KR100491410B1 - Drainage structure of an incline area - Google Patents

Drainage structure of an incline area Download PDF

Info

Publication number
KR100491410B1
KR100491410B1 KR10-2005-0003415A KR20050003415A KR100491410B1 KR 100491410 B1 KR100491410 B1 KR 100491410B1 KR 20050003415 A KR20050003415 A KR 20050003415A KR 100491410 B1 KR100491410 B1 KR 100491410B1
Authority
KR
South Korea
Prior art keywords
slope
drainage structure
drainage
water
bound
Prior art date
Application number
KR10-2005-0003415A
Other languages
Korean (ko)
Other versions
KR20050012882A (en
Inventor
황주연
Original Assignee
(주) 부경종합기술단
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주) 부경종합기술단 filed Critical (주) 부경종합기술단
Priority to KR10-2005-0003415A priority Critical patent/KR100491410B1/en
Publication of KR20050012882A publication Critical patent/KR20050012882A/en
Application granted granted Critical
Publication of KR100491410B1 publication Critical patent/KR100491410B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B11/00Drainage of soil, e.g. for agricultural purposes
    • E02B11/005Drainage conduits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2200/00Geometrical or physical properties
    • E02D2200/13Geometrical or physical properties having at least a mesh portion
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0026Metals
    • E02D2300/0029Steel; Iron
    • E02D2300/0034Steel; Iron in wire form

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Agronomy & Crop Science (AREA)
  • Mechanical Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Revetment (AREA)

Abstract

본 발명은 절성토지등의 경사지(傾斜地)에 배수수단을 설치하는 경사지의 배수구조에 관한 것으로, 더욱 상세하게는 내부에 석재가 담겨진 돌망태의 하방에 유공관이 설치된 배수구조물을 경사지에 수직방향으로 매설하고, 배수구조물 일측의 물이 흘러 내려가는 쪽에 비닐이나 고무판등의 차수판을 설치함으로서, 경사지에서의 배수를 원활히 하여 경사지의 유실 및 붕괴를 방지할 수 있도록 하기 위한 것이다.The present invention relates to a drainage structure of a slope for installing drainage means on a slope such as cut-off land, more specifically, the drainage structure is installed in the vertical direction on the slope of the drainage structure is installed below the gabion in which the stone is embedded In addition, by installing a water-repellent plate such as vinyl or rubber plate on the side of the water flowing down one side of the drainage structure, the drainage on the slope is facilitated to prevent loss and collapse of the slope.

본 발명은 경사지의 유실 및 붕괴를 방지하는 배수수단을 경사지에 설치하는 것에 있어서, 상기 경사지(1)에는 다수개의 배수구조물(2)을 수직으로 간격을 두고 설치하되, 상기 배수구조물(2)은 전후면 철망 사이를 수평철사(4)로 결속한 돌망태(5)의 내부에 다수의 석재(3)가 채워지고, 상기 돌망태(5)의 하부에는 외부에 다수개의 보강테(7)가 철사로서 결속된 사각관망 형태의 유공관틀(8)이 철사로서 결속되며, 상기 유공관틀(8)의 내부에는 상부측에 다수개의 집수구멍(9)이 형성된 유공관(10)이 삽입 설치되고, 상기 유공관틀(8)의 중앙 하부에는 물이 유공관(10)의 하부로 배수되는 것을 막는 진흙등의 차수재(11)가 채워진 것을 특징으로 한다.The present invention is to install a drainage means to prevent the loss and collapse of the slope on the slope, the slope 1 is provided with a plurality of drainage structure (2) vertically spaced apart, the drainage structure (2) A plurality of stones 3 are filled in the gabions 5 bound between the front and back wire meshes with horizontal wires 4, and a plurality of reinforcing frames 7 are provided outside the gabions 5 as wires. The hollow tube frame 8 in the form of a bound square tube network is bound as a wire, and the hollow tube frame 10 having a plurality of collecting holes 9 is inserted into an upper portion of the hollow tube frame 8. (8), the lower portion of the center is filled with a filler material 11, such as mud, which prevents water from being drained to the lower portion of the perforated tube (10).

