KR100348794B1 - A method of repair on the base of a bridge - Google Patents

A method of repair on the base of a bridge Download PDF

Info

Publication number
KR100348794B1
KR100348794B1 KR1020000004176A KR20000004176A KR100348794B1 KR 100348794 B1 KR100348794 B1 KR 100348794B1 KR 1020000004176 A KR1020000004176 A KR 1020000004176A KR 20000004176 A KR20000004176 A KR 20000004176A KR 100348794 B1 KR100348794 B1 KR 100348794B1
Authority
KR
South Korea
Prior art keywords
concrete
foundation
bridge
primary
coring
Prior art date
Application number
KR1020000004176A
Other languages
Korean (ko)
Other versions
KR20010076800A (en
Inventor
김길용
Original Assignee
주식회사 다산이엔씨
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 다산이엔씨 filed Critical 주식회사 다산이엔씨
Priority to KR1020000004176A priority Critical patent/KR100348794B1/en
Publication of KR20010076800A publication Critical patent/KR20010076800A/en
Application granted granted Critical
Publication of KR100348794B1 publication Critical patent/KR100348794B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D22/00Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/02Piers; Abutments ; Protecting same against drifting ice

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

본 발명은 교량기초 보수공법에 관한 것으로서, 특히 시트파일에 주입관을 장착하여 교량의 기초둘레에 설치한 다음 모래를 채워넣고 방수콘크리트를 타설하는 제1단계와; 상기 단계에서 방수콘크리트가 양생되면 그 둘레를 따라 1차코어링을 형성하되 사이의 간격은 지름보다 작도록 하고 1차코어링의 중앙에 철근을 넣고 콘크리트를 타설하여 1차철근·콘크리트파일을 형성하는 제2단계와; 상기 단계에서 형성된 철근·콘크리트파일사이에 2차코어링하고 그 사이로 철근을 넣고 콘크리트를 타설하여 2차철근·콘크리트파일을 형성하는 제3단계와; 그리고 상기 2차철근·콘크리트파일이 형성되면 시트파일을 제거한 후 마무리작업을 하는 제4단계;로 이루어진 것을 특징으로하여, 첫째로 기초를 더욱 견고히 하며 둘째로 공사를 용이하게 하며 셋째로 공사비를 크게 절약할 수 있는 효과를 가지고 있다.The present invention relates to a bridge foundation repair method, and in particular, a first step of installing an injection pipe on a seat pile and installing it on the foundation circumference of a bridge, then filling sand and placing a waterproof concrete; When the waterproof concrete is cured in the above step, the primary coring is formed along the circumference thereof, and the interval between them is smaller than the diameter, and the steel is placed in the center of the primary coring to form the primary reinforcement and concrete pile. A second step; A third step of secondary coring between the reinforcing bars and concrete piles formed in the step, placing reinforcing bars between them, and placing concrete to form secondary reinforcing bars and concrete piles; And when the secondary reinforcement / concrete pile is formed, the fourth step of removing the sheet pile and finishing the work; characterized in that consisting of first, further solidify the foundation, secondly facilitate the construction and thirdly greatly save the construction cost It has an effect that can be done.

Description

교량기초 보수공법{A method of repair on the base of a bridge}A method of repair on the base of a bridge}

본 발명은 교량기초 보수공법에 관한 것으로, 더욱 상세하게는 부식에 의해 침식되어 약해진 교량의 기초를 방수콘크리트로 충진시킨후 기초의 둘레를 철근·콘크리트 파일을 설치함으로써 더욱 견고히 함과 아울러 보수공사를 용이하게할 수 있도록 하는 교량기초 보수공법에 관한 것이다.The present invention relates to a bridge foundation repair method, and more particularly, by filling the foundation of the bridge weakened and eroded by corrosion with waterproof concrete, and further reinforced by installing a reinforced concrete pile around the foundation, It is related to bridge foundation repair method to facilitate.

일반적으로, 교량은 상부구조와 하부구조로 구성되는데, 상기 상부구조는 차량하중을 직접 지지하는 부분으로 상판, 바닥물 및 주형으로 구성되며, 하부구조는 상부구조를 지지하고 상부구조로부터의 하중을 지반으로 전달하는 역할을 하며, 교대, 교각 및 기초로 이루어져 있다.In general, the bridge is composed of a superstructure and an undercarriage, which is a part directly supporting the vehicle load, and is composed of a top plate, a bottom, and a mold, and the undercarriage supports the superstructure and loads from the superstructure. It acts as a ground transport and consists of shifts, piers and foundations.

