Construction of cast-in-place pile

Info

Publication number
JPS63156114A
JPS63156114A JP30469086A JP30469086A JPS63156114A JP S63156114 A JPS63156114 A JP S63156114A JP 30469086 A JP30469086 A JP 30469086A JP 30469086 A JP30469086 A JP 30469086A JP S63156114 A JPS63156114 A JP S63156114A
Authority
JP
Japan
Prior art keywords
concrete
excavation
pile
casing
cast
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP30469086A
Other languages
Japanese (ja)
Inventor
Kiyomi Ishioka
石岡 清見
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ISHIOKA KENSETSU KK
Original Assignee
ISHIOKA KENSETSU KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ISHIOKA KENSETSU KK filed Critical ISHIOKA KENSETSU KK
Priority to JP30469086A priority Critical patent/JPS63156114A/en
Publication of JPS63156114A publication Critical patent/JPS63156114A/en
Pending legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

PURPOSE:To construct cast-in-place piles without using stabilizing liquid, by using removable coupled casings to form an excavated pit, and by removing the castings to be lifted up in order according to filling up the pit with concrete. CONSTITUTION:Excavation is executed by an excavating head, and the casings 8 of specified lengths are pressed in and coupled in order to form a space A for constructing piles. After that, the excavating head is removed, and after a reinforced cage 23 is inserted, a filling hose 24 provided with a vibrator 25 is inserted into the space A, and concrete B is cast. In this case, the hose 24 is lifted up so that the concrete injection nozzle of the hose 24 may be always positioned near the upper surface of the concrete, and the coupled casings 8 are pulled out in order to be removed. As a result, without using stabilizing liquid, cast-in-place piles can be constructed.

Description

【発明の詳細な説明】 〔産業上の利用分野〕 本発明は、場所打ち杭の構築工法に関するものである。[Detailed description of the invention] [Industrial application field] The present invention relates to a construction method for cast-in-place piles.

〔従来の技術) 場所打ち杭構築工法の一つに、壁面崩壊防止用の周面安
定液(例えばベントナイト溶液)を掘削穴に満たしなが
ら、ドリリングバケットによって所定深さの穴を掘削し
、次いで該掘削穴に鉄筋カゴを挿入すると共にコンクリ
ートを打設し、かつ、このコンクリートの打設に並行し
て前記周面安定液をサンドポンプで回収する所謂アース
工法がある。
[Prior art] One method for constructing cast-in-place piles is to use a drilling bucket to drill a hole to a predetermined depth while filling the hole with a surrounding surface stabilizing solution (for example, bentonite solution) to prevent wall collapse. There is a so-called earthing method in which a reinforcing bar cage is inserted into an excavated hole, concrete is poured, and the surrounding surface stabilizing liquid is collected using a sand pump in parallel with the concrete pouring.

〔発明が解決しようとする問題点〕[Problem that the invention seeks to solve]

かかる工法においては次なる問題がある。 This construction method has the following problems.

(1)周面安定液供給のための設備とこれの現場搬入、
並びに、該設備の設置場所を要する点。
(1) Equipment for supplying peripheral surface stabilizing liquid and its delivery to the site;
Also, the installation location of the equipment is required.

(2)周面安定液の回収と後処理に多大の費用を要する
点。
(2) Recovery and post-processing of the peripheral surface stabilizing liquid requires a large amount of cost.

(3)掘削排土に周面安定液が浸透して取り出されるた
め、残土処理が非常に困難になり、かつ、該残土が産業
廃棄物と見做されるため処理コストが高くつく点。
(3) Since the surrounding surface stabilizing liquid permeates into the excavated soil and is taken out, it becomes extremely difficult to dispose of the remaining soil, and the processing cost is high because the remaining soil is considered as industrial waste.

(4)  打設コンクリートに周面安定液が混入し杭天
端にスラッジが浮き上がることから、抗頭にコンクリー
トを予盛りしておいて、杭構築後に設計上の杭天端位置
まで前記予盛りコンクリートをはつり取る極めて困難で
時間の掛かる作業を要する点。
(4) Because the surrounding surface stabilizing liquid mixes with the poured concrete and sludge floats to the top of the pile, pre-fill concrete at the head of the pile, and after constructing the pile, peel off the pre-filled concrete to the designed pile top position. Points that require extremely difficult and time-consuming work.

