KR100509277B1 - A Partition Structure Device For Painting Of A Floodgate - Google Patents

A Partition Structure Device For Painting Of A Floodgate Download PDF

Info

Publication number
KR100509277B1
KR100509277B1 KR10-2003-0020682A KR20030020682A KR100509277B1 KR 100509277 B1 KR100509277 B1 KR 100509277B1 KR 20030020682 A KR20030020682 A KR 20030020682A KR 100509277 B1 KR100509277 B1 KR 100509277B1
Authority
KR
South Korea
Prior art keywords
base
sluice
beams
support
water gate
Prior art date
Application number
KR10-2003-0020682A
Other languages
Korean (ko)
Other versions
KR20040085852A (en
Inventor
하진철
조영국
Original Assignee
(유)예당
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (유)예당 filed Critical (유)예당
Priority to KR10-2003-0020682A priority Critical patent/KR100509277B1/en
Publication of KR20040085852A publication Critical patent/KR20040085852A/en
Application granted granted Critical
Publication of KR100509277B1 publication Critical patent/KR100509277B1/en

Links

Classifications

    • GPHYSICS
    • G11INFORMATION STORAGE
    • G11BINFORMATION STORAGE BASED ON RELATIVE MOVEMENT BETWEEN RECORD CARRIER AND TRANSDUCER
    • G11B31/00Arrangements for the associated working of recording or reproducing apparatus with related apparatus
    • G11B31/006Arrangements for the associated working of recording or reproducing apparatus with related apparatus with video camera or receiver
    • GPHYSICS
    • G11INFORMATION STORAGE
    • G11BINFORMATION STORAGE BASED ON RELATIVE MOVEMENT BETWEEN RECORD CARRIER AND TRANSDUCER
    • G11B15/00Driving, starting or stopping record carriers of filamentary or web form; Driving both such record carriers and heads; Guiding such record carriers or containers therefor; Control thereof; Control of operating function
    • G11B15/02Control of operating function, e.g. switching from recording to reproducing
    • G11B15/05Control of operating function, e.g. switching from recording to reproducing by sensing features present on or derived from record carrier or container
    • G11B15/087Control of operating function, e.g. switching from recording to reproducing by sensing features present on or derived from record carrier or container by sensing recorded signals
    • GPHYSICS
    • G11INFORMATION STORAGE
    • G11BINFORMATION STORAGE BASED ON RELATIVE MOVEMENT BETWEEN RECORD CARRIER AND TRANSDUCER
    • G11B27/00Editing; Indexing; Addressing; Timing or synchronising; Monitoring; Measuring tape travel
    • G11B27/36Monitoring, i.e. supervising the progress of recording or reproducing
    • GPHYSICS
    • G11INFORMATION STORAGE
    • G11BINFORMATION STORAGE BASED ON RELATIVE MOVEMENT BETWEEN RECORD CARRIER AND TRANSDUCER
    • G11B2220/00Record carriers by type
    • G11B2220/90Tape-like record carriers

Landscapes

  • Engineering & Computer Science (AREA)
  • Multimedia (AREA)
  • Barrages (AREA)

Abstract

본 발명은 댐이나 하구언 또는 배수로의 하류 끝의 배수구에 설치되는 갑문교각에 의해 승강되어 외수위 및 내수위를 조절하는 수문 표면을 도장하는 수문 도장공사용 구조물 장치에 있어서, 조립 및 해체가 가능하도록 체결방식을 취하며, 외부와 완전하게 차단됨으로 이물질이나 도장공사용 페인트가 수면으로 유입되는 것을 방지하고, 별도의 이동식 집진설비가 연결되어 보다 쾌적한 환경에서 신속한 도장공사를 수행할 수 있는 특징이 있다. 이로 인해 으로 환경오염에 따른 폐해를 차단할 수 있는 효과가 있다.The present invention is a structural device for a hydrocoating system for painting the surface of the hydrologic control to adjust the external water level and the internal water level by being elevated by a pier pier installed in the dam or the mouth of the drain or the downstream end of the drainage, the assembly and disassembly By taking the method, it is completely blocked from the outside to prevent foreign substances or paint for painters from entering the water surface, and a separate mobile dust collector is connected to perform a quick painting work in a more comfortable environment. This has the effect of blocking the harmful effects of environmental pollution.

Description

수문의 도장공사용 칸막이 구조물 장치{A Partition Structure Device For Painting Of A Floodgate}A partition structure device for painting of a floodgate

본 발명은 댐이나 하구언 또는 배수로의 하류 끝의 배수구에 설치되는 갑문교각에 의해 승강되어 외수위 및 내수위를 조절하는 수문 표면을 도장하기 구조물에 관한 것으로, 보다 상세하게는 조립공법에 따라 설치 또는 분해되는 구조를 갖음으로써, 수문의 도장공사시 비산되는 이물질 및 분진에 따른 해양의 오염을 방지하고, 또한 가설됨에 따라 폐기되는 구조물을 반영구적으로 이용할 수 있도록 규격화 되어 이루어지는 수문의 도장공사용 칸막이 구조물 장치에 관한 것이다.The present invention relates to a structure for painting the surface of the waterway to be elevated by a lock pier installed in the drain or the drain at the downstream end of the drainage channel to adjust the external water level and the internal water level, and more specifically, according to the assembly method By having a decomposing structure, it is possible to prevent the pollution of the sea due to foreign substances and dusts scattered during painting of the gate and also to make a semi-permanent use of the structure that is discarded according to the construction. It is about.

일반적으로 강교나 수문의 경우 항시적으로 물과 접하기 때문에 부식이에 따른 피해를 줄이기 위해 수몇년마다 샌딩 및 도장공사를 시행하고 있다.In general, steel bridges and flood gates are always in contact with water, so sanding and painting works are carried out every few years to reduce the damage caused by corrosion.

그러나 이러한 수문의 샌딩 및 도장공사시 발생되는 분진과 같은 이물질이나 폐인트가루가 해수에 침전되어 수질오염과 대기오염을 가중시켜 왔다. However, foreign matters such as dust generated during sanding and painting work of hydrological or waste int dust have precipitated in seawater and have increased water pollution and air pollution.

이를 방지하기 위해 수문의 도장공사시 외부와 격리시킬 수 있는 가건물을 세워 공사를 시행하였다.In order to prevent this, the construction of a temporary building that can be isolated from the outside during the painting of the gate was carried out.

종래에의 가건물은 수문을 상승시킨 상태에서 상기 수문을 포함하도록 비계를 설치하고, 상기 비계를 토대로 1회성 비닐이나 천막같은 자재를 이용하여 외장한 후 구조물을 가설하였다. In the conventional temporary building, a scaffold was installed to include the floodgate in a state where the floodgate was raised, and the structure was constructed after the exterior was made of a material such as a disposable vinyl or a tent based on the scaffold.

상기에서 비계는 일반적인 건축 공사장에서 외장공사할때 작업선반을 설치하기 위해 쓰이는 쇠파이프로써, 수문 도장공시 상기 수문이 가건물의 안측에 내치될 수 있도록 설치하였다. 그리고 상기 비계를 토대로 하여 비닐이나 천막같은 자재로 외부와 격리될 수 있도록 설치하였다.Scaffolding in the above is a steel pipe used to install a work shelf when the exterior construction in a general construction site, it was installed so that the water gate can be placed on the inner side of the temporary building during painting. And based on the scaffolding was installed to be isolated from the outside with a material such as vinyl or tent.

