KR100523115B1 - The steel pipe inserting method making use of compressed air and grout injection in Jet Grouting Pile - Google Patents
The steel pipe inserting method making use of compressed air and grout injection in Jet Grouting Pile Download PDFInfo
- Publication number
- KR100523115B1 KR100523115B1 KR10-2003-0008085A KR20030008085A KR100523115B1 KR 100523115 B1 KR100523115 B1 KR 100523115B1 KR 20030008085 A KR20030008085 A KR 20030008085A KR 100523115 B1 KR100523115 B1 KR 100523115B1
- Authority
- KR
- South Korea
- Prior art keywords
- steel pipe
- compressed air
- grout
- pipe
- injection
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D3/00—Improving or preserving soil or rock, e.g. preserving permafrost soil
- E02D3/12—Consolidating by placing solidifying or pore-filling substances in the soil
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2250/00—Production methods
- E02D2250/003—Injection of material
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D9/00—Removing sheet piles bulkheads, piles, mould-pipes or other moulds or parts thereof
- E02D9/02—Removing sheet piles bulkheads, piles, mould-pipes or other moulds or parts thereof by withdrawing
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Soil Sciences (AREA)
- Environmental & Geological Engineering (AREA)
- Agronomy & Crop Science (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
- Piles And Underground Anchors (AREA)
Abstract
본 발명은 초고압 제트류를 이용하여 그라우트를 연약 지반에 회전 분사하여 원주상의 고결체를 형성하고 원주상 고결체의 전단 강도를 증대시키기 위하여 강관을 삽입하는 제트 그라우팅 파일 공법에 관한 것으로, 더욱 상세하게는 고결체를 시공하고 이를 천공하여 강관을 삽입한 후 공극을 다시 그라우팅하여야 하는 종래 공법의 문제점을 해결하기 위하여 그라우트(grout) 경화 이전에 강관을 인입함으로써, 지층이 다변하는 깊은 심도까지 수직도를 유지하면서 강관을 인입할 수 있고 불필요한 종래의 공정을 제거하여 시공성을 향상시키는 제트 그라우팅 파일 공법에 있어 압축공기와 그라우트 분사를 이용한 강관 삽입방법에 관한 것이다.The present invention relates to a jet grouting pile method for inserting a steel pipe in order to form a circumferential solidified body by rotating spraying the grout to a soft ground using ultra-high pressure jets, and to increase the shear strength of the cylindrical solidified body. In order to solve the problem of the conventional method of constructing the solidified body, drilling the hole, inserting the steel pipe, and grouting the voids, the steel pipe is introduced before the grout hardening, thereby increasing the vertical degree to the deep depth where the strata vary. The present invention relates to a method for inserting a steel pipe using compressed air and grout injection in a jet grouting pile method which can introduce a steel pipe while maintaining and removes unnecessary conventional processes to improve workability.
본 발명에 따르면, 계획심도까지 고압분사로드로 삭공하는 제1공정과, 삭공 완료 후 저면에서부터 고압분사로드를 회전시키면서 그라우트를 고압분사함과 동시에 인발하여 파일을 생성시키는 제2공정과, 파일 시공 직후에 인입을 목표로 하는 강관의 내부에 설치된 소구경의 그라우트 분사관과 압축공기 분사관에 각각 그라우팅을 실시하던 고압펌프와 공기 압축기의 호스를 연결하는 제3공정과, 상기 강관의 압축공기 분사관으로 압축공기를 분사하고 그라우트 분사관으로 그라우트를 분사하면서 강관을 경화 이전의 파일 저면까지 인입시키는 제4공정과, 압축공기 분사관과 그라우트 분사관를 강관에서 제거하는 제5공정으로 구성된 제트 그라우팅 파일 공법에 있어 압축공기와 그라우트 분사를 이용한 강관 삽입방법이 제공된다.According to the present invention, the first step of cutting the high-pressure injection rod to the planned depth, and the second step of generating a pile by drawing the high pressure spraying and grouting at the same time while rotating the high-pressure injection rod from the bottom after completion of the cutting process, and pile construction A third step of connecting the high pressure pump and the air compressor hose which are grouted to the small diameter grout injection pipe and the compressed air injection pipe respectively installed inside the steel pipe to be pulled in immediately, and the compressed air portion of the steel pipe Jet grouting pile consisting of a fourth step of injecting compressed air into the private pipe and grouting into the grout injection pipe and drawing the steel pipe to the bottom of the pile before curing, and a fifth step of removing the compressed air injection pipe and the grout injection pipe from the steel pipe. In the construction method, a method of inserting a steel pipe using compressed air and grout injection is provided.