〔問題点を解決するための手段〕[Means for solving problems]

本発明は、上述の実情に鑑みて発案されたものであって
、上記の問題を一切伴わない極めて合理的な場所打ち杭
の構築工法を提供せんことを目的としている。
The present invention was devised in view of the above-mentioned circumstances, and aims to provide an extremely rational construction method for cast-in-place piles that does not involve any of the above-mentioned problems.

かかる目的を達成するための本発明による場所打ち杭の
構築工法は、長手方向で分離自在な壁面崩壊防止用の連
結ケーシングによる杭構築用空間に鉄筋カゴを挿入する
と共にコンクリートを打設し、該コンクリートの打設に
並行して前記連結ケーシングを引き上げ当該連結ケーシ
ングの上部側のケーシング体を順次分離すると共に、下
部側のケーシング体を、それの下端を設計上の杭天端よ
りもやや下方に上端を地表上に位置させた状態で地中に
残置し、かつ、打設コンクリートが硬化する前に杭天端
を所定通りに処理して後に、当該杭天端を分割キャップ
で保護すると共に該分割キャップ上に土砂を埋め戻し、
然るのち前記地中に残置させたケーシング体を引き抜く
点に特徴がある。
To achieve this purpose, the cast-in-place pile construction method according to the present invention involves inserting a reinforcing bar cage into a pile construction space using a longitudinally separable connected casing for wall collapse prevention, and pouring concrete. In parallel with the pouring of concrete, the connected casing is pulled up and the upper casing body of the connected casing is successively separated, and the lower end of the lower casing body is moved slightly below the designed top of the pile. The pile is left in the ground above the ground surface, and after the top of the pile is treated as specified before the poured concrete hardens, the top of the pile is protected with a split cap, and earth and sand are poured onto the split cap. backfilling,
The feature is that the casing body left underground is then pulled out.

〔作用〕[Effect]

上記の特徴構成によれば、杭構築後に前記分割キャップ
上の土砂を排除し且つ前記分割キャップを取り除くこと
で、杭天端に所定の処理が成された抗頭部を露出でき、
而して、直ちに床面施工などの作業に取り掛かることが
できる。
According to the above characteristic structure, by removing the earth and sand on the divided cap and removing the divided cap after the pile is constructed, it is possible to expose the head of the pile which has been subjected to a predetermined treatment at the top of the pile,
Therefore, work such as floor construction can be started immediately.

〔実施例〕〔Example〕

先ず、本発明による場所打ち杭の構築工法に用いて好適
な掘削機を第1図に基づいて説明する。
First, an excavator suitable for use in the cast-in-place pile construction method according to the present invention will be explained based on FIG.

かかる掘削機は、クローラ式走行装置1に備えられた旋
回台2に、アウトリガ−3,3ならびにオペレーター室
4を設けると共に、該旋回台2に対して前記オペレータ
ー室4の前部側にガイド支柱5を設け、かつ、回転式の
掘削体6を駆動回転させるための掘削体駆動装置7と、
連結ケーシング8を駆動回転させるためのケーシング駆
動装置9とを、前記ガイド支柱5に沿わせて一体的に吊
り下げワイヤーIOを介して昇降自在に設けると共に、
前記連結ケーシング8を地中に押し込むためのワイヤー
11を前記掘削体駆動袋ff7に連動連結しである。
This excavator is provided with outriggers 3, 3 and an operator's room 4 on a swivel 2 provided on a crawler-type traveling device 1, and a guide column is provided on the front side of the operator's room 4 with respect to the swivel 2. 5, and an excavation body driving device 7 for driving and rotating a rotary excavation body 6;
A casing drive device 9 for driving and rotating the connecting casing 8 is integrally provided along the guide column 5 via a hanging wire IO, and is movable up and down.
A wire 11 for pushing the connection casing 8 into the ground is interlocked and connected to the excavation body drive bag ff7.

そして、必要に応じて前記掘削体6の流体導入路を通し
て掘削ヘッド12の先端から掘削・排出用の霧状流体を
加圧供給するための霧状流体供給装置13を配置しであ
る。
A mist fluid supply device 13 is disposed for supplying atomized fluid for excavation and discharge under pressure from the tip of the excavation head 12 through the fluid introduction path of the excavation body 6 as required.

