KR100478572B1 - Multi-span continuous P.S.C. - I beam bridge and its construction method - Google Patents

Multi-span continuous P.S.C. - I beam bridge and its construction method Download PDF

Info

Publication number
KR100478572B1
KR100478572B1 KR10-2002-0008656A KR20020008656A KR100478572B1 KR 100478572 B1 KR100478572 B1 KR 100478572B1 KR 20020008656 A KR20020008656 A KR 20020008656A KR 100478572 B1 KR100478572 B1 KR 100478572B1
Authority
KR
South Korea
Prior art keywords
strand
span
continuous
slab
bridge
Prior art date
Application number
KR10-2002-0008656A
Other languages
Korean (ko)
Other versions
KR20030068928A (en
Inventor
권오근
김원근
윤숙현
이무일
Original Assignee
동양종합건업 주식회사
주식회사 동양피에스씨
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 동양종합건업 주식회사, 주식회사 동양피에스씨 filed Critical 동양종합건업 주식회사
Priority to KR10-2002-0008656A priority Critical patent/KR100478572B1/en
Publication of KR20030068928A publication Critical patent/KR20030068928A/en
Application granted granted Critical
Publication of KR100478572B1 publication Critical patent/KR100478572B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2/00Bridges characterised by the cross-section of their bearing spanning structure
    • E01D2/02Bridges characterised by the cross-section of their bearing spanning structure of the I-girder type
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/08Members specially adapted to be used in prestressed constructions

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

본 발명은 다경간 연속 피.에스.씨.- 아이빔 합성형교의 시공방법 및 구조에 관한 것으로서 종래에는 각 경간빔(1)의 프리스트레스 압축응력이 연속 되도록 피.씨.(P.C.) 강연선(3)을 배치하여 인장할 경우 슬래브콘크리트(2)에 인장응력이 발생될 수 있다.The present invention relates to a construction method and structure of a multi-span continuous P.S.C.-eye beam composite girder bridge. Conventionally, the P.C. (PC) strands 3 are constructed so that the prestressed compressive stress of each span beam 1 is continuous. When the tension is placed by the tension may be generated in the slab concrete (2).

본 발명은 예시도 1,2,3 과 같이 빔을 지상에서 미리 제작할 때 하부 피.씨. 강연선(4)과 중간부 피.씨. 강연선(5)으로 구분하여 하부 피.씨. 강연선 (4)은 지상에서 미리 인장정착한 상태에서 각각의 빔(1)을 교대(9) 또는 교각(10) 위에 가설한 후 중간부 피.씨. 강연선(5)을 인장정착하는 다경간 피.에스.씨.- 아이빔교량의 시공방법에 있어서, 도 2, 3 과 같이 슬래브 단면내에도 상부 피.씨. 강연선(7)을 교량의 종방향과 나란하게 배치하고 인장정착하여 먼저 슬래브 콘크리트 (2)에 프리스트레스 압축응력을 도입시켜 상기에서 언급한 인장응력과 상쇄시키고자 하는것이다.The present invention is the lower P. Strand (4) and middle part P.C. Divided into strand (5), lower P.C. The strand 4 is constructed by placing each beam 1 on the alternating 9 or the piers 10 in the state of pre-tensioning on the ground, and then the intermediate portion P. A multi-span P.S.C.-C beam construction for tensilely fixing the strand 5, the upper P.C. in the slab cross section as shown in Figs. The strand 7 is placed parallel to the longitudinal direction of the bridge and tension settled to first introduce prestressed compressive stress into the slab concrete 2 to compensate for the above mentioned tensile stress.

Description

다경간 연속 피.에스.씨.- 아이빔 합성형교의 시공방법 및 구조{Multi-span continuous P.S.C. - I beam bridge and its construction method}Construction method and structure of multi-span continuous P.S.C.- i-beam composite bridge {Multi-span continuous P.S.C. I beam bridge and its construction method

본 발명은 다경간 피.에스.씨.- 아이빔(P.S.C.- I Beam) 합성형교에 관한 것으로서, 피.에스.씨.- 아이빔(1)을 지상에서 미리 제작하여 교대(9) 또는 교각(10) 위에 가설한 후 슬래브 콘크리트(2)를 타설하기 전에 슬래브 단면 내에 미리 다수개의 상부 피.씨.(P.C.)강연선(7)을 배치하여 슬래브 콘크리트(2)를 타설 양생한 후 이를 각각 인장 장착하여 피.에스.씨. - 아이빔(1)과 함께 슬래브 콘크리트(2)에도 프리스트레스 압축응력을 도입시키도록 한 시공방법 및 그 구조에 관한 것이다. BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a multi-span PSC-I beam composite girder bridge, comprising a pre-fabricated P.S.-I beam (1) on the ground for alternation (9) or piers (10). After placing the slab concrete (2) in the slab cross-section before placing the slab concrete (2) and placing the cured slab concrete (2) in the slab section in advance, P.S. It relates to a construction method and a structure in which the prestressed compressive stress is introduced to the slab concrete (2) together with the eye beam (1).

