KR100402438B1 - An basement excavation apparatus of pier basis for a bridge - Google Patents

An basement excavation apparatus of pier basis for a bridge Download PDF

Info

Publication number
KR100402438B1
KR100402438B1 KR10-2001-0028324A KR20010028324A KR100402438B1 KR 100402438 B1 KR100402438 B1 KR 100402438B1 KR 20010028324 A KR20010028324 A KR 20010028324A KR 100402438 B1 KR100402438 B1 KR 100402438B1
Authority
KR
South Korea
Prior art keywords
bridge
steel
foundation
coupled
pier
Prior art date
Application number
KR10-2001-0028324A
Other languages
Korean (ko)
Other versions
KR20020089695A (en
Inventor
최성욱
Original Assignee
주식회사유신코퍼레이션
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사유신코퍼레이션 filed Critical 주식회사유신코퍼레이션
Priority to KR10-2001-0028324A priority Critical patent/KR100402438B1/en
Publication of KR20020089695A publication Critical patent/KR20020089695A/en
Application granted granted Critical
Publication of KR100402438B1 publication Critical patent/KR100402438B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F3/00Dredgers; Soil-shifting machines
    • E02F3/04Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/46Dredgers; Soil-shifting machines mechanically-driven with reciprocating digging or scraping elements moved by cables or hoisting ropes ; Drives or control devices therefor
    • E02F3/47Dredgers; Soil-shifting machines mechanically-driven with reciprocating digging or scraping elements moved by cables or hoisting ropes ; Drives or control devices therefor with grab buckets
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/02Piers; Abutments ; Protecting same against drifting ice
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0061Production methods for working underwater
    • E02D2250/0076Drilling
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/18Foundations formed by making use of caissons

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

본 발명은 교량을 건설하는 경우에 교각의 기초에 대한 터파기 작업을 수행하는데 사용되는 장치에 관한 것으로서, 더욱 상세하게는 수상 장비를 사용하는 것이 아니라 케이슨의 상부에 설치된 터파기 장치를 이용하여 조수간만의 차이를 전혀 입지 않는 장치를 사용하므로 공사기간의 단축과 공사비를 절감할 수 있고, 작업중에 발생되는 작업자들의 안전 사고를 완전히 차단할 수 있는 구조를 가지는 교량의 교각 기초의 터파기 굴착 장치에 관한 것이다.The present invention relates to a device used to carry out a digging operation on the foundation of a bridge when constructing a bridge, and more specifically, an assistant using a digging device installed on the top of the caisson, rather than using a water equipment. The use of a device that does not have any difference between the two makes it possible to shorten the construction period and reduce the construction cost, and to make the excavation device of the foundation of the bridge pier of the bridge having a structure that can completely block the safety accidents of workers occurring during the work. will be.

본 발명은, 교량의 교각 기초로 사용되는 케이슨에 대한 터파기 작업에 있어서, 상기의 교각 기초에는 상부면에 일체로 결합되어 작동되는 굴착 장치가 고정되는 한편, 상기의 교각 기초에는 다수개의 하부 고정대가 고무 받침판을 매개로하여 고정 볼트로 결합되고, 상기의 하부 고정대에는 그 상부에 강재 기둥이 결합되며, 상기의 강재 기둥에는 폭 방향으로 측면 지지대가 설치되고 직상부에 길이방향으로 가로 빔이 설치되며, 상기의 가로 빔에는 일측 후방에 보강재가 설치되고 상기의 가로 빔에는 길이방향의 중간부를 가로지르며 수직하게 강재 레일부가 결합되며, 상기의 강재 레일부는 하단에 전동 호이스트가 결합되고 상기의 전동 호이스트의 와이어 로프에는 굴착된 토사를 배토시키는 그래브가 장착되고, 상기의 강재 기둥과 강재 레일부에는 보강 로프가 연결되어 강재 레일부를 가로 빔가 밀착되도록 지지하는 한편, 상기의 강재 레일부는 하단에 설치된 전동 호이스트의 작동에 의해 교각 기초의 내부 바닥면을 굴착하고 굴착된 토사를 교각 기초의 외부로 배토시키는 것을 특징으로 하는 교량의 교각 기초의 터파기 굴착 장치를 제공한다.The present invention, in the excavation work for the caisson used as the bridge foundation of the bridge, the excavation device is fixed to the pier foundation is operated integrally coupled to the upper surface, while a plurality of lower fixtures on the pier foundation Is coupled to the fixing bolt via a rubber support plate, and the steel pole is coupled to the upper portion of the lower holder, the side pillars in the width direction is installed on the steel pole, the horizontal beam is installed in the upper portion in the longitudinal direction The horizontal beam is provided with a reinforcement on one side of the rear beam, and the horizontal beam crosses the middle portion in the longitudinal direction, and the steel rails are vertically coupled. The steel rails are coupled with an electric hoist at the lower end of the electric hoist. The wire rope is equipped with a grab for discharging the excavated earth and sand, the steel pole and the steel rail portion While the reinforcing rope is connected to support the steel rail unit to be in close contact with the horizontal beam, the steel rail unit excavates the inner bottom surface of the pier foundation by the operation of the electric hoist installed at the bottom and dispose the excavated soil to the outside of the pier foundation It provides a trench excavation device of the bridge foundation of the bridge, characterized in that.