따라서, 상기 교량중에 항상 수중에 있어 물과 접촉되는 부분은 교량의 기초인 데, 물과 오랜시간동안 접촉하다보면 물과 콘크리트가 일련의 화학적인 작용을 하여 콘크리트의 응집력이 약화되고, 아울러 수중의 물이 콘크리트에 형성된 미세공간으로 침투하여 반복해서 얼거나 녹으면서 콘크리트에 크랙을 발생시키며, 아울러 물결과 계속적으로 충돌하면서 콘크리트구조물이 분리된다.Therefore, the portion of the bridge that always comes in contact with water in the water is the basis of the bridge, when contact with water for a long time, water and concrete have a series of chemical action to weaken the cohesion of concrete, and Water penetrates into the microcavities formed in the concrete, freezes or melts repeatedly, causing cracks in the concrete, and continuously colliding with the waves to separate the concrete structure.

이렇게 콘크리트가 떨어져나가면 철근이 공기와 수분에 노출되고 이 철근에부식이 일어나게 되면 자체강도는 현격히 떨어진다.When the concrete falls off, the rebar is exposed to air and moisture, and when the rebar is corroded, its strength drops drastically.

그러므로, 교량의 기초는 교량에 작용하는 압축력 인장력 또는 휨 등의 응력으로부터 충분한 강도를 갖고 있지 않으며,이로써 교량의 기초는 점차 제기능을 잃어가고 결국 교량의 무게를 견디지 못하게 되어 외부로의 조그만한 충격에도 쉽게 무너질 수 있게 된다.Therefore, the foundation of the bridge does not have sufficient strength from stresses such as compressive force or tensile force acting on the bridge, so that the foundation of the bridge gradually loses its function and eventually cannot withstand the weight of the bridge, It can be easily collapsed.

이 교량의 기초를 보수하는 공법에 관하여 종래의 기술은, 외부로 드러난 철근을 고결 응축 시멘트로 코팅을 시킨 다음 기초주위에 우물통을 설치하고 그 내부를 건조시킨 후 콘크리트를 타설시킨다.Regarding the method of repairing the foundation of the bridge, the conventional technique is to coat the exposed rebar with solidified condensation cement, install a well bucket around the foundation, dry the interior, and then cast concrete.

상기한 종래의 보수공법은, 어느정도 교량의 기초를 보강시킬 수 있다는 점은 인정되나, 첫째로 교량을 설계할 때에 기초의 단면에 대한 계산치가 있으므로 그 단면을 늘린다 하더라도 크게 보강된다고 볼 수 없으며, 둘째로 이미 오래전에 양생된 기존의 콘크리트구조물은 보수를 위해 막 타설된 콘크리트과 일체되지 않은 상태이므로 보수를 위해 타설된 콘크리트구조물이 오랜시간이 흐르면 다시 본래의 구조물로부터 떨어져 나가게 되는 등의 문제점을 가지고 있다.It is recognized that the above-mentioned conventional repair method can reinforce the foundation of the bridge to some extent, but first, when the bridge is designed, there are calculations for the cross section of the foundation, and therefore, it is not considered to be greatly strengthened even if the cross section is increased. As the existing concrete structures that have been cured long time ago are not integrated with the concrete that has just been poured for repair, they have problems such as being dropped from the original structure again after a long time.

본 발명은 상기한 문제점을 해결하기위하여 발명된 것으로, 본 발명의 목적은 부식에 의해 침식되어 콘크리트가 떨어져 나간 기초에 방수콘크리트로 충진시킨후 기초 둘레에 철근·콘크리트 파일을 설치함으로써 첫째로 기초의 보수공사를 용이하게하며 둘째로, 공사후 기초가 더욱 견고하게 유지되는 교량기초 보수공법을제공하는 데에 있다.The present invention has been invented to solve the above problems, and an object of the present invention is to first fill the foundation of the foundation by installing a reinforced concrete pile around the foundation after filling it with waterproof concrete on the foundation where the concrete is eroded by corrosion. Secondly, to provide a bridge foundation repair method that facilitates renovation work, and the foundation is more firmly maintained after construction.

상기한 목적을 달성하기위하여 본 발명은, 시트파일에 주입관을 장착하여 교량의 기초둘레에 설치한 다음 모래를 채워넣고 방수콘크리트를 타설하는 제1단계와; 상기 단계에서 방수콘크리트가 양생되면 그 둘레를 따라 1차코어링하되 그 간격은 지름보다 작도록 하고 1차코어링의 중앙에 철근을 넣고 콘크리트를 타설하여 1차철근·콘크리트파일을 형성하는 제2단계와; 상기 단계에서 형성된 철근·콘크리트파일사이에 2차코어링하고 그 사이로 철근을 넣고 콘크리트를 타설하여 2차철근·콘크리트파일을 형성하는 제3단계와; 그리고 상기 2차철근·콘크리트파일이 형성되면 시트파일을 제거한 후 마무리작업을 하는 제4단계;로 이루어진 것을 특징으로하는 교량기초 보수공법이다.In order to achieve the above object, the present invention, the first step of mounting the injection pipe to the sheet pile installed on the foundation circumference of the bridge and then filling the sand and pouring the waterproof concrete; When the waterproof concrete is cured in the above step, the first coring is performed along the circumference, but the gap is smaller than the diameter, and the second step of forming the primary reinforcement and concrete pile by placing reinforcing bars in the center of the primary coring and placing concrete Wow; A third step of secondary coring between the reinforcing bars and concrete piles formed in the step, placing reinforcing bars between them, and placing concrete to form secondary reinforcing bars and concrete piles; And when the secondary reinforcement / concrete pile is formed, the fourth step of removing the sheet pile and finishing the work; bridge foundation repair method characterized in that consisting of.