종래의 다경간 연속 피.에스.씨. - 아이빔교로서 지상에서 빔(1)을 제작할 때 일부 피.씨. 강연선(5)의 양단을 빔의 상면으로 인출하고 각경간의 경계인 지점부에서 종방향으로 인접한 2개빔(1)의 상측에서 미리 인출된 각각의 일단을 연속되도록 서로 교차시켜 고정 정착판(6a)에 의하여 슬래브 콘크리트(2)속에 매몰 고정시킨 후, 빔(1)의 상면으로 인출된 다른 각각의 일단을 인장 정착하여 각경간마다 독립적으로 가설된 빔(1)이 각경간에 걸쳐 피.씨. 강연선(3)에 의한 프리스트레스 압축응력이 완전하게 연속되도록 하여 일체구조가 되도록 하는 방법이 알려져 있다.Conventional multi-span continuous P.S.C. -Some P.C. when making beam (1) from the ground as an i-beam bridge. Both ends of the strand 5 are drawn to the upper surface of the beam and the fixed fixing plate 6a is intersected so that each end drawn in advance on the upper side of the two beams 1 adjacent in the longitudinal direction at the point that is the boundary between the respective beams is continuous. After buried and fixed in the slab concrete (2) by the tensile end of each of the other ends drawn out to the upper surface of the beam (1), the beam (1), which is independently hypothesized for each time interval is P. A method is known in which the prestressed compressive stress by the strand 3 is completely continuous to form an integral structure.

그러나 상기와 같은 방식은 슬래브 콘크리트(2)를 타설한 후 빔(1)의 상면으로 인출시킨 피.씨. 강연선(5)을 인장할 경우 미리 타설된 지간 중앙의 슬래브 콘크리트(2)에는 필연적으로 인장응력이 발생하게 되는바, 인장응력이 그리 크지 않다면 크게 문제가 되지는 않을 것이나, 지간을 더욱 길게 하고 빔(1)의 높이를 낮추기 위하여는 빔(1)의 상면으로 인출시키는 피.씨. 강연선(5)의 사용량을 증가시켜야 하므로 결국 슬래브 콘크리트(2)를 타설한 후 빔(1)에 2차적으로 도입시키는 프리스트레스 응력이 아주 커지게 되어 지간 중앙부 슬래브콘크리트(2)에는 허용응력을 초과하는 아주 큰 인장응력과 그로 인한 균열이 발생될 수 있다.However, in the above-described method, after pouring slab concrete 2, P. C. is drawn out to the upper surface of the beam 1. When the strand 5 is tensioned, tensile stress is inevitably generated in the slab concrete (2) in the center of the pre-poured section. If the tensile stress is not large, it will not be a big problem, but the section will be longer and the beam will be longer. In order to lower the height of (1), P. C. is drawn to the upper surface of the beam (1). Since the amount of use of the strand 5 should be increased, the prestress stress introduced secondly into the beam 1 after placing the slab concrete 2 becomes very large, so that the allowable stress in the middle slab concrete 2 is exceeded. Very large tensile stresses and resulting cracks can occur.

본 발명은 상술한 바와 같이 종래의 결점들을 해소하기 위한 것으로서 도 2, 3 과 같이 슬래브 콘크리트(2) 단면에내에도 피.씨. 강연선(7)을 배치하고 인장 정착하여 미리 프리스트레스 압축응력을 도입시켜 위에서 언급한 슬래브 콘크리트(2)의 인장응력과 상쇄시키고자 하는 것이다.The present invention is to solve the conventional defects as described above as shown in Figs. 2, 3 also in the slab concrete (2) cross-section. It is intended to offset the tensile stress of the slab concrete 2 mentioned above by arranging the strand 7 and tension-setting to introduce prestress compressive stress in advance.

위에서 상술한 목적을 실현시키기 위한 본 발명은 2경간 이상의 다경간 교량을 피.에스.씨. - 아이빔으로 가설함에 있어서, 도 2a 와 도 3a 에서와 같이 빔을 지상에서 미리 제작할 때 하부 피.씨. 강연선과 중간부 피.씨. 강연선으로 구분하고 중간부 피.씨. 강연선의 양단을 모두 빔의 상면으로 인출시키거나, 또는 일단은 빔의 상면으로 인출하고 다른 일단은 빔의 측면 상부로 인출시켜 제작하고, 가설 후 빔의 자중과 슬래브 콘크리트의 사하중에 저항하도록 하기 위하여 하부 피.씨. 강연선은 지상에서 미리 인장정착하여 빔에 1차적인 프리스트레스 압축응력을 도입시킨 상태에서 각 경간의 교대 또는 교각 위에 각각의 빔을 독립적으로 가설하고, 도 2,3 에서와 같이 슬래브 콘크리트를 타설하기 전에 지점부에서 종방향으로 인접한 2개 빔의 상측에서 미리 인출된 중간부 피.씨. 강연선의 각각의 일단이 서로 연속되도록 교차시켜 도 4 와 같은 형태로 고정정착판과 함께 조립하며 슬래브 단면 내에는 교량의 종방향과 수평으로 나란하게 하고 횡방향으로는 소정의 간격을 갖는 다수개의 상부 피.씨. 강연선을 미리 배치한 후, 슬래브 콘크리트를 타설하여 양생이 완료되면 상부 피.씨. 강연선을 인장 정착하여 슬래브 콘크리트에 먼저 프리스트레스 압축응력을 도입하고 각경간에 걸쳐 각각의 일단이 연속 결합된 중간부 피.씨. 강연선의 다른 각각의 일단을 인장정착함으로써, 독립적으로 가설된 빔에는 각경간에 걸쳐 연속된 2차 프리스트레스 압축 응력이 도입되어지도록 한것으로서, 이때 각빔 중간부 피.씨. 강연선을 인장정착하므로 인하여 각 지간 중앙부의 상부 슬래브 콘크리트에서 필연적으로 발생되는 인장응력은 상부 피.씨. 강연선의 인장정착에 의하여 슬래브 콘크리트에 미리 도입된 프리스트레스 압축응력으로서 상쇄시키고자 하는 것이다.The present invention for realizing the above-mentioned object is a multi-span bridge over two spans. In the hypothesis of the eye beam, the lower P. C. when the beam is prefabricated on the ground as in FIGS. 2A and 3A. The strand and middle part P.C. Divided by strand, middle part P.C. To draw both ends of the strand to the upper surface of the beam, or one end to the upper surface of the beam and the other end to the upper side of the beam, and to resist the self-weight of the beam and the dead weight of the slab concrete after construction Lower p. The strands are pre-tensioned from the ground and the beams are independently installed on the alternating or pier of each span with primary prestress compressive stress applied to the beams, before placing the slab concrete as shown in Figs. Intermediate P. C. previously drawn on top of two longitudinally adjacent beams at the point. Each end of the strand is crossed with each other so as to be continuous with each other and assembled together with the fixed anchoring plate in the form as shown in FIG. 4, in the slab cross-section parallel to the longitudinal direction of the bridge horizontally and a plurality of upper parts having a predetermined interval in the transverse direction Mr. P. After arranging the strand, the slab concrete is poured and curing is completed. Tensile settling of stranded wire first introduces prestressed compressive stress into slab concrete, and each end is continuously joined over each span. By tensioning each other end of the strand, the independently hypothesized beam is introduced with a continuous secondary prestressed compressive stress over each span, wherein the middle beam of the beam Due to the tension settling of the strands, the tensile stress inevitably generated in the upper slab concrete at the center of each section is the upper P. It is intended to offset the prestressed compressive stress introduced into the slab concrete by the tension settling of the strand.

