KR100396428B1 - base rock cracking method using liquid tube - Google Patents

base rock cracking method using liquid tube Download PDF

Info

Publication number
KR100396428B1
KR100396428B1 KR10-2001-0010027A KR20010010027A KR100396428B1 KR 100396428 B1 KR100396428 B1 KR 100396428B1 KR 20010010027 A KR20010010027 A KR 20010010027A KR 100396428 B1 KR100396428 B1 KR 100396428B1
Authority
KR
South Korea
Prior art keywords
hole
rock
tube
liquid
protective cover
Prior art date
Application number
KR10-2001-0010027A
Other languages
Korean (ko)
Other versions
KR20020069700A (en
Inventor
이수관
Original Assignee
이수관
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 이수관 filed Critical 이수관
Priority to KR10-2001-0010027A priority Critical patent/KR100396428B1/en
Publication of KR20020069700A publication Critical patent/KR20020069700A/en
Application granted granted Critical
Publication of KR100396428B1 publication Critical patent/KR100396428B1/en

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D3/00Particular applications of blasting techniques
    • F42D3/04Particular applications of blasting techniques for rock blasting
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D1/00Blasting methods or apparatus, e.g. loading or tamping
    • F42D1/08Tamping methods; Methods for loading boreholes with explosives; Apparatus therefor
    • F42D1/22Methods for holding or positioning for blasting cartridges or tamping cartridges
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D1/00Blasting methods or apparatus, e.g. loading or tamping
    • F42D1/08Tamping methods; Methods for loading boreholes with explosives; Apparatus therefor
    • F42D1/24Tamping methods; Methods for loading boreholes with explosives; Apparatus therefor characterised by the tamping material

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Abstract

본 발명은 액체튜브를 이용한 암반 균열방법에 관한 것으로, 암반(1)에 긴 길이의 구멍(2)을 형성시키고, 구멍(2)의 직경보다 작은 외경을 가지고 내부에 액체가 충진된 튜브를 다수 구비하며, 구멍(2)의 직경보다 작은 외경을 가지고 상기 튜브 사이에 위치되도록 뇌관을 가지는 폭약을 다수 구비하며, 암반(1)의 구멍(2)에 튜브와 폭약을 번갈아 삽입한 후 구멍의 나머지 공간에 액체를 충진시키고, 액체 충진 후 구멍(2)의 입구에 보호커버(10)를 끼우고, 구멍(2) 내부가 밀폐되도록 상기 보호커버(10) 외측의 구멍 개방부에 모래(11)를 전색시키는 방법을 구비하였다.The present invention relates to a rock cracking method using a liquid tube, which forms a long hole (2) in the rock (1), a plurality of tubes filled with liquid inside the outer diameter smaller than the diameter of the hole (2) And a plurality of explosives having primers to be positioned between the tubes with an outer diameter smaller than the diameter of the holes 2, and the tube and the explosives are alternately inserted into the holes 2 of the rock 1 and the rest of the holes Fill the liquid into the space, and after filling the liquid, insert the protective cover 10 at the inlet of the hole (2), sand (11) in the hole opening outside the protective cover 10 so that the inside of the hole (2) is sealed It was equipped with the method of coloring.

그러므로, 폭파시 그 압력에 의해 액체가 암반(1) 구멍(2)의 내주면을 외측으로 밀면서 암반(1)을 파쇄시키므로 폭발 압력이 암반의 구멍에 직접 전달되었던 종래에 비해 소음 및 진동이 경감되고, 폭파되면서 발생되는 미세한 돌가루 및 암석이 비산되는 종래 문제가 해결되며, 이에 따라 작업 환경이 개선되어 주변 주택가 및 작업자에게 가해지는 피해를 최소화시킬 수 있도록 하였다.Therefore, during the blasting, the liquid crushes the rock 1 by pushing the inner circumferential surface of the rock 1 hole 2 to the outside, thereby reducing noise and vibration compared to the conventional case in which the explosion pressure was directly transmitted to the rock hole. In addition, the conventional problem of scattering fine stones and rocks generated by blasting is solved. Accordingly, the working environment is improved to minimize damage to surrounding residential areas and workers.