Description
본 발명은 초고압 제트류를 이용하여 그라우트를 연약 지반에 회전 분사하여 원주상의 고결체를 형성하고 원주상 고결체의 전단 강도를 증대시키기 위하여 강관을 삽입하는 제트 그라우팅 파일 공법에 관한 것으로, 더욱 상세하게는 고결체를 시공하고 이를 천공하여 강관을 삽입한 후 공극을 다시 그라우팅하여야 하는 종래 공법의 문제점을 해결하기 위하여 그라우트(grout) 경화 이전에 강관을 인입함으로써, 지층이 다변하는 깊은 심도까지 수직도를 유지하면서 강관을 인입할 수 있고 불필요한 종래의 공정을 제거하여 시공성을 향상시키는 제트 그라우팅 파일 공법에 있어 압축공기와 그라우트 분사를 이용한 강관 삽입방법에 관한 것이다.The present invention relates to a jet grouting pile method for inserting a steel pipe in order to form a circumferential solidified body by rotating spraying the grout to a soft ground using ultra-high pressure jets, and to increase the shear strength of the cylindrical solidified body. In order to solve the problem of the conventional method of constructing the solidified body, drilling the hole, inserting the steel pipe, and grouting the voids, the steel pipe is introduced before the grout hardening, thereby increasing the vertical degree to the deep depth where the strata vary. The present invention relates to a method for inserting a steel pipe using compressed air and grout injection in a jet grouting pile method which can introduce a steel pipe while maintaining and removes unnecessary conventional processes to improve workability.
제트 그라우팅 파일 공법은 연약 지반을 개량하기 위한 것으로서, 연약 지반에 그라우트를 초고압 제트류를 이용하여 회전 분사하여 연약지반에 원주상의 고결체를 형성하여 지반을 개량하는 공법이고, 그 공정순서는 계획심도까지 고압분사로드로 삭공하는 제1공정과, 삭공 완료 후 저면에서부터 고압분사로드를 회전시키면서 고압으로 그라우트를 분사함과 동시에 인발하여 파일을 생성시키는 제2공정과, 경화된 파일에 강관을 인입할 수 있도록 천공하고 이에 강관을 삽입하는 제3공정과, 강관의 내부에 그라우트를 충진하는 제4공정으로 구성된다.The jet grouting pile method is to improve the soft ground, and is a method of improving the ground by forming a cylindrical solid body in the soft ground by rotating spraying the grout on the soft ground using ultra-high pressure jets. The first process of cutting with high pressure injection rod, the second process of spraying grout with high pressure while rotating the high pressure injection rod from the bottom after completion of cutting, and the second process of drawing and generating pile, and introducing steel pipe to hardened pile It is composed of a third step of drilling and inserting a steel pipe so as to drill, and a fourth step of filling grout in the steel pipe.
상기와 같이 강관을 인입하는 제트 그라우팅 공법에서는 인입된 강관이 파일이 고압분사로드의 회전으로 형성됨으로써 전단응력에 취약한 문제점을 해결하게 된다.As described above, in the jet grouting method of drawing steel pipes, the steel pipes are formed by the rotation of the high-pressure injection rods to solve the problem of being vulnerable to shear stress.
그러나, 상기의 방법은 파일의 시공 후 재굴착하여 강관을 삽입하고 공극을 그라우팅하게 되는데, 이 때는 이미 경화된 파일에 정확한 수직으로 천공할 수 없어 강관을 수직으로 설치하지 못하여 파일의 효과적인 전단강도의 증대를 기대할 수 없고, 구조물의 말뚝기초로서 사용할 수 없는 문제점이 있으며, 재천공과 삽입 및 재 그라우팅 등의 다수의 공정이 추가됨에 따라 시공성이 저하되는 문제점이 있다.However, the above method reinserts the steel pipe and grouts the voids by re-excavation after construction of the pile. In this case, the pipe cannot be installed vertically because the steel pipe cannot be installed vertically. There is a problem that can not be expected to increase, there is a problem that can not be used as a pile foundation of the structure, there is a problem that the workability is reduced as a number of processes such as re-punching and insertion and re-grouting is added.