이렇게 완성된 가건물의 토대로 우선 수문 박피공사를 먼저 시행하게 되는데, 이는 압축공기를 이용하여 모래를 분사시키는 방법을 이용해 왔다. 그러나 이러한 수문의 박피공사시 모래의 분진이나 박피된 폐인트가루가 비산으로 작업자가 흡입할 경우 건강상 매우 위험한 단점이 있었다.Based on the completed building, the first hydrologic dermabrasion is performed first, which has been used to inject sand using compressed air. However, when the worker inhaled due to the scattering of sand dust or peeled waste int dust during the peeling work of the hydrological was very dangerous for health.

또한 가건물의 경우 비닐이나 천막을 이용하여 외부와 격리시켰기 때문에, 박피 공사시 비닐이나 천막이 손상되는 경우가 잦아, 이로 인한 이물질의 외부 유출로 대기를 오염시키는 경우도 종종 발생되었다. 때문에 공사중 손상된 비닐이나 천막을 재설치함에 따른 공사의 지연에 납기일 마추기 어려운 문제점이 내포되어 왔다.In addition, since the building is separated from the outside by using vinyl or tent, the vinyl or tent is often damaged during peeling construction, which often causes air pollution due to external spillage of foreign matter. Due to the delay of construction due to the re-installation of the damaged vinyl or tent during construction, problems have been implicated.

그리고 압축공기로 분출되어 소비되는 모래 역시 수거가 어렵기 때문에 많은 처리비용이 발생되었고, 설사 모래를 수거하더라도 모래에 수문의 폐인트 가루가 함유되어 있어 다른 곳에서 또다시 사용할때 토양을 오염시킬 수 있는 위험성이 있었다.In addition, the sand consumed by compressed air is also difficult to collect, which incurs a lot of processing costs. Even if the sand is collected, the sand contains waste hydrous powder, which may contaminate the soil when it is used again elsewhere. There was a danger.

또한 상기 가건물은 보통 1회성에 국한되기 때문에 완벽하게 설치하지 않아 외부와의 격리가 잘이루어지지 못하고, 수문 도장공사를 시행할때 마다 새로이 다시 설치되야 하는 단점이 있었다. 특히 비계 같은 경우는 재사용할 수 있으나, 비닐이나 천막같은 경우는 보통 1번만 쓰고 버려지게 되며, 이에 따른 산업폐기물의 처리비용 또한 만만치 않게 되었다.In addition, since the temporary building is usually limited to one-time installation, it is not perfectly installed, and the isolation from the outside is not well achieved. In particular, scaffolding can be reused, but vinyl and tents are usually used only once and discarded, and the disposal cost of industrial waste is also severe.

이에 착안하여 본 발명은 분해와 조립이 간편한 이동식 구조물과, 대기오염 및 수질오염을 방지할 수 있는 집진시설 등이 갖춘 수문의 도장공사용 칸막이 구조물 장치를 개발하기에 이르렀다.In light of this, the present invention has led to the development of a partition structure device for a paintwork of a hydrological gate equipped with a mobile structure that is easy to disassemble and assemble, and a dust collecting facility that can prevent air pollution and water pollution.

따라서 본 발명은 상기와 같은 종래의 문제점들을 감안하여 안출된 것으로, 본 발명의 제 1목적은, 갑문교각에 의해 승강되는 수문의 표면을 반복하여 재도장하기 위한 조립 및 해체가 가능한 구조의 수문의 도장공사용 칸막이 구조물 장치을 제공하는 것이다.Accordingly, the present invention has been made in view of the above-described conventional problems, and a first object of the present invention is to provide a structure of a water gate that can be assembled and disassembled to repeatedly repaint the surface of a water gate lifted by a lock pier. It is to provide a partition structure device for a painter.

그리고 본 발명의 제 2목적은, 이물질이나 도장공사용 페인트가 수면으로 유입되는 것을 방지하고 별도의 이동식 집진설비가 연결되어 보다 쾌적한 환경에서 신속한 도장공사를 수행할 수 있는 수문의 도장공사용 칸막이 구조물 장치을 제공하는 것이다.And a second object of the present invention, to prevent the foreign matter or paint for painters to enter the water surface, and a separate mobile dust collector is connected to provide a water seal painter partition structure device that can perform a quick painting work in a more comfortable environment. It is.

이러한 본 발명의 목적들은, 상기 수문(210)의 하면에 밀착되는 직사각의 베이스(10); 상기 베이스(10)가 상기 수문(210)을 지지하도록 지면에 대해 높이방향을 따라 다단구조로 설치되어 상기 베이스(10)의 하부를 지지하는 적어도 2개 이상의 지지대(20); 상기 베이스(10)의 각 테두리에서부터 높이방향을 따라 상기 수문(210)의 상부까지 기둥-보 구조로 설치되고, 상기 갑문교각(200)과 연결되는 상기 수문(210)의 양측이 외부로 노출되도록 형성되는 직육면체 형상의 프레임(30); 및 상기 프레임(30) 중 상기 수문(210)의 전/후면과 대면하는 위치를 따라 설치되어 외부와 차단하는 다수의 차단부재(70);로 구성되는 것을 특징으로 하는 수문의 도장공사용 칸막이 구조물 장치에 의해서 달성된다.Objects of the present invention, the base 10 of the rectangular close contact with the lower surface of the water gate 210; At least two or more supports 20 installed in a multi-stage structure along a height direction with respect to the ground so that the base 10 supports the sluice 210; It is installed in the column-beam structure from each edge of the base 10 to the upper portion of the sluice 210 along the height direction, so that both sides of the sluice 210 connected to the lock pier 200 is exposed to the outside. A rectangular parallelepiped frame 30 to be formed; And a plurality of blocking members (70) installed along the front / rear surface of the frame (30) to face the outside of the frame (30) to block the outside. Is achieved by

이 때 상기 프레임(30)은, 상기 베이스(10)의 각 테두리에 대응하여 끼워지고, 상대적으로 긴 테두리로부터 상기 수문(210)의 전/후면과 마주하는 부위로 높이방향을 따라 상기 수문(210)의 상부에까지 일정간격별로 병렬 설치되는 다수의 H빔(31)과, 상기 각 H빔(31)이 높이방향을 따라 설치 고정되도록 상기 베이스(10)의 각 꼭지점에 해당되는 부위에서 상기 수문(210)의 상부까지 높이방향을 따라 세워지며, 인접한 상기 각 H빔(31)의 양단이 고정되는 각 L빔(32)으로 이루어져 기둥-보 구조를 갖는 것이 바람직하다.At this time, the frame 30 is fitted in correspondence with each rim of the base 10, and the sluice 210 along the height direction from the relatively long rim to the portion facing the front / rear of the sluice 210. A plurality of H beams 31 installed in parallel at a predetermined interval up to the upper part of the), and the water gate (S) at a portion corresponding to each vertex of the base 10 so that each of the H beams 31 is fixed and installed along the height direction ( It is preferable to have a columnar beam structure that is erected along the height direction up to the top of 210, and each L beam 32 is fixed at both ends of the adjacent H beams 31.

그리고 상기 프레임(30)의 상부에는 길이방향을 따라 일정간격별로 병렬 설치되는 H빔(31)이 더 구비되는 것이 바람직하다.In addition, the upper portion of the frame 30 is preferably further provided with an H beam 31 installed in parallel at a predetermined interval along the longitudinal direction.

아울러 차단부재(70)는 상기 수문(210)의 전/후면 및 상면과 마주하는 각 H빔(31)의 사이로 끼워져 고정되는 다수의 다중판넬(40)인 것이 바람직하다.In addition, the blocking member 70 is preferably a plurality of multi-panel 40 is sandwiched and fixed between each of the H-beams 31 facing the front and rear and top of the water gate 210.