또한, 다른실시예의 경우에 상기 배수구조물(2)의 일측면 물이 흘러 내려가는 쪽에는 비닐이나 고무판등의 차수판(12)이 설치된 것을 특징으로 한다.In addition, in the case of another embodiment, one side of the drainage structure 2 is characterized in that the water-receiving plate 12, such as vinyl or rubber plate is installed on the side that flows down.

Description

경사지의 배수구조{Drainage structure of an incline area}Drainage structure of an incline area

본 발명은 절성토지등의 경사지(傾斜地)에 배수수단을 설치하는 경사지의 배수구조에 관한 것으로, 더욱 상세하게는 내부에 석재가 담겨진 돌망태의 하방에 유공관이 설치된 배수구조물을 경사지에 수직방향으로 매설하고, 배수구조물 일측의 물이 흘러 내려가는 쪽에 비닐이나 고무판등의 차수판을 설치함으로서, 배수불량으로 인한 경사지의 유실 및 붕괴를 방지할 수 있도록 하기 위한 것이다.The present invention relates to a drainage structure of a slope for installing drainage means on a slope such as cut-off land, more specifically, the drainage structure is installed in the vertical direction on the slope of the drainage structure is installed below the gabion in which the stone is embedded In addition, by installing a water-repellent plate such as vinyl or rubber on the side of the water flowing down one side of the drainage structure, it is to prevent the loss and collapse of the slope due to the drainage failure.

종래의 경사지 배수구조는 도 1에 도시된 바와 같이 돌망태(5) 속에 채워진 잡석을 단순히 경사지(1)에 올려 놓은 형태이기 때문에, 우천시 빗물이 잡석 사이의 간격을 통하여 경사지측으로 용이하게 침투하게 되므로서 배수로의 역할을 하여야 할 잡석이 오히려 빗물의 침투를 촉진시키는 문제점이 있었을 뿐만 아니라, 시공후 그 외관 자체가 매우 흉물스럽고 돌망태(5)의 파손시에는 그 내부의 잡석들이 도로주행선이나 인도 및 인근구조물 측으로 한꺼번에 쏟아져 내리기 때문에 각종 사고의 위험을 수반하는 추가적인 문제점이 있었다.In the conventional slope drainage structure, as shown in FIG. 1, since the rubble filled in the gabion 5 is simply placed on the slope 1, rainwater easily penetrates to the slope through the gap between the rubble. Not only did the rubble, which should act as a drainage, facilitate the infiltration of rainwater, but also the appearance itself was very ugly after construction, and when the gabions (5) were broken, the rubble inside the roadway, sidewalks and nearby structures There was an additional problem accompanying the risk of various accidents because it spilled all at once.

또한, 도 2에 도시한 종래의 다른예는 외주면에 다수 개의 배수공을 관통 형성시킨 배수관(13)을 경사지(1)에 매입시키므로서, 경사지(1)의 내부로 침투한 빗물이나 지하수를 배수관(13)을 통하여 배출시키도록 하였으나, 상기와 같은 종래의 배수관은 경사지를 이루는 토사 중 미세입자를 가지는 토사가 그 배수공을 통하여 배수관의 내부로 용이하게 유입되므로서, 일정 시간이 경과한 후에는 배수관의 내부가 토사로 채워져 그 배수기능을 전혀 달성할 수 없는 문제점이 있었으며, 경사지에 배수관을 매설후 지반을 다지는 과정에서 배수관이 파손되게 되는 문제점이 있었다.In addition, another conventional example shown in FIG. 2 embeds a drain pipe 13 having a plurality of drainage holes formed on the outer circumferential surface of the slope 1 so that rainwater or groundwater that has penetrated the interior of the slope 1 is discharged. 13), but the conventional drainage pipes as described above are easily introduced into the drainage pipes through the drainage holes of the soils having fine particles among the soils forming the slope, and after a predetermined time, There was a problem that the interior is filled with soil, and the drainage function can not be achieved at all, and the drainage pipe is damaged in the process of laying the ground after laying the drainage pipe on the slope.

