JPS6245852A - Intermediate connection member of solar energy collecting roof - Google Patents

Intermediate connection member of solar energy collecting roof

Info

Publication number
JPS6245852A
JPS6245852A JP60184298A JP18429885A JPS6245852A JP S6245852 A JPS6245852 A JP S6245852A JP 60184298 A JP60184298 A JP 60184298A JP 18429885 A JP18429885 A JP 18429885A JP S6245852 A JPS6245852 A JP S6245852A
Authority
JP
Japan
Prior art keywords
connecting member
ridge
eaves
engagement
adjustment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP60184298A
Other languages
Japanese (ja)
Other versions
JPH0426020B2 (en
Inventor
高橋 常蔵
孝 平井
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujisash Co Ltd
Hirai Engineering Corp
Original Assignee
Fujisash Co Ltd
Hirai Engineering Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujisash Co Ltd, Hirai Engineering Corp filed Critical Fujisash Co Ltd
Priority to JP60184298A priority Critical patent/JPS6245852A/en
Publication of JPS6245852A publication Critical patent/JPS6245852A/en
Publication of JPH0426020B2 publication Critical patent/JPH0426020B2/ja
Granted legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/40Solar thermal energy, e.g. solar towers
    • Y02E10/44Heat exchange systems

Landscapes

  • Roof Covering Using Slabs Or Stiff Sheets (AREA)

Abstract

(57)【要約】本公報は電子出願前の出願データであるた
め要約のデータは記録されません。
(57) [Summary] This bulletin contains application data before electronic filing, so abstract data is not recorded.

Description

【発明の詳細な説明】 産業上の利用分野 本発明は、太陽エネルギー集収屋根の中間部接続部材に
関するものである。
DETAILED DESCRIPTION OF THE INVENTION FIELD OF INDUSTRIAL APPLICATION The present invention relates to an intermediate connecting member of a solar energy collecting roof.

従来の技術 本出願人は、先に金属屋根材と、該金属屋根材を接続す
るための接続部材と、隣接する接続部材間にスライド可
能に嵌挿したカバーガラス枠4Qびに関連構造よりなる
太陽エネルギー集収屋根を特開昭58−13850号公
報として提案した。
Prior Art The present applicant has first developed a solar panel comprising a metal roofing material, a connecting member for connecting the metal roofing materials, a cover glass frame 4Q slidably inserted between the adjacent connecting members, and related structures. An energy collecting roof was proposed in Japanese Unexamined Patent Publication No. 13850/1983.

ところで、屋根の野地面の長さは片流間口と軒先長さ及
び屋根勾配により決まり、軒先長さはデザイン上の観点
あるいは屋根勾配、隣地境界線及び斜線制限等の関係か
ら様々に設定でき、大工の施工上の精度によっても野地
面の長さは一様でなく、野地面の長さが標準通りでない
と規格品の接続部材に現場で切りつめあるいは孔あけ−
等の加工を行なう必要があった。
By the way, the length of the field surface of the roof is determined by the side-flow frontage, the length of the eaves, and the slope of the roof, and the length of the eaves can be set in various ways from a design perspective, roof slope, adjacent property boundary line, diagonal line restrictions, etc. The length of the field surface is not uniform depending on the construction accuracy of the carpenter, and if the length of the field surface is not according to the standard, the connecting member of the standard product may be cut or drilled on site.
It was necessary to perform other processing.

発明が解決しようとする問題点 *発明の目的は、上述した欠点を除去し、fIP地而の
面さに合った、もしくは最も近い良さの規格化された接
続部材を選択するのみで、野地面の長さが標準通りでな
くても規格品を現場で切りつめあるいは孔あ(j等の加
工を行なう必要がなく、野地面の長さに合せて容易に調
整取付を行なうことが可酢な太陽エネルギー実収屋根の
中間部接続部材をj?供することにある。
Problems to be Solved by the Invention *The purpose of the invention is to eliminate the above-mentioned drawbacks and simply select a standardized connection member that matches or has the closest quality to the field surface. Even if the length is not the standard, there is no need to cut or drill holes (J, etc.) on the spot on the standard product, and it can be easily adjusted and installed according to the length of the field surface. The object of the present invention is to provide an intermediate connecting member of an energy harvesting roof.