상기에서 상대적으로 최하층을 이루는 상기 다중판넬(40)을 관통하여 적어도 1개 이상의 회수구(50b)가 더 구비되고, 상대적으로 상층을 이루는 상기 다중판넬(40) 중 어느 하나를 관통하여 적어도 2개 이상의 집진구(50a)가 더 구비되는 것 바람직하다.At least one recovery port 50b is further provided through the multi-panel 40 forming the lowermost layer, and at least two penetrating through any one of the multi-panel 40 forming the upper layer. It is preferable that the above dust collector 50a is further provided.

또한 상기 각 지지대(20)는 기둥과 보가 직육면체 형상으로 접합되어 높이방향을 따라 적층되는 다단구조의 라멘식 지지철골유닛(21)과, 상기 각 지지철골유닛(21)의 양측부에 일체로 내치되,며 서로 교차된 기둥 구조를 갖는 보조철골유닛(22)으로 이루어지는 것이 바람직하다.In addition, the support 20 is a multi-stage structure of the ramen-type support steel unit 21 is a column and the beam is joined in a rectangular parallelepiped shape stacked in the height direction, and integrally placed on both sides of each of the support steel unit 21 And, it is preferable that the auxiliary steel unit 22 having a pillar structure intersecting with each other.

또한 상기 지지대(20) 및 상기 지지대(20)에 인접하며, 상대적으로 긴 길이의 상기 베이스(10) 각 테두리에 양단이 각각 고정되어 상기 베이스(10)를 지지하는 철봉 형태의 베이스지지부재(11)가 더 구비되는 것이 바람직하다.In addition, adjacent to the support 20 and the support 20, both ends are fixed to the respective edges of the base 10 of a relatively long length, respectively, the base support member 11 of the iron bar form to support the base 10 ) Is preferably further provided.

그리고 상기 수문(210)의 전/후면과 마주하는 위치로 설치된 상기 각 H빔(31)에는 상대적으로 낮은 높이로 인접한 H빔(31)에 의해 지지되는 구조로 작업선반(60)이 더 설치되는 것이 바람직하다.And each of the H beams 31 installed at positions facing the front / rear of the sluice 210, the work shelf 60 is further installed in a structure supported by the adjacent H beam 31 at a relatively low height It is preferable.

본 발명의 그 밖의 목적, 특정한 장점들 및 신규한 특징들은 첨부된 도면들과 연관되어지는 이하의 상세한 설명과 바람직한 실시예들로부터 더욱 분명해질 것이다.Other objects, specific advantages and novel features of the present invention will become more apparent from the following detailed description and the preferred embodiments associated with the accompanying drawings.

이하에서는 본 발명에 따른 수문의 도장공사용 칸막이 구조물 장치에 관하여 첨부되어진 도면과 함께 설명하기로 한다.Hereinafter, a description will be given with reference to the accompanying drawings for the coating construction partition device for a water gate according to the present invention.

도 1은 갑문교각에 설치된 수문의 승강상태를 나타내는 정면도이고, 도 2는 본 발명에 따른 구조물 장치의 사시도이고, 도 3은 도 2에 따른 구조물 장치의 측면도이고, 도 4는 도 2에 따른 구조물 장치의 배면도이고, 도 5는 도 2의 지지대의 사시도이고, 도 6은 도 2의 베이스 및 상기 베이스에 결합된 H빔의 사시도이고, 도 7은 도 2의 프레임의 사시도이고, 도 8은 도 7의 H빔과 L빔의 결합관계를 도시한 평면도이고, 도 9는 도 2의 다중판넬의 사시도이며, 도 10은 본 발명의 구조물 장치을 설치한 상태를 도시한 사용상태도이다 1 is a front view showing the elevated state of the sluice gate installed in the lock pier, Figure 2 is a perspective view of the structure device according to the invention, Figure 3 is a side view of the structure device according to Figure 2, Figure 4 is a structure according to Figure 2 5 is a perspective view of the support of FIG. 2, FIG. 6 is a perspective view of the base of FIG. 2 and the H beam coupled to the base, FIG. 7 is a perspective view of the frame of FIG. 7 is a plan view illustrating a coupling relationship between the H beam and the L beam, FIG. 9 is a perspective view of the multiple panel of FIG. 2, and FIG. 10 is a use state diagram illustrating a state in which the structure apparatus of the present invention is installed.

본 발명에 따른 수문의 도장공사용 칸막이 구조물 장치(100)는 도 1 및 도 2에 도시된 바와 같이, 갑문교각(200)에 의해 승강되는 수문(210)의 표면을 반복하여 재도장하기 위한 조립 및 해체가 가능한 구조의 구조물 장치에 관한 것이다. As shown in FIGS. 1 and 2, the paintwork partition structure device 100 for the hydrological gate according to the present invention is assembled and repainted to repeatedly repaint the surface of the hydrological gate 210 elevated by the lock pier 200. The present invention relates to a structure apparatus of a structure capable of dismantling.

이러한 구조물(100)은 조립공법에 따라 설치 또는 분해되는 구조를 갖음으로써, 수문(210)의 도장공사시 비산되는 이물질 및 분진에 따른 해양의 오염을 방지하고, 또한 가설됨에 따라 폐기되는 구조물을 반영구적으로 이용할 수 있도록 규격화 되어 이루져 있다.Such a structure 100 has a structure that is installed or disassembled according to the assembly method, to prevent pollution of the ocean due to foreign matter and dust scattered during the painting work of the water gate 210, and also semi-permanent It is standardized for use.

본 발명의 구성에 설명하기에 앞서, 상기 구조물(100)을 설치하기 위해서는 우선 만조와 간조에 따른 해수차를 이용하여 설치하게 되는데, 우선 간조때 해당 보조수문을 닫고 본수문(210)을 열어 내수의 물을 차단한 후 설치하게 된다.Prior to explaining the configuration of the present invention, in order to install the structure 100 is first installed using seawater according to the high tide and low tide, first, close the auxiliary floodgate at the time of low tide and open the main water gate 210 It is installed after cutting off the water.

이러한 구조물(100)은 크게 3부분으로 구성되는데, 상기 수문(210)을 지지하기 위해 지면에 대해 소정높이로 적층되는 구조로 설치되는 지지대(20)와, 상기 수문(210)과 지지대(20)의 사이에 설치되는 직사각 판재형상의 베이스(10)와, 상기 베이스(10)의 상부로 높이방향을 따라 설치되며, 내부에 상기 수문(210)이 포함되는 프레임(30)으로 이루어져 있다.The structure 100 is composed of three parts, the support 20 is installed in a structure that is laminated to a predetermined height with respect to the ground in order to support the water gate 210, the water gate 210 and the support 20 A rectangular plate-shaped base 10 installed between the base 10 is installed along the height direction to the upper portion of the base 10, and consists of a frame 30 including the water gate 210 therein.

여기서 상기 각 지지대(20)는 도 5에 도시된 바와 같이, 정육면체 형상으로 높이방향을 따라 적층되는 다단구조의 라멘식 지지철골유닛(21)과, 상기 각 지지철골유닛(21)의 양측부에 내치되는 보조철골유닛(22)으로 이루어져 있다. 이 때 상기 지지대(20)는 상기 수문(210) 및 프레임(30)을 하부에 지지해야함으로, 상기 보조철골유닛(22)은 상기 각 지지대(20)의 상부로 인가되는 하중을 충분히 견딜 수 있도록 상기 지지철골유닛(21)의 내측에서 대각되는 위치에 있는 내측의 각 꼭지점에 양단이 연결되도록 중앙부위가 서로 교차된 기둥 구조를 갖는다.Here, each support 20 is a multi-stage ramen type support steel unit 21 is stacked in the height direction in the shape of a cube, and both sides of each support steel unit 21, as shown in FIG. It consists of an auxiliary steel unit 22 is placed. At this time, the support 20 should support the water gate 210 and the frame 30 at the bottom, so that the auxiliary steel unit 22 to withstand the load applied to the upper portion of each support 20 sufficiently The center portion has a pillar structure in which the central portions cross each other so that both ends are connected to respective vertices of the inner side at positions diagonal to the inner side of the supporting steel frame unit 21.

