KR100243395B1 - A Wastes Treatment District Structure for using a Cell Frame-work and It's Construction Method - Google Patents

A Wastes Treatment District Structure for using a Cell Frame-work and It's Construction Method Download PDF

Info

Publication number
KR100243395B1
KR100243395B1 KR1019990024474A KR19990024474A KR100243395B1 KR 100243395 B1 KR100243395 B1 KR 100243395B1 KR 1019990024474 A KR1019990024474 A KR 1019990024474A KR 19990024474 A KR19990024474 A KR 19990024474A KR 100243395 B1 KR100243395 B1 KR 100243395B1
Authority
KR
South Korea
Prior art keywords
layer
lattice
soil
landfill
concrete
Prior art date
Application number
KR1019990024474A
Other languages
Korean (ko)
Inventor
김종천
Original Assignee
김종천
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from KR1019970010087A external-priority patent/KR100243393B1/en
Application filed by 김종천 filed Critical 김종천
Application granted granted Critical
Publication of KR100243395B1 publication Critical patent/KR100243395B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/46Foundations for supply conduits or other canals
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A20/00Water conservation; Efficient water supply; Efficient water use
    • Y02A20/20Controlling water pollution; Waste water treatment
    • Y02A20/204Keeping clear the surface of open water from oil spills

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
  • Road Paving Structures (AREA)
  • Revetment (AREA)
  • Floor Finish (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)
  • Lining And Supports For Tunnels (AREA)
  • Bridges Or Land Bridges (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
  • Foundations (AREA)
  • Cleaning Or Clearing Of The Surface Of Open Water (AREA)

Abstract

본발명은 하천·수로등에 축적된 개펄, 특히 간척지에 의한 매립지등의 연약지반을 개량하여 이에 구축되는 셀구조의 격자형 구조체를 이용한 폐기물매립장 구조물 및 그 구축방법에 관한 것으로, 지반을 일정깊이로 굴토한 바닥면에 부직포매트를 부설하여 차수막층을 형성하고, 상기 차수막층 상부에 굴토된 현장토와 시멘트 및 고화제등을 혼합교반하여 조성된 개량토를 바닥층과 전면벽에 포설하여 고화성형시키는 폐기물매립장 구조물에 있어서, 굴토된 지반(10)의 외곽부 위치에 복수열의 격자형 구조체(30)들을 일정높이로 부설하여 콘크리트를 타설하여 콘크리트 기초부(51)를 형성하고, 이 기초부의 상측으로 일정높이까지 단계별로 격자형 구조체(30)들을 복수열로 조립부설하여 콘크리트를 타설하여 콘크리트 벽체부(52)를 형성하는 전면벽(50)과, 상기 콘크리트 기초부(51)로부터 굴토된 지반(10)의 바닥 전체에 걸쳐 부직포매트를 부설한 차수막층(20)과, 상기 차수막층 상측에 격자형 구조체(30)를 복수열로 부설하여 최하측은 고화토층(41)을 형성하고, 그 상측은 배수층(42)을 형성한 바닥층(40)으로 구성된다.The present invention relates to a waste landfill structure and a method of constructing the landfill structure using a cell-like lattice structure, which is constructed by improving soft grounds such as reclaimed land accumulated in rivers and waterways, especially landfills caused by reclaimed land. The nonwoven fabric mat is laid on the bottom surface to form a barrier layer, and the improved soil formed by mixing and stirring the soil soil, cement and hardener mixed on the top of the barrier layer is laid on the bottom layer and the front wall to be solidified. In the landfill structure, a plurality of rows of lattice-shaped structures 30 are laid at a predetermined height at an outer position of the excavated ground 10 to cast concrete to form a concrete foundation 51, and to the upper side of the foundation. The front wall 50, which forms the concrete wall part 52 by placing concrete by assembling and placing the lattice structure 30 in a plurality of rows step by step to a certain height. In addition, by placing the non-woven fabric mat on the entire bottom of the ground 10, which is excavated from the concrete foundation 51, and the lattice-like structure 30 in a plurality of rows on the upper side of the water-repellent layer is laid in the lowest The side forms a solidified soil layer 41, and the upper side is composed of a bottom layer 40 having a drainage layer 42 formed thereon.

Description

셀구조의 격자형 구조체를 이용한 폐기물매립장 구조물 및 그 구축방법{A Wastes Treatment District Structure for using a Cell Frame-work and It's Construction Method}A Wastes Treatment District Structure for using a Cell Frame-work and It's Construction Method}

본발명은 하천·수로등에 축적된 개펄, 특히 간척지에 의한 매립지등의 연약지반을 개량하여 이에 구축되는 셀구조의 격자형 구조체를 이용한 폐기물매립장 구조물 및 그 구축방법에 관한 것이다.The present invention relates to a waste landfill structure using a cell-like lattice structure constructed by improving soft ground, such as a landfill, especially a landfill by reclaimed land accumulated in rivers, waterways, and the like, and a method of constructing the same.

통상 폐기물 매립장으로 선정되는 지역은 주민들의 환경오염에 대한 혐오감으로 인하여 토지의 활용도가 낮은 산악지형이나 토질조건이 견고하지 못한 하천변, 해안의 간척지, 뻘등의 연약지반으로 이루어진 지역이 대부분으로서, 특히 대규모로 폐기물을 처리할 수 있는 장소로서는 해안가의 매립지등을 선정할 수 밖에 없는데, 그 토질조건이 대부분 점토지반, 이탄지 또는 느슨한 사질토등 함수율이 상당히 높은 연약지반으로 이루어져 있는데, 이러한 지역에 구축되는 구조물등은 불안정하여 부등침하가 발생되기 쉬워 구조물이 기울어져 제기능을 발휘할 수가 없는 경우가 발생된다.Most of the areas selected as waste landfills are made up of soft grounds such as riversides, coastal reclaimed lands, and wetlands where land use is low due to aversion to environmental pollution by residents, or where soil conditions are not strong. As a place where wastes can be treated, the landfills, etc., have to be selected. The soil conditions are mostly made of soft ground such as clay ground, peat ground, or loose sandy soil. The back is unstable, so that inequality is likely to occur, and the structure is inclined so that it is unable to function properly.

따라서, 이러한 연약지반에 매립장으로 활용할 경우 대규모의 폐기물을 매립적치하는 매립장으로 활용하기 위해서는 먼저 연약지반을 개량 안정시켜야 하며, 또한 매립되는 폐기물 적재하중에 의한 지반의 침하, 폐기물에서 발생되는 침출수의 유출로 인한 토양과 지하수의 2차오염, 안정되지 않은 매립사면 및 외곽사면의 활동, 홍수시 우수등에 의한 수압, 지진이나 진동, 토압등에 의해 부등침하를 일으켜 지반의 균열현상 및 누수현상등의 여러 문제를 해결할 수 있도록 연약지반을 개량 안정화시키는 것이 필수적이다.Therefore, if the soft ground is used as a landfill site, in order to use a large amount of waste as a landfill site, the soft ground must first be improved and stabilized, and the ground subsidence due to the landfill waste load and the leachate discharged from the waste Problems such as secondary soil pollution of soil and groundwater, unstable landfill and outer slope activities, uneven settlement due to water pressure due to rainwater storms, earthquake, vibration, earth pressure, etc. It is essential to improve and stabilize the soft ground to solve the problem.

이와 같이 토질여건이 대부분 연약지반으로 이루어진 간척지를 활용하여 대규모의 폐기물을 매립하는 연약지반에 있어서는, 지반의 지지력을 강화시켜 지반의 인장강도를 증가시키고, 대규모로 매립되는 폐기물의 적재하중에 의한 부등침하를 방지함과 동시에 차수성을 높혀 폐기물로부터 발생하는 침출수의 유출을 방지함으로써 2차적인 환경오염을 방지해야만 한다.As such, in soft grounds where large-scale wastes are buried using reclaimed land consisting mostly of soft grounds, the ground strength of the ground is increased to increase the tensile strength of the ground, and due to the loading load of large-scale landfilled wastes. Secondary environmental pollution should be prevented by preventing sinking and increasing the water quality to prevent the leakage of leachate from waste.

통상적으로 폐기물매립장의 토질조건이 연약지반이므로 집중하중을 받는 하층부의 전단파괴로 인한 균열과 부등침하의 발생으로 침출수의 유출과 토양 및 지하수에 침출수의 유입등으로 2차적인 오염발생을 유발시키게 됨으로 매립장으로서의 제기능을 발휘하지 못하게 되는 문제점이 있다.In general, since the soil condition of the landfill is soft ground, secondary pollution occurs due to the outflow of leachate and the inflow of leachate into soil and groundwater due to the occurrence of crack and unequal sedimentation due to shear failure of the lower layer under concentrated load. There is a problem in that it does not function as a landfill.

따라서, 종래에도 일본국 특허공개공보 소57- 85414호로 알려진 도1a에서 도시하는 바와 같은 기술로서, 연약지반상에 설치되는 폐기물매립장의 구조물이나 차수구조물에 있어서, 고결력이 없는 점토층(1)위에 주로 1-2㎜두께의 폴리에틸렌(PE)·염화비닐수지·가황고무 또는 아스팔트등으로 이루어진 시트(4)를 바닥저면(1)과 사면(2)에 부설하고, 시트(4)위에 다시 점토층(5)을 포설한 시트라이닝공법을 적용시키거나, 일본국 특허공개공보 소48-86341호에서와 같이 연약지반상에 압축매립층을 형성하는 압밀다짐공법이나 또는 원지반토에 약액을 주입하는 방식의 연약지반공법을 적용하여 왔다.Therefore, as a technique shown in Fig. 1A, also known as Japanese Laid-Open Patent Publication No. 57-85414, on a clay layer 1 having no high cohesion in a structure of a landfill or an order structure, which is installed on a soft ground, A sheet 4 composed mainly of polyethylene (PE), vinyl chloride resin, vulcanized rubber, or asphalt, having a thickness of 1-2 mm, is laid on the bottom 1 and the slope 2, and the clay layer (4) is placed on the sheet 4 again. 5) Apply sheet lining method, or consolidation compaction method to form a compressed buried layer on soft ground as in Japanese Patent Laid-Open Publication No. 48-86341, or inject a chemical solution into raw soil. Geotechnical methods have been applied.