かかる霧状流体の供給装置13は、第2図に示すように
、エアーコンプレッサ14からの高圧空気供給管15と
水ポンプ16からの高圧水供給管17とを合流させると
共に、その合流管18を前記掘削体駆動袋W7の霧状流
体導入路に対し着脱自在に構成し、かつ、手動切換え自
在な圧力パルプ19を前記合流管18に介装して成る。
As shown in FIG. 2, this atomized fluid supply device 13 connects a high-pressure air supply pipe 15 from an air compressor 14 and a high-pressure water supply pipe 17 from a water pump 16, and connects the joining pipe 18 to a high-pressure air supply pipe 15 from an air compressor 14. A pressure pulp 19 which is configured to be detachable from the atomized fluid introduction path of the excavation body drive bag W7 and can be manually switched is interposed in the confluence pipe 18.

而して、前記エアーコンプレッサ14から加圧空気(例
えば7kg/aJの圧力空気を800〜10001 /
5in)を吐出させると共に、前記水ポンプ16から加
圧水(例えば40kg/−の圧力水を15 j! /m
tn)を吐出させることによって、前記大量の空気に少
量の水を混合した霧状の流体を合流管1日を介して前記
掘削体駆動装置7の流体導入路に供給できるようになっ
ている。
Then, pressurized air (for example, 7 kg/aJ of pressurized air is supplied from the air compressor 14 at a rate of 800 to 10,001 /
At the same time, the water pump 16 discharges pressurized water (for example, 40 kg/- of pressurized water at 15 j!/m).
By discharging a large amount of air and a small amount of water, a mist-like fluid can be supplied to the fluid introduction path of the excavation body driving device 7 through the confluence pipe.

尚、上記の圧力パルプ19は、合流管1日における背圧
が設定圧(例えば6kg/aJ)以上になると閉弁され
、このとき同時に、前記水ポンプ16のモータMを停止
させるようにしである。
The above-mentioned pressure pulp 19 is closed when the back pressure of the confluence pipe in one day exceeds a set pressure (for example, 6 kg/aJ), and at the same time, the motor M of the water pump 16 is stopped. .

次に、場所打ち杭構築のための掘削穴の形成手順につい
て説明すると、先ず、合計長さが所定の穴深さに対応す
る長さよりも長くなる個数のケーシング体20・・・を
用意し、且つ第3図に示すように、その内の一つの下端
には掘削刃aを備えたものとして、該掘削刃a付のケー
シング体20と残りのケーシング体20の幾つかを長手
方向で連結して連結ケーシング8を構成すると共に、該
連結ケーシング8を前記ケーシング駆動袋W9に吊り下
げ連結する。
Next, to explain the procedure for forming an excavated hole for constructing a cast-in-place pile, first, prepare a number of casing bodies 20 whose total length is longer than the length corresponding to a predetermined hole depth, As shown in FIG. 3, the lower end of one of the casing bodies 20 is provided with a digging blade a, and the casing body 20 with the digging blade a and some of the remaining casing bodies 20 are connected in the longitudinal direction. The connecting casing 8 is constructed by connecting the connecting casing 8 to the casing driving bag W9.

一方、先端に掘削ヘッド12を有する回転式の掘削体6
 (オーガスタリュを例示してあり、これもスクリュ単
体6aを連結して成る。)を、前記連結ケーシング8に
挿入さセる状態で前記スクリュ駆動装置7に吊り下げ連
結し、かつ、前記霧状流体供給装置13の合流管18を
前記掘削体駆動装置7の霧状流体導入路に接続する。
On the other hand, a rotary excavating body 6 having an excavating head 12 at its tip
(An Augusta screw is shown as an example, and this is also formed by connecting screw units 6a.) is suspended and connected to the screw drive device 7 while being inserted into the connection casing 8, and the atomized The confluence pipe 18 of the fluid supply device 13 is connected to the atomized fluid introduction path of the excavation body drive device 7.

