐스트 바닥판 패널(6)을 거치하고 유압잭(90)을 사용하여 균일한 압력을 가하여 프리캐스트 바닥판 패널(6)의 측면 접착면이 충분히 부착될 수 있도록 한다(도 9c 참조).When the first precast deck panel (6) is mounted, it is fixed to prevent the rolling, then apply an adhesive to the connection between the panels, the second precast deck panel (6) is mounted and the hydraulic jack (90) Using a uniform pressure to ensure that the side adhesive surface of the precast bottom panel 6 is sufficiently attached (see Fig. 9c).

다음으로 전단 연결재(31)가 설치될 위치에 형성된 프리캐스트 바닥판 패널(6)의 홀(35)을 통하여 전단연결재(31)를 삽입하여 용접건(96) 등의 용접장치를 이용하여 전단연결재(31)를 거더(10)의 상부플랜지 상면에 설치하고(도 9d 참 조), 상기 홀(35)을 통하여 상기 전단연결재(31) 설치부에 무수축 몰탈 등의 충진재(33)를 타설하여 충진시켜 양생시킨다(도 9e 참조). Next, the shear connector 31 is inserted through the hole 35 of the precast deck panel 6 formed at the position where the shear connector 31 is to be installed, and then the shear connector is formed by using a welding device such as a welding gun 96. (31) is installed on the upper surface of the upper flange of the girder (see FIG. 9D), and the filler 33, such as non-shrink mortar, is placed in the shear connector 31 installation portion through the hole 35 Fill and cure (see FIG. 9E).

다음에서는 도 10a 내지 도 10e를 참조하여 본 발명에 따른 유리섬유 강화 복합소재 프리캐스트 바닥판 패널을 이용한 교량 바닥판 시공방법에 있어서, 거더와 프리캐스트 바닥판 패널이 비합성형으로 연결되는 실시예의 구체적인 시공단계에 대하여 살펴본다. Next, in the bridge deck construction method using the glass fiber reinforced composite material precast deck panel according to the present invention with reference to FIGS. 10a to 10e, the girder and the precast deck panel is connected to the non-synthetic Examine the specific construction stage.

구체적으로 도 10a 내지 도 10e는 각각 Z형 플레이트를 이용하여 거더와 프리캐스트 바닥판 패널을 비합성형으로 연결하여 교량 바닥판을 시공하는 각 시공단계에서의 거더와 패널의 연결부를 보여주는 부분단면도와 측면도이다. Specifically, FIGS. 10A to 10E are partial cross-sectional views showing connections between the girder and the panel at each construction stage in which the bridge bottom plate is constructed by connecting the girder and the precast bottom plate panel by non-synthesizing using a Z-shaped plate, respectively. Side view.

우선, 프리캐스트 바닥판 패널(6)과 거더(10)의 비합성 연결을 위해 프리캐스트 바닥판 패널(6)을 거치하기 전에 볼트 연결을 위한 관통홀이 형성된 Z형 연결 플레이트(100)를 거더(10)의 상부플랜지 하단에 용접 등의 방법으로 설치한다(도 10a 참조). Z형 연결 플레이트(100)가 설치되고 나면, 거더(10)의 상부에 고무 또는 플라스틱재로 이루어진 탄성패드(70)를 설치하여 바닥판으로부터의 활하중에 의하여 거더와 프리캐스트 바닥판 패널의 접촉부에 파손이 발생하는 것을 방지하도록 한다(도 10b 참조). First, before mounting the precast deck panel 6 for non-synthetic connection between the precast deck panel 6 and the girder 10, the girder of the Z-shaped connecting plate 100 having through holes for bolted connections is formed. The bottom of the upper flange of (10) is installed by welding or the like (see Fig. 10a). After the Z-shaped connecting plate 100 is installed, an elastic pad 70 made of rubber or plastic is installed on the top of the girder 10, and the contact portion of the girder and the precast bottom plate panel is caused by the live load from the bottom plate. Breakage is prevented from occurring (see FIG. 10B).

