KR100214881B1 - Assembling type hot water circulating heating panel and construction method for a building - Google Patents

Assembling type hot water circulating heating panel and construction method for a building Download PDF

Info

Publication number
KR100214881B1
KR100214881B1 KR1019970016150A KR19970016150A KR100214881B1 KR 100214881 B1 KR100214881 B1 KR 100214881B1 KR 1019970016150 A KR1019970016150 A KR 1019970016150A KR 19970016150 A KR19970016150 A KR 19970016150A KR 100214881 B1 KR100214881 B1 KR 100214881B1
Authority
KR
South Korea
Prior art keywords
hot water
building
floor plate
floor
pillar
Prior art date
Application number
KR1019970016150A
Other languages
Korean (ko)
Other versions
KR19980078583A (en
Inventor
이세웅
이정호
Original Assignee
장동립
쌍용건설주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 장동립, 쌍용건설주식회사 filed Critical 장동립
Priority to KR1019970016150A priority Critical patent/KR100214881B1/en
Publication of KR19980078583A publication Critical patent/KR19980078583A/en
Application granted granted Critical
Publication of KR100214881B1 publication Critical patent/KR100214881B1/en

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D3/00Hot-water central heating systems
    • F24D3/12Tube and panel arrangements for ceiling, wall, or underfloor heating
    • F24D3/14Tube and panel arrangements for ceiling, wall, or underfloor heating incorporated in a ceiling, wall or floor
    • F24D3/141Tube mountings specially adapted therefor
    • F24D3/144Clips for fastening heating tubes on a reinforcement net or mesh, e.g. mesh for concrete reinforcement
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F15/00Flooring
    • E04F15/12Flooring or floor layers made of masses in situ, e.g. seamless magnesite floors, terrazzo gypsum floors
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F2290/00Specially adapted covering, lining or flooring elements not otherwise provided for
    • E04F2290/02Specially adapted covering, lining or flooring elements not otherwise provided for for accommodating service installations or utility lines, e.g. heating conduits, electrical lines, lighting devices or service outlets
    • E04F2290/023Specially adapted covering, lining or flooring elements not otherwise provided for for accommodating service installations or utility lines, e.g. heating conduits, electrical lines, lighting devices or service outlets for heating

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Floor Finish (AREA)

Abstract

본 발명은 연립주택 또는 아파트와 같은 다층건물의 바닥을 간편하게 시공할 수 있는 방법에 관한 것으로, 건물의 설계과정에서 바닥체를 하중압력과 구조 및 구조물의 위치에 대응할 수 있는 강도등을 계산하여 분할 설계한 후, 별도의 공장에서 설계된 바닥판에 의하여 난방관이 내장된 조립식 온수온돌바닥판(10)을 대량으로 제조하고, 완성된 온수온돌바닥판(10)을 간단하게 조립하여 시공할 수 있도록 하는 다층건물의 온수온돌바닥판(10) 시공방법에 관한 것으로서, 건축물의 크기와 구조에 따라 온수온돌바닥판(10)의 크기를 결정하는 설계공정과; 상기 설계에 의하여 결정된 크기로 난방관이 내장된 바닥판을 제작하는 공정과; 상기 온수온돌바닥판(10)을 건축물의 기둥(1)과 벽체(2)상측에 설치고정하는 바닥판설치공정과; 상기 온수온돌바닥판(10)위에 다시 벽체(2)와 기둥(1) 및 보조기둥을 세우는 기둥설치공정과; 상기 온수온돌바닥판(10)과 벽체(2)사이에 소폭의 콘크리트 몰탈(23)로서 마감작업을 하는 마무리공정; 으로 시공하여 공사기간의 단축 및 공사인력의 절감과 더불어 시공품질이 우수한 건축물을 건축할 수 있는 다층건물의 바닥판 시공방법인 것이다.The present invention relates to a method for easily constructing a floor of a multi-story building such as a townhouse or an apartment. In the design process of a building, the floor is divided by calculating the load pressure and the strength corresponding to the structure and the position of the structure. After the design, a large number of prefabricated hot water heating floor plate 10 with a built-in heating tube by a floor plate designed in a separate factory, so that the completed hot water heating floor plate 10 can be easily assembled and constructed It relates to a construction method of a hot water ondol floor board 10 of a multi-story building, the design process of determining the size of the hot water ondol floor board 10 according to the size and structure of the building; Manufacturing a bottom plate having a heating tube built in the size determined by the design; A bottom plate installation step of fixing the hot water warming floor plate 10 on the pillar 1 and the wall 2 of the building; A pillar installation step of erecting the wall (2), the pillar (1), and the auxiliary pillar on the hot water floor plate (10) again; Finishing process for finishing the work as a narrow concrete mortar (23) between the hot water floor plate (10) and the wall (2); As a construction method, it is the floor plate construction method of multi-storey building that can shorten the construction period, reduce construction manpower, and build a building with excellent construction quality.