그러나, 이러한 시트라이닝공법이나 압밀다짐공법등에서는 대규모의 상재하중을 지지할 만한 지반반력을 얻을 수 없다는 점, 사면은 점토의 포설 자체마져 안정되게 시공하기가 불가능하여 사면이 붕괴될 우려와, 또한 특히 이음부에서 시트의 접착불량, 하부 점토층의 표면이 평활하지 않으면 시트가 들뜨게 되어 일체로 시공을 할 수 없다는 점, 부설작업 또는 매립작업중에 장비에 의한 시트의 손상, 날카롭게 돌출된 매립물에 의한 손상으로 인하여 침출수가 유출되면 무방비 상태로 침출수 유출에 따른 지반붕괴, 사면붕괴로 지하수의 오염, 토양의 오염등 주변환경에 대하여 2차오염을 유발시키고 있는 문제점이 상존하였다.However, the sheet lining method and the compaction method cannot obtain ground reaction force that can support a large amount of load, and the slope is impossible to install stably, so that the slope may collapse. In particular, if the poor adhesion of the sheet at the joint, the surface of the lower clay layer is not smooth, the sheet will be lifted and cannot be integrally constructed, the sheet may be damaged by equipment during laying or reclamation work, When leachate is leaked due to damage, there is a problem that causes secondary pollution to the surrounding environment such as soil collapse, groundwater contamination, soil pollution due to leachate leakage without defense.

또한, 도1b에서와 같이 현장 토질여건이 작업장비의 출입이 불가능할 정도의 연약지반으로 이루어져 있어, 연약한 기초지반의 지내력을 향상시키고, 또한 차수보강층의 인장강도를 증대시켜 지반을 안정시키기 위한 수단으로써 현장토를 이용하여 여기에 시멘트 및 고화제를 혼합교반시킨 개량토를 50㎝두께의 지반개량층(6)과 기초보강부(8)에 포설 고화처리하고, 지반개량층(6)상부로 20㎝의 차수막보강층(7)을 포설하여 고화처리시키는 표층고화처리공법을 구축시공한 바 있다.In addition, as shown in FIG. 1B, the soil condition of the site is made of soft ground such that it is impossible to access the work equipment, and as a means to stabilize the ground by improving the bearing strength of the soft foundation ground and increasing the tensile strength of the reinforcement layer. Improved soil, which was mixed and stirred with cement and hardener, was installed on the soil improving layer 6 and foundation reinforcing part 8 having a thickness of 50 cm by using soil soil. A surface layer solidification treatment method for laying and solidifying a cm-order reinforcement layer 7 has been constructed.

그러나, 이는 폐기물투기고 11m의 매립하중에 적당한 정도로서 40m의 대규모 매립하중인 경우, 매립적재하중이 바닥층에 전면분포됨으로 인하여 이를 지지하는 지반개량층(6)과 차수보강층(7)이 인장응력을 받게 되어 지반개량층의 자체침하 및 함몰현상이 발생될 우려가 있고, 과다침하시 사면과 바닥면의 경계면 하부와, 바닥면의 중앙부에서 전단파괴등이 발생할 가능성이 많아 기초보강부(8)로 보강한 공법으로 시공하였으나, 이러한 공법으로서는 대규모의 매립하중을 충분하게 지지할 수 없으며, 또한 보강층의 인장강도도 충분치 않아 구조적으로 불안정한 문제점을 갖고 있었다.However, this means that the landfill layer (6) and the order reinforcement layer (7) supporting the ground load are distributed to the bottom layer when the landfill load is distributed to the bottom layer. There is a possibility of self-sedimentation and depression of the ground improvement layer, and the shear reinforcement is likely to occur in the lower part of the interface between the slope and the bottom surface and in the middle of the floor during oversettling. Although it was constructed by the reinforced method, such a method could not sufficiently support a large landfill load, and also had a problem of structural instability due to insufficient tensile strength of the reinforcing layer.

또한, 여기에서 도시하지는 않았으나 폐기물매립장 공사에서 적용되었던 매립장을 구축함에 있어, 사면불안정과 구조물의 전단파괴가 발생될 우려가 있는 전면벽과 바닥층의 경계면 하부에 별도의 기초보강부를 먼저 구축하고, 또한 기초층 하부에 종방향 180-200m, 횡방향 80-100m의 간격으로 단면 2m×2m의 콘크리트 지중보강보를 설치하고, 그 위에 기초층을 성형하고 토목섬유를 부설한 다음, 그 상부에 현장토를 이용한 개량토에 의해 보강층, 차수층 및 고밀도 폴리에틸렌(HDPE)층을 연속적으로 층을 형성시킨 구조의 표층고화처리방식을 채택하고 있다.In addition, in the construction of a landfill site, which is not shown here, but was applied in the construction of a landfill site, a separate foundation reinforcement unit is first constructed under the boundary between the front wall and the bottom layer, which may cause slope instability and shear failure of the structure. Under the foundation layer, install a concrete underground reinforcement with a cross section of 2m × 2m at intervals of 180-200m in the longitudinal direction and 80-100m in the transverse direction, and form the foundation layer and lay the geotextiles on it. The surface layer solidification method of the structure which formed the reinforcement layer, the order layer, and the high density polyethylene (HDPE) layer continuously by the improved soil used was adopted.

이러한 방식은 지중보강보를 기초층 하부에 설치함으로써 구조적인 면에서 안정성을 갖고 있기는 하나, 지중보강보의 간격이 비교적 크므로 매립하중을 지지하는 분포지역이 넓고, 또한 시공기간이 길며, 건설경비도 크게 소요되므로 비경제적인 측면을 갖고 있다.This method is structurally stable by installing underground reinforcement under the foundation layer, but because the distance of underground reinforcement is relatively large, the distribution area supporting the landfill load is wide, the construction period is long, and construction cost It also takes a large amount of money and has an uneconomical aspect.

한편, 매립과정에서 작용하는 각종 상재하중으로부터 지반의 국부적인 침하(함몰등)를 방지하고 침출수의 배수기능을 유지하며, 작업성과 장비의 주행성을 확보하기 위하여 원지반을 차수막과 차수막보호층의 다층의 고화처리층으로 이루어진 연약지반을 개량하는 표층고화처리공법을 시공한 바 있다.On the other hand, in order to prevent the local settlement of the ground (depression, etc.) from various loads acting in the process of reclamation, to maintain the drainage function of leachate, and to secure the workability and running of the equipment, The surface layer solidification treatment method for improving the soft ground composed of the solidification layer has been constructed.

상기 표층고화처리방법에 의한 시공에서 일부 미세한 균열현상이 발생하였으며, 이는 배합비, 개량토의 혼합교반정도, 고화제의 특성, 현장토질등의 시공여건에 의하여 결정되어지기 때문인 것으로 보여진다. 그러나, 크랙발생은 침출수의 유출을 가져오게 되고, 결과적으로 부등침하의 현상으로 이어지므로 이에 대한 대책이 필요하게 되었다.Some fine cracking occurred during the construction by the surface-solidification treatment method, which is considered to be determined by the construction conditions such as the mixing ratio, the degree of mixing and mixing of the improved soil, the characteristics of the hardening agent, the site soil. However, crack generation leads to the outflow of leachate and consequently leads to the phenomenon of inequality. Therefore, countermeasures are required.

이와 같이 종래의 연약지반상에 설치되는 구조물, 즉 폐기물매립장 구조물에 있어서 다음과 같은 문제점이 발생하였다.Thus, the following problems occur in the structure installed on the conventional soft ground, that is, the landfill structure.

첫째, 시트라이닝공법에 의한 차수구조물을 시공시, 점토층이 시트 상하부에 포설되어지나, 대규모의 상재하중을 지지할 만한 지반반력을 확보할 수 없는 문제점과, 점토층위에 부설되는 시트는 1-2㎜두께로서 재질 자체적인 문제로 인장강도가 약하다는 점, 시공상의 문제로 시트가 부설되는 표면이 평활하지 않으면 일체시공이 되지 않는다는 점, 시트간 접합부의 접착불량, 작업장비나 예리한 매립물에 의한 시트의 파손등으로 누수가 발생하면 차수구조물의 주위환경에 악영향을 끼칠 가능성이 크다는 점과,First, when constructing the order structure by the sheet lining method, the clay layer is installed on the upper and lower parts of the sheet, but there is a problem that it is not possible to secure the ground reaction force to support a large load of materials, and the sheet laid on the clay layer is 1-2 mm. Its thickness is weak due to the material itself, the surface is not smooth due to construction problems, and it is not possible to install it completely. The poor adhesion between the joints between sheets, the work equipment or the sharp landfill If water leakage occurs due to breakage, it is likely to adversely affect the surrounding environment of the order structure.

