KR100500861B1 - Method for installing hoist - Google Patents

Method for installing hoist Download PDF

Info

Publication number
KR100500861B1
KR100500861B1 KR10-2002-7015544A KR20027015544A KR100500861B1 KR 100500861 B1 KR100500861 B1 KR 100500861B1 KR 20027015544 A KR20027015544 A KR 20027015544A KR 100500861 B1 KR100500861 B1 KR 100500861B1
Authority
KR
South Korea
Prior art keywords
winch
guide rail
lifting
attaching
attachment
Prior art date
Application number
KR10-2002-7015544A
Other languages
Korean (ko)
Other versions
KR20030003288A (en
Inventor
고데라히데아키
Original Assignee
미쓰비시덴키 가부시키가이샤
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 미쓰비시덴키 가부시키가이샤 filed Critical 미쓰비시덴키 가부시키가이샤
Priority to KR10-2002-7015544A priority Critical patent/KR100500861B1/en
Publication of KR20030003288A publication Critical patent/KR20030003288A/en
Application granted granted Critical
Publication of KR100500861B1 publication Critical patent/KR100500861B1/en

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B11/00Main component parts of lifts in, or associated with, buildings or other structures
    • B66B11/04Driving gear ; Details thereof, e.g. seals
    • B66B11/08Driving gear ; Details thereof, e.g. seals with hoisting rope or cable operated by frictional engagement with a winding drum or sheave

Landscapes

  • Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Structural Engineering (AREA)
  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

본 발명에 의한 권양기의 설치방법은 가이드레일(5a),(5b)을 승강로(1)내에 세워서 설치하는 입설공정과, 부착틀(73)을 가이드레일(5a),(5b)에 대해 슬라이드가능하게 지지하는 가이드부재(74a),(74b),(75a),(75b)를 부착틀(73)에 부착하는 부착공정과, 부착공정 후, 부착틀(73)을 가이드레일(5a),(5b)의 길이방향으로 슬라이드시키면서 권양기(6)를 들어올리는 들어올림공정과, 가이드레일(5a),(5b)에 권양기(6) 및 부착틀(73)의 수직하중을 지지하는 지지대(71a),(71b) 및 빔(72)을 고정하는 고정공정과, 빔(72)상에 부착틀(73) 및 권양기(6)를 설치하는 설치공정을 갖는다.The installation method of the hoist according to the present invention is a erecting step of installing the guide rails 5a, 5b upright in the hoistway 1, and the attachment frame 73 is slidable with respect to the guide rails 5a, 5b. To attach the guide members 74a, 74b, 75a, 75b to the attachment frame 73, and after the attachment process, the attachment frame 73 is guide rails 5a, ( A lifting step of lifting the winch 6 while sliding in the longitudinal direction of 5b), and a support 71a for supporting the vertical loads of the winch 6 and the mounting frame 73 on the guide rails 5a, 5b. , 71b and a fixing step for fixing the beam 72, and an installation step for installing the attachment frame 73 and the winch 6 on the beam 72.

Description

권양기의 설치방법{METHOD FOR INSTALLING HOIST} Installation method of hoisting machine {METHOD FOR INSTALLING HOIST}

본 발명은 승강로의 저부에서 소정의 높이 위치에 권양기를 설치하기 위한 권양기의 설치방법에 관한 것이다.The present invention relates to a method for installing a winch for installing the winch at a predetermined height position at the bottom of the hoistway.

권양기를 승강로의 저부에서 소정의 높이 위치에 설치하는 기계실 없는 엘리베이터로서, 일본국 실개소 63-119579호 공보나 일본국 특개평 7-10434호 공보에 표시된 것이 있다. 이 엘리베이터 장치는 권양기를 승강로내의 정상부에서 카와 승강로 벽과의 사이에 배치하고 있다. 이 엘리베이터 장치는 승강로와 별도로 기계실을 설치할 필요가 없으므로 건물 공간을 절약할 수가 있는 점에서 유리하다.As an elevator without a machine room which installs a hoisting machine in the predetermined height position at the bottom of a hoistway, there exist some which are shown by Unexamined-Japanese-Patent No. 63-119579 and Unexamined-Japanese-Patent No. 7-10434. This elevator apparatus arranges a winch machine between the car and the hoistway wall in the top part of the hoistway. This elevator apparatus is advantageous in that it saves building space because it does not need to install a machine room separately from a hoistway.

그러나, 권양기를 승강로의 저부에서 소정의 높이 위치에 설치하기 위해서는 권양기를 들어올릴 필요가 있고, 중량물인 권양기의 들어올림 작업은 대단히 어려운 작업이었다. 예를 들면, 권양기를 들어올린 상태에서의 고정작업은 불안정하고, 위치조정이나 설치정밀도의 확보 등이 쉽지는 않았다.However, in order to install the hoist at a predetermined height position at the bottom of the hoistway, it is necessary to lift the hoist, and the lifting operation of the hoist which is a heavy object is a very difficult task. For example, the fixing work in the state of lifting the winch is unstable, and it is not easy to adjust the position and secure the installation accuracy.

(발명의 개시)(Initiation of invention)

본 발명은 상기와 같은 문제점을 해결하기 위해 된 것으로, 승강로의 저부에서 소정의 높이 위치에 권양기를 쉽게 설치할 수 있는 설치방법을 얻는 것을 목적으로 한다.The present invention has been made to solve the above problems, and an object of the present invention is to obtain an installation method which can easily install a winch at a predetermined height position at the bottom of the hoistway.