問題点を解決するだめの手段 本発明の太陽エネルギー実収屋根の中間部1a続部材は
、断商略溝型の本体両側に下部係合排水溝と垂下脚片と
を設け、前記本体の底部下面に長手方向に沿う支持溝を
設け、前記支持溝の両側に溝型係合部を設け、前記支持
溝の長手方向ほぼ中央に固定用丸孔を設け、前記固定用
丸孔の両側に間隔を、j′3いて長孔を設けた下部接続
部材と、中空本体の下面両側に前記下部接続部材の溝型
係合部に(県会する垂下係合支叫を設け、前記中空本体
の上面両側に立上り部を設け、前記中空本体の中間部両
側に張出して上部支持溝と上部排水溝とを形成し、!’
IXl i足中空本体水平部の長子方向中央とφF先寄
りにそれぞれ取イ;1孔を設けた上部接続部材とからな
り、前記下部接続部材の支持溝の長手方向Il寄りに良
さ調整取付長孔を穿設し、前記上部接続部材の中空本体
水平部の棟部りに前記長さ調整取付長孔に相当して調整
取付用長孔を穿設したことを特徴とする構成を(1する
ものである。
Means for Solving the Problems The intermediate part 1a connecting member of the solar energy harvesting roof of the present invention is provided with a lower engaging drainage groove and a hanging leg piece on both sides of the main body, and the lower surface of the bottom of the main body. A support groove is provided along the longitudinal direction, a groove-shaped engaging portion is provided on both sides of the support groove, a fixing round hole is provided approximately at the center in the longitudinal direction of the support groove, and an interval is provided on both sides of the fixing round hole. , j'3, and a lower connecting member provided with a long hole, and a groove-shaped engaging portion of the lower connecting member on both sides of the lower surface of the hollow body is provided with a hanging engagement shaft, and a hanging engagement shaft is provided on both sides of the upper surface of the hollow body. A rising portion is provided and extends from both sides of the middle portion of the hollow body to form an upper support groove and an upper drainage groove, and!'
IXl i Leg Hollow main body horizontal part taken at the center in the longitudinal direction and toward the tip of φF; consists of an upper connecting member with one hole, and a long hole for adjusting the quality in the longitudinal direction Il of the support groove of the lower connecting member and a long adjustment mounting hole corresponding to the length adjustment mounting hole is bored in the ridge of the horizontal part of the hollow main body of the upper connecting member. It is.

実施例 以下、本発明の実施例を図面に基づいて詳細に説明する
Embodiments Hereinafter, embodiments of the present invention will be described in detail based on the drawings.

第1図は太陽エネルギー実収屋根の完成状(ぷの斜視図
を示し、Aは中間部)&紐部材、Bは、これら中間部接
続部材へ、A間に取付けられた太陽Jネルキー集収体の
カバー枠どなる採光ガラス枠で、1111人部採光ガラ
ス枠B+、中間部採光ガラス枠B2及び棟部採光ガラス
枠B3で構成されている。
Figure 1 shows the completed solar energy harvesting roof (a perspective view of P, where A is the middle part) & the string member, B is the connecting member of the middle part, and the solar J-nel key collector attached between A. The cover frame is made up of a 1111-person lighting glass frame B+, an intermediate lighting glass frame B2, and a ridge lighting glass frame B3.

