KR100536411B1 - Foundation structure of slope face protect block for road - Google Patents

Foundation structure of slope face protect block for road Download PDF

Info

Publication number
KR100536411B1
KR100536411B1 KR1020050083034A KR20050083034A KR100536411B1 KR 100536411 B1 KR100536411 B1 KR 100536411B1 KR 1020050083034 A KR1020050083034 A KR 1020050083034A KR 20050083034 A KR20050083034 A KR 20050083034A KR 100536411 B1 KR100536411 B1 KR 100536411B1
Authority
KR
South Korea
Prior art keywords
block
drainage
connection
hole
surface protection
Prior art date
Application number
KR1020050083034A
Other languages
Korean (ko)
Inventor
정재경
Original Assignee
주식회사 서영엔지니어링
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 서영엔지니어링 filed Critical 주식회사 서영엔지니어링
Priority to KR1020050083034A priority Critical patent/KR100536411B1/en
Application granted granted Critical
Publication of KR100536411B1 publication Critical patent/KR100536411B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B11/00Drainage of soil, e.g. for agricultural purposes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Agronomy & Crop Science (AREA)
  • Mechanical Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

본 발명은 도로와 인접한 법면에 신속 용이하게 설치하여 법면을 이루는 성토층의 구조적인 안정과 보호를 효과적으로 이룰 수 있도록 함과 동시에 법면을 이루는 성토층 내로 침투한 침투수의 외부 배출을 효과적으로 이룰 수 있도록 하고, 배수로를 자체적으로 형성하여 배수로 관리상의 편의성과 주변 미관을 저해하는 문제 요인 등을 미연에 방지할 수 있도록 한 도로용 법면보호블록 설치구조에 관한 것이다.The present invention can be quickly and easily installed on the surface adjacent to the road to effectively achieve the structural stability and protection of the fill layer forming the surface and at the same time to effectively achieve the external discharge of the infiltration water penetrated into the fill layer forming the surface. In addition, the present invention relates to a road protection block installation structure for forming a drainage path by itself so as to prevent problems such as convenience of management of the drainage path and disturbing the surrounding aesthetics.

특히, 법면과 인접한 지면에 삽입 설치되어 있되, 전방에는 배수로가 형성되어 있고, 이 배수로를 형성하는 전방 턱의 상면에는 전면에 등간격에 걸쳐 전,후방으로 관통된 배수공이 수개 형성되어 있는 배수로 이물질 차단막의 전방에 형성되어 있는 수직 관통공에 삽입하여 이를 너트 고정할 수 있도록 하는 볼트가 수개 형성되어 있으며, 후방 상면에는 삽입 고정홈이 형성되어 있는 기초 블록과;In particular, it is inserted into the ground adjacent to the legal surface, but the drainage is formed in the front, the upper surface of the front jaw forming the drainage is a drainage foreign body having a plurality of drainage holes penetrated in the front and rear at equal intervals in the front A plurality of bolts inserted into a vertical through hole formed at the front of the blocking membrane to fix the nut, and a base block having an insertion fixing groove formed on a rear upper surface thereof;

상기 기초 블록 상에 다단 적층 연결되어 있되, 전체적인 형상이 전협후광(前廣後狹)의 형상을 취하고 있으며, 후방 하부에는 상기 기초 블록의 후방 상면에 형성되어 있는 삽입 고정홈()과 동일 구성물간에 삽입 연결을 이룰 수 있도록 하는 고정 돌기가 돌출 형성되어 있고, 후방 상부에는 동일 구성물의 후방 하부에 돌출 형성되어 있는 고정 돌기에 연결을 이룰 수 있는 연결홈이 형성되어 있으며, 내측 전방에는 집수로가 형성되어 있고, 전면 중앙에는 상기 내측 전방에 위치한 집수로와 연통을 이루고 있는 연통공이 형성되어 있고, 후면에는 이 역시 상기 집수로와 연통을 이루고 있는 연결공이 형성되어 있는 법면보호블록과;Multi-stage stacked connection on the foundation block, the overall shape is the shape of the front narrow halo (front), the rear lower portion between the same configuration as the insertion fixing groove () formed on the rear upper surface of the foundation block A fixing protrusion for forming an insertion connection is formed to protrude, and at the rear upper portion, a connecting groove for forming a connection to the fixing protrusion formed at the rear lower portion of the same component is formed. A front surface protection block having a communication hole formed in communication with the water collecting channel located in the front of the inner front, and a connection hole formed in the communication with the water collecting channel at the rear;

상기, 다단 적층 연결되어 있는 각 법면보호블록의 전방 중앙에 형성되어 있는 연통공에 후방에 연결 형성되어 있는 러버재질의 연결구를 이용하여 삽입 연결되어 상호간의 연통을 가능하게 하는 배수 처리파이프와;A drainage treatment pipe inserted into and connected to the communication hole formed at the front center of each of the front surface protection blocks connected to the multi-stage stack by using a rubber connector;

