KR100536825B1 - Construction and dismantle method of soundproofed wall apparatus for construction - Google Patents

Construction and dismantle method of soundproofed wall apparatus for construction Download PDF

Info

Publication number
KR100536825B1
KR100536825B1 KR1020050097756A KR20050097756A KR100536825B1 KR 100536825 B1 KR100536825 B1 KR 100536825B1 KR 1020050097756 A KR1020050097756 A KR 1020050097756A KR 20050097756 A KR20050097756 A KR 20050097756A KR 100536825 B1 KR100536825 B1 KR 100536825B1
Authority
KR
South Korea
Prior art keywords
outer panel
steel pipe
clamp
scaffold
panel
Prior art date
Application number
KR1020050097756A
Other languages
Korean (ko)
Inventor
이상우
Original Assignee
주식회사 누리플랜
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 누리플랜 filed Critical 주식회사 누리플랜
Priority to KR1020050097756A priority Critical patent/KR100536825B1/en
Application granted granted Critical
Publication of KR100536825B1 publication Critical patent/KR100536825B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/32Safety or protective measures for persons during the construction of buildings

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

본 발명은 가설방음벽의 설치 및 해체방법에 관한 것으로서, 비계(10)를 설치하는 단계; 상기 비계(10)에 양단을 결속시키면서 복수개의 외측판넬(20)을 연속적으로 설치하는 단계; 상기 외측판넬(20)의 결속부위 상·하부에 끼움구(70)를 끼우는 단계; 상기 단계가 완료되면 상기 비계(10)의 수평강관(14) 후방에 클램프(100)를 배치하는 단계; 상기 클램프(100)의 상기 제1걸림부(126a)를 상기 외측판넬(20)의 돌출부(24) 일측 전방에 걸어놓는 단계; 상기 클램프(100)의 제2걸림부(126b)가 상기 외측판넬(20)의 돌출부(24) 측면에 위치하도록 상기 클램프(100)를 1차 가압하는 단계; 상기 제2걸림부(126b)가 상기 돌출부(24)의 전방에 걸리면서 상기 외측판넬(20)의 상기 돌출부(24)를 파지하도록 상기 클램프(100)를 2차 가압하는 단계 및; 상기 클램프(100)에 체결부재(130)를 체결하여 상기 비계(10)의 상기 수평강관(14)을 가압하는 단계;를 포함하는 설치방법 및 이 설치방법의 역순으로 구성된 해체방법을 제공하며, 복수개의 상기 외측판넬(20)이 서로 결속되면서 연속적으로 설치됨에 따라 종래의 찬넬과 같은 부속부품 및 부속부품의 설치과정을 생략할 수 있으므로 가설방음벽의 시공시간 및 시공비용을 절감할 수 있다.The present invention relates to a method of installing and dismantling a temporary soundproof wall, comprising: installing a scaffold 10; Continuously installing a plurality of outer panels 20 while binding both ends to the scaffold 10; Inserting fitting holes (70) into upper and lower binding portions of the outer panel (20); Placing a clamp (100) behind the horizontal steel pipe (14) of the scaffold (10) when the step is completed; Hanging the first catching portion (126a) of the clamp (100) in front of one side of the protrusion (24) of the outer panel (20); First pressing the clamp (100) such that the second catching portion (126b) of the clamp (100) is located at the side of the protrusion (24) of the outer panel (20); Second pressing the clamp (100) so that the second catching portion (126b) is caught in front of the protrusion (24) and grips the protrusion (24) of the outer panel (20); Compressing the fastening member 130 to the clamp 100 to press the horizontal steel pipe 14 of the scaffold 10; provides an installation method comprising a reverse method of the installation method and the installation method, As the plurality of outer panels 20 are continuously attached to each other, the installation process of the accessory parts and the accessory parts, such as a conventional channel, can be omitted, thereby reducing the construction time and construction cost of the temporary soundproof wall.

Description

가설방음벽의 설치 및 해체방법 { CONSTRUCTION AND DISMANTLE METHOD OF SOUNDPROOFED WALL APPARATUS FOR CONSTRUCTION }Installation and Dismantling of Temporary Soundproof Walls {CONSTRUCTION AND DISMANTLE METHOD OF SOUNDPROOFED WALL APPARATUS FOR CONSTRUCTION}

본 발명은 가설방음벽의 설치 및 해체방법에 관한 것으로서, 새로운 구조의 방음벽체 및 클램프로 구성된 가설방음벽에 적용되는 가설방음벽의 설치 및 해체방법에 관한 것이다. The present invention relates to a method of installing and dismantling a temporary soundproof wall, and more particularly, to a method of installing and dismantling a temporary soundproof wall applied to a temporary soundproof wall composed of a new soundproof wall body and a clamp.

일반적으로 공사장에는 내부를 차폐하면서 소음을 차단하도록 주변을 따라 담장형태의 가설방음벽이 설치된다.In general, a construction-type temporary soundproof wall is installed along the periphery to block the noise while shielding the interior.

이와 같은 가설방음벽의 일 예로는 대한민국의 실용신안등록 제275007호(이하 "종래기술"이라 함)가 있으며, 이러한 종래기술은 도 1에 도시된 바와 같이 기초강관(A)에 고정된 경사강관(16)에 지지되는 수직 및 수평강관(12, 14)으로 이루어진 비계(10)와; 상기 비계(10)의 상기 수평강관(14) 전방에 등간격으로 고정되는 복수개의 H빔 형태 찬넬(18) 및; 상기 찬넬(18)의 측방에 끼워지는 복수개의 방음벽체(19);로 구성된다.An example of such a temporary soundproofing wall is the Republic of Korea Utility Model Registration No. 275007 (hereinafter referred to as "prior art"), such a prior art is inclined steel pipe fixed to the base steel pipe (A) as shown in FIG. A scaffold 10 composed of vertical and horizontal steel pipes 12 and 14 supported by 16; A plurality of H-beam type channels 18 fixed at equal intervals in front of the horizontal steel pipe 14 of the scaffold 10; And a plurality of sound insulating walls 19 fitted to the side of the channel 18.

이때, 상기 비계(10)의 상기 강관(12, 14, 16) 및 상기 기초강관(A)은 서로 일체를 이루도록 도시된 바와 같은 더블커플러(1)에 의해 서로 결속된다.At this time, the steel pipes (12, 14, 16) and the base steel pipe (A) of the scaffold 10 is bound to each other by a double coupler (1) as shown to be integral with each other.

또, 상기 비계(10)의 상기 수평강관(14) 및 상기 찬넬(18)은 서로 연결됨과 동시에 고정되도록 도 2에 도시된 바와 같은 클램프(2)의 강관홀더(2a) 및 찬넬홀더(2b)에 제각기 구속된다.In addition, the steel pipe holder 2a and the channel holder 2b of the clamp 2 as shown in FIG. 2 so that the horizontal steel pipe 14 and the channel 18 of the scaffold 10 are connected to each other and fixed at the same time. Are bound to each.

이때, 상기 클램프(2)의 상기 강관홀더(2a)는 도시된 바와 같은 회전축(A)을 중심으로 양쪽으로 벌어진 후 상기 수평강관(14)을 도시된 바와 같이 원통형으로 감싼 다음 동일체로 힌지고정된 볼트(B) 및 상기 볼트(B)에 체결되는 플랜지너트(N)에 의해 상기 수평강관(14)을 구속한다.At this time, the steel pipe holder (2a) of the clamp (2a) is opened to both sides around the axis of rotation (A) as shown, then wrapped the horizontal steel pipe (14) as shown in the cylindrical and then hinged and fixed The horizontal steel pipe 14 is restrained by a bolt B and a flange nut N fastened to the bolt B.

또, 상기 찬넬홀더(2b)는 도시된 바와 같이 '∪'자 형으로 절곡되어 상기 찬넬(18)의 후방 양측에 양단이 걸리면서 상기 찬넬(18)을 구속한다.In addition, the channel holder 2b is bent into a '∪' shape as shown in order to restrain the channel 18 while being caught at both ends of the rear side of the channel 18.

이와 같은 종래기술에 의한 가설방음벽의 설치방법은 다음과 같다.The installation method of the temporary soundproof wall according to the prior art is as follows.

우선, 상기 클램프(2)가 상기 찬넬(18)에 연결되도록 도 2에 도시된 바와 같이 상기 찬넬(18)의 후방에 상기 클램프(2)의 상기 찬넬홀더(2b)를 끼운다.First, the channel holder 2b of the clamp 2 is inserted behind the channel 18 so that the clamp 2 is connected to the channel 18.

또, 상기 찬넬홀더(2b)가 끼워진 상기 찬넬(18)이 상기 비계(10)의 전방에 세워지도록 상기 찬넬(18)을 세워서 상기 비계(10)의 상기 수평강관(14) 전방에 등간격으로 배치한다.Further, the channel 18 is erected so that the channel 18 into which the channel holder 2b is fitted is erected in front of the scaffold 10 and at equal intervals in front of the horizontal steel pipe 14 of the scaffold 10. To place.

또한, 세워진 상기 찬넬(18)이 상기 수평강관(14)에 고정되도록 상기 클램프(2)의 상기 강관홀더(2a)를 상기 회전축(A)을 중심으로 벌려서 상기 수평강관(14)을 도 2에 도시된 바와 같이 감싼다.Further, the horizontal steel pipe 14 is opened in FIG. 2 by opening the steel pipe holder 2a of the clamp 2 about the rotation axis A so that the standing channel 18 is fixed to the horizontal steel pipe 14. Wrap as shown.

또, 상기 강관홀더(2a)가 상기 수평강관(14)에 고정되도록 상기 너트(N)를 상기 볼트(B)에 체결하여 상기 수평강관(14)에 상기 찬넬(18)을 동일체로 연결한다.In addition, the nut (N) is fastened to the bolt (B) so that the steel pipe holder (2a) is fixed to the horizontal steel pipe (14) to connect the channel 18 to the horizontal steel pipe (14).

또한, 상기 찬넬(18)에 상기 방음벽체(19)가 고정되도록 도 1에 도시된 바와 같이 상기 찬넬(18)의 측방에 형성된 삽입홈에 육면체로 이루어진 판상의 상기 방음벽체(19)를 삽입하여 가설방음벽의 설치를 완료한다.In addition, by inserting the plate-shaped sound barrier wall 19 made of a hexahedron into the insertion groove formed on the side of the channel 18, as shown in Figure 1 so that the sound barrier wall 19 is fixed to the channel 18. Complete the installation of temporary soundproof walls.

이와 같이 설치된 가설방음벽은 전술한 설치방법의 역순으로 해체된다.The temporary soundproof walls installed in this way are dismantled in the reverse order of the above-described installation method.

그러나, 이러한 종래기술에 의한 가설방음벽은 전술한 바와 같은 상기 찬넬(18) 및 상기 클램프(2)에 의해 가설되므로 설치 및 해체가 매우 까다로울 뿐만 아니라 설치 및 해체과정이 매우 복잡하여 설치 및 해체를 위한 비용 및 시간이 과도하게 소요되는 문제가 있다.However, since the temporary soundproof walls according to the prior art are installed by the channel 18 and the clamp 2 as described above, installation and dismantling are very difficult, and the installation and dismantling process is very complicated. There is a problem of excessive cost and time.

특히, 상기 방음벽체(19)를 고정하기 위해 상기 찬넬(18)을 반드시 이용하여야하므로 설치비용이 가중될 뿐만 아니라 상기 찬넬(18)을 상기 방음벽체(19)의 폭에 상응하는 간격으로 이격시켜서 설치하여야 하므로 설치가 매우 까다로워 설치시간 및 시공비용이 과도하게 소요된다.In particular, since the channel 18 must be used to fix the sound insulation wall 19, the installation cost is increased, and the channel 18 is spaced apart at intervals corresponding to the width of the sound insulation wall 19. Since installation is very demanding, installation time and construction cost are excessive.

또, 상기 클램프(2)를 벌려서 상기 비계(10)의 상기 수평강관(14)을 감싼 후 상기 볼트(B) 및 상기 너트(N)를 체결해야 하므로 상기 클램프(2)의 설치 및 해체시간도 과도하게 소요된다.In addition, since the bolt (B) and the nut (N) should be fastened after wrapping the horizontal steel pipe (14) of the scaffold (10) by opening the clamp (2), the installation and dismantling time of the clamp (2) It takes excessively.

본 발명은 상기와 같은 종래의 문제를 해결하기 위하여 창출한 것으로서, 종래의 찬넬을 생략할 수 있는 구조로 형성된 방음벽체 및 클램프를 이용하여 가설방음벽을 설치 및 해체함으로써 종래의 찬넬을 이용하지 않고도 가설방음벽을 단시간에 용이하게 설치 및 해체할 수 있는 가설방음벽의 설치 및 해체방법을 제공하기 위함이 그 목적이다.The present invention was created in order to solve the above-mentioned conventional problems, by installing and dismantling a temporary soundproof wall using a soundproof wall and a clamp formed in a structure that can omit the conventional channel, without using a conventional channel. The object of the present invention is to provide a method of installing and dismantling a temporary soundproof wall that can be easily installed and dismantled in a short time.