Description

교량의 교각 기초의 터파기 굴착 장치{An basement excavation apparatus of pier basis for a bridge}An basement excavation apparatus of pier basis for a bridge}

본 발명은 교량을 건설하는 경우에 교각의 기초에 대한 터파기 작업을 수행하는데 사용되는 장치에 관한 것으로서, 더욱 상세하게는 수상 장비를 사용하는 것이 아니라 케이슨의 상부에 설치된 터파기 장치를 이용하여 조수간만의 차이를 전혀 입지 않는 장치를 사용하므로 공사기간의 단축과 공사비를 절감할 수 있고, 작업중에 발생되는 작업자들의 안전 사고를 완전히 차단할 수 있는 구조를 가지는 교량의 교각 기초의 터파기 굴착 장치에 관한 것이다.The present invention relates to a device used to carry out a digging operation on the foundation of a bridge when constructing a bridge, and more specifically, an assistant using a digging device installed on the top of the caisson, rather than using a water equipment. The use of a device that does not have any difference between the two makes it possible to shorten the construction period and reduce the construction cost, and to make the excavation device of the foundation of the bridge pier of the bridge having a structure that can completely block the safety accidents of workers occurring during the work. will be.

일반적으로 강 또는 바다와 같이 수중에 교량의 교각을 건설하는 경우에는, 수중 구조물인 교각 기초(cassion; 케이슨)를 적정한 위치에 설치한 후 상기의 교각 기초의 내부에 대한 터파기 작업을 시행하는게 일반적이다.In general, when a bridge pier is constructed underwater, such as a river or the sea, it is common to install a caisson, which is an underwater structure, at an appropriate location, and then carry out the excavation work on the inside of the pier foundation. to be.

이러한 터파기 작업은 종래에는 교각 기초가 설치되는 장소에 근접하게 가교를 설치하거나 가도를 축설한 후 상기의 가도를 이용하여 많은 차량 등을 운행하며 모든 교각 기초에 대한 작업을 실시하였지만, 상기한 가도 축설을 이용한 방법은 근래에 와서 환경 오염을 일으키는 주요한 요인으로 대두된 바 현재는 이러한 방법을 실시할 수 없게 되었고 이로인해 교각 기초에 대한 건설에 사용되는 장비는, 주로 바지선, 크레인의 크람 샬 등을 이용하여 기초 터파기 작업을 시행하는게 대부분이라 말할 수 있다.Such excavation work has conventionally been carried out on all pier foundations by operating a number of vehicles using the above road after installing bridges or laying roads close to where the pier foundations are installed. In recent years, the method using the snow stock has become a major factor causing environmental pollution. Currently, this method cannot be implemented. As a result, the equipment used for the construction of the pier foundation is mainly used for the construction of barges and crane scrambles. It can be said that the basic excavation work is mostly performed by using.

도 1은 종래의 교각 기초 하상 터파기 작업을 나타내는 도면으로서, 수중 구조물인 교각 기초로 사용되는 교각 기초(20)를 적정한 위치에 위치시키고 상기의 교각 기초(20)이 설치된 인접한 곳에는 바지선(22)을 위치시키며, 상기의 바지선(22)에는 크레인(24)을 상부에 적재한 후 상기의 크레인(24)에 결합된 크람 샬(26)을 이용하여 교각 기초(20)의 하단에 대한 터파기 작업을 시행하게 된다.1 is a view showing a conventional pier foundation bed excavation work, where the pier foundation 20 used as an pier foundation, which is an underwater structure, is positioned at an appropriate position, and the barge 22 is located in the vicinity where the pier foundation 20 is installed. ), The barge 22 is loaded on the top of the crane 24, the trench for the lower end of the pier foundation 20 using the crammals 26 coupled to the crane 24 above The work will be carried out.

상기의 바지선(22)과 크레인(24)을 이용한 수중 터파기 작업은, "작업 바지선 제작 ⇒ 예인선 제작 ⇒ 크레인 설치 ⇒ 크랍 샬 제작 및 굴착" 등과 같은 순으로 작업이 진행되게 된다.Underwater excavation work using the barge 22 and the crane 24 described above, the work proceeds in the order such as "work barge production ⇒ tugboat production ⇒ crane installation ⇒ crowhal production and excavation".

상기한 방법은 교량 및 기타 수중 구조물을 건설하는 경우에 사용되는 일반적인 방법이다.The above method is a general method used when constructing bridges and other underwater structures.

상술한 교각 기초에 대한 수중 터파기 작업은, 작업 바지선을 제작하는데 고가의 제작비가 투입되고 크레인 및 예인선을 사용하는데 과다한 비용이 투자되는 문제점이 있었고, 또한 상기의 작업 바지선을 이용하여 수중 터파기 작업을 실시하는 경우에는 조수 간만의 차이에 따른 썰물 시기에는 바지선의 운항이 불가능하여 교각 기초에 대한 터파기 작업을 시행하기가 힘들었다.Underwater excavation work on the above-mentioned pier foundation, there is a problem that expensive manufacturing costs are put into the production of the work barge, and excessive costs are invested in the use of cranes and tugboats, and also the work of underwater excavation work using the above work barge In the case of carrying out the barge operation at low tide due to the difference between tides, it was difficult to carry out the digging work on the foundation of the piers.