Δ′は側部接続部材で、この側部接続部材Δ′の片側に
は採光ガラス枠Bが取イ」けられず、側部補強材C(第
3a図)が取付けられる。Dは中間部1811部材カバ
ー、D′は側部接続部材カバーで、これらカバーD、D
’ はその長さがほぼ採光ガラス枠BI7)Ifiさに
相当している。Eは装飾防ゆギトップ(以下防塵キャッ
プという)、Fは側部下隅装飾カバーである。Gは防塵
・配線点検カバーで、)−1は、該防寒・配線点検カバ
ー〇に設けた軒先部吸気孔である。Iは装飾棟冠(以下
棟冠という)で、棟部熱気排出孔Jを有する。Lは装飾
巴冠(以■巴冠という)、Mは活動連結部材(以下連情
員部月という)、Nは第58図に示づ連結具部をオニ’
Vlと係合する棟冠装飾取イリ部材ひあり、4は金属キ
IR(反、191はφr先技飾補強板、27は第3a図
に示す側部補強材Cに取付けた側部脱着カバーである。
Δ' is a side connecting member, and on one side of this side connecting member Δ', the lighting glass frame B is not removed, and a side reinforcing member C (FIG. 3a) is attached. D is the middle part 1811 member cover, D' is the side connecting member cover, and these covers D, D
' has a length that roughly corresponds to the daylighting glass frame BI7) Ifi. E is a decorative anti-swing top (hereinafter referred to as a dust-proof cap), and F is a side lower corner decorative cover. G is a dustproof/wiring inspection cover, and )-1 is an intake hole at the eaves provided in the cold protection/wiring inspection cover. I is a decorative ridge cap (hereinafter referred to as ridge cap), which has a ridge hot air exhaust hole J. L is a decorative tomoekan (hereinafter referred to as tomoekan), M is an active connection member (hereinafter referred to as renjoubutsu), and N is a connector shown in Figure 58.
191 is the φr advanced decorative reinforcing plate, 27 is the side removable cover attached to the side reinforcing member C shown in Fig. 3a. It is.

144は棟部採光ガラス枠B3の上桟に形成した調整有
効面、M′は連結具部材、N′は巴冠取付部材である。
144 is an adjustment effective surface formed on the upper crosspiece of the ridge lighting glass frame B3, M' is a connector member, and N' is a cap mounting member.

第2a図及び第2b図は、太陽エネルギー実収屋根の側
断面図を示ず。1は垂木で、この上に野地板2が張られ
ており、前記野地板2上には下地材どなる防水紙3が張
られ、前記防水紙3上には軒先部から棟部に軒先f1本
5 A 、下部中棧木5B。
Figures 2a and 2b do not show side sectional views of solar energy yielding roofs. Reference numeral 1 denotes a rafter, on which a roofing board 2 is stretched, on the roofing board 2 a waterproof paper 3 that is a base material is stretched, and on the waterproofing paper 3 there are 1 eaves f from the eaves to the ridge. 5 A, lower middle box 5B.

係合桟木5C(図示ぜず)、上部中棧木5D及び棟棧木
5[が配設され、この上に各金属屋根板85.89.9
3が軒先と凍どの間に取付けられ、第3a図及び第3b
図に示ずように、中間部接続部(オAによって順次横方
向に)aaされている。各金属屋根板の両側には立上り
部である係合防水壁を設け、11「先金属屋根板ε35
の軒先部には下方に曲けた軒界水切部86・3設(Jる
。各金属屋根板の下側には、各F1木間に断熱材ア(グ
ラスウール。
An engaging crosspiece 5C (not shown), an upper middle crosspiece 5D, and a ridge crosspiece 5 are arranged, and each metal roof plate 85, 89, 9 is placed on top of this.
3 is installed between the eaves and the frost, Figures 3a and 3b
As shown in the figure, the intermediate connection portion (sequentially laterally by A) is aa. Engagement waterproof walls, which are rising parts, are provided on both sides of each metal roof plate.
At the edge of the eaves, there are 3 downwardly curved eaves border drains (86.

発泡樹脂等)が充填されている。中間部接続部材△によ
って順次横方向に接続された金属屋根板の」二に、軒先
から棟に向って防塵・配線点検カバーG、軒先部採光ガ
ラス枠B+、中間部採光ガラス枠B2及び棟部採光ガラ
ス枠B3が順次連結される。Eは防塵キ17ツブ、44
は軒先係合金具、Pは採光ガラス枠固定金具、Kは採光
ガラス融雪用の洗浄装置Qと連結した散水管、116−
は熱気1+J1出切欠部、9は軒先部横長手方向に設け
られた配線連絡孔、(Jは前記防寒・配線点検カバー〇
に装着した軒先防塵装置、■は防塵キャップEに装着し
たキャップ防g装置である。
foamed resin, etc.). From the eaves to the ridge, there are the dustproof/wiring inspection cover G, the eaves daylighting glass frame B+, the middle daylighting glass frame B2, and the ridge. The lighting glass frames B3 are sequentially connected. E is for dustproof key 17, 44
116- is the eave-edge engagement metal fitting, P is the lighting glass frame fixing fitting, K is the water sprinkler pipe connected to the cleaning device Q for snow melting on the lighting glass, 116-
9 is the hot air 1 + J1 outlet notch, 9 is the wiring communication hole provided in the horizontal and longitudinal direction of the eaves, (J is the eaves dustproof device attached to the cold protection/wiring inspection cover 〇, ■ is the cap anti-g attached to the dustproof cap E) It is a device.