Description

액체튜브를 이용한 암반 균열방법{base rock cracking method using liquid tube}Base rock cracking method using liquid tube

본 발명은 암반 균열방법에 관한 것으로, 특히 액체튜브를 이용한 암반 균열방법에 관한 것이다.The present invention relates to a rock cracking method, and more particularly to a rock cracking method using a liquid tube.

일반적으로 암반을 파쇄하기 위해서 먼저, 파쇄할 암반에 천공기 등으로 구멍을 형성시키고 이에 폭약을 넣어서 폭파하거나, 구멍에 유압식 또는 공압식 암반 파쇄기를 삽입시킨 후 작동시켜서 암반을 파쇄시키게 된다.In general, in order to crush rock, first, a hole is formed in a rock to be crushed by a perforator, etc., and explosives are put into the blast, or a hydraulic or pneumatic rock crusher is inserted into the hole and operated to crush the rock.

그런데 이와 같은 종래 암반 파쇄방법은, 폭발시그 압력이 암반의 구멍에 직접 부딪히면서 큰 소음이 발생되었고, 이때 발생되는 진동이 매우 커 작업자의 청각 손상 및 주변의 가옥 등이 심하게 흔들리거나 파손되는 문제가 있었으며, 특히 폭파시 많은 양의 암석이 주변에 비산되어 농작물, 주택 등에 피해를 주었을 뿐 아니라 비산되는 돌가루에 의한 호흡기 질병을 유발하게 되는 문제가 있었다.However, in the conventional rock crushing method, a large noise was generated when the explosion sieve pressure hit directly to the hole of the rock, and there was a problem that the hearing caused by the vibration was very large and the worker's hearing damage and the surrounding houses were severely shaken or broken. In particular, when blasting, a large amount of rocks were scattered around, causing damage to crops and houses, as well as causing respiratory diseases caused by scattered stone powder.

상술한 문제를 해결하기 위한 본 발명의 목적은, 암반 폭파시 소음 및 진동이 적으며, 암석 및 돌가루의 비산을 극소화시키도록 한 액체튜브를 이용한 암반 균열방법을 제공하는데 있다.An object of the present invention for solving the above problems is to provide a rock cracking method using a liquid tube to minimize the noise and vibration during rock blasting, to minimize the scattering of rock and stone powder.

이와 같은 목적을 달성하기 위한 본 발명 액체튜브를 이용한 암반 균열방법은, 암반에 긴 길이의 구멍을 형성시키고, 구멍의 직경보다 작은 외경을 가지고 내부에 액체가 충진된 튜브를 구비하며, 구멍의 직경보다 작은 외경을 가지고 상기 튜브 사이에 위치되도록 뇌관을 가지는 폭약을 구비하며, 암반의 구멍에 튜브와 폭약을 삽입한 후 구멍의 나머지 공간에 액체를 충진시키고, 액체 충진 후 구멍의 입구에 보호커버를 끼우고, 구멍 내부가 밀폐되도록 상기 보호커버 외측의 구멍 개방부에 모래를 전색시키는 것을 특징으로 한다.The rock cracking method using the liquid tube of the present invention for achieving the above object is to form a long length hole in the rock, and having a tube filled with a liquid inside the outer diameter smaller than the diameter of the hole, the diameter of the hole It has an explosive having a primer so as to be located between the tubes having a smaller outer diameter, and after inserting the tube and explosives into the hole of the rock and fill the liquid into the remaining space of the hole, the protective cover at the inlet of the hole after filling the liquid It inserts, and characterized in that to color the sand in the hole opening portion outside the protective cover so that the inside of the hole is sealed.

따라서, 폭파시 그 압력에 의해 액체가 암반 구멍의 내주면을 외측으로 밀면서 암반을 파쇄시키므로 폭발 압력이 암반의 구멍에 직접 전달되었던 종래에 비해 소음 및 진동이 경감되고, 폭파되면서 발생되는 미세한 돌가루 및 암석이 비산되는 종래 문제가 해결되며, 이에 따라 작업 환경이 개선되어 주변 주택가 및 작업자에게 가해지는 피해를 최소화시킬 수 있는 등의 효과가 있다.Therefore, the liquid crushes the rock while pushing the inner circumferential surface of the rock hole by the pressure during the blasting, thereby reducing noise and vibration compared to the conventional blast pressure transmitted directly to the rock hole, and fine stone powder generated by blasting and The conventional problem that the rock is scattered is solved, and thus the working environment is improved, thereby minimizing damage to surrounding residential areas and workers.