특히, 경사지의 내부에 배수관을 설치하기 위하여 경사지의 토사를 굴착할 때 암석이 있는 경우에 토사의 굴착작업이 매우 어렵고, 그에 따른 공사원가가 상승되는 등의 또 다른 문제점이 있었다.In particular, when excavating the soil in the slope to install the drain pipe in the slope, the excavation work of the soil is very difficult when there is a rock, there was another problem such that the construction cost is increased accordingly.

본 발명은 상기의 문제점을 해결하기 위한 것으로서, 내부에 석재가 담겨진 돌망태의 하방에 유공관이 설치된 배수구조물을 경사지에 수직방향으로 매설하고, 배수구조물 일측의 물이 흘러 내려가는 쪽에 비닐이나 고무판등의 차수판을 설치함으로서, 배수불량으로 인한 경사지의 유실 및 붕괴를 방지할 수 있도록 하는 것을 기술적 과제로 한다.The present invention is to solve the above problems, embedded in the vertical direction of the drainage structure is installed on the slope of the drainage structure is installed in the bottom of the gabion in which the stone is contained inside, the order of the vinyl or rubber plate on the side of the water flows down By providing a plate, the technical problem is to prevent the loss and collapse of the slope due to drainage failure.

상기의 목적을 달성하기 위한 본 발명은, 경사지에 경사지의 유실 및 붕괴를 방지하는 배수수단을 설치하는 것에 있어서, 상기 경사지에는 다수개의 배수구조물을 수직으로 간격을 두고 설치하되, 상기 배수구조물은 전후면 철망 사이를 수평철사로 결속한 돌망태의 내부에 다수의 석재가 채워지고, 상기 돌망태의 하부에는 외부에 다수개의 보강테가 철사로서 결속된 사각관망 형태의 유공관틀이 철사로서 결속되며, 상기 유공관틀의 내부에는 상부측에 다수개의 집수구멍이 형성된 유공관이 삽입 설치되고, 상기 유공관틀의 중앙 하부에는 물이 유공관의 하부로 배수되는 것을 막는 진흙등의 차수재가 채워지고, 상기 배수구조물의 일측면 물이 흘러 내려가는 쪽에는 비닐이나 고무판등의 차수판이 설치된 것을 특징으로 한다.The present invention for achieving the above object, in the installation of the drainage means for preventing the loss and collapse of the slope on the slope, the slope is provided with a plurality of drainage structures at vertical intervals, the drainage structure is the front and rear A plurality of stones are filled in the interior of the gabion that is bound between the horizontal wire mesh, and the bottom of the gabion is a rectangular pipe network-shaped perforated pipe frame bound by a plurality of reinforcing frames on the outside is bound as a wire, the perforated pipe Into the inside of the frame is inserted into the air hole tube formed with a plurality of collecting holes in the upper side, the lower portion of the center of the hole tube frame is filled with a filler such as mud to prevent water from draining to the lower portion of the hole, one side of the drainage structure The water flowing down is characterized by the installation of a water-repellent plate such as vinyl or rubber plate.

이하, 본 발명에 따른 경사지의 배수구조에 대하여 첨부된 도면 도 3 내지 도 7을 참고하여 설명하면 다음과 같다.Hereinafter, the drainage structure of the slope according to the present invention will be described with reference to the accompanying drawings, FIGS. 3 to 7.

먼저, 도 3 내지 도 5에 도시된 본 발명의 일실시예는, 절토 및 성토지등의 경사지(1)에 경사지의 유실 및 붕괴를 방지하는 배수수단을 설치하는 것으로, 상기 경사지(1)에는 다수개의 배수구조물(2)을 간격을 두고 수직방향으로 설치한다.First, one embodiment of the present invention shown in Figures 3 to 5, to install the drainage means for preventing the loss and collapse of the slope on the slope 1, such as cut and fill land, the slope 1 A plurality of drainage structures (2) are installed in the vertical direction at intervals.