상기, 다단 적층 연결되어 있는 각 법면보호블록의 후방 중앙에 형성되어 있는 연결공에 삽입하여 너트 체결되어 있되, 전면에 걸쳐서는 유공이 형성되어 있고, 이렇게 유공이 형성된 외주연에는 투수파이프가 연결 설치되어 있는 유공 체결 파이프와;The nut is inserted into a connection hole formed at the rear center of each of the front surface protection blocks that are connected in a multi-stage stack, and a hole is formed over the front surface, and a perforated pipe is connected to the outer periphery where the hole is formed. A perforated fastening pipe;

상기, 다단 적층 연결되어 있는 각 법면보호블록 중 최상부에 위치한 법면보호블록에 전방 하면에 형성되어 있는 연결 돌기를 이용하여 연결 설치되어 있되, 상면에는 상,하로 수직 관통된 식재공 수개가 등간격으로 형성되어 있는 상단 마감 블록과;The multi-stage stacking connection is provided by connecting projections formed on the front lower surface to the front surface protection block located at the top of each of the front surface protection block, the upper and lower vertically penetrating planting holes several at equal intervals An upper finishing block formed;

상기, 다단 적층 연결되어 있는 각 법면보호블록의 후방에 연결 위치되는 유공 체결 파이프의 선단 외주연에 위치되는 골재를 일체로 포함하여 구성됨을 특징으로 한다. The multi-stage laminated connection is characterized in that it comprises an aggregate integrally located on the outer peripheral edge of the front end of the hole fastening pipe that is connected to the rear of the front protective block.

Description

도로용 법면보호블록 설치구조{foundation structure of slope face protect block for road}Establishment structure of slope face protect block for road}

본 발명은 도로용 법면보호블록 설치구조에 관한 것으로, 더욱 상세하게는 도로와 인접한 법면에 신속 용이하게 설치하여 법면을 이루는 성토층의 구조적인 안정과 보호를 효과적으로 이룰 수 있도록 함과 동시에 법면을 이루는 성토층 내로 침투한 침투수의 외부 배출을 효과적으로 이룰 수 있도록 하고, 배수로를 자체적으로 형성하여 배수로 관리상의 편의성과 주변 미관을 저해하는 문제 요인 등을 미연에 방지할 수 있도록 한 도로용 법면보호블록 설치구조에 관한 것이다.The present invention relates to a road protection block installation structure for roads, and more particularly, to quickly and easily installed on the surface adjacent to the road to achieve the structural stability and protection of the fill layer forming the surface effectively and at the same time to form a surface Installation of road protection blocks for roads to effectively achieve external discharge of infiltration water penetrated into the fill layer, and to prevent the problems such as the convenience of management of the drainage path and the problem of hindering the surrounding aesthetics by forming the drainage path by itself. It's about structure.

일반적으로 도로를 조성하는 과정에서 노상면을 정형하기 위해 자연 토층을 절토하거나 기초지반 위에 성토를 취하는 공사를 도로 토공이라 한다.In general, construction works that cut natural soil layers or fill soils on foundation grounds to form road surfaces in the process of creating roads are called earthworks.

이렇게 노상면을 정형하기 위해 불가피하게 자연 토층을 절토한 이후에는 이 절토된 부위에 비탈지게 성토를 다짐한 후 이렇게 성토에 의해 형성된 법면에 식물 또는 구조물에 의한 법면보호공을 시공하게 된다. After inevitably cutting the natural soil layer to shape the road surface, the soil is compacted to the cut area, and the surface protection hole by plants or structures is constructed on the surface formed by the soil.

여기서 이러한 법면 보호공을 시공하는 것은 법면이 외부적인 기후 요인 등에 의해 도로로 슬라이딩 되는 사태를 사전에 예방할 수 있도록 하기 위한 것이다.The construction of such a surface protector is intended to prevent the sliding of the surface to the road due to external weather factors.

그러나, 이러한 기존의 법면 보호공 대분은 강우를 동반하는 악천우시 또는 융설기 등에 그 내부에 침투한 물에 의해 안정을 잃고 법면의 효과적인 보호를 이룰 수 없어 도 3에 도시된 바와 같이 슬라이딩 되어 인접한 도로로 유실되는 문제 현상이 자주 초래되었다.However, most of the existing surface protectors lose stability due to water penetrating into the rainy weather or snow melter accompanied by rainfall, and can not achieve effective protection of the surface. As shown in FIG. Problems with the loss of roads often resulted.

이에 따라 도로 소통에 크나큰 장애는 물론이고 인명 사고를 유발시키는 문제 현상을 자주 초래하였고, 또한 해마다 막대한 예산을 편성하여 유지 보수해 주어야 하는 불편하고도 비경제적인 문제점이 있었다.As a result, there were frequent obstacles to road traffic, as well as problems causing human accidents, and there was also an uncomfortable and uneconomical problem of having to make and maintain a huge budget every year.

그리고, 이러한 법면 보호공 대부분은 시공에 상당한 공기가 소요되는 문제점이 있었다. In addition, most of these surface protectors had a problem in that a considerable amount of air is required for construction.