둘째, 상기의 표층고화처리공법으로 차수구조물을 시공시, 대규모의 상재하중을 지지할 만한 충분한 지반반력을 확보하기가 곤란하며, 특히 바닥면 전체에 걸쳐 상부 적재하중을 분포시킴으로써 하중이 집중되어 지반개량층에 인장응력이 발생되므로 부등침하 또는 함몰될 우려가 있어, 이러한 경우 차수층등의 전단파괴로 인하여 침출수의 유출이 발생되고, 또한 매립사면의 불안정으로 차수구조물의 기능을 제대로 수행할 수 없다는 점과,Second, it is difficult to secure sufficient ground reaction force to support large loads when constructing the order structure by the above-mentioned surface solidification treatment method, and in particular, the load is concentrated by distributing the upper load load over the entire floor surface. Since tensile stress is generated in the improved layer, there is a risk of inequality or sinking. In this case, leachate flows out due to shear failure of the ordered layer, and inability of the order structure to function properly due to instability of the buried slope. and,

세째, 시공완료후 어느 부분에서 균열 및 누수 등의 하자가 발생하였는지 조차 파악하기가 곤란하고 완전한 보수가 어렵다는 점에 있어서 구조적으로 근본적인 문제해결이 요구되고 있다.Third, it is difficult to identify where the cracks and leaks, such as after the completion of the construction, it is difficult to determine the structural problem fundamentally in that it is difficult to completely repair.

그러므로 연약지반에 구축되는 구조물은 계획 및 설계단계에서 정밀한 현장조사를 통해 현장토질여건에 따른 사전준비를 철저히 해야 하며, 시공단계에서도 현장여건에 따른 제방 및 운반도로 성토시 사면붕괴방지등의 대책과, 또한 매립장 조성단계시 매립장 현장내에서의 불도져·로울러 및 굴삭기등의 중장비와 각종 운반차량등 대형작업차량의 적재하중에 의한 영향도 고려하여야 한다.Therefore, the structures constructed on the soft ground should be thoroughly prepared according to the site soil conditions through precise site surveys at the planning and design stages.In the construction stages, measures such as prevention of slope collapse during embankment and transportation roads will be carried out. In addition, the impact of heavy loads such as bulldozers, rollers, and excavators and heavy duty vehicles such as various transport vehicles on the site of the landfill site should be considered during the construction of the landfill site.

또한, 매립장조성후 매립단계에서 최종적인 복토작업 완료시까지 폐기물 운반차량의 교통하중증가, 매립되는 폐기물 매립하중에 의한 상재하중의 증가등으로인하여 원지반의 침하 및 매립층 자체의 침하현상이 발생되어 사면 및 바닥면의 안정성이 요청되며, 매립작업과정에 있어서 쓰레기의 비산, 악취발생등의 환경오염과 화재발생 및 안전관리등도 검토되어야 한다.In addition, settlement of the ground and settlement of the landfill layer itself occur due to the increase in traffic load of the waste transporting vehicle and increase of load of the landfill due to the landfill waste from the landfill stage to the completion of the final cover work. The stability of the floor is required, and during the landfilling process, environmental pollution such as scattering of trash and odors, fire and safety management should be considered.

본발명의 폐기물매립장 구조물은 셀구조의 격자형 구조체를 이용하여 다수의 독립된 셀공간부들을 형성시킴으로써 이들 격자형 구조체들을 단계적으로 전면벽과 바닥층의 내부골조로 매설시키고, 이 격자형 구조체에 형성된 다수의 셀공간부들에 콘크리트, 고화토 또는 입상골재를 위치에 따라 선택적으로 충진시킴으로써 상부하중에 대한 지지력을 향상시키고, 또한 각각 바닥층과 전면벽 구조부의 지지강도를 높히도록 일체화시킨 구조물을 구축하고, 또한 침출수의 원활한 배수처리를 기하는 방법을 통하여 달성된다.The landfill structure of the present invention forms a plurality of independent cell space portions by using a cell grid structure to gradually bury these grid structures into the inner frame of the front wall and the bottom layer, By selectively filling concrete, solidified soil or granular aggregates in the cell spaces according to the position, it is possible to build a structure integrated to increase the bearing capacity of the upper load and to increase the supporting strength of the bottom layer and the front wall structure, respectively. It is achieved through a method for smooth drainage of leachate.

특히, 본발명은 대규모의 폐기물매립장건설에 적합한 형태로써 매립시 운반차량의 교통하중과 중장비를 이용한 작업시의 제하중, 매립후 매립하중의 증가 및 매립완료후의 적재하중의 장기 적재에 따라 발생할 수 있는 부등침하 및 침출수의 유출을 방지하기 위하여 전면벽을 연속적으로 구축하여 바닥층과 일체의 구조물이 되게 하여 이를 구조역학 측면에서 구획별로 상재하중을 분산지지하고 침출수를 차단 집수유도하는 방식을 채택함으로써 달성된다.In particular, the present invention is suitable for the construction of large-scale landfills, which may occur due to the transportation load of transport vehicles at the time of landfilling, unloading during work using heavy equipment, increase of landfill load after landfill, and long-term loading of landfill after completion of landfill. In order to prevent unequal sedimentation and leakage of leachate, the front wall is continuously constructed to form an integrated structure with the bottom layer. Is achieved.

즉, 본발명은 연약지반을 개량함에 있어서, 원지반의 현장토를 시멘트와 고화제등을 혼합교반하여 조성한 고화토에 의해 포설성형되는 바닥층과 단위구역별로 경계면을 형성하는 전면벽을 격자형 구조체에 의하여 콘크리트벽체부를 형성시키고, 전면벽의 하단부와 바닥층을 일체화시킨 구조물을 구축함으로써 기초토질역학 측면에서 파일·줄기초 또는 온통기초의 기능과 구조역학 측면에서 보 및 기둥의 역할을 하는 전면벽과 바닥층을 연속적으로 일체로 성형시켜서 지지강도를 더욱 향상시키는 수단으로써 셀구조의 격자형 구조체를 이용함으로써 폐기물매립장을 구축하게 된다.That is, in the present invention, in the improvement of the soft ground, the bottom layer formed by the solidified soil formed by mixing and stirring cement and hardener, and the front wall which forms the boundary surface for each unit area are formed in the lattice structure. By forming a concrete wall part and constructing a structure in which the lower part of the front wall and the bottom layer are integrated, the front wall and the floor layer serving as beams and columns in the function and structural dynamics of piles, stems or whole foundations in terms of basic soil mechanics. The waste landfill site is constructed by using the lattice structure of the cell structure as a means of further improving the supporting strength by continuously forming a single body.

따라서, 본발명의 목적은 파일·줄기초·보 및 기둥의 역할을 하는 전면벽과 바닥층을 연속적으로 일체로 성형시킴으로써 지반반력을 향상시키고, 또한 상재하중을 단위구역별로 분산지지시켜 부등침하를 방지함과 동시에 일체화된 구조물로 성형시킴으로써 구조적인 측면에서 구조물의 안정성을 기하는 폐기물 매립장의 구조물 및 그 구축방법을 제공하는데 있다.Therefore, the object of the present invention is to improve the ground reaction force by continuously forming the front wall and the bottom layer, which act as piles, stem foundations, beams, and pillars, and prevent the inequality by dispersing the loads by unit area. In addition, the present invention provides a structure of a waste landfill and a method of constructing the same by forming a structure into an integrated structure, thereby ensuring stability of the structure.

본발명의 다른 목적은 격자형 구조체에 일정위치의 셀공간부들에 자갈등 통수성의 입상골재를 충진시켜 폐기물내로 침투하는 우수 및 폐기물로부터 발생하는 침출수를 일정하게 집수유도하는 방식을 채택하여, 그 배수처리가 원활하도록 한 폐기물 매립장의 구조물 및 그 구축방법을 제공하는데 있다.Another object of the present invention is to fill the lattice-like structure with the cell space parts of a certain position, such as gravel, water-permeable granular aggregates, and adopts a method of uniformly inducing leachate from the wastewater and rainwater that penetrates into the waste. The present invention provides a structure of a waste landfill and a method of constructing the waste landfill to facilitate drainage treatment.

본발명의 또다른 목적은 단위부재들로 이루어진 격자형 구조체의 연결조립시공이 용이하여 시공성이 양호한 폐기물 매립장의 구조물 및 그 구축방법을 제공하는데 있다.Still another object of the present invention is to provide a structure and method for constructing a waste landfill having easy construction by connecting and constructing a grid-like structure composed of unit members.

도1a는 종래기술의 시트라이닝공법에 의한 연약지반을 개량시킨 단면도Figure 1a is a cross-sectional view improved the soft ground by the sheet lining method of the prior art

도1b는 종래기술의 표층고화처리공법에 의한 연약지반을 개량시킨 단면도Figure 1b is a cross-sectional view of improved soft ground by the surface layer solidification method of the prior art

도2는 본발명에 따른 셀구조의 격자형 구조체를 이용한 폐기물매립장의 시공예를 나타내는 단면도2 is a cross-sectional view showing a construction example of a waste landfill site using a lattice structure of a cell structure according to the present invention.

도3a 내지 도3C는 본발명에서 적용하는 셀구조의 격자형 구조체들의 사시도3A to 3C are perspective views of the lattice structure of the cell structure applied in the present invention

도4a는 도2의 A부분의 확대단면도4A is an enlarged cross-sectional view of portion A of FIG.

도4b는 도2의 B부분의 확대단면도4B is an enlarged cross-sectional view of the portion B of FIG.

도4c는 도2의 C부분의 확대단면도4C is an enlarged cross-sectional view of part C of FIG.

도5는 고화토층의 일정위치에 배수로를 형성한 고화구조의 사시도5 is a perspective view of a solidified structure in which a drainage path is formed at a predetermined position of the solidified soil layer;

도6은 고화토층의 상층부에 배수층을 형성한 또다른 고화구조의 사시도6 is a perspective view of another solidification structure in which a drainage layer is formed on an upper layer of the solidified soil layer;

도7은 도5의 일부를 확대 도시한 평면도FIG. 7 is an enlarged plan view of a portion of FIG. 5; FIG.

