JPS63315767A - Sleeve construction method for slab piercing piping - Google Patents

Sleeve construction method for slab piercing piping

Info

Publication number
JPS63315767A
JPS63315767A JP62152986A JP15298687A JPS63315767A JP S63315767 A JPS63315767 A JP S63315767A JP 62152986 A JP62152986 A JP 62152986A JP 15298687 A JP15298687 A JP 15298687A JP S63315767 A JPS63315767 A JP S63315767A
Authority
JP
Japan
Prior art keywords
sleeve
slab
concrete
formwork
post
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP62152986A
Other languages
Japanese (ja)
Other versions
JPH07116837B2 (en
Inventor
鈴木 芳治
豊 小島
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tokyu Construction Co Ltd
Original Assignee
Tokyu Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tokyu Construction Co Ltd filed Critical Tokyu Construction Co Ltd
Priority to JP62152986A priority Critical patent/JPH07116837B2/en
Publication of JPS63315767A publication Critical patent/JPS63315767A/en
Publication of JPH07116837B2 publication Critical patent/JPH07116837B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

(57)【要約】本公報は電子出願前の出願データであるた
め要約のデータは記録されません。
(57) [Summary] This bulletin contains application data before electronic filing, so abstract data is not recorded.

Description

【発明の詳細な説明】 [産業上の利用分野1 本発明は、スラブ貫通配管用スリーブ工法に関するもの
である。
DETAILED DESCRIPTION OF THE INVENTION [Industrial Field of Application 1] The present invention relates to a sleeve construction method for slab-through piping.

[従来技術とその問題点] 一般に、建築中のコンクリートスラブには、第9図に示
すように、上下方向に管体Pを配管したり、工事中の墨
出し用にスラブ貫通孔Hがあけられる。
[Prior art and its problems] Generally, as shown in Fig. 9, in concrete slabs under construction, pipes P are installed in the vertical direction, and slab through holes H are drilled for marking during construction. It will be done.

しかしながら、この種のスラブ貫通孔Hは、図示のよう
に、上階から下階に雨水が落水して特に内装工事中の下
階に被害を及ぼしたり、ゴミや祈り〃う、或いは鉄筋等
が落下する危険があったり、さらに建設作業具が貫通孔
■]に足を突っ込んで大怪我をする等の安全管理上の問
題点があった。
However, as shown in the diagram, this type of slab through-hole H can cause rainwater to fall from the upper floor to the lower floor, causing damage especially to the lower floor during interior construction, or to prevent debris, debris, or reinforcing steel from falling onto the lower floor. There were problems with safety management, such as the risk of falling and serious injuries caused by construction tools stepping into the through holes.

[発明の目的] 本発明は、上記従来の問題点を解決するためになされた
もので、その目的とするところは、部用かつ迅速に施工
することができ、落水落下を効果的に防止することがで
きると共に、施工中の安全管理および労務費の節減等を
図ることができるスラブ貫通配管用スリーブ工法を提供
することにある。
[Object of the Invention] The present invention has been made to solve the above-mentioned problems of the conventional art, and its purpose is to be able to perform partial and quick construction, and to effectively prevent water falling. It is an object of the present invention to provide a sleeve construction method for slab penetrating piping, which can achieve safety management during construction and reduce labor costs.

[発明の構成1 本発明のスラブ貫通配管用スリーブ工法は、着脱自在の
キャップを有するスリーブをスラブ用型枠の貫通孔位置
にセットしてスラブコンクリートを打設し、該スラブコ
ンクリート硬化後に脱型してスリーブ内に管体を挿設し
、該管体とスリーブとの間隙の下側に管回りコンクリー
ト後打用型枠を取付けて、管体とスリーブとの間隙内に
後打コンクリートを打設し、該後打コンクリートの硬化
後に上記後打用型枠を脱型することを特徴とするもので
ある。
[Structure 1 of the invention] The sleeve construction method for slab penetrating piping of the present invention involves setting a sleeve having a removable cap at the through hole position of a slab formwork, pouring slab concrete, and removing the mold after the slab concrete hardens. Then insert the pipe into the sleeve, install a formwork for post-cast concrete around the pipe below the gap between the pipe and the sleeve, and pour post-cast concrete into the gap between the pipe and the sleeve. The method is characterized in that the post-casting formwork is removed from the post-casting form after the post-casting concrete has hardened.