그리고, 파일의 경화 이전에 강관을 삽입할 경우도 강관의 수직도를 관리할 수 없는 문제점으로 인하여 파일 경화전 강관의 인입은 종래의 방법에서는 상기의 천공 후 삽입의 방법에서와 같은 문제점이 야기된다.In addition, even when the steel pipe is inserted before the hardening of the pile, the verticality of the steel pipe cannot be managed. Therefore, the introduction of the steel pipe before the hardening of the pile causes the same problem as the above-described method of inserting after drilling. .
본 발명의 목적은 상기와 같은 종래의 문제점을 감안하여 제트 그라우팅 주입 후에, 강관의 내부에 설치된 압축공기 분사관과 그라우트 분사관으로 압축공기와 그라우트를 분사하면서 강관을 경화 이전의 파일에 인입시키는 방법을 제공함으로써, 시공성과 강관의 수직도를 증대시키는 제트 그라우팅 파일 공법에 있어 압축공기와 그라우트 분사를 이용한 강관 삽입방법을 제공함에 있다.SUMMARY OF THE INVENTION In view of the above-mentioned problems, an object of the present invention is to inject compressed air and grout into a compressed air jet pipe and grout jet pipe after jet grouting injection into a pile before hardening while injecting compressed air and grout into a compressed air jet pipe and a grout jet pipe. The present invention provides a method for inserting a steel pipe using compressed air and grout injection in a jet grouting pile method for increasing workability and verticality of steel pipe.
이하 본 발명을 첨부도면에 의거 상세히 설명하면 다음과 같다.Hereinafter, the present invention will be described in detail with reference to the accompanying drawings.
본 발명에 의한 제트 그라우팅 파일 공법의 강관 삽입방법은 계획심도까지 고압분사로드(1)로 삭공하는 제1공정과, 삭공 완료 후 저면에서부터 고압분사로드(1)를 회전시키면서 그라우트를 고압분사함과 동시에 인발하여 파일(2)을 생성시키는 제2공정과, 파일(2) 시공 직후에 인입을 목표로 하는 강관(3)의 내부에 설치된 소구경의 그라우트 분사관(4)과 압축공기 분사관(5)에 각각 그라우팅을 실시하던 고압펌프와 공기 압축기의 호스를 연결하는 제3공정과, 상기 강관(3)의 압축공기 분사관(5)으로 압축공기를 분사하고 그라우트 분사관(4)으로 그라우트를 분사하면서 강관(3)을 경화 이전의 파일(2) 저면까지 인입시키는 제4공정과, 압축공기 분사관(5)과 그라우트 분사관(4)를 강관(3)에서 제거하는 제5공정으로 구성됨을 특징으로 한다.The steel pipe insertion method of the jet grouting pile method according to the present invention comprises the first step of cutting the high-pressure jetting rod (1) to the planned depth, and rotating the high-pressure jetting rod (1) from the bottom after completion of the cutting, At the same time, the second step of drawing the pile (2) and the small-diameter grout injection pipe (4) and the compressed air injection pipe (installed inside the steel pipe (3) aiming to draw in immediately after construction of the pile (2) ( 5) the third step of connecting the high-pressure pump and the air compressor hose grouting respectively, and spraying the compressed air into the compressed air injection pipe (5) of the steel pipe (3) and grout to the grout injection pipe (4) The fourth step of introducing the steel pipe (3) to the bottom of the pile (2) before hardening while spraying, and the fifth step of removing the compressed air injection pipe (5) and the grout injection pipe (4) from the steel pipe (3). Characterized in that configured.
도면 중 미설명 부호 6은 강관(3)의 내부에 설치된 소구경의 그라우트 분사관(4)과 압축공기 분사관(5)의 하측 단부에 설치된 분사노즐이다.In the figure, reference numeral 6 denotes an injection nozzle provided at lower ends of the small-diameter grout injection pipe 4 and the compressed air injection pipe 5 installed inside the steel pipe 3.