Description

다층건물의 조립식 온수온돌바닥판과 그 시공방법Prefabricated hot water floor plate of multi-storey building and its construction method

제1도는 본 발명에 적용되는 분할도의 일례를 나타낸 평면도.1 is a plan view showing an example of a divided view applied to the present invention.

제2a, b, c도는 본 발명이 적용되는 조립식 온수온돌바닥판을 제조하는 방법을 나타낸 단면도.Figure 2a, b, c is a cross-sectional view showing a method for producing a prefabricated hot water floor plate to which the present invention is applied.

제3a, b, c도는 조립식 온수온돌바닥판을 시공하는 순서를 나타낸 개략도.3a, b, c is a schematic diagram showing the procedure for constructing a prefabricated hot water floor plate.

* 도면의 주요부분에 대한 부호의 설명* Explanation of symbols for main parts of the drawings

1 : 기둥 2 : 벽체1: pillar 2: wall

3 : 거푸집 4 : 보강철근3: formwork 4: rebar

5 : 콘크리트 슬라브 6 : 단열재5: concrete slab 6: insulation

7 : 난방관 8 : 시멘트몰탈7: heating tube 8: cement mortar

10 : 온수온돌바닥판10: hot water floor plate

본 발명은 연립주택 또는 아파트와 같은 다층건물의 바닥을 조립식으로 간편하게 시공할 수 있는 방법에 관한 것으로, 건물의 설계과정에서 바닥체를 하중압력과 구조 및 구조물의 위치에 대응할 수 있도록 스팬(SPAN)이나 강도 등을 계산하여 바닥판의 분할도를 설계한 후, 별도의 공장에서 상기 분할도에 의거 난방 배관이 내장된 바닥슬라브(Slab)를 대량으로 제조하고, 완성된 바닥판을 현장에서 간단하게 조립하여 시공함으로써 바닥판 시공작업이 완료되도록 하는 다층건물의 조립식 온수온돌바닥판 시공방법에 관한 것이다.The present invention relates to a method for easily constructing the floor of a multi-story building, such as a townhouse or apartment, in a prefabricated manner. In the design process of the building, the floor can be spanned so as to correspond to the load pressure and the structure and the position of the structure. After designing the degree of division of the floor plate by calculating the strength, strength, etc., in a separate factory, the slab with the heating pipe is built in a large quantity based on the degree of partitioning, and the finished floor plate can be easily It relates to a prefabricated hot water heated floor plate construction method of a multi-storey building to be completed by assembling the floor plate construction work.

일반적으로 건물의 바닥판을 시공할 때에는,In general, when building a floor plate,

1) 콘크리트바닥 슬라브를 형성하기 위하여 거푸집을 설치하고,1) install the formwork to form the concrete floor slab,

2) 상기 거푸집에 콘크리트를 부어 넣어 소정의 두께로 슬라브를 형성하여 양생시키고,2) pour concrete into the formwork to form and cure the slab to a predetermined thickness,

3) 경화된 슬라브 상부에 차음, 단열부재를 시공하며,3) Install sound insulation and insulation on the top of the hardened slab,

4) 경량기포나 자갈등으로 축열층을 구성한 후,4) After the heat storage layer is composed of lightweight bubbles or gravel,

5) 난방관을 배관하기 위하여 시공면의 수평표시를 물수평기로 측정하고,5) Measure the horizontal marking on the construction surface with a water level to pipe the heating tube.