이러한 상기 지지대(20)는 상기 수문(210)의 승강높이나 크기에 따라 상기 수문(210)의 저면에 길이방향을 따라 적어도 2개소 이상에 설치되며, 각각의 지지대(20)는 분해 조립이 편리하도록 볼트 결합구조를 갖는다.The support 20 is installed in at least two or more places along the longitudinal direction on the bottom surface of the water gate 210 according to the lifting height or the size of the water gate 210, each support 20 is easy to disassemble and assembly It has a bolted structure.

아울러 상기 지지대(20)의 상부로는 도 6에 도시된 바와 같이, 베이스(10)가 설치되는데, 상기 베이스(10)는 충분한 강성을 유지할 수 있도록 길이, 너비, 두께가 약 15m ×6m ×0.1m 정도의 직사각 판재 형태를 취한다.In addition, the upper portion of the support 20, as shown in Figure 6, the base 10 is installed, the base 10 has a length, width, thickness of about 15m × 6m × 0.1 to maintain sufficient rigidity Take the form of a rectangular plate of the order of m.

이 때 상기 베이스(10)의 하부에는 베이스(10)의 자중 및 상기 수문(210)으로부터 전가되는 하중에 의해 상기 베이스(10)가 처지는 것을 방지할 수 있도록 베이스지지부재(11)가(도 3에도시) 설치된다. 상기 베이스지지부재(11)는 상단이 상기 베이스(10)의 길이방향 테두리에 고정되고 하단은 상기 지지대(20)에 연결되는 경사설치로 상기 베이스(10)를 지지하며, 철봉의 형태로서 상기 각 지지대(20)의 양측에 2개씩 총 8개가 설치된다.At this time, the lower portion of the base 10 has a base support member 11 (FIG. 3) to prevent the base 10 from sagging due to the weight of the base 10 and the load imparted from the water gate 210. Edo) is installed. The base support member 11 supports the base 10 by an inclined installation in which an upper end is fixed to a longitudinal edge of the base 10 and a lower end is connected to the support 20, and each of the base rods is in the form of an iron rod. A total of eight are installed on each of the two sides of the support 20.

그리고 도 7에 도시된 바와 같이, 상기 베이스(10)의 상부에 상기 수문(210)을 포함하여 기둥-보 형태로 높이방향을 따라 프레임(30)이 설치되어 있다. 상기 프레임(30)은 H빔(31)과 L빔(32)이 조합되어 이루어진 것으로, L빔(32)이 기둥으로서 베이스(10)의 각 꼭지점에서부터 세워져 설치되고, H빔(31)은 높이방향을 따라 병렬 설치되어 이루어진다.As shown in FIG. 7, the frame 30 is installed along the height direction in the form of a column-beam including the sluice 210 on the base 10. The frame 30 is a combination of the H beam 31 and the L beam 32, the L beam 32 is installed as a column from each vertex of the base 10, the H beam 31 is a height It is made by parallel installation along the direction.

우선 4개의 각 H빔(31)이 함몰부위가 상기 베이스(10)의 각 테두리에 끼워져 고정된다. 이에 따라 2개의 긴 H빔(31) 즉 상기 베이스(10)의 길이방향(X축) 테두리에 끼워진 것과, 2개의 짧은 H빔(31) 즉 폭방향(Y축) 테두리에 끼워진 것으로 총 4개의 H빔(31)이 그 길이별로 대칭되게 설치된다.First, four recessed portions of each of the H beams 31 are fixed to each edge of the base 10. Accordingly, four long H beams 31, which are fitted to the longitudinal (X-axis) edges of the base 10, and two short H beams 31, that is, fitted to the widthwise (Y-axis) edges, total four The H beam 31 is provided symmetrically by its length.

상기 베이스(10)의 각 테두리에 설치된 H빔(31)에서, 각 H빔(31)이 만나는 베이스(10)의 꼭지점에 해당되는 부위로 기둥으로서 높이방향을 따라 4개의 L빔(32) 설치된다. 상기 L빔(32)은 상기 베이스(10)의 꼭지점에 수직으로 설치되어 상기 각 H빔(31)의 단부를 서로 고정되도록 구비된 것이다.In the H beams 31 installed at each edge of the base 10, four L beams 32 are installed along the height direction as a column to a portion corresponding to a vertex of the base 10 where each H beam 31 meets. do. The L-beams 32 are installed perpendicular to the vertices of the base 10 so that the ends of the respective H-beams 31 are fixed to each other.

즉 상기 L빔(32)은 Z축(높이방향)으로 설치되어 X축 및 Y축방향으로 설치되는 상기 H빔(31)을 상호 연결 또는 고정하는 기능을 하게 된다. 상기에서 L빔(32)은 상기 수문(210)보다 상대적으로 높도록 약 14m ~ 15m 정도의 길이를 갖는다.That is, the L beam 32 is installed in the Z-axis (height direction) to function to interconnect or fix the H-beams 31 installed in the X- and Y-axis directions. In this case, the L beam 32 has a length of about 14m to 15m to be relatively higher than the water gate 210.

그리고 상기 각 L빔(32) 중 상대적으로 그 간격이 긴 부분 즉 상기 베이스(10)에서 상대적으로 긴 길이방향(X축)의 상부로 높이방향을 따라 다수의 H빔(31)을 병렬 설치한다. In addition, a plurality of H beams 31 are installed in parallel in the height direction from the portion of each of the L beams 32 having a relatively long interval, that is, the base 10 in a relatively long longitudinal direction (X axis). .

이러한 상기 H빔(31)은 상기 L빔(32)의 높이방향을 따라 약 2m 정도의 간격을 두고 그 상단까지 7개가 설치되며, 그 형상에 기인하여 상대적으로 함몰된 부위가 서로 마주보도록 배치하여 체결된다. 이러한 배치관계로 서로 마주하는 각 함몰부위에 해당 간격만큼의 폭을 갖는 다중판넬(40)이 끼워진다.The H beam 31 is provided with seven to the upper end at intervals of about 2m along the height direction of the L-beam 32, the relatively recessed parts due to the shape to face each other Is fastened. In such an arrangement relationship, each of the recessed portions facing each other is fitted with a multipanel 40 having a width corresponding to that interval.

그리고 상기 각 L빔(32)에서 상대적으로 그 간격이 짧은 부위(Y축)에도 2개의 H빔(31)이 설치된다. 이와 같은 상기 H빔(31)의 설치로 사각을 이루는 상부 즉 상기 베이스(10)와 동일형상을 갖고 마주하는 부위에 상기 베이스(10)의 길이방향을 따라 약 2m 간격으로 2개의 H빔(31)이 설치된다. 이에 따라 각 H빔(31) 사이의 간격은 2m이며, 상기 간격별로 3개의 다중판넬(40)이 끼워져 고정된다.In addition, two H-beams 31 are also provided in the portions (Y-axis) of which the intervals are relatively short in each of the L-beams 32. By installing the H beams 31 as described above, two H beams 31 are spaced about 2m along the longitudinal direction of the base 10 at the upper part forming a square, that is, having the same shape as the base 10 and facing each other. ) Is installed. Accordingly, the spacing between each H beam 31 is 2m, and three multiple panels 40 are fitted and fixed for each of the spacings.