そして、前記合流管18を通して前記掘削ヘッド12の
先端から霧状流体を導出させながら、前記掘削体6を掘
削方向に回転させると共に、該掘削体6よりも遅い速度
で同方向(逆方向でもよい、)に前記連結ケーシング8
を回転させ、もって、当該連結ケーシング8と掘削体6
の回転、並びに霧状流体6の導出によって地盤を掘削・
排土しつつ、前記ワイヤー11の巻き込みによって前記
連結ケーシング8を地中に圧入させるのであり、かつ、
掘削の進行に伴い順次スクリュ単体6a並びにケーシン
グ体20を連結するのである。
Then, while the atomized fluid is led out from the tip of the excavation head 12 through the merging pipe 18, the excavation body 6 is rotated in the excavation direction, and at a speed slower than that of the excavation body 6 in the same direction (or in the opposite direction). , ) to the connecting casing 8
by rotating the connected casing 8 and the excavated body 6.
The ground is excavated and excavated by the rotation of the
While removing the earth, the connection casing 8 is press-fitted into the ground by the winding of the wire 11, and
As excavation progresses, the screw unit 6a and the casing body 20 are successively connected.

而して、上記の霧状流体を導出する掘削によれば、該霧
状流体の水分が潤滑剤になることで、掘削対象土質の如
何に拘らず掘削を良好に行えると共に、掘削体6に掘削
土砂が密着することがない   “ので、該掘削土砂を
大量の霧状流体によって所定通り容易に加圧排土するこ
とができる。
According to the above-mentioned excavation that derives the atomized fluid, the moisture in the atomized fluid acts as a lubricant, so that the excavation can be performed well regardless of the soil quality of the excavation target, and the excavation body 6 is Since the excavated earth and sand do not stick together, the excavated earth and sand can be easily pressurized and discharged as specified using a large amount of atomized fluid.

かかる掘削に際して、前記掘削体6の掘進速度を速くし
過ぎると、掘削ヘッド12の霧状流体導出口が詰まって
閉塞されてしまい、水ポンプ16による加圧水供給の高
圧がエアーコンプレッサ14にかかって、該コンプレッ
サ14が破損する虞れがある。
During such excavation, if the excavation speed of the excavation body 6 is made too fast, the atomized fluid outlet of the excavation head 12 will become clogged and blocked, and the high pressure of pressurized water supplied by the water pump 16 will be applied to the air compressor 14. There is a risk that the compressor 14 may be damaged.

しかし、かかる導出口閉塞の事態を生じると、前記合流
管18に介装した圧力パルプ19がその異常圧を感知し
て、前記合流管18を閉止すると共に、同時に前記水ポ
ンプ16のモータMが駆動停止されるので、前記エアー
コンプレッサ14が破損する事態を回避できる。
However, when such a situation where the outlet port is blocked occurs, the pressure pulp 19 installed in the merging pipe 18 senses the abnormal pressure and closes the merging pipe 18, and at the same time, the motor M of the water pump 16 is turned off. Since the drive is stopped, a situation where the air compressor 14 is damaged can be avoided.

ところで、前記掘削体6の先端に付設された第3図に示
す掘削ヘッド12は、粘土や砂礫、シルト等の地盤の掘
削に適するものであって、掘削部分に岩石やコンクリー
ト構造物などの障害物があると掘削が不可能になること
がある。
By the way, the excavation head 12 shown in FIG. 3 attached to the tip of the excavation body 6 is suitable for excavating ground such as clay, gravel, silt, etc. Objects may make excavation impossible.

かかる場合は、前記掘削体6を地表上に引き上げて前記
掘削ヘッド12を取り外し、第4図に示すような障害物
破壊用の掘削ヘッド21を装着して掘削を行えば良い、
あるいは、掘削当初から前記掘削ヘッド21によって掘
削を行うも良い。
In such a case, the excavator 6 may be lifted above the ground surface, the excavation head 12 removed, and the excavation head 21 for destroying obstacles as shown in FIG. 4 may be attached and excavation performed.
Alternatively, the excavation may be performed by the excavation head 21 from the beginning of excavation.