144は棟部採光ガラス枠B3の調整有効面であり、棟
部寄りに調整取付部145が設けられている。、221
は前記調整有効面144の上面に装着した面戸板からな
る面戸プラスマイナス調整装置、240は前記面戸プラ
スマイナス調整装置221に装着した防水カバーである
Reference numeral 144 indicates an effective adjustment surface of the ridge lighting glass frame B3, and an adjustment mounting portion 145 is provided near the ridge. , 221
Reference numeral 240 denotes a side door plus/minus adjustment device consisting of a side door plate attached to the upper surface of the adjustment effective surface 144, and 240 is a waterproof cover attached to the side door plus/minus adjustment device 221.

第4図は、太陽エネルギー集収屋根の下地の要部を示す
斜視図であって、該下地は棟部から軒先部に連なってお
り、所定の間隔を隔てて平行状に配置された複数本の角
材よりなる垂木1の直上に野地板2が取付けられ、前記
野地板2の上面には下地材3が張られ、前記下地材3の
上には棟部と平行な軒先桟木5A、下部中桟木5B、係
合桟木5C,上部中桟木5D及び棟植木5Fが野地板2
の一端から細端まで連続して階段状に固定され、各t1
木間には断熱材7が充填されて下地が形成される。8は
下地の両側に取付けた破風板である。
FIG. 4 is a perspective view showing the main part of the base of the solar energy collecting roof, which extends from the ridge to the eaves, and has a plurality of parallel structures arranged at predetermined intervals. A field board 2 is installed directly above the rafters 1 made of square timbers, a base material 3 is placed on the top surface of the field board 2, and on top of the base material 3 are an eave sill 5A parallel to the ridge, and a lower middle sill. 5B, engaging crosspiece 5C, upper middle crosspiece 5D and ridge plant 5F are field board 2
are fixed in a stepwise manner from one end to the narrow end, and each t1
A heat insulating material 7 is filled between the wood to form a base. 8 is a gable plate attached to both sides of the base.

次に、各植木の取付は手順を説明する。Next, we will explain how to install each plant.

複数本の垂木1を所定の間隔で平行状に配設したら、前
記垂木1上に野地板2を釘等によって固着し、前記野地
板2上面に下地材3を張った後、始めに前記下地材3の
上面に垂木1と直交し、棟部と平行に軒先桟木5Aを釘
等により固設し、前記軒先桟木5Aの下端を基準として
下部中桟木5Bを取イ1け、次に係合桟木5C,上部中
桟木50の順に各桟木を足場として取付けを行ない、F
後に、野地板2の最上端より70mm下げた位置に棟桟
木5Eの中心を合せて前記棟植木5Eを釘等により固設
する。
After arranging a plurality of rafters 1 in parallel at predetermined intervals, the sheathing board 2 is fixed onto the rafters 1 with nails, etc., and the base material 3 is pasted on the upper surface of the sheathing board 2, and then the base material 3 is first placed on the baseboard. An eaves crosspiece 5A is fixed on the upper surface of the timber 3 perpendicularly to the rafter 1 and parallel to the ridge using nails, etc., and a lower middle crosspiece 5B is installed with the lower end of the eaves crosspiece 5A as a reference, and then engaged. Install each crosspiece as a scaffold in the order of crosspiece 5C and upper middle crosspiece 50, and then
Afterwards, the ridgepole 5E is fixed with nails or the like, with the center of the ridgepiece 5E aligned at a position 70 mm lower than the top end of the roof board 2.