도1은 본 발명에 따른 액체튜브를 이용한 암반 균열방법을 보이는 개략적 단면도1 is a schematic cross-sectional view showing a rock cracking method using a liquid tube according to the present invention

도2 내지 도4는 본 발명 액체튜브를 이용한 암반 균열방법의 다른 실시예를 보이는 개략적 단면도들2 to 4 are schematic cross-sectional views showing another embodiment of the rock cracking method using the liquid tube of the present invention

*도면의 주요 부분에 대한 부호의 설명** Description of the symbols for the main parts of the drawings *

1 ; 암반 2 ; 구멍One ; Rock mass 2; hole

3 ; 제1튜브 4 ; 충진액3; First tube 4; Filling liquid

5 ; 제1폭약 7 ; 제2튜브5; First explosive 7; 2nd tube

8 ; 제2폭약 9 ; 제3튜브8 ; Second explosive 9; 3rd tube

10 ; 보호커버 11 ; 모래10; Protective cover 11; sand

본 발명의 구체적 특징 및 이점은 첨부된 도면을 참조한 이하의 설명으로 더욱 명확해 질 것이다.Specific features and advantages of the present invention will become more apparent from the following description taken in conjunction with the accompanying drawings.

본 발명 액체튜브를 이용한 암반 균열방법은, 암반(1)에 긴 길이의 구멍(2)을 형성시키고, 구멍(2)의 직경보다 작은 외경을 가지고 내부에 액체가 충진된 튜브를 다수 구비하며, 구멍(2)의 직경보다 작은 외경을 가지고 상기 튜브 사이에 위치되도록 뇌관을 가지는 폭약을 다수 구비한다.In the rock cracking method using the liquid tube of the present invention, a hole 2 having a long length is formed in the rock 1, and has a plurality of tubes filled with a liquid having an outer diameter smaller than the diameter of the hole 2, It is provided with a plurality of explosives having a primer so as to be located between the tubes with an outer diameter smaller than the diameter of the hole 2.

그리고, 암반(1)의 구멍(2)에 튜브와 폭약을 번갈아 삽입한 후 구멍의 나머지 공간에 액체를 충진시키고, 액체 충진 후 구멍(2)의 입구에 보호커버(10)를 끼우며, 구멍(2) 내부가 밀폐되도록 보호커버(10) 외측의 구멍 개방부에 모래(11)를 전색(栓塞)시킨다.Then, the tube and the explosive are alternately inserted into the hole 2 of the rock 1, and the liquid is filled in the remaining space of the hole, and after the liquid is filled, the protective cover 10 is inserted into the inlet of the hole 2, and the hole (2) The sand 11 is colored in the hole opening portion outside the protective cover 10 so that the inside is sealed.

이러한 본 발명 액체튜브를 이용한 암반 균열방법에는 제1튜브(3)와, 제1폭약(5), 제2튜브(7), 제2폭약(8), 제3튜브(9), 보호커버(10), 모래(11)가 사용되며, 제1튜브(3), 제2튜브(7), 제3튜브(9)에 충진되는 충진액(4) 및 구멍(2)의 나머지 공간에 충진되는 보충액(13)이 구비된다.In the rock cracking method using the liquid tube of the present invention, the first tube 3, the first explosive (5), the second tube (7), the second explosive (8), the third tube (9), the protective cover ( 10, sand (11) is used, and the filling liquid (4) and the remaining space of the hole (2) filled in the first tube (3), the second tube (7), the third tube (9) The replenishment liquid 13 is provided.

먼저 제1튜브(3), 제2튜브(7), 제3튜브(9)는 탄력을 가지는 합성수지재의 주머니 형상을 가진다.First, the first tube 3, the second tube 7, the third tube 9 has a bag shape of a synthetic resin material having elasticity.