또한, 상기한 원인에 따른 작업 연장으로 공사기간이 연장되고 그로인해 경제적인 측면에서 수중 구조물의 건설 비용이 막대하게 투입되는 문제점이 있었다.In addition, the construction period is extended due to the extension of the work according to the above causes there was a problem that the construction cost of the underwater structure is enormously input in terms of economy.

본 발명은 상술한 문제점을 해결하기 위하여 안출된 것으로서, 본 발명은,교각 기초에 대한 수중 터파기 작업을 시행하는데 있어 조수 간만의 차이에 따른 영향을 전혀 받지 않으며, 경제적인 측면에서도 사용되는 장비를 대폭적으로 감소시킬 수 있어 수중 구조물의 건설 비용을 최대한 삭감할 수 있으며, 특히 강재 빔을 이용하여 제작이 간단하고 전동 호이스트와 소형 그래브를 제작하여 사용하므로 조립 및 해체가 수월하여 종래의 장비에 비하여 작업자들의 작업 조건을 향상시킬 있는 구조를 가지는 교량의 교각 기초의 터파기 굴착 장치를 제공하는 것을 그 목적으로 한다.The present invention has been made to solve the above-described problems, the present invention is not affected by the difference between the tide in performing the underwater excavation work on the foundation of the piers at all, economical equipment used It can greatly reduce the construction cost of the underwater structure as much as possible. Especially, it is easy to manufacture by using steel beam, and it is easy to assemble and dismantle by using electric hoist and small grab. It is an object of the present invention to provide a trench excavation apparatus based on a bridge piers having a structure capable of improving working conditions of workers.

본 발명은 상술한 목적을 달성하기 위하여 안출된 것으로서, 본 발명은, 교량의 교각 기초로 사용되는 케이슨에 대한 터파기 작업에 있어서, 상기의 교각 기초에는 상부면에 일체로 결합되어 작동되는 굴착 장치가 고정되는 한편, 상기의 교각 기초에는 다수개의 하부 고정대가 고무 받침판을 매개로하여 고정 볼트로 결합되고, 상기의 하부 고정대에는 그 상부에 강재 기둥이 결합되며, 상기의 강재 기둥에는 폭 방향으로 측면 지지대가 설치되고 직상부에 길이방향으로 가로 빔이 설치되며, 상기의 가로 빔에는 일측 후방에 보강재가 설치되고 상기의 가로 빔에는 길이방향의 중간부를 가로지르며 수직하게 강재 레일부가 결합되며, 상기의 강재 레일부는 하단에 전동 호이스트가 결합되고 상기의 전동 호이스트의 와이어 로프에는 굴착된 토사를 배토시키는 그래브가 장착되고, 상기의 강재 기둥과 강재 레일부에는 보강 로프가 연결되어 강재 레일부를 가로 빔가 밀착되도록 지지하는 한편, 상기의 강재 레일부는 하단에 설치된 전동 호이스트의 작동에 의해 교각 기초의 내부 바닥면을 굴착하고 굴착된 토사를 교각 기초의 외부로 배토시키는 것을 특징으로하는 교량의 교각 기초의 터파기 굴착 장치를 제공한다.The present invention has been made in order to achieve the above object, the present invention, in the excavation work for the caisson used as the bridge foundation of the bridge, the excavation device which is integrally coupled to the upper surface of the pier foundation to operate On the other hand, the pier base is a plurality of lower supporters are coupled to the fixing bolt via a rubber support plate, the lower supporter is coupled to the upper steel poles, the steel pillars in the width direction side The support is installed and a horizontal beam is installed in the upper portion in the longitudinal direction, the horizontal beam is provided with a reinforcement on one side and the horizontal beam is coupled to the steel rail vertically across the middle portion in the longitudinal beam, The steel rail unit is coupled to the electric hoist at the bottom and the excavated earth and sand is applied to the wire rope of the electric hoist. The key is equipped with a grab, and the reinforcing rope is connected to the steel pillar and the steel rail portion to support the steel rail portion so that the horizontal beam is in close contact with the steel rail portion, and the steel rail portion of the piling foundation is operated by the operation of the electric hoist installed at the lower end. The excavation apparatus of the bridge piers foundation of the bridge characterized by excavating the inner bottom surface and the excavated excavated soil to the outside of the bridge foundation.

도 1은 종래의 교각 기초 하상 터파기 작업을 나타내는 도면.BRIEF DESCRIPTION OF THE DRAWINGS Fig. 1 is a view showing a conventional piers foundation bed excavation work.

도 2는 본 발명의 교각 기초 하상 터파기 작업에 사용되는 장치를 설명하기 위한 도면.2 is a view for explaining the apparatus used in the piers foundation bed breaker operation of the present invention.

도 3은 본 발명의 교각 기초 하상 터파기 작업을 시행하는 상태를 나타내는 단면도.3 is a cross-sectional view showing a state of performing a piers foundation bed breaker operation of the present invention.