そして、5寸勾配未満の通常勾配の屋根においては、第
1表に示すように、野地板2の長さによって各植木が所
定の間隔で取付けられており、例えば野地板2の長さρ
=2500mmの場合には、始めに棟部と平行に軒先桟
木5Aを取付け、前記軒先桟木5Aを足場とし、前記軒
先植木5Aの下端を基準として10100O+の間隔を
隔てて下部中桟木5B+を取付け、次に前記下部中桟木
5B+を足場とし、前記下部中桟木5B+より500m
1ll第  1  表 5寸勾配未満 の間隔を隔てて係合桟木5Cを取付け、最後に前記係合
植木5Cを足場とし、前記係合桟木5Cより10100
O+の間隔を隔てた野地板最上端より7Qmm下げた位
置に棟桟木5Eの中心を合せて棟植木5Eを取付け、軒
先部より棟部に向かって各桟木を足場として順次階段状
に取付けられる。
For roofs with a normal slope of less than 5 cm, as shown in Table 1, each plant is attached at a predetermined interval depending on the length of the roof board 2. For example, the length of the roof board 2 is ρ.
= 2500 mm, first install the eave sill 5A parallel to the ridge, use the eave sill 5A as a foothold, and install the lower middle sills 5B+ at intervals of 10100 O+ with the lower end of the eave garden 5A as a reference, Next, use the lower middle crosspiece 5B+ as a foothold, and move 500m from the lower middle crosspiece 5B+.
1ll No. 1 Attach the engaging crosspieces 5C at intervals of less than the slope of Table 5, and finally use the engaging plants 5C as scaffolding, and install the engaging crosspieces 5C from the engaging crosspieces 5C.
A ridge plant 5E is installed by aligning the center of the ridge beam 5E with the center of the ridge beam 5E at a position 7Qmm lower than the top end of the field board separated by an interval of O+, and is installed in a stepwise manner from the eaves to the ridge using each beam as a foothold.

(第5a図) なお、軒先桟木5Aには軒先支持材10を取付けるため
、桟木の幅を通常のものより幅広とし、係合桟木5Cに
は太陽エネルギー集収屋根の荷重がかかるため通常より
桟木の幅を幅広とし、前記係合桟木5Cは下部接続部材
50に固定した垂下係合支脚46を係合取付けし、前記
下部接続部材50が熱膨張により中心部から摺動するた
めに、野地板2の中心部あるいは中心部よりも上方に配
設し、垂直壁においては最上部に係合桟木5Cを取付け
、前記係合植木5Cを基準として下部中桟木5Bを等間
隔で取付ける。
(Fig. 5a) In addition, in order to attach the eave support material 10 to the eave edge support member 5A, the width of the frame is made wider than usual, and since the load of the solar energy collecting roof is applied to the engaging frame 5C, the width of the frame is wider than usual. The width of the engagement crosspiece 5C is wide, and the hanging engagement support legs 46 fixed to the lower connection member 50 are engaged with each other, and the lower connection member 50 slides from the center due to thermal expansion. In the case of a vertical wall, an engaging crosspiece 5C is installed at the top of the vertical wall, and lower middle crosspieces 5B are installed at equal intervals with the engaging plant 5C as a reference.