도1은 본 발명의 일실시예에 따른 교량기초 보수공법을 수행하기위한 단계를 도시한 도면이고,1 is a view showing the steps for performing the bridge foundation repair method according to an embodiment of the present invention,

도2는 도1에서 도시된 제1단계를 도시한 도면으로, 도2a는 시트패널과 주입관의 관계를 설명하기위하여 도시한 것이고, 도2b는 교량기초에 시트패널이 설치된 것을 도시한 것이며, 도2c는 방수콘크리트가 타설된 상태를 도시한 것이고,FIG. 2 is a view showing a first step shown in FIG. 1, FIG. 2A is a diagram illustrating a relationship between a seat panel and an injection tube, and FIG. 2B is a view showing a seat panel installed in a bridge foundation. Figure 2c shows a state in which the waterproof concrete is poured,

도3은 도1에서 도시된 제2단계를 도시한 도면으로, 도3a는 방수콘크리트가 양생된 교량기초주위로 1차코어링이 형성된 것을 도시한 것이고, 도3b는 코어링에 콘크리트가 타설된 상태를 도시한 것이며,Figure 3 is a view showing a second step shown in Figure 1, Figure 3a shows that the primary coring is formed around the bridge foundation is cured concrete waterproofing, Figure 3b is concrete is poured into the core ring Shows the state,

도4는 도1에서 도시된 제3단계를 도시한 도면으로, 도4a는 코어링이 형성된 것을 도시한 것이며, 도4b는 이 2차코어링에 콘크리트가 타설된 상태를 도시한 것이며,Figure 4 is a view showing a third step shown in Figure 1, Figure 4a shows that the coring is formed, Figure 4b shows a state in which concrete is poured on the secondary coring,

도5는 도1에서 도시된 제4단계를 도시한 도면이다.FIG. 5 is a diagram illustrating a fourth step shown in FIG. 1.

도면의 주요부분에 대한 부호의 설명Explanation of symbols for main parts of the drawings

110 : 시트패널 120 : 주입관110: sheet panel 120: injection tube

210,212,213,214,… : 1차코어링 220 : 철근210,212,213,214,... : 1st Coring 220: Reinforcing Bar

250,251,252,254,… : 1차철근·콘크리트파일250,251,252,254,... : Primary reinforcing bar, concrete pile

310,312,313,314,… : 2차코어링 320 : 철근310,312,313,314,... : Secondary Coring 320: Reinforcing Bar

350,351,352,354,… : 2차철근·콘크리트파일350,351,352,354,... : Secondary reinforcement, concrete pile

이하, 본 발명에 속하는 통상의 지식을 가진 자가 용이하게 실시할 수 있도록 하기위하여 본 발명의 가장 바람직한 실시예를 첨부한 도면과 함께 더욱 상세히 설명한다.Hereinafter, the most preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings so that those skilled in the art may easily implement the present invention.

도1은 본 발명의 일실시예에 따른 교량기초 보수공법을 수행하기위한 단계를 도시한 도면이다.1 is a view showing the steps for performing the bridge foundation repair method according to an embodiment of the present invention.

본 발명의 교량기초 보수공법은, 교량의 기초주위로 방수콘크리트를 타설하는 제1단계(100)와, 이 단계에서 타설된 방수콘크리트에 코어드릴링한 후 1차철근·콘크리트파일을 설치하는 제2단계(200)와, 이 단계(200)에서 철근·콘크리트파일사이에 코어드릴링한 후 2차철근·콘크리트파일을 설치하는 제3단계(300), 이 단계에서 시트파일을 제거하는 제4단계(400)로 이루어진다.Bridge foundation repair method of the present invention, the first step (100) for placing the waterproof concrete around the foundation of the bridge, and the second step of installing the primary reinforcement, concrete pile after core-drilling in the waterproof concrete poured in this step (3) and a third step (300) of installing the secondary reinforcement / concrete file after core drilling between the reinforcement and the concrete file in this step (200), and the fourth step (400) of removing the sheet file in this step. Is made of.

도2는 도1에서 도시된 제1단계(100)를 도시한 도면으로, 도2a는 시트패널 (110)과 주입관(120)의 관계를 설명하기위하여 도시한 것이고, 도2b는 교량기초에 시트패널(110)이 설치된 것을 도시한 것이며, 도2c는 방수콘크리트가 타설된 상태를 도시한 것이다.FIG. 2 is a view showing the first step 100 shown in FIG. 1, and FIG. 2A is for explaining the relationship between the seat panel 110 and the injection tube 120. FIG. It is shown that the seat panel 110 is installed, Figure 2c shows a state in which the waterproof concrete is poured.