이와 같은 본 발명에 의한 가설방음벽의 설치방법은, 수직 및 수평강관과 경사강관과 기초강관으로 이루어진 비계와; 상기 비계에 지지되는 복수개의 방음벽체 및; 상기 방음벽체를 상기 비계에 고정시키는 클램프;를 포함하는 가설방음벽의 설치방법에 있어서, 상기 비계가 지상에 세워지도록 연결부재를 이용하여 상기 수직 및 수평강관과 상기 경사강관을 격자형태로 직립가능하게 조립하면서 지반에 박힌 기초강관에 고정하는 비계설치단계; 상기 비계에 상기 방음벽체의 외측판넬들이 서로 결속되면서 세워지도록 상기 외측판넬의 암형 및 수형 도킹부를 결합하면서 직렬로 연속설치하는 외측판넬 설치단계; 상기 외측판넬이 직렬로 연속설치되면 서로 결속된 상기 외측판넬의 양단이 결속된 상태를 유지하도록 상기 외측판넬의 상기 도킹부 양측을 파지하는 끼움구를 상기 도킹부의 상·하단에 끼우는 끼움구 끼움단계; 상기 끼움구의 끼움이 완료되면 상기 외측판넬이 상기 클램프에 의해 상기 비계의 수평강관에 고정되도록 서로 결합된 한쌍의 상기 외측판넬 사이에 위치한 상기 수평강관의 후방에 상기 클램프를 위치시키는 클램프 배치단계; 상기 클램프가 배치되면 상기 외측판넬의 배면에 형성된 일측의 상기 돌출부에 상기 클램프의 판넬홀더의 제1걸림부가 걸리도록 상기 외측판넬의 배면에 형성된 공간부에 상기 제1걸림부를 삽입하여 상기 돌출부의 전방에 걸어놓는 제1걸림부 걸림단계; 상기 제1걸림부와 대향하는 상기 판넬홀더의 제2걸림부가 탄성변형하는 상기 판넬홀더의 상기 탄성부에 의해 벌어지면서 상기 돌출부의 후방측 모서리를 지나서 상기 돌출부의 측면에 위치하도록 상기 클램프의 강관홀더를 1차적으로 가압하여 상기 탄성부에 외력을 부여하는 1차 가압단계; 상기 강관홀더의 1차 가압이 완료되면 상기 돌출부의 측면에 위치하는 상기 제2걸림부가 상기 돌출부의 측면을 따라 슬라이딩해서 상기 돌출부의 전방에 걸리는 동시에 상기 강관홀더가 상기 비계의 상기 수평강관 후방을 감싸도록 상기 강관홀더를 2차적으로 가압하는 2차 가압단계 및; 상기 강관홀더의 2차가압이 완료되면 상기 외측판넬이 상기 비계의 상기 수평강관에 의해 압박되도록 상기 강관홀더의 체결공에 볼트와 같은 체결부재를 나사결합하면서 관통시키는 체결부재 체결단계;를 포함한다.Such a method of installing a temporary soundproof wall according to the present invention includes: a scaffold consisting of vertical and horizontal steel pipes, inclined steel pipes, and basic steel pipes; A plurality of soundproof walls supported on the scaffold; In the installation method of the temporary soundproof wall comprising a clamp for fixing the soundproof wall body to the scaffold, the vertical and horizontal steel pipe and the inclined steel pipe in a grid form by using a connecting member so that the scaffold is standing on the ground. A scaffolding installation step of fixing the foundation steel pipe embedded in the ground while assembling; An outer panel installation step of continuously installing in series while combining the female and male docking portions of the outer panel so that the outer panels of the soundproof wall are bound to each other on the scaffold; If the outer panel is installed in series, the fitting step of inserting the fitting holes for holding both sides of the docking portion of the outer panel to the upper and lower ends of the docking portion so that both ends of the outer panel which are bound to each other to remain bound. ; A clamp arrangement step of positioning the clamp behind the horizontal steel pipe positioned between the pair of outer panels coupled to each other such that the outer panel is fixed to the horizontal steel pipe of the scaffold by the clamp when the fitting of the fitting hole is completed; When the clamp is disposed, the first locking portion is inserted into a space formed on the rear surface of the outer panel so that the first locking portion of the panel holder of the clamp is caught by the protrusion formed on the rear surface of the outer panel so that the front of the protrusion is positioned. A first catching part hanging step to hang on; Steel clamp holder of the clamp such that the second catching portion of the panel holder facing the first catching portion is positioned by the elastic portion of the panel holder elastically deformed and positioned on the side of the protrusion beyond the rear side edge of the protrusion. Primary pressing step to impart an external force to the elastic portion by primarily pressing; When the primary pressing of the steel pipe holder is completed, the second locking portion located on the side of the protrusion slides along the side of the protrusion to be caught in front of the protrusion, and the steel pipe holder surrounds the rear of the horizontal steel pipe of the scaffold. A secondary pressurizing step of secondaryly pressing the steel pipe holder to be used; And a fastening member fastening step of screwing a fastening member such as a bolt through a fastening hole of the steel pipe holder such that the outer panel is pressed by the horizontal steel pipe of the scaffold when the secondary pressure of the steel pipe holder is completed. .

이와 같이 설치된 가설방음벽의 해체방법은, 상기 외측판넬에 대한 상기 비계의 상기 수평강관의 압박력이 해제되도록 상기 클램프의 상기 강관홀더에 형성된 상기 체결공으로부터 상기 체결부재를 분리하는 체결부재 분리단계; 상기 체결부재가 분리되면 상기 외측판넬에 가해지는 상기 클램프의 상기 판넬홀더의 파지력이 상실되도록 드라이버와 같은 공구를 이용하여 상기 외측판넬의 상기 돌출부 타측 전방에 걸린 상기 판넬홀더의 상기 제2걸림부를 이탈시켜서 걸림을 해제하는 제2걸림부 해제단계; 상기 제2걸림부가 이탈되면 상기 제2걸림부가 상기 돌출부의 측면을 슬라이딩하여 상기 외측판넬의 상기 돌출부 배면에 위치하도록 상기 클램프의 상기 강관홀더를 측방으로 가압하는 강관홀더 가압단계; 상기 강관홀더에 의해 상기 제2걸림부가 상기 돌출부 배면에 위치하면 상기클램프가 상기 외측판넬에서 완전히 분리되도록 상기 외측판넬의 상기 공간부를 통해 상기 제1걸림부를 제거하는 제1걸림부 제거단계; 상기 제1걸림부가 제거되면 상기 외측판넬의 분리가 가능하도록 상기 외측판넬의 상기 도킹부 상·하단에 끼워진 상기 끼움구를 제거하는 끼움구 제거단계; 상기 끼움구의 제거가 완료되면 상기 도킹부에 의한 상기 외측판넬의 결속력이 상실되도록 직결된 상기 외측판넬을 측방으로 슬라이딩시켜서 연속적으로 연결된 상기 외측판넬을 분리하는 외측판넬 분리단계 및; 상기 외측판넬이 분리되면 상기 연결부재에 의해 격자형태를 이루는 상기 비계의 상기 수직·수평강관 및 상기 경사강관을 분리하여 상기 기초강관과 함께 제거하는 비계 제거단계;를 포함한다.The dismantling method of the temporary soundproof wall installed as described above comprises: a fastening member separating step of separating the fastening member from the fastening hole formed in the steel pipe holder of the clamp such that the pressing force of the horizontal steel pipe of the scaffold against the outer panel is released; When the fastening member is separated, the second catching part of the panel holder caught on the other side front of the protruding portion of the outer panel by using a tool such as a driver so that the holding force of the panel holder of the clamp applied to the outer panel is lost. A second catching part releasing step to release the catch; A steel pipe holder pressurizing step of pressing the steel pipe holder of the clamp laterally such that the second locking part slides the side surface of the protrusion to be positioned on the rear surface of the protrusion of the outer panel when the second locking part is separated; A first catching part removing step of removing the first catching part through the space part of the outer panel so that the clamp is completely separated from the outer panel when the second catching part is positioned on the rear surface of the protrusion by the steel pipe holder; A fitting hole removing step of removing the fitting hole inserted into upper and lower ends of the docking part of the outer panel so that the outer panel can be separated when the first catching part is removed; An outer panel separating step of separating the continuously connected outer panel by sliding the outer panel directly connected to the side so that the binding force of the outer panel by the docking part is lost when the fitting hole is completed; And a scaffold removal step of separating the vertical and horizontal steel pipes and the inclined steel pipe of the scaffold having a lattice form by the connecting member and removing the outer panel together with the base steel pipe.

이와 같은 본 발명에 의한 가설방음벽의 설치 및 해제방법은, 외측판넬을 직결시키면서 설치하므로 종래의 찬넬 및 찬넬 설치과정의 생략이 가능하여 가설방음벽의 단가 및 시공비용을 동시에 절감할 수 있을 뿐만 아니라 가설방음벽의 설치 및 해체시간을 대폭적으로 단축시킬 수 있다.Since the installation and release method of the temporary soundproof wall according to the present invention is installed while the outer panel is directly connected, it is possible to omit the conventional channel and the channel installation process, thereby simultaneously reducing the unit cost and construction cost of the temporary soundproof wall. The installation and dismantling time of the sound barrier can be greatly shortened.

또, 클램프의 강관홀더가 비계의 수평강관 후방만을 감싸고, 클램프의 판넬홀더가 탄성력에 의해 외측판넬의 돌출부를 파지하므로 클램프의 설치 및 해체시간과 설치 및 해체에 따른 가설방음벽의 시공비용을 절감할 수도 있다.In addition, the steel pipe holder of the clamp only covers the rear of the horizontal steel pipe of the scaffold, and the panel holder of the clamp grips the protrusion of the outer panel by the elastic force, thereby reducing the installation and dismantling time of the clamp and the construction cost of the temporary soundproof wall according to the installation and dismantling. It may be.

또한, 클램프의 강관홀더가 판넬홀더의 상태에 따라 비계의 수평강관 후방을 감싸거나 감싼상태를 해제하므로 클램프의 설치 및 제거에 따른 가설방음벽의 소요시간 및 소요비용을 단축할 수도 있다.In addition, since the steel pipe holder of the clamp releases the state surrounding the horizontal steel pipe of the scaffold according to the state of the panel holder or release the wrapped state, it is possible to reduce the time required and cost of the temporary soundproof wall according to the installation and removal of the clamp.

이하, 첨부된 도면을 참조하여 본 발명의 실시예에 의한 가설방음벽의 설치 및 해체방법을 설명하면 다음과 같으며, 첨부된 도 3은 본 발명의 실시예에 의해 설치된 가설방음벽의 사시도이고, 도 4는 도 3에 도시된 가설방음벽의 분해사시도 이며, 도 5 내지 도 8은 도 3에 도시된 방음벽체용 클램프의 설치 및 해체과정을 단계적으로 도시한 평면도이다.Hereinafter, the installation and dismantling method of the temporary soundproofing wall according to an embodiment of the present invention with reference to the accompanying drawings as follows, the accompanying Figure 3 is a perspective view of the temporary soundproofing wall installed according to an embodiment of the present invention, Figure 4 is an exploded perspective view of the temporary soundproofing wall shown in FIG. 3, and FIGS. 5 to 8 are plan views illustrating the installation and dismantling process of the clamp for the soundproofing wall shown in FIG. 3.

도 3에 도시된 바와 같이 본 발명의 실시예에 의한 가설방법에 사용되는 가설방음벽은, 지반에 박힌 기초강관에 의해 지지되고, 수직 및 수평강관(12, 14)과 경사강관(16)으로 구성된 비계(10)와; 상기 비계(10)의 상기 수평강관(14) 전방에 직렬로 연속해서 세워지는 압출성형된 복수개의 플라스틱재 외측판넬(20) 및, 상기 외측판넬(20)의 배면에 순차적으로 밀착고정되는 방음부재(30)로 이루어진 방음벽체(SW) 및; 상기 방음벽체(SW)의 상기 외측판넬(20)을 상기 비계(10)의 수평강관(14)에 연결하여 고정하는 클램프(100);를 포함한다.As shown in FIG. 3, the temporary soundproof walls used in the temporary construction method according to the embodiment of the present invention are supported by basic steel pipes embedded in the ground, and are composed of vertical and horizontal steel pipes 12 and 14 and inclined steel pipes 16. Scaffold 10; The plurality of extruded plastic outer panels 20 standing in series in front of the horizontal steel pipe (14) of the scaffold (10), and the soundproof member is in close contact fixed to the back of the outer panel (20) sequentially Soundproof wall (SW) consisting of 30 and; And a clamp 100 that connects and fixes the outer panel 20 of the soundproof wall body SW to the horizontal steel pipe 14 of the scaffold 10.

이때, 상기 비계(10)의 상기 기초강관은 전술한 도 1에 도시된 기초강관(A)과 대동소이하므로 이후의 설명에 있어서 전술한 도 1을 참고하여 설명한다.At this time, the base steel pipe of the scaffold 10 is substantially the same as the base steel pipe (A) shown in FIG. 1 described above will be described with reference to FIG.

한편, 상기 방음벽체(SW)의 상기 외측판넬(20)은, 확대 도시된 바와 같이 양단 배면에 동일체로 형성되어 서로 결합되면서 양단부를 결속시키는 암형 및 수형 도킹부(22a, 22b)와, 상기 도킹부(22a, 22b)의 후단 측방에 동일체로 제각기 돌출형성된 한쌍의 돌출부(24) 및, 상기 돌출부(24)의 측방으로 소정간격 이격되어 공간부(G1)를 형성하면서 동일체로 돌출형성되고, 직교상태로 절곡된 단부를 서로 대향하면서 수용홈(G2)을 형성하는 절곡돌기(26)로 이루어진다.On the other hand, the outer panel 20 of the soundproof wall (SW) is formed on the back of both ends as shown in the same body coupled to each other while binding the two ends and the male docking portion (22a, 22b), and the docking A pair of protrusions 24 each protruded into the same body on the rear end side of the portions 22a and 22b, and spaced apart by a predetermined distance to the side of the protrusions 24 to form the space portion G1, protruding into the same body, orthogonally It consists of a bending protrusion 26 to form the receiving groove (G2) while facing the ends bent in the state.

또, 상기 외측판넬(20)은 자중이 감소되면서 소음을 감쇠시키도록 확대 도시된 바와 같이 중공(H)이 내부에 길이방향을 따라 형성된다.In addition, the outer panel 20 has a hollow (H) is formed along the longitudinal direction therein as shown enlarged to attenuate noise while reducing its own weight.

또한, 상기 외측판넬(20)은 도 4에 도시된 바와 같이 'ㄷ'자 형태로 절곡형성된 끼움구(40)에 의해 양단이 결속된 상태를 유지한다.In addition, the outer panel 20 maintains a state where both ends are bound by the fitting holes 40 bent in a 'c' shape as shown in FIG.