본 발명에서의 권양기의 설치방법은 제1의 가이드레일 및 제2의 가이드레일을 승강로내에 세워서 설치하는 입설공정과, 상기 입설공정 후, 부착부재를 상기 제1의 가이드레일 및 상기 제2의 가이드레일에 대해 슬라이드가능하게 지지하는 가이드부재를 상기 부착부재에 부착하는 부착공정과, 상기 부착부재에 권양기를 부착한 상태로 상기 부착공정 후, 상기 부착부재를 상기 제1의 가이드레일 및 상기 제2의 가이드레일의 길이방향으로 슬라이드시키면서 상기 권양기를 들어올리는 들어올림공정과, 상기 들어올림공정 후, 상기 제1의 가이드레일 및 상기 제2의 가이드레일에 상기 권양기 및 상기 부착부재의 수직하중을 지지하는 지지부재를 고정하는 고정공정과, 상기 고정공정 후, 상기 지지부재상에 상기 부착부재 및 상기 권양기를 설치하는 설치공정을 갖는 것이다.In the present invention, a method for installing a winch machine includes a step of placing a first guide rail and a second guide rail in a hoistway, and a mounting member after the step of placing the first guide rail and the second guide. The attachment member is attached to the first guide rail and the second after the attaching step of attaching a guide member slidably supported to a rail to the attaching member, and the attaching process with the winches attached to the attaching member. A lifting step of lifting the winch while sliding in the longitudinal direction of the guide rail of the guide rail, and supporting the vertical load of the winch and the attachment member on the first guide rail and the second guide rail after the lifting step. A fixing step of fixing the supporting member, and an installation hole for installing the attaching member and the hoist on the supporting member after the fixing step. To have a.

본 발명에서의 권양기의 설치방법은 제1의 가이드레일 및 제2의 가이드레일을 승강로내에 세워서 설치하는 입설공정과, 상기 입설공정 후, 권양기를 상기 제1의 가이드레일 및 상기 제2의 가이드레일에 대해 슬라이드가능하게 유지하는 가이드부재를 상기 권양기에 부착하는 부착공정과, 상기 부착공정 후, 상기 권양기를 상기 제1의 가이드레일 및 상기 제2의 가이드레일의 길이방향으로 슬라이드시키면서 상기 권양기를 들어올리는 들어올림공정과, 상기 들어올림공정 후, 상기 제1의 가이드레일 및 상기 제2의 가이드레일에 상기 권양기의 수직하중을 지지하는 지지부재를 고정하는 고정공정과, 상기 고정공정 후, 상기 지지부재상에 상기 권양기를 설치하는 설치공정을 갖는 것이다.The installation method of the hoist according to the present invention includes a step of placing the first guide rail and the second guide rail in a hoistway and installing the hoisting machine, and after the step of the hoisting, the hoisting machine of the first guide rail and the second guide rail. An attachment step of attaching the guide member slidably held relative to the hoisting machine, and after the attachment step, lifting the hoisting machine while sliding the hoisting machine in the longitudinal direction of the first guide rail and the second guide rail; A lifting step of fixing, a fixing step of fixing a support member supporting the vertical load of the winch to the first guide rail and the second guide rail after the lifting step, and the supporting part after the fixing step. It has an installation process for installing the winch on the ash.

또, 상기 들어올림공정은 상기 권양기 또는 상기 부착부재에 서스펜션 지그를 부착하고, 상기 서스펜션 지그를 현수점으로 해서 들어올리는 공정을 포함하는 것이다.The lifting step includes a step of attaching a suspension jig to the winch or the attachment member and lifting the suspension jig as a suspension point.

또, 상기 들어올림공정에서는 상기 서스펜션 지그로서, 상기 권양기 또는 상기 부착부재로부터 상기 제1의 가이드레일을 초과해서 돌출하는 제1 돌출부분과, 상기 권양기 또는 부착부재로부터 상기 제2의 가이드레일을 초과해서 돌출하는 제2 돌출부분을 갖는 서스펜션 지그를 사용하여 상기 제1 및 제2 돌출부분을 현수점으로 해서 들어올리는 것이다.In the lifting step, the suspension jig includes a first protruding portion protruding beyond the first guide rail from the winch or the attachment member, and the second guide rail from the winch or attachment member. A suspension jig having a second protruding portion to protrude therefrom is used to lift the first and second protruding portions as suspension points.

또, 상기 들어올림공정은 상기 권양기 또는 상기 부착부재를 현수점으로 해서 들어올리는 제1 들어올림공정과, 상기 제1 들어올림공정 후, 상기 권양기 또는 상기 부착부재로부터 상기 제1의 가이드레일을 초과해서 돌출하는 제1 돌출부분과, 상기 권양기 또는 부착부재로부터 상기 제2의 가이드레일을 초과해서 돌출하는 제2 돌출부분을 갖는 서스펜션 지그를 상기 권양기 또는 상기 부착부재에 부착하고, 상기 제1 및 제2 돌출부분을 현수점으로 해서 들어올리는 제2 들어올림공정을 갖는 것이다.The lifting step includes a first lifting step of lifting the winch or the attachment member as a suspension point, and after the first lifting step, the first guide rail is exceeded from the winch or the attachment member. A suspension jig having a first projecting portion projecting from the winder and the attaching member and a second projecting portion projecting from the winder or the attaching member beyond the second guide rail, and attached to the winder or the attaching member. 2 It has a 2nd lifting process of lifting by making a protrusion part into suspension point.

도 1은 본 발명이 적용되는 엘리베이터 장치의 전체 구성도.1 is an overall configuration diagram of an elevator apparatus to which the present invention is applied.

도 2는 본 발명이 적용되는 부착기구(7)의 확대도.2 is an enlarged view of an attachment mechanism 7 to which the present invention is applied.

도 3은 가이드부재의 구조를 표시하는 도면.3 is a view showing the structure of the guide member.