거더(10) 상부에 탄성패드(70)의 설치가 완료되면, 도 10c에 도시된 바와 같이, 거더(10)의 볼트 연결용 관통홀에 대응하는 위치에 홀과 너트가 구비된 첫 번째 프리캐스트 바닥판 패널(6)을 거치한다. 첫 번째 프리캐스트 바닥판 패널(6)이 거치된 후 도 10d에 도시된 바와 같이 밀림을 방지할 수 있도록 고정을 시킨 후, 패널 간 연결부에 접착재를 도포하고 두 번째 프리캐스트 바닥판 패널6)을 거치하고 유압잭(90)을 사용하여 균일한 압력으로 일체 결합시켜 이웃하는 프리캐스트 바닥판 패널(6)이 완전하게 부착될 수 있도록 한다.When the installation of the elastic pad 70 on the girder 10 is completed, as shown in FIG. 10C, the first precast hole and the nut are provided at a position corresponding to the through hole for bolt connection of the girder 10. Mount the bottom plate panel (6). After the first precast deck panel 6 is mounted, it is fixed to prevent the rolling as shown in FIG. 10D. Then, an adhesive is applied to the connection between the panels, and the second precast deck panel 6 is applied. Mounting and integrally coupled at a uniform pressure using the hydraulic jack 90 so that the neighboring precast bottom panel 6 can be completely attached.

프리캐스트 바닥판 패널(6)간 연결이 완료되면, 도 10e에 나타낸 바와 같이 거더(10)의 상부플랜지 하단에서 상향식으로 연결 볼트(75)를 체결하여 거더(10)와 프리캐스트 바닥판 패널(6)을 비합성형으로 연결하여 시공을 완료한다.When the connection between the precast bottom panel 6 is completed, as shown in FIG. 10E, the connecting bolt 75 is fastened upward from the bottom of the upper flange of the girder 10 to the girder 10 and the precast bottom panel ( Connect 6) by non-synthesis to complete the construction.

한편, 이와 같이 바닥판을 이루도록 복수개의 프리캐스트 바닥판 패널(6)이 순차적으로 설치되면, 패널간의 이음부 상부에는 복합소재 프리캐스트 바닥판 패널과 동일한 재질의 연결부 보강 스트립(34)을 부착하여 패널간 이음부를 보강한다(도 3 참조). On the other hand, when a plurality of precast bottom plate panels 6 are sequentially installed to form a bottom plate in this way, by attaching a joint reinforcing strip 34 of the same material as the composite precast bottom plate panel on the joint between the panels Reinforce the interpanel seam (see Figure 3).

위와 같이 프리캐스트 바닥판 패널(6)을 설치하게 되면, 도 6a 또는 도 6b와 관련하여 설명한 방호벽 구조 및 방법을 통하여 프리캐스트 바닥판 패널(6)의 양단부에 방호벽을 설치한다. 프리캐스트 바닥판 패널(6)의 상부에는 아스팔트 포장층과의 부착개선을 위해 규사와 수지재료로 구성된 부착개선층(32)을 형성하고, 그 위로 아스팔트 포장(25)을 포설하여 바닥판의 시공을 완료한다. When the precast bottom plate panel 6 is installed as described above, the barrier walls are installed at both ends of the precast bottom plate panel 6 through the barrier structure and method described with reference to FIG. 6A or 6B. On the upper part of the precast slab panel 6, an adhesion improving layer 32 composed of silica sand and a resin material is formed to improve adhesion with the asphalt pavement layer, and the asphalt pavement 25 is laid thereon to construct the bottom plate. To complete.

이상에서 살펴본 바와 같이, 본 발명은 제형 단면형상으로 구성된 유리섬유 복합소재 바닥판 튜브를 상호 연결하여 제작한 프리캐스트 바닥판 패널을 이용하여 교량의 바닥판을 건설하는 방법에 관한 것으로서, 종래의 현장타설 철근 콘크리트 교량 바닥판 공법으로 대체하여 노후교량의 성능개선과 신설 교량의 바닥판 설치 및 가설교량의 바닥판 설치에 사용될 수 있다.As described above, the present invention relates to a method for constructing a bridge bottom plate using a precast slab panel manufactured by interconnecting a glass fiber composite bottom plate tube having a cross-sectional shape of a formulation, and a conventional site. It can be used to improve the performance of old bridges, to install new bridges, and to install temporary bridges.