상기와 같은 본 발명의 강관 삽입방법은 제1공정과 제2공정은 통상의 방법과 같고, 제3공정에서 제5공정이 본 발명의 특징을 이룬다. 즉, 본 발명은 인입을 목표로 하는 강관(3) 내에 압축공기 분사관(5)과 그라우트 분사관(4)을 설치하여 그라우트 및 압축 공기를 하향 분사하면서 강관(3)을 인입하는 방법으로서, 그라우트가 경화되기 이전에 강관(3)을 삽입함에 그 특징이 있는 것으로, 강관(3)의 수직도 관리가 용이하고, 별도로 공극을 충진시킬 필요가 없어 시공성이 향상되는 특징이 있다.In the steel pipe insertion method of the present invention as described above, the first step and the second step are the same as the conventional method, and the third step to the fifth step form the features of the present invention. That is, the present invention provides a compressed air injection pipe (5) and grout injection pipe (4) in the steel pipe (3) aimed at the inlet to draw the steel pipe (3) while injecting the grout and compressed air downward, It is characterized by inserting the steel pipe (3) before the grout is cured, it is easy to manage the verticality of the steel pipe (3), there is a feature that does not need to fill the gap separately, the workability is improved.
본 발명의 특유한 제3공정은 파일(2) 시공 직후에 인입을 목표로 하는 강관(3)의 내부에 설치된 소구경의 그라우트 분사관(4)과 압축공기 분사관(5)에 각각 그라우팅을 실시하던 고압펌프와 공기 압축기의 호스를 연결하는 공정이다.The peculiar third process of the present invention is to grout the small-diameter grout injection pipe 4 and the compressed air injection pipe 5 respectively installed inside the steel pipe 3 aiming to be pulled in immediately after the construction of the pile 2. It is the process of connecting the hose of the high pressure pump and the air compressor.
여기서, 강관(3)에는 그라우트 분사관(4)과 압축공기 분사관(5)이 설치되는데 그 각각의 단부에는 분사노즐(6)이 설치되고, 압축공기 분사관(5)이 그라우트 분사관(4)보다 아래로 더 길게 설치하여 분사시에 압축 공기가 더 아래쪽에서 분사되게 설치한다. 그리고, 그라우트 분사관(4)과 압축공기 분사관(5)은 고압분사로드(1)의 그라우트 분사시에 사용되는 고압펌프와 공기 압축기를 그대로 사용하여 별도의 시설이 필요없는 장점이 있다.Here, the grout injection pipe 4 and the compressed air injection pipe 5 are installed in the steel pipe 3, and injection nozzles 6 are installed at each end thereof, and the compressed air injection pipe 5 is the grout injection pipe ( Install longer than 4) so that compressed air is injected more downward when spraying. In addition, the grout injection pipe 4 and the compressed air injection pipe 5 have the advantage that a separate facility is not required by using a high pressure pump and an air compressor which are used at the time of grout injection of the high pressure injection rod 1.
본 발명의 특유한 제4공정은 강관(3)에 설치된 압축공기 분사관(5)으로 압축공기를 분사하고 그라우트 분사관(4)으로 그라우트를 분사하면서 상기 강관(3)을 경화 이전의 파일(2) 저면까지 인입시키는 공정이다.The fourth process peculiar to the present invention is a pile (2) before hardening the steel pipe (3) while injecting compressed air into the compressed air injection pipe (5) installed in the steel pipe (3) and spraying grout into the grout injection pipe (4). ) It is a process to draw to the bottom.