尚、上記掘削の開始と同時に前記掘削ヘッド12(また
は21)の先端から霧状流体を導出させる必要はなく、
ある程度掘削が進行してから霧状流体を掘削へγド12
(または21)から導出させるも良(、あるいは、加圧
空気のみを供給しながら掘削を行うと共に、前記掘削ヘ
ッド12(または21)が硬質粘土や粘性岩などの地層
に達した時点で水ポンプ16を作動させて、前記掘削ヘ
ッド12(または21)から霧状流体を導出させる掘削
形態をとるも良い。
Note that it is not necessary to lead out the atomized fluid from the tip of the excavation head 12 (or 21) at the same time as the start of the excavation.
After the excavation has progressed to a certain extent, the atomized fluid is applied to the excavation.
(or 21) (Alternatively, excavation may be carried out while supplying only pressurized air, and when the excavation head 12 (or 21) reaches a stratum such as hard clay or viscous rock, a water pump 16 may be operated to take a form of excavation in which atomized fluid is drawn out from the excavation head 12 (or 21).

さて、前記連結ケーシング8の所定深さへの圧入ならび
に掘削土砂の排出を完了した時点で前記掘削体6を地表
上に引き上げ、第5図に示すような底浚い用の掘削体2
2を前記掘削体駆動装W7に連結して、該底浚い用掘削
体22により掘削穴の底浚いを行うのである。
Now, when the connection casing 8 has been press-fitted to a predetermined depth and the excavated soil has been discharged, the excavation body 6 is pulled up above the ground surface, and the excavation body 6 for bottom dredging as shown in FIG.
2 is connected to the excavation body driving device W7, and the bottom of the excavation hole is dredged by the bottom dredging excavation body 22.

以上をもって場所打ち杭構築用の穴掘削を完了するので
あり、そして第6図に示すように、かくして形成された
連結ケーシング8による杭構築用空間Aに、縦筋23a
のみが設計上の杭天端よりも上方に突出するように形成
された鉄筋カゴ23を挿入すると共に、例えばコンクリ
ートミキサー車に接続されたコンクリート注入ホース2
4を、それの下端側にバイブレータ−25を付設して、
該ホース24のコンクリート吐出口を苅記杭構築用空間
Aの下方に位置させ、コンクリートBの打設を行うので
ある。
With the above, the hole excavation for constructing the cast-in-place pile is completed, and as shown in FIG.
A reinforcing bar cage 23 is inserted so that its only part protrudes above the designed top of the pile, and a concrete injection hose 2 connected to, for example, a concrete mixer truck is inserted.
4, with a vibrator 25 attached to its lower end,
The concrete discharge port of the hose 24 is positioned below the pile construction space A, and concrete B is placed.

このコンクリートBの打設に際して、前記ホース24の
コンクリート吐出口が常にコンクリート上面近くに位置
するように、当該ホース24を引き上げながら、設計上
の杭天端Sよりもやや上方にまでコンクリートBを打設
するのであり、かつ、該コンクリートBの打設に並行し
て、前記連結ケーシング8の下端がコンクリート上面よ
り上方に抜は出さないようにしながら当該連結ケーシン
グ8を引き抜くと共に、この連結ケーシング8の引き抜
きに伴つて地表上に現れてくる上部側のケーシング体2
0を順次分離するのである。
When placing this concrete B, the concrete B is placed slightly above the designed pile top S while pulling up the hose 24 so that the concrete discharge port of the hose 24 is always located near the top surface of the concrete. In addition, in parallel with the pouring of the concrete B, the connecting casing 8 is pulled out while ensuring that the lower end of the connecting casing 8 does not come out above the upper surface of the concrete. The upper casing body 2 appears above the ground.
The 0s are separated one after another.

このように、コンクリートBの打設に並行して連結ケー
シング8を引き抜くことで、該連結ケーシング8の引き
抜きを容易に行えるのであり、かつ、連結ケーシング引
き抜き後の掘削穴にはコンクリートBが充満しているの
で、掘削穴の壁面崩壊を良好に防止できる。
In this way, by pulling out the connecting casing 8 in parallel with the pouring of concrete B, the connecting casing 8 can be easily pulled out, and the excavated hole after pulling out the connecting casing is filled with concrete B. This effectively prevents wall collapse of the excavated hole.

この連結ケーシング8の引き抜きにとって大切なことは
、前記連結ケーシング8の全体を地表上に引き抜いてし
まわないことである。即ち、第7図に示すように、下端
側のケーシング体20を、それの下端を設計上の杭天端
Sよりもやや下方に且つ上端を地表上に位置させた状態
で地中に残置させるのである。
What is important for pulling out the connecting casing 8 is not to pull out the entire connecting casing 8 above the ground surface. That is, as shown in FIG. 7, the lower end side casing body 20 is left in the ground with its lower end located slightly below the designed pile top S and its upper end positioned above the ground surface. .