본 발명의 제형 중공단면의 유리섬유 복합소재 프리캐스트 바닥판 패널을 이용한 거더 교량의 바닥판 시공방법은 내부식, 고내구성 특성을 보유한 유리섬유 복합소재 재질의 바닥판 패널을 사용하여 종래의 바닥판 재료인 철근 콘크리트의 콘크리트 열화 및 철근 부식과 같은 내구성 및 구조안전성 측면의 문제를 근원적으로 해결할 수 있어 교량 바닥판의 내구수명을 종래 철근 콘크리트 바닥판 공법 보다 2∼3배 이상 연장할 수 있다. 또한, 고내구성 특성으로 공용중 유지관리비 지출을 최소화할 수 있으므로 전체 교량의 생애주기비용(Life Cycle Cost)을 고려할 때 종래 철근 콘크리트 바닥판에 비해 현격한 유지관리비의 절감효과를 기대할 수 있다. The bottom plate construction method of the girder bridge using the glass fiber composite material precast deck panel of the hollow section of the formulation of the present invention is a conventional bottom plate using a bottom plate panel of glass fiber composite material having corrosion resistance and high durability characteristics. It can fundamentally solve the problems of durability and structural safety aspects such as concrete deterioration and reinforcement corrosion of the reinforced concrete material, which can extend the durability life of bridge deck two to three times or more than the conventional reinforced concrete deck method. In addition, due to the high durability, the maintenance cost can be minimized during public use, so when considering the life cycle cost of the entire bridge can be expected to significantly reduce the maintenance cost compared to the conventional reinforced concrete deck.

본 발명의 제형 중공단면의 유리섬유 복합소재 프리캐스트 바닥판 패널을 이용한 교량 바닥판 시공방법을 이용하여 기존 콘크리트 바닥판 교량을 성능개선하는 경우에는 기존 철근 콘크리트 바닥판을 철거하고 공장제작된 프리캐스트 바닥판 패널을 현장에 조립 설치하면 되므로, 이 경우 콘크리트 바닥판의 사하중이 경량 복합소재 바닥판의 사하중으로 대체되어 상부구조의 사하중을 80%이상 경감시킬 수 있으며, 사하중의 경감분 만큼 더 큰 차량하중을 통과시킬 수 있으므로 간단하게 기존 2등교 또는 3등교를 1등교로 성능개선하여 기존 교량의 승급이 가능하게 되며, 교량 신설시에도 거더와 하부구조를 경제적으로 건설할 수 있다. In the case of improving the performance of the existing concrete slab bridge using the bridge deck construction method using the glass fiber composite precast slab panel of the hollow cross-section of the formulation of the present invention, the precast prefabricated panel is demolished by removing the existing reinforced concrete slab. Since the floor panel panels can be assembled and installed on site, in this case, the dead weight of the concrete slab is replaced by the dead weight of the lightweight composite floor plate, which can reduce the dead weight of the superstructure by more than 80%, and the vehicle load is larger than the reduced weight of the dead weight. As it can pass through, the existing 2nd or 3rd bridge can be upgraded to the 1st bridge to upgrade the existing bridge, and even when the bridge is newly constructed, the girder and the substructure can be economically constructed.

본 발명의 제형 중공단면의 유리섬유 강화 복합소재 프리캐스트 바닥판 패널을 이용한 거더 교량의 바닥판 시공방법에 의하면, 공장제작된 프리캐스트 바닥판 패널을 현장에서 조립 설치하므로 종래 철근 콘크리트 바닥판 공법의 1/4수준에 달하는 공기로 신속시공이 가능하여 공사의 장기화로 인해 발행하는 교통통제 및 시민불편의 사회간접비용을 절감할 수 있게 된다.According to the construction method of the bottom plate of the girder bridge using the glass fiber reinforced composite material precast deck plate panel of the hollow section of the present invention, the prefabricated deck panel panel manufactured in the field is assembled and installed in the field of the conventional reinforced concrete deck plate method The construction can be done quickly with the air of 1/4 level, which can reduce the traffic control and social overhead costs issued due to the prolonged construction.

이상에서는 본 발명에 따른 실시예를 기준으로 본 발명의 구성과 특징을 설명하였으나, 본 발명은 이에 한정되지 아니하며 본 발명의 기술적 사상에 따라 자유로운 변경이 가능하다.In the above described the configuration and features of the present invention based on the embodiment according to the present invention, the present invention is not limited to this and can be changed freely according to the technical idea of the present invention.