본 발명은 상술한 바와 같은 종래의 문제들을 감안하여 이를 해결하고자 안출한 것으로, 그 목적은 도로와 인접한 법면에 신속 용이하게 설치하여 법면을 이루는 성토층의 구조적인 안정과 보호를 효과적으로 이룰 수 있도록 함과 동시에 법면을 이루는 성토층 내로 침투한 침투수의 외부 배출을 효과적으로 이룰 수 있도록 하고, 배수로를 자체적으로 형성하여 배수로 관리상의 편의성과 주변 미관을 저해하는 문제 요인 등을 미연에 방지할 수 있도록 한 도로용 법면보호블록 설치구조를 제공하는 데 있다.The present invention has been made in view of the conventional problems as described above, the purpose is to quickly and easily installed on the surface adjacent to the road to achieve the structural stability and protection of the fill layer forming the surface effectively At the same time, it is possible to effectively achieve the external discharge of the infiltrate water penetrating into the embankment layer that forms the legal surface, and to make the drainage itself so as to prevent problems such as the convenience of management of the drainage path and the problems that hinder the surrounding aesthetics. It is to provide a surface protection block installation structure.

상기의 목적을 달성하기 위한 본 발명의 구체적인 수단은,Specific means of the present invention for achieving the above object,

법면과 인접한 지면에 삽입 설치되어 있되, 전방에는 배수로가 형성되어 있고, 이 배수로를 형성하는 전방 턱의 상면에는 전면에 등간격에 걸쳐 전,후방으로 관통된 배수공이 수개 형성되어 있는 배수로 이물질 차단막의 전방에 형성되어 있는 수직 관통공에 삽입하여 이를 너트 고정할 수 있도록 하는 볼트가 수개 형성되어 있으며, 후방 상면에는 삽입 고정홈이 형성되어 있는 기초 블록과;It is inserted into the ground adjacent to the legal surface, but the drainage is formed in the front, and the upper surface of the front jaw forming the drainage is formed in the front of the drainage barrier of the foreign material blocking membrane which has a plurality of drainage holes penetrated in the front and rear over equal intervals. A plurality of bolts inserted into the vertical through-holes formed at the front to fix the nuts, and a base block having an insertion fixing groove formed at the rear upper surface thereof;

상기 기초 블록 상에 다단 적층 연결되어 있되, 전체적인 형상이 전협후광(前廣後狹)의 형상을 취하고 있으며, 후방 하부에는 상기 기초 블록의 후방 상면에 형성되어 있는 삽입 고정홈과 동일 구성물간에 삽입 연결을 이룰 수 있도록 하는 고정 돌기가 돌출 형성되어 있고, 후방 상부에는 동일 구성물의 후방 하부에 돌출 형성되어 있는 고정 돌기에 연결을 이룰 수 있는 연결홈이 형성되어 있으며, 내측 전방에는 집수로가 형성되어 있고, 전면 중앙에는 상기 내측 전방에 위치한 집수로와 연통을 이루고 있는 연통공이 형성되어 있고, 후면에는 이 역시 상기 집수로와 연통을 이루고 있는 연결공이 형성되어 있는 법면보호블록과;Multi-stage stacked connection on the foundation block, the overall shape is the shape of the front narrow halo (front), the rear lower portion is inserted into the connection between the same configuration and the insertion fixing groove formed on the rear upper surface of the foundation block Fixing protrusions are formed to protrude, and the rear upper portion is formed with a connecting groove to form a connection to the fixing protrusions protruding formed in the rear lower portion of the same component, the inner front is formed with a collecting channel A front surface protection block having a communication hole formed in communication with the water collecting channel located at the inner front, and a connection hole formed in the rear communication with the water collecting channel;

상기, 다단 적층 연결되어 있는 각 법면보호블록의 전방 중앙에 형성되어 있는 연통공에 후방에 연결 형성되어 있는 러버재질의 연결구를 이용하여 삽입 연결되어 상호간의 연통을 가능하게 하는 배수 처리파이프와;A drainage treatment pipe inserted into and connected to the communication hole formed at the front center of each of the front surface protection blocks connected to the multi-stage stack by using a rubber connector;

상기, 다단 적층 연결되어 있는 각 법면보호블록의 후방 중앙에 형성되어 있는 연결공에 삽입하여 너트 체결되어 있되, 전면에 걸쳐서는 유공이 형성되어 있고, 이렇게 유공이 형성된 외주연에는 투수파이프가 연결 설치되어 있는 유공 체결 파이프와;The nut is inserted into a connection hole formed at the rear center of each of the front surface protection blocks that are connected in a multi-stage stack, and a hole is formed over the front surface, and a perforated pipe is connected to the outer periphery where the hole is formed. A perforated fastening pipe;

상기, 다단 적층 연결되어 있는 각 법면보호블록 중 최상부에 위치한 법면보호블록에 전방 하면에 형성되어 있는 연결 돌기를 이용하여 연결 설치되어 있되, 상면에는 상,하로 수직 관통된 식재공 수개가 등간격으로 형성되어 있는 상단 마감 블록과;The multi-stage stacking connection is provided by connecting projections formed on the front lower surface to the front surface protection block located at the top of each of the front surface protection block, the upper and lower vertically penetrating planting holes several at equal intervals An upper finishing block formed;

상기, 다단 적층 연결되어 있는 각 법면보호블록의 후방에 연결 위치되는 유공 체결 파이프의 선단 외주연에 위치되는 골재를 일체로 포함하여 구성됨을 특징으로 한다. The multi-stage laminated connection is characterized in that it comprises an aggregate integrally located on the outer peripheral edge of the front end of the hole fastening pipe that is connected to the rear of the front protective block.