도2a에서 도시된 시트패널(110)은 교량의 기초와 동일한 곡률을 가지며 하측부분에 주입관(120)을 고정시킬 수 있는 고정부재(112)를 형성한다. 상기 주입관 (120)은 끝이 뽀족하고 중간에 배출구멍(123)을 형성하고 있어서 끝부분이 상기 고정부재(112)에 고정된다.The seat panel 110 shown in FIG. 2A has the same curvature as the foundation of the bridge and forms a fixing member 112 that can fix the injection pipe 120 to the lower portion. The injection pipe 120 has a sharp end and forms a discharge hole 123 in the middle, so that the end is fixed to the fixing member 112.

상기 고정부재(112)는 상기 주입관(120)을 고정시키도록 여러형태로 형성될 수 있으나 본 실시에는 바람직하게 상기 시트패널(110)상에서 상측으로 절개부를 형성하여 상측에서 벌어지도록 절곡시키도록 하여, 이 부분에 상기 주입관(120)을 고정시게 하였다.The fixing member 112 may be formed in various forms to fix the injection tube 120, but in the present embodiment, it is preferable to form an incision to the upper side on the sheet panel 110 to be bent to open from the upper side. In this part, the injection tube 120 was fixed.

그러므로, 도2b에서 도시된 바와 같이, 상기 시트패널(112)은 교량의 기초(102)로부터 일정한 간격을 가지고 둘레를 따라 다수가 설치되는 데, 하측이 강바닥(103)에 깊숙히 매설되어 고정되도록 하며 그 깊이는 바람직하게 상기 고정부재(112)가 강바닥에 묻히고 상기 주입관(12)의 배출구(123)가 수중의 토사층 위에 위치할 수 있도록 한다.Therefore, as shown in Figure 2b, the seat panel 112 is installed a plurality along the circumference at regular intervals from the foundation 102 of the bridge, the lower side is to be embedded deeply buried in the river bottom 103 The depth is preferably such that the fixing member 112 is buried in the river bed and the outlet 123 of the injection tube 12 can be located on the soil layer in water.

그리고, 상기 시트패널(112)을 설치한 후 시트패널(112)이 반대쪽으로 넘어지지 않도록 약 10kg용량의 마대자루(105)에 모래를 반정도 채운 다음 시트파일의 외부에 쌓아 올려 안정되게 하고 시트패널(112)내의 물을 양수펌프등으로 모두 빼낸다.After the seat panel 112 is installed, the seat panel 112 is filled with sand about half of the sack 105 having a capacity of about 10 kg so that the seat panel 112 does not fall to the opposite side, and then stacked on the outside of the sheet pile to stabilize the sheet. The water in the panel 112 is all taken out with a pump.

도2c는 상기 시트패널(112)이 설치된 기초(102)의 둘레에 모래(130)를 채우고 상기 설치된 각 시트패널(110)에 고정된 각각의 주입관(120)을 통해 방수콘크리트를 주입시켜 타설한다.2c fills the sand 130 around the foundation 102 on which the seat panel 112 is installed, and injects water-resistant concrete through the injection pipes 120 fixed to the seat panels 110. do.

따라서, 상기 기초(102)에서 부식되어 콘크리트가 떨어져 나가거나 침식된 부분이 있다면 그 부분에 모래가 채워지고 그 사이로 방수콘크리트가 충진되어 철근을 보호해줌과 아울러 구조를 더욱 견고히한다.Thus, if there is a part that is corroded from the base 102 to fall out or eroded, the sand is filled in the part and the waterproof concrete is filled therebetween to protect the reinforcing bar and to further strengthen the structure.

이 방수콘크리트의 타설 공법은 특허 제180959호의 ‘건축구조물의 방수공법’에서 응용한 것으로, 물을 이용하여 모세관의 인력과 장력을 유발시키고 시멘트입자 및 충전재의 침전 및 압밀을 이룬다.The casting method of waterproofing concrete is applied in the 'waterproofing method of building structure' of Patent No. 180959, which induces the attraction and tension of the capillary by using water and precipitates and consolidates cement particles and fillers.

이 방수콘크리트는 포틀랜드시멘트와 물 그리고 수용성 방수제 등을 약 8:10:6의 비율로 배합한 것으로, 건국대학교의 연구보고서‘모세관인력과 장력을 이용한 보수공법의 성능에 관한 연구(1999년9월)’에 따르면 강도 및 접착성능 그리고 방수성능이 우수한 것으로 판명되었다.This waterproof concrete is composed of Portland cement, water, and water-soluble waterproofing agent at a ratio of about 8: 10: 6. A study on Konkuk University's research on the performance of capillary manpower and tension repair method (September 1999 ) 'Proved to be excellent in strength, adhesion and waterproofing.