이에 따라 상기 프레임(30)에서 상대적으로 긴 길이로 대칭되는 전/후부위 및 상부에는 다중판넬(40)이 구비되어 외부와 차단되고, 이와는 달리 양측부는 개방되어 이를 통해 상기 수문(210)의 양측이 갑문교각(200)과 연결되어 있다.Accordingly, the front and rear parts and the upper part which are symmetrical to the relatively long length in the frame 30 is provided with a multi-panel 40 is cut off from the outside, on the contrary, both sides are open to both sides of the water gate 210 through this It is connected to the lock pier (200).

상기에서 다중판넬(40)은 소음방지를 위해 안측으로는 방음재(42)가 중간에 내재되고, 소정두께의 철판(41)이 외장된 구성을 갖는데(도 9에 도시됨), 만일 상기 프레임(30) 및 다중판넬(40)로 이루어진 구조물 내에서 도장공사가 실시될 경우 소음이 외부로 발산되는 것을 차단하고, 외부 충격으로 인한 변형을 방지할 수 있다.In the multi-panel 40 has a configuration in which the soundproof material 42 is embedded in the middle to prevent the noise, and the iron plate 41 of a predetermined thickness is exterior (shown in FIG. 9), if the frame ( 30) and when the painting is carried out in the structure consisting of a multi-panel 40 can block the noise emitted to the outside, and can prevent deformation due to external impact.

이 때 상기 구조물의 내부에서 수문(210)의 도장공사를 위해 사람이 출입할 수 있도록 전면 최하층을 이루고 있는 다중판넬(40)에는 양측으로 2개의 출입구(50c)가 각각 관통 형성된다. 그리고 상기 각 출입구(50c)의 사이에는 도장공사 이전 수문(210) 표면의 이물질을 벗겨내도록 분사하는 쇼트볼(short ball)을 회수하기 위해 적어도 1개 이상의 회수구(50b)가 관통 형성된다. 그리고 전면 상층부로는 가로, 세로 약 1m 정도의 4개의 집진구(50a)가 형성된다.At this time, two entrances 50c are formed in both sides of the multi-panel 40 which forms the lowermost front layer so that a person can enter and exit for the painting of the water gate 210 in the interior of the structure. In addition, at least one recovery port 50b is formed therebetween to recover a short ball sprayed to peel off foreign substances on the surface of the water gate 210 before the painting work. In addition, four dust collecting holes 50a of about 1m in width and length are formed in the front upper layer.

여기서 상기 각 집진구(50a)로 중 적어도 1개 이상에 집진설비가 연결되며, 나머진 집진구(50a)는 개방된 상태를 유지하게 된다. 상기 집진설비로부터 흡입력이 구조물의 내부로 제공될 경우 상기 구조물 안측의 기압이 상대적으로 낮아지는 방지하기 위함이다.Here, at least one dust collecting facility is connected to each of the dust collecting ports 50a, and the remaining dust collecting ports 50a are kept open. This is to prevent the air pressure on the inner side of the structure is relatively lowered when the suction force is provided from the dust collecting equipment to the inside of the structure.

그리고 상기 회수구(50b)는 상기 수문(210)의 도장공사시 폐인트를 제거하는 과정에서 높은 압력으로 분출되는 쇼트볼을 재사용하기 위해 수거하도록 구비된 것이다.And the recovery port (50b) is provided to collect to reuse the shot ball ejected at a high pressure in the process of removing the waste in the coating of the water gate (210).

아울러 상기 구조물의 전/후면 내부로는 높이방향을 따라 소정간격으로 설치되는 H빔(31)에 대해 대응되는 위치로 작업선반(60)이 설치된다. 상기 작업선반(60)은 작업자가 안전하게 올라서도록 상부는 평편하고 하부는 상기 각 H빔(31)에 경사지게 연결되는 지지구조를 갖는다.In addition, the working shelf 60 is installed in the front / rear of the structure to a position corresponding to the H beam 31 is installed at a predetermined interval along the height direction. The work shelf 60 has a support structure in which the upper portion is flat and the lower portion is inclinedly connected to each of the H beams 31 so that the worker can safely climb.

이와 같이 상기 프레임(30) 및 다중판넬(40)로 이루어진 구조물은, 도 10에 도시된 바와 같이, 상기 수문(210)의 전후면을 포함하고, 그 양측면 즉 갑문교각(200)과 연결된 부위에 이르기까지 설치됨에 따라 그 전/후부 안측면이 상기 수문(210)의 전후면과 일정거리를 두고 대면하게 되며, 이 때 개방된 양측으로 상기 수문(210)의 양측이 연결된 갑문교각(200)의 콘크리트층과 소정간격을 두고 대면하게 된다.Thus, the structure consisting of the frame 30 and the multi-panel 40, as shown in Figure 10, including the front and rear surfaces of the sluice 210, both sides, that is to the site connected to the pier 200 As it is installed until the front / rear side faces at a certain distance from the front and rear surfaces of the sluice 210, at this time of the lock pier 200 connected to both sides of the sluice 210 to the open both sides It faces the concrete layer at a predetermined interval.

이 때 상기 구조물은 상기 수문(210)의 도장공사시 비산되는 먼지를 외부와 차단되기 위해서는 밀폐된 공간을 유지하여야 한다. 이를 위해 상기 갑문교각(200)과 대면하는 상기 구조물의 양측으로는 실리콘 및 고무재질로 이루어진 차단부재(70)가 덧대어 진다. 이 때 차단부재(70)는 상기 소정간격보다 상대적으로 더 두꺼운 판재 형태로서 상기 소정간격 사이에 억지로 끼워넣음으로서, 외부와 밀폐시킨다.At this time, the structure must maintain a closed space in order to block the dust scattered during the painting of the water gate 210 and the outside. To this end, blocking members 70 made of silicon and rubber are padded on both sides of the structure facing the lock pier 200. At this time, the blocking member 70 is in the form of a plate relatively thicker than the predetermined intervals and is forcibly sandwiched between the predetermined intervals, thereby sealing the outside.

한편 상기 구조물의 내부로는 도 4에 도시된 바와 같이, 태양광이 입사되어 광원으로서 사용할 수 있도록 후면 상부로는 적어도 2개 이상의 창틀(50d)이 형성되어 있어, 주간에는 별도의 조명기구가 필요치 않다.Meanwhile, as shown in FIG. 4, at least two or more window frames 50d are formed in the upper part of the structure so that sunlight can be used as a light source as shown in FIG. not.

이하에서는 본 발명에 따른 수문 도장공사용 구조물의 시공방법에 대해 설명하기로 한다.Hereinafter, a description will be given of the construction method of the hydrological paintwork structure according to the present invention.

먼저 만조와 간조에 따른 해수차를 이용하여 설치하게 되는데, 우선 간조때 해당 보조수문을 닫아 물을 차단하고, 본 발명에서 도장공사의 대상이 되는 수문(210)을 상승시킨다. 이 때 상기 수문(210)의 상승은 양측에 위치한 각 갑문교각(200)에서 수문(210)에 연결된 와이어(미도시)를 끌어당김으로써 가능한 구조를 갖는다.First, it is installed by using the seawater car according to the high tide and low tide, first close the auxiliary sluice at low tide to block the water, and raise the water gate 210 to be the target of the painting work in the present invention. At this time, the rise of the water gate 210 has a structure that is possible by attracting a wire (not shown) connected to the water gate 210 in each lock pier 200 located on both sides.