(a)는 상부 가이드부재(74a)의 구조를 표시하는 도면이고, 도 2에서의 A방향의 단면도.      (a) is a figure which shows the structure of the upper guide member 74a, and is sectional drawing of A direction in FIG.

(b)는 하부 가이드부재(75a)의 구조를 표시하는 도면이고, 도 2에서의 B방향의 단면도.      (b) is a figure which shows the structure of the lower guide member 75a, and is sectional drawing of B direction in FIG.

도 4는 권양기(6)의 설치작업의 순서를 표시하는 플로차트.4 is a flowchart showing the procedure of the installation work of the winch machine 6;

도 5는 상부 가이드부재(74a),(74b) 및 하부 가이드부재(75a),(75b)를 부착하는 공정에서의 작업상태를 표시하는 도면.Fig. 5 is a view showing the working state in the process of attaching the upper guide member 74a, 74b and the lower guide member 75a, 75b.

도 6은 권양기(6)를 들어올리는 제1의 공정에서의 작업상태를 표시하는 도면.FIG. 6 is a view showing a working state in a first process of lifting the winch machine 6. FIG.

도 7은 권양기(6)를 들어올리는 제2의 공정에서의 작업상태를 표시하는 도면.FIG. 7 is a view showing a working state in a second process of lifting the winch machine 6. FIG.

도 8은 권양기(6)를 승강로내의 정상부에 위치시킨 상태를 표시하는 도면.Fig. 8 is a diagram showing a state where the winch machine 6 is located at the top of the hoistway.

<도면의 주요부분에 대한 부호의 설명><Description of the symbols for the main parts of the drawings>

1 : 승강로, 2 : 카,1: hoistway, 2: car,

3a, 3b : 가이드레일, 4 : 균형추,3a, 3b: guide rail, 4: counterweight,

5a, 5b : 가이드레일, 6 : 권양기,5a, 5b: guide rail, 6: hoisting machine,

7 : 부착기구, 8 : 균형추 활차,7: attachment mechanism, 8: counterweight pulley,

9 : 카하(下) 활차, 10 : 주삭,9: kaha pulley, 10: grinding,

11 : 주삭 부착부, 12 : 주삭 부착부,11: cutting attachment part, 12: cutting attachment part,

13 : 전동 승강기, 13a, 13b : 체인블록,13: electric lift, 13a, 13b: chain block,

14 : 지그, 14: jig,

71a, 71b : 지지대, 72 : 빔,71a, 71b: support, 72: beam,

73 : 부착틀, 74a, 74b : 상부 가이드부재,73: attachment frame, 74a, 74b: upper guide member,

75a, 75b : 하부 가이드부재.75a, 75b: Lower guide member.

(발명을 실시하기 위한 최량의 형태)(The best form to carry out invention)

다음, 본 발명에 대해 아래와 같이 실시예로 설명한다.Next, the present invention will be described in the following Examples.

실시의 형태 1. Embodiment 1.

우선, 본 발명의 권양기의 설치방법이 적용되는 엘리베이터 장치에 대해 도 1을 사용해서 설명한다.First, the elevator apparatus to which the mounting method of the winch | winder of this invention is applied is demonstrated using FIG.

도 1에서, 1은 승강로, 2는 승강로(1)내를 승강하는 카(3a, 3b)는 카(2)의 양측면에 각각 설치되고, 카(2)의 승강을 안내하는 카용의 가이드레일이다.In Fig. 1, 1 is a hoistway, 2 is a hoist 3a, 3b for elevating in the hoistway 1, which is provided on both sides of the car 2, respectively, and is a guide rail for the car for guiding the hoisting of the car 2; .

4는 카(2)의 승강방향과 반대방향으로 승강로내를 승강하는 균형추(5a, 5b)는 균형추(4)의 양측에 각각 설치되고, 균형추(4)의 승강을 안내하는 균형추용 가이드레일이다.4 is the counterweights 5a and 5b which elevate the inside of the hoistway in the opposite direction to the hoisting direction of the car 2, respectively. .

6은 카(2) 및 균형추(4)의 승강의 동력원이 되는 권양기이고, 권양기(6)는 후술하는 주삭(主索)이 감기는 트랙션시브와 이 트랙션시브를 회전시키는 모터를 포함한 구동부를 가지고 있다.6 is a winch which serves as a power source for the lifting of the car 2 and the counterweight 4, and the winch 6 has a drive unit including a traction sheave to which the main wheel is wound and a motor for rotating the traction sheave, which will be described later. have.

7은 권양기(6)를 가이드레일(5a),(5b) 사이에 부착하기 위한 부착기구이다. 본 실시의 형태는 이 부착기구(7)를 특징으로 하는 것으로 그의 상세는 후술한다.7 is an attachment mechanism for attaching the winch 6 between the guide rails 5a and 5b. This embodiment is characterized by the attachment mechanism 7, the details of which will be described later.

8은 균형추(4)의 상부에 부착된 균형추 활차(滑車)이고, 9는 카(2)의 하부에 설치된 카하 활차이고, 카하 활차(9)는 카(2)의 하부에 2개 설치되어 있다.8 is a counterweight pulley attached to the upper part of the counterweight 4, 9 is a caha pulley installed in the lower part of the car 2, and two caha pulleys 9 are provided in the lower part of the car 2; .

10은 균형추 활차(8), 트랙션시브, 카하 활차(9)에 감긴 주삭이다. 주삭 (10)의 일단은 가이드레일(3a)의 상단의 주삭 부착부(11)에 고정되고, 타단은 가이드레일(5a),(5b) 사이에 설치된 주삭 부착부(12)에 고정된다.10 is a head wound around the counterweight pulley 8, the traction sheave, and the kaha pulley 9. One end of the main line 10 is fixed to the main attachment part 11 of the upper end of the guide rail 3a, and the other end is fixed to the main attachment part 12 provided between the guide rails 5a and 5b.