도3은 도1에서 도시된 제2단계(200)를 도시한 도면으로, 도3a는 방수콘크리트(132)가 양생된 교량기초주위로 1차코어링(210,212,213,214,…)이 형성된 것을 도시한 것이고, 도3b는 1차코어링(210,212,213,214,…)에 콘크리트가 타설된 상태를 도시한 것이다.3 is a view showing the second step 200 shown in Figure 1, Figure 3a shows that the primary coring (210, 212, 213, 214, ...) is formed around the bridge foundation on which the waterproof concrete 132 is cured 3B illustrates a state in which concrete is poured into primary corings 210, 212, 213, 214,.

도3a에서 도시된 바와 같이, 1차코어링(210,212,213,214,…)은 교각(107)을 지지하는 기초(102)를 따라 형성되는 데, 양생된 방수콘크리트(132)와 기초(102)를 함께 코어 드릴링한 것이고 서로 일정한 간격을 형성한다.As shown in FIG. 3A, the primary corings 210, 212, 213, 214,... Are formed along the foundation 102 supporting the piers 107, with the cured waterproof concrete 132 and the foundation 102 cored together. It is drilled and forms a constant distance from each other.

이 1차코어링(210,212,213,214,…)은 강바닥을 깊숙히 들어가 암반위치까지 천공되는 것이 바람직하고 또한 방수콘크리트(132)의 두께가 지름(L1)의 반을 차지하고 기초(102)가 지름(L1)의 나머지 반을 차지하도록 하고 또 그 사이의 간격(L2)이 지름(L1)의 반이 되도록 하는 것이 좋다.The primary corings 210, 212, 213, 214, ... are preferably drilled deep into the riverbed to the rock position, and the thickness of the waterproof concrete 132 occupies half of the diameter L1, and the base 102 has a diameter L1. It is better to occupy the other half and to make the space L2 between them half the diameter L1.

따라서, 상기 제1단계(100)에서 시트패널(110)을 기초(102)주위에 설치할 때에 계획된 1차코어링의 반지름에 해당되는 간격을 고려하는 것이 좋다.Therefore, when installing the seat panel 110 around the base 102 in the first step 100, it is good to consider the interval corresponding to the radius of the planned primary coring.

도3b는 기초(102)주위로 강바닥(103)의 깊숙히 형성된 1차코어링 (210,212,213,214,…)에 각각 철근(220)을 박아서 고정시킨 것을 볼 수 있다.3b shows that the reinforcing bars 220 are driven and fixed to the primary corings 210, 212, 213, 214,..., Deeply formed around the foundation 102, respectively.

이 철근(220)은 끝이 뽀족한 정모양을 하고 그 윗쪽에 고정홈(223)을 형성하여 이 고정홈(223)에 배출구(230)이 형성된 별도의 주입관(225)을 절곡하여 크램핑시킨다.The reinforcing rod 220 is clamped by bending a separate injection pipe 225 having a discharge port 230 formed in the fixed groove 223 to form a fixed groove and the upper fixed groove 223 thereon. Let's do it.

이렇게 철근(220)이 배근시킨 1차코어링(210,212,213,214,…)에 수중콘크리트를 타설하는 데, 이때 타설되는 수중콘크리트는 시멘트:모래:자갈의 비율을 2:2:4로 하고 물을 30%로 하여 잘 반죽한 것이다.The reinforcing concrete 220 is placed in the primary coring (210, 212, 213, 214, ...) is placed in the water concrete, the water concrete is poured: the ratio of cement: sand: gravel 2: 2: 4 and water 30% It is kneaded well.

상기 수중콘크리트가 완전히 굳은 다음에 상기 주입관(225)으로 물을 주입하여 수중콘크리트의 균열여부를 확인한다. 즉, 수중콘크리트에 균열이 생길 경우 주입관(225)의 물은 상기 배출구(230)을 통해 빠져나와 수중콘크리트의 균열사이로퍼질 것이고 작업자는 줄어드는 물의 양으로 균열을 판단하게 된다.After the concrete is completely hardened, water is injected into the injection tube 225 to check whether the concrete is cracked. That is, when a crack occurs in the water concrete, the water in the injection pipe 225 will be discharged through the outlet 230, and will be spread between the cracks of the water concrete, and the worker will determine the crack by the amount of water reduced.

상기에서 콘크리트의 균열이 확인될 경우 특허 제180959호의 구조물 방수공법을 이용하여 1∼2kg/cm2의 압력으로 방수액과 시멘트를 혼합한 방수재를 압송한다. 콘크리트의 균열이 많을 경우에는 외부로 방수액이 통과하여 새어나오지만 시간이 경과하면 투과량이 적어지고 간극을 응고시키게 된다.When the crack of the concrete is confirmed in the above, using the waterproofing method of the structure of Patent No. 180959, the waterproofing material mixed with the waterproofing liquid and cement is pressured at a pressure of 1 to 2kg / cm 2 . If there are many cracks in the concrete, the waterproofing liquid passes through and leaks out, but as time passes, the amount of permeation decreases and the gap is solidified.