본 발명을 첨부된 예시도면과 함께 상세히 설명하면 다음과 같다.The present invention will be described in detail with reference to the accompanying drawings.

본 발명은 2경간 또는 그 이상의 교량을 시공하는 방법 및 구조에 관한 것으로서 2경간의 교량을 본 발명에 의하여 건설하고자 할 경우 각 경간의 빔(1a)을 지상에서 미리 독립적으로 제작할 때 하부 피.씨. 강연선(4)과 중간부 피.씨. 강연선(5)으로 구분하여 하부 피.씨. 강연선(4)의 양단은 빔(1a)의 양측면 하부로 각각 인출시키고 중간부 피.씨. 강연선은 도 2 및 도 2a 과 같이 중간지점 교각(10) 쪽의 각 일단은 빔(1a)의 상면으로 인출시키고 외측 지점인 교대(9) 쪽의 각 일단은 빔(1a)의 측면 상부로 인출시켜 제작하여 하부 피.씨. 강연선(4)을 지상에서 미리 인장 정착함에 따라 빔(1a)에 1차 프리스트레스 압축응력을 먼저 도입시킨후 각 경간마다 독립적으로 빔(1a)을 가설한다. 다음으로 1,2경간의 경계 부분인 중간지점 교각 (10)위에서 종 방향으로 인접한 2개 빔(1a)의 상측에서 중간부 피.씨. 강연선(5)의 각각의 일단을 도 4 와 같이 서로 교차시켜 연속되도록 고정정착판 (6a)에 의하여 슬래브 콘크리트(2)속에 매몰되도록 조립함과 동시에 슬래브에도 교량의 종방향과는 나란하게 하고 교량의 횡 방향으로는 소정의 간격으로 다수개의 상부 피.씨. 강연선 (5)을 제1,2 경간에 걸쳐 연속되도록 배치하고 제1,2경간에 걸쳐 슬래브 콘크리트 (2)를 연속하여 일체구조가 되도록 타설 양생한 후, 상부 피.씨. 강연선(5)의 양단을 인장 정착하여 슬래브콘크리트(2)에 프리스트레스 압축응력을 먼저 도입한 후, 중간부 피.씨. 강연선(5)을 외측지점인 양쪽 교대(9)측에서 빔(1a)의 측면상부로 각각 인출된 인장정착부에서 인장 정착하여 제1,2경간에 걸쳐 완전하게 연속 결합되는 2차 프리스트레스 압축응력이 빔(1a)에 도입되도록 하는 것이다.The present invention relates to a method and a structure for constructing two-span or more bridges. When the two-span bridges are to be constructed according to the present invention, the lower beams are produced when the beams 1a of each span are independently prepared in advance on the ground. . Strand (4) and middle part P.C. Divided into strand (5), lower P.C. Both ends of the strand 4 are led out to the lower sides of both sides of the beam 1a, respectively. As shown in FIGS. 2 and 2A, each end of the strand 10 is drawn out to the upper surface of the beam 1a, and each end of the outside 9, which is the outer point, is drawn out to the upper side of the beam 1a. Make it to the bottom. As the strand 4 is tensioned in advance on the ground, the first prestressed compressive stress is first introduced into the beam 1a, and then the beam 1a is independently installed for each span. Next, the middle part is located above the two longitudinal beams (1a) above the middle point piers (10), which are boundary portions of the first and second spans. Each end of the strand 5 is assembled so as to be buried in the slab concrete (2) by the fixed fixing plate (6a) so as to intersect with each other as shown in Figure 4 and at the same time parallel to the longitudinal direction of the bridge in the slab In the transverse direction of the plurality of upper P. C. at predetermined intervals. The strand 5 is disposed so as to be continuous over the first and second spans and the slab concrete 2 is successively cured to form an integrated structure over the first and second spans, and then the upper P. Both ends of the strand 5 were tension-set and the prestressed compressive stress was first introduced into the slab concrete 2, and then the middle part P.C. Secondary prestressed compressive stress in which the strand 5 is tension-fixed at the tensile anchorage portions respectively drawn out on the side surfaces of the beam 1a at both side shift portions 9, which are outer points, and are completely continuously coupled over the first and second spans. This is to be introduced into the beam (1a).