상기 배수구조물(2)은 전후면 철망 사이를 수평철사(4)로 결속한 돌망태(5)의 내부에 다수의 석재(3)가 채워지고, 상기 돌망태(5)의 하부에는 사각관 형태의 철망(6) 외부에 다수개의 보강테(7)가 철사로서 결속된 유공관틀(8)이 철사로서 결속되게 설치되어 있다.The drainage structure (2) is filled with a plurality of stones (3) in the interior of the gabion (5) bound between the front and rear wire mesh with a horizontal wire (4), the lower portion of the gabion (5) wire mesh in the form of a square tube (6) The perforated pipe frame 8, in which a plurality of reinforcing frames 7 are bound as wires, is provided to be bound as wires.

그리고, 상기 유공관틀(8)의 내부에는 상부측에 다수개의 집수구멍(9)이 형성된 유공관(10)이 삽입 설치되고, 상기 유공관틀(8) 내측의 유공관(10) 외측 중앙 하부에는 유공관(10)의 하부로 물이 배수되는 것을 막는 진흙등의 차수재(11)가 채워진 것이다.In addition, a hole hole tube 10 having a plurality of collecting holes 9 is inserted into an upper portion of the hole tube frame 8, and a hole hole tube is formed at an outer center lower portion of the hole hole tube 10 inside the hole tube frame 8. The lower part of 10) is filled with a filler material 11 such as mud to prevent water from being drained.

상기 보강테(7)는 철근을 사각형으로 절곡하여 형성하거나, 앵글등의 형강을 사각으로 형성할 수 있고, 상기 유공관틀(8)은 도 4에서 보는 바와 같이 유공관(10)의 상면과 유공관틀(8) 상측과 소정의 간격(c)을 두도록 유공관틀(8)을 크게 제작해야 함을 밝혀둔다.The reinforcing frame 7 may be formed by bending the reinforcing bars in a square, or may be formed in a square steel, such as an angle, the perforated pipe frame 8 is the upper surface of the perforated pipe 10 and the perforated pipe frame as shown in FIG. (8) It should be noted that the perforated pipe frame 8 should be made large so as to have a predetermined distance c from the upper side.

다음은 도 도 6 및 도 7에 도시된 본 발명의 이실시예에 대한 설명으로, 이실시예는 일실시예에 차수판(12)만 추가된 것이므로, 추가된 구성에 대해서만 설명한다.The following is a description of this embodiment of the present invention shown in Figures 6 and 7, this embodiment is only added to the order plate 12 in one embodiment, only the added configuration will be described.

즉, 이실시예의 본 발명은 돌망태(5)의 내부에 석재(3)가 담겨지고 하부에 유공관틀(8)이 설치되며, 유공관틀(8)의 내부에 유공관(10)이 설치된 배수구조물(2)이 경사지(1)에 간격을 두고 설치된 것에 있어서, 상기 배수구조물(2)의 일측면 물이 흘러 내려가는 쪽에는 배수구조물(2)의 하방의 토사층으로 물이 스며들어가는 것을 차단하는 비닐이나 고무판등의 차수판(12)이 설치된 것이다.That is, the present invention of this embodiment is a stone structure 3 is contained in the gabion 5 and the lower hole tube frame 8 is installed at the bottom, the lower hole structure 10 is installed in the inner hole tube frame 8 ( 2) is provided at intervals on the inclined ground (1), one side of the drainage structure (2) on the side of the water flows down the vinyl or rubber plate to block water from entering the soil layer below the drainage structure (2) The order plate 12, etc. is provided.

상기와 같이 구성되어 있는 본 발명의 작용 관계를 도 3 내지 도 7을 참고하여 설명하면 다음과 같다.Referring to Figures 3 to 7 the operational relationship of the present invention configured as described above are as follows.

경사지(1)의 침하를 막기 위하여 경사지(1)에 배수구조물(2)을 설치 하고자 하는 경우에는 배수구조물(2)을 설치할 경사지(1)에 배수구조물(2)이 들어갈 홈을 판 뒤에 그 홈에 일실시예의 경우에는 배수구조물(2)을 수직으로 삽입하고, 이실시예의 경우에는 배수구조물(2)과 차수판(12)을 상기 홈에 삽입시킨 뒤에 토사를 메우면 도 3 및 도 6과 같이 배수구조물(2) 및 차수판(12)을 설치할 수 있게 되는 것이다.If the drainage structure 2 is to be installed on the slope 1 to prevent the settlement of the slope 1, the groove is to be inserted into the slope 1 where the drainage structure 2 will be installed. In one embodiment, the drainage structure 2 is inserted vertically, and in this embodiment, the drainage structure 2 and the order plate 12 are inserted into the grooves, and then the soil is filled with FIGS. 3 and 6. As will be able to install the drainage structure (2) and the order plate (12).