이하, 본 발명의 구성을 도면을 참조하여 상세하게 설명하면 다음과 같다.Hereinafter, the configuration of the present invention in detail with reference to the drawings.

도 1은 본 발명에 따른 도로용 법면보호블록 설치구조의 구성 상태를 도시한 분해 사시도이고, 도 2는 본 발명에 따른 도로용 법면보호블록 설치구조의 연결 설치된 상태를 도시한 단면도이다.1 is an exploded perspective view showing a configuration of the road surface protective block installation structure for road according to the present invention, Figure 2 is a cross-sectional view showing a connection state of the road surface protective block installation structure for road according to the present invention.

참고로, 본 발명을 설명함에 있어 관련된 공지 기능 또는 구성에 대한 구체적인 설명이 본 발명의 요지를 불필요하게 흐릴 수 있다고 판단될 경우에는 그 상세한 설명을 생략하였다.For reference, in describing the present invention, when it is determined that a detailed description of related known functions or configurations may unnecessarily obscure the gist of the present invention, the detailed description thereof is omitted.

또한, 후술되는 용어들은 본 발명에서의 기능을 고려하여 정의된 용어들로서 이는 사용자와 운영자의 의도 또는 관례 등에 따라 달라질 수 있다.In addition, terms to be described below are terms defined in consideration of functions in the present invention, which may vary according to intentions or customs of users and operators.

그러므로, 그 정의는 본 명세서 전반에 걸친 내용을 토대로 내려져야 할 것이다.Therefore, the definition should be made based on the contents throughout the specification.

도시된 바와 같이 법면과 인접한 지면에는 전방에 배수로(11)가 형성되어 있고, 이 배수로(11)를 형성하는 전방 턱(12)의 상면에는 전면에 등간격에 걸쳐 전,후방으로 관통된 배수공(13)이 수개 형성되어 있는 배수로 이물질 차단막(14)의 전방에 형성되어 있는 수직 관통공(15)에 삽입하여 이를 너트(16) 고정할 수 있도록 하는 볼트(17)가 수개 형성되어 있으며, 후방 상면에는 삽입 고정홈(18)이 형성되어 있는 기초 블록(10)이 삽입 설치되어 있다.As shown in the figure, the drainage passage 11 is formed on the front surface adjacent to the law surface, and the drainage hole penetrates the front and rear at equal intervals on the front surface of the front jaw 12 forming the drainage passage 11. A plurality of bolts 17 are formed to allow the nut 16 to be inserted into the vertical through hole 15 formed at the front of the foreign matter blocking film 14 by a plurality of drainage channels 13 formed therein, and a rear upper surface thereof. The base block 10 in which the insertion fixing groove 18 is formed is inserted in this.

그리고, 상기 기초 블록(10) 상부에는 전체적인 형상이 전협후광(前廣後狹)의 형상을 취하고 있되, 후방 하부에는 상기 기초 블록(10)의 후방 상면에 형성되어 있는 삽입 고정홈(18)과 동일 구성물간에 삽입 연결을 이룰 수 있도록 하는 고정 돌기(21)가 돌출 형성되어 있고, 후방 상부에는 동일 구성물의 후방 하부에 돌출 형성되어 있는 고정 돌기(21)에 연결을 이룰 수 있는 연결홈(22)이 형성되어 있으며, 내측 전방에는 집수로(23)가 형성되어 있고, 전면 중앙에는 상기 내측 전방에 위치한 집수로(23)와 연통을 이루고 있는 연통공(24)이 형성되어 있으며, 후면에는 이 역시 상기 집수로(23)와 연통을 이루고 있는 연결공(25)이 형성되어 있는 법면보호블록(20)이 다단 적층 연결되어 있다.In addition, the overall shape of the upper portion of the base block 10 has the shape of the front narrow halo (front), the rear lower portion of the insertion fixing groove 18 formed on the rear upper surface of the base block 10 and Fixing protrusions 21 are formed to protrude between the same components to form an insertion connection, the rear upper connection grooves 22 to form a connection to the fixing protrusions 21 protruding from the rear lower portion of the same configuration. Is formed, the inner front is a water collecting passage 23 is formed, the front center is formed with a communication hole 24 in communication with the collecting passage 23 located in the inner front, the rear is also this The surface protection block 20 in which the connection hole 25 which communicates with the said water collecting passage 23 is formed is multi-stage laminated connection.