균형추 활차(8)는 평면도에서 가이드레일(5a),(5b)을 통과하는 면에 대해 경사해서 배치되어 있으므로 주삭(10)을 트랙션시브에서 균형추(8)에 이르고, 주삭 부착부(12)에 고정할 수가 있다.Since the counterweight pulley 8 is arranged inclined with respect to the surface passing through the guide rails 5a and 5b in the plan view, the spindle 10 reaches the counterweight 8 from the traction sheave and is attached to the spindle attachment part 12. Can be fixed

이 엘리베이터 장치는 권양기(6)의 트랙션시브를 회전시킴으로서, 주삭 (10)을 통해서 카(2) 및 균형추(4)를 승강시킨다.This elevator apparatus raises and lowers the car 2 and the counterweight 4 through the main wheel 10 by rotating the traction sheave of the winch machine 6.

다음, 부착기구(7)의 구조에 대해 상세하게 설명한다.Next, the structure of the attachment mechanism 7 is demonstrated in detail.

도 2는 부착기구(7)의 구조를 표시하는 확대도이고, 부착기구(7) 이외의 부분은 생략하고 있다.2 is an enlarged view showing the structure of the attachment mechanism 7, and parts other than the attachment mechanism 7 are omitted.

부착기구(7)는 지지대(71a),(71b), 빔(72), 권양기(6)의 부착부재로서의 부착틀(73)로 구성된다.The attachment mechanism 7 is comprised with the support frame 71a, 71b, the beam 72, and the attachment frame 73 as an attachment member of the winch | winder 6. As shown in FIG.

지지대(71a),(71b)는 가이드레일(5a),(5b)에 각각 부착되어 있고, 빔(72)은 일단이 지지대(71a)에, 타단이 지지대(71b)에 부착되어 있다.The support bases 71a and 71b are attached to the guide rails 5a and 5b, respectively, and one end of the beam 72 is attached to the support base 71a, and the other end is attached to the support base 71b.

빔(72) 위에는 권양기의 부착틀(73)이 설치되어 있다. 이 부착틀(73)에는 권양기(6)가 부착되는 동시에 상부 가이드부재(74a),(74b) 및 하부 가이드부재(75a), (75b)가 부착되어 있다.On the beam 72, the attachment frame 73 of a winch is provided. The winch 6 is attached to the attachment frame 73, and the upper guide members 74a, 74b and the lower guide members 75a, 75b are attached.

상부 가이드부재(74a), 하부 가이드부재(75a)는 도 3에 표시한 바와 같이 가이드레일(5a)의 슬라이드면인 凸부를 탄성체를 통해서 끼고 있다. 상부 가이드부재 (74b), 하부 가이드부재(75b)도 같은 구성이다. 이 때문에 상부 가이드부재(74a), (74b) 및 하부 가이드부재(75a),(75b)는 부착틀(73)을 가이드레일(5a),(5b)의 길이방향으로 슬라이드가능하게 지지하는 기능을 가지고 있다.As shown in Fig. 3, the upper guide member 74a and the lower guide member 75a sandwich the concave portion, which is the slide surface of the guide rail 5a, through the elastic body. The upper guide member 74b and the lower guide member 75b have the same configuration. Therefore, the upper guide member 74a, 74b and the lower guide member 75a, 75b have a function of slidably supporting the attachment frame 73 in the longitudinal direction of the guide rails 5a, 5b. Have.

또, 엘리베이터 장치의 가동시에는 상부 가이드부재(74a),(74b) 및 하부 가이드부재(75a),(75b)는 권양기(6)의 가로에의 진동을 저감하는 진동방지부재로서의 기능도 갖고 있다.Moreover, at the time of operation of an elevator apparatus, the upper guide member 74a, 74b and the lower guide member 75a, 75b also have a function as an anti-vibration member which reduces the vibration to the side of the winch 6. .

권양기(6) 및 부착틀(73)의 수직하중은 빔(72) 및 지지대(71a),(71b)를 통해서 가이드레일(5a),(5b)에 지지된다.The vertical loads of the winch 6 and the attachment frame 73 are supported by the guide rails 5a and 5b through the beams 72 and the supports 71a and 71b.

다음, 상술한 부착기구(7)를 전제로 한 권양기의 설치방법에 대해 설명한다. 설명에는 도 4의 플로차트 및 도 5 ~ 도 8의 작업상태도를 사용한다.Next, a description will be given of a method for installing the winching machine assuming the attachment mechanism 7 described above. The flowchart of FIG. 4 and the working state diagrams of FIGS. 5 to 8 are used for the description.

우선, 가이드레일(5a),(5b)을 승강로(1)내에 세워서 설치한다(도 4의 S1).First, the guide rails 5a and 5b are installed upright in the hoistway 1 (S1 in Fig. 4).

다음, 권양기(6)를 부착틀(73)에 부착한 상태로 승강로(1)의 저부에 올려 놓는다(도 4의 S2). 이때 권양기(6) 및 부착틀(73)은 가이드레일(5a),(5b) 사이에 올려 놓는다. 또, 권양기(6), 부착틀(73)을 각각 별개로 가이드레일(5a),(5b) 사이에 올려 놓은 후 권양기(6)를 부착틀(73)에 부착하도록 해도 된다.Next, the hoist 6 is placed on the bottom of the hoistway 1 in a state of being attached to the attachment frame 73 (S2 in FIG. 4). At this time, the lifting device 6 and the attachment frame 73 are placed between the guide rails 5a and 5b. Alternatively, the winches 6 and the attachment frame 73 may be separately placed between the guide rails 5a and 5b and then the winches 6 may be attached to the attachment frame 73.