강관(3)을 인입시키는 공정을 종래와 비교하면, 종래의 경우는 파일(2)을 생성시켜 경화된 후 다시 천공시키고 이에 강관(3)을 인입시켰으나, 본 발명의 경우는 파일(2)의 경화 이전에 압축공기와 그라우트를 분사하여 용이하게 강관(3)을 인입시킨다. 이와같이 종래는 경화된 파일(2)을 재천공하게 되는데 이의 천공이 수직도를 좋게하여 행할 수 없어 강관(3)을 삽입하더라도 전단강도의 증대 효과가 미미하고 말뚝기초로서의 기능이 저하되었다. 이에 비해서 본 공정에서 분사되는 그라우트와 압축공기는 파일(2)을 형성하는 그라우트를 밀어서 강관(3)의 진로를 형성시킬 뿐만 아니라, 압축공기는 강관(3)의 외주면을 따라 지표상으로 배출되기 때문에 강관(3)의 표면과 파일(2)의 마찰 저항을 줄여줌으로써 강관(3)이 쉽게 파일(2) 속으로 인입될 수 있게 하는 역할을 한다.Comparing the process of drawing the steel pipe 3 with the conventional one, in the conventional case, the pile 2 was created, hardened, perforated again, and the steel pipe 3 was introduced thereto. However, in the present invention, the pile 2 Compressed air and grout are blown into the steel pipe (3) easily before curing. As described above, the hardened pile 2 is conventionally re-perforated, but the perforation thereof cannot be performed by improving the verticality. Even when the steel pipe 3 is inserted, the effect of increasing shear strength is insignificant and the function as a pile foundation is reduced. In contrast, the grout and compressed air sprayed in the present process not only push the grout forming the pile 2 to form a path of the steel pipe 3, but also pressurized air is discharged to the surface along the outer circumferential surface of the steel pipe 3. Therefore, by reducing the frictional resistance between the surface of the steel pipe (3) and the pile (2) serves to allow the steel pipe (3) can be easily drawn into the pile (2).
경험적으로 그라우트의 분사압력은 10kg/㎠ ~ 20kg/㎠ 정도의 저압이 적절하고, 압축공기의 분사는 생략할 수도 있으나, 그라우트와 압축공기를 동시에 분사할 경우에는 그라우트보다 압축공기를 보다 더 아래쪽에서 분사하도록 한다. 그리고, 점토층에서 그라우트를 분사하면서 강관(3)을 인입할 경우 기 파쇄된 점토 덩어리가 강관을 통해 배출되는 경우가 있는데, 이 때는 강관(3) 인입을 중단하고 새로이 강관(3)을 인입한다. As a rule of thumb, the injection pressure of grout is 10kg / ㎠ ~ 20kg / ㎠ low pressure is appropriate, and the injection of compressed air may be omitted, but when spraying grout and compressed air at the same time, compressed air is lower than that of grout. Let's spray. In addition, when the steel pipe 3 is introduced while spraying grout from the clay layer, the crushed clay mass may be discharged through the steel pipe. In this case, the steel pipe 3 is stopped and new steel pipe 3 is introduced.
본 공정에 의해 강관(3)은 큰 저항없이 수직으로 파일(2)의 저부에까지 용이하게 인입되어, 파일(2)의 전단강도의 중요 인자가 되는 강관(3)의 수직도가 보장되어 말뚝기초로서의 기능을 충분히 수행할 수 있게 된다.By this process, the steel pipe 3 is easily drawn vertically to the bottom of the pile 2 without large resistance, so that the verticality of the steel pipe 3, which is an important factor of the shear strength of the pile 2, is guaranteed, so that the pile foundation It is possible to fully perform the function as.
본 발명의 특유한 제5공정은 압축공기 분사관(5)과 그라우트 분사관(4)를 강관(3)에서 제거하는 공정으로서, 이로써 강관(3)의 인입이 완료된다. 압축공기 분사관(5)과 그라우트 분사관(4)을 강관(3)에서 제거할 때는 상황에 따라서 그라우트를 분사하면서 제거할 수도 있다.The peculiar fifth process of this invention is the process of removing the compressed air injection pipe 5 and the grout injection pipe 4 from the steel pipe 3, and the drawing-in of the steel pipe 3 is completed by this. When the compressed air injection pipe 5 and the grout injection pipe 4 are removed from the steel pipe 3, it may be removed while spraying the grout depending on the situation.
이상과 같은 구성을 갖는 본 발명의 강관 삽입방법은 강관(3)을 수직으로 용이하게 설치할 수 있고, 번거로운 종래의 공정을 제거하여 시공성을 높일 수 있게 된다.The steel pipe insertion method of the present invention having the configuration as described above can easily install the steel pipe (3) vertically, thereby improving the workability by removing the cumbersome conventional process.