또한, 상기 다단 적층 연결되어 있는 각 법면보호블록(20)의 전방 중앙에 형성되어 있는 연통공(24)에는 후방에 연결 형성되어 있는 러버재질의 연결구(31)를 이용하여 상호간의 연통을 가능하게 하는 배수 처리파이프(30)가 삽입 연결되어 있고, 상기, 다단 적층 연결되어 있는 각 법면보호블록(20)의 후방 중앙에 형성되어 있는 연결공(25)에는 전면에 걸쳐서는 유공(41)이 형성되어 있고, 이렇게 유공(41)이 형성된 외주연에는 투수파이프(42)가 연결 설치되어 있는 유공 체결 파이프(40)가 삽입되어 너트(43) 체결되어 있으며, 상기, 다단 적층 연결되어 있는 각 법면보호블록(20) 중 최상부에 위치한 법면보호블록(20)에는 상면에는 상,하로 수직 관통된 식재공(52) 수개가 등간격으로 형성되어 있는 상단 마감 블록(50)이 전방 하면에 형성되어 있는 연결 돌기(51)를 상기 법면보호블록(20)의 후방 상부에 형성되어 있는 삽입 고정홈(18)에 삽입 연결하여 연결 설치되어 있고, 상기, 다단 적층 연결되어 있는 각 법면보호블록(20)의 후방에 연결 위치되는 유공 체결 파이프(40)의 선단 외주연에는 골재(60)가 위치되어 있다.In addition, the communication hole 24 formed at the front center of each of the front surface protection blocks 20 connected to the multi-stage stack connection is connected to each other by using a rubber material connector 31 connected to the rear. The drainage treatment pipe 30 is inserted into and connected, and the hole 25 is formed in the connection hole 25 formed at the rear center of each of the front surface protection blocks 20 which are connected in a multi-stage stack. In the outer periphery in which the holes 41 are formed, a hole 43 fastening pipe 40 in which the permeable pipe 42 is connected is inserted and fastened to the nut 43, and the surface protections of the multi-layer laminated connection In the front surface of the block protection block 20 located in the top of the block 20, the upper and lower vertical finishing block 50, which is formed at equal intervals the number of vertically penetrating planting holes 52 is connected to the front lower surface Projection (51) The hole is inserted into and connected to the insertion fixing groove 18 is formed in the rear upper portion of the surface protection block 20, the hole is connected to the rear of each of the surface protection block 20, which is multi-stage laminated connection Aggregate 60 is located at the outer periphery of the distal end of the fastening pipe 40.

다음은 상술한 기술적 구성 요소를 참조하여 본 발명의 작용효과를 설명한다. The following describes the operational effects of the present invention with reference to the above technical components.

먼저, 이해를 돕기 위해 시공 순서와 더불어 설치 방법을 개략적으로 설명하면 다음과 같다.First, the installation method and the installation method will be briefly described as follows to help understanding.

법면과 일정의 간격을 두고 도로와 인접한 지면을 터파기한 후 이 터파기한 지점에 기초 블록(10)을 매설하고 뒤이어 이 기초 블록(10) 후방 상면에 형성되어 있는 삽입 고정홈(18)에 법면보호블록(20)의 후방 하부에 형성되어 있는 고정 돌기(21)를 삽입하여 연결 위치시키면 된다.After digging the ground adjacent to the road at a certain distance from the surface, the foundation block 10 is embedded at the excavated point, followed by the surface protection in the insertion fixing groove 18 formed on the rear surface of the foundation block 10. What is necessary is just to insert and fix the fixing protrusion 21 formed in the lower back part of the block 20.

그리고, 이렇게 기초 블록(10)의 상부에 연결 위치된 법면보호블록(20)의 후방 상부에 형성되어 있는 연결홈(22)에 동일 구성물이라 할 수 있는 타 법면보호블록(20)의 후방 하부에 형성되어 있는 고정 돌기(21)를 삽입 연결하여 위치시키면 된다.Then, in the rear lower portion of the other surface protection block 20 which can be referred to as the same configuration in the connection groove 22 formed in the rear upper portion of the front surface protection block 20 located at the upper portion of the foundation block 10 in this way. What is necessary is just to insert and connect the fixed protrusion 21 formed.

여기서 이러한 법면보호블록(20)의 연결 설치는 법면의 높이에 해당하는 높이만큼 다단 적층 연결하면 된다.Here, the installation of the connection surface protection block 20 may be a multi-stage laminated connection by the height corresponding to the height of the surface.

이때, 다단 적층 연결되는 각 법면보호블록(20)의 후방에 형성되어 있는 연결공(25)에는 외주연에 투수파이프(32)가 연결 설치되어 있는 유공 체결 파이프(30)의 선단을 삽입하여 너트(33) 고정하여야 한다. At this time, a nut is inserted into the connection hole 25 formed at the rear of each of the front surface protection blocks 20 connected to the multi-stage stack by inserting the end of the perforated pipe 30 in which the permeable pipe 32 is connected to the outer periphery. (33) To be fixed.

그리고, 이러한 법면보호블록(20)간의 적층 연결이 완료되면 상기 적층 연결된 법면보호블록(20)의 전방 중앙에 형성되어 있는 연통공(24)에 후방에 연결 형성되어 있는 러버재질의 연결구(31)를 이용하여 배수 처리파이프(30)를 삽입 연결한 후 이렇게 형성시킨 법면보호블록(20)과 법면 사이에 복토를 하면 시공이 완료된다.And, when the laminated connection between the surface protection block 20 is completed, the rubber connector (31) is formed in the rear connection to the communication hole 24 formed in the front center of the laminated connection surface protection block 20. After inserting and connecting the drainage treatment pipe 30 by using the cover between the protective block 20 and the surface formed in this way construction is completed.

이때, 이러한 복토 과정에서 상기 각 법면보호블록(20)의 후방에 연결 위치되는 유공 체결 파이프(40)의 선단 외주연에 골재(60)를 위치시켜야 한다.At this time, in such a cover process, the aggregate (60) should be positioned on the outer periphery of the front end of the hole fastening pipe (40) which is connected to the rear of the front surface protection block (20).