도 3 및 도 4에 도시된 바와같이 경사지(1)에 배수구조물(2)만 설치된 일실시예의 경우에 경사지(1)에 빗물등의 물이 흘러내리게 되면, 위의 물은 토사로 된 경사지(1)의 내부로 스며들면서 토사층의 구조에 따라 토사층의 수직방향으로 하측이나 옹벽(14)이 설치된 아래쪽으로 스며들게 된다.3 and 4, in the case of the embodiment in which only the drainage structure 2 is installed on the inclined ground 1, when water such as rainwater flows down the inclined ground 1, the above water is an inclined ground made of soil ( 1) It penetrates into the interior of the soil layer, so that the bottom or the retaining wall 14 is installed in the vertical direction of the soil layer in accordance with the structure of the soil layer.

이때, 상기 옹벽(14)측의 아래쪽으로 경사지게 스며들면서 내려가는 물은 내부에 다수의 석재(3)가 담겨져서 커다란 틈새를 형성하고 있는 돌망태(5)로 스며들게 되는데, 이 돌망태(5)의 내부는 위에서 언급한 바와같이 다수의 석재(3)가 채워져 있음에 따라 석재(3)의 사이에 커다란 틈새들이 생기게 되고, 이 다수의 석재(3)는 물에 의해 흐트러지지도 아니함에 따라 돌망태(5)의 내부로 스며드는 물은 빠르게 하측으로 흘러내려가게 된다.At this time, the water going down while inclined downward on the retaining wall 14 side is soaked into the gabions 5, which contain a large number of stones 3 and form a large gap therein, the inside of the gabions 5 As mentioned above, a large number of stones (3) are filled, creating large gaps between the stones (3), which are not distracted by water, so the gabions (5) The water seeping inside quickly flows down.

이렇게 하측으로 흘러 내려가는 물은 유공관틀(8)에 삽입된 유공관(10)의 집수구멍(9)으로 집수되어 유공관(10)으로 유입되게 되고, 유공관의 내부로 흘러들어온 물은 외측의 배수로로 배수되게 되는 것이며, 그로 인하여 토사의 유실이나 붕괴를 막을 수 있게 되는 것이다.Water flowing down like this is collected into the collecting hole 9 of the oil hole pipe 10 inserted into the oil hole pipe frame 8 to be introduced into the oil hole pipe 10, and the water flowing into the oil hole pipe is drained to an outside drainage channel. This will prevent the loss or collapse of earth and sand.

이때, 상기 유공관(10)의 중앙하부에는 진흙과 같이 물이 잘 스며들지 않는 차수재(11)가 채워져 있음에 따라 유공관(10)으로 내려오던 물이 유공관(10)의 하부로 스며드는 시간을 지연시키게 되며, 차수재(11)에 의해 밑으로 스며들지 않고 모이는 물이 유공관(10)의 집수구멍(9)으로 집수되어 경사지(1)로 스며드는 다량의 물을 효과적으로 배수시킴에 따라 경사지의 유실 및 붕괴를 최소화할 수 있게 되는 것이다.At this time, the lower part of the perforated pipe 10 is filled with a water repellent material 11 that does not penetrate the water well such as mud delays the time that the water coming down into the perforated pipe 10 to the bottom of the perforated pipe 10 As the water collected without being penetrated by the water repellent material 11 is collected through the water collecting hole 9 of the perforated pipe 10 and effectively drains a large amount of water that penetrates the slope 1, The collapse will be minimized.