이와 같은 끼움구(40)는 도 4에 도시된 바와 같이 상기 외측판넬(20)의 상기 도킹부(22a, 22b) 상·하단에 억지끼움으로 끼워져서 상기 도킹부(22a, 22b)의 양측을 파지한다.As shown in FIG. 4, the fitting holes 40 are inserted into the upper and lower ends of the docking parts 22a and 22b of the outer panel 20 to cover both sides of the docking parts 22a and 22b. Gripping.

한편, 상기 방음벽체(SW)의 상기 방음부재(30)는 도 4에 분해 도시된 바와 같이 상기 외측판넬(20)의 상기 절곡돌기(26)가 형성한 수용홈(G2)에 삽입된 후 도 3에 도시된 바와 같이 상기 절곡돌기(26)의 절곡된 단부에 걸려서 상기 외측판넬(20)의 배면에 밀착된 상태로 고정된다.Meanwhile, the soundproof member 30 of the soundproof wall body SW is inserted into the receiving groove G2 formed by the bending protrusion 26 of the outer panel 20 as shown in FIG. 4. As shown in 3, the bent end of the bending protrusion 26 is caught and fixed to the rear surface of the outer panel 20.

이때, 상기 방음부재(30)는 도 4에 일부 절개된 바와 같이 소음을 흡음하는 흡음재(32) 및; 상기 흡음재(32)로 소음을 유입하는 소음유입공(34a)과, 횡방향으로 형성되어 소음을 반사하면서 횡방향강성을 보강하는 팽출돌기(34b)로 이루어진 흡음판(34);을 포함한다.At this time, the soundproof member 30 is a sound absorbing material 32 for absorbing noise as partially cut in Figure 4; And a sound absorbing plate 34 formed of a noise inflow hole 34a for introducing noise into the sound absorbing material 32 and a bulge protrusion 34b formed in the horizontal direction to reinforce the lateral rigidity while reflecting the noise.

이와 같은 상기 방음부재(30)는 도 3에 도시된 바와 같이 상기 외측판넬(20)의 상기 절곡돌기(26)를 관통하는 스크류와 같은 고정부재(F)에 의해 유동됨 없이 고정된다.As shown in FIG. 3, the soundproof member 30 is fixed without being moved by a fixing member F such as a screw passing through the bending protrusion 26 of the outer panel 20.

즉, 상기 고정부재(F)는 상기 방음부재(30)를 상기 외측판넬(20)에 견고히 고정시킨다.That is, the fixing member F firmly fixes the soundproof member 30 to the outer panel 20.

한편, 상기 클램프(100)는 도 3에 도시된 바와 같이 상기 외측판넬(20)의 상기 돌출부(24)를 파지하는 동시에 상기 외측판넬(20)을 상기 비계(10)의 상기 수평강관(14)에 고정하도록 구성된다.Meanwhile, as illustrated in FIG. 3, the clamp 100 grips the protrusion 24 of the outer panel 20 and simultaneously moves the outer panel 20 to the horizontal steel pipe 14 of the scaffold 10. Is configured to lock in.

이와 같은 상기 클램프(100)는 도 4에 확대 도시된 바와 같이 상기 비계(10)의 상기 수평강관(14) 후방을 감싸도록 형성된 강관수용부(110a)와, 상기 강관수용부(110a)의 상·하부에 직각으로 절곡형성된 절곡부(110b)로 이루어지고, 탄성변형이 방지되는 두께로 형성된 판상의 금속재 강관홀더(110) 및; 상기 강관홀더(110)와 일체를 이루면서 자체 탄성력으로 상기 외측판넬(20)의 상기 돌출부(24)를 파지하도록 탄성변형이 가능한 두께로 이루어진 절곡된 판상의 금속재 판넬홀더(120);를 포함한다.As shown in FIG. 4, the clamp 100 includes a steel pipe accommodating part 110a formed to surround the rear of the horizontal steel pipe 14 of the scaffold 10 and an image of the steel pipe accommodating part 110a. A plate-shaped steel pipe holder 110 formed of a bent portion 110b bent at a right angle to a lower portion and formed to a thickness to prevent elastic deformation; It includes a bent plate-shaped metal panel holder 120 made of a thickness that is elastically deformed so as to be integral with the steel pipe holder 110 and gripping the protrusion 24 of the outer panel 20 with its own elastic force.

이때, 상기 판넬홀더(120)는 도시된 바와 같이 길이에 비해 두께가 얇게 형성된 동시에 절곡형성됨에 따라 외력이 가해질 경우 탄성변형된다.At this time, the panel holder 120 is elastically deformed when an external force is applied as the thickness of the panel holder 120 is formed at the same time as the thickness is formed and bent at the same time.

즉, 상기 판넬홀더(120)는 탄성변형되는 판상의 탄성체이다.That is, the panel holder 120 is a plate-shaped elastic body that is elastically deformed.

이와 같은 상기 판넬홀더(120)는 도 5에 확대 도시된 바와 같이 상기 강관홀더(110)에 고정되도록 리벳(R)과 같은 고정수단에 의해 상기 강관홀더(110)의 상기 절곡부(110b)에 제각기 고정되는 판상의 고정부(122)와; 상기 고정부(122)의 양단에서 전방을 향해 직각으로 절곡되어 평행을 이루는 판상의 제1 및 제2사이드부(124a, 124b) 및; 상기 제1 및 제2사이드부(124a, 124b)의 양단에서 제각기 내향절곡되어 서로 대향하는 판상의 제1 및 제2걸림부(126a, 126b);로 이루어지며, 도시된 바와 같이 평면상 '∪'자형으로 형성된다.The panel holder 120 as described above is enlarged in FIG. 5 to the bent portion 110b of the steel pipe holder 110 by a fixing means such as a rivet R to be fixed to the steel pipe holder 110. Plate-like fixing parts 122 fixed to respective ones; Plate-shaped first and second side portions 124a and 124b that are bent at right angles toward the front at both ends of the fixing portion 122 and parallel to each other; The first and second catching portions 126a and 126b of the plate facing each other and bent inward at both ends of the first and second side portions 124a and 124b, respectively, and are formed as 'It is formed in a shape.

이때, 상기 고정부(122)는 도 5에 도시된 바와 같이 상기 외측판넬(20)의 상기 돌출부(24) 배면 폭(W1)에 대응하는 길이(L1)로 형성되어 후술되는 도 7에 도시된 바와 같이 상기 돌출부(24)의 배면을 감싼다.In this case, as shown in FIG. 5, the fixing part 122 is formed to have a length L1 corresponding to the back width W1 of the protruding portion 24 of the outer panel 20, as illustrated in FIG. 7. As described above, the back surface of the protrusion 24 is wrapped.

또, 상기 제1 및 제2사이드부(124a, 124b)는 도 5에 도시된 바와 같이 상기 돌출부(24)의 양측면 폭(W2)에 대응하는 길이(L2)로 형성되어 후술되는 도 7에 도시된 바와 같이 상기 돌출부(24)의 양측면을 감싼다.In addition, the first and second side parts 124a and 124b are formed in lengths L2 corresponding to both side widths W2 of the protrusions 24 as shown in FIG. As described above, both sides of the protrusion part 24 are wrapped.

또한, 상기 제1 및 제2걸림부(126a, 126b)는 도 5에 도시된 바와 같이 상기 돌출부(24)의 돌출된 전방 폭(W3)에 대응하는 길이(L3)로 절곡되어 후술되는 도 7에 도시된 바와 같이 상기 외측판넬(20)의 상기 돌출부(24) 전방에 제각기 걸려서 고정된다. In addition, the first and second locking portions 126a and 126b are bent to a length L3 corresponding to the protruding front width W3 of the protrusion 24, as shown in FIG. As shown in, the projections 24 of the outer panel 20 are fixed to each other in front.

즉, 상기 판넬홀더(120)는 도 7에 도시된 바와 같이 상기 고정부(122)와 상기 제1 및 제2사이드부(124a, 124b)와 상기 제1 및 제2걸림부(126a, 126b)에 의해 상기 돌출부(24)의 사방을 감싸는 상태로 상기 외측판넬(20)의 상기 돌출부(24)를 파지한다.That is, the panel holder 120 includes the fixing part 122, the first and second side parts 124a and 124b, and the first and second locking parts 126a and 126b as shown in FIG. 7. By holding the protrusions 24 of the outer panel 20 in a state surrounding all of the protrusions 24 by.

이때, 상기 판넬홀더(120)의 '∪'자형으로 절곡된 특성에 의해 발생되는 탄성력으로 상기 돌출부(24)를 파지한다.At this time, the projecting portion 24 is gripped by an elastic force generated by a characteristic of the panel holder 120 bent in a '∪' shape.

즉, 상기 판넬홀더(120)의 상기 제1 및 제2사이드부(124a, 124b)와 상기 제1 및 제2걸림부(126a, 126b)는 탄성력에 의해 상기 돌출부(12)의 측방을 가압하면서 파지한다.That is, the first and second side portions 124a and 124b and the first and second locking portions 126a and 126b of the panel holder 120 press the sides of the protrusion 12 by elastic force. Gripping.

한편, 상기 판넬홀더(120)의 상기 제1걸림부(126a)는 도 5에 도시된 바와 같이 상기 외측판넬(20)의 상기 돌출부(24) 전방에 곧바로 걸리도록 평면상 일직선으로 형성된다.On the other hand, the first locking portion 126a of the panel holder 120 is formed in a straight line in a plane so as to be immediately caught in front of the protrusion 24 of the outer panel 20.

또, 상기 판넬홀더(120)의 상기 제2걸림부(126b)는 후술되는 도 6에 도시된 바와 같이 상기 돌출부(24)의 측면을 따라 슬라이딩해서 도 7에 도시된 바와 같이 상기 돌출부(24)의 전방에 걸려서 탄성고정되도록 도 5에 도시된 바와 같이 굴곡지게 밴딩가공되어 후크형태로 형성된다.In addition, the second locking portion 126b of the panel holder 120 slides along the side surface of the protrusion 24 as shown in FIG. 6 to be described later, so that the protrusion 24 is shown in FIG. 7. It is bent to be bent as shown in Figure 5 so as to be elastically fixed to the front of the hook is formed.

즉, 상기 판넬홀더(120)의 상기 제1걸림부(126a)는 일직선으로 형성되어 상기 외측판넬(20)의 상기 돌출부(24) 전방에 곧바로 걸려서 고정되고, 상기 제2걸림부(126b)는 굴곡형성되어 상기 돌출부(24)의 측면을 슬라이딩한 후 상기 돌출부(24)의 전방에 걸려서 탄성고정된다.That is, the first catching portion 126a of the panel holder 120 is formed in a straight line to be fastened and fixed in front of the protruding portion 24 of the outer panel 20, and the second catching portion 126b is fixed. It is bent to slide the side of the protrusions 24 and is elastically fixed to the front of the protrusions 24.

이때, 상기 제2걸림부(126b)는 도 5에 도시된 바와 같이 평면상 '>' 모양으로 밴딩하여 구성할 수 있으며, 도시된 바와 달리 '⊃' 모양으로 밴딩하여 구성할 수도 있다.At this time, the second catching portion 126b may be configured by bending in a flat '>' shape as shown in FIG. 5, or may be configured by bending it in a '⊃' shape, as shown in FIG. 5.

이와 같은 상기 제2걸림부(126b)는 밴딩가공된 특성으로 인하여 탄성력이 발생함에 따라 상기 돌출부(24)에 전방에 탄성고정된다.The second locking portion 126b is elastically fixed to the front of the protrusion 24 as the elastic force is generated due to the bending processing characteristics.

즉, 상기 제2걸림부(126b)는 도 7에 도시된 바와 같이 상기 돌출부(24)의 전방에 걸리는 동시에 벌어지면서 상기 돌출부(24)의 전방 및 상기 외측판넬(20)의 배면 사이에 억지끼움으로 개재된다.That is, as shown in FIG. 7, the second catching portion 126b is caught between the front of the protrusion 24 and the gap between the front of the protrusion 24 and the rear surface of the outer panel 20 as it is opened. It is interposed.

한편, 상기 판넬홀더(120)의 상기 상기 고정부(122)는 도 5에 도시된 바와 같이 탄성력을 보강하도록 일직선으로 중앙에 형성된 일직선구간(S) 및; 상기 일직선구간(S)의 양측에 경사절곡된 한쌍의 경사구간(I);으로 구성하는 것이 바람직하다.On the other hand, the fixing portion 122 of the panel holder 120 is a straight section (S) formed in the center in a straight line to reinforce the elastic force as shown in Figure 5 and; It is preferable to constitute a pair of inclined section (I) inclined bent on both sides of the straight section (S).

즉, 상기 일직선구간(S)은 상기 경사구간(I)의 중간에 위치한다.That is, the straight section S is located in the middle of the inclined section I.

이와 같은 상기 경사구간(I)은 후술되는 도 6에 도시된 바와 같이 상기 제1 및 제2사이드부(124a, 124b)가 벌어질 경우 경사절곡된 특성에 의해 상기 제1 및 제2사이드부(124a, 124b)가 원형복원되도록 탄성력을 제공한다.As shown in FIG. 6 to be described later, the inclined section I may be inclined and bent when the first and second side portions 124a and 124b are opened. 124a and 124b provide an elastic force to restore the circle.

이때, 상기 경사구간(I)은 상기 제1 및 제2사이드부(124a, 124b)가 벌어질 경우 상기 일직선구간(S) 처럼 일직선으로 펴지면서 상기 제1 및 제2사이드부(124a, 124b)에 탄성력을 제공한다.In this case, when the first and second side portions 124a and 124b are opened, the inclined section I extends in a straight line like the straight section S and the first and second side portions 124a and 124b. Provides elastic force to

즉, 상기 경사구간(I)은 일직선으로 펴질 경우 경사절곡된 특성에 의해 다시 탄성복원되려 하는 탄성력이 발생하며, 이렇게 발생한 탄성력을 상기 제1 및 제2사이드부(124a, 124b)에 제공한다.That is, when the inclined section (I) is straight, the elastic force to restore the elastic force is generated again by the inclined bent characteristic, and the elastic force thus generated is provided to the first and second side parts 124a and 124b.