따라서, 방수가 완전히 되고 견고한 1차철근·콘크리트파일가 교량의 둘레를 따라 설치된다.Therefore, the waterproof and solid primary reinforcement concrete pile is installed along the circumference of the bridge.

도4는 도1에서 도시된 제3단계(300)를 도시한 도면으로, 도4a는 1차철근·콘크리트파일(250,251,252,253,…)이 형성된 사이로 이차적으로 2차코어링(310,312, 313,314,…)이 형성된 것을 도시한 것이며, 도4b는 이 2차코어링(310,312,313,314,…)에 콘크리트가 타설된 상태를 도시한 것이다.FIG. 4 is a view showing a third step 300 shown in FIG. 1, and FIG. 4A shows secondary corings 310, 312, 313, 314,... Between secondary reinforcement and concrete piles 250, 251, 252, 253,. 4B illustrates a state in which concrete is poured into the secondary corings 310, 312, 313, 314,...

도4a에서 볼 수 있듯이 제2단계(200)에서 형성된 1차철근·콘크리트파일 (250,251,252,253,…)사이로 별도의 2차코어링(310,312,313,314,…)을 제2단계 (200)와 같은 방식으로 암반층까지 깊숙히 형성시킨다.As shown in FIG. 4A, the second secondary coring 310, 312, 313, 314,..., Between the primary reinforcing bars and the concrete piles 250, 251, 252, 253,... To form.

즉, 각 코어(310,312,313,314,…)사이의 간격(L')은 코어의 지름(L)에 약 반에 해당되는 것이다. 따라서, 2차코어링(310,312,313,314,…)은 양편의 1차철근·콘크리트파일(250,251,252,253,…)사이에서 중앙점을 잡고 코어 드릴링하게 되면 방수콘크리트를 포함해서 양편의 1차철근·콘크리트파일(250,251,252,253,…)와 어느정도 겹치게 되는 데, 이때 겹치는 부분은 지름의 약 1/4에 해당된다.That is, the spacing L 'between each of the cores 310, 312, 313, 314, ... is about half of the diameter L of the core. Accordingly, the secondary corings 310, 312, 313, 314, ... have a center point between the two primary reinforcing bars and concrete piles 250, 251, 252, 253, ..., and the core is drilled. ) And some overlap, which is about 1/4 of the diameter.

그러므로, 상기 1차철근·콘크리트파일(250,251,252,253,…)는 양쪽으로 지름의 1/4씩 코어링되고 중앙에서 철근을 포함하여 지름의 2/4가 남게 된다.Therefore, the primary reinforcing bar concrete piles 250, 251, 252, 253, ... are corrugated by 1/4 of the diameter on both sides, and two quarters of the diameter including the reinforcing bar remain in the center.

도4b는 1차철근·콘크리트파일을 형성하는 것과 동일한 방식으로 2차철근·콘크리트파일을 형성시키는 것이다.4B shows the formation of the secondary reinforcement concrete pile in the same manner as the formation of the primary reinforcement concrete pile.

각 2차코어링(310,312,313,314,…)에 박아지는 각각의 철근(320)은 고정홈 (322)에 주입관(323)을 고정시키게 된다. 그리고, 이 철근(320)이 박아진 각 2차코어링(310,312,313,314,…)에 수중콘크리트가 타설되는 데, 이때의 수중콘크리트는 제2단계(200)에서와 같이 시멘트:모래:자갈의 비율을 2:2:4로하고 물의 비율을 30%로 하여 배합한 것이다.Each of the reinforcing bars 320 embedded in each of the secondary corings 310, 312, 313, 314, ... is fixed to the injection pipe 323 in the fixing groove 322. In addition, underwater concrete is poured into each of the secondary corings 310, 312, 313, 314, ... into which the reinforcing steel 320 is embedded. At this time, the underwater concrete has a ratio of cement: sand: gravel as in the second step 200. It is mix | blended with the ratio of 2: 2 and water to 30%.

이렇게 타설된 수중콘크리트가 양생중에 균열이 생겼는가 여부를 제2단계 (200)에서와 같은 방식으로 한다. 즉, 수중콘크리트가 균열이 생겼을 경우에는 먼저 물을 주입관(323)에 넣고 가압하면 물이 각 균열사이로 퍼져 나가므로 작업자는 물이 줄어든 상태로 균열을 감지하여 각 주입관(323)에 방수재를 넣고 가압하여 각 균열에 방수재를 충진시킨다.Whether or not cracking occurred during curing of the poured concrete is made in the same manner as in the second step (200). That is, when underwater concrete is cracked, water is first introduced into the injection tube 323, and when water is pressurized, water is spread out between the cracks, so that the worker detects the crack in the reduced water state and applies a waterproof material to each injection tube 323. And pressurized to fill each crack with a waterproofing material.