도 3 및 도 3a 은 3경간 이상의 교량을 본 발명에 의하여 건설하고자 하는 경우로서 각각의 빔(1a)(1b)을 지상에서 독립적으로 제작할 때 하부 피.씨. 강연선(4)과 중간부 피.씨. 강연선(5)으로 구분하여 제작함에 있어서, 제1경간과 제N경간(마지막 경간)에 해당되는 외측경간 빔(1a)은 상기 제2경간교량의 예시에서와 같이 제작하고 제2,3,4,5,6,···경간에 해당하는 내측 경간의 빔(1b)은 중간부 피.씨. 강연선(5)의 양단을 모두 빔(1b)의 상면으로 인출시켜 제작한 후 하부 피.씨. 강연선(4)은 모두 지상에서 인장정착하여 빔(1a)(1b)에는 먼저 1차 프리스트레스압축응력을 도입하고 각 경간의 빔(1a)(1b)을 독립적으로 가설한다.3 and 3A is a case in which three or more spans of bridges are to be constructed by the present invention, when the beams 1a and 1b are independently manufactured on the ground. Strand (4) and middle part P.C. In the production by dividing into the strand 5, the outer span beam 1a corresponding to the first span and the Nth span (last span) is manufactured as in the example of the second span bridge, and the second, third and fourth bridges are manufactured. ..., 5, 6, ... the inner span beam 1b corresponding to the span is the middle part. After drawing both ends of the strand 5 to the upper surface of the beam (1b), the lower P. All of the strands 4 are tension-seated on the ground, and the first prestressing stress is first introduced to the beams 1a and 1b, and the beams 1a and 1b of each span are independently installed.

다음으로 제2지점 교각(10) 위에서 종방향으로 인접한 2개 빔(1a)(1b)의 상측에서 미리 인출된 중간부 피.씨. 강연선(5)의 각 일단을 도 4 와 같이 조립함과 동시에 제1,2경간이 연속되도록 상부 피.씨. 강연선(7a)을 배치한 후, 제1,2경간의 슬래브콘크리트(2a)를 제 3경간 쪽으로 약간 연장하여 일체구조가 되도록 연속하여 타설 양생하게 된다.Next, the middle part P. C., which is previously drawn above the two longitudinally adjacent beams 1a and 1b above the second point piers 10. Assembling each end of the strand 5 as shown in Figure 4 and at the same time the first and second spans are continuous. After arranging the strand 7a, the slab concrete 2a between the first and second spans is slightly extended toward the third span to continuously pour and cure to form an integral structure.

이때 제3지점 교각(10) 위에서 역시 종방향인접한 2개 빔(1b)의 상측에서도 마찬가지로 중간부 피.씨. 강연선(5)을 연속시키기 위하여 제1,2경간의 슬래브콘크리트 (2a)를 타설하기 전에 미리 도 5 와 같이 제2경간과 제3경간의 중간부 피.씨. 강연선(5)의 각각의 일단을 교차시켜 조립하되 제 2경간빔(1b)의 제 3지점쪽으로 인출된 중간부 피.씨. 강연선(5)은 제1,2경간 슬래브콘크리트(2a)의 타설 경계면에서 인장정착판(6b)에 의하여 인장 정착될 수 있도록 하고, 제3경간빔(1b)의 제3지점쪽으로 인출된 중간부 피.씨. 강연선(5)은 고정정착판(6a)에 의하여 제1,2경간 슬래브 콘크리트(2a)속에 미리 매몰 고정될 수 있도록 하며, 제3경간에 배치될 상부 피.씨. 강연선(7b) 또한 제 3지점쪽의 일단이 역시 제 1,2경간의 슬래브콘크리트 (2a)속에 미리 매몰 되어져 제1,2경간의 상부 피.씨. 강연선(7a)과 연속되어지도록 도 6 과 같이 연결정착판(8)에 의하여 교차되도록 미리 조립설치한다.At this time, the middle portion P. C. in the upper side of the two beam (1b) also adjacent in the longitudinal direction on the third point piers (10). Before placing the slab concrete 2a between the first and second spans in order to continue the strand 5, the intermediate portion between the second and third spans is shown in FIG. Assembled by crossing each end of the strand 5, the middle portion P. C. drawn out toward the third point of the second span beam (1b). The strand 5 allows the tension settling to be fixed by the tension fixing plate 6b at the placing interface of the first and second span slab concrete 2a, and the middle portion drawn out toward the third point of the third span beam 1b. Mr. P. The strand 5 is to be buried in the first and second span slab concrete (2a) in advance by a fixed fixing plate (6a), the upper P. C. to be disposed in the third span. The strand 7b also has one end on the third point already buried in the slab concrete 2a between the first and second spans, so that the upper p. 6 is assembled in advance so as to be crossed by the connecting fixing plate 8 as shown in FIG. 6 so as to be continuous with the strand 7a.