도8은 도6의 측단면도Figure 8 is a side cross-sectional view of Figure 6

< 도면의 주요부분에 대한 부호의 설명 ><Description of Symbols for Major Parts of Drawings>

10:지반 20:차수막층 30:격자형 구조체10: ground 20: barrier layer 30: lattice structure

34:통공 40:바닥층 41:고화토층34: through-hole 40: bottom layer 41: solidified soil layer

42:배수층 43:배수로 44:집수정42: drainage layer 43: drainage 44: catchment

50:전면벽 51:콘크리트기초부 52:콘크리트벽체부50: front wall 51: concrete foundation part 52: concrete wall part

53:배수통로 60:폐기물53: drainage passage 60: waste

본발명은 지반을 일정깊이로 굴토한 바닥면에 부직포매트를 부설하여 차수막층을 형성하고, 상기 차수막층 상부에 굴토된 현장토와 시멘트 및 고화제등을 혼합교반하여 조성된 개량토를 바닥층과 전면벽에 포설하여 고화성형시키는 폐기물매립장 구조물에 있어서,According to the present invention, a nonwoven fabric mat is formed on the bottom surface of the ground which has excavated the ground to a certain depth to form a barrier layer, and the improved soil formed by mixing and stirring the soil soil and cement and the hardener excavated on the top of the barrier layer and the bottom layer. In the landfill structure that is installed on the front wall and solidified,

굴토된 지반(10)의 외곽부 위치에 복수열의 격자형 구조체(30)들을 일정높이로 부설하여 콘크리트를 타설하여 콘크리트 기초부(51)를 형성하고, 이 기초부의 상측으로 일정높이까지 단계별로 격자형 구조체(30)들을 복수열로 조립부설하여 콘크리트를 타설하여 콘크리트 벽체부(52)를 형성하는 전면벽(50)과,Laying a plurality of rows of lattice-like structures 30 at a certain height in the outer position of the excavated ground 10 to form concrete foundation 51 by placing concrete, lattice step by step up to a certain height above the foundation A front wall 50 for assembling and placing concrete structures 30 in a plurality of rows to form concrete wall portions 52 by pouring concrete;

상기 콘크리트 기초부(51)로부터 굴토된 지반(10)의 바닥 전체에 걸쳐 부직포매트를 부설한 차수막층(20)과, 상기 차수막층 상측에 격자형 구조체(30)를 복수열로 부설하여 최하측은 고화토층(41)을 형성하고, 그 상측은 배수층(42)을 형성한 바닥층(40)으로 구성시킴을 그 기술구성상의 특징으로 한다.The bottom layer is formed by placing a plurality of rows of lattice-shaped structures 30 in which a non-woven fabric mat is laid over the entire bottom of the ground 10 excavated from the concrete foundation 51 and a lattice structure 30 in an upper portion of the layer. It is characterized by the technical configuration that the solidified soil layer 41 is formed, and the upper side thereof is composed of the bottom layer 40 having the drainage layer 42 formed thereon.

이하, 본발명의 기술구성을 도면을 참조하여 구체적으로 설명한다.Hereinafter, the technical configuration of the present invention will be described in detail with reference to the drawings.

도2는 폐기물 매립장의 시공에 본발명의 셀구조의 격자형 구조체가 사용되어 구축되어진 시공예를 보여준다.2 shows a construction example in which the lattice structure of the cell structure of the present invention is used in the construction of a waste landfill.

도2에 도시되는 본 시공예에서 전면벽(50)의 셀구조의 격자형 구조체(30)는 복수열로서 배치되며 그 일부는 바닥층(40)의 셀구조의 격자형 구조체(30)에 일체로 연결되고, 다른 일부는 수평셀구조의 격자형 구조체의 상측으로 꺾여놓인 구조로 폐기물 매립장의 골조부를 형성하여 구축된 상태를 보여 주고 있다.In the present construction example shown in FIG. 2, the cell-like lattice structure 30 of the front wall 50 is arranged in a plurality of rows, a part of which is integral with the cell-like lattice structure 30 of the bottom layer 40. The other part is connected to the upper part of the horizontal cell-shaped lattice structure, and shows a state of being constructed by forming a framework of the waste landfill.

먼저, 전면벽(50)은 콘크리트 기초부(51)와 콘크리트 벽체부(52)로 단계별로 구축되어지는데, 셀구조의 격자형 구조체(30)를 복수열로 설치하여 이 구조부들의 내부골조로 이용하는데, 전면벽의 내측으로는 투수성의 입상골재를 충진시켜 배수통로(53)를 형성하고, 그이외의 대부분은 콘크리트를 타설하여 일체화시킨 구조로 형성된다.First, the front wall 50 is constructed step by step with the concrete foundation 51 and the concrete wall 52, by installing a plurality of grid structure 30 of the cell structure used as the internal frame of these structural parts To the inside of the front wall is filled with permeable granular aggregate to form a drainage passage 53, most of the other is formed of a structure in which the concrete is poured into one.

특히, 바닥층(40)과 전면벽(50)의 경계면에서의 구조적 강도를 보강하기 위하여 전면벽의 기초부를 넓게 형성하고, 그 상측의 바닥층과 전면벽이 연결되는 모서리부위에 설치되는 격자형 구조체(30)들은 서로 일체로 연결시킴으로써 전체적으로 일체화된 폐기물 매립장 구조물을 형성하도록 한다.In particular, in order to reinforce the structural strength at the interface between the bottom layer 40 and the front wall 50, the base structure of the front wall is broadly formed, and the lattice-shaped structure is installed at the corner where the bottom layer and the front wall of the upper side are connected ( 30) are integrally connected to each other to form a fully integrated waste landfill structure.

상기 바닥층(40)은 굴토된 폐기물 매립장의 지반(10)의 표면에 부직포매트를 부설하여 차수막층(20)을 형성한 후에 형성하게 되는데, 상기 바닥층(40)은 셀구조의 격자형 구조체(30)들을 복수열로 단계적으로 부설하여 격자형 구조체의 다수의 독립된 셀공간부들내로 최하측은 고화토를 충진시켜 다져서 고화토층(41)을 형성하고, 그 상측의 격자형 구조체에는 투수성의 입상골재를 충진시킨 배수층(42)을 형성시킨 구조로 형성되어 있다.The bottom layer 40 is formed after the nonwoven fabric mat is formed on the surface of the ground 10 of the burial waste landfill to form the membrane layer 20. The bottom layer 40 is a cell-shaped lattice structure 30 ) Are laid in a plurality of rows in stages to fill a plurality of independent cell space portions of the lattice structure to fill the hardened soil to form a solidified soil layer 41, and to fill the upper lattice structure with permeable granular aggregate. It is formed in a structure in which the drainage layer 42 is formed.

또한, 상기 바닥층(40)은 상기 고화토층(41)의 상부에 통수가 가능한 자갈 등의 입상골재를 채워넣은 배수층(42)를 형성하여서 침출수의 배수가 가능하도록 형성되고, 전면벽(50)의 배수로(53)을 통하여 서로 통수가 가능하도록 구성됨으로서 배수처리가 원활하게 이루어진다.In addition, the bottom layer 40 is formed to allow drainage of the leachate by forming a drainage layer 42 filled with granular aggregates, such as gravel, that can pass through the top of the solidified soil layer 41, and the front wall 50 of the front wall 50. The drainage treatment is made smoothly by being configured to allow water to pass through the drainage passage 53.

이와 같이 투수성 입상골재로 채워지는 배수층(41) 및 배수로(53)는 그 상부에 매립되는 각종 폐기물에서 배출되는 침출수의 원활한 배수가 가능하도록 하여서, 폐기물의 침출수가 바닥층(40)을 뚫고 지하로 침투하여 지하수의 수질을 오염시키는 것을 방지한다.In this way, the drainage layer 41 and the drainage passage 53 filled with the permeable granular aggregate enable the smooth drainage of the leachate discharged from the various wastes embedded in the upper portion thereof, so that the leachate of the waste passes through the bottom layer 40 and goes underground. Prevents penetration and contaminates groundwater quality.

한편, 본 시공예의 바닥층은 증대되는 하중감당능력으로 인하여 많은 량의 폐기물을 적재시킬 수 있으며, 한편, 폐기물을 매립하는 소정위치의 일정높이마다 셀구조의 격자형 구조체(30)를 부설하여서, 그 상부에 매립되는 폐기물(60)의 하중을 중간에서 분산지지시키면, 어느 한쪽에서의 집중하중에 의한 부등침하 현상을 막게 되므로 폐기물 매립층의 적재층고를 높혀서 매립할 수도 있음을 밝혀둔다.On the other hand, the bottom layer of the present construction can be loaded with a large amount of waste due to the increased load carrying capacity, while laying the grid-like structure 30 of the cell structure at a predetermined height at a predetermined position for embedding the waste, If the load of the waste (60) buried in the upper portion is distributed in the middle, it is possible to prevent the uneven settlement phenomenon due to the concentrated load on either side, so that it is possible to raise the height of the loading layer of the landfill layer.

이와 같이, 셀구조의 격자형 구조체을 내부골조로 하여 고화토층(41)과 배수층(42)으로 구성되는 폐기물 매립장의 바닥층(40)은 어느 일부분에 부분적으로 커다란 집중하중을 받아도 매설되어 충진재들로 충진된 셀구조의 격자형 구조체의 일체적인 내부골조를 통하여 전체로 분산되어 지지되므로 부분적인 파손과 부등침하를 효율적으로 방지시키며, 투수성의 배수층 및 배수통로에 의하여 침출수의 원활한 배수처리를 가능케 한다.In this way, the bottom layer 40 of the waste landfill site composed of the solidified soil layer 41 and the drainage layer 42 using the lattice structure of the cell structure as an internal frame is buried and filled with the fillers even in part under a large concentrated load. Since it is distributed and supported as a whole through an integral internal framework of the cell-structured lattice structure, it effectively prevents partial breakage and uneven settlement, and enables the smooth drainage treatment of the leachate by the permeable drainage layer and the drainage passage.