본 발명 제1튜브(3), 제2튜브(7), 제3튜브(9)에 충진되는 충진액(4)은 기타 여러 액체가 충진될 수도 있지만 물이 충진되는 것이 바람직하다.The filling liquid 4 filled in the first tube 3, the second tube 7, and the third tube 9 of the present invention may be filled with various other liquids, but is preferably filled with water.

그리고 제1튜브(3), 제2튜브(7), 제3튜브(9) 사이에는 제1폭약(5)과 제2폭약(8)이 각각 구비되어 있으며, 이 폭약에는 뇌관(6)이 구비되어 있고, 뇌관(6)에는 폭약을 점화시키도록 전선(12)이 연결되어 있다.A first explosive (5) and a second explosive (8) are respectively provided between the first tube (3), the second tube (7), and the third tube (9). The electric wire 12 is connected to the primer 6 so that an explosive may be ignited.

여기서 제1튜브(3), 제2튜브(7), 제3튜브(9) 및 제1폭약(5), 제2폭약(8)은, 그 외경이 암반(1)의 구멍(2)의 직경에 비해 작다. 따라서 튜브와 폭약을 구멍(2)에 삽입시키기가 매우 용이하다.The first tube 3, the second tube 7, the third tube 9, the first explosive 5, and the second explosive 8 have an outer diameter of the hole 2 of the rock 1. Small compared to the diameter It is therefore very easy to insert the tube and explosive into the hole 2.

이러한 본 발명 액체튜브를 이용한 암반 균열방법은, 암반(1)의 구멍(2)에 제1튜브(3), 제1폭약(5), 제2튜브(7), 제2폭약(8), 제3튜브(9)를 순차적으로 삽입시킨 후 구멍(2)의 나머지 공간에 물인 보충액(13)을 충진시킨다.In the rock cracking method using the liquid tube of the present invention, the first tube 3, the first explosive 5, the second tube 7, the second explosive 8, After the third tube 9 is sequentially inserted, the replenishing liquid 13, which is water, is filled in the remaining space of the hole 2.

여기서 구멍(2)은 θ만큼 기울어진 상태에서 형성되어 있기 때문에 구멍(2)에 보충액(13)을 충진시키기가 용이하다.Since the hole 2 is formed in a state inclined by θ, it is easy to fill the refill liquid 13 in the hole 2.

이와 같이 구멍(2)에 보충액(13)이 충진되면 구멍(2)의 개구부에 보호커버(10)를 끼우고, 보호커버(10) 외측의 구멍(2) 개구부에 모래(11)를 전색시킨다.In this way, when the replenishing liquid 13 is filled in the hole 2, the protective cover 10 is inserted into the opening of the hole 2, and the sand 11 is colored in the opening of the hole 2 outside the protective cover 10. .

이와 같은 상태에서 전선(12)에 전류를 통하면 뇌관(6)이 터지면서 제1폭약(5), 제2폭약(8)을 폭발시키게 되고, 이에 따라 제1튜브(3), 제2튜브(7) 및 제3튜브(9)의 충진액(4) 및 구멍(2)의 보충액(13)이 제1폭약(5) 및 제2폭약(8)의폭발력에 의해 구멍(2) 내주면을 강하게 밀게 되어 암반(1)을 균열시키게 되는 것이다.In this state, when a current flows through the wire 12, the primer 6 bursts to explode the first explosive (5) and the second explosive (8). Accordingly, the first tube 3 and the second tube. (7) and the filling liquid (4) of the third tube (9) and the replenishing liquid (13) of the hole (2) are formed by the explosive force of the first explosive (5) and the second explosive (8). It is pushed hard to crack the rock (1).

여기서 폭약 및 튜브, 즉 제1폭약(5), 제2폭약(8) 및 제1튜브(3), 제2튜브(7), 제3튜브(9)의 외경이 구멍(2)의 직경에 비해 작게 형성되기 때문에 이들을 구멍(2)에 삽입시키기가 매우 편리하며, 별도의 도구없이 간단히 삽입 가능하다. 따라서 이들을 구멍(2)에 삽입시키기 위해 별도의 도구를 사용하였던 종래 문제가 해결된다.Where the outer diameter of the explosive and the tube, i.e. the first explosive (5), the second explosive (8) and the first tube (3), the second tube (7), the third tube (9) is determined by the diameter of the hole (2). It is very convenient to insert them into the hole (2) because it is formed small compared to, can be simply inserted without a separate tool. Thus, the conventional problem of using a separate tool to insert them into the hole 2 is solved.

