JPS6366972B2 - - Google Patents

Info

Publication number
JPS6366972B2
JPS6366972B2 JP16008782A JP16008782A JPS6366972B2 JP S6366972 B2 JPS6366972 B2 JP S6366972B2 JP 16008782 A JP16008782 A JP 16008782A JP 16008782 A JP16008782 A JP 16008782A JP S6366972 B2 JPS6366972 B2 JP S6366972B2
Authority
JP
Japan
Prior art keywords
concrete
precast concrete
column
beams
precast
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP16008782A
Other languages
Japanese (ja)
Other versions
JPS5948540A (en
Inventor
Seiji Takeda
Masao Komura
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fudo Kenken Kk
Original Assignee
Fudo Kenken Kk
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fudo Kenken Kk filed Critical Fudo Kenken Kk
Priority to JP16008782A priority Critical patent/JPS5948540A/en
Publication of JPS5948540A publication Critical patent/JPS5948540A/en
Publication of JPS6366972B2 publication Critical patent/JPS6366972B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Description

【発明の詳細な説明】 本発明は、プレキヤストコンクリート部材を多
く用いたコンクリート建築物の構築方法に関する
ものであつて、短い工期で能率良くコンクリート
建築物を構築することができる新規方法を提供す
ることを目的としている。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a method for constructing a concrete building using many precast concrete members, and provides a new method that can efficiently construct a concrete building in a short construction period. The purpose is to

そして、本発明方法の構成上の特徴は、鉄骨柱
にプレキヤストコンクリート梁の端部を固定し、
この状態でプレキヤストコンクリートスラブの架
設作業、床コンクリート及び柱コンクリートの配
筋作業等を行うとともに、前記プレキヤストコン
クリート梁にプレキヤストコンクリートカーテン
ウオールを取付け、最後に前記プレキヤストコン
クリートスラブ及びプレキヤストコンクリートカ
ーテンウオールを型枠に利用して、床コンクリー
トと共に柱コンクリートを打設する点にある。
The structural feature of the method of the present invention is that the end of the precast concrete beam is fixed to the steel column,
In this state, erection work of the precast concrete slab, reinforcing work for the floor concrete and column concrete, etc. are carried out, and a precast concrete curtain wall is installed on the precast concrete beam, and finally the precast concrete slab and the precast concrete The point is that the curtain wall is used as a formwork and the column concrete is poured together with the floor concrete.

以下、図面に基いて本発明を具体的に説明す
る。
Hereinafter, the present invention will be specifically explained based on the drawings.

なお、以下の説明ではプレキヤストコンクリー
トをPCと略称する。
In the following explanation, precast concrete will be abbreviated as PC.

図中、1は工事の初期に立設される鉄骨柱であ
つて、通常は十字柱が用いられるが、広巾H形鋼
柱やボツクス柱でもよい。
In the figure, reference numeral 1 denotes a steel column that is erected at the beginning of construction, and although a cross column is usually used, a wide H-shaped steel column or a box column may also be used.

鉄骨柱1にスパン方向及び桁方向のPC梁2,
3の端部を固定するが、本発明ではその後直ちに
PCスラブ4の架設作業等を開始するので、この
固定はこれら作業時の荷重に十分耐えるように堅
固になされることが必要である。
Steel column 1 with PC beams 2 in the span direction and girder direction,
3. However, in the present invention, immediately after that,
Since the work of constructing the PC slab 4 will begin, it is necessary that this fixation be made firmly enough to withstand the load during these works.

PCスラブ4を架設し、その上に床コンクリー
トの配筋を行うとともに、柱コンクリートの配筋
を行い、さらに柱コンクリートの型枠を組立て
る。そして、この段階でPC梁2,3にPCカーテ
ンウオール5を取付けるが、本発明ではこのPC
カーテンウオールを型枠として利用するので、柱
コンクリートの型枠は室内側のみでよい。
PC slab 4 is erected, floor concrete is reinforced on it, column concrete is reinforced, and formwork for the column concrete is assembled. At this stage, the PC curtain wall 5 is attached to the PC beams 2 and 3, but in the present invention, the PC curtain wall 5 is attached to the PC beams 2 and 3.
Since the curtain wall is used as formwork, the formwork for the concrete pillars only needs to be used on the indoor side.

PCカーテンウオール5の内側の床コンクリー
トと柱コンクリートに当る部分には発泡スチロー
ル等の絶縁材6を貼着し、また、PCカーテンウ
オール5の取付け部には図示のように絶縁材7を
配置し、この状態で床コンクリート8と共に柱コ
ンクリート9を打設する。そして、絶縁材7は埋
めころすが、絶縁材6は打設コンクリートが硬化
した後、除去する。
An insulating material 6 such as styrofoam is pasted to the inner part of the PC curtain wall 5 that corresponds to the floor concrete and column concrete, and an insulating material 7 is placed at the attachment part of the PC curtain wall 5 as shown in the figure. In this state, column concrete 9 is poured together with floor concrete 8. The insulating material 7 is then buried, but the insulating material 6 is removed after the poured concrete has hardened.