도 4는 본 발명의 교각 기초 하상 터파기에 사용되는 굴착 장치의 분해 상태도.Figure 4 is an exploded state diagram of the excavation device used in the piers foundation bed breaker of the present invention.

< 도면의 주요 부분에 대한 부호의 간단한 설명 ><Brief description of symbols for the main parts of the drawings>

50 : 케이슨 52 : 강재 슈50: caisson 52: steel shoe

54 : 하부 고정대 56 : 고무 받침판54: lower holder 56: rubber support plate

58 : 고정 볼트 60 : 강재 기둥58: fixing bolt 60: steel pillar

62 : 측면 지지대 64 : 가로 빔62: side support 64: horizontal beam

66 : 보강재 68 : 보강 로프66: reinforcement 68: reinforcement rope

70 : 강재 레일부 72 : 레일 보강재70: steel rail portion 72: rail reinforcement

74 : 전동 호이스트 76 : 몸체74: electric hoist 76: body

78 : 구동 롤러 80 : 와이어 로프78: driving roller 80: wire rope

82 : 그래브 84 : 바닥판82: grab 84: bottom plate

이하, 첨부 도면을 참조하여 본 발명의 구성과 작동 상태를 설명한다.Hereinafter, with reference to the accompanying drawings will be described the configuration and operating state of the present invention.

도 2는 본 발명의 교각 기초 하상 터파기 작업에 사용되는 장치를 설명하기 위한 도면이다.2 is a view for explaining the apparatus used in the piers foundation bed breaker operation of the present invention.

도 2에서 알 수 있는 바와 같이, 교각의 기초로 사용되는 사각 구조로 형성된 교각 기초(50)에는 상부에 굴착 장치(100)가 일체로 결합되는 구조이다.As can be seen in Figure 2, the pier foundation 50 formed of a square structure used as the foundation of the pier is a structure in which the excavation device 100 is integrally coupled to the upper portion.

상기의 교각 기초(50)에는 4개의 하부 고정대(54)가 밀착되어 지지되고, 상기의 하부 고정대(54)에는 그 상부에 강재 기둥(60)이 결합된다.Four lower fixtures 54 are tightly supported on the pier foundation 50, and the steel pillars 60 are coupled to the lower fixtures 54.

상기의 강재 기둥(60)에는 폭 방향으로 측면 지지대(62)가 설치되고 상기의 강재 기둥(60)에는 직상부에 교각 기초(50)와 같은 길이방향으로 가로 빔(64)이 설치되며, 상기의 가로 빔(64)에는 일측 후방에 보강재(66)가 설치되고 상기의 가로 빔(64)에는 길이방향의 대략 중간부를 가로지르며 수직하게 결합되는 강재 레일부(70)가 결합된다.The steel pillars 60 are provided with side support members 62 in the width direction, and the steel pillars 60 are provided with horizontal beams 64 in the same lengthwise direction as the piers foundation 50 in the upper portion. The horizontal beam 64 of the reinforcement 66 is installed on one side rear, and the horizontal beam 64 is coupled to the steel rail portion 70 which is vertically coupled across the approximately middle portion in the longitudinal direction.

상기의 강재 레일부(70)에는 전동 호이스트(74)가 결합되는데, 상기의 전동 호이스트(74)에는 와이어 로프(80)에 그래브(82)가 장착되며, 상기의 강재 기둥(60)과 강재 레일부(70)에는 보강 로프(68)가 연결된다.An electric hoist 74 is coupled to the steel rail unit 70, and a grab 82 is mounted on the wire rope 80 to the electric hoist 74, and the steel pillars 60 and the steel. The reinforcement rope 68 is connected to the rail part 70.

상기의 강재 레일부(70)는 2단으로 형성되는데, 상기의 가로 빔(64)은 2단으로 형성된 강재 레일부(70)의 사이에 밀착되도록 결합된다.The steel rail portion 70 is formed in two stages, the horizontal beam 64 is coupled to be in close contact between the steel rail portion 70 formed in two stages.

도 3은 본 발명의 교각 기초 하상 터파기 작업을 시행하는 상태를 나타내는단면도이다.3 is a cross-sectional view showing a state of performing the piers foundation bed breaker operation of the present invention.

도 3에서 알 수 있는 바와 같이, 상기의 교각 기초(50)에는 상부면에 하부 고정대(54)가 진동을 흡수할 수 있도록 설치되는 고무 받침판(56)를 매개로 하여 설치되는데, 상기의 교각 기초(50)와 하부 고정대(60)는 고정 볼트(58)로 결합되고 상기의 하부 고정대(54)에는 직상부에 강재 기둥(60)이 고정 볼트(58)로 결합되며, 상기의 강재 기둥(60)에는 그 측면에 측면 지지대(62)가 고정 볼트 및 용접으로 결합되고 상기의 강재 기둥(60)에는 상부면에 가로 빔(64)이 고정되며, 상기의 가로 빔(64)에는 2단으로 형성되는 강재 레일부(70)가 결합된다.As can be seen in Figure 3, the pier foundation 50 is installed on the upper surface via a rubber support plate 56 is installed so that the lower support 54 to absorb the vibration, the pier foundation 50 and the lower holder 60 is coupled to the fixing bolt 58 and the steel pole 60 is coupled to the upper portion of the lower holder 54 by a fixing bolt 58 directly above, the steel pole 60 The side support 62 is coupled to the side by the fixing bolt and welding, and the horizontal beam 64 is fixed to the upper surface to the steel pillar 60, and formed in two stages to the horizontal beam 64 Steel rail unit 70 is coupled.