또한 폭약의 폭발력이 충진액(4) 및 보충액(13)에 전달되어 이 액체가 구멍(2)의 사방을 강하게 밀어서 암반(1)을 파쇄시키기 때문에 제1폭약(5) 및 제2폭약(8)의 폭발력이 구멍(2)을 직접 가격함에 따른 소음 증가, 전동 증가를 초래하였던 종래에 비해 소음 및 진동이 격감된다.In addition, the explosive force of the explosive is transmitted to the filling liquid 4 and the replenishing liquid 13 so that the liquid strongly pushes all the directions of the hole 2 to crush the rock 1 so that the first explosive 5 and the second explosive 8 Noise and vibration are significantly reduced compared to the prior art in which explosion force of) caused an increase in noise and an increase in electric power by directly hitting the hole 2.

한편 일반 발파에 비해 돌가루 및 암석의 비산이 없고 암반에 균열만 생기므로 돌가루 및 암석의 비산문제가 해결된다.On the other hand, compared to general blasting, there is no scattering of stone powder and rocks, only cracking occurs in the rock, thereby solving the problem of scattering of stone powder and rocks.

도2는 본 발명 액체튜브를 이용한 암반 균열방법을 보이는 개략적 단면도로써, 이는 암반(1)에 구멍(2)이 수직으로 형성되고 이에 제1튜브(3), 제1폭약(5), 제2튜브(7), 제2폭약(8), 제3튜브(9), 보충액(13), 보호커버(10), 모래(11)가 순차적으로 구비 또는 주입된다.FIG. 2 is a schematic cross-sectional view showing a rock cracking method using the liquid tube of the present invention, in which a hole 2 is vertically formed in the rock 1 and thus the first tube 3, the first explosive 5, and the second The tube 7, the second explosive 8, the third tube 9, the replenishing liquid 13, the protective cover 10, and the sand 11 are sequentially provided or injected.

이와 같이 암반(1)의 구멍(2)이 수직으로 형성된 경우에도 도1과 같이 동일하게 작업할 수 있다.그러므로 도1 및 도2와 같이 암반(1)의 구멍(2)이 하향 형성된 경우에는, 튜브와 폭약들을 별도의 도구없이 삽입시킬 수도 있지만, 가는 막대(ST)에 테이프(T)를 사용하여 제1튜브(3), 제1폭약(5), 제2튜브(7), 제2폭약(8), 제3튜브(9)를 순차적으로 묶고, 이 가는 막대(ST)를 암반(1) 구멍(3)에 밀어 넣은 후 암반(1) 구멍(2)의 나머지 공간에 보충액(13)을 충진시키며, 보호커버(10)를 씌우고 모래(11)를 전색시킬 수 있다.Thus, even when the hole 2 of the rock 1 is formed vertically, the same operation can be performed as shown in FIG. 1. Therefore, when the hole 2 of the rock 1 is formed downward as shown in FIGS. Although the tube and explosives may be inserted without any tools, the first tube 3, the first explosive 5, the second tube 7 and the second may be inserted using the tape T on the thin rod ST. The explosives 8 and the third tube 9 are sequentially bundled, and the thin rods ST are pushed into the rock 1 holes 3 and then the replenishment liquid 13 is stored in the remaining space of the rock 1 holes 2. ) Can be filled, the protective cover 10 can be put on and the sand 11 can be colored.