여기에서 본발명에 사용되는 격자형 구조체는 단위부재들을 연결하여 하나의 구조체로써 조립되는 부재로서, 먼저, 도3a에 도시하는 바와 같은 격자형 구조체(30a)는 수직벽 중앙부에 일정한 간격으로 관통되어 통공(34)이 형성되고, 통공들 사이의 중앙부 상측에 끼움홈(35)과 이 끼움홈에 연장하여 단부에서 좌우측으로 확대된 통과홈(36)이 형성되는 기본판부재(31a)(32a)를 단위부재로 하여, 단위부재들을 가로 및 세로로 교차시켜 끼움홈(35)간에 서로 끼워져 격자형의 형태를 형성하여 다수의 독립된 셀공간부를 갖는 격자형 구조체이다.Here, the lattice structure used in the present invention is a member assembled by connecting the unit members as one structure. First, the lattice structure 30a as shown in FIG. 3A is penetrated at regular intervals in the center of the vertical wall. The through hole 34 is formed, the base plate member (31a) (32a) is formed in the upper groove in the center portion between the through hole 35 and the through groove 36 extending from the end portion to the left and right enlarged Is a unit member, and the unit members are intersected horizontally and vertically to be interposed between the fitting grooves 35 to form a lattice shape, and thus have a plurality of independent cell space portions.

또다른 형태로써 도3b에 도시하는 바와 같은 격자형 구조체(30b)는 도3a에 도시된 격자형 구조체(30a)와 유사하나, 다만 기본판부재의 하단부에 반원형의 배수홈(37)이 형성된 것이외에는 도3a의 구조와 동일하다.In another embodiment, the lattice structure 30b as shown in Fig. 3b is similar to the lattice structure 30a shown in Fig. 3a, except that a semicircular drainage groove 37 is formed at the lower end of the base plate member. Other than that is the same as the structure of FIG.

즉, 수직벽 중앙부에 일정한 간격으로 반원형의 홈(37)이 형성되고, 배수홈 사이의 중앙부 상단에 끼움홈(35)과 이 끼움홈에 연장하여 단부에서 좌우측으로 확대된 통과홈(36)이 형성되는 기본판부재(31b)(32b)를 단위부재로 하여, 단위부재들을 가로 및 세로로 교차시켜 끼움홈(35)간에 서로 끼워져 격자형의 형태를 형성하여 다수의 독립된 셀공간부를 갖는 격자형 구조체이다.That is, semicircular grooves 37 are formed at regular intervals in the center of the vertical wall, and the fitting grooves 35 and the passing grooves 36 extending from the ends to the left and right sides at the upper ends of the central portions between the drain grooves are formed. The base plate members 31b and 32b to be formed as a unit member, and the unit members are crossed horizontally and vertically to be sandwiched between the fitting grooves 35 to form a lattice shape to form a grid shape having a plurality of independent cell space portions. It is a structure.

또, 도3c에 도시하는 바와 같은 격자형 구조체(30c)는 수직벽 중앙부 하측에 일정한 간격으로 끼움공(38)이 형성되고, 그 끼움공으로부터 일정간격을 두고 수직으로 끼움홈(35)과 이 끼움홈에 연장하여 상단부에서 좌우측으로 확대된 통과홈(36)이 형성되는 기본판부재(31c)와, 기본판부재의 대략1/2크기로서 상기 기본판부재의 끼움공(38)에 끼워지는 연결부재(33)와, 상기 기본판부재의 대략1/2크기로서 기본판부재의 단부에 형성되는 구조와 유사한 끼움홈과 통과홈이 형성된 접속지지부재(32c)를 1세트로 하여, 단위부재들을 가로 및 세로로 교차시켜 서로 끼워져 격자형의 형태를 형성하여 다수의 독립된 셀공간부를 갖는 격자형 구조체이다.In addition, in the lattice structure 30c as shown in Fig. 3C, fitting holes 38 are formed at regular intervals below the center of the vertical wall, and the fitting grooves 35 are vertically spaced at regular intervals from the fitting holes. The base plate member 31c, which extends to the fitting groove and extends from the upper end to the left and right, is formed, and is fitted into the fitting hole 38 of the base plate member as approximately 1/2 of the base plate member. The unit member includes one connection member 33 and one connection support member 32c having a fitting groove and a passage groove similar to the structure formed at the end of the base plate member as approximately 1/2 of the base plate member. A grid structure having a plurality of independent cell space portions is formed by intersecting them horizontally and vertically to form a grid shape.

여기에서 조립된 연결부재와 접속지지부재간에는 일정한 간격의 상하간격(s)을 유지하게 된다. 이 상하간격(s)을 유지하도록 형성된 이유는 수직으로부터 받게 되는 충격이나 하중을 흡수하여 분산지지하기 위한 것이며, 또한 입상골재가 충진되어 배수통로로서의 기능을 하게 하기 위함이다.Here, the assembled upper and lower spaces (s) of a predetermined interval are maintained between the connection member and the connection support member. The reason why it is formed to maintain the vertical space s is to absorb and support the impact or load received from the vertical, and also to make the granular aggregate fill and function as a drainage passage.

상기에서 설명한 격자형 구조체(30)는 통공, 통과홈 또는 상하간격이 형성된 것중에서 어느 하나가 형성된 것을 선택적으로 사용하여 내부골조로 매설시켜 사용하나, 상기 바닥층 또는 전면벽에 부설되는 격자형 구조체들은 기본판부재, 접속지지부재 또는 연결부재의 형태 또는 재질은 다양하게 변경되어 실시될 수 있다.The above-described lattice-shaped structure 30 may be used by embedding it into an internal frame by selectively using any one formed of a through hole, a passing groove, or a vertical gap, but the lattice-shaped structures attached to the bottom layer or the front wall are The shape or material of the base plate member, the connection support member or the connection member may be variously changed.

이러한 격자형 구조체는 전체적으로 다수의 독립된 셀들을 형성함으로써 셀구조로 이루어진 격자형 구조체를 형성하게 되어 보강 지지골조로서의 기본적인 기능을 가지게 되며, 이 독립된 셀구조의 크기는 정방형으로 이루어져 있으나, 직사각형등 공간부의 크기를 서로 달리하도록 구성하여도 좋다.Such a lattice structure forms a lattice structure made of a cell structure by forming a plurality of independent cells as a whole, and thus has a basic function as a reinforcement support frame. The size of the independent cell structure is square, The size may be configured to be different from each other.

뿐만 아니라, 본발명의 격자형 구조체는 다수의 독립된 셀공간부의 구조로 형성됨으로써, 필요에 따라 선택된 격자형 구조체의 셀공간부들은 배수통로 등으로 활용할 수가 있는 등 다양한 이점을 제공한다.In addition, the lattice structure of the present invention is formed by the structure of a plurality of independent cell space portions, thereby providing various advantages such that the cell space portions of the lattice structure selected as needed can be utilized as a drainage passage.

즉, 격자형 구조체에 형성되는 다수의 셀공간부들에 투수가 가능한 입상골재등의 채움재를 투입함으로써 배수통로로서의 기능을 갖게 되나, 단순히 콘크리트 또는 고화토를 충진시키게 되면 인접한 셀공간부들과 일체로 연결하여 구조강도를 향상시키는 지반강화용으로 이용될 수 있음을 밝혀 둔다.In other words, by inserting a filling material such as granular aggregate that is permeable to a plurality of cell spaces formed in the lattice structure, it has a function as a drainage passage, but when it is simply filled with concrete or solidified soil, it is connected integrally with adjacent cell spaces. It can be used for the ground strengthening to improve the structural strength.

상기 격자형 구조체는 1세트를 단위부재들로 하여 부피를 줄인 상태로 운반이 가능하며, 1세트의 단위부재들의 조립 작업이 용이함은 물론, 자체적으로 지지보강골조로서 견고성을 주는 한편, 도시하지는 않았으나, 일정한 구역의 격자형 구조체들을 볼트너트 또는 연결끈등의 연결수단에 의하여 하나의 구조체로 연결조립함으로써 보강골조로서 일체화된 구조체로서 더욱 견고한 골조로 설치하게 되는 것이다.The lattice structure can be transported in a state of reduced volume by using one set as unit members, and the assembly work of one set of unit members is easy, as well as providing rigidity as a supporting reinforcing frame by itself, while not shown. By assembling and connecting the lattice-shaped structures of a certain area into one structure by connecting means such as bolt nuts or connecting strings, the structure is integrated as a reinforcing frame and is installed as a more rigid frame.

이러한 폐기물 매립장의 골조부는 바닥층(40)과 전면벽(50)이 일체로 시공되므로, 매립되는 폐기물(60)로 인하여 전면벽(50)이 전도되거나 외측으로 밀리는 것을 방지하는 데에 도움이 된다.Since the bottom layer 40 and the front wall 50 are constructed integrally with the waste landfill, it helps to prevent the front wall 50 from being turned over or pushed out due to the waste 60 being buried.

한편, 도5 및 도6의 도시와 같이, 바닥층(40)에 형성되는 배수층(41)들은 바닥층(40)의 상면에 형성되는 격자형 구조체(30)내부로 입상골재를 충진시켜서 된 배수층(41)을 통하여 바닥층의 소정위치에 위치한 집수정(44)쪽으로 집수유도시키는 구조를 나타내고 있다.On the other hand, as shown in Figures 5 and 6, the drainage layer 41 formed in the bottom layer 40 is a drainage layer 41 by filling the granular aggregate into the lattice structure 30 formed on the upper surface of the bottom layer 40. It is shown a structure that induces the collection to the water collecting well 44 located at a predetermined position of the bottom layer through the ().