상기의 강재 기둥(60)과 강재 레일부(70)의 하단은 보강 로프(68)로 상호 고정되고, 상기의 보강 로프(68)는 전동 호이스트(74)가 강재 레일부(70)를 따라 이동하는 경우에 발생되는 진동을 삭감시킴과 동시에 가로 빔(64)과 강재 레일부(70)가 유동이 없도록 밀착시킬 수 있게 된다.The lower ends of the steel pillar 60 and the steel rail portion 70 are fixed to each other by a reinforcing rope 68, the reinforcing rope 68 is an electric hoist 74 is moved along the steel rail portion 70 In addition, the vibration generated in the case of reducing the horizontal beam 64 and the steel rail portion 70 can be in close contact with no flow.

상기의 강재 레일부(70)는 2단으로 형성되는 경우 그 사이에 레일 보강재(72)가 강재 레일부(70)의 길이방향의 사이에 다수개가 고정 볼트(58)로 고정되며, 상기의 강재 레일부(70)에는 하단에 전동 호이스트(74)가 장착되고 상기의 전동 호이스트(74)에는 그래브(82)가 결합되어 있다.When the steel rail portion 70 is formed in two stages, a plurality of rail reinforcement materials 72 are fixed between the steel rail portions 70 in the longitudinal direction of the steel rail portion 70 with fixing bolts 58. An electric hoist 74 is mounted at the lower end of the rail unit 70, and a grab 82 is coupled to the electric hoist 74.

즉, 상기의 굴착 장치(100)는 교각 기초(50)의 상부면에 고정되어 있는 관계로 조수간만의 차이에 따른 영향을 받지않는 상태로 교각 기초(50)의 내부 바닥면에 대한 굴착 작업을 진행할 수 있는데, 상기의 굴착 장치(100)는 강재 레일부(70)와 결합된 전동 호이스트(74)가 강재 레일부(70)를 따라 이동하면서 그래브(82)가굴착한 토사를 교각 기초(50)의 외부로 배토할 수 있다.That is, since the excavation device 100 is fixed to the upper surface of the pier foundation 50, the excavation work on the inner bottom surface of the pier foundation 50 is not affected by the difference between tides. The excavation device 100 may be a pier foundation based on the excavated earth and sand excavated by the grab 82 while the electric hoist 74 coupled with the steel rail unit 70 moves along the steel rail unit 70. You can throw out of 50).

상기의 도면에서는 전동 호이스트(74)에 와이어 로프(80)로 결합되어 작동되는 그래브(82)가 교각 기초(50)의 외부로 배토하는 상태를 도시하고 있는데, 상기의 그래브(82)에서 굴착한 토사는 수중의 환경오염을 방지하기 위하여 바지선을 이용하여 외부로 이동시킬 수 있음은 당연하다 할 것이다.In the above figure shows a state in which the grab 82 coupled to the electric hoist 74 by a wire rope 80 is applied to the outside of the pier foundation 50, and in the grab 82 above. It is natural that excavated earth and sand can be moved outside by using barges to prevent environmental pollution in the water.

도 4는 본 발명의 교각 기초 하상 터파기에 사용되는 굴착 장치의 분해 상태도이다.4 is an exploded state diagram of an excavation device used in the piers foundation bed breaker of the present invention.

도 4에서 알 수 있는 바와 같이, 상기의 교각 기초(50)에는 하부에 강재 슈(52)가 설치되어 있는 관계로 수중의 바닥면에 견고하게 밀착될 수 있는 구조이다.As can be seen in Figure 4, the pier foundation 50 is a structure that can be firmly in close contact with the bottom surface of the water because the steel shoe 52 is installed in the lower portion.

상기의 하부 고정대(54)는 대략 "ㄷ"자 형상으로 형성되는데, 상기의 하부 고정대(54)에는 폐쇄된 내측면에 고무 받침판(56)이 밀착되어 형성되고 상기의 하부 고정대(54)에는 교각 기초(50) 및 강재 기둥(60)과 고정될 수 있도록 다수개의 볼트홈이 형성된다.The lower holder 54 is formed in a substantially "C" shape, the lower holder 54 is formed in close contact with the rubber support plate 56 on the closed inner surface and the lower holder 54 is pier A plurality of bolt grooves are formed to be fixed to the base 50 and the steel column 60.

상기의 강재 기둥(60)은 4개가 설치되어 지지되는 구조로 형성되는데, 상기의 강재 기둥(60)에는 하부 고정대(54)와 고정 볼트로 결합되는 경우 그 결합이 수월하도록 수직 방향의 제일 하부면에 평판 형상으로 바닥판(84)이 용접된다. 상기의 바닥판(84)에는 하부 고정대(54)의 폐쇄된 면에 형성한 볼트홈과 고정 볼트로 결합되도록 다수개의 볼트홈이 형성됨은 당연하다 할 것이다.The steel pillars 60 are formed in a structure in which four are installed and supported. The steel pillars 60 have a lower bottom surface in the vertical direction to facilitate the coupling when the steel pillars 60 are coupled with the lower fixing rod 54. The bottom plate 84 is welded in a flat plate shape. It will be apparent that the bottom plate 84 has a plurality of bolt grooves formed to be coupled to the bolt grooves and the fixing bolts formed on the closed surface of the lower holder 54.