한편, 상기 클램프(100)는 도 7 및 도 8에 도시된 바와 같이 상기 강관홀더(110)에 수용된 상기 수평강관(14)이 상기 외측판넬(20)의 후방을 압박하도록 상기 강관홀더(110)의 중앙에 체결공(112)을 형성하고, 상기 체결공(112)을 관통해서 상기 수평강관(14)을 가압하는 볼트와 같은 체결부재(130)를 상기 체결공(112)에 나사결합하여 구성하는 것이 바람직하다.Meanwhile, the clamp 100 has the steel pipe holder 110 so that the horizontal steel pipe 14 accommodated in the steel pipe holder 110 presses the rear of the outer panel 20 as shown in FIGS. 7 and 8. The fastening hole 112 is formed in the center of the fastening hole 112, and the fastening member 130, such as a bolt for pressing the horizontal steel pipe 14, is configured by screwing the fastening hole 112. It is desirable to.

이와 같은 상기 체결부재(130)는 상기 체결공(112)에 나사결합되는 체결력에 의해 상기 수평강관(14)을 도 8에 도시된 바와 같이 가압한다.The fastening member 130 as described above presses the horizontal steel pipe 14 as shown in Figure 8 by the fastening force screwed to the fastening hole 112.

이때, 상기 수평강관(14)은 상기 체결부재(130)에 의해 가압되면서 도 8에 도시된 바와 같이 상기 외측판넬(20)의 후방을 압박한다.At this time, the horizontal steel pipe 14 is pressed by the fastening member 130 and press the rear of the outer panel 20 as shown in FIG.

즉, 상기 외측판넬(20)은 상기 수평강관(14)의 압박에 의해 상기 비계(10)에 압착되면서 견고히 지지된다.That is, the outer panel 20 is firmly supported while being pressed to the scaffold 10 by the pressing of the horizontal steel pipe (14).

이와 같이 상기 수평강관(14)이 상기 체결부재(130)에 의해 상기 외측파넬(20)을 가압할 경우 상기 외측판넬(20)의 상기 돌출부(24)는 상기 수평강관(14)의 가압력에 의해 전방으로 밀린다.As such, when the horizontal steel pipe 14 presses the outer panel 20 by the fastening member 130, the protruding portion 24 of the outer panel 20 is applied by the pressing force of the horizontal steel pipe 14. Pushed forward.

이때, 상기 돌출부(24)의 전방은 상기 제1 및 제2걸림부(126a, 126b)를 가압면서 상기 제1 및 제2걸림부(126a, 126b)에 긴밀하게 밀착된다.In this case, the front of the protrusion 24 is in close contact with the first and second locking portions 126a and 126b while pressing the first and second locking portions 126a and 126b.

즉, 상기 제1 및 제2걸림부(126a, 126b)는 상기 돌출부(24)의 전방과 더욱 긴밀하게 밀착하면서 상기 돌출부(24)를 보다 견고하게 파지한다.That is, the first and second locking portions 126a and 126b grip the protrusion 24 more firmly while being in close contact with the front of the protrusion 24.

이와 같이 구성된 가설방음벽의 가설방법을 설명하면 다음과 같다.Referring to the hypothesis method of the temporary sound barrier constructed as described above is as follows.

우선, 상기 비계(10)가 지상에 세워지도록 도 1에 도시된 바와 같이 지반에 상기 기초강관(A)을 박은 후 상기 수직 및 수평강관(12, 14)과 상기 경사강관(16)을 격자형태로 직립가능하게 조립하면서 상기 기초강관(A)에 고정한다.(비계 설치단계)First, as shown in Figure 1 so that the scaffold 10 is built on the ground and the base steel pipe (A) in the ground and then the vertical and horizontal steel pipes (12, 14) and the inclined steel pipe (16) lattice form While assembling so as to stand upright, it is fixed to the base steel pipe (A).

이때, 상기 수직 및 수평강관(12, 14) 및 상기 기초강관(A)은 도 1에 도시된 더블커플러(1)와 같은 연결부재에 의해 격자형태로 조립된다.At this time, the vertical and horizontal steel pipes (12, 14) and the base steel pipe (A) is assembled in a grid form by a connecting member such as the double coupler (1) shown in FIG.

이와 같이 상기 비계(10)가 설치가 완료되면 상기 비계(10)의 전방에 상기 외측판넬(20)들이 서로 결속되면서 세워지도록 확대 도시된 바와 같이 상기 외측판넬(20)의 상기 암형 및 수형 도킹부(22a, 22b)를 결합하면서 상기 비계(10)의 상기 수평강관(14) 전방에 상기 외측판넬(20)들을 직렬로 연속설치한다.(외측판넬 설치단계)As such, when the installation of the scaffold 10 is completed, the female and male docking parts of the outer panel 20 are enlarged to show the outer panel 20 being erected with each other in front of the scaffold 10. The outer panels 20 are continuously installed in series in front of the horizontal steel pipe 14 of the scaffold 10 while engaging (22a, 22b). (Outer panel installation step)

즉, 복수개의 상기 외측판넬(20)은 상기 도킹부(22a, 22b)의 결합에 의해 서로 지지되면서 직렬로 연결된다.That is, the plurality of outer panels 20 are connected in series while being supported by each other by the combination of the docking units 22a and 22b.

이때, 상기 외측판넬(20)은 2개만 우선적으로 상기 수평강관(14)의 전방에 직렬로 연속설치한다.At this time, only two outer panels 20 are installed in series in front of the horizontal steel pipe 14 preferentially.

이와 같이 상기 외측판넬(20)을 2개만 우선적으로 연속설치하는 이유는 2개의 상기 외측판넬(20)을 먼저 설치한 후 설치된 상기 외측판넬(20)을 후술되는 상기 클램프(100)로 상기 비계(10)에 고정한 다음, 상기 클램프(100)로 고정된 상기 외측판넬(20)에 별도로 준비된 또 다른 상기 외측판넬(20)을 하나씩 직렬로 연결하기 위함이다.The reason for preferentially installing only two outer panels 20 as described above is that the two outer panels 20 are first installed, and then the outer panel 20 installed by the clamp 100 to be described later, the scaffolding ( After fixing to 10), the outer panel 20 separately prepared to the outer panel 20 fixed by the clamp 100 to connect in series one by one.

즉, 한꺼번에 여러개의 상기 외측판넬(20)을 연속설치한 후 상기 클램프(100)로 상기 외측판넬(20)을 고정할 경우, 상기 외측판넬(20)이 상기 클램프(100)에 의해 고정되기 전 상기 비계(10)의 전방으로 넘어질 수 있기 때문이다.That is, when the outer panel 20 is fixed by the clamp 100 after the plurality of the outer panel 20 are continuously installed at a time, before the outer panel 20 is fixed by the clamp 100. This is because it can fall to the front of the scaffold 10.

이와 같이 2개의 상기 외측판넬(20)이 상기 비계(10)의 상기 수평강관(14)에 고정되면 고정된 상기 외측판넬(20)의 측방에 또 다른 별도의 상기 외측판넬(20)을 직렬로 연결한 후 연결된 상기 외측판넬(20)을 상기 클램프(100)를 이용하여 곧바로 상기 비계(10)에 고정한다.As such, when the two outer panels 20 are fixed to the horizontal steel pipe 14 of the scaffold 10, another separate outer panel 20 is arranged in the side of the fixed outer panel 20 in series. After the connection, the connected outer panel 20 is immediately fixed to the scaffold 10 using the clamp 100.

즉, 이와 같은 방법으로 여러개의 상기 외측판넬(20)을 상기 비계(10)의 전방에 연속적으로 가설한다.That is, in this manner, a plurality of the outer panel 20 is continuously installed in front of the scaffold 10.

이때, 상기 외측판넬(20)이 상기 클램프(100)에 의해 상기 비계(10)에 고정되기 전에 서로 결속된 상기 외측판넬(20)들이 결속력을 유지하도록 도 4에 도시된 바와 같이 상기 외측판넬(20)의 상기 도킹부(22a, 22b) 양측을 파지하는 상기 끼움구(40)를 상기 도킹부(22a, 22b)의 상·하단에 끼운다.(끼움구 끼움단계)At this time, the outer panel 20, which is bound to each other before the outer panel 20 is fixed to the scaffold 10 by the clamp 100 to maintain the binding force as shown in FIG. The fitting holes 40 holding both sides of the docking parts 22a and 22b of the docking part 22a and 22b are inserted into upper and lower ends of the docking parts 22a and 22b.

즉, 상기 외측판넬(20)들은 상기 끼움구(40)에 의해 결속된 상태를 유지한다.That is, the outer panel 20 maintains the state bound by the fitting hole (40).

이와 같이 상기 끼움구(40)가 상기 외측판넬(20)에 끼워진 후 상기 외측판넬(20)을 상기 비계(10)의 상기 수평강관(14)에 세운다.이때, 상기 끼움구(40)를 끼우는 끼움구 끼움단계는 생략될 수 있다.즉, 상기 외측판넬(20)의 결속력이 충분할 경우에는 상기 끼움구(40)를 상기 외측판넬(20)에 설치하지 않을 수도 있다.After the fitting hole 40 is fitted to the outer panel 20, the outer panel 20 is mounted on the horizontal steel pipe 14 of the scaffold 10. In this case, the fitting hole 40 is fitted. The fitting hole fitting step may be omitted. That is, when the binding force of the outer panel 20 is sufficient, the fitting hole 40 may not be installed in the outer panel 20.

한편, 상기 클램프(100)를 이용하여 상기 외측판넬(20)을 상기 비계(10)의 상기 수평강관(14)에 고정하기 위해서는 도 4에 도시된 바와 같이 상기 클램프(100)가 상기 수평강관(14) 및 상기 외측판넬(20)의 상기 돌출부(24)와 인접하도록 상기 클램프(100)를 서로 결합된 한쌍의 상기 외측판넬(20) 사이에 위치한 상기 수평강관(14)의 후방에 배치한다.(클램프 배치단계)Meanwhile, in order to fix the outer panel 20 to the horizontal steel pipe 14 of the scaffold 10 by using the clamp 100, the clamp 100 is connected to the horizontal steel pipe (as shown in FIG. 4). 14) and the clamp 100 is disposed at the rear of the horizontal steel pipe 14 located between the pair of the outer panel 20 coupled to each other so as to be adjacent to the protrusion 24 of the outer panel 20. (Clamp placement step)

이때, 상기 클램프(100)는 후술되는 도 5에 도시된 바와 같이 비스듬하게 배치한다.At this time, the clamp 100 is disposed obliquely as shown in FIG. 5 to be described later.

이와 같이 상기 클램프(100)의 배치가 완료된 후 상기 클램프(100)의 상기 판넬홀더(120)가 상기 외측판넬(20)의 상기 돌출부(24)에 걸리도록 도 5에 도시된 바와 같이 상기 판넬홀더(120)에 일직선으로 형성된 상기 제1걸림부(126a)를 상기 외측판넬(20)의 일측에 형성된 상기 공간부(G1)에 삽입한 후 상기 도킹부(22a, 22b)에 돌출된 상기 돌출부(24)의 일측 전방에 걸어놓는다.(제1걸림부 걸림단계)As such, after the arrangement of the clamp 100 is completed, the panel holder 120 of the clamp 100 is caught by the protrusion 24 of the outer panel 20, as shown in FIG. 5. The protrusions protruding from the docking parts 22a and 22b after inserting the first locking part 126a formed in a straight line into the space part G1 formed on one side of the outer panel 20. 24) to hang on one side of the front.

이때, 상기 제1걸림부(126a)가 도 5에 도시된 바와 같이 상기 제2걸림부(126b)와 함께 내향절곡됨에 따라 상기 제2걸림부(126b)와 동시에 상기 돌출부(24)에 걸릴 수 없으므로 상기 제1걸림부(126a)를 상기 제2걸림부(126b) 보다 우선적으로 상기 돌출부(24)의 전방에 걸어놓는다.At this time, as the first catching portion 126a is bent inward with the second catching portion 126b as shown in FIG. 5, the first catching portion 126a may be caught by the protrusion 24 at the same time as the second catching portion 126b. Therefore, the first locking portion 126a is hanged in front of the protruding portion 24 in preference to the second locking portion 126b.

즉, 상기 제1 및 제2걸림부(126a, 126b)가 내향절곡된 형상으로 인해 상기 돌출부(24)에 동시에 걸리지 못하므로 상기 제1걸림부(126a)만 우선적으로 상기 돌출부(24)의 전방에 걸어놓는다.That is, since the first and second locking portions 126a and 126b are not simultaneously caught by the protrusion 24 due to the inwardly bent shape, only the first locking portion 126a is preferentially forward of the protrusion 24. Hang on.

한편, 밴딩가공된 상기 제2걸림부(126b)는 도 5에 도시된 바와 같이 상기 제1걸림부(126a)만이 상기 돌출부(24)에 걸림에 따라 상기 돌출부(24)의 후면에 접촉된다.Meanwhile, as shown in FIG. 5, only the first catching portion 126a contacts the rear surface of the protruding portion 24 as the first catching portion 126a is caught by the protruding portion 24.

이때, 상기 판넬홀더(120) 및 상기 강관홀더(110)는 상기 제1 및 제2걸림부(126a, 126b)가 상기 돌출부(24)의 전방 및 후면에 각각 위치함에 따라 도시된 바와 같이 비스듬한 형태를 이룬다.In this case, the panel holder 120 and the steel pipe holder 110 has an oblique shape as shown as the first and second catching portions 126a and 126b are located at the front and the rear of the protrusion 24, respectively. To achieve.

이와 같은 상태에서 밴딩가공된 상기 제2걸림부(126b)가 도 6에 도시된 바와 같이 상기 돌출부(24)의 후방측 모서리를 지나서 상기 돌출부(24)의 측면에 위치하도록 상기 강관홀더(110)의 후방을 1차적으로 가압한다.(1차 가압단계)In this state, the steel pipe holder 110 is positioned such that the second hooked portion 126b that is bent is positioned at the side of the protrusion 24 beyond the rear edge of the protrusion 24 as shown in FIG. 6. Press the back of the primary pressure (primary pressing step).