다음, 도 5에 표시한 바와 같이 부착틀(73)에 상부 가이드부재(74a),(74b) 및 하부 가이드부재(75a),(75b)를 부착한다(도 4의 S3). 상부 가이드부재(74a), (74b) 및 하부 가이드부재(75a),(75b)가 부착됨으로서, 부착틀(73) 및 권양기(6)는 가이드레일(5a),(5b)의 길이방향으로 슬라이드가능하게 지지되게 된다.Next, as shown in FIG. 5, the upper guide members 74a and 74b and the lower guide members 75a and 75b are attached to the attachment frame 73 (S3 of FIG. 4). By attaching the upper guide member 74a, 74b and the lower guide member 75a, 75b, the attachment frame 73 and the hoist 6 slide in the longitudinal direction of the guide rails 5a, 5b. Possibly supported.

다음, 도 6에 표시한 바와 같이 권양기(6)를 들어올린다(도 4의 S4). 권양기 (6) 또는 부착틀(73)을 현수점으로 해서 전동 승강기(13)에 의해 매달음으로서 들어올려진다. 이때, 부착틀(73)은 권양기(6)가 부착된 상태로 가이드레일(5a),(5b)의 길이방향으로 슬라이드된다.Next, as shown in FIG. 6, the winch | winder 6 is lifted up (S4 of FIG. 4). It is lifted up by the electric hoist 13 by making the winch 6 or the attachment frame 73 a suspension point. At this time, the attachment frame 73 slides in the longitudinal direction of the guide rails 5a and 5b with the winch 6 attached thereto.

권양기(6) 및 부착틀(73)이 소정의 높이까지 들어올려진 단계에서 권양기(6) 또는 부착틀(73)의 하방에 서스펜션 지그(14)를 고정한다. 또, 상기 서스펜션 지그(14)는 미리 고정해 두어도 된다.The suspension jig 14 is fixed below the winch 6 or the attachment frame 73 in a step in which the winch 6 and the attachment frame 73 are lifted to a predetermined height. In addition, the suspension jig 14 may be fixed in advance.

그후, 도 7에 표시한 바와 같이 서스펜션 지그(14)의 양단을 현수점으로 하고, 각각 체인블록(13a),(13b)에 의해 권양기(6)를 더욱 들어올린다(도 4의 S5). 이때, 체인블록(13a),(13b)을 동시에 조작한다.Thereafter, as shown in Fig. 7, both ends of the suspension jig 14 are suspended points, and the winches 6 are further lifted by the chain blocks 13a and 13b, respectively (S5 in Fig. 4). At this time, the chain blocks 13a and 13b are operated simultaneously.

서스펜션 지그(14)는 권양기(6) 또는 부착틀(73)의 하방에 고정되어 있으므로 체인블록(13a),(13b)의 설치에 필요한 들어올림부분을 가능한 한 적게 할 수 있고, 권양기(6)를 승강로(1)의 천정에 가깝게 배치할 수가 있다.Since the suspension jig 14 is fixed below the winch 6 or the attachment frame 73, the lifting portion required for the installation of the chain blocks 13a, 13b can be made as small as possible, and the winch 6 Can be arranged close to the ceiling of the hoistway 1.

권양기(6)가 승강로(1)내의 정상부까지 달한(도 8) 후 가이드레일(5a),(5b)에 대해 지지대(71a),(71b)를 각각 부착하고, 이 지지대(71a),(71b)에 빔(72)을 고정한다(도 4의 S6).After the hoist 6 reaches the top of the hoistway 1 (Fig. 8), the supporters 71a and 71b are attached to the guide rails 5a and 5b, respectively, and the supports 71a and 71b. ), The beam 72 is fixed (S6 in FIG. 4).

그후, 부착틀(73)을 빔(72)상에 내리고, 부착틀(73)을 빔(72)상에 설치한다(도 4의 S7).Thereafter, the attachment frame 73 is lowered on the beam 72, and the attachment frame 73 is installed on the beam 72 (S7 in FIG. 4).

이상의 작업순서에 의해 도 2에 표시한 바와 같이 권양기(6)가 승강로(1)내의 정상부에 설치된다.As shown in FIG. 2, the winch | winder 6 is installed in the top part of the hoistway 1 by the above-mentioned work procedure.

상술한 설치방법에서는 권양기(6) 및 부착틀(73)은 가이드레일(5a),(5b)에 의해 가로방향의 이동이 규제되므로 들어올림중에도 권양기(6)가 안정된다. 또 부착틀(73)의 위치조정이나 권양기(6)의 설치 정밀도의 확보를 쉽게 할 수가 있다.In the above-described installation method, since the movement of the hoisting machine 6 and the attachment frame 73 in the lateral direction is restricted by the guide rails 5a and 5b, the hoisting machine 6 is stabilized even during lifting. In addition, it is possible to easily adjust the position of the attachment frame 73 and to secure the installation accuracy of the winch machine 6.

또, 상하좌우에 가이드부재를 설치하고 있으므로 들어올림시에 부착틀(73)이나 권양기(6)에 회전모멘트가 작용한 경우에도 안정되게 들어올릴 수가 있다.In addition, since the guide members are provided on the upper, lower, left and right sides, it can be lifted stably even when the rotation moment acts on the attachment frame 73 or the winch 6 at the time of lifting.