Claims (6)

삭제delete 상부판, 하부판 및 복부판으로 구성된 사다리꼴 단면을 가진 튜브 형태의 유리섬유 복합소재 바닥판 튜브(1)를, 상기 복부판 사이에 형성되는 사다리꼴 단면의 중공이 교량 거더(10)의 종방향에 수직하도록 상호 연결하여 판형구조의 프리캐스트 바닥판 패널(6)을 제작하고; The glass-fiber composite bottom plate tube 1 having a trapezoidal cross-section consisting of an upper plate, a lower plate and an abdominal plate is formed so that the hollow of the trapezoidal cross section formed between the abdominal plates is perpendicular to the longitudinal direction of the bridge girder 10. Connect to produce a plate-shaped precast deck panel 6; 사전 제작된 상기 프리캐스트 바닥판 패널(6)을 현장으로 이송하여 거더(10) 위에 거치하여 순차적으로 연결 접합하므로써 교량 전체의 바닥판을 형성하며; Transfer the prefabricated slab panel (6) to the site and mount it on the girder (10) to sequentially connect and join to form the slab of the entire bridge; 상기 프리캐스트 바닥판 패널(6)에는 전단연결재(31)가 삽입되어 위치하게 되는 공간으로서, 상기 바닥판 튜브(1)의 중공 내측에 설치된 폼댐(50)에 의하여 전단포켓을 형성하고; A shear pocket is formed in the precast bottom panel panel 6 by a foam dam 50 installed inside the hollow of the bottom panel tube 1 as a shear connector 31; 상기 프리캐스트 바닥판(6)이 거더(10)에 거치된 상태에서, 상기 전단포켓이 형성되는 위치의 프리캐스트 바닥판 패널(6)에 형성된 홀(35)을 통하여 전단연결재(31)가 상기 전단포켓 내로 삽입되어 상기 전단연결재(31)가 상기 전단포켓 내에 위치하도록 상기 전단연결재(31)를 거더(10)의 상면에 일체로 설치하고; In the state where the precast bottom plate 6 is mounted on the girder 10, the shear connector 31 is connected to the shear connector 31 through the hole 35 formed in the precast bottom plate panel 6 at the position where the front pocket is formed. Inserting the shear connector (31) integrally on the upper surface of the girder (10) so that the shear connector (31) is inserted into the shear pocket and positioned in the shear pocket; 상기 전단포켓 내에 전단연결재(31)가 위치한 상태에서 상기 전단포켓에 충진재를 충진하여 양생시키므로써 거더(10)와 프리캐스트 바닥판 패널(6)이 일체로 연결되도록 하는 것을 특징으로 하는 제형 중공단면의 유리 섬유 강화 복합소재 프리캐스트 바닥판 패널을 이용한 교량 바닥판 시공방법. Formulation hollow section, characterized in that the girder 10 and the precast bottom plate panel 6 is integrally connected by filling and curing the filler in the shear pocket in a state that the shear connector 31 is located in the shear pocket. Method of Construction of Bridge Deck Using Glass Fiber Reinforced Composite Precast Deck Panel 삭제delete 삭제delete 제2항에 있어서, The method of claim 2, 콘크리트 방호벽(20)이 설치되는 부분의 프리캐스트 바닥판 패널(6)에는 철근설치 및 충진재 충진용 홀을 형성하고; A precast deck panel 6 at the portion where the concrete firewall 20 is installed is formed with holes for installing reinforcing bars and filling fillers; 콘크리트 방호벽(20)에 배근되는 연결 철근(41)의 하단부를 상기 홀을 통하여 프리캐스트 바닥판 패널(6) 내부에 배근하며; A lower end portion of the connecting reinforcing bar 41 arranged in the concrete firewall 20 is disposed inside the precast deck panel 6 through the hole; 거더(10)의 전단연결재(31)도 상기 프리캐스트 바닥판 패널(6)의 내부에 위치하고; The shear connector 31 of the girder 