6) 난방배관의 수평설치를 위한 배관받침대를 설치한 후,6) After installing the pipe support for horizontal installation of heating pipes,

7) 난방배관작업을 수행하며,7) Perform heating piping work,

8) 그 위에 시멘트몰탈로 마감하는 과정으로 바닥을 시공하여 왔던 것이다.8) The floor was constructed by finishing it with cement mortar.

상기의 방법으로 온돌바닥을 시공하는 경우에는 다음과 같은 여러 가지 많은 시공상의 문제점이 필수적으로 발생된다.In the case of constructing the ondol floor by the above method, a number of construction problems are indispensable.

첫째, 상기한 온돌바닥 시공과정에서 난방관을 배관하기 위한 배관받침대를 장착할 경우에는 수평조절을 위하여 물수평기 등과 같은 소정의 수평조절기를 다수 이용하여 수평을 조절하는 부수적인 과정이 포함되는 것으로서, 시공상의 정밀도와 난방관의 시공시간이 장기화되는 문제점이 발생하는 것이며,First, in the case of installing the pipe support for piping the heating tube in the construction process of the ondol floor, as a secondary process of adjusting the horizontal using a predetermined level controller such as a water leveler for horizontal adjustment, The problem arises that the construction precision and the construction time of the heating tube are prolonged,

둘째, 배관받침대 위에 난방배관을 설치할 때, 이 난방배관은 상기 수평조절기를 이용하여 정확하게 수평을 조절한 다음 난방관을 설치하여야 하므로 시공의 숙련도가 필요하고, 시공도중 배관된 난방관의 휨 등과 같은 시공하자 발생가능성이 높은 등 시공상의 번거로움이 있는 것이다.Second, when installing the heating pipe on the pipe support, this heating pipe should be precisely leveled by using the horizontal adjuster, and then the heating pipe should be installed, so the skill of construction is required, such as the bending of the heated pipe during construction. There is a lot of trouble in construction such as the possibility of occurrence when we construct.

상기한 각종의 문제점들은 다층건물을 건축할 경우에는 그 어려움이 배가되는 것이다.The various problems described above are doubled in difficulty when building a multi-storey building.

따라서, 이러한 방법으로 바닥을 시공하는 경우, 현장기능공의 숙련도에 따라 시공질이 좌우되기 때문에 부실시공될 염려가 있는 것이고, 각종 시공과정의 수행을 위한 시공기간이 장기화되므로 이는 결국 건축비용의 상승으로 연결되는 등의 문제점으로 상존하는 것이다.Therefore, when the floor is constructed in this way, the construction quality depends on the skill of the on-site craftsman, and there is a possibility that it will be carried out, and the construction period for performing various construction processes is prolonged. There is a problem such as being connected.

일반 건설업체나 현장에서는 상기한 문제점을 해소하기 위하여 난방관이 사전에 배관된 온돌판재가 제안되어 사용되어 왔었다.In order to solve the above problems in general construction companies or on-site heating plate has been proposed and used in which the heating pipe is pre-piped.

이는 난방관이 배관, 매립된 상태에서 시멘트로 일정한 형태를 구성하는 콘크리트 판재의 조립식 온돌패널을 다량으로 생산한 다음, 이 온돌패널을 기 시공된 콘크리트슬라브 상부에 시공된 단열재 상측에 배열하고, 각각의 난방관을 용접연결하는 방법으로 온돌바닥을 시공하도록 하는 것이다.It produces a large amount of prefabricated ondol panels made of concrete plates that form a certain form of cement in the state in which the heating tube is piped and buried, and then arranges the ondol panels on the upper side of the insulator installed on the top of the installed concrete slab. How to connect the heating pipe of the ondol floor is to be constructed.

이후, 조립식온돌 마감면에 시멘트몰탈을 토핑(Topping)하는 방법과 시멘트몰탈의 토핑(Topping)없이 조립식 온돌판 상면을 그대로 이용하여 마감하는 2가지 방안을 선택적으로 적용하여 왔었다.Thereafter, two methods of topping cement mortar on the surface of the prefabricated ondol and the top surface of the prefabricated ondol plate without the topping of cement mortar have been selectively applied.

그러나, 이러한 조립식 온돌판넬을 이용하는 경우에도 다음과 같은 여러 가지 문제점이 발생되는 것이다.However, even when using such a prefabricated ondol panel is a number of problems occur as follows.