그리고, 상기 유공관틀(8)은 도 4에서 보는 바와 같이 유공관(10)의 상면과 유공관틀(8) 상측과 소정의 간격(c)을 두도록 크게 제작되고 유공관틀(8)의 외부에 보강테(7)가 설치되어서 돌망태(5)에 담겨진 석재(3)의 무게에 의해 유공관틀(8)이 눌릴 때, 유공관틀(8)의 내부에 삽입 설치된 유공관(10)이 눌리지 않도록 하여 합성수지재로 된 유공관(10)의 파손을 예방할 수 있게 된다.In addition, the perforated tube frame 8 is made large so as to have a predetermined distance (c) with the upper surface of the perforated tube frame 10 and the upper side of the perforated tube frame 8 as shown in Figure 4 and the reinforcement frame outside the perforated tube frame (8) When the perforated pipe frame 8 is pressed by the weight of the stone 3 contained in the gabion 5 when the perforated pipe frame 8 is installed, the perforated pipe 10 installed in the perforated pipe frame 8 is not pressed. It is possible to prevent the breakage of the perforated tube (10).

도 6 및 도 7에 도시된 본 발명의 이실시예는 일실시예에 차수판(12)이 추가된 것이므로 차수판(12)이 추가된 부분에 대해서만 설명한다.This embodiment of the present invention shown in Figures 6 and 7 is added to the order plate 12 in one embodiment, so only the portion to which the order plate 12 is added will be described.

상기와 같이 본 발명의 이실시예에서는 경사지(1)에 배수구조물(2)이 설치된 곳에 차수판(12)이 추가된 것이므로 돌망태(5)측으로 스며든 물이 아래쪽으로 흘러 내려가다가 차수판(12)에 막혀서 옹벽(14) 쪽의 토사층으로 스며들지 못하면서 차수판(12)을 따라서 수직방향의 하측으로 흘러내리게 된다.As described above, in this embodiment of the present invention, since the order plate 12 is added where the drainage structure 2 is installed on the inclined ground 1, the water penetrating to the gabion 5 side flows down and then the order plate 12 ) So that it does not penetrate into the soil layer on the retaining wall 14 side, it flows downward along the order plate 12 in the vertical direction.

이렇게 차수판(12)을 따라 아래로 흘러내리는 물은 진흙등의 차수재(11)의 상면에 고이면서 이렇게 고이는 물이 유공관(10)의 집수구멍(9)으로 유입되어 유공관(10)을 따라 외측으로 배수되게 되는 것이다. Water flowing down along the order plate 12 accumulates on the upper surface of the order member 11 such as mud, and the water thus collected flows into the collecting hole 9 of the perforated tube 10 and follows the perforated tube 10. It will be drained to the outside.

상기와 같이 본 발명의 경사지의 배수구조는, 내부에 석재가 담겨진 돌망태의 하방에 유공관이 설치된 배수구조물을 경사지에 수직방향으로 매설하고, 배수구조물 일측의 물이 흘러 내려가는 쪽에 비닐이나 고무판등의 차수판을 설치함으로서, 경사지의 유실 및 붕괴를 방지할 수 있는 효과와, 상기 유공관틀에 설치된 보강테에 의해 중량물의 돌망태 무게를 지탱하여 유공관틀의 내부에 삽입된 유공관의 파손을 방지할 수 있는 효과가 있는 것이다.As described above, the sloped drainage structure of the present invention embeds a drainage structure in which a perforated pipe is installed below the gabion in which the stone is contained, in a vertical direction on the sloped slope, and the degree of the vinyl or rubber plate on the side where the water from one side of the drainage structure flows down. By installing the plate, the effect of preventing the loss and collapse of the slope, and the effect of supporting the gabion weight of the heavy by the reinforcement frame installed in the perforated pipe frame to prevent damage of the perforated pipe inserted into the perforated pipe frame There is.

도 1은 종래의 경사지 배수구조의 일예를 나타내는 측단면도. 1 is a side cross-sectional view showing an example of a conventional slope drainage structure.

도 2는 종래의 경사지 배수구조의 다른예를 나타내는 측단면도.Figure 2 is a side cross-sectional view showing another example of a conventional inclined drainage structure.

도 3은 본 발명에 따른 경사지의 배수구조의 일실시예를 나타내는 측단면도. Figure 3 is a side cross-sectional view showing an embodiment of the drainage structure of the slope according to the present invention.