10 is also located inside the precast deck panel 6; 상기 홀을 통하여 충진재(33)를 프리캐스트 바닥판 패널(6)의 내부에 주입하여 양생시키며; The filler 33 is injected into the precast bottom panel 6 to cure through the hole; 상기 홀의 상부에 방호벽용 철근(40)을 배근하고 거푸집을 설치한 뒤 콘크리트를 타설 양생하여 콘크리트 방호벽(20)을 설치하는 단계를 더 포함하는 것을 특징으로 하는 제형 중공단면의 유리 섬유 강화 복합소재 프리캐스트 바닥판 패널을 이용한 교량 바닥판 시공방법. The glass fiber reinforced composite material free of the formulation hollow cross section, characterized in that it further comprises the step of installing the concrete protection wall 20 by placing the concrete after installing the formwork after laying the reinforcing bar 40 for the upper part of the hole. Bridge deck construction method using cast deck panel. 제2항에 있어서, The method of claim 2, 교량 방호벽의 연석(65)이 설치되는 부분의 프리캐스트 바닥판 패널(6)에는 철근설치 및 충진재 충진용 홀을 형성하고; A precast deck panel 6 in the portion where the curb 65 of the bridge barrier is installed is formed with holes for reinforcing rods and filling of fillers; 방호벽의 연석(65)에 배근되는 연결 철근(41)의 하단부를 상기 홀을 통하여 프리캐스트 바닥판 패널(6) 내부에 배근하며; A lower end portion of the connecting reinforcing bar 41 which is placed on the curb 65 of the security barrier is placed inside the precast bottom panel 6 through the hole; 거더(10)의 전단연결재(31)도 상기 프리캐스트 바닥판 패널(6)의 내부에 위치하고; The shear connector 31 of the girder 10 is also located inside the precast deck panel 6; 강재 방호벽(60)을 체결할 수 있는 앵커 볼트(61)를 설치하며; An anchor bolt 61 for fastening the steel barrier 60; 상기 홀을 통하여 상기 프리캐스트 바닥판 패널(6)의 내에 충진재(33)를 주입하여 양생시키고; Injecting and filling filler 33 into the precast bottom panel 6 through the holes; 상기 홀의 상부에 연석(65)의 시공을 위한 거푸집을 설치한 뒤 콘크리트를 타설 양생하여 콘크리트 연석(65)을 완성하고; After installing the formwork for the construction of the curb (65) in the upper part of the hole to pour concrete to complete the concrete curb (65); 상기 콘크리트 연석(65) 상면 밖으로 노출된 앵커 볼트(61)에 사전 제작된 방호벽(60)을 체결하여 조립하므로써 강재 방호벽을 시공하는 단계를 더 포함하는 것을 특징으로 하는 제형 중공단면의 유리 섬유 강화 복합소재 프리캐스트 바닥판 패널을 이용한 교량 바닥판 시공방법. The glass fiber reinforced composite of the hollow fiber cross-section of the formulation further comprises the step of constructing a steel barrier by fastening and assembling the prefabricated protective barrier 60 to the anchor bolt 61 exposed outside the upper surface of the concrete curbstone 65. Construction method of bridge deck using precast deck panel.
KR1020030037663A 2003-06-11 2003-06-11 Installation Method of Deck for Girder Bridges Using Precast Panel of Trapezoidal Hollow Section Made with Glass Fiber Reinforced Composites KR100563718B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020030037663A KR100563718B1 (en) 2003-06-11 2003-06-11 Installation Method of Deck for Girder Bridges Using Precast Panel of Trapezoidal Hollow Section Made with Glass Fiber Reinforced Composites