즉, 상기 바닥판(40)과 전면벽(50)의 내측으로 형성된 배수로(43)(53)들은 바닥층(40)의 배수층 또는 배수로를 통하여 소정위치에 형성된 집수정(44)으로 연통되며, 상기 집수정은 외부로 관통되는 배수통로로 연결되어 폐기물 매립장의 외부로 배수시키게 된다.That is, the drainage passages 43 and 53 formed inwardly of the bottom plate 40 and the front wall 50 communicate with the sump well 44 formed at a predetermined position through the drainage layer or the drainage passage of the bottom layer 40. The sump is connected to the drainage passage which penetrates to the outside to drain the waste landfill.

한편, 도5 및 도7은 상기 고화토층(41)을 격자형 구조체의 일부분의 셀들에만 형성하고, 다른 일부분의 셀들에는 통기와 배수가 가능한 자갈 등의 입상골재를 채워넣은 배수로(43)를 형성하는 부분고화구조가 예시되어 있다.Meanwhile, FIGS. 5 and 7 form the solidified soil layer 41 only in the cells of a part of the lattice structure, and in another part of the cells, a drainage path 43 in which granular aggregates such as gravel and aeration and drainage are filled. A partial solidification structure is illustrated.

즉, 상기 고화토층(40)은 상기 격자형 구조체의 일정부분의 셀들에만 형성하고, 다른 부분의 셀들에는 통기와 배수가 가능하도록 자갈 등의 입상골재를 채워넣은 배수로(43)를 형성한다.That is, the solidified soil layer 40 is formed only in cells of a certain portion of the lattice structure, and forms a drainage passage 43 in which granular aggregates such as gravel are filled in cells of other portions to allow aeration and drainage.

이러한 부분고화 처리공법은 일부분의 셀공간부들에 형성되는 배수로(43)를 통하여 공기와 수분의 유통이 가능하게 되는 효과를 가지며, 지반의 강도를 더욱 견고하게 지지해 줄 필요가 있는 경우에 적용된다.This partial solidification treatment method has the effect that the air and moisture can be distributed through the drainage passages 43 formed in the part of the cell space, and is applied when it is necessary to more firmly support the strength of the ground. .

한편, 도6 및 도8에서 도시하는 바와 같이, 상기 격자형 구조체는 2층으로 적층하되, 하층의 격자형 구조체에는 고화토층(40)을 일체로 형성시키고, 상층의 격자형 구조체에는 배수층(50)을 형성시키는 것도 가능하다.6 and 8, the lattice structure is laminated in two layers, but the solidified soil layer 40 is integrally formed in the lower lattice structure, and the drainage layer 50 is formed in the upper lattice structure. It is also possible to form).

즉, 상기 바닥층(40)은 2중의 고화토층(41)으로 형성되어지되, 그 상측 격자형 구조체(30)의 셀공간부들에는 자갈등의 입상골재를 충진시켜 배수층(41)을 형성하여 폐기물의 침출수를 배수시키는 상태를 나타내고 있다. 이 경우는 지반이 견고한 경우에 적용되는 것으로 배수처리를 더욱 원활하게 할 필요가 있는 경우에 적용된다.That is, the bottom layer 40 is formed of a double solidified soil layer 41, the cell space portions of the upper lattice-shaped structure 30 is filled with granular aggregates such as gravel to form a drainage layer 41 to The state which drains leachate is shown. This case is applied when the ground is firm, and it is applied when it is necessary to make drainage smoother.

상기 바닥층(40)은 약간의 경사구배를 가짐으로써 집수정(44)쪽으로 침출수를 집수유도 및 배수를 원활하게 하도록 한다.The bottom layer 40 has a slight inclination gradient to facilitate the induction and drainage of the leachate toward the sump 44.

본발명의 폐기물매립장을 구축하는 방법에 대하여 설명한다.A method for constructing a waste landfill of the present invention will be described.

지반을 일정깊이로 굴토한 바닥면에 부직포매트를 부설하여 차수막층을 형성하고, 상기 차수막층 상부에 굴토된 현장토와 시멘트 및 고화제등을 혼합교반하여 조성된 개량토를 바닥층과 전면벽에 포설하여 고화성형시키는 폐기물매립장의 구축방법에 있어서,A nonwoven fabric mat is laid on the bottom surface of the ground which has excavated the soil to a certain depth to form a water barrier layer, and the improved soil formed by mixing and stirring the soil soil, cement and hardener, which was excavated on the top of the water barrier layer, is applied to the bottom layer and the front wall. In the method of constructing a landfill site for laying and solidifying,

굴토된 지반의 외곽부 위치에 복수열의 격자형 구조체를 일정높이로 부설하여 콘크리트를 타설하여 콘크리트 기초부(51)를 형성한 후, 상기 콘크리트 기초부의 상측으로 일정높이까지 단계별로 격자형 구조체를 복수열로 조립부설하여 콘크리트를 타설하여 콘크리트 벽체부(52)를 형성하는 단계로 전면벽(50)을 시공한 후,Laying a plurality of rows of lattice structure at a certain height in the outer position of the excavated ground to form a concrete foundation 51 by placing concrete, and then a plurality of lattice structures in a step up to a certain height above the concrete foundation portion After assembling and laying concrete in rows to form the concrete wall part 52, the front wall 50 is constructed,

상기 콘크리트 기초부로부터 굴토된 지반바닥상에 차수막층을 부설하고, 그 차수막층 상측으로 복수층의 격자형 구조체를 부설하여 하측 구조체에는 고화토를 충진시켜 고화토층(41)을 형성한 후, 상기 상측 구조체에 입상골재를 충진시켜 배수층(42)을 형성하는 단계로 바닥층(40)을 시공함으로써 구축되어진다.After placing a layer on the ground bottomed from the concrete foundation, and laying a plurality of lattice-like structures above the layer, and filling the lower structure with solidified soil, a layer of soil layer 41 is formed. The granular aggregate is filled into the upper structure to form the drainage layer 42, thereby constructing the bottom layer 40 by construction.

상기 구축방법을 통하여 바닥층과 전면벽의 어느 일부분에 부분적으로 커다란 집중하중을 받아도 격자형 구조체의 내부 매설골조를 통하여 전체로 분산되어서 지지되므로 부분적인 파손을 효율적으로 방지하며, 연약지반의 지지력을 균등하게 향상시키므로 연약지반의 부등침하를 효율적으로 방지하는 효과를 가진다.Through the above construction method, even if a large concentrated load is partially applied to any part of the bottom layer and the front wall, it is supported by being distributed as a whole through the internal buried framework of the lattice structure, thereby effectively preventing partial breakage and equally supporting the soft ground. Therefore, it has an effect of effectively preventing inequality of soft ground.

이와 같이 구성된 본발명은 첫째, 토질역학 측면에서 파일·줄기초의 역할과 구조역학측면에서 보 및 기둥의 역할을 하는 전면벽과 바닥층이 연속적으로 일체로 성형됨으로써 그 상부에 매립되는 대규모의 폐기물등 매립하중으로부터 구조물의 안정성을 확보할 수가 있으며, 또한 매설된 전면벽에 의하여 원지반의 측방이동을 제한하며, 한편 상재하중을 단계적으로 분산지지시켜 부등침하를 방지하여 줌으로써 구조적인 측면에서 구조물의 안정성을 제공하는 효과가 있다.The present invention configured as described above is, firstly, a large-scale waste, which is buried in the upper part by continuously forming the front wall and the bottom layer which act as piles and stems in terms of soil mechanics and beams and columns in structural mechanics. The stability of the structure can be secured from the buried load, and the buried front wall restricts the lateral movement of the ground, and also prevents uneven settlement by distributing the phase loads step by step to prevent the stability of the structure. It is effective to provide.

둘째, 바닥층에 고화토층과 입상골재로 채워진 배수층을 형성하고 전면벽의 내측으로 배수통로를 형성함으로써, 침출수가 외부로 유출되는 것을 방지하고, 또한 바닥층의 배수로를 통하여 침출수를 집수유도하는 방식으로 구축됨으로써 배수처리가 원활하게 이루어지며, 또한 바닥층에 별도의 배수통로관을 매설할 필요가 없는 경제적인 효과가 있다.Second, by forming a drainage layer filled with a solidified soil layer and granular aggregate in the bottom layer and forming a drainage passage inward of the front wall, the leachate is prevented from leaking to the outside and the leachate is guided through the drainage passage of the bottom layer. As it is constructed, the drainage treatment is made smoothly, and there is also an economic effect that does not require a separate drainage pipe in the bottom layer.

셋째, 본발명은 단위부재들로 이루어진 격자형 구조체의 연결조립이 용이하여 시공성이 양호할 뿐만 아니라, 공사기간을 단축시켜 주는 효과도 있다.Third, the present invention is easy to connect and assemble the grid-like structure consisting of unit members not only good construction, but also has the effect of shortening the construction period.

상기에서 설명한 시공예외에도 본발명의 특허청구범위의 기술적범위를 벗어나지 않는 한 본발명은 위와 같은 기술적사상을 가진 범주내에서 이 기술분야에서 통상의 지식을 가진 자가 용이하게 변경하여 실시할 수 있으며, 이러한 정도의 변경은 본 발명의 기술범주에 속하는 것임을 밝혀둔다.Except for the above-described construction exceptions, the present invention can be easily changed and implemented by those skilled in the art without departing from the technical scope of the claims of the present invention. It is to be noted that changes in this degree belong to the technical category of the present invention.