이에 따라 상승한 수문(210)의 저면을 지지할 수 있도록 수문(210)의 하부에서 길이방향을 따라 적어도 2개소 이상에 지지대(20)를 적층시켜 직립시킨다. 이 때 상기 각 개소의 각 지지대(20)는 볼트 결합으로 상호간 결합시킨다.Accordingly, in order to support the bottom of the raised gate 210, the support 20 is laminated at least at two or more places along the longitudinal direction at the lower portion of the gate 210 to stand up. At this time, each support 20 of each said position is mutually couple | bonded with a bolt coupling.

이 후 소정 간격을 두고 직립된 상기 각 지지대(20)의 상부에 직사각 판재 형상의 베이스(10)를 올려놓는다. 그리고 상기 베이스(10)가 자중 및 수문(210)의 하중으로 처지는 것을 방지하도록 지지대(20)의 상부 양측 및 베이스(10)의 길이방향 테두리에서 상기 지지대(20)가 근접한 부위의 사이로 철봉 형태의 베이스지지부재(11)를 경사지게 배치한 뒤 볼트 결합시킨다.Thereafter, the base 10 having a rectangular plate shape is placed on the upper portion of each support 20 that is upright at a predetermined interval. And in order to prevent the base 10 from sagging under the weight of the weight and the water gate 210 and the upper side of the support 20 and the length of the base 10 in the longitudinal edge of the base 10 between the adjacent portions of the iron rod form The base support member 11 is inclined and then bolted together.

그리고 상기 갑문교각(200)에서 와이어에 걸린 장력을 해제하여 수문(210)을 하강시킴으로써 상기 베이스(10) 위에 올려놓는다.Then, the tension on the wire is released from the lock pier 200 and the water gate 210 is lowered and placed on the base 10.

다음으로는 상기 베이스(10)의 각 테두리를 길이별로 2개씩 총 4개의 H빔(31)을 끼운 후, 상기 각 H빔(31)의 단부가 만나는 지점에 L빔(32)을 높이방향으로 따라 설치한 뒤, 상기 L빔(32) 중 상기 베이스(10)의 길이방향 테두리에 해당되는 부위부터 높이방향을 따라 상기 각 L빔(32)의 상단까지 약 2m 간격으로 7개의 H빔(31)을 병렬로 설치한다. 이 때 상기 각 L빔(32) 중 상대적으로 그 간격이 짧은 부위에도 2개의 H빔(31)을 설치한다.Next, after inserting four H beams 31 each of the two edges of the base 10 in length, the L beams 32 in the height direction at the points where the ends of the H beams 31 meet. After the installation, the seven H beams 31 at intervals of about 2 m from the portion corresponding to the longitudinal edge of the base 10 of the L beam 32 to the upper end of each L beam 32 along the height direction. ) In parallel. At this time, two H-beams 31 are also provided in a portion of the L-beams 32 having a relatively short interval.

이에 따라 직육면체를 이루는 프레임(30)이 완성되며, 상기 직육면체에서 상부 및 상대적으로 면적이 넓은 전/후부에서 각 H빔(31)별로 다중판넬(40)을 끼워넣어 외부와 차단시킨다.Accordingly, the frame 30 constituting the rectangular parallelepiped is completed, and the multi-panel 40 is inserted into each H beam 31 at the front and the rear of the rectangular parallelepiped and relatively large in area to block the outside.

이 후 상기 각 갑문교각(200)과 상기 각 갑문교각(200)에 대해 일정간격을 이루는 상기 구조물의 양측부 사이로 차단부재(70)를 억지끼움방식으로 삽입하여 밀폐시킨다.Thereafter, the barrier member 70 is inserted between the sides of the structure forming a predetermined interval with respect to each of the lock pier 200 and each of the lock pier 200 in a tight fitting manner to seal it.

다음으로는 상기 구조물을 이용한 수문의 도장공사에 대해 설명하기로 한다. 우선 상기 구조물 내에서 전/후부를 이루는 H빔(31) 즉 다중판넬(40)이 끼워진 부분에는 작업선반(60)이 설치된다. 그리고 상기 구조물의 전면에 구비된 다중판넬(40) 중 상부로 형성된 집진구(50a)에 집진설비가 연결된다.Next, a description will be given of the painting of the water gate using the structure. First, the work lathe 60 is installed at the portion where the H beam 31 forming the front / rear part of the structure, that is, the multi-panel 40, is fitted. And a dust collecting facility is connected to the dust collecting port (50a) formed in the upper portion of the multi-panel 40 provided on the front of the structure.

이러한 상기 작업선반(60)에 작업자가 올라가 수문(210)의 표면을 끌로 스크래핑시킨다. 수문(210)의 표면에는 조류나 어패류가 붙어 있기 때문에 이같은 스크래핑 작업으로 이를 제거한다.The worker climbs to the work shelf 60 to scrape the surface of the water gate 210 with chisels. Since the surface of the water gate 210 is attached to algae or fish and shellfish, such a scraping operation to remove it.

그리고 쇼트볼을 고압으로 분사하여 표면의 이물질(예를 들어 이전에 도장한 페인트 등)을 벗겨내어 제거한다.The shot ball is sprayed at high pressure to remove and remove foreign substances (eg, previously painted paint) from the surface.

이 후 상기 쇼트볼 분사작업 및 스크래핑작업으로 베이스(10)의 상면에 떨어진 각종 이물질은 하부의 회수구(50b)를 통해 외부로 반출되고, 비산되는 먼지 등은 상부의 집진구(50a)에 연결된 집진설비에서 흡입하여 제거된다.Thereafter, various foreign matters dropped on the upper surface of the base 10 by the shot ball spraying and scraping operations are carried out to the outside through the lower recovery port 50b, and the scattered dust is connected to the upper dust collecting port 50a. It is removed by suction from the dust collector.

따라서 본 발명에 따른 구조물(100)은 상기와 같이 외부와 차단된 상태에서 비산되는 먼지 및 이물질과 더불어 이를 위해 사용되는 쇼트볼 등을 외부로 용이하게 반출할 수 있으며, 반출된 쇼트볼은 회수하여 재사용이 가능하다.Therefore, the structure 100 according to the present invention can be easily carried out to the outside, such as a short ball used for this, along with the dust and foreign matters scattered in the blocked state with the outside as described above, the exported short ball is recovered by Reusable.

아울러 상기와 같이 이물질이 제거된 상태에서 상기 수문(210)의 표면에 도장공사를 실시한다.In addition, the coating work on the surface of the water gate 210 in the state where the foreign matter is removed as described above.

이상에서와 같이 예시된 본 발명에 따른 수문의 도장공사용 칸막이 구조물 장치(100)에서, 예시된 수치, H빔(31), L빔(32) 및 다중판넬(40)의 개수는 수문(210)의 크기 및 해당 위치의 주변 조건에 따라 달리하여 사용할 수 있음은 물론이다. In the paintwork partition structure device 100 of the water gate according to the present invention illustrated as described above, the number of the illustrated, H-beam 31, L-beam 32 and the multi-panel 40 is the water gate 210 Of course, it can be used differently depending on the size and surrounding conditions of the location.

아울러 다중판넬(40)은 중간에 방음재(42)를 내장하고, 철판(41)을 외장하는 구조 이외에, 철판(41)과 방음재(42)가 교번하여 반복하는 복층구조로서 변경사용할 수 있으며, 다중판넬(40)을 대신하여 부직포나 비닐포장막을 부착하여 사용할 수 있다.In addition, the multi-panel 40 is built in the sound insulation material 42 in the middle, in addition to the structure to the outer plate 41, the iron plate 41 and the soundproof material 42 can be used as a multi-layer structure in which the alternating repeating, multiple, Instead of the panel 40, a nonwoven fabric or vinyl packaging film may be attached.