또, 권양기(6)의 들어올림공정을 2단계로 나누고 있다. 도 7에 표시한 들어올림의 경우 서스펜션 지그(14)를 권양기(6) 또는 부착틀(73)의 하방에 고정시킴으로서 들어올림에 요하는 승강로(1)의 상부의 공간을 작게 할 수가 있다. 또, 서스펜션 지그(14)는 가이드레일(5a),(5b)의 간격보다도 긴 치수이고, 양단이 권양기(6) 또는 부착틀 (73)에서 가이드레일(5a),(5b)을 초과해서 돌출하고 있다. 이 돌출부분을 매달고 있기 때문에 체인블록(13a),(13b)과 권양기(6) 및 부착틀(73)이 접촉하는 일이 없다.Moreover, the lifting process of the hoisting machine 6 is divided into two steps. In the case of the lifting shown in FIG. 7, by fixing the suspension jig 14 below the winch 6 or the attachment frame 73, the space at the top of the hoistway 1 required for lifting can be reduced. In addition, the suspension jig 14 has a dimension longer than the distance between the guide rails 5a and 5b, and both ends protrude beyond the guide rails 5a and 5b in the winch 6 or the attachment frame 73. Doing. Since the protruding portion is suspended, the chain blocks 13a, 13b, the winch 6 and the attachment frame 73 do not come into contact with each other.

또, 이 실시의 형태에서는 가이드부재(74a),(74b),(75a),(75b)가 부착틀(73)에 부착되어 있으나, 부착틀(73)을 사용하지 않고, 권양기(6)에 직접 부착하도록 해도 된다.Moreover, in this embodiment, although the guide member 74a, 74b, 75a, 75b is attached to the attachment frame 73, it does not use the attachment frame 73 to the winch | winder 6 You may attach it directly.

또, 이 실시의 형태에서는 균형추의 가이드레일(5a),(5b)에 권양기(6)를 부착하는 경우를 설명하고 있으나, 카의 가이드레일(3a),(3b)에 부착하는 경우에도 상술한 설치방법이 적용 가능하다.Moreover, although this embodiment demonstrated the case where the winch | winder 6 is attached to the guide rails 5a and 5b of a counterweight, it is mentioned above also when attaching to the guide rails 3a and 3b of a car. Installation method is applicable.

또, 이 실시의 형태에서는 지지대(71a),(71b) 및 빔(72)에 의해 권양기(6) 및 부착틀(73)의 수직하중을 지지하는 지지부재를 구성하고 있으나, 다른 부재에 의해 구성하는 것도 가능하다. 지지부재는 가이드레일(5a),(5b)에 고정되고, 권양기(6) 및 부착틀(73)의 수직하중을 지지하는 구성이면 된다.Moreover, in this embodiment, although the support member 71a, 71b, and the beam 72 support the vertical load of the winch | winder 6 and the attachment frame 73, it is comprised by the other member. It is also possible. The supporting member may be fixed to the guide rails 5a and 5b and may be configured to support the vertical loads of the winch 6 and the attachment frame 73.

또, 권양기(6) 및 부착틀(73)은 빔(72)의 위에 최종적으로 설치되나, 권양기 (6) 또는 부착틀(73)을 탄성부재 등 다른 부재를 통해서 빔(72)상에 설치하도록 해도 된다.The winch 6 and the attachment frame 73 are finally installed on the beam 72, but the winch 6 or the attachment frame 73 is installed on the beam 72 through another member such as an elastic member. You may also

또, 이 실시의 형태에서는 권양기(6)를 승강로(1)내의 정상부에 설치하는 경우를 표시하고 있으나, 정상부에 한하지 않고, 승강로의 저부에서 소정의 높이 위치에 설치하는 경우에 적용가능하다.In addition, in this embodiment, although the case where the winch | winder 6 is installed in the top part in the hoistway 1 is shown, it is applicable to the case where it is not limited to a top part but installs in the predetermined height position in the bottom part of the hoistway.

본 발명의 권양기의 설치방법의 효과는 아래와 같다.The effect of the installation method of the winch of the present invention is as follows.

본 발명에서의 권양기의 설치방법은 제1의 가이드레일 및 제2의 가이드레일을 승강로내에 세워서 설치하는 입설공정과, 상기 입설공정 후, 부착부재를 상기 제1의 가이드레일 및 상기 제2의 가이드레일에 대해 슬라이드가능하게 지지하는 가이드부재를 상기 부착부재에 부착하는 부착공정과, 상기 부착부재에 권양기를 부착한 상태에서, 상기 부착공정 후, 상기 부착부재를 상기 제1의 가이드레일 및 상기 제2의 가이드레일의 길이방향으로 슬라이드시키면서 상기 권양기를 들어올리는 들어올림공정과, 상기 들어올림공정 후, 상기 제1의 가이드레일 및 상기 제2의 가이드레일에 상기 권양기 및 상기 부착부재의 수직하중을 지지하는 지지부재를 고정하는 고정공정과, 상기 고정공정 후, 상기 지지부재상에 상기 부착부재 및 상기 권양기를 설치하는 설치공정을 가지므로 권양기를 쉽게 설치할 수가 있다.In the present invention, a method for installing a winch machine includes a step of placing a first guide rail and a second guide rail in a hoistway, and a mounting member after the step of placing the first guide rail and the second guide. An attaching step of attaching a guide member slidably supported to a rail to the attaching member, and after the attaching step is attached to the attaching member, the attaching member is attached to the first guide rail and the A lifting step of lifting the hoisting device while sliding in the longitudinal direction of the guide rail of 2, and after the lifting step, vertical loads of the hoisting machine and the attachment member are applied to the first guide rail and the second guide rail. A fixing step of fixing the supporting member to be supported, and an installation of installing the attachment member and the hoist on the support member after the fixing step. Since it has a process, a winch can be easily installed.