도3은 암반(1)의 구멍(2)이 수평으로 형성된 상태를 보이는 개략적 단면도로써, 이는 구멍(2)이 수평으로 형성되어 있기 때문에 보충액(13)이 제대로 충진되지 않는다. 이와 같은 경우, 도1 및 도2의 보호커버(10) 대신에 일방향 주입노즐(14)이 구비된 보호커버(10)를 구비하고, 보충액(13)을 주입하기 전에 보호커버(10)를 먼저 닫아서 구멍(2)의 내부를 밀폐시킨 후 주입노즐(14)을 통해 내부에 보충액(13)을 충진시킬 수 있다.여기서 일방향 주입노즐(14)은, 일측방향으로는 액체의 주입이 가능하지만 주입된 액체가 반대방향으로는 유출되지 않는 구조를 가지며, 이러한 주입노즐(14)은 공지된 여러가지 중에서 통상의 지식을 가진 자가 적절히 선택하여 사용할 수 있을 것이다.상술한 바와 같이 도3과 같이 암반(1)의 구멍(2)이 수평으로 형성된 경우에는, 튜브와 폭약들을 삽입시킬시 가는 막대(ST)를 이용하면 편리하게 삽입시킬 수 있는바, 이는 상술한 바와 같이 가는 막대(ST)에 테이프(T)를 사용하여 제1튜브(3), 제1폭약(5), 제2튜브(7), 제2폭약(8), 제3튜브(9)를 순차적으로 묶고, 이 가는 막대(ST)를 암반(1) 구멍(2)에 밀어 넣은 후 보호커버(10)를 씌우며, 이 보호커버(10)의 주입노즐(14)을 통해 암반(1) 구멍(2)의 나머지 공간에 보충액(13)을 충진시키고, 보호커버(10) 외측에 모래(11)를 전색시킨다.이와 같이 가는 막대(ST)와 테이프(T)를 사용하면 튜브들과 폭약들을 구멍(2)에 밀어 넣는데 용이하다.FIG. 3 is a schematic cross-sectional view showing a state where the hole 2 of the rock 1 is formed horizontally, which is not properly filled with the supplement liquid 13 because the hole 2 is formed horizontally. In this case, instead of the protective cover 10 of FIGS. 1 and 2, the protective cover 10 having a one-way injection nozzle 14 is provided, and the protective cover 10 is first applied before the replenishing liquid 13 is injected. By closing the interior of the hole (2) to close the filling liquid 13 can be filled through the injection nozzle 14. Here, the one-way injection nozzle 14 is capable of injecting liquid in one direction, but injection The injected liquid 14 has a structure in which the liquid does not flow out in the opposite direction, and the injection nozzle 14 may be appropriately selected and used by those skilled in the art from various known arts. In the case where the hole 2 of the) is formed horizontally, it can be conveniently inserted by using a thin rod ST for inserting the tube and explosives, which is described above. ), The first tube (3), the first explosive (5), the second tube (7), the second explosive (8), and the third tube (9) in sequence, the thin rod (ST) is pushed into the rock (1) hole (2) and then covered with a protective cover (10), The replenishment liquid 13 is filled in the remaining space of the hole 1 of the rock 1 through the injection nozzle 14 of the protective cover 10, and the sand 11 is colored on the outer side of the protective cover 10. The use of the rods ST and the tape T together facilitates the push of the tubes and explosives into the holes 2.

도4는 암반(1)의 구멍(2)이 상향경사지게 형성된 상태를 보이는 개략적 단면도로써, 이러한 구멍(2)에도 보충액(13)이 제대로 충진되지 않기 때문에 도3과 같이 주입노즐(14)이 구비된 보호커버(10)를 구비하고, 상술한 바와 같은 순서로 보충액(13) 충진 작업을 할 수 있다.이와 같이 암반(1)의 구멍(2)이 상향 경사지게 형성된 경우에는, 튜브와 폭약들을 삽입시킬시 상술한 바와 동일하게 막대(ST)를 이용하면 튜브들과 폭약들을 편리하게 삽입시킬 수 있는바, 가는 막대(ST)에 테이프(T)를 사용하여 제1튜브(3), 제1폭약(5), 제2튜브(7), 제2폭약(8), 제3튜브(9)를 순차적으로 묶고, 이 가는 막대(ST)를 암반(1) 구멍(2)에 밀어 넣은 후 보호커버(10)를 구멍(2)에 강제로 밀어 끼워서 가는 막대(ST)가 하측 방향으로 흘러 내리지 않도록 하며, 이 보호커버(10)의 주입노즐(14)을 통해 암반(1) 구멍(2)의 나머지 공간에 보충액(13)을 충진시키고, 보호커버(10) 외측에 모래(11)를 전색시킨다.여기서 암반(1) 구멍(2)의 입구에는 점성을 가지는 모래(11)(예를 들면 접착제와 혼합된 모래)를 충진시켜서 구멍(1) 입구를 마감처리하게 된다.FIG. 4 is a schematic cross-sectional view showing a state in which the hole 2 of the rock 1 is formed to be inclined upwardly, and since the refill solution 13 is not properly filled in the hole 2 as well, the injection nozzle 14 is provided as shown in FIG. 3. It is provided with a protective cover 10, the filling liquid 13 can be filled in the same order as described above. When the hole 2 of the rock 1 is formed to be inclined upward, the tube and the explosives are inserted. When the rod ST is used as described above, the tubes and explosives can be conveniently inserted into the first tube 3 and the first explosive by using the tape T on the thin rod ST. (5), the second tube (7), the second explosive (8), and the third tube (9) are sequentially tied, and the thin rod (ST) is pushed into the rock (1) hole (2) and then the protective cover (10) is forcibly pushed into the hole (2) so that the thin rod (ST) does not flow downward, and passes through the injection nozzle (14) of the protective cover (10). The replenishment liquid 13 is filled in the remaining space of the hole 1 of the rock 1, and the sand 11 is colored outside the protective cover 10. Here, the entrance of the hole 2 of the rock 1 has a viscosity. Filling sand 11 (eg sand mixed with adhesive) is used to finish the opening of hole 1.