Claims (10)

지반을 일정깊이로 굴토한 바닥면에 부직포매트를 부설하여 차수막층을 형성하고, 상기 차수막층 상부에 굴토된 현장토와 시멘트 및 고화제등을 혼합교반하여 조성된 개량토를 바닥층과 전면벽에 포설하여 고화성형시키는 폐기물매립장 구조물에 있어서,A nonwoven fabric mat is laid on the bottom surface of the ground which has excavated the soil to a certain depth to form a water barrier layer, and the improved soil formed by mixing and stirring the soil soil, cement and hardener, which was excavated on the top of the water barrier layer, is applied to the bottom layer and the front wall. In the landfill structure to install and solidify, 굴토된 지반(10)의 외곽부 위치에 복수열의 격자형 구조체(30)들을 일정높이로 부설하여 콘크리트를 타설하여 콘크리트 기초부(51)를 형성하고, 이 기초부의 상측으로 일정높이까지 단계별로 격자형 구조체(30)들을 복수열로 조립부설하여 콘크리트를 타설하여 콘크리트 벽체부(52)를 형성하는 전면벽(50)과,Laying a plurality of rows of lattice-like structures 30 at a certain height in the outer position of the excavated ground 10 to form concrete foundation 51 by placing concrete, lattice step by step up to a certain height above the foundation A front wall 50 for assembling and placing concrete structures 30 in a plurality of rows to form concrete wall portions 52 by pouring concrete; 상기 콘크리트 기초부(51)로부터 굴토된 지반(10)의 바닥 전체에 걸쳐 부직포매트를 부설한 차수막층(20)과, 상기 차수막층 상측에 격자형 구조체(30)를 복수열로 부설하여 최하측은 고화토층(41)을 형성하고, 그 상측은 배수층(42)을 형성한 바닥층(40)으로 구성된 것을 특징으로 하는 셀구조의 격자형 구조체를 이용한 폐기물매립장 구조물.The bottom layer is formed by placing a plurality of rows of lattice-shaped structures 30 in which a non-woven fabric mat is laid over the entire bottom of the ground 10 excavated from the concrete foundation 51 and a lattice structure 30 in an upper portion of the layer. Forming a solidified soil layer (41), the upper side of the waste landfill structure using a lattice structure of the cell structure, characterized in that consisting of a bottom layer 40 formed a drainage layer (42). 제1항에 있어서, 전면벽(50) 하단의 격자형 구조체(30) 일부와 상기 바닥층(40)의 격자형 구조체(30)는 서로 일체로 연결됨을 특징으로 하는 셀구조의 격자형 구조체를 이용한 폐기물매립장 구조물.According to claim 1, wherein a portion of the grid-like structure 30 of the bottom of the front wall 50 and the grid-like structure 30 of the bottom layer 40 is connected to each other using a grid-like structure of the cell structure Waste landfill structure. 제1항에 있어서, 상기 전면벽(50)의 격자형 구조체(30)의 내측 셀공간부들에는 통수가 가능한 자갈 등의 입상골재를 충진시켜 배수통로(53)를 형성시킨 것을 특징으로 하는 셀구조의 격자형 구조체를 이용한 폐기물매립장 구조물.The cell structure according to claim 1, wherein the inner cell spaces of the lattice-shaped structure 30 of the front wall 50 are filled with granular aggregates, such as gravel, which can pass through, to form a drainage passage 53. Landfill Structures Using Lattice Structures. 제1항에 있어서, 상기 배수층(42)에 부설된 격자형 구조체(30)의 모든 셀공간부들에는 자갈등의 입상골재를 충진시켜 배수시킴을 특징으로 하는 셀구조의 격자형 구조체를 이용한 폐기물매립장 구조물.The method of claim 1, wherein all cell spaces of the lattice-shaped structure 30 attached to the drainage layer 42 is filled with granular aggregates, such as gravel, and drained. structure. 제1항에 있어서, 상기 바닥층(40)은 2중의 고화토층(41)으로 형성되어지되, 그 상측 고화토층의 일부 격자형 구조체(30)의 셀공간부들에는 자갈등의 입상골재를 충진시켜 배수로(43)를 형성시킨 것을 특징으로 하는 셀구조의 격자형 구조체를 이용한 폐기물매립장 구조물.According to claim 1, wherein the bottom layer 40 is formed of a double solidified soil layer 41, the cell space portions of the lattice-like structure 30 of the upper solidified soil layer is filled with granular aggregate such as gravel drainage A landfill structure using a lattice structure of a cell structure, characterized in that (43) is formed. 제1항에 있어서, 상기 바닥층(40)의 상부에 일정높이마다 격자형 구조체(30)를 부설함을 특징으로 하는 셀구조의 격자형 구조체를 이용한 폐기물매립장 구조물.The method of claim 1, wherein the landfill structure using a lattice structure of the cell structure, characterized in that the lattice structure (30) is laid at a predetermined height above the bottom layer (40). 제1항 내지 제6항중 어느 한항에 있어서, 상기 바닥층(40) 또는 전면벽(50)에 부설되는 격자형 구조체(30)는 통공, 통과홈 또는 상하간격이 형성된 것중에서 어느 하나가 형성된 것을 사용함을 특징으로 하는 셀구조의 격자형 구조체를 이용한 폐기물매립장 구조물.According to any one of claims 1 to 6, the lattice-like structure 30 to be attached to the bottom layer 40 or the front wall 50 is used that any one of the through-hole, the through groove or the vertical gap is formed. Waste landfill structure using a lattice structure of the cell structure, characterized in that. 제1항에 있어서, 상기 바닥판(40)과 전면벽(50)의 내측으로 형성된 배수로(43)(53)들은 바닥층(40)의 소정위치에 형성된 집수정(44)으로 연통되며, 상기 집수정은 외부로 관통되는 배수통로로 연결됨을 특징으로 하는 셀구조의 격자형 구조체를 이용한 폐기물매립장 구조물.The drainage passages 43 and 53 formed inwardly of the bottom plate 40 and the front wall 50 communicate with the sump 44 formed at a predetermined position of the bottom layer 40. The landfill structure using the cell-type lattice structure characterized in that the modification is connected to the drainage passage penetrating to the outside. 제1항에 있어서, 상기 고화토층은 현장토, 시멘트 및 고화제를 혼합교반하여 충진시켜 다져 놓은 것을 특징으로 하는 셀구조의 격자형 구조체를 이용한 폐기물매립장 구조물.The landfill structure of claim 1, wherein the solidified soil layer is filled by mixing and stirring the soil, cement, and solidifying agent. 지반을 일정깊이로 굴토한 바닥면에 부직포매트를 부설하여 차수막층을 형성하고, 상기 차수막층 상부에 굴토된 현장토와 시멘트 및 고화제등을 혼합교반하여 조성된 개량토를 바닥층과 전면벽에 포설하여 고화성형시키는 폐기물매립장의 구축방법에 있어서,A nonwoven fabric mat is laid on the bottom surface of the ground which has excavated the soil to a certain depth to form a water barrier layer, and the improved soil formed by mixing and stirring the soil soil, cement and hardener, which was excavated on the top of the water barrier layer, is applied to the bottom layer and the front wall. In the method of constructing a landfill site for laying and solidifying, 굴토된 지반의 외곽부 위치에 복수열의 격자형 구조체를 일정높이로 부설하여 콘크리트를 타설하여 콘크리트 기초부(51)를 형성한 후, 상기 콘크리트 기초부의 상측으로 일정높이까지 단계별로 격자형 구조체를 복수열로 조립부설하여 콘크리트를 타설하여 콘크리트 벽체부(52)를 형성하는 단계로 전면벽(50)을 시공한 후,Laying a plurality of rows of lattice structure at a certain height in the outer position of the excavated ground to form a concrete foundation 51 by placing concrete, and then a plurality of lattice structures in a step up to a certain height above the concrete foundation portion After assembling and laying concrete in rows to form the concrete wall part 52, the front wall 50 is constructed, 상기 콘크리트 기초부로부터 굴토된 지반바닥상에 차수막층을 부설하고, 그 차수막층 상측으로 복수층의 격자형 구조체를 부설하여 하측 구조체에는 고화토를 충진시켜 고화토층(41)을 형성한 후, 상기 상측 구조체에 입상골재를 충진시켜 배수층(42)을 형성하는 단계로 바닥층(40)을 시공함으로써 구축되어짐을 특징으로 하는 셀구조의 격자형 구조체를 이용한 폐기물매립장의 구축방법.After placing a layer on the ground bottomed from the concrete foundation, and laying a plurality of lattice-like structures above the layer, and filling the lower structure with solidified soil, a layer of soil layer 41 is formed. A method of constructing a landfill site using a lattice structure of a cell structure, wherein the granular aggregate is filled into the upper structure to form a drainage layer 42.
KR1019990024474A 1997-03-24 1999-06-26 A Wastes Treatment District Structure for using a Cell Frame-work and It's Construction Method KR100243395B1 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1019970010087A KR100243393B1 (en) 1996-03-23 1997-03-24 Reinforced structure of soft foundation for using cell frame-work and its construction method

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
KR1019970010087A Division KR100243393B1 (en) 1996-03-23 1997-03-24 Reinforced structure of soft foundation for using cell frame-work and its construction method

Publications (1)

Publication Number Publication Date
KR100243395B1 true KR100243395B1 (en) 2000-03-15

Family

ID=19500587

Family Applications (13)