該地中に残置させるケーシング体20は、上記の条件を
満たすならば個数は不問であるが、該ケーシング体20
の上端をあまり高く地表上に突出させると、後述する作
業の邪魔になることから、1m程度が好適である。
The number of casing bodies 20 to be left underground is not limited as long as the above conditions are satisfied;
If the upper end protrudes too high above the ground surface, it will get in the way of the work to be described later, so it is preferably about 1 m.

さて、上記のコンクリートBの打設ならびに下部側ケー
シング体20の地中残置を所定通りに完了して後で、か
つ、前記コンクリートBが未だ完全に硬化し切らないう
ち(例えばコンクリートを打設して2〜3時間経過後)
において、前記地中に残置させた下部側ケーシング体2
0の上端と前記鉄筋カゴ23とにわたって梯子などを掛
は渡し、該鉄筋カゴ23や梯子などを足場にして、コン
クリート上面が設計上の杭天端S相当高さになるように
、前記コンクリート上面のスラッジと余分のコンクリー
トとを吸引排除すると共に、コンクリート上面に浮いて
いる砂分を押し込むように該コンクリート上面を木ごて
などで均らす杭天端処理の作業を行うのである。
Now, after the concrete B has been poured and the lower casing body 20 has been left in the ground as specified, and before the concrete B has completely hardened (for example, the concrete is poured). (After 2-3 hours)
, the lower casing body 2 left underground
0 and the reinforcing bar cage 23, and using the reinforcing bar cage 23 and the ladder as a foothold, remove the sludge on the top surface of the concrete so that the top surface of the concrete is at a height equivalent to the designed top of the pile S. At the same time, the top of the pile is treated by suctioning out the excess concrete and leveling the top surface of the concrete with a wooden trowel so as to push in any sand floating on the top surface of the concrete.

そして第8図に示すように、前記鉄筋カゴ23の縦筋2
3a・・・を貫通させる孔a・・・が形成され且つ扇形
に分割された杭天端保護用の分割キャップ(外観形状が
前記ケーシング体20の内径に略等しい大きさの例えば
発泡スチロール板などから成る。)26を、前記杭天端
処理されたコンクリート上面に敷き並べて前記杭天端S
を保護すると共に、該分割キャップ26上に土砂を埋め
戻し、然るのち前記地中に残置させたケーシング体20
を引き抜くのである。
As shown in FIG. 8, the vertical bars 2 of the reinforcing bar basket 23
A split cap for protecting the top of a pile is formed with a hole a passing through the cap, and is divided into fan shapes (made of, for example, a foamed polystyrene plate or the like, the external shape of which is approximately equal to the inner diameter of the casing body 20). ) 26 on the top surface of the concrete treated with the pile top to form the pile top S.
The casing body 20 that protects the split cap 26 and backfills earth and sand, and then leaves it in the ground.
It pulls out the.

上記の杭天端処理ならびに杭天端保護の作業に際して、
掘削穴まわりの土砂等がコンクリート上面に落ちこぼれ
ることを防止する上で、前記下部側のケーシング体20
を地中に残置させておくのである。
When performing the above pile top treatment and pile top protection work,
The lower casing body 20 is used to prevent earth and sand around the excavation hole from falling onto the upper surface of the concrete.
is left underground.

以上の作業で場所打ち杭の構築を完了するのであり、後
は前記コンクリートBの硬化を待って前記埋め戻し土砂
を排除し且つ分割キャップ26を取り除くことで、所定
の杭天端処理が成された杭頭部を露出でき、而して、直
ちに床面施工などの作業に取り掛かることができるので
ある。
The construction of the cast-in-place pile is completed with the above operations, and the next step is to wait for the concrete B to harden, remove the backfill earth and sand, and remove the split cap 26, so that the pile is finished with the specified pile top treatment. The head can be exposed, and work such as floor construction can be started immediately.