また、上記工法は、スリーブの下端面に突設した固定釘
に、管回りコンクリート後打用型枠を打付けて取付けた
り、或いは、管回りコンクリート後任用型枠を管体に取
付けることを特徴とするものである。
Furthermore, the above construction method is characterized by attaching a post-concrete concrete formwork around the pipe to fixing nails protruding from the lower end surface of the sleeve, or by attaching a formwork for replacing concrete around the pipe to the pipe body. That is.

さらに、スリーブの下端面とスラブ用型枠との間に僅な
間隙を形成して、スラブコンクリートのモルタルが流れ
込むことができるようにしたことを特徴とするものであ
る。
Furthermore, a small gap is formed between the lower end surface of the sleeve and the slab formwork, so that mortar for slab concrete can flow into it.

尚、後打コンクリートを打設する前に、スリーブを取外
してもよいことを特徴とするものである。
Note that the sleeve may be removed before pouring concrete.

[実施例J 以下、本発明の一実施例について図面を参照しながら説
明する。
[Embodiment J] Hereinafter, an embodiment of the present invention will be described with reference to the drawings.

f51図において、1はスラブ用型枠であって、その貫
通孔位置にスリーブ2をセットする。
In Figure f51, 1 is a formwork for slabs, and the sleeve 2 is set in the through hole position.

該スリーブ2は、第2図からも明らかなように、円筒状
のスリーブ本体2aとキャップ2bと固定釘2cとスペ
ーサ一部2dから構成されている。
As is clear from FIG. 2, the sleeve 2 is composed of a cylindrical sleeve body 2a, a cap 2b, a fixing nail 2c, and a spacer portion 2d.

上記スリーブ本体2aは、プラスチック或いは金属製の
筒体からなり、その中を貫通する管体P(第4図参照)
の直径より大きい内径と、スラブ厚よりやや低い高さを
有する。また、該スリーブ本体2aは、スラブコンクリ
ート打設後に取外す場合には、特に上に広がったテーパ
ー状(#S2図の仮想線状1)に形成して、引抜き易い
ようにするとよい。
The sleeve main body 2a is made of a plastic or metal cylinder, and a pipe P (see Fig. 4) passes through the sleeve body 2a.
has an inner diameter larger than the diameter of the slab and a height slightly lower than the slab thickness. Further, when the sleeve main body 2a is to be removed after slab concrete is placed, it is preferably formed into an upwardly tapered shape (imaginary line shape 1 in Figure #S2) so that it can be easily pulled out.

上記キャップ2bは、スリーブ本体2aに対して着脱自
在に嵌め込まれている。この場合、この去め込み部から
水が浸透しないように、水返し2b。
The cap 2b is removably fitted into the sleeve body 2a. In this case, the water return 2b is installed to prevent water from penetrating through this recessed portion.

を形成しておくとよい。また、上記キャップ2)〕の裏
側には補強用のリプ2b2を形成しておくと、例えば足
場や支保材が乗っても破損するようなことはない。尚、
キャップ2bの外周裏側の適宜箇所に切込2b、を設け
て、これにドライバー等の先を突っ込んでキャップ2b
を外し易いようにしておくとよい。
It is a good idea to form a Furthermore, if a reinforcing lip 2b2 is formed on the back side of the cap 2), it will not be damaged even if, for example, a scaffold or support material is placed on it. still,
Make a notch 2b at an appropriate location on the back side of the outer periphery of the cap 2b, and insert the tip of a screwdriver etc. into the notch 2b to remove the cap 2b.
It is a good idea to make it easy to remove.

上記固定釘2cは、少なくとも3個以上、スリーブ本体
2aの円周下端部に均等に配置しておくのが望ましく、
該固定釘2cをスラブ用型枠1に打付けてスリーブ2を
セットする。
It is desirable that at least three or more fixing nails 2c are arranged evenly around the lower end of the circumference of the sleeve main body 2a,
The sleeve 2 is set by driving the fixing nails 2c into the slab formwork 1.

上記スペーサー2dは、スラブ用型枠1とスリーブ本体
2aの下端面との開に僅かな隙間Sを保ってスリーブ2
をセットし、打設したスラブコンクリートのモルタルが
流れ込むことが出来るようにしである。尚、本実施例で
は、このスペーサー2dは固定釘2cの支持部にもなっ
ている。これら固定釘2cとスペーサー2dは、各々別
の位置に分離して配置してもよい。
The spacer 2d maintains a slight gap S between the slab formwork 1 and the lower end surface of the sleeve body 2a, and the sleeve 2d
This is done so that the mortar of the poured concrete slab can flow into it. In this embodiment, the spacer 2d also serves as a support for the fixing nail 2c. These fixed nails 2c and spacers 2d may be arranged separately at different positions.