5寸勾配以上の急勾配の屋根あるいは強風地域において
は、第2表に示すように、各桟木が第  2  表 500mmの等間隔に取り付けられており、例えば野地
板2の長さρ=3000mmの場合には、始めに棟部と
平行にφ1先植木5Aを取付け、前記軒先桟木5△を足
場とし、前記軒先桟木5Aの下端を基準として500m
mの間隔を隔てて下部中桟木5B1を取付け、次に前記
下部中桟木5B+を足場とし、前記下部中桟木5B+よ
り50Qmmの間隔を隔てて下部中様木5B2を取付け
、前記下部中4本5B2を足場とし、前記下部中桟木5
B2より500111mの間隔を隔−Cて係合桟木5C
を取付け、前記係合桟木5Cを足場とし、前記係合桟木
5Cより50Qmmの間隔を隔てて上部巾桟木5D1を
取付け、前記上部中桟木5D+を足場とし、前記]二部
中桟木5D+より500mmの間隔を隔てて上部中桟木
5D2を取付け、最後に、前記上部巾桟木5D2を足場
とし、前記上部中様木5D2より5oommの間隔を隔
てた野地板最上端」−り7Qmm下げた位置に棟植木5
Fの中心を合せて棟桟木5Eを取付ける(第6b図)。
For roofs with a steep slope of 5 cm or more or in areas with strong winds, each crosspiece is installed at equal intervals of 500 mm, as shown in Table 2. For example, when the length of the roof board 2 is ρ = 3000 mm, In this case, first install the φ1 front garden tree 5A parallel to the ridge, use the eave sill 5△ as a foothold, and use the lower end of the eave sill 5A as a reference for 500 m.
Lower middle crosspieces 5B1 are installed at intervals of m, then the lower middle crosspieces 5B+ are used as scaffolds, lower middle crosspieces 5B2 are installed at intervals of 50 Qmm from the lower middle crosspieces 5B+, and the four lower middle crosspieces 5B2 are installed. with the lower middle crosspiece 5 as a scaffold.
Engagement crosspiece 5C with an interval of 500111 m from B2 -C
, use the engagement crosspiece 5C as a foothold, install the upper width crosspiece 5D1 at an interval of 50 Qmm from the engagement crosspiece 5C, use the upper middle crosspiece 5D+ as a foothold, and use the upper middle crosspiece 5D+ as a foothold, and use the upper middle crosspiece 5D+ as a foothold, and install the upper width crosspiece 5D1 at a distance of 500 mm from the second middle crosspiece 5D+. Attach the upper middle crosspieces 5D2 at intervals, and finally, using the upper width crosspieces 5D2 as a foothold, install a ridge plant at the top of the field board at a distance of 50mm from the upper middle crosspieces 5D2, lowered by 7Qmm. 5
Align the centers of F and attach the ridge beam 5E (Figure 6b).

そして、各植木間が500mmの等間隔と狭いために、
急勾配の屋根の場合には各桟木が階段状の吊用となり、
作業を安全かつ容易に行なうことができ、強風地域にJ
3いても耐風圧強度を高めることができ、家屋の周囲に
家屋足場を必要とせずに測定場のみで施工でき、足場式
を安くすることができ、経済的である。
And because the distance between each plant is narrow with equal intervals of 500mm,
In the case of a steeply sloped roof, each crosspiece serves as a step-like suspension.
Work can be done safely and easily, and is suitable for use in strong wind areas.
3, it is possible to increase the wind pressure resistance strength, it can be constructed only at the measurement site without the need for scaffolding around the house, and the scaffold type can be cheaper, making it economical.

よって、5用勾配未満の通常勾配の屋根において(ま、
第1表及び第5a図〜第5g図に示すように、野地板2
の長さに合せて、各桟木が軒先部から棟部に向かって順
次取付けられ、高さが500Qmmの垂直壁においては
、第5h図に示すように、最−ト喘より70mm下げた
位置に係合(1木5Cをr]止めし、最上端を基準にし
て各下部中桟木5B1゜5B2.5B3.5B4 .5
Bs を1000mmの等間隔て釘止めlノで下端に向
って順次取付けられ、また、5寸勾配以上の急勾配の屋
根及び強風地域においては、第2表及び第6a図〜第6
g図に示すように、野地板2の長さに合せて、各桟木が
軒先部から棟部に向かって順次500 mmの等間隔で
取付けられる。
Therefore, on a roof with a normal slope that is less than the slope for 5 (well,
As shown in Table 1 and Figures 5a to 5g, the field board 2
Each crosspiece is installed in sequence from the eaves to the ridge according to the length of the eaves, and on a vertical wall with a height of 500Qmm, the beams are installed at a position 70mm lower than the highest point, as shown in Figure 5h. Engage (1 wood 5C r) and lock each lower middle crosspiece 5B1゜5B2.5B3.5B4.5 with the top end as a reference.
Bs are attached sequentially towards the lower end with nails at equal intervals of 1000 mm, and on roofs with a steep slope of 5 cm or more and in areas with strong winds, the
As shown in Figure g, each crosspiece is sequentially installed at equal intervals of 500 mm from the eaves to the ridge in accordance with the length of the roof board 2.