상기와 같이 제2,3지점 각 교각(10)위에서 종방향으로 인접한 각 빔(1b)의 상측에서 중간부 피.씨. 강연선(5)과 상부 피.씨. 강연선(7a)(7b)의 연속교차조립이 완료되어 제 1,2경간 슬래브콘크리트(2a)의 타설 양생이 완료되면 제 1,2경간의 상부 피.씨. 강연선(7a)을 인장정착하여 슬래브콘크리트(2a)에 프리스트레스 압축응력을 먼저 도입하고, 제 1경간빔(1a)의 중간부 피.씨. 강연선(5)은 제 1지점 교대(9)쪽 빔(1a)의 측면 상부에서 인장 정착하고 제 2경간빔(1b)의 중간부 피.씨. 강연선(5)은 제 1,2경간 슬래브콘크리트(2a)의 제3지점쪽 경계면에서 인장 정착하여 제1,2경간의 빔(1a)(1b)에는 연속된 2차 프리스트레스 압축응력이 도입되는 것이다.As described above, the middle portion of the beam 1b in the longitudinal direction adjacent to each of the second and third points of the piers 10. Strand (5) and upper P.C. When the continuous cross assembly of the strands 7a and 7b is completed and the casting curing of the first and second span slab concrete 2a is completed, the upper P.C. Prestressing compressive stress was first introduced into the slab concrete 2a by tensilely fixing the strand 7a, and the intermediate portion of the first spanning beam 1a. The strand 5 is tension-fixed on the upper side of the beam 1a toward the first point alternate 9, and the middle portion of the second span beam 1b. The strand 5 is tension-fixed at the interface of the third point of the first and second span slab concretes 2a so that the continuous secondary prestress compressive stress is introduced into the beams 1a and 1b between the first and second span slabs. .

지금까지와 같이 제1,2경간의 시공이 완료되면 제1,2경간의 슬래브 콘크리트 (2a)속에 그 일단이 미리 매몰된 제3경간의 상부 피.씨. 강연선(7b)을 배치하되 제3경간 슬래브 콘크리트(2b)의 제 4지점쪽 타설 경계면에서 도 6 과 같이 그 일단이 인장 정착될 수 있도록 하며 동시에 제 4지점 교각(10)위에서 종방향으로 인접한 빔(1b)의 상측에서도 역시 도 5 와 같이 제3,4경간빔(1b)의 중간부 피.씨. 강연선(5)을 교차시켜 연속되도록 조립하고 동시에 제 4경간에 배치될 상부 피.씨. 강연선(7b)의 제4지점 쪽의 일단 또한 도 6 과 같이 제3경간 슬래브콘크리트(7b)속에 매몰될수 있도록 조립한후 제3경간의 슬래브콘크리트(7b)를 타설양생하고 그 경계면에서 제 3경간 빔(1b)의 상부 피.씨. 강연선(5)을 인장정착하여 슬래브콘크리트 (7b)에 제1,2,3경간이 모두 연속되는 프리스트레스 압축응력을 먼저 도입시키고 제3경간 빔(1b)의 중간부 피.씨. 강연선(5)을 인장 정착하여 제1,2,3경간의 빔 (1a)(1b)이 모두 연속하는 2차 프리스트레스 압축응력을 도입시키는 것이다.As before, when the construction of the first and second spans is completed, the upper part of the third span in which the one end is buried in the slab concrete (2a) of the first and second spans in advance. The strand 7b is arranged to allow the one end of the third span slab concrete 2b to be placed in tension at the fourth point side of the casting interface as shown in FIG. 6 and at the same time, the beam is longitudinally adjacent to the fourth point pier 10. Also in the upper side of (1b), as shown in Fig. 5, the middle portion of the third, fourth span beam (1b). The upper P. C. to be assembled in a row by crossing the strand 5 and to be disposed at the same time in the fourth span. One end of the fourth point of the strand 7b is also assembled so as to be buried in the third span slab concrete 7b as shown in Fig. 6, and then the slab concrete 7b of the third span is cast and the third span at the boundary surface thereof. The upper P. C. of the beam 1b. Tensile fixation of the strand 5, the prestressed compressive stress of the first, second and third spans are first introduced into the slab concrete (7b), and the middle portion of the third span beam (1b). The strand 5 is tension-fixed to introduce a secondary prestressed compressive stress in which the beams 1a and 1b between the first, second and third spans are all continuous.

위와 같이 제3경간의 시공이 완료된 후 제4경간 부터는 순차적으로 제3경간의 시공과정을 반복적으로 되풀이하여 다수의 경간이 연속되도록 하는 것이다.After completing the construction of the third span as described above, from the fourth span, the construction process of the third span is repeated repeatedly so that a plurality of spans are continuous.

지금까지는 제 3경간 이상의 교량을 가설함에 있어서 먼저 제 1,2경간의 슬래브(2a)를 시공하고 제 3경간부터는 반복적으로 분할하여 슬래브(2b)를 시공함을 예시한 것으로서 모든 경간에 걸쳐 슬래브콘크리트(2)를 동시에 연속하여 타설 하고자 할 경우에는 도 7 과 같이 각 지점마다 상부 피.씨. 강연선(7)과 중간부 피. 씨. 강연선(5)을 인장정착 할 수 있도록 상부슬래브단면 내 미리 별도의 개구부 (11)를 설치하도록 한다.Up to now, in the construction of bridges over the third span, first, the slab 2a between the first and second spans is constructed, and the slab 2b is constructed by repeatedly dividing from the third span. If you want to continually cast (2) at the same time as shown in Fig. 7 for each point. Strand (7) and mid-blood; Seed. In order to allow the strand 5 to be tensioned, an additional opening 11 is installed in the upper slab section in advance.