이상에서와 같은 본 발명에 따른 액체튜브를 이용한 암반 균열방법에 의하면, 폭파시 그 압력에 의해 액체가 암반(1) 구멍(2)의 내주면을 외측으로 밀면서 암반(1)을 파쇄시키므로 폭발 압력이 암반의 구멍에 직접 전달되었던 종래에 비해 소음 및 진동이 경감되고, 폭파되면서 발생되는 미세한 돌가루 및 암석이 비산되는 종래 문제가 해결되며, 이에 따라 작업 환경이 개선되어 주변 주택가 및 작업자에게 가해지는 피해를 최소화시킬 수 있는 등의 효과가 있다.According to the rock cracking method using the liquid tube according to the present invention as described above, because the pressure crushes the rock (1) while pushing the inner peripheral surface of the rock (1) hole 2 by the pressure at the time of explosion, the explosion pressure is Compared to the conventional method, the noise and vibration are reduced compared to the conventional one, which is directly transmitted to the hole of the rock, and the conventional problem of scattering fine stones and rocks scattered by the blast is solved. This can minimize the effects.

Claims (3)

암반(1)에 긴 길이의 구멍(2)을 형성시키고,Long holes 2 are formed in the rock 1, 상기 구멍(2)의 직경보다 작은 외경을 가지고 내부에 액체가 충진된 튜브를 구비하며,It has an outer diameter smaller than the diameter of the hole (2) having a tube filled with liquid therein, 상기 구멍(2)의 직경보다 작은 외경을 가지고 상기 튜브 일측에 위치되도록 뇌관을 가지는 폭약을 구비하며,It has an explosive having a primer to be located on one side of the tube having an outer diameter smaller than the diameter of the hole (2), 상기 암반(1)의 구멍(2)에 튜브와 폭약을 삽입한 후 구멍의 나머지 공간에 액체를 충진시키고,After inserting the tube and explosives into the hole (2) of the rock (1) and filling the remaining space of the hole with liquid, 상기 액체 충진 후 구멍(2)의 입구에 보호커버(10)를 끼우며,Insert the protective cover 10 at the inlet of the hole (2) after the liquid filling, 상기 구멍(2) 내부가 밀폐되도록 상기 보호커버(10) 외측의 구멍 개방부에 모래(11)를 전색시키는 것을 특징으로 하는 액체튜브를 이용한 암반 균열방법.Rock cracking method using a liquid tube, characterized in that to color the sand (11) to the hole opening portion outside the protective cover 10 so that the inside of the hole (2) is sealed. 제1항에 있어서,The method of claim 1, 상기 튜브와 폭약을 다수 구비하고 이를 상기 구멍(2)에 번갈아 삽입하는 것을 것을 특징으로 하는 액체튜브를 이용한 암반 균열방법.Rock tube cracking method using a liquid tube, characterized in that it comprises a plurality of explosives and the tube and inserting them alternately into the hole (2). 제1항에 있어서,The method of claim 1, 상기 튜브에 충진되는 액체와 구멍(2)의 나머지 공간에 충진되는 액체가 물로 이루어진 것을 특징으로 하는 액체튜브를 이용한 암반 균열방법.Rock filling method using a liquid tube, characterized in that the liquid filled in the tube and the liquid filled in the remaining space of the hole (2).
KR10-2001-0010027A 2001-02-27 2001-02-27 base rock cracking method using liquid tube KR100396428B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR10-2001-0010027A KR100396428B1 (en) 2001-02-27 2001-02-27 base rock cracking method using liquid tube