도 4는 도 4의 "A"부를 확대도시한 부분 단면도.4 is an enlarged partial cross-sectional view of a portion “A” of FIG. 4.

도 5는 본 발명의 요부인 배수구조물을 나타내는 분해 사시도.5 is an exploded perspective view showing a drainage structure that is a main part of the present invention.

도 6은 본 발명에 따른 경사지의 배수구조의 이실시예를 나타내는 측단면도.Figure 6 is a side cross-sectional view showing an embodiment of the drainage structure of the slope according to the present invention.

도 7은 도 6의 "B"부를 확대도시한 부분 단면도이다.FIG. 7 is an enlarged partial cross-sectional view of part “B” of FIG. 6.

〈도면의 주요 부분에 대한 부호의 설명〉<Explanation of symbols for main parts of drawing>

1 : 경사지 2 : 배수구조물 3 : 석재1: slope 2: drainage structure 3: stone

4 : 수평철사 5 : 돌망태 6 : 철망4: horizontal wire 5: gabion 6: wire mesh

7 : 보강테 8 : 유공관틀 9 : 집수구멍7: reinforcement frame 8: perforated pipe frame 9: catchment hole

10 : 유공관 11 : 차수재 12 : 차수판10: Merit Hall 11: Order of Order 12: Order of Order

13 : 배수관 14 : 옹벽 13: drain pipe 14: retaining wall

Claims (2)

경사지(1)에 다수개의 배수구조물(2)을 간격을 두고 수직방향으로 매설하되,To bury a plurality of drainage structure (2) in the vertical direction at intervals on the slope (1), 상기 배수구조물(2)은 전후면 철망 사이를 수평철사(4)로 결속한 돌망태(5)의 내부에 다수의 석재(3)가 채워지고, 상기 돌망태(5)의 하부에는 외부에 다수개의 보강테(7)가 철사로서 결속된 사각관망 형태의 유공관틀(8)이 철사로서 결속되게 설치되며, 상기 유공관틀(8)의 내부에는 상부측에 다수개의 집수구멍(9)이 형성된 유공관(10)이 삽입 설치되고, 상기 유공관틀(8) 내의 유공관 (10) 외측의 중앙 하부에는 유공관(10) 하측의 흙으로 물이 스며드는 것을 막는 차수재(11)가 채워진 것을 특징으로 경사지의 배수구조.The drainage structure (2) is filled with a plurality of stone (3) inside the gabion (5) bound between the front and back wire mesh with a horizontal wire (4), a plurality of reinforcement outside the lower of the gabion (5) The perforated pipe frame 8 having a rectangular pipe network form in which the frame 7 is bound as a wire is installed to be bound as a wire, and the perforated pipe frame 10 has a plurality of collecting holes 9 formed in the upper side in the perforated pipe frame 8. ) Is installed, the drainage structure of the slope, characterized in that the lower portion of the center hole outside the hole tube (10) in the hole tube frame (8) is filled with a filler (11) to prevent water from seeping into the soil of the lower hole tube (10). 제 1항에 있어서, 상기 배수구조물(2)의 일측면 물이 흘러 내려가는 쪽에는 차수판(12)이 설치된 것을 특징으로 하는 경사지의 배수구조.2. The inclined drainage structure according to claim 1, wherein a water order plate (12) is installed on one side of the drainage structure (2).
KR10-2005-0003415A 2005-01-13 2005-01-13 Drainage structure of an incline area KR100491410B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR10-2005-0003415A KR100491410B1 (en) 2005-01-13 2005-01-13 Drainage structure of an incline area

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR10-2005-0003415A KR100491410B1 (en) 2005-01-13 2005-01-13 Drainage structure of an incline area

Publications (2)

Publication Number Publication Date
KR20050012882A KR20050012882A (en) 2005-02-02
KR100491410B1 true KR100491410B1 (en) 2005-05-27

Family

ID=37224636

Family Applications (1)

Application Number Title Priority Date Filing Date
KR10-2005-0003415A KR100491410B1 (en) 2005-01-13 2005-01-13 Drainage structure of an incline area

Country Status (1)