즉, 상기 온돌판넬은 건물의 설계와 관계없이 자체의 제작기준에 의하여 대량생산되는 것이어서, 그 크기가 제한되어 사용상의 적용성이 제한되는 것이고, 콘크리트슬라브가 수평상태로 시공되었다 할지라도 콘크리트 슬라브상에서 각 조립식 온돌판넬을 시공하게 되면, 상기 조립식 온돌판넬부재간의 시공오차로 인하여 바닥의 수평구배가 형성되지 않으며, 바닥마감면에 요철면이 발생하는 등의 시공상 하자요인이 발생하게 되는 것이다.That is, the ondol panel is mass-produced by its own manufacturing standard regardless of the design of the building, its size is limited and its applicability in use is limited, and even though the concrete slab is constructed in a horizontal state, When constructing each prefabricated ondol panel, due to the construction error between the prefabricated ondol panel members, the horizontal gradient of the floor is not formed, and the defects in construction such as the uneven surface is generated on the floor finishing surface.

이를 방지하기 위하여는 각각의 온돌판넬의 수평상태를 확인하면서 시공하여야 하므로 시공시간이 많이 걸리게 될 뿐만 아니라, 오랜 기간동안 숙련된 숙련기술자가 배관하여야 하는 문제점이 있으며, 더욱이 이들 조립식 온돌판은 예를들어, 5㎝ 두께에 60 x 80㎝의 크기일 경우, 그 무게가 60㎏이상을 상회하는 등 시공도 어려울 뿐만 아니라, 제품의 파손율도 상당하기 때문에 공사비용의 상승요인이 되어 현실적으로 이들 공법을 사용된 전례가 거의 없을 정도로 사용상 문제점이 많은 것이다.In order to prevent this, it is necessary to construct while checking the horizontal state of each ondol panel, which not only takes a lot of construction time, but also requires a skilled technician to pipe for a long period of time. For example, when the size of 5 x 60 cm and 60 x 80 cm is not only difficult to construct such as the weight is more than 60 kg, but also the damage rate of the product is considerable, it is a rising factor of the construction cost and practically uses these methods. There are so many problems in use that there are few precedents.

본 발명은 상기한 제반 문제점들을 감안하여 창출된 것으로서, 바닥판을 시공함과 동시에 천장판을 시공할 수 있으며, 시공기간 및 각 공정을 최소한으로 줄여줌으로써 시공비용을 절감할 수 있는 방법을 제공함과 동시에 시공품질을 양질화시킬 수 있도록 함을 그 목적으로 하는 것이다.The present invention has been made in view of the above-mentioned problems, and at the same time, it is possible to construct a ceiling plate while simultaneously constructing a floor plate, and at the same time providing a method of reducing construction costs by reducing construction period and each process to a minimum. The purpose is to improve the construction quality.

상기한 목적은, 난방관이 내장된 바닥판을 조립식으로 조성하되, 그 크기를 건물의 구조를 감안하여 바닥슬라브와 일체식으로 공장제작 함으로써, 기존의 조립식 온돌등이 가지고 있는 문제들을 일거에 해결할 수 있을 것이다.The above-mentioned object is to construct a floor plate with a heating tube in a prefabricated manner, but in consideration of the structure of the building by manufacturing the factory integrally with the floor slab, solving the problems of the existing prefabricated ondol at once. Could be.

이하, 본 발명의 시공방법 및 이에 적합하게 사용되는 다층건물의 조립식온수 온돌바닥판을 첨부도면에 의하여 상세히 설명하면 다음과 같다.Hereinafter, the construction method of the present invention and the prefabricated hot water ondol floor of the multi-story building suitably used will be described in detail with reference to the accompanying drawings.

[조립식 온수온돌바닥판의 제조방법][Manufacturing method of prefabricated hot water floor plate]

먼저, 제1도 및 제2도를 참고하여 온돌바닥판을 제조하는 과정에 대하여 설명한다.First, a process of manufacturing an underfloor base plate will be described with reference to FIGS. 1 and 2.

1공정) 건물의 설계도에 나타난 기둥(1)과 벽체(2)의 위치 및 제반 구조물의 위치와 크기를 감안하여 제조하고자 하는 바닥판슬라브의 분할도를 결정한다. 상기한 분할도는 다음과 같은 조건을 구비한다.Step 1) Determine the degree of division of the floor slab to be manufactured in consideration of the position of the pillar 1 and the wall 2 and the position and size of the overall structure shown in the blueprint of the building. The above-described divisional view has the following conditions.