즉, 상기 강관홀더(110)를 1차적으로 가압하여 상기 판넬홀더(120)에 탄성을 부여한다.That is, the steel pipe holder 110 is primarily pressed to give elasticity to the panel holder 120.

이때, 상기 판넬홀더(120)는 절곡된 형상에 의해 탄성이 발생되며, 이러한 탄성력에 의해 상기 판넬홀더(120)의 상기 제1 및 제2사이드부(124a, 124b)는 벌어진다.In this case, the panel holder 120 is elastic due to the bent shape, and the first and second side portions 124a and 124b of the panel holder 120 are opened by the elastic force.

이와 같이 제1 및 제2사이드부(124a, 124b)가 벌어짐으로써 상기 판넬홀더(120)의 상기 제2걸림부(126b)는 상기 돌출부(24)의 후방측 모서리를 지나서 상기 돌출부(24)의 측면에 위치한다.As such, the first and second side portions 124a and 124b are opened so that the second catching portion 126b of the panel holder 120 passes through the rear edge of the protrusion 24 so that It is located on the side.

한편, 상기 제1 및 제2사이드부(124a, 124b)가 벌어짐에 따라 상기 고정부(122)의 상기 경사구간(I)은 일직선으로 펴지면서 탄성복원되려고 한다.On the other hand, as the first and second side portions 124a and 124b are opened, the inclined section I of the fixing portion 122 is straightened and tries to be elastically restored.

이때, 상기 경사구간(I)은 탄성복원력 보다 가압력이 더 큼에 따라 가압력을 극복하지 못하여 탄성복원력에 의한 탄성력을 계속해서 상기 제2사이드부(124b)에 전달한다.At this time, the inclined section (I) does not overcome the pressing force as the pressing force is greater than the elastic restoring force to continue to transmit the elastic force by the elastic restoring force to the second side portion (124b).

이와 같이 상기 판넬홀더(120)의 상기 제2걸림부(126b)가 상기 돌출부(24)의 측면에 위치한 후 상기 제2걸림부(126b)가 상기 돌출부(24)의 측면을 따라 슬라이딩한 후 도 7에 도시된 바와 같이 상기 돌출부(24)의 전방측 모서리를 지나서 상기 돌출부(24)의 타측 전방에 걸리도록 상기 강관홀더(110)를 2차적으로 가압한다.(2차 가압단계)After the second locking portion 126b of the panel holder 120 is positioned on the side of the protrusion 24, the second locking portion 126b slides along the side of the protrusion 24. As shown in FIG. 7, the steel pipe holder 110 is secondarily pressed to pass the front edge of the protrusion 24 to the other front of the protrusion 24.

이때, 상기 제2걸림부(126b)는 상기 강관홀더(110)의 가압력에 의해 도 6에 도시된 바와 같이 상기 돌출부(24)의 후방 모서리를 지나서 상기 돌출부(24)의 측면을 따라 슬라이딩한 후 상기 경사구간(I)의 탄성력에 의해 상기 돌출부(24)의 전방측 모서리를 지나서 상기 돌출부(24)의 타측 전방에 걸린다.At this time, the second locking portion 126b is slid along the side of the protrusion 24 past the rear edge of the protrusion 24 as shown in Figure 6 by the pressing force of the steel pipe holder 110 By the elastic force of the inclined section (I) is past the front edge of the protrusion 24 is caught on the other front of the protrusion (24).

이와 같이 상기 제2걸림부(126b)가 상기 돌출부(24)의 전방에 걸림에 따라 측면을 계속해서 슬라이딩한 후 전술한 바와 같이 상기 돌출부(24)의 타측 전방에 걸린다.As described above, the second catching part 126b continuously slides the side surface as the front catching part of the protrusion part 24 is caught, and the second catching part 126b is caught by the other front side of the protrusion part 24 as described above.

이때, 상기 경사구간(I)은 상기 제2걸림부(126b)가 상기 돌출부(24)의 전방에 걸림에 따라 탄성복원력에 의해 원형복원된다.At this time, the inclined section I is circularly restored by the elastic restoring force as the second catching portion 126b is caught in front of the protruding portion 24.

즉, 상기 경사구간(I)은 일직선에서 다시 경사상태로 복원된다.That is, the inclined section I is restored to the inclined state again in a straight line.

이와 같이 상기 경사구간(I)이 원형복원됨에 따라 상기 제1 및 제2사이드부(124a, 124b)는 상기 돌출부(24)의 측방에 밀착된다.As the inclined section I is restored in a circular manner, the first and second side parts 124a and 124b are in close contact with the side of the protrusion 24.

이때, 상기 판넬홀더(120)는 도 6에 도시된 바와 같이 비스듬한 상태에서 도 7에 도시된 바와 같이 상기 돌출부(24)를 감싸면서 파지하는 상태로 변환된다.In this case, the panel holder 120 is converted to a state in which the panel holder 120 surrounds and grips the protrusion 24 as shown in FIG. 7 in an oblique state as shown in FIG. 6.

즉, 상기 판넬홀더(120)는 도 7에 도시된 바와 같이 상기 제1 및 제2걸림부(126a, 126b)가 상기 돌출부(24)의 전방에 제각기 걸리고, 상기 제1 및 제2사이드부(124a, 124b)가 상기 돌출부(24)의 측면을 밀착상태로 파지하며, 상기 고정부(122)가 상기 돌출부(24)의 후방을 감싼다.That is, the panel holder 120 has the first and second catching portions 126a and 126b fastened to the front of the protrusion 24, respectively, as shown in FIG. 7, and the first and second side portions ( 124a and 124b grip the side surface of the protrusion 24 in close contact, and the fixing part 122 surrounds the rear of the protrusion 24.

이때, 직렬로 연결된 복수개의 상기 외측판넬(20)은 상기 돌출부(24)가 상기 판넬홀더(120)에 감싸면서 파지함에 따라 상기 도킹부(22a, 22b)의 결속력을 지속적으로 유지한다.In this case, the plurality of outer panels 20 connected in series maintains the binding force of the docking parts 22a and 22b as the protrusions 24 surround and grip the panel holder 120.

즉, 상기 판넬홀더(120)는 복수개의 상기 외측판넬(20)을 하나로 묶어서 고정시킨다.That is, the panel holder 120 bundles and fixes the plurality of outer panels 20 to one.

한편, 상기 강관홀더(110)는 도 7에 도시된 바와 같이 상기 수평강관(14)의 후방 일부분을 감싼다.On the other hand, the steel pipe holder 110 surrounds the rear portion of the horizontal steel pipe 14 as shown in FIG.

이와 같이 상기 판넬홀더(120) 및 상기 강관홀더(110)가 상기 외측판넬(20)의 상기 돌출부(24) 및 상기 비계(10)의 상기 수평강관(14)을 감싸므로 상기 외측판넬(20)은 상기 비계(10)에 고정된다.As described above, the panel holder 120 and the steel pipe holder 110 surround the protruding portion 24 of the outer panel 20 and the horizontal steel pipe 14 of the scaffold 10, so that the outer panel 20 Is fixed to the scaffold 10.

즉, 상기 외측판넬(20)은 상기 클램프(100)에 의해 상기 비계(10)에 고정된다.That is, the outer panel 20 is fixed to the scaffold 10 by the clamp 100.

이와 같이 상기 외측판넬(20)의 상기 비계(10)에 고정된 후에는 도 7에 도시된 바와 같이 상기 강관홀더(110)의 상기 체결공(112)에 상기 체결부재(130)를 나사결합상태로 관통시켜서 체결한다.(체결부재 체결단계)As described above, after the outer panel 20 is fixed to the scaffold 10, the fastening member 130 is screwed to the fastening hole 112 of the steel pipe holder 110, as shown in FIG. 7. Fasten by penetrating (fastening member fastening step).

이때, 상기 수평강관(14)은 상기 체결부재(130)의 가압에 의해 도 8에 도시된 바와 같이 상기 외측판넬(20)의 후방에 밀착되면서 상기 외측판넬(20)의 후방을 압박한다.At this time, the horizontal steel pipe 14 presses the rear of the outer panel 20 while being in close contact with the rear of the outer panel 20 as shown in Figure 8 by the pressing of the fastening member 130.

이와 같은 상기 외측판넬(20)의 압박에 의해 상기 수평강관(14)은 상기 외측판넬(20)을 보다 견고히 지지하며, 또한 상기 클램프(100)의 상기 판넬홀더(120)는 상기 외측판넬(20)의 상기 돌출부(24)를 보다 견고히 파지한다.The horizontal steel pipe 14 more firmly supports the outer panel 20 by the pressure of the outer panel 20, and the panel holder 120 of the clamp 100 is the outer panel 20. The protrusions 24 of) are gripped more firmly.

즉, 상기 외측판넬(20)은 상기 수평강관(14)이 상기 외측판넬(20)의 후방을 압박하므로 상기 수평강관(14)에 견고히 지지되며, 상기 판넬홀더(120)는 상기 외측판넬(20)이 상기 돌출부(24)와 함께 전방으로 밀리므로 상기 제1 및 제2걸림부(126a, 126b)가 상기 돌출부(24)의 전방과 긴밀하게 밀착됨에 따라 상기 돌출부(24)를 견고히 파지한다.That is, the outer panel 20 is firmly supported by the horizontal steel pipe 14 because the horizontal steel pipe 14 presses the rear of the outer panel 20, and the panel holder 120 is the outer panel 20. ) Is pushed forward with the protrusions 24, so that the first and second catching portions 126a and 126b closely grip the front of the protrusions 24, thereby firmly holding the protrusions 24.

이때, 상기 체결부재(130)는 상기 클램프(100)의 상기 강관홀더(110)에 상기 체결공(112)이 형성될 경우 체결된다.At this time, the fastening member 130 is fastened when the fastening hole 112 is formed in the steel pipe holder 110 of the clamp 100.

즉, 상기 강관홀더(110)에 상기 체결공(112)이 형성되지 않은 경우 상기 체결부재(130)의 체결과정은 생략된다.That is, when the fastening hole 112 is not formed in the steel pipe holder 110, the fastening process of the fastening member 130 is omitted.

전술한 바와 같은 과정에 의하여 본 발명의 실시예에 의한 상기 클램프(100)가 적용된 가설방음벽은 용이하게 설치된다.By the above-described process, the temporary soundproof wall to which the clamp 100 according to the embodiment of the present invention is applied is easily installed.

이와 같은 가설방음벽은 상기 외측판넬(20)에 의해 차음을 실시한다.Such a temporary soundproof wall is soundproofed by the outer panel 20.

한편, 이상과 같이 설치된 가설방음벽은 다음과 같이 해체된다.On the other hand, the temporary sound insulation wall provided as above is dismantled as follows.

우선, 상기 클램프(100)에 상기 체결부재(130)가 체결된 경우 상기 외측판넬(20)에 대한 상기 비계(10)의 상기 수평강관(14) 압박력이 해제되도록 상기 클램프(100)의 상기 강관홀더(110)에 형성된 상기 체결공(112)에서 상기 체결부재(130)를 분리한다.(체결부재 분리단계)First, when the fastening member 130 is fastened to the clamp 100, the steel pipe of the clamp 100 is released so that the pressing force of the horizontal steel pipe 14 of the scaffold 10 against the outer panel 20 is released. The fastening member 130 is separated from the fastening hole 112 formed in the holder 110.

이때, 상기 수평강관(14)은 상기 체결공(112)에 나사결합된 상기 체결부재(130)가 분리됨에 따라 상기 외측판넬(20)의 압박을 중단한다.At this time, the horizontal steel pipe 14 stops the pressing of the outer panel 20 as the fastening member 130 screwed to the fastening hole 112 is separated.

이와 같이 상기 방음판(30)의 제거가 완료된 후에는 상기 외측판넬(20)에 가해지는 상기 클램프(100)의 파지력이 상실되도록 드라이버와 같은 공구를 이용하여 도 6에 도시된 바와 같이 상기 외측판넬(20)의 상기 돌출부(24) 타측 전방에 걸린 상기 제2걸림부(126b)를 이탈시켜서 걸림을 해제한다.(제2걸림부 해제단계)As such, after the removal of the sound insulation panel 30 is completed, the outer panel (as shown in FIG. 6) by using a tool such as a driver so that the holding force of the clamp 100 applied to the outer panel 20 is lost. The second locking portion 126b caught on the other side of the protruding portion 24 is released to release the locking. (2nd locking portion releasing step)

즉, 공구를 이용하여 상기 외측판넬(20)의 상기 돌출부(24) 타측 전방에 걸린 상기 제2걸림부(126b)를 상기 돌출부(24)에서 이탈시킨다.That is, the second catching portion 126b caught on the other side of the protruding portion 24 of the outer panel 20 is separated from the protruding portion 24 using a tool.

이때, 상기 제2걸림부(126b)는 밴딩가공에 의한 자체 탄성력에 의해 상기 돌출부(24)의 전방측 모서리를 지나서 상기 돌출부(24)의 측방으로 용이하게 이탈된다.At this time, the second locking portion 126b is easily separated from the side of the protrusion 24 past the front edge of the protrusion 24 by its elastic force due to bending.

이와 같은 상기 제2걸림부(126b)의 이탈로 인하여 상기 판넬홀더(120) 및 상기 강관홀더(110)는 도 6에 도시된 바와 같이 비스듬한 상태로 변환된다.Due to such separation of the second catching portion 126b, the panel holder 120 and the steel pipe holder 110 are converted into an oblique state as shown in FIG.

이와 같이 상기 제2걸림부(126b)가 이탈된 후 상기 제2걸림부(126b)가 상기 돌출부(24)의 측면을 슬라이딩하여 도 5에 도시된 바와 같이 상기 외측판넬(20)의 상기 돌출부(24) 배면에 위치하도록 상기 클램프(100)의 상기 강관홀더(110)를 측방으로 밀면서 가압한다.(강관홀더 가압단계)As such, after the second catching part 126b is separated, the second catching part 126b slides the side surface of the protruding part 24 so that the protruding part of the outer panel 20 as shown in FIG. 5. 24) Press the steel pipe holder 110 of the clamp 100 to the side so as to be located on the back side (pressing the steel pipe holder step).