상기의 강재 기둥(60)에는 그 상부면에 길이방향으로 가로 빔(64)이 고정되는 한편, 상기의 가로 빔(64), 측면 지지대 및 보강재는 H 빔으로 제작되며, 상기의 측면 지지대는 강재 기둥의 측면에 고정되고 상기의 보강재는 가로 빔의 길이방향의 한쪽 후방(도면상 후방측)에 고정볼트 및 용접으로 고정된다.The horizontal beam 64 is fixed to the steel pillar 60 in the longitudinal direction on the upper surface thereof, while the horizontal beam 64, the side support and the reinforcement are made of H beam, the side support is steel It is fixed to the side of the pillar and the reinforcement is fixed by fixing bolts and welding on one rear (back side in the drawing) in the longitudinal direction of the transverse beam.

상기의 강재 레일부(70)는 상단과 하단의 형태가 동일한 형태로 구성되는 한편, 상기의 강재 레일부(70)는 길이방향에 레일 보강재(72)가 다수개 형성되고 상기의 레일 보강재(72)가 고정되지 않은 사이에는 그 사이가 오픈된 형태로 형성되는 관계로 그 사이에 가로 빔(64)이 위치되게 된다.The steel rail portion 70 is configured in the same shape of the top and bottom, while the steel rail portion 70 is formed with a plurality of rail reinforcement 72 in the longitudinal direction and the rail reinforcement 72 ) Is not fixed, so that the horizontal beam 64 is located therebetween because it is formed in an open form therebetween.

상기의 강재 레일부(70)에는 하단에 전동 호이스트(74)가 결합되는데, 상기의 전동 호이스트(74)는 구동 롤러(78), 몸체(76), 와이어 로프(80) 및 그래브(82)로 구성된다.An electric hoist 74 is coupled to a lower end of the steel rail unit 70, and the electric hoist 74 includes a driving roller 78, a body 76, a wire rope 80, and a grab 82. It consists of.

상기의 구동 롤러(78)는 강재 레일부(70)에 밀착되어 유동되고 몸체(76)에는 와이어 로프(80)를 작동시키는 구동부인 모터가 설치되며, 상기의 와이어 로프(80)에는 한쪽 끝단에 그래브(82)가 결합된다.The drive roller 78 is in close contact with the steel rail portion 70 and flows, the body 76 is provided with a motor that is a drive for operating the wire rope 80, the wire rope 80 at one end Grabs 82 are coupled.

상기의 굴착 장치(100)를 이용한 작업 방법은, " 강재레일 제작 ⇒ 호이스트 제작 ⇒ 그래브 제작 및 굴착"의 순으로 모든 작업을 진행시키게 된다.Work method using the above-mentioned excavation device 100 is to proceed all the work in the order of "steel rail production ⇒ hoist production ⇒ grab production and excavation".

상술한 설명에서 알 수 있는 바와 같이, 상기의 굴착 장치(100)는 교각 기초(50)의 상부면에 직접 고정되는 구조로 형성되는 관계로 외부 요인에 따른 작업 저해의 요소를 완전히 차단한 상태에서 작업을 진행할 수 있어 수중 터파기 작업을 시행하는 경우에 발생되는 안전사고를 미연에 방지한 상태에서 작업을 간단하게 진행할 수 있게 된다.As can be seen in the above description, the excavation device 100 is formed in a structure that is directly fixed to the upper surface of the pier foundation 50 in a state that completely blocked the elements of work inhibition due to external factors Since the work can be carried out, the work can be easily carried out while preventing safety accidents occurring when the underwater digging work is performed.

또한, 상기의 굴착 장치(100)는 교각 기초(50)의 형태에 따라 가변이 가능한 구조로 변형이 수월할뿐만 아니라 그 제작, 설치 및 해체가 용이하여 수중 구조물에 대한 모든 공사에 사용이 가능하게 된다.In addition, the excavation device 100 is a structure that can be changed according to the shape of the pier foundation 50 is not only easy to deform, but also easy to manufacture, install and dismantle, so that it can be used in all construction of the underwater structure. do.

상술한 본 발명의 구성과 작동 상태에 따른 효과를 설명한다.Effects of the configuration and operation of the present invention described above will be described.

본 발명의 교각 기초의 수심 하상에 대한 터파기 굴착 장치는 강재 레일을 이용하여 제작되는 관계로 제작 시공이 간단하고 설치 및 해체 작업이 간단하여 작업의 효율화를 도모할 수 있는 효과를 가진다.The excavation device for the deep bottom of the piers foundation of the present invention is produced by using the steel rails, the production and construction is simple, and the installation and dismantling work is simple, it has the effect that can be efficient work.