① 대행되는 두쌍의 모서리 중 어느 한쌍의 모서리가 기둥(1)과 벽체(2)에 안착되어야 한다.① One of the two paired edges must be seated on the pillar (1) and the wall (2).

② 상기 다층건물의 층수에 따른 하중과, 바닥판의 크기에 따른 강도를 감안하여 철근을 배열한다.② Arrange the reinforcing bars in consideration of the load according to the number of floors of the multi-story building and the strength according to the size of the bottom plate.

③ 상기 ②번의 조건에 따라 분할되는 바닥판의 수를 최소로 한다.③ Minimize the number of floor plates to be divided according to the conditions in ② above.

2공정) 상기한 조건을 만족하는 분할도에 따라 바닥슬라브의 크기에 맞추어 거푸집(3)을 설치하고,2 step) Install the formwork (3) according to the size of the floor slab according to the degree of division that satisfies the above conditions,

3공정) 이 거푸집에 상층으로부터 가해지는 압력에 대응할 수 있도록 보강철근(4)을 배근한 다음,Step 3) Reinforce the rebar 4 so as to cope with the pressure applied from the upper layer to the formwork,

4공정)콘크리트 슬라브(5)를 규정두께로(일반적으로 20㎜이상) 형성하여 1차적으로 양생,경화시킨다.Step 4) The concrete slab 5 is formed to a prescribed thickness (generally 20 mm or more) to be cured and cured primarily.

5공정) 경화된 콘크리트슬라브(5) 상부에 단열재(6)를 설치하며, 그 위에 난방관(7)을 배관한 다음, 경량기포 콘크리트 및 시멘트몰탈(8)을 일정두께로 도포하여 양생시킨다.Step 5) Install the heat insulating material 6 on the hardened concrete slab 5, pipe the heating tube 7 thereon, and apply light weight foamed concrete and cement mortar (8) to a certain thickness to cure.

6공정) 이와같이 제작된 온수온돌바닥판(10)은 양생과정을 거친 후 거푸집(3)으로부터 탈형시켜 완성한다.Step 6) The hot water floorboard 10 thus produced is finished by demolding from the formwork 3 after the curing process.

상기 조립식 온수온돌바닥판(10)의 크기는 건축물의 설계도에 나타난 기둥(1) 또는 보조기둥 및 벽체(2)의 위치에 따라 상기한 조건을 충족하도록 설계되는 것이며, 그 크기는 상부에서 받는 하중을 충분히 버틸 수 있도록 보강철근(4)을 배열하여 설계토록 하는 것이다. 또한 온수온돌바닥판(10)은 동시에 천장판의 역할을 하게 되는 것이다.The size of the prefabricated hot water underfloor plate 10 is designed to satisfy the above conditions according to the position of the pillar 1 or the auxiliary pillar and the wall 2 shown in the architectural plan, and the size is the load received from the upper part. It is to arrange the reinforcing bars (4) so as to hold enough. In addition, the hot water floor plate 10 is to serve as a ceiling plate at the same time.

이러한 온수온돌바닥판(10)의 설계는 출원인에 의하여 자체 개발한 컴퓨터프로그램(쌍용건설 제작, 온돌설계용 프로그램)을 통하여 효과적으로 설계될 수 있는 것이다.The design of the hot water floor plate 10 can be effectively designed through a computer program (Ssangyong Construction, Ondol design program) developed by the applicant.

상기한 공정에 의하여 제작된 조립식 온수온돌바닥판(10)은, 현장에서 설치가 완료된 후에는 기존의 방법인 커플링등과 같은 배관접속구를 이용하여 난방관(7)을 접속함으로써 바닥공정이 마무리 되며, 조립식 온수온돌바닥판(10)의 저면부가 균일한 수평면을 이루게 되어 차후, 장판지등을 이용하여 실내장식을 하거나 천장마무리 작업을 하게되는 경우에 편리하게 마무리작업을 할 수 있을 뿐만 아니라, 마무리 작업후에 미려한 외관을 얻을 수 있는 장점이 있는 것이다.After the installation is completed in the field, the prefabricated hot water flooring plate 10 manufactured by the above-described process is completed by connecting the heating pipe 7 by using a pipe connection such as a coupling method, which is an existing method. The bottom part of the prefabricated hot water underfloor plate 10 forms a uniform horizontal surface, and in the future, when the interior decoration or ceiling finishing work is performed using sheetboard, etc. After work, there is an advantage to get a beautiful appearance.