上記スリーブ2のセットが完了すると、fjS3図に示
すように、スラブコンクリートCを打設する。
When the setting of the sleeve 2 is completed, slab concrete C is poured as shown in Fig. fjS3.

この時、上述のようにスラブ用型枠1とスリーブ本体2
aの下端面との隙間Sからモルタルが流れ込み・スリー
ブ2内に後打するコンクリートとの一体化を図ったり、
また、特に埋込み型のスリーブの場合には、スリーブ2
の下端面がスラブの下面から露出して耐火上問題を生ず
ることのないように、十分なかぶり厚を出すようになっ
ている。
At this time, as mentioned above, the slab formwork 1 and the sleeve body 2
Mortar flows from the gap S between the lower end surface of a and integrates with the concrete that will be poured later into the sleeve 2.
In addition, especially in the case of an implantable sleeve, sleeve 2
Sufficient cover thickness is provided to prevent the lower end surface from being exposed from the lower surface of the slab and causing fire resistance problems.

コンクリ−)Cが硬化したら、上記スラブ型枠1を脱型
すると共に、キャップ2bを取外し、第4図に示すよう
に、スリーブ2内に管体Pを挿設する。
Once the concrete (C) has hardened, the slab formwork 1 is demolded, the cap 2b is removed, and the tube P is inserted into the sleeve 2 as shown in FIG.

次に、第5図に示すように、例えば薄いベニヤ板のよう
な管回りコンクリート後打用型枠3を上記固定釘2cに
より打込み固定し、スリーブ2と管体Pとの隙間の下側
を塞ぐ。
Next, as shown in FIG. 5, a formwork 3 for post-casting concrete around the pipe, such as a thin plywood board, is driven and fixed with the fixing nails 2c, and the lower side of the gap between the sleeve 2 and the pipe body P is closed. .

続いて、第6図に示すように、スリーブ2と管体Pとの
隙間に後打コンクリートC′を打設し、該コンクリート
C′が硬化した後、上記管回りコンクリート後打用型枠
3を脱型すると共に、固定釘2cを切り取って作業を完
了する。
Subsequently, as shown in FIG. 6, post-cast concrete C' is placed in the gap between the sleeve 2 and the pipe body P, and after the concrete C' has hardened, the formwork 3 for post-cast concrete around the pipe is poured. At the same time, the fixing nail 2c is cut out to complete the work.

尚、上記管回りコンクリート後打用型枠3に代元で、第
7図に示すような、分割型の管回りコンクリート後打用
型枠4を用いて管体Pに締付バンド4aにより締付ける
と共に、7ランノ4bの穴にボルトを通して締付けて管
体Pに取付け、Pt5a図に示すように、スリーブ2と
管体Pとの隙間に後打コンクリートC′を打設してもよ
い。この場合には、埋込んだスリーブ2に対するか」ζ
り厚が十分となり、特に耐火効果がある。従って、スラ
ブコンクリ−)Cの打設時に、スリーブ2下側のモルタ
ルの流込みは必ずしも必要ない。上記締付バンド4aに
よる締着には、図示のようなボルト・ナツトによるもの
のほかに、ワンタッチで掛止めることのできる締付金具
にしてもよい。
In addition, in place of the above-mentioned formwork 3 for concrete post-casting around the pipe, a split-type formwork 4 for post-casting concrete around the pipe as shown in Fig. 7 is used to tighten the pipe body P with a tightening band 4a. At the same time, bolts may be passed through the holes of the 7-run no. 4b and tightened to attach them to the pipe P, and post-cast concrete C' may be placed in the gap between the sleeve 2 and the pipe P, as shown in Figure Pt5a. In this case, for the implanted sleeve 2?
It has a sufficient thickness and is particularly effective in fire resistance. Therefore, when pouring the mortar under the sleeve 2 when pouring the slab concrete (C), it is not necessarily necessary. For fastening with the above-mentioned tightening band 4a, in addition to using bolts and nuts as shown in the figure, a fastening metal fitting that can be latched with one touch may be used.

[発明の効果] (1)工事中のスラブ貫通孔用のスリーブに着脱自在の
キャップを設けたので、落水やゴミ・研りがう等の落下
の恐れがなく、作業具が足を差込む等の事故の恐れもな
い。
[Effects of the invention] (1) A removable cap is provided on the sleeve for the through hole in the slab during construction, so there is no fear of falling water, dirt, sanding particles, etc., and the foot of the work tool can be inserted. There is no fear of such accidents.