이때, 상기 강관홀더(110)는 상기 제2걸림부(126b)가 상기 돌출부(24)의 배면에 위치하도록 비스듬한 상태에서 상기 외측판넬(20)의 상기 제1걸림부(126a)를 중심으로 편축회전한다.At this time, the steel pipe holder 110 is a single axis around the first catching portion 126a of the outer panel 20 in an oblique state such that the second catching portion 126b is located on the rear surface of the protrusion 24. Rotate

즉, 상기 제2걸림부(126b)는 상기 강관홀더(110)가 편축회전함에 따라 상기 돌출부(24)의 배면에 위치한다.That is, the second catching part 126b is located on the rear surface of the protrusion part 24 as the steel pipe holder 110 rotates uniaxially.

한편, 상기 판넬홀더(120)의 상기 제1걸림부(126a)는 상기 강관홀더(110)의 편축회전에 의해 도 5에 도시된 바와 같이 단부가 상기 돌출부(24)의 일측 전방에 걸려있게 된다.On the other hand, as shown in Figure 5 by the uniaxial rotation of the steel pipe holder 110, the first locking portion 126a of the panel holder 120 is caught in front of the one side of the protrusion (24). .

이와 같이 상기 제2걸림부(126b)가 상기 돌출부(24) 배면에 위치한 후에는 상기 클램프(100)가 상기 외측판넬(20)에서 완전히 분리되도록 상기 외측판넬(20)의 상기 공간부(G1)를 통해 상기 제1걸림부(126a)를 제거한다.(제1걸림부 제거단계)As such, after the second catching portion 126b is positioned on the rear surface of the protruding portion 24, the space G1 of the outer panel 20 is completely separated from the outer panel 20. The first catching portion 126a is removed through the first removing portion 126a.

즉, 상기 제1걸림부(126a)를 상기 돌출부(24)의 측방으로 이탈시켜서 상기 클램프(100)를 제거한다.That is, the clamp 100 is removed by detaching the first catching portion 126a to the side of the protrusion 24.

이때, 상기 클램프(100)는 상기 제1 및 제2걸림부(126a, 126b)가 상기 돌출부(24)로부터 이탈됨에 따라 상기 외측판넬(20)로부터 완전히 분리된다.In this case, the clamp 100 is completely separated from the outer panel 20 as the first and second catching portions 126a and 126b are separated from the protrusion 24.

이와 같이 상기 클램프(100)가 해체된 후에는 상기 외측판넬(20)의 분리가 가능하도록 상기 외측판넬(20)의 상기 도킹부(22a, 22b) 상·하단에 끼워진 상기 끼움구(40)를 제거한다.(끼움구 제거단계)After the clamp 100 is dismantled as described above, the fitting holes 40 fitted to the upper and lower ends of the docking parts 22a and 22b of the outer panel 20 are separated so that the outer panel 20 can be separated. Remove (Screw Removal Step)

즉, 상기 외측판넬(20)은 상기 끼움구(40)로부터의 구속이 해제된다.That is, the outer panel 20 is released from the fitting hole 40.

상기 끼움구(40)가 제거된 후에는 상기 도킹부(22a, 22b)에 의한 상기 외측판넬(20)의 결속력이 상실되도록 서로 결합된 상기 외측판넬(20) 중 어느 하나를 측방으로 슬라이딩시켜서 분리한다.(외측판넬 분리단계)After the fitting hole 40 is removed, any one of the outer panels 20 coupled to each other so as to lose the binding force of the outer panel 20 by the docking parts 22a and 22b is separated by sliding laterally. (Outer panel separation step)

이때, 상기 외측판넬(20)의 상기 암형 및 수형 도킹부(22a, 22b)는 서로 이격되면서 결속력을 상실한다.In this case, the female and male docking parts 22a and 22b of the outer panel 20 lose the binding force while being spaced apart from each other.

즉, 서로 결합된 상기 외측판넬(20)은 결속력이 상실됨에 따라 용이하게 분리된다.That is, the outer panel 20 coupled to each other is easily separated as the binding force is lost.

이와 같이 상기 외측판넬(20)이 분리된 후에는 상기 비계(10)에 설치된 더블커플러(1)와 같은 연결부재를 제거함으로써 격자형태를 이루는 상기 비계(10)의 상기 수직·수평강관(12, 16) 및 상기 경사강관(16)을 분리하여 상기 기초강관(A: 도1 참고)과 함께 제거한다.(비계제거단계)As described above, after the outer panel 20 is separated, the vertical and horizontal steel pipes 12 of the scaffold 10 forming a lattice form by removing the connection member such as the double coupler 1 installed on the scaffold 10. 16) and the inclined steel pipe 16 is removed and removed together with the base steel pipe (A: Fig. 1).

이때, 상기 기초강관(A)은 상기 수직·수평강관(12, 16) 및 상기 경사강관(16)을 분리한 후 제거한다.At this time, the base steel pipe (A) is removed after separating the vertical and horizontal steel pipes (12, 16) and the inclined steel pipe (16).

전술한 바와 같은 과정에 의하여 본 발명에 의해 설치된 가설방음벽은 용이하게 해체된다.By the above process, the temporary soundproof wall installed by the present invention is easily dismantled.

한편, 전술한 바와 같은 본 발명의 실시예에 의한 가설방음벽의 가설방법은, 상기 방음벽체(SW)가 흡음을 실시하도록 상기 외측판넬(20)에 상기 방음부재(30)가 설치되도록 구성할 수 있다.On the other hand, the construction method of the temporary soundproof wall according to the embodiment of the present invention as described above, the soundproof wall (SW) can be configured so that the soundproof member 30 is installed on the outer panel 20 so as to absorb sound. have.

즉, 가설방음벽이 차음 및 흡음을 실시하도록 구성할 수 있다.In other words, the temporary soundproof wall can be configured to perform sound insulation and sound absorption.

이와 같이 상기 방음부재(30)를 설치하기 위해서는 우선, 상기 외측판넬(20)이 상기 비계(10)에 세워지기 전에 상기 외측판넬(20)의 상기 절곡돌기(26)에 의해 형성된 상기 외측판넬(20)의 수용홈(G2)에 흡음을 실시하는 흡음재(32) 및 흡음판(34)으로 이루어진 방음부재(30)를 순차적으로 삽입한다.(방음부재 삽입단계)In order to install the soundproofing member 30 in this way, first, the outer panel formed by the bending protrusions 26 of the outer panel 20 before the outer panel 20 is erected on the scaffold 10 ( The soundproof member 30 made of the sound absorbing material 32 and the sound absorbing plate 34 for absorbing sound is sequentially inserted into the receiving groove G2 of FIG. 20.

이때, 상기 방음부재(30)는 상기 외측판넬(20)의 상기 절곡돌기(26) 단부에 걸려서 삽입된 상태를 유지한다.At this time, the soundproof member 30 is held by the end of the bending projection 26 of the outer panel 20 to maintain the inserted state.

이와 같이 상기 방음부재(30)가 상기 수용홈(G2)에 삽입된 후에는 상기 방음부재(30)가 상기 외측판넬(20)의 후방에 고정되도록 스크류와 같은 고정부재(F)를 이용하여 상기 방음부재(30)를 상기 외측판넬(20)의 상기 절곡돌기(26)에 고정시킨다.(방음부재 고정단계)After the soundproof member 30 is inserted into the receiving groove G2 as described above, the soundproof member 30 is fixed by using a fixing member F such as a screw to fix the soundproof member 30 to the rear of the outer panel 20. The soundproof member 30 is fixed to the bending protrusions 26 of the outer panel 20. (Soundproof member fixing step)

즉, 상기 방음부재(30)는 상기 고정부재(F)에 의해 상기 외측판넬(20)의 절곡돌기(26)에 고정된다.That is, the sound insulation member 30 is fixed to the bending protrusion 26 of the outer panel 20 by the fixing member (F).

이와 같은 상기 방음부재(30)를 해체하는 방법을 설명하면, 우선 상기 외측판넬(20)이 상기 비계(10)에서 분리가 완료된 다음 상기 방음부재(30)가 상기 외측판넬(20)에서 분리되도록 상기 외측판넬(20)의 상기 절곡돌기(26)에 체결된 상기 고정부재(F)를 제거한다.(고정부재 제거단계)Referring to the method of dismantling the soundproofing member 30 as described above, the outer panel 20 is first separated from the scaffold 10 and then the soundproof member 30 is separated from the outer panel 20. The fixing member (F) fastened to the bending protrusions 26 of the outer panel 20 is removed.

이때, 상기 방음부재(30)는 상기 고정부재(F)가 제거됨에 따라 상기 외측판넬(20)로부터 이탈가능하게 분리된다.In this case, the soundproof member 30 is detachably separated from the outer panel 20 as the fixing member F is removed.

이와 같이 상기 방음부재(30)가 분리된 후에는 상기 방음판(30)을 상기 외측판넬(20)의 상기 수용홈(G2)에서 이탈시켜서 제거한다.(방음부재 제거단계)As described above, after the soundproof member 30 is separated, the soundproof plate 30 is removed from the receiving groove G2 of the outer panel 20 to be removed.

이때, 상기 방음부재(30)는 상기 외측판넬(20)의 상부나 하부로 당겨서 제거한다.At this time, the sound insulation member 30 is removed by pulling to the upper or lower portion of the outer panel (20).

한편, 도 9는 본 발명에 적용되는 가설방음벽용 클램프의 다른 실시예를 도시한 사시도로서, 다른 실시예에 의한 클램프는 전술한 클램프(100)와 그 구성이 동일하고, 다만 전술한 일직선의 상기 제1걸림부(126a)가 전술한 상기 제2걸림부(126b) 처럼 굴곡지게 밴딩가공된 것이 차이점이다.On the other hand, Figure 9 is a perspective view showing another embodiment of the clamp for the temporary soundproof wall applied to the present invention, the clamp according to another embodiment is the same as the above-described clamp 100, the above-described straight line The difference is that the first catching portion 126a is bent to be bent like the second catching portion 126b described above.

즉, 본 발명의 다른 실시예에 의한 상기 클램프(100)는 상기 제1 및 제2사이드부(124a, 124b)의 양단에 내향절곡된 상기 제1 및 제2걸림부(126a, 126b)가 모두 굴곡형성된 것이 전술한 도 3 내지 도 8의 실시예와 차이점이다.That is, in the clamp 100 according to another embodiment of the present invention, both the first and second catching portions 126a and 126b bent inwardly at both ends of the first and second side portions 124a and 124b. The bending is different from the embodiment of FIGS. 3 to 8 described above.

이와 같이 구성된 도 9의 상기 클램프(100)는 상기 제1걸림부(126a)가 상기 제2걸림부(126b)와 동일하게 굴곡형성됨에 따라 상기 외측판넬(20)의 상기 돌출부(24) 일측 전방에 용이하게 걸린다.The clamp 100 of FIG. 9 configured as described above has one front side of the protruding portion 24 of the outer panel 20 as the first catching portion 126a is formed to be bent in the same manner as the second catching portion 126b. Takes on easily

즉, 상기 제1걸림부(126a)가 도 3 내지 도 8에 도시된 바와 같이 일직선으로 형성될 경우 상기 돌출부(24)의 전방 및 상기 외측판넬(20)의 배면 사이에 삽입한 후 강제로 상기 돌출부(24)의 전방에 걸어야 하지만, 다른 실시예는 상기 제1걸림부(126a)가 도시된 바와 같이 밴딩가공됨에 따라 상기 돌출부(24)의 전방 및 상기 외측판넬(20)의 배면 사이에 밀어넣기만 하면 상기 제2걸림부(126b) 처럼 자체 탄성력에 의해 상기 돌출부(24)의 전방에 자연히 걸린다.That is, when the first catching portion 126a is formed in a straight line as illustrated in FIGS. 3 to 8, the first catching portion 126a is inserted between the front of the protrusion 24 and the rear surface of the outer panel 20. Although it should be walked in front of the protrusion 24, another embodiment pushes between the front of the protrusion 24 and the back of the outer panel 20 as the first catch 126a is banded as shown. Simply put, it is naturally caught in front of the protruding portion 24 by its elastic force as the second locking portion (126b).

이와 같이 다른 실시예에 의한 상기 클램프(100)는 전술한 도 5 내지 도 8과 동일한 방법으로 설치 및 해체되며, 전술한 바와 같이 상기 제1걸림부(126a)가 상기 돌출부(24)의 전방에 용이하게 걸리므로 가설방음벽의 설치 및 해체를 용이하게 할 수 있을 뿐만 아니라 설치 및 해체에 소요되는 시공시간을 대폭적으로 단축시킬 수 있다.As described above, the clamp 100 according to another embodiment is installed and disassembled in the same manner as described above with reference to FIGS. 5 to 8, and as described above, the first catching portion 126a is located in front of the protrusion 24. Since it is easily caught, it is not only easy to install and dismantle the temporary soundproof walls, but also significantly shorten the construction time required for installation and dismantling.

이상과 같은 본 발명의 실시예에 의한 가설방음벽의 가설방법은, 복수개의 상기 외측판넬(20)의 상기 도킹부(22a, 22b)를 서로 결합시켜서 상기 외측판넬(20)을 연결하므로 종래의 찬넬 설치과정의 생략이 가능하여 가설방음벽의 단가와 설치 및 해체에 소요되는 시공비용을 동시에 절감할 수 있을 뿐만 아니라 가설방음벽의 설치 및 해체시간을 대폭적으로 단축시킬 수 있다.In the construction method of the temporary soundproof wall according to the embodiment of the present invention as described above, by connecting the docking portions (22a, 22b) of the plurality of the outer panel 20 to each other to connect the outer panel 20, the conventional channel Since the installation process can be omitted, the unit cost of the temporary soundproof walls and the construction cost required for installation and dismantling can be simultaneously reduced, and the installation and dismantling time of the temporary soundproof walls can be greatly reduced.