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020030037663A KR100563718B1 (en) 2003-06-11 2003-06-11 Installation Method of Deck for Girder Bridges Using Precast Panel of Trapezoidal Hollow Section Made with Glass Fiber Reinforced Composites

Publications (2)

Publication Number Publication Date
KR20040106813A KR20040106813A (en) 2004-12-18
KR100563718B1 true KR100563718B1 (en) 2006-03-28

Family

ID=37381130

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020030037663A KR100563718B1 (en) 2003-06-11 2003-06-11 Installation Method of Deck for Girder Bridges Using Precast Panel of Trapezoidal Hollow Section Made with Glass Fiber Reinforced Composites

Country Status (1)

Country Link
KR (1) KR100563718B1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100735735B1 (en) 2006-06-27 2007-07-06 한국건설기술연구원 Connection structure of precast concrete composite frp deck units and precast concrete composite frp deck having such connection structure
KR101118029B1 (en) 2010-02-22 2012-03-05 주식회사 국민씨아이 Fiber Reinforced Composite Tubular Unit and Bridge Deck Assembled with Tubular Unit
KR101384447B1 (en) * 2012-05-14 2014-04-10 주식회사 보성알앤디 Gangway

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101389704B1 (en) * 2013-07-25 2014-04-28 김근택 Precast concrete panel for pavement and its construction method
CN105401514B (en) * 2015-10-20 2017-02-01 同济大学 Upper portion structure of prefabricated trapezoidal three-support hollow board beam bridge
KR101704302B1 (en) 2015-12-10 2017-02-08 현대자동차주식회사 Reinforcement member

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100735735B1 (en) 2006-06-27 2007-07-06 한국건설기술연구원 Connection structure of precast concrete composite frp deck units and precast concrete composite frp deck having such connection structure
KR101118029B1 (en) 2010-02-22 2012-03-05 주식회사 국민씨아이 Fiber Reinforced Composite Tubular Unit and Bridge Deck Assembled with Tubular Unit
KR101384447B1 (en) * 2012-05-14 2014-04-10 주식회사 보성알앤디 Gangway

Also Published As

Publication number Publication date
KR20040106813A (en) 2004-12-18

Similar Documents

Publication Publication Date Title
KR100604251B1 (en) Fiber Reinforced Composite Bridge Deck of Tubular Profile?Having Snap-fit Connection
KR102009134B1 (en) Construction Method of Long Span Girder Bridge
UA75609C2 (en) Panel of bridge deck and method to make the panel (versions)
CN104594190B (en) A kind of bridge seamless process stretching device and construction method thereof
CN203475598U (en) Shock-proof prefabricated building of steel bar truss shearing wall composite structure
CN104594191A (en) Corrugated steel plate built-in seamless expansion device between girder and bridge abutment and construction method of seamless expansion device
CN104762873B (en) A kind of Abutment implicit expression retractor device and construction method thereof
KR100938395B1 (en) The Construction Method of Underpass using Steel-Concrete Composite Wall Pile
KR100483083B1 (en) Composite Deck having Frame and Concrete
CN112900255A (en) Novel bridge deck continuous seam crossing plate structure and construction method thereof
KR100603901B1 (en) Girder bridge construction make use of a part existing girder and that execution method
JP5273556B2 (en) Widening structure of road bridge and widening method of road bridge
CN110396919B (en) Assembled steel structure-concrete combined bridge and construction method thereof
KR100563718B1 (en) Installation Method of Deck for Girder Bridges Using Precast Panel of Trapezoidal Hollow Section Made with Glass Fiber Reinforced Composites
JPH09268888A (en) Tunnel lining method using composite panel
KR100650411B1 (en) Tunnel cover plate
KR200417221Y1 (en) Precast Arch Panel having Corrugated Multi Plate
KR20040105446A (en) Structures and Methods for Connection between Precast Decks and Prestressed Concrete Girders
KR100690395B1 (en) Continuous Beam Construction Method of Prestressed Concrete Beam
KR102463606B1 (en) girder-slab integrated composite footpath bridge
RU2369680C1 (en) Track plate for making roads of rail vehicles (versions) and method of its manufacturing (versions)
JP3835256B2 (en) Composite floor slab construction method and floor slab panel used in the construction method
JP7306053B2 (en) Joint structure of precast floor slab and construction method of joint
KR20040001642A (en) Lining building method for tunnel
JP2006112086A (en) Structure of bridge and method for rebuilding bridge

Legal Events

Date Code Title Description
A201 Request for examination
N231 Notification of change of applicant
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20130220

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20140306

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20150310

Year of fee payment: 10

FPAY Annual fee payment

Payment date: 20160307

Year of fee payment: 11

FPAY Annual fee payment

Payment date: 20170309

Year of fee payment: 12

FPAY Annual fee payment

Payment date: 20180307

Year of fee payment: 13

FPAY Annual fee payment

Payment date: 20190109

Year of fee payment: 14

FPAY Annual fee payment

Payment date: 20190226

Year of fee payment: 15