〔発明の効果〕〔Effect of the invention〕

以上説明したように本発明による場所打ち杭の構築工法
によれば、壁面の崩壊防止にケーシングを用いるので、
従来のように壁崩壊防止用の開面安定液供給設備と、こ
れの現場搬入ならびに設置場所が不要になることはもと
より、周面安定液の回収と後処理も要せず、かつ、掘削
排土に周面安定液が浸透することもないので、掘削排土
の処理も容易になる。
As explained above, according to the construction method of cast-in-place piles according to the present invention, a casing is used to prevent wall collapse.
Not only does it eliminate the need for conventional open surface stabilizing liquid supply equipment to prevent wall collapse, its delivery and installation location, but it also eliminates the need for collecting and post-processing of surrounding surface stabilizing liquid, and eliminates the need for excavation and drainage. Since the surrounding surface stabilizing liquid does not penetrate into the soil, the disposal of excavated soil becomes easier.

更には、コンクリートが硬化する前に杭天端処理をして
おいて、当該杭天端を分割キャップで保護しておくので
、杭構築後に前記分割キャップ上の土砂を排除し且つ前
記分割キャップを取り除くことで、杭天端に所定の処理
が成された杭頭部を露出でき、而して、直ちに床面施工
などの作業に取り掛かることができる。
Furthermore, since the top of the pile is treated before the concrete hardens and the top of the pile is protected with a split cap, by removing the earth and sand on the split cap and removing the split cap after the pile is constructed, The pile head, which has undergone a predetermined treatment, can be exposed at the top of the pile, and work such as floor construction can be started immediately.

而して従来のように、抗頭にコンクリートを予盛りして
おいて、杭構築後に設計上の杭天端位置まで前記予盛り
コンクリートをはつり取る極めて困難で時間の掛かる作
業が不要になり、全体として、床面施工に取り掛かるま
での工期を短縮できると共にコスト的に安価に場所打ち
杭を構築できる合理的な工法を提供できるに至つたので
ある。
This eliminates the need for the extremely difficult and time-consuming work of pre-filling the pile with concrete at the shaft head and then removing the pre-filled concrete to the designed top of the pile after constructing the pile. As a result, we have been able to provide a rational construction method that can shorten the construction period until floor construction begins, and can construct cast-in-place piles at a low cost.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は本発明の工法に用いて好適な掘削機全体の側面
図、第2図は霧状流体供給装置の形態図、第3図及び第
4図は掘削ヘッドの詳細図、第5図は底浚い用掘削体の
破断斜視図、第6図乃至第S図は場所打ち杭構築の手順
を示す説明図である。 8・・・連結ケーシング、20・・・ケーシング体、2
3・・・鉄筋カゴ、26・・・分割キャップ、A・・・
杭構築用空間、B・・・コンクリート、S・・・杭天端
。 出 願 人    石岡建設株式会社 代 理 人    弁理士 藤本英夫 第1図 第2図 第3図 第6図 第8図
Figure 1 is a side view of the entire excavator suitable for use in the construction method of the present invention, Figure 2 is a configuration diagram of the atomized fluid supply device, Figures 3 and 4 are detailed views of the excavation head, and Figure 5. FIG. 6 is a cutaway perspective view of an excavation body for bottom dredging, and FIGS. 6 to S are explanatory diagrams showing the procedure for constructing cast-in-place piles. 8... Connected casing, 20... Casing body, 2
3... Rebar basket, 26... Split cap, A...
Space for pile construction, B: Concrete, S: Pile top. Applicant Ishioka Construction Co., Ltd. Agent Patent Attorney Hideo Fujimoto Figure 1 Figure 2 Figure 3 Figure 6 Figure 8

Claims (1)

【特許請求の範囲】[Claims] 長手方向で分離自在な壁面崩壊防止用の連結ケーシング
による杭構築用空間に鉄筋カゴを挿入すると共にコンク
リートを打設し、該コンクリートの打設に並行して前記
連結ケーシングを引き上げ当該連結ケーシングの上部側
のケーシング体を順次分離すると共に、下部側のケーシ
ング体を、それの下端を設計上の杭天端よりもやや下方
に上端を地表上に位置させた状態で地中に残置し、かつ
、打設コンクリートが硬化する前に杭天端を所定通りに
処理して後に、当該杭天端を分割キャップで保護すると
共に該分割キャップ上に土砂を埋め戻し、然るのち前記
地中に残置させたケーシング体を引き抜くことを特徴と
する場所打ち杭の構築工法。
A reinforcing cage is inserted into the space for building piles using a connecting casing for preventing wall collapse that can be separated in the longitudinal direction, and concrete is poured, and in parallel with the pouring of the concrete, the connecting casing is pulled up and the upper part of the connecting casing is placed. The side casing bodies are separated in sequence, and the lower side casing body is left in the ground with its lower end slightly below the designed top of the pile and its upper end above the ground surface, and is then driven. After the pile top is treated as specified before the concrete hardens, the pile top is protected with a split cap, earth and sand is backfilled onto the split cap, and then the casing body left in the ground is pulled out. A construction method for cast-in-place piles characterized by:
JP30469086A 1986-12-20 1986-12-20 Construction of cast-in-place pile Pending JPS63156114A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP30469086A JPS63156114A (en) 1986-12-20 1986-12-20 Construction of cast-in-place pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP30469086A JPS63156114A (en) 1986-12-20 1986-12-20 Construction of cast-in-place pile