이와같이 된 본 발명은 강관(3)에 설치된 압축공기 분사관(5)과 그라우트 분사관(4)을 이용하여 압축공기와 그라우트의 하향분사로 강관(3)을 삽입함으로써, 지층이 다변하는 깊은 심도에서도 수직되게 강관(3)을 용이하게 인입시킬 수 있는 효과가 있고, 종래에 비해 불필요한 공정의 제거로 시공성이 향상되는 효과가 있다. According to the present invention, the compressed air injection pipe 5 and the grout injection pipe 4 installed in the steel pipe 3 insert the steel pipe 3 into the downward injection of compressed air and grout, so that the depth of the strata varies. Also in the vertical, there is an effect that can be easily drawn into the steel pipe (3), there is an effect that the workability is improved by the elimination of unnecessary processes compared with the prior art.
도 1은 고압분사로드로 삭공을 하는 단계의 시공도1 is a construction of the step of cutting the high-pressure jet rod
도 2는 고압분사로드로 그라우트를 분사하는 상태의 시공도Figure 2 is a construction diagram of the state of spraying the grout with the high-pressure injection rod
도 3은 고압분사로드로 그라우트를 분사하여 파일을 생성시키는 시공도3 is a construction diagram for generating a file by spraying the grout with a high-pressure jet rod
도 4는 파일이 생성된 상태도4 is a state diagram in which a file is generated
도 5는 본 발명에 의해 강관이 삽입되는 상태도5 is a state diagram in which the steel pipe is inserted by the present invention
도 6은 도 5의 "A"부 상세도FIG. 6 is a detailed view of portion “A” of FIG. 5;
도 7은 본 발명에 의해 강관이 파일의 저부에까지 완전히 삽입된 상태도7 is a state in which the steel pipe is completely inserted to the bottom of the pile by the present invention
도 8은 본 발명에 의해 파일이 생성된 상태도8 is a state in which a file is generated by the present invention
도 9는 도 8의 "B-B" 단면도9 is a cross-sectional view taken along line “B-B” of FIG. 8.
<도면의 주요 부분에 대한 부호의 설명><Explanation of symbols for the main parts of the drawings>
1 : 고압분사로드 2 : 파일 3 : 강관1: high pressure injection rod 2: file 3: steel pipe
4 : 그라우트 분사관 5 : 압축공기 분사관 6 : 분사노즐4: grout injection pipe 5: compressed air injection pipe 6: injection nozzle
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR10-2003-0008085A KR100523115B1 (en) | 2003-02-10 | 2003-02-10 | The steel pipe inserting method making use of compressed air and grout injection in Jet Grouting Pile |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR10-2003-0008085A KR100523115B1 (en) | 2003-02-10 | 2003-02-10 | The steel pipe inserting method making use of compressed air and grout injection in Jet Grouting Pile |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20030024723A KR20030024723A (en) | 2003-03-26 |
KR100523115B1 true KR100523115B1 (en) | 2005-10-20 |
Family
ID=27730603
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR10-2003-0008085A KR100523115B1 (en) | 2003-02-10 | 2003-02-10 | The steel pipe inserting method making use of compressed air and grout injection in Jet Grouting Pile |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100523115B1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100710576B1 (en) | 2006-09-05 | 2007-04-24 | 주식회사 도화종합기술공사 | Grouting method for cavity area |
Families Citing this family (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100523116B1 (en) * | 2003-02-10 | 2005-10-20 | 주식회사 동아지질 | The steel pipe inserting method making use of the rod for injecting super pressure grout in Jet Grouting Pile |
CN100449064C (en) * | 2007-03-22 | 2009-01-07 | 建研地基基础工程有限责任公司 | Vibration pipe-sinking wind pile-pressing machine |
CN103015423A (en) * | 2012-12-21 | 2013-04-03 | 广东永基建筑基础有限公司 | Static pressure jet flow piling wall forming equipment and static pressure jet flow piling wall forming construction method |
CN104695456B (en) * | 2015-03-27 | 2017-01-18 | 济南轨道交通集团有限公司 | Construction method vertical shaft horizontal rotation jet grouting pile foundation pit lateral wall water stopping curtain |
KR102117392B1 (en) * | 2019-06-17 | 2020-06-03 | 한경건설(주) | Method for constructing earth retaining wall |
CN114032906B (en) * | 2021-06-01 | 2023-08-22 | 浙江工业大学 | Automatic shallow biogas cavity recognition and filling equipment and construction method for grouting and filling biogas cavity |