또, 상기 클램프(100)의 상기 강관홀더(110)가 상기 비계(10)의 상기 수평강관(14) 후방만을 감싸면서 설치되고, 상기 판넬홀더(120)가 탄성력에 의해 상기 외측판넬(20)의 상기 돌출부(24)에 걸리는 동시에 파지하므로 상기 클램프(100)를 용이하게 설치할 수 있을 뿐만 아니라 가설방음벽의 설치 및 해체시간, 그리고 이에 따른 시공비용을 크게 절감할 수 있다.In addition, the steel pipe holder 110 of the clamp 100 is installed while covering only the rear of the horizontal steel pipe 14 of the scaffold 10, the panel holder 120 by the elastic force to the outer panel 20 Since the clamp is caught by the protrusions 24 at the same time, the clamp 100 can be easily installed, as well as the installation and dismantling time of the temporary soundproof walls, and construction cost can be greatly reduced.

특히, 상기 판넬홀더(120)가 상기 외측판넬(20)의 상기 돌출부(24)를 파지하거나 파지상태를 해제하게 되면 상기 강관홀더(110)가 구조적 특성에 의해 상기 비계(10)의 상기 수평강관(14) 후방을 자연적으로 감싸거나 감싼상태를 해제하게 되므로 상기 클램프(100)의 설치 및 제거가 용이할 뿐만 아니라 설치 및 제거에 따른 소요시간 및 소요비용을 단축할 수 있으며, 궁극적으로는 가설방음벽의 설치 및 해체시간을 보다 단축시킬 수 있다.Particularly, when the panel holder 120 grips or releases the protruding portion 24 of the outer panel 20, the steel pipe holder 110 is structurally oriented in the horizontal steel pipe of the scaffold 10. (14) Since the rear is naturally wrapped or wrapped around the release state, not only the installation and removal of the clamp 100 is easy, but also the time and cost required for installation and removal can be shortened. Can shorten installation and dismantling time.

상기와 같은 본 발명에 의한 가설방음벽의 설치 및 해제방법은, 외측판넬을 직결시키면서 설치하므로 종래의 찬넬과 같은 부속부품 및 찬넬 설치과정의 생략이 가능하여 가설방음벽의 단가 및 시공비용을 동시에 절감할 수 있을 뿐만 아니라 가설방음벽의 설치 및 해체시간을 대폭적으로 단축시킬 수 있는 효과가 있다.The method of installing and releasing the temporary soundproof wall according to the present invention as described above is installed while connecting the outer panel directly, so it is possible to omit the accessory parts and the channel installation process such as the conventional channel, thereby simultaneously reducing the unit cost and construction cost of the temporary soundproof wall. In addition, it is possible to significantly shorten the installation and dismantling time of the temporary sound barrier.

또, 클램프의 강관홀더는 비계의 수평강관 후방만을 감싸고, 클램프의 판넬홀더는 탄성력에 의해 외측판넬의 돌출부를 파지하므로 클램프의 설치 및 해체시간과 설치 및 해체에 따른 가설방음벽의 시공비용을 절감할 수 있는 효과도 있다.In addition, the steel pipe holder of the clamp only covers the rear of the horizontal steel pipe of the scaffold, and the panel holder of the clamp grips the protrusion of the outer panel by the elastic force, thereby reducing the installation and dismantling time of the clamp and the construction cost of the temporary soundproof wall according to the installation and dismantling. There is also an effect.

또한, 클램프의 강관홀더가 판넬홀더의 상태에 따라 비계의 수평강관 후방을 감싸거나 감싼상태를 해제하므로 클램프의 설치 및 제거에 따른 가설방음벽의 소요시간 및 소요비용을 단축할 수 있는 효과도 있다.In addition, since the steel pipe holder of the clamp releases the state surrounding the rear of the horizontal steel pipe of the scaffold according to the state of the panel holder, there is also an effect that the required time and cost of the temporary soundproof wall according to the installation and removal of the clamp can be shortened.

특히, 종래의 찬넬과 같은 부속부품을 생략한 상태로 가설방음벽을 설치하므로, 외관이 미려한 가설방음벽을 제공할 수 있는 효과가 있다.In particular, since the provisional sound insulation wall is provided in a state of omitting an accessory such as a conventional channel, there is an effect that can provide a provisional sound insulation wall with a beautiful appearance.

도 1은 종래기술에 의한 가설방음벽의 사시도,1 is a perspective view of a temporary soundproof wall according to the prior art,

도 2는 도 1에 도시된 가설방음벽의 클램프가 종래기술의 설치방법에 의해 설치된 모습을 도시한 평면도,Figure 2 is a plan view showing a state in which the clamp of the temporary soundproofing wall shown in Figure 1 is installed by a prior art installation method,

도 3은 본 발명의 실시예에 의해 설치된 가설방음벽의 사시도,3 is a perspective view of a temporary soundproofing wall installed by an embodiment of the present invention;

도 4는 도 3에 도시된 가설방음벽의 분해사시도,4 is an exploded perspective view of the temporary soundproofing wall shown in FIG. 3;

도 5 내지 도 8은 도 3에 도시된 방음벽체용 클램프의 설치 및 해체과정을 단계적으로 도시한 평면도,5 to 8 are plan views showing the installation and disassembly process of the clamp for soundproof walls shown in FIG.

도 9는 본 발명에 적용되는 가설방음벽용 클램프의 다른 실시예를 도시한 사시도.Figure 9 is a perspective view showing another embodiment of the clamp for the temporary soundproofing wall applied to the present invention.

<도면의 주요 부분에 대한 부호의 설명><Explanation of symbols for the main parts of the drawings>

10 : 비계 14 : 수평강관 20 : 외측판넬10 scaffold 14 horizontal steel pipe 20 outer panel

22a, 22b : 도킹부 24 : 돌출부 26 : 절곡돌기22a, 22b: docking portion 24: protrusion 26: bent projection

30 : 방음부재 100 : 클램프30: soundproof member 100: clamp

110 : 강관홀더 120 : 판넬홀더 122 : 고정부110: steel pipe holder 120: panel holder 122: fixed part

124a : 제1사이드부 124b : 제2사이드부 126a : 제1걸림부124a: first side portion 124b: second side portion 126a: first locking portion

126b : 제2걸림부 G1 : 공간부 G2 : 수용홈126b: second catching portion G1: space portion G2: receiving groove

I : 경사구간 S : 일직선구간 SW : 방음벽체I: Slope section S: Straight section SW: Soundproof wall

Claims (4)