도5는 도1에서 도시된 제4단계(400)를 도시한 도면으로, 상기 단계(300)에서 2차철근·콘크리트파일(350,351,352,353,…)가 설치된 기초(102)에서 시트패널 (110)을 제거하고 면을 정리하는 등의 마무리작업을 한 것이다.FIG. 5 is a view showing the fourth step 400 shown in FIG. 1, and in step 300, the sheet panel 110 is removed from the base 102 on which the secondary reinforcement concrete blocks 350, 351, 352, 353, ... are installed. And finishing the work, such as cleaning the face.

이 기초(102)주위로 1차철근·콘크리트파일(250,251,252,253,…)과 2차철근·콘크리트파일(350,351,352,353,…)은 서로 맞물리면서 설치되고 또한 설치된 후에 각 기초(102)의 표면과도 물리적으로 결합되면서 그 기초(102)와의 결합력이 향상되면서 오랜기간동안 보수상태를 유지하고 또한 수중에서도 물이 기초(102)에 직접 미치지 않도록 하고 외부에서 강한 충격이 가해지더라도 충격을 받은 철근·콘크리트파일만 손상을 일을 뿐 다른 부분으로 전파되지 않도록 하여 기초(102)를 더욱 견고히 지지해 준다.Primary reinforcement concrete piles (250,251,252,253, ...) and secondary reinforcement concrete piles (350,351,352,353, ...) are interlocked with each other and are physically combined with the surface of each foundation 102 after being installed. As the bonding force with the foundation 102 is improved, it is maintained for a long time and prevents water from directly reaching the foundation 102 even in the water and damages only the reinforcing steel or concrete piles that are impacted even if a strong impact is applied from the outside. Not to propagate to other parts as well to support the foundation 102 more firmly.

그러므로, 교량의 교각밑에서 지지하는 기초가 부식되어 침식되었을 때에 본 발명에 의하면 기초주위로 시트패널을 설치하고, 모래와 방수콘크리트를 충진시켜 콘크리트가 떨어져 나간 부분에 방수콘크리트가 채워져 지지할 수 있도록 하고, 그 둘레에 1차철근·콘크리트파일과 2차철근·콘크리트파일을 설치하여 기초와의 결합력을 높인 다음, 시트패널을 제거한다.Therefore, when the foundation supported under the bridge pier is corroded and eroded, according to the present invention, the seat panel is installed around the foundation, and sand and waterproof concrete are filled so that the waterproof concrete is filled and supported in the part where the concrete falls off. After installing the primary reinforcement, concrete pile and the secondary reinforcement / concrete pile, increase the cohesion with the foundation and remove the seat panel.

이상에서 상술한 본 발명에 따르면, 콘크리트가 떨어져 나간 기초부위에 모래와 방수콘크리트를 충진시켜 양생하고 기초의 둘레에 1차철근·콘크리트파일과 2차철근·콘크리트파일을 서로 결합시킴으로써, 첫째로 기초가 더욱 견고히 교량을 지지할 수 있도록 하며 둘째로 공사를 더욱 용이하게 하며 셋째로 공사비를 크게 줄일 수 있는 효과가 있다.According to the present invention as described above, by filling the sand and waterproof concrete to the foundation portion where the concrete has fallen off, by combining the primary reinforcement, concrete pile and secondary reinforcement, concrete pile around the foundation, firstly the foundation is further Secondly, it is possible to firmly support the bridge, secondly to make the construction easier, and thirdly, to significantly reduce the construction cost.

이상에서 서술된 것은 모든 점에서 단순한 예시에 불과한 것이기 때문에, 이를 바탕으로 본 발명을 한정적으로 해석해서는 안될 것이다. 그러므로, 본 발명의 진정한 기술적 사상 및 범위 내에 존재하는 변형예 및 균등한 실시예는 모두 본 발명의 청구 범위에 속하는 것이다.Since what has been described above is merely a mere example in all respects, the present invention should not be limitedly interpreted based on this. Therefore, modifications and equivalent embodiments that fall within the true spirit and scope of the present invention shall fall within the claims of the present invention.

Claims (2)