이와 같이 시공되는 본 발명은 법면을 기초 블록(10) 상에 적층연결되어 있는 법면보호블록(20)과 이 법면보호블록(20)과 연결 설치된 배수시설, 즉 법면보호블록(20)에 형성되어 있는 집수로(23)와 상기 집수로(23)와 연결 설치되어 있어 집수된 오수를 기초 블록(10)에 일체로 형성되어 있는 배수로(11) 상으로 배출 유도할 수 있는 배수 처리파이프(30)와 법면을 이루는 성토층 내로 침투한 침출수를 집수하여 상기 집수로(23)으로 전달할 수 있는 유공 체결 파이프(40)에 의해 구조적인 안정을 장기간 걸쳐 이루며 견고히 유지 보호할 수 있게 된다.The present invention constructed as described above is formed in the surface protection block 20 and the drainage facility, that is, the surface protection block 20 installed in connection with the surface protection block 20 is stacked on the foundation block 10 connected to the surface And a drainage treatment pipe 30 which is installed in connection with the catchment passage 23 and the catchment passage 23 to discharge the collected sewage onto the drainage passage 11 formed integrally with the foundation block 10. By collecting the leachate penetrated into the fill layer forming the law and the surface, the hole fastening pipe 40 that can be delivered to the water collecting passage 23 to achieve a structural stability for a long time and firmly maintain and protect.

그리고, 이러한 작용을 이룰 수 있는 법면보호시설이 조립식 구조로 이루어져 있어 이동과 시공을 비교적 신속 용이하게 이룰 수 있으므로 공기 단축에 따른 공비의 절감과 시공 편의에 따른 작업의 편의성 등을 대폭 향상시켜 줄 수 있게 된다. In addition, the surface protection facility that can achieve such an action is made of a prefabricated structure, so that movement and construction can be performed relatively quickly and easily, thereby greatly reducing the cost of air shortening and the convenience of work according to the construction convenience. Will be.

또한, 도로 주변에 통상적으로 설치되는 배수로의 시공을 별도로 이루지 않아도 됨에 따른 경제적인 이익 측면과 이러한 배수로의 외부 노출을 방지함에 따른 도로 주변의 경관미를 개선할 수 있는 작용을 이룰 수 있게 되고, 최상부에 위치하는 상단 마감 블록(50)에 식재를 이룰 수 있는 식재공(52)을 형성하여 주어 도로 주변 경관미의 향상과 더불어 우기시 법면의 상단이 빗물에 슬라이딩 되는 문제현상을 최소화할 수 있게 된다. In addition, it is possible to achieve the economical benefit of not having to separately construct the drainage paths normally installed around the road, and to improve the landscape beauty around the roadway by preventing the external exposure of such drainage paths. By forming a planting hole 52 to form a planting plant in the top finishing block 50 is located, it is possible to minimize the problem phenomenon that the upper surface of the surface during the rainy season sliding in addition to the improvement of scenic beauty around the road.

참고로 본 발명은 다양하게 변형 실시될 수 있고, 여러 가지의 형태를 취할 수 있으나 상기 발명의 상세한 설명에서는 그에 따른 특별한 실시 예에 대해서만 기술하였다.For reference, the present invention may be variously modified and may take various forms. However, in the detailed description of the present invention, only specific embodiments thereof are described.

그러므로, 본 발명은 상세한 설명에서 언급되는 특별한 형태로 한정되는 것이 아닌 것으로 인정되어야 하며, 오히려 첨부된 청구범위에 의해 정의되는 본 발명의 정신과 범위 내에 있는 모든 변형물과 균등물 및 대체물을 포함하는 것으로 이해되어야 한다. Therefore, it is to be understood that the invention is not to be limited to the specific forms referred to in the description, but rather to include all modifications, equivalents and alternatives falling within the spirit and scope of the invention as defined by the appended claims. It must be understood.

이상에서 살펴 본 바와 같이 본 발명은 도로와 인접한 법면에 신속 용이하게 설치하여 법면을 이루는 성토층의 구조적인 안정과 보호를 효과적으로 이룰 수 있도록 함과 동시에 법면을 이루는 성토층 내로 침투한 침투수의 외부 배출을 효과적으로 이룰 수 있도록 하고, 배수로를 자체적으로 형성하여 배수로 관리상의 편의성과 주변 미관을 저해하는 문제 요인 등을 미연에 방지할 수 있도록 한 효과가 있다.As described above, the present invention can be quickly and easily installed on the surface adjacent to the road to achieve structural stability and protection of the fill layer forming the surface effectively and at the same time the outside of the infiltration water penetrated into the fill layer forming the surface. It is effective in achieving the discharge effectively, and by forming the drainage path by itself, it is possible to prevent the problems such as the convenience of the drainage management and the disturbance of the surrounding aesthetics in advance.

도 1은 본 발명에 따른 도로용 법면보호블록 설치구조의 구성 상태를 도시한 분해 사시도.1 is an exploded perspective view showing the configuration of the road surface protective block installation structure according to the present invention.

도 2는 본 발명에 따른 도로용 법면보호블록 설치구조의 연결 설치된 상태를 도시한 단면도.Figure 2 is a cross-sectional view showing a connection installed state of the road surface protective block installation structure according to the present invention.