본 발명에서는 2경간 및 3경간 이상의 교량을 프리스트레스 응력이 완전하게 연속결합되는 피.에스.씨. - 아이빔(1)구조의 교량을 건설하고자할 경우 하부 피.씨. 강연선(4)과 중간부 피. 씨. 강연선(5)으로 구분하여 빔(1)을 제작하고 하부 피. 씨. 강연선(4)은 빔(1)의 자중과 슬래브콘크리트(2)의 사하중에 저항하도록 하고 중간부 피.씨. 강연선(5)으로서 활하중과 지점부의 부모멘트에 대응하도록 함과 동시에 각경간의 빔(1)에는 연속된 프리스트레스 응력을 도입시키면서 슬래브 단면 내에도 상부 피.씨. 강연선(7)을 배치하고 인장 정착하여 프리스트레스 압축 응력을 도입함으로써 슬래브콘크리트(2)의 인장 응력 및 균열을 억제하여 더욱 안정적이고 경제적인 연속구조의 피.에스.씨. - 아이빔교 를 가설할 수 있게 되는 것이다.In the present invention, the two-stage and three-span bridges or more are combined with P.S. -If you want to build a bridge with the structure of the i-beam (1), the lower P. Strand (4) and mid-blood; Seed. The beam (1) is manufactured by dividing the strand (5) and the lower blood. Seed. The strand 4 is made to resist the dead weight of the beam 1 and the dead weight of the slab concrete 2, As the strand 5, it corresponds to the live load and the parental portion of the point, and at the same time, a continuous prestress stress is introduced into the beam 1 of each span while the upper P. By arranging the strand 7 and tension-fixing to introduce prestressed compressive stress, the tensile stress and crack of the slab concrete 2 are suppressed, thereby providing a more stable and economical continuous structure. -I will be able to construct an i-beam bridge.

도 1 은 다경간 연속 피.에스.씨.- 아이빔의 일부단면사시도, 1 is a cross-sectional perspective view of a multi-span continuous P.S.C.-eye beam,

도2 는 본 발명에 따른 2경간 연속구조의 단면도,2 is a cross-sectional view of a two-span continuous structure according to the present invention;

도 2a 은 도2의 빔제작 상태 단면도,Figure 2a is a cross-sectional view of the beam manufacturing state of FIG.

도 3 은 본 발명에 따른 3경간 이상 연속구조의 단면도,3 is a cross-sectional view of a continuous structure of three or more spans according to the present invention;

도 3a 은 도 3의 빔제작 상태 단면도,Figure 3a is a cross-sectional view of the beam manufacturing state of FIG.

도 4 는 도 2와 도3의 제 2지점 교각위에서 종방향으로 인접한 2개빔의 상측에서 빔의 상면으로 미리 인출된 상부 피.에스.씨. 강연선의 각 일단이 연속되도록 교차시켜 고정 정착판과 함께 조립한 연결부 확대 사시도,4 is an upper P. C. C. previously drawn to an upper surface of the beam above the two longitudinally adjacent beams above the second point pier of FIGS. 2 and 3; An enlarged perspective view of the connecting portion assembled with the fixed fixing plate by crossing each end of the strand to be continuous,

도 5 는 도3의 제 3,4,5,6,7,···N지점 교각위에서 도 4와 같이 상부 피.씨. 강연선의 각일단을 교차시켜 조립하되 1개빔의 일단은 고정정착판에 의하여 슬래브콘크리트 속에 매몰 고정되고 1개빔의 일단은 슬래브콘크리트의 타설 경계면에서 인장 정착될 수 있도록 한 연결부 확대 사시도,FIG. 5 is an upper P. C. as shown in FIG. 4 above the third, fourth, fifth, sixth, seventh, ... N point pier of FIG. Assembled by crossing each end of the strand, but one end of one beam is buried in the slab concrete by a fixed fixing plate and one end of one beam is to be tension-fixed at the casting interface of the slab concrete,

도 6 은 도 3의 제 3,4,5,6,7,···N지점 교각위에서 각경간의 슬래브콘크리트 타설 경계면에서 슬래브단면내의 상부 피.씨. 강연선을 연결 정착판에 의하여 연속되도록 교차시켜 조립한 상태의 확대사시도,FIG. 6 is an upper P.C. in slab cross section at slab concrete pour interface of each span at point 3,4,5,6,7, ... N point pier of FIG. An enlarged perspective view in which the stranded wires are assembled by intersecting them continuously by a connecting fixing plate,

도 7 은 도3에서 각경간의 슬래브를 차례로 분할하여 시공하지 않고 모든 경경간의 슬래브콘크리트를 동시에 타설하였을 경우 상부 피.씨. 강연선과 중간부 피.씨. 강연선을 인장 정착하기 위한 개구부 설치 단면도.7 is the upper P. C. when the slab concrete of all spans are poured at the same time without dividing the slabs of each span in sequence in FIG. The strand and middle part P.C. Sectional view of opening installation for tensile fixation of stranded wire.

<도면의 주요부분에 대한 부호의 설명><Description of the symbols for the main parts of the drawings>

1 - 피.에스.씨. - 아이빔(P.S.C.-I빔)1-P.S.C. Eye Beam (P.S.C.-I Beam)

1a -도 2의 2경간 연속 구조와 도3의 제 1경간 및 제 N경간인 외측경간의 피.에스.씨. - 아이빔.1a-P.S.C. between the two span continuous structure of FIG. 2 and the outer span which is the 1st and Nth spans of FIG. -I-beam.

1b - 도3의 제 2,3,4,5,6,7, ···N-1경간인 내측 경간의 피.에스.씨.-아이빔1b-2,3,4,5,6,7, ... P-S.C.-i-beam of the inner span of the N-1 span

2 - 슬래브콘크리트2-slab concrete

2a - 도3의 제 1,2경간슬래브콘크리트2a-1st and 2nd span slab concrete of FIG.