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR10-2001-0010027A KR100396428B1 (en) 2001-02-27 2001-02-27 base rock cracking method using liquid tube

Publications (2)

Publication Number Publication Date
KR20020069700A KR20020069700A (en) 2002-09-05
KR100396428B1 true KR100396428B1 (en) 2003-09-03

Family

ID=27695728

Family Applications (1)

Application Number Title Priority Date Filing Date
KR10-2001-0010027A KR100396428B1 (en) 2001-02-27 2001-02-27 base rock cracking method using liquid tube

Country Status (1)

Country Link
KR (1) KR100396428B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20220023560A (en) 2020-08-21 2022-03-02 이수관 The rock cracking method by using gel liquid tube and submerged tamping material

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100794783B1 (en) * 2007-04-04 2008-01-21 주식회사 코리아카코 Explosive demolition method by a hydraulic pressure for the elevator hall of a building
KR101892181B1 (en) * 2017-11-23 2018-08-27 한동훈 Blasting a method of underwater base rock using the geltube

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20220023560A (en) 2020-08-21 2022-03-02 이수관 The rock cracking method by using gel liquid tube and submerged tamping material

Also Published As

Publication number Publication date
KR20020069700A (en) 2002-09-05

Similar Documents

Publication Publication Date Title
CN105874299B (en) It is provided with the charge tube of air gap and the rock blasting construction method using this charge tube
EP2069710B1 (en) An explosive cartridge and a method of arranging an explosive cartridge in a blast hole
US2785631A (en) Shaped explosive-charge perforating apparatus
US8201500B2 (en) Powder charged rock cracker cartridge
EP1855737A1 (en) System and method for controlling access to features of a medical instrument
KR100467483B1 (en) Sealing plug for covering a blasing hole
US3089416A (en) Methods of and means for fracturing earth formations
US5233926A (en) Adhesive secondary blasting cone
KR100396428B1 (en) base rock cracking method using liquid tube
KR101212605B1 (en) charging unit for blasting and blasting method using the same
RU2431560C2 (en) Portable pneumatic rock breaker
US4109575A (en) Blasting method and device
KR101796292B1 (en) Method for manufacturing high explosive shell with preformed fragment
CN105043180B (en) A kind of explosion method fast blocking-up device
KR101822595B1 (en) Blasting method and blasting unit using the same
SE505665C2 (en) Method and apparatus for driving pipes into ground and cartridge used for this and for subsequent pipe blasting
KR102589276B1 (en) The rock cracking method by using gel liquid tube and submerged tamping material
KR100329579B1 (en) base rock cracking method using gell tube
KR100317825B1 (en) Method for Crushing a Rock Resulting in a Slight Shock
KR101995692B1 (en) New Filling Blashing method
RU2368867C1 (en) Blast-hole plug
KR20040086617A (en) Method of rock blasting using hydrofractring
RU182481U1 (en) Borehole
RU2451264C1 (en) Down-hole stemming
JPH06129800A (en) Method for stabilizing collapsible bedrock mountain at excavating tunnel

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20120820

Year of fee payment: 10

FPAY Annual fee payment

Payment date: 20130820

Year of fee payment: 11

FPAY Annual fee payment

Payment date: 20140902

Year of fee payment: 12

FPAY Annual fee payment

Payment date: 20151109

Year of fee payment: 13

FPAY Annual fee payment

Payment date: 20160822

Year of fee payment: 14

FPAY Annual fee payment

Payment date: 20180919

Year of fee payment: 16