第3a図及び第31)図は、第2a図の線B −B断面
図を示し、軒先金属屋根板85は、その立上り部である
係合防水壁88を中間部接続部材△に係合することにJ
:り横方向に順次(&続される。Bは接続811祠間に
取付けられた採光ガラス枠で、採光カラス枠Bの下側に
は、アしルファスシリコンあるいは結晶シリコン等から
なるエネルギー集版3Sか取付けられている4、Dは中
間部1a続部材カバーである。151は横所面を広い空
間部とした進入水の凍結破損防止部、152は排熱用の
煙突状空間である。
Figures 3a and 31) show cross-sectional views along the line B-B in Figure 2a, and the eaves metal roof plate 85 engages the engagement waterproof wall 88, which is the rising part, with the intermediate connecting member Δ. Especially J
B is a lighting glass frame attached to the connection 811 shrine, and below the lighting glass frame B is an energy collection plate made of alphus silicon or crystalline silicon, etc. Reference numeral 4 and D to which 3S is attached are intermediate part 1a connecting member covers. Reference numeral 151 is a part that prevents freezing and damage of incoming water with a wide space on the side surface, and reference numeral 152 is a chimney-shaped space for exhaust heat.

また、第3a図及び第3b図において、A′は側部接続
部材、Cは破風板8に取付けた側部補強材、D′は側部
接続部材カバーを示す。
Further, in FIGS. 3a and 3b, A' indicates a side connecting member, C indicates a side reinforcing member attached to the gable plate 8, and D' indicates a side connecting member cover.

中間部接続部材Aと採光ガラス枠Bとは、採光ガラス枠
Bの下面と各金属屋根板の上面との間が軒先部から棟部
に至る煙突状の空間を形成するように組合わされる。
The intermediate connecting member A and the daylighting glass frame B are combined so that a chimney-shaped space extending from the eaves to the ridge is formed between the lower surface of the daylighting glass frame B and the top surface of each metal roof plate.

第7図は、)&続部材及び金属屋根材取付面の軒先と側
部どの取付図であって、(a )〜(C)の順に組立て
られる。10は軒先支持材で、断面路T型をなし、水平
部を軒先桟木5Aに固定する。
FIG. 7 is an installation diagram of the eaves and sides of the connecting member and the metal roofing material attachment surface, and is assembled in the order of (a) to (c). Reference numeral 10 denotes an eave support member, which has a T-shaped cross section, and its horizontal portion is fixed to the eaves crosspiece 5A.

各桟木の端部には、目測ガイド切欠部11を有する接続
部材固定金具Tが墨線に沿って取付けられ、11IT先
支持材10には水平部に長孔よりなる1習動取付孔10
aが設けられる。なお、風圧の強い地方では垂下部にも
長孔の摺動取付孔10bを設けて風圧強化構造とするこ
とも可能である。Cは側部補強材で、上部水平部12と
下部水平部13と垂直部14とで構成される。上部水平
部12の一端縁には水切片16を有する立上りの防水壁
15をを設け、上部水平部12の他端縁には下向凹溝1
7を設ける。18は垂直部14に穿設された取付孔、1
つは垂直部14に穿設された長孔よりなる摺動取付孔で
ある。
At the end of each crosspiece, a connecting member fixing fitting T having a sight guide notch 11 is attached along the ink line, and the 11 IT tip support member 10 has a 1-way attachment hole 10 formed of a long hole in the horizontal part.
a is provided. In addition, in regions where wind pressure is strong, it is also possible to provide a long sliding mounting hole 10b in the hanging portion to provide a wind pressure reinforced structure. C is a side reinforcing member, which is composed of an upper horizontal part 12, a lower horizontal part 13, and a vertical part 14. A rising waterproof wall 15 having a water section 16 is provided at one end edge of the upper horizontal portion 12, and a downward groove 1 is provided at the other end edge of the upper horizontal portion 12.
7 will be provided. 18 is a mounting hole drilled in the vertical portion 14;
One is a sliding mounting hole made of a long hole drilled in the vertical portion 14.

Fは側部下隅装飾カバーで、断面り型をなした本体部2
2と、前記本体部22の後方に一体に設けられた断面り
型をなす後方突出部23と、同じく前記本体部22の後
方に一体に設けられた固定片24とからなる。25は固
定片24に設けられた固定取付孔である。
F is a side lower corner decorative cover, and the main body part 2 has a cross-sectional shape.
2, a rear protrusion 23 having a cross-sectional shape integrally provided at the rear of the main body 22, and a fixing piece 24 also integrally provided at the rear of the main body 22. Reference numeral 25 denotes a fixing mounting hole provided in the fixing piece 24.