Publications (1)

Publication Number Publication Date
JPS63156114A true JPS63156114A (en) 1988-06-29

Family

ID=17936048

Family Applications (1)

Application Number Title Priority Date Filing Date
JP30469086A Pending JPS63156114A (en) 1986-12-20 1986-12-20 Construction of cast-in-place pile

Country Status (1)

Country Link
JP (1) JPS63156114A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011137318A (en) * 2009-12-28 2011-07-14 Daiho Constr Co Ltd Construction method and apparatus for cast-in-place pile
JP2015042833A (en) * 2013-01-23 2015-03-05 辻 八郎 Reinforcement assembly device utilizing shaft, reinforcement assembly method utilizing shaft, and shaft construction method using the method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4935512B1 (en) * 1970-09-30 1974-09-24
JPS54156310A (en) * 1978-05-31 1979-12-10 Buichi Higuchi Constructing method of concrete pile by place driving that do not use bentonite solution
JPS598827A (en) * 1982-07-03 1984-01-18 Katsumaru Yanaida Large-diameter foundation work

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4935512B1 (en) * 1970-09-30 1974-09-24
JPS54156310A (en) * 1978-05-31 1979-12-10 Buichi Higuchi Constructing method of concrete pile by place driving that do not use bentonite solution
JPS598827A (en) * 1982-07-03 1984-01-18 Katsumaru Yanaida Large-diameter foundation work

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011137318A (en) * 2009-12-28 2011-07-14 Daiho Constr Co Ltd Construction method and apparatus for cast-in-place pile
JP2015042833A (en) * 2013-01-23 2015-03-05 辻 八郎 Reinforcement assembly device utilizing shaft, reinforcement assembly method utilizing shaft, and shaft construction method using the method

Similar Documents

Publication Publication Date Title
WO1996018001A1 (en) Pile head treating tool for cast-in-place pile, pile head treating method, and cast-in-place piling method
JPS63156114A (en) Construction of cast-in-place pile
JP2640841B2 (en) Slime treatment method in cast-in-place pile method
JP2963972B2 (en) Construction method for underground structures
JP2006322190A (en) Pile head processing method of cast-in-place concrete pile and concrete processing agent mixing device
JPH0442498B2 (en)
JP4400700B2 (en) Cutting and drawing method and equipment for existing piles
JP3471742B2 (en) Continuous underground wall construction method
JP2002138475A (en) Method and device for cutting and pulling out existing pile
JP2640419B2 (en) Pile head processing equipment
JPS63223215A (en) In-situ concrete piling work
JPH0718152B2 (en) Excessive concrete treatment method using a screw pump and excess concrete removing device used therefor
JPH02492B2 (en)
JPH079091B2 (en) Soil cement construction method
JPH0868051A (en) Method for embedding pile
JP2878784B2 (en) Drilling rig for slope construction
JPS6249407B2 (en)
JP2023171017A (en) Existing pile extraction method and fluid supply device
CN111305241A (en) Method for treating quicksand in hole digging of manual hole digging pile through light well point dewatering
JPS60126491A (en) Ground drilling method
JPS60208515A (en) Piling work
JPH01131717A (en) Construction of in-situ pile
CN111021385A (en) Precipitation method for treating quicksand when manual hole digging pile hole digging meets quicksand layer
JPH02183011A (en) Device and method for in-situ pile driving
JPS61146913A (en) Method of disposing extra banking concrete in underwater concrete