2b - 도3의 제 3,4,5,···N경간의 슬래브콘크리트2b-slab concrete between 3, 4, 5, ... N span of FIG.

3 - 피.씨. 강연선(P.C. 강연선)3-Mr. P. Strand (P.C. Strand)

4 - 하부 피.씨. 강연선4-lower p. Strand

5 - 중간부 피.씨. 강연선5-middle p. Strand

6 - 정착판6-fixing plate

6a - 슬래브콘크리트에 매몰되는 고정정착판6a-Fixed fixing plate buried in slab concrete

6b - 슬래브콘크리트 타설경계면의 인장정착판6b-Tension Fixing Plate of Slab Concrete Placing Interface

7 - 슬래브 단면 내의 상부 피.씨. 강연선7-upper P.seed in the cross section of the slab. Strand

7a - 도 3의 제 1,2경간의 상부 피.씨. 강연선7a-upper P. c. Between first and second spans of FIG. Strand

7b - 도 3의 제 3,4,5,···N의 상부 피.씨. 강연선7b-upper p. C. Of 3,4,5, ... N of FIG. Strand

8 - 상부 피.씨. 강연선의 연속교차 정착판8-upper p. Continuous crossing fixation plate of strand

9 - 교대9-shift

10 - 교각 10-piers

11 - 상부 슬래브콘크리트 개구부11-upper slab concrete opening

Claims (4)

피.에스.씨. - 아이빔을 지상에서 미리 제작할 때 하부 피.씨. 강연선(4)과 중간부 피.씨. 강연선(5)으로 구분하여 하부 피.씨. 강연선(4)은 지상에서 미리 인장정착한 상태에서 각각의 빔(1)을 교대(9) 또는 교각(10) 위에 독립적으로 가설한 후 중간부 피.씨. 강연선(5)을 각 경간에 걸쳐 연속되도록 교차시켜 인장정착하는 다경간 연속 피.에스.씨. - 아이빔교의 시공방법에 있어서,P.S. -The lower P.C. when the iBeam is pre-made on the ground. Strand (4) and middle part P.C. Divided into strand (5), lower P.C. The strand 4 is the intermediate portion of the P. C. after each beam 1 is independently hypothesized on the alternating 9 or the piers 10 in the state of pre-tensioning on the ground. Multi-span continuous P.S.C. which crosses the strand 5 so as to be continuous over each span. -In the construction method of the i-beam bridge, 부 슬래브단면내에 교량의 종방향과 나란하게 상부 피.씨. 강연선(7)을 배치하고 인장정착하여 슬래브 콘크리트(2)에 프리스트레스 압축 응력을 도입하면서 각경간 빔(1)의 중간부 피.씨. 강연선(5)을 순차적으로 인장정착함을 특징으로 하는 다경간 연속 피.에스.씨.- 아이빔(1) 합성형교의 시공방법. Upper slab parallel to the longitudinal direction of the bridge in the upper slab section. Placing the strand 7 and tension-seating to introduce prestressed compressive stress into the slab concrete 2, while the intermediate portion of the beam between beams (1). A method for constructing a multi-span continuous P.S.C.- I-beam (1) composite girder bridge, characterized in that the strand 5 is successively tensioned. 제 1 항에 있어서 의 양단 상면또는 일단 상면이 약간 낮게 형성되고 제 1 경간과 마지막 경간(제N경간)에 사용되는 외측경간 빔(1a)의 중간부 피.씨. 강연선(5)의 일단은 빔(1a)의 상면으로, 다른 일단은 빔(1a)의 측면 상부로 인출하고 내측의 각경간에 사용되는 빔(1b)의 중간부 피.씨. 강연선(5)의 양단은 모두 빔(1b)의 상면으로 인출시킨 것을 특징으로 하는 다경간 연속 피.에스.씨. - 아이빔 합성형교의 시공방법.2. The middle part of the outer span beam (1a) according to claim 1, wherein the upper or one end surface of the beam is slightly lower and is used for the first span and the last span (N span). One end of the strand 5 is drawn on the upper surface of the beam 1a, and the other end is drawn to the upper side of the beam 1a, and the middle portion of the beam 1b used for the inner angular intervals. Both ends of the strand 5 are drawn out to the upper surface of the beam 1b. -Construction method of i-beam composite bridge. 제 1 항에 있어서 내측 경간 각 지점 교각(10) 위에서 종 방향으로 나란하게 인접한 2개빔(1b)의 상측에서 중간부 피.씨. 강연선(5)의 각 일단을 교차시켜 조립하되 도 5 와 같이 1개빔(1b)의 중간부 피.씨. 강연선(5)은 고정정착판(6a)과 함께 슬래브 콘크리트(2) 속에 매몰고정되고 1개 빔(1b)의 중간부 피.씨. 강연선(5)은 인장정착판(6b)에 지지하여 인장정착 함을 특징으로 하는 다경간 연속 피.에스.씨.- 아이빔 합성형교의 시공방법.2. The middle part of claim 1, wherein the middle portion is located above the two beams (1b) adjacent to each other in the longitudinal direction on each of the inner piers (10). Assemble by crossing each end of the strand (5), but as shown in Figure 5 the middle part of one beam (1b). The strand 5 is buried and fixed in the slab concrete 2 together with the fixed fixing plate 6a, and the middle portion of one beam 1b. The strand 5 is supported by a tension fixing plate 6b for tensile fixation, characterized in that the construction of a multi-span continuous P.S.C.- i-beam composite bridge. 1항에 있어서 부슬래브콘크리트(2)를 각 경간마다 분할하여 차례로 타설 해가면서 슬래브 단면 내에서 교량의 종방향으로 연속된 상부 피.씨. 강연선(7)을 각 경간에 걸쳐 순차적으로 인장 정착하여 분할되어져 타설 된 각 경간의 상부 슬래브콘크리트(2a)(2b)가 일체구조가 되도록 한 것을 특징으로 하는 다경간 연속 피.에스.씨 - 아이빔 합성형교의 시공방법. Claim 1, wherein the secondary concrete slab (2), the upper blood continuous in the longitudinal direction of the bridge going to split by placing in turn each span in the slab cross-section. In the seed. Multi-span continuous P.S.C.C.-I-Beam characterized in that the upper slab concrete (2a) and (2b) of each of the divided spans are formed by tensilely fixing the strand 7 sequentially over each span. Construction method of composite bridge.
KR10-2002-0008656A 2002-02-19 2002-02-19 Multi-span continuous P.S.C. - I beam bridge and its construction method KR100478572B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR10-2002-0008656A KR100478572B1 (en) 2002-02-19 2002-02-19 Multi-span continuous P.S.C. - I beam bridge and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR10-2002-0008656A KR100478572B1 (en) 2002-02-19 2002-02-19 Multi-span continuous P.S.C. - I beam bridge and its construction method