이와같이 건축물의 설계도를 기초로 하여 제작 완성된 조립식 온수온돌바닥판(10)을 이용하여 다층건물에 시공하는 방법을 설명한다.As described above, a method of constructing a multi-story building using the prefabricated hot water heated floor plate 10 manufactured based on the design of the building will be described.

[다층건물에 조립식온돌바닥판을 시공하는 방법][Method of constructing prefabricated floor plate on multi-story building]

제1공정) 지하굴토된 바닥에 기초공정으로서 기초를 깔고 그 상부에 부위별로 거푸집(21)을 설치한 후, 콘크리트(22)를 투입하여 지하층등 건물의 기초부를 축조한다.(이 공정은 기존의 기초공사공정에 준한다)The first step is to lay the foundation as a foundation process on the basement of the basement and install the formwork 21 for each part on the upper part of the basement, and then add concrete 22 to build the foundation of the building such as the basement floor. Conforms to the basic construction process)

제2공정) 이후, 바닥판 분할도에 의하여 제작된 조립식 온수온돌바닥판(10)을 상기 벽체(2)와 기둥(1)사이에 얹어놓고 고정한다.After the second step), the prefabricated hot water warming floor plate 10 produced by the bottom plate divided diagram is placed and fixed between the wall (2) and the column (1).

제3공정) 상기 각각의 조립식 온수온돌바닥판(10)에 매립된 난방관(7)을 커플링 또는 용접의 수단으로 연결하고,Third step) connecting the heating tubes 7 embedded in the respective prefabricated hot water underfloor plates 10 by means of coupling or welding,

제4공정) 수압시험을 통하여 난방배관의 연결상태를 검점한 후,Step 4) After checking the connection of the heating pipes through the hydraulic test,

제5공정) 제2공정단계에서 1차 고정시킨 구조물을 시멘트몰탈로 그라우팅(Grouting)하여 고정시킨다.Fifth step) The structure fixed first in the second step is grouted with cement mortar to fix it.

제6공정) 상기 조립식 온수온돌바닥판(10)의 상부층을 대상으로 하는 벽체(2)와 기둥(1)을 시공한 후, 그위에 소정의 두께로 시멘트 몰탈(23)을 적정두께로 도포하여 바닥공사를 종료한다.Sixth step) After constructing the wall (2) and the pillar (1) for the upper layer of the prefabricated hot water heating floor plate (10), by applying a cement mortar (23) to a predetermined thickness thereon to a predetermined thickness Finish the floor work.

제7공정) 양생된 벽체(2)와 기둥(1)위에 상기한 제2공정과 제3,4,5공정을 반복함으로써 소정의 다층건물을 건축하게 되는 것이다.7th step) The predetermined | prescribed multilayered building is built by repeating the said 2nd process and the 3rd, 4th, and 5th process on the cured wall 2 and the pillar 1 ,.

기게 제2공정에 의하여 조립식 온수온돌바닥판(10)을 설치, 시공하는 경우, 각 온돌바닥판(10)과 벽체(2) 및 기둥(1)과 보조기둥과의 연결수단으로서 앵커보울트등을 이용하여 연결고정할 수도 있으며, 기타 다른 수단으로 연결고정하여도 본 발명의 범주에서 벗어나지 못할 것이다.In the case of installing and constructing the prefabricated hot water underfloor plate 10 by the second step, anchor bolts or the like are used as a connecting means between each of the underfloor plate 10, the wall 2, the column 1, and the auxiliary column. It is also possible to fix the connection by using, it will not be departed from the scope of the present invention even if connected by other means.