또한, 상기의 교각 기초의 수심 하상에 대한 터파기 굴착 장치를 이용하여 터파기 작업을 진행하는 경우에는 조수 간만에 따른 영향을 전혀 받지 않는 상태에서 작업이 진행될 수 있어 공사기간을 종래에 비하여 대폭적으로 절감할 수 있어 경제적인 이익을 확보할 수 있는 효과를 가진다.In addition, when the excavation work is carried out using the excavation device for the depth of the bottom of the pier foundation work can be carried out in a state that is not affected by the tidal tides at all, significantly reducing the construction period compared to the conventional It has the effect of securing economic profits.

Claims (2)

교량의 교각 기초로 사용되는 케이슨에 대한 터파기 작업에 있어서, 상기의 교각 기초(50)에는 상부면에 일체로 결합되어 작동되는 굴착 장치(100)가 고정되는 한편, 상기의 교각 기초(50)에는 다수개의 하부 고정대(54)가 고무 받침판(56)을 매개로하여 고정 볼트(58)로 결합되고, 상기의 하부 고정대(54)에는 그 상부에 강재 기둥(60)이 결합되며, 상기의 강재 기둥(60)에는 폭 방향으로 측면 지지대(62)가 설치되고 직상부에 길이방향으로 가로 빔(64)이 설치되며, 상기의 가로 빔(64)에는 일측 후방에 보강재(66)가 설치되고 상기의 가로 빔(64)에는 길이방향의 중간부를 가로지르며 수직하게 강재 레일부(70)가 결합되며, 상기의 강재 레일부(70)는 하단에 전동 호이스트(74)가 결합되고 상기의 전동 호이스트(74)의 와이어 로프(80)에는 굴착된 토사를 배토시키는 그래브(82)가 장착되고, 상기의 강재 기둥(60)과 강재 레일부(70)에는 보강 로프(68)가 연결되어 강재 레일부(70)를 가로 빔(64)가 밀착되도록 지지하는 한편, 상기의 강재 레일부(70)는 하단에 설치된 전동 호이스트(74)의 작동에 의해 교각 기초(50)의 내부 바닥면을 굴착하고 굴착된 토사를 교각 기초(50)의 외부로 배토시키는 것을 특징으로 하는 교량의 교각 기초의 터파기 굴착 장치.In the excavation work for the caisson used as the bridge foundation of the bridge, the pier foundation 50 is fixed to the excavation device 100 which is integrally coupled to the upper surface, while the pier foundation 50 is fixed. There are a plurality of lower holders 54 are coupled to the fixing bolt 58 via the rubber support plate 56, the lower holder 54 is coupled to the steel pillars 60 thereon, the steel The column 60 is provided with a side support 62 in the width direction and a horizontal beam 64 is installed at the upper portion in the lengthwise direction, and the reinforcement 66 is installed at one side and the horizontal beam 64 is installed at the rear side. The transverse beam 64 of the longitudinal cross the middle portion of the steel rail 70 is coupled vertically, the steel rail 70 is coupled to the electric hoist 74 at the lower end of the electric hoist ( The wire rope 80 of the 74 is a grab ( 82 is mounted, and the reinforcing ropes 68 are connected to the steel pillars 60 and the steel rails 70 to support the steel rails 70 so that the horizontal beams 64 are in close contact with each other. Steel rail portion 70 is a bridge, characterized in that excavation of the inner bottom surface of the pier foundation 50 by the operation of the electric hoist 74 installed on the bottom and discharging the excavated soil to the outside of the pier foundation 50 Excavation device of pier foundation. 제 1 항에 있어서, 상기의 강재 레일부(70)는 2단으로 형성되고, 상기의 강재 레일부(70)에는 2단을 형성시 그 사이에 다수개의 레일 보강재(72)가 고정볼트(58)로 고정되며, 상기의 강재 레일부(70)에는 하단에 전동 호이스트(74)의 구동 롤러(78)가 밀착되어 좌,우로 구동하고 상기의 전동 호이스트(74)의 몸체(76)에는 그 직하부에 와이어 로프(80)를 결합하여 그래브(82)를 상,하로 동작시켜가며 작동되는 것을 특징으로 하는 교량의 교각 기초의 터파기 굴착 장치.According to claim 1, wherein the steel rail portion 70 is formed in two stages, when the two rails formed in the steel rail portion 70, a plurality of rail reinforcement 72 between the fixing bolts 58 ) Is fixed to the steel rail 70, the driving roller 78 of the electric hoist 74 is in close contact with the lower end to drive left and right, and the body 76 of the electric hoist 74 The dig foundation excavation device of the bridge piers foundations, characterized in that the operation is operated by operating the grab 82 up and down by combining the wire rope 80 in the lower portion.
KR10-2001-0028324A 2001-05-23 2001-05-23 An basement excavation apparatus of pier basis for a bridge KR100402438B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR10-2001-0028324A KR100402438B1 (en) 2001-05-23 2001-05-23 An basement excavation apparatus of pier basis for a bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR10-2001-0028324A KR100402438B1 (en) 2001-05-23 2001-05-23 An basement excavation apparatus of pier basis for a bridge

Publications (2)

Publication Number Publication Date
KR20020089695A KR20020089695A (en) 2002-11-30
KR100402438B1 true KR100402438B1 (en) 2003-10-22