본 발명에서의 권양기의 설치방법은 제1의 가이드레일 및 제2의 가이드레일을 승강로내에 세워서 설치하는 입설공정과, 상기 입설공정 후, 권양기를 상기 제1의 가이드레일 및 상기 제2의 가이드레일에 대해 슬라이드가능하게 지지하는 가이드부재를 상기 권양기에 부착하는 부착공정과, 상기 부착공정 후, 상기 권양기를 상기 제1의 가이드레일 및 상기 제2의 가이드레일의 길이방향으로 슬라이드시키면서 상기 권양기를 들어올리는 들어올림공정과, 상기 들어올림공정 후, 상기 제1의 가이드레일 및 상기 제2의 가이드레일에 상기 권양기의 수직하중을 지지하는 지지부재를 고정하는 고정공정과, 상기 고정공정 후, 상기 지지부재상에 상기 권양기를 설치하는 설치공정을 가지므로 권양기를 쉽게 설치할 수가 있다.The installation method of the hoist according to the present invention includes a step of placing the first guide rail and the second guide rail in a hoistway and installing the hoisting machine, and after the step of the hoisting, the hoisting machine of the first guide rail and the second guide rail. An attachment step of attaching the guide member slidably supported to the winch machine; and after the attachment step, the winch machine is lifted while sliding the winch machine in the longitudinal direction of the first guide rail and the second guide rail. A lifting step of fixing, a fixing step of fixing a support member supporting the vertical load of the winch to the first guide rail and the second guide rail after the lifting step, and the supporting part after the fixing step. Since it has an installation process for installing the winch on the ash, it is easy to install the winch.

또, 상기 들어올림공정은 상기 권양기 또는 상기 부착부재에 서스펜션 지그를 부착하고, 상기 서스펜션 지그를 현수점으로 해서 들어올리는 공정을 포함하므로 권양기를 쉽게 설치할 수가 있다.In addition, since the lifting step includes a step of attaching a suspension jig to the winch or the attachment member and lifting the suspension jig as a suspension point, the winch can be easily installed.

또, 상기 들어올림공정에서는 상기 서스펜션 지그로서, 상기 권양기 또는 상기 부착부재로부터 상기 제1의 가이드레일을 초과해서 돌출하는 제1 돌출부분과, 상기 권양기 또는 상기 부착부재에서 상기 제2의 가이드레일을 초과해서 돌출하는 제2 돌출부분을 갖는 서스펜션 지그를 사용하여 상기 제1 및 제2 돌출부분을 현수점으로 해서 들어올리므로 들어올림에 요하는 장치가 권양기나 부착부재에 접촉하는 일이 없다.In the lifting step, the suspension jig includes a first protruding portion protruding beyond the first guide rail from the winch or the attachment member, and the second guide rail in the winch or the attachment member. The suspension jig having a second protruding portion which protrudes excessively is used to lift the first and second protruding portions as a suspension point so that the lifting device does not come into contact with the winch or the attachment member.

또, 상기 들어올림공정은 상기 권양기 또는 상기 부착부재를 현수점으로 해서 들어올리는 제1 들어올림공정과, 상기 제1 들어올림공정 후, 상기 권양기 또는 상기 부착부재로부터 상기 제1의 가이드레일을 초과해서 돌출하는 제1 돌출부분과, 상기 권양기 또는 상기 부착부재로부터 상기 제2의 가이드레일을 초과해서 돌출하는 제2 돌출부분을 갖는 서스펜션 지그를 상기 권양기 또는 상기 부착부재에 부착하고, 상기 제1 및 제2 돌출부분을 현수점으로 해서 들어올리는 제2 들어올림공정을 가지므로 들어올림에 요하는 장치가 권양기나 부착부재에 접촉하는 일이 없다.The lifting step includes a first lifting step of lifting the winch or the attachment member as a suspension point, and after the first lifting step, the first guide rail is exceeded from the winch or the attachment member. And a suspension jig having a first projecting portion projecting from the winder and the attaching member and a second projecting portion projecting beyond the second guide rail from the winder or the attaching member, and attaching the suspension jig to the winder or the attaching member. Since it has a 2nd lifting process which raises a 2nd protrusion part as a suspension point, the apparatus which requires lifting does not contact a winch | winder or an attachment member.

이상과 같이 본 발명은 권양기를 승강로의 저부에서 소정의 높이 위치에 설치하는 기계실 없는 엘리베이터 장치에 적용된다.As described above, the present invention is applied to an elevator apparatus without a machine room for installing a hoisting machine at a predetermined height position at the bottom of the hoistway.

Claims (3)