이와같이 기초기둥(1)과 벽체(2)로서 대상층을 축조한 후에, 바닥슬라브, 온돌판 및 천장의 개념이 종합된 조립식 온수온돌바닥판(10)을 설치하고, 그 위에 다시 벽체(2)와 기둥(1)을 시공하게 되므로, 시공현장에서는 바닥을 시공하는 과정과 난방관을 시공하는 과정들이 생략됨에 따라 건축기간이 현저하게 단축될 뿐만 아니라, 조립식 온수온돌바닥판(10) 시공시 기계화시공율을 높여 현장기능공의 의존도를 낮춰 줌으로써 시공품질의 향상을 유도할 수 있는 것이다.After constructing the target layer as the foundation column 1 and the wall 2 in this way, the prefabricated hot water floor plate 10, in which the concepts of the floor slab, the ondol plate, and the ceiling are integrated, is installed. Since the construction of the column (1), the construction site is significantly shortened by eliminating the process of constructing the floor and the construction of the heating tube in the construction site, and mechanized construction of the prefabricated hot water underfloor plate (10). It is possible to induce improvement of construction quality by lowering the dependence of field technicians by increasing the rate.

따라서, 본 발명에 의한 다층건물의 조립식 온수온돌바닥판으로 건물을 시공하게되면, 공기단축은 물론, 제공정을 소수의 인원으로 수행할 수 있어 건축비용을 최소한으로 절감할 수 있을 뿐만 아니라, 시공품질이 우수한 건축물을 얻을 수 있는 탁월한 방법인 것이다.Therefore, when the building is constructed with a prefabricated hot water heated floor plate of a multi-layered building according to the present invention, not only shortening the air, but also providing a small number of wells can reduce the construction cost as well as construction. It is an excellent way to get high quality buildings.

Claims (2)

건물의 구조와 조건에 따라According to the structure and conditions of the building ① 대향되는 두쌍의 모서리 중 어느 한쌍의 모서리가 기둥과 벽체의 상면에 안착되도록 하는 조건과,(1) the condition that any one of the two opposite pairs of edges is settled on the upper surface of the column and the wall, ② 상기 다층건물의 층수에 따른 하중 및 바닥판의 크기에 따른 강도를 감안하여 철근을 배열토록 하는 조건과,② conditions to arrange the reinforcing bars in consideration of the load according to the number of floors of the multi-storey building and the strength according to the size of the bottom plate; ③ 상기 ②번의 조건에 따라 분할되는 바닥판의 수를 최소로 하도록 하는 조건;을 구비하는 분할도의 작성공정과,(3) a process of creating a divided view, comprising: a condition for minimizing the number of bottom plates to be divided according to the above condition ②; 상기 분할도에 의하여 결정된 크기와 두께로 난방관이 내장된 조립식 온수온돌바닥판(10)을 제작하는 공정과; 상기 조립식 온수온돌바닥판(10)을 건축물의 기둥(1)과 벽체(2)상측에 설치고정하는 바닥판설공정과; 상기 온수온돌바닥판(10)위에 다시 벽체(2)와 기둥(1) 및 보조기둥을 세우는 기둥 설치공정과; 상기 온수온돌바닥판(10)과 벽체(2)사이에 소폭의 콘크리트 몰탈(23)로서 마감작업을 하는 마무리공정;을 반복 시공함을 특징으로 하는 다층건물의 조립식 온수온돌바닥판 시공방법.Manufacturing a prefabricated hot water heated floor plate 10 having a heating tube embedded therein in a size and a thickness determined by the degree of division; A bottom plate laying step of installing and fixing the prefabricated hot water floorboard 10 on the pillar 1 and the wall 2 of the building; A pillar installation step of establishing a wall (2), a pillar (1), and an auxiliary pillar on the hot water floor plate (10) again; A method of constructing a prefabricated hot water heated floor plate of a multi-story building, characterized in that it is repeated; finishing process of finishing as a narrow concrete mortar (23) between the hot water heated floor plate (10) and the wall (2). 제1항에 있어서, 상기 조립식 온수온돌바닥판(10)은, 건축물의 크기와 구조 및 층수에 따라 바닥판의 크기를 결정하는 설계공정과; 상기 설계에 의하여 결정된 크기의 바닥판을 양산할 수 있는 거푸집(3) 제작공정과; 이 거푸집(3)에 하중을 견딜 수 있도록 보강철근(4)을 배열하고, 콘크리트 슬라브(5)와 단열재(6)를 투입하여 양생시킴과 동시에 그 상측에 난방관(7)을 배관하고, 다시 그 위에 일정량의 시멘트몰탈(8)을 도포하여 구성한 조립식 온수온돌바닥판(10)을 대량으로 양생시키도록 하는 공정으로 된 것을 특징으로 하는 다층건물의 조립식온수온돌 바닥판.According to claim 1, The prefabricated hot water floorboards 10, Design process for determining the size of the floorboard according to the size and structure of the building and the number of floors; A formwork (3) manufacturing process capable of mass-producing a bottom plate of the size determined by the design; Arrange the reinforcing bars 4 so that the formwork 3 can bear the load, put the concrete slab 5 and the heat insulator 6 to cure and pipe the heating tube 7 on the upper side thereof, and again. A prefabricated hot water hot stone bottom plate of a multi-story building, characterized in that it is a step of curing a large amount of prefabricated hot water warm floor plate 10 formed by applying a predetermined amount of cement mortar (8) thereon.
KR1019970016150A 1997-04-29 1997-04-29 Assembling type hot water circulating heating panel and construction method for a building KR100214881B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1019970016150A KR100214881B1 (en) 1997-04-29 1997-04-29 Assembling type hot water circulating heating panel and construction method for a building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1019970016150A KR100214881B1 (en) 1997-04-29 1997-04-29 Assembling type hot water circulating heating panel and construction method for a building