(2)スリーブの下端面に固定釘を突設したので、スリ
ーブをスラブ型枠に容易にセットし得るのみならず、該
固定釘により管回りコンクリート後打用型枠も取付ける
ことができる。
(2) Since fixing nails are provided protruding from the lower end surface of the sleeve, not only can the sleeve be easily set in the slab formwork, but also the formwork for post-casting concrete around the pipe can be attached using the fixing nails.

(3)スリーブの下側に僅かの隙間をあけて、ここから
コンクリートモルタルを流出させ、後打コンクリートと
の一体化を図ることができる。
(3) A slight gap is provided at the bottom of the sleeve, through which the concrete mortar can flow out and be integrated with the post-cast concrete.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図はスリーブをスラブ型枠にセットした状態を示す
断面図、第2図はスリーブを斜め下方から見上げた状態
の斜視図、PtIJ3図はスラブコンクリートを打設し
た状態の断面図、第4図はスラブ型枠を外して管を配管
した状態の断面図、第5図は管回りにコンクリート後打
用型枠を取り付けた状態の断面図、第6図は管回りコン
クリートを後打して型枠を解体した断面図、第7図は管
回りコンクリート後打用型枠の別の実施例を示す分解斜
視図、第8図はそれによるコンクリートの後打状説明図
である。 1・・・スラブ用型枠、2・・・スリーブ、2a・・・
スリーブ本体、2b・・・キャップ、2b、・・・水返
し、2b2・・・リブ、2b、・・・切込、2c・・・
固定釘、2d・・・スペーサ一部、3・・・管回りコン
クリート後打用型枠、S・・・間隙、C・・・スラブコ
ンクリート、c′・・・後打コンクリート、P・・・管
体。
Fig. 1 is a cross-sectional view showing the sleeve set in the slab formwork, Fig. 2 is a perspective view of the sleeve looking up from diagonally below, PtIJ3 is a cross-sectional view of the slab concrete being poured, and Fig. 4 is a cross-sectional view showing the sleeve set in the slab formwork. The figure is a cross-sectional view of the pipe with the slab formwork removed, Figure 5 is a cross-sectional view of the post-concrete pour formwork attached around the pipe, and Figure 6 is a cross-sectional view of the pipe with post-cast concrete around the pipe. FIG. 7 is an exploded perspective view showing another embodiment of the formwork for post-casting of concrete around pipes, and FIG. 8 is an explanatory diagram of the post-casting shape of concrete thereby. 1... Formwork for slab, 2... Sleeve, 2a...
Sleeve body, 2b...cap, 2b...water return, 2b2...rib, 2b,...notch, 2c...
Fixed nail, 2d... Part of spacer, 3... Formwork for post-cast concrete around the pipe, S... Gap, C... Slab concrete, c'... Post-cast concrete, P... tube body.

Claims (6)

【特許請求の範囲】[Claims] (1)着脱自在のキャップを有するスリーブをスラブ用
型枠の貫通孔位置にセットしてスラブコンクリートを打
設し、該スラブコンクリート硬化後に脱型してスリーブ
内に管体を挿設し、該管体とスリーブとの間隙の下側に
管回りコンクリート後打用型枠を取付けて、管体とスリ
ーブとの間隙内に後打コンクリートを打設し、該後打コ
ンクリートの硬化後に上記後打用型枠を脱型することを
特徴とするスラブ貫通配管用スリーブ工法。
(1) A sleeve with a removable cap is set in the through-hole position of the slab formwork, slab concrete is poured, and after the slab concrete has hardened, the mold is removed and the pipe is inserted into the sleeve. A formwork for post-cast concrete around the pipe is installed below the gap between the pipe body and the sleeve, and post-cast concrete is poured into the gap between the pipe body and the sleeve, and after the post-cast concrete has hardened, the post-cast concrete is poured. A sleeve construction method for slab-through piping, which is characterized by removing the formwork.
(2)スリーブの下端面に突設した固定釘をスラブ用型
枠に打付けて、スリーブをセットすることを特徴とする
前記特許請求の範囲第1項に記載のスラブ貫通配管用ス
リーブ工法。
(2) The sleeve construction method for slab-through piping according to claim 1, characterized in that the sleeve is set by driving fixing nails protruding from the lower end surface of the sleeve into a slab formwork.
(3)スリーブの下端面に突設した固定釘に、管回りコ
ンクリート後打用型枠を打付けて取付けることを特徴と
する前記特許請求の範囲第1項または第2項に記載のス
ラブ貫通配管用スリーブ工法。
(3) The slab penetration according to claim 1 or 2, characterized in that the sleeve is attached by nailing a formwork for post-concrete around the pipe to fixed nails protruding from the lower end surface of the sleeve. Piping sleeve construction method.
(4)管回りコンクリート後打用型枠を管体に取付ける
ことを特徴とする前記特許請求の範囲第1項または第2
項に記載のスラブ貫通配管用スリーブ工法。
(4) Claim 1 or 2, characterized in that a formwork for post-casting concrete around the pipe is attached to the pipe body.
Sleeve construction method for slab-through piping described in section.
(5)スリーブの下端面とスラブ用型枠との間に僅な間
隙を形成して、スラブコンクリートのモルタルが流れ込
むことができるようにしたことを特徴とする前記特許請
求の範囲第1項ないし第4項のいずれか1項に記載のス
ラブ貫通配管用スリーブ工法。
(5) A slight gap is formed between the lower end surface of the sleeve and the slab formwork to allow mortar for slab concrete to flow into it. The sleeve construction method for slab penetration piping according to any one of Item 4.
(6)後打コンクリートを打設する前に、スリーブを取
外すことを特徴とする前記特許請求の範囲第1項、第3
項、第4項または第5項に記載のスラブ貫通配管用スリ
ーブ工法。
(6) Claims 1 and 3 above, characterized in that the sleeve is removed before pouring concrete.
5. Sleeve construction method for slab penetrating piping according to item 4 or 5.
JP62152986A 1987-06-19 1987-06-19 Slave method for slab penetration piping Expired - Lifetime JPH07116837B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP62152986A JPH07116837B2 (en) 1987-06-19 1987-06-19 Slave method for slab penetration piping