수직 및 수평강관(12, 14)과 경사강관(16)과 기초강관(A)으로 이루어진 비계(10)와; 상기 비계(10)에 지지되는 복수개의 방음벽체(SW) 및; 상기 방음벽체(SW)를 상기 비계(10)에 고정시키는 클램프(100);를 포함하는 가설방음벽의 설치방법에 있어서,Scaffolding (10) consisting of vertical and horizontal steel pipes (12, 14), inclined steel pipes (16) and basic steel pipes (A); A plurality of soundproof walls (SW) supported by the scaffold (10); In the installation method of the temporary soundproof wall comprising a; clamp (100) for fixing the soundproof wall (SW) to the scaffold (10), 상기 비계(10)가 지상에 세워지도록 연결부재를 이용하여 상기 수직 및 수평강관(12, 14)과 상기 경사강관(16)을 격자형태로 직립가능하게 조립하면서 지반에 박힌 기초강관(A)에 고정하는 비계설치단계;The vertical and horizontal steel pipes 12 and 14 and the inclined steel pipe 16 can be erected in a lattice form using a connecting member so that the scaffold 10 stands on the ground. Fixing the scaffold installation step; 상기 비계(10)에 상기 방음벽체(SW)의 외측판넬(20)들이 서로 결속되면서 세워지도록 상기 외측판넬(20)의 암형 및 수형 도킹부(22a, 22b)를 결합하면서 직렬로 연속설치하는 외측판넬 설치단계;The outer side of the scaffold 10 is installed continuously in series while combining the female and male docking parts 22a and 22b of the outer panel 20 so that the outer panels 20 of the soundproof wall SW are bound together. Panel installation step; 상기 외측판넬(20)이 직렬로 연속설치되면 서로 결속된 상기 외측판넬(20)의 양단이 결속된 상태를 유지하도록 상기 외측판넬(20)의 상기 도킹부(22a, 22b) 양측을 파지하는 끼움구(40)를 상기 도킹부(22a, 22b)의 상·하단에 끼우는 끼움구 끼움단계;When the outer panel 20 is installed continuously in series, the gripping parts of the docking parts 22a and 22b of the outer panel 20 are held so that both ends of the outer panel 20 which are bound to each other are maintained in a bound state. A fitting hole fitting step of fitting the sphere 40 to the upper and lower ends of the docking parts 22a and 22b; 상기 끼움구(40)의 끼움이 완료되면 상기 외측판넬(20)이 상기 클램프(100)에 의해 상기 비계(10)의 수평강관(14)에 고정되도록 서로 결합된 한쌍의 상기 외측판넬(20) 사이에 위치한 상기 수평강관(14)의 후방에 상기 클램프(100)를 위치시키는 클램프 배치단계;When the fitting of the fitting hole 40 is completed, the outer panel 20 is a pair of the outer panel 20 coupled to each other to be fixed to the horizontal steel pipe 14 of the scaffold 10 by the clamp 100. Clamp arrangement step of positioning the clamp 100 in the rear of the horizontal steel pipe 14 located between; 상기 클램프(100)가 배치되면 상기 외측판넬(20)의 배면에 형성된 일측의 상기 돌출부(24)에 상기 클램프(100)의 판넬홀더(120)의 제1걸림부(126a)가 걸리도록 상기 외측판넬(20)의 배면에 형성된 공간부(G1)에 상기 제1걸림부(126a)를 삽입하여 상기 돌출부(24)의 전방에 걸어놓는 제1걸림부 걸림단계;When the clamp 100 is disposed, the outer side of the first locking portion 126a of the panel holder 120 of the clamp 100 is caught by the protruding portion 24 formed on the rear surface of the outer panel 20. A first catching part engaging step of inserting the first catching part 126a into the space part G1 formed on the rear surface of the panel 20 and hanging the front part of the protruding part 24; 상기 제1걸림부(126a)와 대향하는 상기 판넬홀더(120)의 제2걸림부(126b)가 탄성변형하는 상기 판넬홀더(120)의 상기 탄성부(122)에 의해 벌어지면서 상기 돌출부(24)의 후방측 모서리를 지나서 상기 돌출부(24)의 측면에 위치하도록 상기 클램프(100)의 강관홀더(110)를 1차적으로 가압하여 상기 탄성부(122)에 외력을 부여하는 1차 가압단계;The protruding portion 24 is opened by the elastic portion 122 of the panel holder 120 in which the second locking portion 126b of the panel holder 120 facing the first locking portion 126a is elastically deformed. A first pressing step of applying an external force to the elastic part 122 by first pressing the steel pipe holder 110 of the clamp 100 so as to be positioned at a side of the protrusion part 24 beyond the rear side edge of the head; 상기 강관홀더(110)의 1차 가압이 완료되면 상기 돌출부(24)의 측면에 위치하는 상기 제2걸림부(126b)가 상기 돌출부(24)의 측면을 따라 슬라이딩해서 상기 돌출부(24)의 전방에 걸리는 동시에 상기 강관홀더(110)가 상기 비계(10)의 상기 수평강관(14) 후방을 감싸도록 상기 강관홀더(110)를 2차적으로 가압하는 2차 가압단계; 및When the primary pressurization of the steel pipe holder 110 is completed, the second catching portion 126b positioned on the side of the protrusion 24 slides along the side of the protrusion 24 so as to front the protrusion 24. A second pressurizing step of pressing the steel pipe holder 110 at a time such that the steel pipe holder 110 surrounds the rear of the horizontal steel pipe 14 of the scaffold 10; And 상기 강관홀더(110)의 2차가압이 완료되면 상기 외측판넬(20)이 상기 비계(10)의 상기 수평강관(14)에 의해 압박되도록 상기 강관홀더(110)의 체결공(112)에 볼트와 같은 체결부재(130)를 나사결합하면서 관통시키는 체결부재 체결단계;를 포함하는 것을 특징으로 하는 가설방음벽의 설치방법.When the secondary pressure of the steel pipe holder 110 is completed, the outer panel 20 is bolted to the fastening hole 112 of the steel pipe holder 110 to be pressed by the horizontal steel pipe 14 of the scaffold 10 Fastening member fastening step of penetrating while screwing the fastening member 130, such as; installation method of the temporary soundproof sound wall comprising a. 제 1 항에 있어서,The method of claim 1, 상기 방음벽체(SW)가 흡음을 실시하도록 상기 외측판넬(20)이 상기 비계(10)에 세워지기 전에 상기 외측판넬(20)의 절곡돌기(26)에 의해 형성된 상기 외측판넬(20)의 수용홈(G2)에 흡음을 실시하는 흡음재(32) 및 흡음판(34)으로 이루어진 방음부재(30)를 순차적으로 삽입하는 방음부재 삽입단계; 및 Receiving the outer panel 20 formed by the bending protrusions 26 of the outer panel 20 before the outer panel 20 is erected on the scaffold 10 so that the soundproof wall SW absorbs sound. Soundproof member insertion step of sequentially inserting the soundproof member 30 consisting of a sound-absorbing material 32 and a sound-absorbing plate 34 to absorb sound into the groove (G2); And 상기 방음부재(30)가 상기 외측판넬(20)의 후방에 고정되도록 스크류와 같은 고정부재(F)를 이용하여 상기 방음부재(30)를 상기 외측판넬(20)의 상기 절곡돌기(26)에 고정시키는 방음부재 고정단계;를 더 포함하는 것을 특징으로 하는 가설방음벽의 설치방법.The soundproof member 30 is connected to the bending protrusions 26 of the outer panel 20 by using a fixing member F such as a screw to fix the soundproof member 30 to the rear of the outer panel 20. The soundproof member fixing step of fixing; The installation method of the temporary soundproof wall, characterized in that it further comprises. 제 1 항에 의해 설치된 가설방음벽의 해체방법에 있어서,In the dismantling method of the temporary soundproofing wall installed according to claim 1, 상기 외측판넬(20)에 대한 상기 비계(10)의 상기 수평강관(14)의 압박력이 해제되도록 상기 클램프(100)의 상기 강관홀더(110)에 형성된 상기 체결공(112)으로부터 상기 체결부재(130)를 분리하는 체결부재 분리단계;The fastening member (from the fastening hole 112 formed in the steel pipe holder 110 of the clamp 100 so that the pressing force of the horizontal steel pipe 14 of the scaffold 10 against the outer panel 20 is released) A fastening member separating step of separating 130; 상기 체결부재(130)가 분리되면 상기 외측판넬(20)에 가해지는 상기 클램프(100)의 상기 판넬홀더(120)의 파지력이 상실되도록 드라이버와 같은 공구를 이용하여 상기 외측판넬(20)의 상기 돌출부(24) 타측 전방에 걸린 상기 판넬홀더(120)의 상기 제2걸림부(126b)를 이탈시켜서 걸림을 해제하는 제2걸림부 해제단계;When the fastening member 130 is separated, the grip of the outer panel 20 by using a tool such as a driver to lose the holding force of the panel holder 120 of the clamp 100 applied to the outer panel 20. A second catching part releasing step of releasing the catch by releasing the second catching part 126b of the panel holder 120 caught on the other side of the protrusion 24; 상기 제2걸림부(126b)가 이탈되면 상기 제2걸림부(126b)가 상기 돌출부(24)의 측면을 슬라이딩하여 상기 외측판넬(20)의 상기 돌출부(24) 배면에 위치하도록 상기 클램프(100)의 상기 강관홀더(110)를 측방으로 가압하는 강관홀더 가압단계;When the second catching portion 126b is separated from the clamp 100 such that the second catching portion 126b slides the side surface of the protruding portion 24 to be located on the rear surface of the protruding portion 24 of the outer panel 20. Steel pipe holder pressurizing step of pressing the steel pipe holder 110 of the side; 상기 강관홀더(110)에 의해 상기 제2걸림부(126b)가 상기 돌출부(24) 배면에 위치하면 상기클램프(100)가 상기 외측판넬(20)에서 완전히 분리되도록 상기 외측판넬(20)의 상기 공간부(G1)를 통해 상기 제1걸림부(126a)를 제거하는 제1걸림부 제거단계;When the second catching portion 126b is positioned on the rear surface of the protruding portion 24 by the steel pipe holder 110, the clamp 100 is completely separated from the outer panel 20 so that the clamp of the outer panel 20 is removed. A first catching part removing step of removing the first catching part 126a through a space G1; 상기 제1걸림부(126a)가 제거되면 상기 외측판넬(20)의 분리가 가능하도록 상기 외측판넬(20)의 상기 도킹부(22a, 22b) 상·하단에 끼워진 상기 끼움구(40)를 제거하는 끼움구 제거단계;When the first catching portion 126a is removed, the fitting holes 40 inserted into the upper and lower portions of the docking portions 22a and 22b of the outer panel 20 are removed so that the outer panel 20 can be separated. Insertion step removal step; 상기 끼움구(40)의 제거가 완료되면 상기 도킹부(22a, 22b)에 의한 상기 외측판넬(20)의 결속력이 상실되도록 직결된 상기 외측판넬(20)을 측방으로 슬라이딩시켜서 연속적으로 연결된 상기 외측판넬(20)을 분리하는 외측판넬 분리단계; 및When the removal of the fitting hole 40 is completed, the outer side panel continuously connected by sliding the outer panel 20 directly connected to the side so that the binding force of the outer panel 20 by the docking units 22a and 22b is lost. An outer panel separating step of separating the panel 20; And 상기 외측판넬(20)이 분리되면 상기 연결부재에 의해 격자형태를 이루는 상기 비계(10)의 상기 수직·수평강관(12, 16) 및 상기 경사강관(16)을 분리하여 상기 기초강관(A)과 함께 제거하는 비계 제거단계;를 포함하는 것을 특징으로 하는 가설방음벽의 해체방법.When the outer panel 20 is separated, the basic steel pipe (A) by separating the vertical and horizontal steel pipes (12, 16) and the inclined steel pipe (16) of the scaffold (10) to form a grid by the connecting member Disassembling method of the temporary soundproofing wall comprising a; scaffold removal step of removing together. 제 2 항에 의해 설치된 가설방음벽의 해체방법에 있어서,In the dismantling method of the temporary soundproofing wall provided in accordance with claim 2, 상기 외측판넬(20)에 대한 상기 비계(10)의 상기 수평강관(14)의 압박력이 해제되도록 상기 클램프(100)의 상기 강관홀더(110)에 형성된 상기 체결공(112)으로부터 상기 체결부재(130)를 분리하는 체결부재 분리단계;The fastening member (from the fastening hole 112 formed in the steel pipe holder 110 of the clamp 100 so that the pressing force of the horizontal steel pipe 14 of the scaffold 10 against the outer panel 20 is released) A fastening member separating step of separating 130; 상기 체결부재(130)가 분리되면 상기 외측판넬(20)에 가해지는 상기 클램프(100)의 상기 판넬홀더(120)의 파지력이 상실되도록 드라이버와 같은 공구를 이용하여 상기 외측판넬(20)의 상기 돌출부(24) 타측 전방에 걸린 상기 판넬홀더(120)의 상기 제2걸림부(126b)를 이탈시켜서 걸림을 해제하는 제2걸림부 해제단계;When the fastening member 130 is separated, the grip of the outer panel 20 by using a tool such as a driver to lose the holding force of the panel holder 120 of the clamp 100 applied to the outer panel 20. A second catching part releasing step of releasing the catch by releasing the second catching part 126b of the panel holder 120 caught on the other side of the protrusion 24; 상기 제2걸림부(126b)가 이탈되면 상기 제2걸림부(126b)가 상기 돌출부(24)의 측면을 슬라이딩하여 상기 외측판넬(20)의 상기 돌출부(24) 배면에 위치하도록 상기 클램프(100)의 상기 강관홀더(110)를 측방으로 가압하는 강관홀더 가압단계;When the second catching portion 126b is separated from the clamp 100 such that the second catching portion 126b slides the side surface of the protruding portion 24 to be located on the rear surface of the protruding portion 24 of the outer panel 20. Steel pipe holder pressurizing step of pressing the steel pipe holder 110 of the side; 상기 강관홀더(110)에 의해 상기 제2걸림부(126b)가 상기 돌출부(24) 배면에 위치하면 상기클램프(100)가 상기 외측판넬(20)에서 완전히 분리되도록 상기 외측판넬(20)의 상기 공간부(G1)를 통해 상기 제1걸림부(126a)를 제거하는 제1걸림부 제거단계;When the second catching portion 126b is positioned on the rear surface of the protruding portion 24 by the steel pipe holder 110, the clamp 100 is completely separated from the outer panel 20 so that the clamp of the outer panel 20 is removed. A first catching part removing step of removing the first catching part 126a through a space G1; 상기 제1걸림부(126a)가 제거되면 상기 외측판넬(20)의 분리가 가능하도록 상기 외측판넬(20)의 상기 도킹부(22a, 22b) 상·하단에 끼워진 상기 끼움구(40)를 제거하는 끼움구 제거단계;When the first catching portion 126a is removed, the fitting holes 40 inserted into the upper and lower portions of the docking portions 22a and 22b of the outer panel 20 are removed so that the outer panel 20 can be separated. Insertion step removal step; 상기 끼움구(40)가 제거되면 상기 도킹부(22a, 22b)에 의한 상기 외측판넬(20)의 결속력이 상실되도록 직결된 상기 외측판넬(20)을 측방으로 슬라이딩시켜서 연속적으로 연결된 상기 외측판넬(20)을 분리하는 외측판넬 분리단계;When the fitting hole 40 is removed, the outer panel 20 continuously connected by sliding the outer panel 20 directly connected to the side so that the binding force of the outer panel 20 by the docking units 22a and 22b is lost. 20) separating the outer panel to separate; 상기 외측판넬(20)의 분리가 완료되면 상기 흡음재(32) 및 상기 흡음판(34)으로 이루어진 상기 방음부재(30)가 상기 외측판넬(20)에서 분리되도록 상기 외측판넬(20)의 상기 절곡돌기(26)로부터 상기 고정부재(F)를 제거하는 고정부재 제거단계;When the separation of the outer panel 20 is completed, the bending protrusion of the outer panel 20 so that the soundproof member 30 made of the sound absorbing material 32 and the sound absorbing plate 34 is separated from the outer panel 20. A fixing member removing step of removing the fixing member F from the 26; 상기 고정부재(F)가 제거되면 상기 방음부재(30)를 상기 외측판넬(20)의 상기 수용홈(G2)으로부터 이탈시켜서 제거하는 방음부재 제거단계; 및Removing the soundproof member 30 by removing the soundproof member 30 from the receiving groove G2 of the outer panel 20 when the fixing member F is removed; And 상기 방음부재(30)의 제거가 완료되면 상기 연결부재에 의해 격자형태를 이루는 상기 비계(10)의 상기 수직·수평강관(12, 16) 및 상기 경사강관(16)을 분리하여 상기 기초강관(A)과 함께 제거하는 비계 제거단계;를 포함하는 것을 특징으로 하는 가설방음벽의 해체방법.When the removal of the soundproof member 30 is completed by separating the vertical and horizontal steel pipes (12, 16) and the inclined steel pipe (16) of the scaffold 10 to form a grid by the connecting member to the base steel pipe ( A) and a scaffold removal step of removing together; dismantling method of the temporary soundproofing wall comprising a.
KR1020050097756A 2005-10-17 2005-10-17 Construction and dismantle method of soundproofed wall apparatus for construction KR100536825B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020050097756A KR100536825B1 (en) 2005-10-17 2005-10-17 Construction and dismantle method of soundproofed wall apparatus for construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020050097756A KR100536825B1 (en) 2005-10-17 2005-10-17 Construction and dismantle method of soundproofed wall apparatus for construction

Publications (1)

Publication Number Publication Date
KR100536825B1 true KR100536825B1 (en) 2005-12-14

Family

ID=37306667

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020050097756A KR100536825B1 (en) 2005-10-17 2005-10-17 Construction and dismantle method of soundproofed wall apparatus for construction

Country Status (1)

Country Link
KR (1) KR100536825B1 (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100816788B1 (en) * 2006-12-28 2008-03-25 김종수 Structure of temporary soundproofing walls
KR100918422B1 (en) * 2007-09-20 2009-09-24 (주)삼정스틸 Built-up structure of construction soundproof panel
KR100945461B1 (en) 2007-11-26 2010-03-05 (주)신아이엔피 Soundproofing Walls
WO2010126250A2 (en) * 2009-05-01 2010-11-04 주식회사 석강 Cover board installation structure for a construction site
KR101172753B1 (en) * 2009-08-27 2012-08-17 안경환 Temporary installation soundproofing walls
KR200466068Y1 (en) * 2012-06-29 2013-03-26 주식회사 삼일레이져 Hypothesis soundproof flat panel construction sites
EP2686506A4 (en) * 2010-11-05 2015-10-07 Dag Nordin Acoustical dampening system

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100816788B1 (en) * 2006-12-28 2008-03-25 김종수 Structure of temporary soundproofing walls
KR100918422B1 (en) * 2007-09-20 2009-09-24 (주)삼정스틸 Built-up structure of construction soundproof panel
KR100945461B1 (en) 2007-11-26 2010-03-05 (주)신아이엔피 Soundproofing Walls
WO2010126250A2 (en) * 2009-05-01 2010-11-04 주식회사 석강 Cover board installation structure for a construction site
WO2010126250A3 (en) * 2009-05-01 2011-03-10 주식회사 석강 Cover board installation structure for a construction site
CN102428239A (en) * 2009-05-01 2012-04-25 石岗株式会社 Cover board installation structure for a construction site
CN102428239B (en) * 2009-05-01 2014-10-15 石岗株式会社 Cover board installation structure for a construction site
KR101172753B1 (en) * 2009-08-27 2012-08-17 안경환 Temporary installation soundproofing walls
EP2686506A4 (en) * 2010-11-05 2015-10-07 Dag Nordin Acoustical dampening system
KR200466068Y1 (en) * 2012-06-29 2013-03-26 주식회사 삼일레이져 Hypothesis soundproof flat panel construction sites

Similar Documents

Publication Publication Date Title
KR100536825B1 (en) Construction and dismantle method of soundproofed wall apparatus for construction
KR101231150B1 (en) Solar module mounting clam
KR100536826B1 (en) Soundproofing wall of soundproofed wall apparatus for construction
WO2012125595A1 (en) Systems and methods for constructing a building structure
KR100511681B1 (en) Soundproof plate coupled structure for soundproofed wall
JP4202892B2 (en) Column removal beam reinforcement method and beam reinforcement structure in partition
KR100536829B1 (en) Clamp of soundproofed wall apparatus for construction
KR100475692B1 (en) A locking device for fixing soundproofing plate
KR200445056Y1 (en) Pipe fastening assembly
KR200444703Y1 (en) Bracket for sound insulation fence
JP4321784B1 (en) Formwork fixture and concrete formwork method
JP4908362B2 (en) Joint
KR200298082Y1 (en) Soundproof plate coupled structure for soundproofed wall
KR200449993Y1 (en) Clamp for Soundproof Panel Assembly
KR101472942B1 (en) Fence assembling clamp
JP7267143B2 (en) Baseboard fixture for scaffolding
KR200317282Y1 (en) Separator for concrete form
KR200380015Y1 (en) Clamp of Connecting Pipe
KR20090075117A (en) Concrete form
KR200403203Y1 (en) Plastic panel for sound insulation fence
JP7340651B2 (en) Connecting parts for stairs
KR100654301B1 (en) Bracket for sound insulation fence
KR200403209Y1 (en) Bracket for sound insulation fence
KR20130045454A (en) Attachment of thermal insulation deck plate
KR20170089643A (en) Temporary soundproofing walls

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20121204

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20131204

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20141209

Year of fee payment: 10

LAPS Lapse due to unpaid annual fee