또한 지지대(20)는 상기 수문(210)의 하면 크기에 따라 2개 이외에, 3개, 4개, 5개 중에서 선택하여 사용할 수 있으며, 베이스(10)의 각 모서리 별로 설치하여 사용할 수 있다.In addition, the support 20 may be selected and used among three, four, and five, in addition to the two according to the size of the lower surface of the water gate 210, it can be installed and used for each corner of the base (10).

또한 본 구조물 장치(100)의 설치방법은 일실시예이며, 현장여건에 따라 그 순서를 달리할 수 있으며, 도장공사방법 또한 예시된 것에 불과할 뿐 그 순서나 추가되는 공정이 있을 수 있음은 물론이다.In addition, the installation method of the structure device 100 is one embodiment, and the order may vary depending on site conditions, and the painting construction method is also merely illustrated, and the order or process may be added. .

더불어 본 발명에 따른 구조물 장치(100)는, 수문(210)과 같은 대형구조물의 표면 도장 공사 이외에, 대형옹벽이나 중간차단벽 등에도 적용하여 사용할 수 있다.In addition, the structure device 100 according to the present invention can be applied to a large retaining wall, an intermediate barrier wall, or the like, in addition to the surface painting work of a large structure such as a water gate 210.

이상에서와 같은 본 발명에 따른 수문의 도장공사용 칸막이 구조물 장치에 의하면, 조립 및 해체가 가능하도록 체결방식이 주로 이용되는 구조임으로 반복하여 재사용할 수 있는 특징이 있다. According to the partition construction device for the paintwork of the sluice according to the present invention as described above, since the fastening method is mainly used to enable assembly and disassembly there is a feature that can be reused repeatedly.

아울러 별도의 집진설비가 장착될 수 있으며, 작업선반의 마련으로 작업자의 작업편리성을 제공함으로 보다 쾌적한 환경에서 신속한 도장공사를 수행할 수 있는 장점이 있다.In addition, a separate dust collecting facility can be installed, and by providing a work shelf, there is an advantage in that a quick painting work can be performed in a more comfortable environment by providing a worker's convenience.

또한 외부와 완전하게 차단됨으로 이물질이나 도장공사용 페인트가 수면으로 유입되는 것을 방지함으로 환경오염에 따른 폐해를 차단할 수 있는 효과가 있다.In addition, since it is completely blocked from the outside, foreign substances or paints used by the painter can be prevented from entering the surface, thereby preventing harmful effects caused by environmental pollution.

비록 본 발명이 상기 언급된 바람직한 실시예와 관련하여 설명되어졌지만, 발명의 요지와 범위로부터 벗어남이 없이 다양한 수정이나 변형을 하는 것이 가능하다. 따라서 첨부된 특허청구의 범위는 본 발명의 요지에서 속하는 이러한 수정이나 변형을 포함할 것이다.Although the present invention has been described in connection with the above-mentioned preferred embodiments, it is possible to make various modifications or variations without departing from the spirit and scope of the invention. Accordingly, the appended claims will cover such modifications and variations as fall within the spirit of the invention.

도 1은 갑문교각에 설치된 수문의 승강상태를 나타내는 정면도,1 is a front view showing the elevated state of the sluice gate installed in the lock pier,

도 2는 본 발명에 따른 구조물 장치의 사시도,2 is a perspective view of a structure device according to the present invention;

도 3은 도 2에 따른 구조물 장치의 측면도,3 is a side view of the structure device according to FIG. 2, FIG.

도 4는 도 2에 따른 구조물 장치의 배면도,4 is a rear view of the structure apparatus according to FIG. 2;

도 5는 도 2의 지지대의 사시도,5 is a perspective view of the support of FIG.

도 6은 도 2의 베이스 및 상기 베이스에 결합된 H빔의 사시도,6 is a perspective view of the base of FIG. 2 and the H beam coupled to the base;

도 7은 도 2의 프레임의 사시도,7 is a perspective view of the frame of FIG.

도 8은 도 7의 H빔과 L빔의 결합관계를 도시한 평면도,8 is a plan view illustrating a coupling relationship between an H beam and an L beam of FIG. 7;

도 9는 도 2의 다중판넬의 사시도,9 is a perspective view of the multi-panel of FIG.

도 10은 본 발명의 구조물 장치을 설치한 상태를 도시한 사용상태도이다 10 is a use state diagram showing a state in which the structure apparatus of the present invention is installed.

< 도면의 주요부분에 관한 부호의 설명 ><Description of the code | symbol about the principal part of drawing>

10: 베이스 11: 베이스지지부재10: base 11: base support member

20: 지지대 21: 지지철골유닛20: support 21: support steel unit

22: 보조철골유닛 30: 프레임22: auxiliary steel unit 30: frame

31: H빔 32: L빔31: H beam 32: L beam

40: 다중판넬 41: 철판40: multipanel 41: iron plate

42: 방음재 50a: 집진구42: sound insulation material 50a: dust collector

50b: 회수구 50c: 출입구50b: recovery port 50c: doorway

50d: 창틀 60: 작업선반50d: Window Frame 60: Work Shelf

70: 차단부재 100: 구조물70: blocking member 100: structure

200: 갑문교각 210: 수문200: lock pier 210: water gate

Claims (9)