도 3은 종래 법면보호시설의 문제점을 도시한 측단면도.Figure 3 is a side cross-sectional view showing a problem of the conventional legal protection facilities.

<도면중 주요부분에 대한 부호의 설명><Description of the symbols for the main parts of the drawings>

10 : 기초 블록 11 : 배수로10: foundation block 11: drainage

12 : 전방 턱 13 : 배수공12: front jaw 13: drain hole

14 : 이물질 차단막 15 : 수직 관통공14: foreign material blocking film 15: vertical through hole

16 : 너트 17 : 볼트16: Nut 17: Bolt

18 : 삽입 고정홈18: insertion fixing groove

20 : 법면보호블록 21 : 고정 돌기20: legal protection block 21: fixed protrusion

22 : 연결홈 23 : 집수로22: connecting groove 23: catchment

24 : 연통공 25 : 연결공24: communication hole 25: connection hole

30 : 배수 처리 파이프 31 : 연결구30: drainage pipe 31: connector

40 : 유공 체결 파이프 41 : 유공40: hole fastening pipe 41: hole

42 : 투수 파이프 43 : 너트42: Pitcher Pipe 43: Nut

50 : 상단 마감 블록 51 : 연결 돌기50: top finishing block 51: connecting projection

52 : 식재공 52: planting work

60 : 골재 60: aggregate

Claims (1)

직각 또는 경사지게 절토된 절토면의 붕락을 방지하기 위해 시공되는 법면보호시설물에 있어서,In the surface protection facility constructed to prevent the collapse of the cut surface cut perpendicularly or obliquely, 법면과 인접한 지면에 삽입 설치되어 있되, 전방에는 배수로가 형성되어 있고, 이 배수로를 형성하는 전방 턱의 상면에는 전면에 등간격에 걸쳐 전,후방으로 관통된 배수공이 수개 형성되어 있는 배수로 이물질 차단막의 전방에 형성되어 있는 수직 관통공에 삽입하여 이를 너트 고정할 수 있도록 하는 볼트가 수개 형성되어 있으며, 후방 상면에는 삽입 고정홈이 형성되어 있는 기초 블록과;It is inserted into the ground adjacent to the legal surface, but the drainage is formed in the front, and the upper surface of the front jaw forming the drainage is formed in the front of the drainage barrier of the foreign material blocking membrane which has a plurality of drainage holes penetrated in the front and rear over equal intervals. A plurality of bolts inserted into the vertical through-holes formed at the front to fix the nuts, and a base block having an insertion fixing groove formed at the rear upper surface thereof; 상기 기초 블록 상에 다단 적층 연결되어 있되, 전체적인 형상이 전협후광(前廣後狹)의 형상을 취하고 있으며, 후방 하부에는 상기 기초 블록의 후방 상면에 형성되어 있는 삽입 고정홈과 동일 구성물간에 삽입 연결을 이룰 수 있도록 하는 고정 돌기가 돌출 형성되어 있고, 후방 상부에는 동일 구성물의 후방 하부에 돌출 형성되어 있는 고정 돌기에 연결을 이룰 수 있는 연결홈이 형성되어 있으며, 내측 전방에는 집수로가 형성되어 있고, 전면 중앙에는 상기 내측 전방에 위치한 집수로와 연통을 이루고 있는 연통공이 형성되어 있고, 후면에는 이 역시 상기 집수로와 연통을 이루고 있는 연결공이 형성되어 있는 법면보호블록과;Multi-stage stacked connection on the foundation block, the overall shape is the shape of the front narrow halo (front), the rear lower portion is inserted into the connection between the same configuration and the insertion fixing groove formed on the rear upper surface of the foundation block Fixing protrusions are formed to protrude, and the rear upper portion is formed with a connecting groove to form a connection to the fixing protrusions protruding formed in the rear lower portion of the same component, the inner front is formed with a collecting channel A front surface protection block having a communication hole formed in communication with the water collecting channel located at the inner front, and a connection hole formed in the rear communication with the water collecting channel; 상기, 다단 적층 연결되어 있는 각 법면보호블록의 전방 중앙에 형성되어 있는 연통공에 후방에 연결 형성되어 있는 러버재질의 연결구를 이용하여 삽입 연결되어 상호간의 연통을 가능하게 하는 배수 처리파이프와;A drainage treatment pipe inserted into and connected to the communication hole formed at the front center of each of the front surface protection blocks connected to the multi-stage stack by using a rubber connector; 상기, 다단 적층 연결되어 있는 각 법면보호블록의 후방 중앙에 형성되어 있는 연결공에 삽입하여 너트 체결되어 있되, 전면에 걸쳐서는 유공이 형성되어 있고, 이렇게 유공이 형성된 외주연에는 투수파이프가 연결 설치되어 있는 유공 체결 파이프와;The nut is inserted into a connection hole formed at the rear center of each of the front surface protection blocks that are connected in a multi-stage stack, and a hole is formed over the front surface, and a perforated pipe is connected to the outer periphery where the hole is formed. A perforated fastening pipe; 상기, 다단 적층 연결되어 있는 각 법면보호블록 중 최상부에 위치한 법면보호블록에 전방 하면에 형성되어 있는 연결 돌기를 이용하여 연결 설치되어 있되, 상면에는 상,하로 수직 관통된 식재공 수개가 등간격으로 형성되어 있는 상단 마감 블록과;The multi-stage stacking connection is provided by connecting projections formed on the front lower surface to the front surface protection block located at the top of each of the front surface protection block, the upper and lower vertically penetrating planting holes several at equal intervals An upper finishing block formed; 상기, 다단 적층 연결되어 있는 각 법면보호블록의 후방에 연결 위치되는 유공 체결 파이프의 선단 외주연에 위치되는 골재를 일체로 포함하여 구성됨을 특징으로 하는 도로용 법면보호블록 설치구조.The surface protection block installation structure for a road, characterized in that it comprises an aggregate integrally located on the outer periphery of the distal end of the hole fastening pipe that is connected to the rear of each of the surface protection blocks that are connected in a multi-stage stack.
KR1020050083034A 2005-09-07 2005-09-07 Foundation structure of slope face protect block for road KR100536411B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020050083034A KR100536411B1 (en) 2005-09-07 2005-09-07 Foundation structure of slope face protect block for road