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP62152986A JPH07116837B2 (en) 1987-06-19 1987-06-19 Slave method for slab penetration piping

Publications (2)

Publication Number Publication Date
JPS63315767A true JPS63315767A (en) 1988-12-23
JPH07116837B2 JPH07116837B2 (en) 1995-12-18

Family

ID=15552462

Family Applications (1)

Application Number Title Priority Date Filing Date
JP62152986A Expired - Lifetime JPH07116837B2 (en) 1987-06-19 1987-06-19 Slave method for slab penetration piping

Country Status (1)

Country Link
JP (1) JPH07116837B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009084787A (en) * 2007-09-27 2009-04-23 Nisan Sangyo Kk Sleeve tube fixing method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS52171723U (en) * 1976-06-21 1977-12-27
JPS577821U (en) * 1980-06-16 1982-01-16
JPS6073745U (en) * 1983-10-27 1985-05-24 稲葉 孝治 Sleeve fixing device used during concrete pouring

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS52171723U (en) * 1976-06-21 1977-12-27
JPS577821U (en) * 1980-06-16 1982-01-16
JPS6073745U (en) * 1983-10-27 1985-05-24 稲葉 孝治 Sleeve fixing device used during concrete pouring

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009084787A (en) * 2007-09-27 2009-04-23 Nisan Sangyo Kk Sleeve tube fixing method

Also Published As

Publication number Publication date
JPH07116837B2 (en) 1995-12-18

Similar Documents

Publication Publication Date Title
JPS63315767A (en) Sleeve construction method for slab piercing piping
US8628703B2 (en) Apparatus and system for forming concrete blockouts
JPH0539152Y2 (en)
JP3029343U (en) Form tool for mortar material injection in exposed elastic fixed column base method
JPH0380210B2 (en)
JPH0539153Y2 (en)
JPH0340982Y2 (en)
JP3017247U (en) Height adjustment fittings and concrete members with height adjustment fittings
JPH0238988Y2 (en)
JPH0712432Y2 (en) Foundation anchor bolt
JPH08144515A (en) Positioning fixing device of sleeve
JPH0826667B2 (en) Anchor for handrail mounting at slab opening and its pre-attachment method
JP3021412U (en) Reinforcing bar receiver for construction slope
JPH0725389Y2 (en) Formwork for manhole
JPH10195810A (en) Tie-bar with socket for concrete pavement
JP3033479U (en) Fixture for draining pipe construction with nail holes in the reinforcing ribs
JPS6127422Y2 (en)
JPH0477093B2 (en)
JPH10121724A (en) Molding tool for slab throgh hole for piping
JPS61113935A (en) Locating and fixing jig of drain device
JP2510069Y2 (en) Ceramic insert nut
KR200235135Y1 (en) A Fixing Device for Steel form Panel
JPS6319477Y2 (en)
JPH10266428A (en) Permanent form
JPH0130481Y2 (en)