以上の説明から明らかなように、本発明によれ
ば、桁方向の梁のみならずスパン方向の梁にも
PC材を用いていること、これら梁の端部を鉄骨
柱に固定した段階でPCスラブの架設作業等を始
めていること、PCカーテンウオールを早めに梁
に取付け、PCスラブと共にこのPCカーテンウオ
ールを型枠に利用して床コンクリートと共に柱コ
ンクリートを打設していることの諸点により、コ
ンクリート建築物の工期を大巾に短縮することが
できるのみならず、強度的に優れたコンクリート
建築物が得られる等の利点がある。
As is clear from the above description, according to the present invention, not only beams in the girder direction but also beams in the span direction can be
PC materials are used, the construction of the PC slabs is started after the ends of these beams are fixed to the steel columns, the PC curtain walls are installed on the beams as soon as possible, and the PC curtain walls are installed together with the PC slabs. By using the formwork to cast column concrete together with floor concrete, not only can the construction period of concrete buildings be drastically shortened, but also concrete buildings with excellent strength can be obtained. There are advantages such as being able to

【図面の簡単な説明】[Brief explanation of drawings]

図面は本発明説明用の縦断面図である。 1……鉄骨柱、2……スパン方向のPC梁、3
……桁方向のPC梁、4……PCスラブ、5……
PCカーテンウオール。
The drawing is a longitudinal sectional view for explaining the present invention. 1... Steel column, 2... PC beam in the span direction, 3
...PC beam in girder direction, 4...PC slab, 5...
PC curtain wall.

Claims (1)

【特許請求の範囲】[Claims] 1 鉄骨柱にプレキヤストコンクリート梁の端部
を固定し、この状態でプレキヤストコンクリート
スラブの架設作業、床コンクリート及び柱コンク
リートの配筋作業等を行うとともに、前記プレキ
ヤストコンクリート梁にプレキヤストコンクリー
トカーテンウオールを取付け、最後に前記プレキ
ヤストコンクリートスラブ及びプレキヤストコン
クリートカーテンウオールを型枠に利用して、床
コンクリートと共に柱コンクリートを打設するこ
とを特徴とするコンクリート建築物の構築方法。
1. Fix the ends of the precast concrete beams to the steel columns, and in this state perform the erection work of the precast concrete slabs, the reinforcement work of the floor concrete and column concrete, etc., and also install the precast concrete curtains on the precast concrete beams. A method for constructing a concrete building, comprising: installing a wall, and finally using the precast concrete slab and precast concrete curtain wall as a formwork to cast column concrete together with floor concrete.
JP16008782A 1982-09-14 1982-09-14 Construction of concrete building Granted JPS5948540A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP16008782A JPS5948540A (en) 1982-09-14 1982-09-14 Construction of concrete building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP16008782A JPS5948540A (en) 1982-09-14 1982-09-14 Construction of concrete building

Publications (2)

Publication Number Publication Date
JPS5948540A JPS5948540A (en) 1984-03-19
JPS6366972B2 true JPS6366972B2 (en) 1988-12-22

Family

ID=15707577

Family Applications (1)

Application Number Title Priority Date Filing Date
JP16008782A Granted JPS5948540A (en) 1982-09-14 1982-09-14 Construction of concrete building

Country Status (1)

Country Link
JP (1) JPS5948540A (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6341038A (en) * 1986-08-06 1988-02-22 Hitachi Electronics Eng Co Ltd Inspection device for foreign matter of wafer

Also Published As

Publication number Publication date
JPS5948540A (en) 1984-03-19

Similar Documents

Publication Publication Date Title
US4454702A (en) Building construction and method of constructing same
JP2915897B1 (en) Building construction method
JPS6366972B2 (en)
JPS6347856B2 (en)
JPH02300439A (en) Prefabricating method
JP2959325B2 (en) Construction method of steel frame reinforced concrete structure
JPH1150538A (en) Building and method for constructing the same
JPH0447737B2 (en)
JPH07103583B2 (en) Construction method for large span underground structure
JP2643641B2 (en) Building method using PC members
JP2757032B2 (en) Construction method of underground building with pillars with capital by reverse hitting method
JPS6366970B2 (en)
JPS5858503B2 (en) Construction method of reinforced concrete composite wall
JP3312945B2 (en) Construction method of concrete structure
JPH0715177B2 (en) How to build a reinforced concrete structure
SU1638277A1 (en) Building
JPH0360990B2 (en)
JPS6232303B2 (en)
JPH0522777B2 (en)
JPH04149365A (en) Construction method of beam
JPS642742B2 (en)
JPH0533388A (en) Joining section of precast reinforced concrete construction
JPS62296031A (en) Construction method using shape steel in small beam of reinforced concrete structure
JPH0256461B2 (en)
JPH0327690B2 (en)