Family

ID=27706088

Family Applications (1)

Application Number Title Priority Date Filing Date
KR10-2001-0028324A KR100402438B1 (en) 2001-05-23 2001-05-23 An basement excavation apparatus of pier basis for a bridge

Country Status (1)

Country Link
KR (1) KR100402438B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100589131B1 (en) 2006-03-02 2006-06-14 벽산엔지니어링주식회사 Construction device of underwater bridge base structure that use of barge

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103861714A (en) * 2014-03-13 2014-06-18 中国瑞林工程技术有限公司 Ball-milling area feeding method
CN115012462B (en) * 2022-06-30 2024-06-18 北京场道市政工程集团有限公司 Foundation pit excavation device and construction method thereof
KR102624294B1 (en) * 2022-12-05 2024-01-15 장인호 Support Type Pedestrian Bridge and Its Construction Method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0633466A (en) * 1992-07-10 1994-02-08 Ogawa Seisakusho:Kk Earth lift device for caisson
JPH08105054A (en) * 1994-10-06 1996-04-23 Taisei Corp Construction of shaft
JPH09228383A (en) * 1996-02-26 1997-09-02 Daiho Constr Co Ltd Sediment discharge device inside caisson
JPH1082043A (en) * 1996-09-06 1998-03-31 Maeda Corp Caisson with crane
JPH1136338A (en) * 1997-07-23 1999-02-09 Shimizu Corp Construction method of underground structure
JP2001032323A (en) * 1999-07-21 2001-02-06 Kumagai Gumi Co Ltd Excavated-soil carrying-out device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0633466A (en) * 1992-07-10 1994-02-08 Ogawa Seisakusho:Kk Earth lift device for caisson
JPH08105054A (en) * 1994-10-06 1996-04-23 Taisei Corp Construction of shaft
JPH09228383A (en) * 1996-02-26 1997-09-02 Daiho Constr Co Ltd Sediment discharge device inside caisson
JPH1082043A (en) * 1996-09-06 1998-03-31 Maeda Corp Caisson with crane
JPH1136338A (en) * 1997-07-23 1999-02-09 Shimizu Corp Construction method of underground structure
JP2001032323A (en) * 1999-07-21 2001-02-06 Kumagai Gumi Co Ltd Excavated-soil carrying-out device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100589131B1 (en) 2006-03-02 2006-06-14 벽산엔지니어링주식회사 Construction device of underwater bridge base structure that use of barge

Also Published As

Publication number Publication date
KR20020089695A (en) 2002-11-30

Similar Documents

Publication Publication Date Title
JP6010070B2 (en) Temporary closing method for existing underwater structures
US6139225A (en) Method for building an underground continuous wall
CN105350526B (en) Method for setting up steel platform
KR101211811B1 (en) Cast in concrete pile With precast type Caisson
CN108179735A (en) A kind of boulder bed large-sized deep water foundation construction platform and method
CN106088120B (en) A kind of cofferdam decentralization construction method
CN109577365A (en) A kind of pile formula drainage anchor rod barrier wall structure and its construction method
KR20070090733A (en) Waterproof open caisson assembly and concrete foundation construction method using the same
CN110359476A (en) A kind of construction method of steel sheet-pile cofferdam inner support and drilled pile steel pile casting installation operation platform
KR100854338B1 (en) Construction structure of open caisson cofferdam using holding type sheet pile
CN109577277A (en) A kind of wall-mounted drainage anchor rod barrier wall structure and its construction method
KR100402438B1 (en) An basement excavation apparatus of pier basis for a bridge
KR20040039271A (en) Shoe coffering method for new construction and repair, reinforcement of bridge open caisson foundation
CN110306560A (en) Supporting construction and foundation ditch construction method
JPH1136338A (en) Construction method of underground structure
JP4504864B2 (en) Dam body reinforcement structure with wave-dissipating function
CN111733760A (en) Improved assembly type mountain river channel revetment structure and construction method thereof
KR100493516B1 (en) Micro pile and assembly foundation reinforcement structure member and its method for pier
KR200404677Y1 (en) Concrete Well Construction Method Using Weight Reducing Method and Concrete Well Thereof
KR200224758Y1 (en) Structure of caisson soil protection four concret caisson
CN215948218U (en) A construction support frame for narrow and small space
CN1019917C (en) Construction method and apparatus for bank revetment engineering with coarse-cloth layer
CN220953191U (en) Under pass railway bridge river course and open up construction structure
KR200235118Y1 (en) An assembly square housing founding at a breast wall
CN220927778U (en) Large-diameter pile foundation operation platform for deep water karst geology

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20121004

Year of fee payment: 10

FPAY Annual fee payment

Payment date: 20130926

Year of fee payment: 11

FPAY Annual fee payment

Payment date: 20140926

Year of fee payment: 12

FPAY Annual fee payment

Payment date: 20150924

Year of fee payment: 13

FPAY Annual fee payment

Payment date: 20160922

Year of fee payment: 14

FPAY Annual fee payment

Payment date: 20170918

Year of fee payment: 15

FPAY Annual fee payment

Payment date: 20181001

Year of fee payment: 16

FPAY Annual fee payment

Payment date: 20191001

Year of fee payment: 17