갑문교각(200)의 사이에서 승강하는 수문(210)의 도장공사를 위한 칸막이 구조물 장치에 있어서, In the partition structure device for the painting work of the water gate 210 to move up and down between the lock pier 200, 상기 수문(210)의 하면에 밀착되는 직사각의 베이스(10);A rectangular base 10 in close contact with the bottom surface of the water gate 210; 상기 베이스(10)가 상기 수문(210)을 지지하도록 지면에 대해 높이방향을 따라 다단구조로 설치되어 상기 베이스(10)의 하부를 지지하는 적어도 2개 이상의 지지대(20);At least two or more supports 20 installed in a multi-stage structure along a height direction with respect to the ground so that the base 10 supports the sluice 210; 상기 베이스(10)의 각 테두리에서부터 높이방향을 따라 상기 수문(210)의 상부까지 기둥-보 구조로 설치되고, 상기 갑문교각(200)과 연결되는 상기 수문(210)의 양측이 외부로 노출되도록 형성되는 직육면체 형상의 프레임(30); 및It is installed in the column-beam structure from each edge of the base 10 to the upper portion of the sluice 210 along the height direction, so that both sides of the sluice 210 connected to the lock pier 200 is exposed to the outside. A rectangular parallelepiped frame 30 to be formed; And 상기 프레임(30) 중 상기 수문(210)의 전/후면과 대면하는 위치를 따라 설치되어 외부와 차단하는 다수의 차단부재(70);로 구성되는 것을 특징으로 하는 수문의 도장공사용 칸막이 구조물 장치.Partitioning device for coating works for hydrological coatings, characterized in that consisting of; a plurality of blocking members 70 are installed along the front / rear of the frame 30 facing the front / rear of the frame 30 to block the outside. 제 1항에 있어서,The method of claim 1, 상기 프레임(30)은 상기 베이스(10)의 각 테두리에 대응하여 끼워지고, 상대적으로 긴 테두리로부터 상기 수문(210)의 전/후면과 마주하는 부위로 높이방향을 따라 상기 수문(210)의 상부에까지 일정간격별로 병렬 설치되는 다수의 H빔(31)과, 상기 각 H빔(31)이 높이방향을 따라 설치 고정되도록 상기 베이스(10)의 각 꼭지점에 해당되는 부위에서 상기 수문(210)의 상부까지 높이방향을 따라 세워지며, 인접한 상기 각 H빔(31)의 양단이 고정되는 각 L빔(32)으로 이루어져 기둥-보 구조를 갖는 것을 특징으로 하는 수문의 도장공사용 칸막이 구조물 장치.The frame 30 is fitted in correspondence with each rim of the base 10, and the upper portion of the sluice 210 along the height direction from a relatively long rim to a portion facing the front / rear of the sluice 210. A plurality of H beams 31 are installed in parallel at a predetermined interval until, and each of the H-beams 31 in the area corresponding to each vertex of the base 10 so that the installation is fixed along the height direction of the water gate 210 Standing along the height direction to the top, the partitioning device for the paintwork of hydrological gates, characterized in that it has a column-beam structure consisting of each of the L-beams 32 fixed to both ends of the adjacent H-beams (31). 제 2항에 있어서,The method of claim 2, 상기 프레임(30)의 상부에는 길이방향을 따라 일정간격별로 병렬 설치되는 H빔(31)이 더 구비되는 것을 특징으로 하는 수문의 도장공사용 칸막이 구조물 장치.The upper part of the frame 30 is the partition structure device for the paintwork of a sluice gate, characterized in that the H beam 31 is further provided in parallel at a predetermined interval along the longitudinal direction. 제 3항에 있어서,The method of claim 3, wherein 상기 차단부재(70)는 상기 수문(210)의 전/후면 및 상면과 마주하는 각 H빔(31)의 사이로 끼워져 고정되는 다수의 다중판넬(40)인 것을 특징으로 하는 수문의 도장공사용 칸막이 구조물 장치.The blocking member 70 is a partition structure for the paintwork of the water gate, characterized in that a plurality of multiple panels (40) that is fitted and fixed between each of the H-beams 31 facing the front / rear and top of the water gate 210 Device. 제 1항에 있어서,The method of claim 1, 상기 각 지지대(20)는 기둥과 보가 직육면체 형상으로 접합되어 높이방향을 따라 적층되는 다단구조의 라멘식 지지철골유닛(21)과, 상기 각 지지철골유닛(21)의 양측부에 일체로 내치되며, 서로 교차된 기둥 구조를 갖는 보조철골유닛(22)으로 이루어지는 것을 특징으로 하는 수문의 도장공사용 칸막이 구조물 장치.The support 20 is a column and a beam is joined to the rectangular parallelepiped shape is a multi-stage ramen-type support steel unit 21 is stacked in the height direction and integrally placed on both sides of each of the support steel unit 21 , Painter's partition structure device for a hydrological door, characterized in that the auxiliary steel unit 22 having a column structure crossed with each other. 제 1항에 있어서,The method of claim 1, 상기 지지대(20) 및 상기 지지대(20)에 인접하며, 상대적으로 긴 길이의 상기 베이스(10) 각 테두리에 양단이 각각 고정되어 상기 베이스(10)를 지지하는 철봉 형태의 베이스지지부재(11)가 더 구비되는 것을 특징으로 하는 수문의 도장공사용 칸막이 구조물 장치.Adjacent to the support 20 and the support 20, both ends are fixed to each rim of the base 10 of a relatively long length to support the base 10 in the form of a base rod 11 Partition construction device for the paintwork of a sluice characterized in that it is further provided. 제 4항 있어서,The method of claim 4, 상대적으로 최하층을 이루는 상기 다중판넬(40)을 관통하여 적어도 1개 이상의 회수구(50b)가 더 구비되는 것을 특징으로 하는 수문의 도장공사용 칸막이 구조물 장치.At least one recovery port (50b) penetrates through the multi-panel (40) forming a relatively lower layer, characterized in that the partitioning device for the paintwork of water gates. 제 4항에 있어서,The method of claim 4, wherein 상대적으로 상층을 이루는 상기 다중판넬(40) 중 어느 하나를 관통하여 적어도 2개 이상의 집진구(50a)가 더 구비되는 것을 특징으로 하는 수문의 도장공사용 칸막이 구조물 장치.At least two or more dust collectors 50a penetrate through any one of the multipanels 40 forming a relatively upper layer. 제 2항에 있어서,The method of claim 2, 상기 수문(210)의 전/후면과 마주하는 위치로 설치된 상기 각 H빔(31)에는 상대적으로 낮은 높이로 인접한 H빔(31)에 의해 지지되는 구조로 작업선반(60)이 더 설치되는 것을 특징으로 하는 수문의 도장공사용 칸막이 구조물 장치.Each of the H beams 31 installed at positions facing the front / rear of the sluice 210 may be further provided with a working shelf 60 having a structure supported by adjacent H beams 31 at a relatively low height. A partition structure device for a painter of a sluice gate.
KR10-2003-0020682A 2003-04-02 2003-04-02 A Partition Structure Device For Painting Of A Floodgate KR100509277B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR10-2003-0020682A KR100509277B1 (en) 2003-04-02 2003-04-02 A Partition Structure Device For Painting Of A Floodgate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR10-2003-0020682A KR100509277B1 (en) 2003-04-02 2003-04-02 A Partition Structure Device For Painting Of A Floodgate

Publications (2)

Publication Number Publication Date
KR20040085852A KR20040085852A (en) 2004-10-08
KR100509277B1 true KR100509277B1 (en) 2005-08-31

Family

ID=37368781

Family Applications (1)

Application Number Title Priority Date Filing Date
KR10-2003-0020682A KR100509277B1 (en) 2003-04-02 2003-04-02 A Partition Structure Device For Painting Of A Floodgate

Country Status (1)

Country Link
KR (1) KR100509277B1 (en)

Also Published As

Publication number Publication date
KR20040085852A (en) 2004-10-08

Similar Documents

Publication Publication Date Title
US20190055730A1 (en) Module splicing structure
EP3012379A1 (en) Dissipator panels and respective building system
CA2962394C (en) Portable flexible sealing device for grated openings
JP6718628B2 (en) Scattering prevention dismantling method of the cleaning plant
KR100509277B1 (en) A Partition Structure Device For Painting Of A Floodgate
WO2016181417A1 (en) A deflecting module for an anti-sand barrier, a barrier thus obtained and a protection method from windblown sand
TWI673418B (en) External wall cantilever construction platform and its assembly method
CN112411772B (en) Structure and construction method of basement outer wall post-cast strip
US5022786A (en) Method and apparatus for the recovery and treatment of ground water contaminated by hazardous waste
JP6497857B2 (en) Temporary waterproof structure and temporary waterproof method
SE444198B (en) BUILDING CONSTRUCTION OF PRISMATIC SPACE MODULES WITH VERTICAL AND HORIZONTAL FAST WELDING CONNECTING ELEMENTS AND LIFTOGLOGS
KR101216948B1 (en) Water leakage prevention sheet panel of gable roof
JP2007107359A (en) Asbestos removal method and asbestos removal device
RU2411334C2 (en) Method for protection of environment
CN219604416U (en) Scour prevention device for foundation pit slope
JP5365844B2 (en) Building renovation / demolition equipment and building renovation / demolition method
CN214575908U (en) Self-locking horizontal sealing protective device for elevator shaft
RU2131009C1 (en) Mountable-dismountable observation tower
JP3118801U (en) Asbestos scattering prevention device
SU802487A1 (en) Water tower
CN212200435U (en) Foundation pit dustproof device
Taher General Recommendations for Improved Building Practices in Earthquake and Hurricane Prone Areas
JP6019488B2 (en) Tsunami protection device for existing or new wooden houses
WO2002025024A1 (en) Transportable building and use thereof
DE20307766U1 (en) Protection system for prevention of flooding consists of rectangular frames which can be inflated with air and may be stacked one above the other to help form coffer dam in window

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
N231 Notification of change of applicant
LAPS Lapse due to unpaid annual fee