Publications (2)

Publication Number Publication Date
KR19980078583A KR19980078583A (en) 1998-11-16
KR100214881B1 true KR100214881B1 (en) 1999-08-02

Family

ID=19504273

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1019970016150A KR100214881B1 (en) 1997-04-29 1997-04-29 Assembling type hot water circulating heating panel and construction method for a building

Country Status (1)

Country Link
KR (1) KR100214881B1 (en)

Also Published As

Publication number Publication date
KR19980078583A (en) 1998-11-16

Similar Documents

Publication Publication Date Title
KR101182536B1 (en) Prefabricated double wall precast concrete pannel having surface material, reinforcing rod according to the purpose
US20090165399A1 (en) Prefabricated reinforced-concrete single-family dwelling and method for erecting said dwelling
US20020059763A1 (en) Pre-fabricated bathroom
CN106013811A (en) Mounting method of prefabricated building
CA2400122A1 (en) Prefabricated thin wall concrete panel
WO2007080561A1 (en) Construction of buildings
US20080016805A1 (en) Truss lock floor systems and related methods and apparatus
CN108842944A (en) A kind of assembled light composite thermo-insulating wall board and preparation method thereof and installation method
CN115162505A (en) Key groove connected full-assembly integral building system and construction method
CN112575886A (en) Low-level and multi-level fully-prefabricated assembled concrete structure and design, production and installation method
CN114108917A (en) Height-adjustable assembly type composite floor slab construction method
CN210658664U (en) Assembled energy-saving new residential structure
RU2598664C1 (en) Method of mounting support masonry formwork profile
RU2459913C2 (en) Set of leave-in-place form by vv podsevalov
CN218374567U (en) Can fix a position ALC wallboard reinforced structure that can exempt from to plaster
CN210369292U (en) Cast-in-place coincide mould shell integral structure of assembled building
US20080289286A1 (en) Method of constructing foundation substructure and a building
KR100214881B1 (en) Assembling type hot water circulating heating panel and construction method for a building
CN116104224A (en) External wall heat insulation integrated gap spliced construction node and construction method
KR20180092477A (en) Prefabricated wall with precast concrete inner and outer panel
KR20180117498A (en) Truss deck which is available for slab maintenance repair and manufacture method
RU2678750C1 (en) Buildings and structures with bearing monolithic reinforced concrete structures construction method using the reinforced concrete wall panels
US3955332A (en) Method of building a structure from bricks and mortar
GB2303862A (en) A ceiling and a method of constructing the same
EP1063362A2 (en) System of prefabricated elements made of structural light concrete and of reinforced concrete for the total erection of 1 to 8 storey buildings

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20130520

Year of fee payment: 15

FPAY Annual fee payment

Payment date: 20140520

Year of fee payment: 16

FPAY Annual fee payment

Payment date: 20150520

Year of fee payment: 17

FPAY Annual fee payment

Payment date: 20160520

Year of fee payment: 18

EXPY Expiration of term