Related Child Applications (1)

Application Number Title Priority Date Filing Date
KR2020020004851U Division KR200278126Y1 (en) 2002-02-19 2002-02-19 Multi-span continuous P.S.C. - I beam bridge

Publications (2)

Publication Number Publication Date
KR20030068928A KR20030068928A (en) 2003-08-25
KR100478572B1 true KR100478572B1 (en) 2005-03-28

Family

ID=32221761

Family Applications (1)

Application Number Title Priority Date Filing Date
KR10-2002-0008656A KR100478572B1 (en) 2002-02-19 2002-02-19 Multi-span continuous P.S.C. - I beam bridge and its construction method

Country Status (1)

Country Link
KR (1) KR100478572B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104233942A (en) * 2014-09-28 2014-12-24 浙江大学 Method for enhancing overall stress on assembled type heterotropic pre-stress hollow slab beam bridge

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112523098B (en) * 2020-12-07 2022-08-12 中交第一公路勘察设计研究院有限公司 Method for improving anti-cracking performance of hogging moment area of steel-concrete composite beam bridge

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104233942A (en) * 2014-09-28 2014-12-24 浙江大学 Method for enhancing overall stress on assembled type heterotropic pre-stress hollow slab beam bridge
CN104233942B (en) * 2014-09-28 2017-01-18 浙江大学 Method for enhancing overall stress on assembled type heterotropic pre-stress hollow slab beam bridge

Also Published As

Publication number Publication date
KR20030068928A (en) 2003-08-25

Similar Documents

Publication Publication Date Title
KR101177342B1 (en) Precast end segmet girder for continuous bridge, girder making method and bridge construction method using the same
KR101283535B1 (en) Fully-precast prestressed concrete girder bridges and construction method of such bridges
KR101242842B1 (en) Construction method for corrugated steel plate web-psc composite beam
KR100952623B1 (en) Bridge having deck slab concrete structure on plural beams, constructing method thereof and precast partial-depth deck slab concrete structure used in constructing same
KR100936944B1 (en) Continuity Girder, Continuity Structure of Girder and Construction Method of the Same
KR100554408B1 (en) Composite Girder for Bridge and Construction Method
KR100911148B1 (en) Lightened Coping for bridge
KR102203826B1 (en) Prestressed Concrete Spliced Girder Bridge and Construction method thereof
KR100478572B1 (en) Multi-span continuous P.S.C. - I beam bridge and its construction method
KR200278126Y1 (en) Multi-span continuous P.S.C. - I beam bridge
KR101067717B1 (en) Process for producing prestressed concrete girder and concrete girder structure
KR102077385B1 (en) Prestressed Steel-Concrete Composite Girder
KR101075756B1 (en) A manufacturing process for the Truss Half Precast Prestressed Concrete Panel
KR100583671B1 (en) Prestressed concrete beam manufactured by installing steel anchorage devices to various positions and reinforcing member to the upper and lower flanges, and construction method of bridge using the concrete beam
KR100712622B1 (en) Continuous Preflex Girder Structure Using Prestress in Parent Section Using Expanded Concrete and Its Construction Method
KR102327700B1 (en) Girder structure and construction method for continuity of supporting portion of girder using the same
KR100393132B1 (en) Construction method of composite steel-box bridge using prestress
KR100691664B1 (en) Method of construction for girder bridge
KR101578637B1 (en) Prestressed Concrete Girder for Continuous Composite Girder Bridge and Construction Method for Thereof
KR20060017949A (en) Field-fabricated prestressing steel-composed girder and construction method of continuous bridge using the girder
KR102203149B1 (en) Precast Prestressed Concrete Slab Using Unbonded Strand Area And Cutting Pocket And the Manufacturing Method Therefor
KR200279224Y1 (en) Multi-span continuous Preflex Composite Beam Type Bridge
KR20120140338A (en) Constructing method of bridge using half precast panel having connecting bar
KR100582563B1 (en) Construction method for bridges and bridges production it
KR20150083446A (en) Construction methods for bridges of rahmen types by using precast P.S girder and steel box girder

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20080917

Year of fee payment: 4

LAPS Lapse due to unpaid annual fee