시트파일에 주입관을 장착하여 교량의 기초둘레에 설치한 다음 모래를 채워넣고 방수콘크리트를 타설하는 제1단계와;A first step of installing the injection pipe on the sheet pile and installing it on the foundation circumference of the bridge, then filling sand and placing the waterproof concrete; 상기 단계에서 방수콘크리트가 양생되면 그 둘레를 따라 1차코어링하되 그 간격은 지름보다 작도록 하고 1차코어링의 중앙에 철근을 넣고 콘크리트를 타설하여 1차철근·콘크리트파일을 형성하는 제2단계와;When the waterproof concrete is cured in the above step, the first coring is performed along the circumference, but the gap is smaller than the diameter, and the second step of forming the primary reinforcement and concrete pile by placing reinforcing bars in the center of the primary coring and placing concrete Wow; 상기 단계에서 형성된 철근·콘크리트파일사이에 2차코어링하고 그 사이로 철근을 넣고 콘크리트를 타설하여 2차철근·콘크리트파일을 형성하는 제3단계와;A third step of secondary coring between the reinforcing bars and concrete piles formed in the step, placing reinforcing bars between them, and placing concrete to form secondary reinforcing bars and concrete piles; 그리고 상기 2차철근·콘크리트파일이 형성되면 시트파일을 제거한 후 마무리작업을 하는 제4단계;And a fourth step of removing the sheet file and finishing the work when the secondary reinforcement concrete file is formed. 로 이루어진 것을 특징으로하는 교량기초 보수공법.Bridge foundation repair method, characterized in that consisting of. 제1항에 있어서, 상기 제2단계와 제3단계는 1차철근·콘크리트파일과 2차철근·콘크리트파일을 설치한 후 균열여부를 확인하고 균열이 확인되면 방수제를 압송하여 균열에 충진시키는 것을 특징으로 하는 교량기초 보수공법.According to claim 1, wherein the second step and the third step is to install the primary reinforcement, the concrete pile and the secondary reinforcement, the concrete pile after checking whether the crack, and if the crack is confirmed by filling the crack by pressing the waterproofing agent Bridge foundation repair method.
KR1020000004176A 2000-01-28 2000-01-28 A method of repair on the base of a bridge KR100348794B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020000004176A KR100348794B1 (en) 2000-01-28 2000-01-28 A method of repair on the base of a bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020000004176A KR100348794B1 (en) 2000-01-28 2000-01-28 A method of repair on the base of a bridge

Publications (2)

Publication Number Publication Date
KR20010076800A KR20010076800A (en) 2001-08-16
KR100348794B1 true KR100348794B1 (en) 2002-08-17

Family

ID=19642326

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020000004176A KR100348794B1 (en) 2000-01-28 2000-01-28 A method of repair on the base of a bridge

Country Status (1)

Country Link
KR (1) KR100348794B1 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100440092B1 (en) * 2001-08-07 2004-07-14 선암산업개발주식회사 Pannel for Repair and Reinforcement Method of Pier and Utilize Pannel Repair and Reinforcement Method
KR100446360B1 (en) * 2001-08-07 2004-09-01 선암산업개발주식회사 Utilize Stone Repair and Reinforcement Method of Pier
KR100927578B1 (en) * 2009-06-02 2009-11-23 우경건설 주식회사 Pier footing reinforcement work

Also Published As

Publication number Publication date
KR20010076800A (en) 2001-08-16

Similar Documents

Publication Publication Date Title
KR200205765Y1 (en) Reinforcing structure of foundation for pier
NL8700512A (en) FOUNDATION AND METHOD FOR MAKING THEREOF
JPH1060817A (en) Constructing method of annexing structure
KR100348794B1 (en) A method of repair on the base of a bridge
KR20090098201A (en) Method for enhancing bearing power of existing bridges using the a pile
CN111042843A (en) Pre-anchoring method for underground excavated tunnel
WO2022200692A1 (en) Method for forming a wall structure in the ground by drilling and wall structure formed by drilling
KR20100118482A (en) To use reclamation steel perimeter beam and slab diaphragm effect in order for one side of the basement outer wall continuous construct was possible ,which the basement infrastructure construction method
KR100433653B1 (en) Constructing method for the filling out abutement of bridge
JP3789444B2 (en) Segment and segment manufacturing method
KR20090095204A (en) Method of repairing and reinforcing submarine concrete constructions
CN104818678A (en) Simply supported hollow plate girder bending resistance reinforcement method
KR101050824B1 (en) Pier constructing method for expanding using oscillator on brideg expanding of upper part over water
KR101051364B1 (en) Loop construction method of underground LNG storage tank
KR100493516B1 (en) Micro pile and assembly foundation reinforcement structure member and its method for pier
CN110656576A (en) Pier structure and construction method thereof
KR102463636B1 (en) External Reinforcement Structure of Head Cutting PC Pile
KR200245125Y1 (en) A pier structure for engineering works
CN115478548B (en) Expansion soil cutting side slope expansion-reducing anti-seismic disaster-preventing combined retaining structure and construction method
CN219280687U (en) Device for repairing broken damage of pile foundation of wharf and pile foundation structure of high-pile wharf
CN217105151U (en) Compound high slope supporting construction
KR200308699Y1 (en) Shore of CFRP composite frame for new construction of underwater structures and reinforcement of foundation
KR100652011B1 (en) Pile in pile
JP3678290B2 (en) High earthquake resistance foundation
EP4314415A1 (en) Method for forming a wall structure in the ground by drilling and wall structure formed by drilling

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
N231 Notification of change of applicant
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20130704

Year of fee payment: 12

FPAY Annual fee payment

Payment date: 20140703

Year of fee payment: 13

FPAY Annual fee payment

Payment date: 20150703

Year of fee payment: 14

FPAY Annual fee payment

Payment date: 20160705

Year of fee payment: 15

FPAY Annual fee payment

Payment date: 20170705

Year of fee payment: 16

FPAY Annual fee payment

Payment date: 20180704

Year of fee payment: 17