제1의 가이드레일 및 제2의 가이드레일을 승강로내에 세워서 설치하는 입설공정과, A standing process of installing the first guide rail and the second guide rail in a hoistway; 상기 입설공정 후, 부착부재를 상기 제1의 가이드레일 및 상기 제2의 가이드레일에 대해 슬라이드가능하게 지지하는 가이드부재를 상기 부착부재에 부착하는 부착공정과, An attaching step of attaching a guide member to the attaching member, the guide member slidably supporting the attaching member relative to the first guide rail and the second guide rail; 상기 부착부재에 권양기를 부착시킨 상태에서, 상기 부착공정 후, 상기 부착부재를 상기 제1의 가이드레일 및 상기 제2의 가이드레일의 길이방향으로 슬라이드시키면서 상기 권양기를 들어올리는 들어올림공정과, A lifting step of lifting the winch while sliding the winch in the longitudinal direction of the first guide rail and the second guide rail, after the attaching step, in the state where the winch is attached to the attaching member; 상기 들어올림공정 후, 상기 제1의 가이드레일 및 상기 제2의 가이드레일에 상기 권양기 및 상기 부착부재의 수직하중을 지지하는 지지부재를 고정하는 고정공정과,A fixing step of fixing a support member supporting the vertical load of the winch and the attachment member to the first guide rail and the second guide rail after the lifting step; 상기 고정공정 후, 상기 지지부재상에 상기 부착부재 및 상기 권양기를 설치하는 설치공정을 포함하는 것을 특징으로 하는 권양기의 설치방법.And a mounting step of installing the attachment member and the hoist on the support member after the fixing step. 제1의 가이드레일 및 제2의 가이드레일을 승강로내에 세워서 설치하는 입설공정과, A standing process of installing the first guide rail and the second guide rail in a hoistway; 상기 입설공정 후, 권양기를 상기 제1의 가이드레일 및 상기 제2의 가이드레일에 대해 슬라이드가능하게 지지하는 가이드부재를 상기 권양기에 부착하는 부착공정과, An attaching step of attaching a guide member for slidably supporting the hoisting machine to the first guide rail and the second guide rail after the placing step; 상기 부착공정 후, 상기 권양기를 상기 제1의 가이드레일 및 상기 제2의 가이드레일의 길이방향으로 슬라이드시키면서 상기 권양기를 들어올리는 들어올림공정과,A lifting step of lifting the winch while sliding the winch in the longitudinal direction of the first guide rail and the second guide rail after the attaching step; 상기 들어올림공정 후, 상기 제1의 가이드레일 및 상기 제2의 가이드레일에 상기 권양기의 수직하중을 지지하는 지지부재를 고정하는 고정공정과, A fixing step of fixing a support member supporting the vertical load of the winch to the first guide rail and the second guide rail after the lifting step; 상기 고정공정 후, 상기 지지부재상에 상기 권양기를 설치하는 설치공정을 포함하는 것을 특징으로 하는 권양기의 설치방법.And a mounting step of installing the winch on the support member after the fixing step. 제 1 항 또는 제 2 항에 있어서, The method according to claim 1 or 2, 상기 들어올림공정은 상기 권양기 또는 상기 부착부재를 현수점(points of suspension)으로 해서 상기 권양기를 들어올리는 제1 들어올림공정과, The lifting step may include a first lifting step of lifting the winch using the winch or the attachment member as a points of suspension; 상기 제1 들어올림공정 후, 상기 권양기 또는 상기 부착부재로부터 상기 제1의 가이드레일을 초과해서 돌출하는 제1 돌출부분과, 상기 권양기 또는 상기 부착부재로부터 상기 제2의 가이드레일을 초과해서 돌출하는 제2 돌출부분을 갖는 서스펜션 지그를 상기 권양기 또는 상기 부착부재에 부착하고, 상기 제1 및 제2 돌출부분을 현수점으로 해서 상기 권양기를 들어올리는 제2 들어올림공정을 포함하는 것을 특징으로 하는 권양기의 설치방법.After the first lifting step, the first projecting portion protruding beyond the first guide rail from the hoisting machine or the attaching member, and protruding beyond the second guide rail from the hoisting or attaching member. And a second lifting step of attaching a suspension jig having a second protrusion to the winch or the attachment member, and lifting the winch with the first and second protrusions as suspension points. How to install
KR10-2002-7015544A 2002-11-18 2001-03-29 Method for installing hoist KR100500861B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR10-2002-7015544A KR100500861B1 (en) 2002-11-18 2001-03-29 Method for installing hoist

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR10-2002-7015544A KR100500861B1 (en) 2002-11-18 2001-03-29 Method for installing hoist

Publications (2)

Publication Number Publication Date
KR20030003288A KR20030003288A (en) 2003-01-09
KR100500861B1 true KR100500861B1 (en) 2005-07-14

Family

ID=43671506

Family Applications (1)

Application Number Title Priority Date Filing Date
KR10-2002-7015544A KR100500861B1 (en) 2002-11-18 2001-03-29 Method for installing hoist

Country Status (1)

Country Link
KR (1) KR100500861B1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102106837B1 (en) * 2016-05-25 2020-05-07 미쓰비시덴키 가부시키가이샤 Elevator hoisting machine installation method

Also Published As

Publication number Publication date
KR20030003288A (en) 2003-01-09

Similar Documents

Publication Publication Date Title
KR100444936B1 (en) Elevator device
JP4828084B2 (en) How to install the hoist
CN109153539B (en) Elevator traction machine installation method
KR100743522B1 (en) Elevator device
CA2447396C (en) Elevator hoist machine installation apparatus
JP2009173386A (en) Installation device of elevator
JPWO2020035933A1 (en) How to apply elevator head extension technology
JP3744764B2 (en) Elevator apparatus and assembly method thereof
JP2007210703A (en) Device and method for installing hoist machine in machine-room-less elevator
KR100500861B1 (en) Method for installing hoist
JP4091326B2 (en) Elevator equipment
JP2012046296A (en) Method of mounting elevator hoist
JP2013245033A (en) Method of installing hoisting machine
JP2004168518A (en) Elevator device
JP4268275B2 (en) Elevator equipment
JP2005008335A (en) Elevator apparatus
JP2002160876A (en) Elevator device
JP2004196468A (en) Elevator device
JP4491300B2 (en) Elevator hoist support device
KR20040068178A (en) Elevator equipment
JP2000318947A (en) Elevator device
JP2006151625A (en) Elevator device
JP2002205888A (en) Elevator device
KR200256842Y1 (en) A movable working pulley of bridge
KR100500862B1 (en) Mechanism for fixing hoist and elevator

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20130621

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20140626

Year of fee payment: 10

FPAY Annual fee payment

Payment date: 20150619

Year of fee payment: 11

FPAY Annual fee payment

Payment date: 20160617

Year of fee payment: 12

FPAY Annual fee payment

Payment date: 20170616

Year of fee payment: 13

FPAY Annual fee payment

Payment date: 20180619

Year of fee payment: 14

FPAY Annual fee payment

Payment date: 20190619

Year of fee payment: 15