CN113622670B (en) * | 2021-08-16 | 2022-07-26 | 方远建设集团股份有限公司 | High-pressure grouting device for assembly type construction |
CN114808949B (en) * | 2022-05-12 | 2023-09-12 | 徐州市公路工程总公司 | Soft foundation reinforcement construction method for high-pressure jet grouting pile internally-planted threaded steel pipe |
CN115613547A (en) * | 2022-12-20 | 2023-01-17 | 中铁二十二局集团轨道工程有限公司 | MJS all-dimensional high-pressure jet grouting device and construction method thereof |
-
2003
- 2003-02-10 KR KR10-2003-0008085A patent/KR100523115B1/en active IP Right Grant
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100710576B1 (en) | 2006-09-05 | 2007-04-24 | 주식회사 도화종합기술공사 | Grouting method for cavity area |
Also Published As
Publication number | Publication date |
---|---|
KR20030024723A (en) | 2003-03-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100523115B1 (en) | The steel pipe inserting method making use of compressed air and grout injection in Jet Grouting Pile | |
KR20120020570A (en) | Tunnel reinforcing method by multi-forepoling | |
US6120214A (en) | Process for constructing reinforced subterranean columns | |
KR101095393B1 (en) | Method and apparatus for improving ground using cement grouting | |
KR101095388B1 (en) | Method and apparatus for improving ground using cement grouting | |
KR101095390B1 (en) | Method and apparatus for improving ground using cement grouting | |
JP2018076663A (en) | Hollow pipe for constructing displacement reduction type compacted sand pile and construction method of compacted sand pile | |
KR20040093538A (en) | Construction method for reinforcing the ground using steel pipes and prestressed concrete piles | |
JP5717148B2 (en) | Underground consolidated body construction method | |
KR100523116B1 (en) | The steel pipe inserting method making use of the rod for injecting super pressure grout in Jet Grouting Pile | |
KR102185255B1 (en) | Construction method of composite pile with extensioned tip | |
JP4916758B2 (en) | Ground improvement method by high-pressure jet agitation | |
KR101442822B1 (en) | Apparatus for inserting steel pipe and simultaneous horizontal high pressure jet-grouting in a tunnel supporting, and Method for inserting steel pipe and high pressure jet grouting with it | |
JP5875849B2 (en) | Injection stirring ground improvement method | |
JP4197377B2 (en) | Ground strengthening method | |
JP2007070980A (en) | Antiearthquake reinforcing method for masonry wall, and masonry wall reinforcing material used for the reinforcing method | |
KR101692360B1 (en) | Phc pile with end support pipe and the phc pile construction method using pile injection apparatus | |
JP2008208620A (en) | Ground improvement construction method and ground improvement device | |
JPH1025734A (en) | Bearing-pile reinforcing structure of existing structure and reinforcing method thereof | |
CN207498944U (en) | The guard aperture casing of ultra-deep jet groutinl guide hole | |
JPH11172667A (en) | High-pressure injection ground-improvement method | |
KR100710576B1 (en) | Grouting method for cavity area | |
KR101024257B1 (en) | The earth anchor operate method which reinforces a soft ground and the device | |
JP4515317B2 (en) | Consolidation production method and apparatus | |
KR100786350B1 (en) | A casing for file hammering |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20121005 Year of fee payment: 8 |
|
FPAY | Annual fee payment |
Payment date: 20131007 Year of fee payment: 9 |
|
FPAY | Annual fee payment |
Payment date: 20141006 Year of fee payment: 10 |
|
FPAY | Annual fee payment |
Payment date: 20151005 Year of fee payment: 11 |
|
FPAY | Annual fee payment |
Payment date: 20161005 Year of fee payment: 12 |
|
FPAY | Annual fee payment |
Payment date: 20191007 Year of fee payment: 15 |