Country Link
KR (1) KR100491410B1 (en)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100717729B1 (en) * 2006-11-29 2007-05-11 동남이엔씨(주) Guard structure of slope surpace
RU2512031C2 (en) * 2012-05-04 2014-04-10 Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования Кабардино-Балкарская государственная сельскохозяйственная академия им. В.М. Кокова (ФГБОУ ВПО КБГСХА) Method of erection of underground horizontal water intake of combined structure
RU2513183C2 (en) * 2012-05-05 2014-04-20 Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования Кабардино-Балкарская государственная сельскохозяйственная академия им. В.М. Кокова (ФГБОУ ВПО КБГСХА) Underground horizontal water intake of combined design
RU2528836C2 (en) * 2012-08-31 2014-09-20 Общество с ограниченной ответственностью Научно-производственная фирма "БЕРЕГ" Method to erect horizontal underground water intake of combined design
CN103898884B (en) * 2014-03-26 2015-11-18 重庆地质矿产研究院 Method for eliminating soil medium current of terrace in landslide area
RU2601818C1 (en) * 2015-07-22 2016-11-10 Федеральное государственное бюджетное образовательное учреждение высшего образования Кабардино-Балкарский государственный аграрный университет им. В.М. Кокова (ФГБОУ ВО КБГАУ) Erection method of combined drainage earth structures
RU2614072C1 (en) * 2015-12-08 2017-03-22 Федеральное государственное бюджетное образовательное учреждение высшего образования Кабардино-Балкарский государственный аграрный университет им. В.М. Кокова (ФГБОУ ВО КБГАУ) Combined drainage of earthworks
US10661319B2 (en) * 2017-12-28 2020-05-26 Republic Services, Inc. Gas ventilation and leachate drain assemblage for landfill
CN110644309B (en) * 2019-09-26 2022-01-18 山东大学 Roadbed drainage structure, system and construction method
KR102596812B1 (en) * 2023-02-21 2023-11-01 조문선 Self-supporting retaining wall system based on multi-step structure by selectively measuring of moisture

Also Published As

Publication number Publication date
KR20050012882A (en) 2005-02-02

Similar Documents

Publication Publication Date Title
KR100491410B1 (en) Drainage structure of an incline area
JP5346731B2 (en) Rainwater penetration facilities
JP4284665B2 (en) Drainage structure of gutter
JP3981146B1 (en) Drainage structure construction method
KR20150065477A (en) Side gutter for mountain ridge and construction method
KR101201544B1 (en) Underground Penetration Type Side Gutter Assembly
JP5182903B2 (en) Osmotic structure, water collecting facility with osmotic structure, and installation method of osmotic structure
CN215057564U (en) Visual and maintainable type anti-clogging drainage system for highway tunnel
JP7073163B2 (en) Embankment structure
JP2011032703A (en) Subterranean rainwater infiltration facility
JP7222602B2 (en) Surface drainage system and its installation method
JP4362202B2 (en) Road penetration facility and its construction method
KR100586879B1 (en) A drain ball of drainage structure for public works
JP4504220B2 (en) Drainage channel
KR100561716B1 (en) A drain at slope
KR100854718B1 (en) Construction method of drainage system for cable troughs and a cable trough used for the method
KR200187240Y1 (en) Double waterway using permeation pipe
CN112922670B (en) Visual and maintainable type anti-clogging drainage system for highway tunnel
KR102362469B1 (en) Rainwater penetration and storage type shoulder structure for impermeable pavement road and construction method thereof
JP7311923B1 (en) waterway
KR102290646B1 (en) Sidewall structure for early rain removal and sidewall structure system for early rain removal
JPS6325141B2 (en)
KR102219577B1 (en) Sidewalk structure for decreasing outflowing water
JPH10168985A (en) Structure for promoting infiltration of surface water
CN208201898U (en) One kind being used for highway excavation section subgrade drainage system

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
N231 Notification of change of applicant
FPAY Annual fee payment

Payment date: 20130515

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20140515

Year of fee payment: 10

FPAY Annual fee payment

Payment date: 20150518

Year of fee payment: 11

FPAY Annual fee payment

Payment date: 20160919

Year of fee payment: 12

LAPS Lapse due to unpaid annual fee