Application Number Title Priority Date Filing Date
KR1019990024474A KR100243395B1 (en) 1997-03-24 1999-06-26 A Wastes Treatment District Structure for using a Cell Frame-work and It's Construction Method
KR1019990024479A KR100274849B1 (en) 1997-03-24 1999-06-26 A construction method of road bed subgrade for using a cell structure
KR1019990024482A KR100243401B1 (en) 1997-03-24 1999-06-26 A supporting structure for laying pipes under the ground
KR1019990024476A KR100243397B1 (en) 1997-03-24 1999-06-26 A Construction System of a Multi-Retaining Wall Structure for using Cell Frame-Work
KR1019990024473A KR100243394B1 (en) 1997-03-24 1999-06-26 A solidity structure of soft foundation for using cell frame-work
KR1019990024477A KR100243398B1 (en) 1997-03-24 1999-06-26 A lining structure of tunnel for using a cell frame-work
KR1019990024483A KR100243402B1 (en) 1997-03-24 1999-06-26 A bank structure
KR1019990024480A KR100243400B1 (en) 1997-03-24 1999-06-26 A frame-work for a pipe laying of a hypocaust
KR1019990024481A KR100274850B1 (en) 1997-03-24 1999-06-26 A Construction method of pavement of road for using a cell structure
KR1019990024478A KR100243399B1 (en) 1997-03-24 1999-06-26 An underground structure for using a cell frame-work
KR1019990024485A KR100243424B1 (en) 1997-03-24 1999-06-26 An oil-fence
KR1019990024484A KR100243423B1 (en) 1997-03-24 1999-06-26 A floating structure on the water
KR1019990024475A KR100243396B1 (en) 1997-03-24 1999-06-26 A retaining wall structure for using cell frame-work and it's construction method

Family Applications After (12)

Application Number Title Priority Date Filing Date
KR1019990024479A KR100274849B1 (en) 1997-03-24 1999-06-26 A construction method of road bed subgrade for using a cell structure
KR1019990024482A KR100243401B1 (en) 1997-03-24 1999-06-26 A supporting structure for laying pipes under the ground
KR1019990024476A KR100243397B1 (en) 1997-03-24 1999-06-26 A Construction System of a Multi-Retaining Wall Structure for using Cell Frame-Work
KR1019990024473A KR100243394B1 (en) 1997-03-24 1999-06-26 A solidity structure of soft foundation for using cell frame-work
KR1019990024477A KR100243398B1 (en) 1997-03-24 1999-06-26 A lining structure of tunnel for using a cell frame-work
KR1019990024483A KR100243402B1 (en) 1997-03-24 1999-06-26 A bank structure
KR1019990024480A KR100243400B1 (en) 1997-03-24 1999-06-26 A frame-work for a pipe laying of a hypocaust
KR1019990024481A KR100274850B1 (en) 1997-03-24 1999-06-26 A Construction method of pavement of road for using a cell structure
KR1019990024478A KR100243399B1 (en) 1997-03-24 1999-06-26 An underground structure for using a cell frame-work
KR1019990024485A KR100243424B1 (en) 1997-03-24 1999-06-26 An oil-fence
KR1019990024484A KR100243423B1 (en) 1997-03-24 1999-06-26 A floating structure on the water
KR1019990024475A KR100243396B1 (en) 1997-03-24 1999-06-26 A retaining wall structure for using cell frame-work and it's construction method

Country Status (1)

Country Link
KR (13) KR100243395B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111041916A (en) * 2019-12-30 2020-04-21 中交水利水电建设有限公司 Roadbed construction method by solidifying earthwork
CN112144359A (en) * 2020-09-25 2020-12-29 中建六局水利水电建设集团有限公司 Construction method of road foundation

Families Citing this family (26)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100444133B1 (en) * 2001-06-28 2004-08-09 한국건설기술연구원 Materials for filling the back of abreast wall using copper slag and abreast wall structure using the same
KR20020033676A (en) * 2002-02-28 2002-05-07 (주)케이씨지오컨설턴트 Drain Method with Vacuum Pressure Using the Geotextile treated by Ceramic Solid Admixture
KR100503725B1 (en) * 2002-10-10 2005-07-26 피티엘산업(주) Stable method of poor ground
KR100686186B1 (en) * 2005-06-13 2007-02-26 영진종합건설 주식회사 Structure for drainage in bridge
KR100719888B1 (en) 2006-10-12 2007-05-18 주식회사 백산공영 Ground reinforcement constructing method for improving ground intensity
KR100814332B1 (en) 2006-11-28 2008-03-18 (유) 강원건설중기 A desiccator of mud
KR100853125B1 (en) 2007-02-06 2008-08-20 원 회 양 Frame type concrete block and method of construction using for PP mat and frame type concrete block
KR100947049B1 (en) * 2007-11-09 2010-03-10 (주)밸류우드 Pipe stand with fill-soil prevention walls
KR100936997B1 (en) 2008-01-11 2010-01-15 코오롱건설주식회사 Side mold for tunnel lining form
KR100945254B1 (en) * 2009-04-10 2010-03-03 한국과학기술원 Unclogging surface filtering elastic paving for non-point source pollution management with constant thickness
KR100937137B1 (en) 2009-04-28 2010-01-15 대현산업 (주) Pipe support for buried underground
KR101005481B1 (en) 2009-07-06 2011-01-05 김영근 Assistant buoyancy device and amphibious vehicle having the same
KR101233722B1 (en) * 2011-04-04 2013-03-11 김영근 Buoyancy structure and amphibious leisure device including the same
EP2695908A4 (en) * 2011-04-04 2015-04-22 Yetoo Co Ltd Molded foam product, and buoyant material and construction material including same
KR101737075B1 (en) * 2015-01-30 2017-05-18 대진대학교 산학협력단 Differential Settlement prevention structures
KR102127377B1 (en) * 2017-07-10 2020-06-26 최종선 Construction Method of Reinforced Earth Retaining Wall
CN108221528B (en) * 2018-01-02 2020-04-21 中建五局土木工程有限公司 Roadbed building overlapping structure and construction method
KR102055217B1 (en) 2018-07-27 2019-12-12 주식회사 군장종합건설 A construction method of groundwater drainage material and how to block groundwater entering the drainage using foundation slab
KR102206864B1 (en) 2019-03-08 2021-01-22 이준혁 Laying Structure for Underground Facilities
CN110318310A (en) * 2019-07-17 2019-10-11 邓怡宁 A kind of assembly type roadnet based on the building of dot matrix foundation pile net
CN110904759B (en) * 2019-10-21 2021-11-23 广东省交通规划设计研究院集团股份有限公司 Method for determining thickness of filling layer of pipeline system in roadbed and processing structure
KR102120402B1 (en) * 2019-10-30 2020-06-08 한국건설기술연구원 System and Method for Remediation of Polluted Ground Water
US11434616B1 (en) 2019-12-19 2022-09-06 Robert Anderson Erosion block
KR102374363B1 (en) 2020-12-08 2022-03-15 한국경량혼합토 주식회사 Temporary double wall sheet pile and the foundation improvement method of construction using the same
KR102543052B1 (en) * 2021-07-16 2023-06-14 주식회사 유시티 Drainage Facilty Without Backfill
KR102573385B1 (en) 2022-12-06 2023-09-04 스코트라 주식회사 Floating type workshop for manufacturing units of floating photovoltaic power generation system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111041916A (en) * 2019-12-30 2020-04-21 中交水利水电建设有限公司 Roadbed construction method by solidifying earthwork
CN112144359A (en) * 2020-09-25 2020-12-29 中建六局水利水电建设集团有限公司 Construction method of road foundation

Also Published As

Publication number Publication date
KR100243397B1 (en) 2000-03-15
KR100243398B1 (en) 2000-03-15
KR100274849B1 (en) 2000-12-15
KR100274850B1 (en) 2000-12-15
KR100243402B1 (en) 2000-03-15
KR100243400B1 (en) 2000-03-15
KR100243401B1 (en) 2000-03-15
KR100243399B1 (en) 2000-03-15
KR100243396B1 (en) 2000-03-15
KR100243394B1 (en) 2000-03-15
KR100243423B1 (en) 2000-03-15
KR100243424B1 (en) 2000-03-15

Similar Documents

Publication Publication Date Title
KR100243395B1 (en) A Wastes Treatment District Structure for using a Cell Frame-work and It&#39;s Construction Method
KR100243393B1 (en) Reinforced structure of soft foundation for using cell frame-work and its construction method
JP4761780B2 (en) Construction method of impermeable layer
US20230091971A1 (en) System and Method for Protection of Under-Slab Utilities From Changes in Soil Volume
CN111305027A (en) Rapid repairing construction method and repairing structure for subsidence of karst area pavement
DE19930701A1 (en) Tub construction for an underpass of a traffic route
CN110067168B (en) Asphalt pavement combined structure and construction method
KR101327278B1 (en) Foundation construction
KR102210048B1 (en) System of retaining wall for selective draining of percolating water
KR100888212B1 (en) A structure of landfill, reservoir and method of construction
US11781280B2 (en) Local deep excavation and backfilling structural subgrade and its rapid construction method
JPH02504050A (en) Method for forming road and roadbed structures
JPH0453205B2 (en)
KR100857922B1 (en) A sand mat execution method according to the cause that can make sand reduction through unnecessary section reduction for impeachment
Sew et al. Geotechnical solutions for high speed track embankment–a brief overview
CN221052662U (en) Multi-stage reinforced earth retaining wall with composite panel
CN219604069U (en) Soft permeable pipe drainage foam concrete widened air quality embankment
CN219568891U (en) Deep soft soil area throttle gate subsides and foundation pit supporting structure
JP2668922B2 (en) Seismic structure of excavated road
CN218756816U (en) Can prevent soft highway roadbed structure of road bed
CN217419719U (en) Anti-settlement foundation structure and building system
CN218521839U (en) Assembled floor column retaining wall
CN217922839U (en) High-speed railway buried high embankment structure in deep and thick miscellaneous fill-up area
KR100536429B1 (en) Block structure of inorganic porous material and laying method using that
Allen et al. Fundamentals of Building Construction

Legal Events

Date Code Title Description
A107 Divisional application of patent
A201 Request for examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
LAPS Lapse due to unpaid annual fee