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020050083034A KR100536411B1 (en) 2005-09-07 2005-09-07 Foundation structure of slope face protect block for road

Publications (1)

Publication Number Publication Date
KR100536411B1 true KR100536411B1 (en) 2005-12-14

Family

ID=37306643

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020050083034A KR100536411B1 (en) 2005-09-07 2005-09-07 Foundation structure of slope face protect block for road

Country Status (1)

Country Link
KR (1) KR100536411B1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103866774A (en) * 2014-03-31 2014-06-18 张锦宇 Ditch pipe network protection body for slope protection and collapsing hill drainage and soil fixation
CN106149736A (en) * 2016-08-24 2016-11-23 陕西建工第二建设集团有限公司 The construction method stable based on cutting draining holding hillside fields bury excavation slope
CN114457820A (en) * 2022-02-21 2022-05-10 中国水利水电第五工程局有限公司 High slope earth and stone excavation protective guard adjacent to urban highway and construction method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103866774A (en) * 2014-03-31 2014-06-18 张锦宇 Ditch pipe network protection body for slope protection and collapsing hill drainage and soil fixation
CN106149736A (en) * 2016-08-24 2016-11-23 陕西建工第二建设集团有限公司 The construction method stable based on cutting draining holding hillside fields bury excavation slope
CN106149736B (en) * 2016-08-24 2017-07-14 陕西建工第二建设集团有限公司 The stable construction method of hillside fields bury excavation slope is kept based on draining is cut
CN114457820A (en) * 2022-02-21 2022-05-10 中国水利水电第五工程局有限公司 High slope earth and stone excavation protective guard adjacent to urban highway and construction method
CN114457820B (en) * 2022-02-21 2024-04-16 中国水利水电第五工程局有限公司 High slope earth and stone excavation guard rail adjacent to urban expressway and construction method

Similar Documents

Publication Publication Date Title
CN106759825B (en) Construction method of sponge urban green land water storage system
CN202170502U (en) Soil cut slope drainage system
CN106065656B (en) Guard system and construction method are oozed under the regularization of Collapsible Loess District rainwater
KR102233633B1 (en) Rainwater infiltration device for flower beds
KR100536411B1 (en) Foundation structure of slope face protect block for road
KR101043662B1 (en) Rain water draining side ditch assembly
KR100684542B1 (en) Foundation structure of slope face protect block forroad
CN211228269U (en) High-grade highway central separation strip structure
CN207988098U (en) A kind of road oozes drainage system
KR101906075B1 (en) Road side ditch having seepage paving-material
JP2007211546A (en) Bed soil draining improving structure for lawn grass ground surface
KR100523962B1 (en) A slope protection equipment for construction
CN214033246U (en) A road seepage prevention structure for sponge city design
KR100790387B1 (en) Slope protection equipment for road
CN211498333U (en) Roadbed drainage structure for municipal road construction
JPH08205691A (en) Planted tree zone
KR20060097377A (en) Constructing method of road block for protecting roadside tree
KR100519910B1 (en) A slope protection equipment for construction development
JP2011137354A (en) Drainage device for field
KR100542617B1 (en) Prefabricated concrete vegetation retaining wall and it&#39;s construction method
CN210288008U (en) Two-stage road slope ditch component and two-stage road slope ditch structure
KR100616245B1 (en) breast foundation structure for development house a environmentally
KR100903307B1 (en) The cover plate for protection a street trees
KR102219577B1 (en) Sidewalk structure for decreasing outflowing water
KR100673908B1 (en) A footway for protecting lawn

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
N231 Notification of change of applicant
N231 Notification of change of applicant
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20121203

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20131129

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20141208

Year of fee payment: 10

FPAY Annual fee payment

Payment date: 20151204

Year of fee payment: 11

FPAY Annual fee payment

Payment date: 20161205

Year of fee payment: 12

FPAY Annual fee payment

Payment date: 20171206

Year of fee payment: 13

FPAY Annual fee payment

Payment date: 20181203

Year of fee payment: 14

FPAY Annual fee payment

Payment date: 20200102

Year of fee payment: 15