次に、側部補強材Cの破風板8への取付けは、まず、側
部下隅装飾カバーFの後方突出部23で前記側部補強材
Cの下部水平部13を下から抱えるようにし、他方、固
定片24を側部補強材Cの垂直部14の外側に密着させ
、前記取付孔18に固定孔25を合U、ねじ26を螺入
して側部下隅装飾カバーFが予め前記側部補強材Cの軒
先側に固定されており、前記側部下隅装飾カバーFの図
示しない凹部を軒先支持材10に係合して破風板8に載
置した接、前記側部補強材Cの該摺動取付7L19に釘
等の固定具20をワッシャ21を介して打込み、側部補
強材Cを屋根側部の破風板8に固定する。側部補強材C
が固定されたならば、側部脱着カバー27を取付ける。
Next, to attach the side reinforcing material C to the gable plate 8, first, the lower horizontal part 13 of the side reinforcing material C is held from below by the rear protrusion 23 of the side lower corner decorative cover F, and then the other , the fixing piece 24 is brought into close contact with the outside of the vertical part 14 of the side reinforcing member C, the fixing hole 25 is fitted into the mounting hole 18, and the screw 26 is screwed in so that the side lower corner decorative cover F is attached to the side part in advance. It is fixed to the eaves side of the reinforcing material C, and is placed on the gable board 8 by engaging a recess (not shown) of the side lower corner decorative cover F to the eaves supporting material 10. A fixing member 20 such as a nail is driven into the sliding attachment 7L19 through a washer 21, and the side reinforcing material C is fixed to the gable plate 8 on the side of the roof. Side reinforcement material C
Once it is fixed, attach the side removable cover 27.

側部脱着カバー27は断面コ型をしており、上下フラン
ジを側部補強材Cの上部水平部12及び下部水平部13
の間に嵌合させる。側部脱着カバー27の垂直部下端は
突条28を有している。
The side removable cover 27 has a U-shaped cross section, and the upper and lower flanges are connected to the upper horizontal part 12 and the lower horizontal part 13 of the side reinforcement C.
Fit between. The vertical lower end of the side detachable cover 27 has a protrusion 28 .

次に、軒先装飾補強板2つを側部脱着カバー27に取付
ける。軒先装飾補強板29はその上端を前記側部補強材
Cの上部水平部12の下向凹@17に、下端に設けた凹
溝30を側部脱着カバー27の下部突条28に係合させ
、第7(C)図に示すように、矢印方向にずらして取付
ける。
Next, two eave decoration reinforcing plates are attached to the side detachable cover 27. The eave decoration reinforcing plate 29 has its upper end engaged with the downward recess @17 of the upper horizontal part 12 of the side reinforcing member C, and the groove 30 provided at its lower end engaged with the lower protrusion 28 of the side removable cover 27. , as shown in Fig. 7(C), install it by shifting it in the direction of the arrow.

下部接続部材50は第8a図及び第16b図に示づよう
に、断面略溝型をなした本体51の底下面中央に長手方
向に沿う支持溝51aを設け、前記本体51の前記支持
溝51a両側には上部接続部材31の垂下係合支脚33
が嵌合する溝型係合部52を形成し、前記溝型係合部5
2の両側上部に立上り壁53.53を設け、前記立上り
壁53゜53の中央より外方に張出して水平部54.5
4を形成し、前記水平部54の端部下部に垂下脚片55
を設け、前記水平部54#a部上部を立上らせてその上
端を折り曲げて各金属屋根板の立上り部である係合防水
壁が係合する金属屋根板係合片56を設け、前記水平部
54の上部には前記本体51の両側上部に一体的に上方
に開口する下部係合排水溝57が形成されている。53
aは立上り壁53の内側に設(プられた上部接続部材3
1の垂下係合支脚33の嵌合凹部35に嵌合する嵌合凸
部である。
As shown in FIGS. 8a and 16b, the lower connecting member 50 is provided with a support groove 51a along the longitudinal direction at the center of the bottom surface of the main body 51, which has a substantially groove-shaped cross section. On both sides are hanging engagement support legs 33 of the upper connection member 31.
A groove-shaped engaging portion 52 is formed into which the groove-shaped engaging portion 5 is fitted.
Rising walls 53.53 are provided at the upper portions of both sides of the wall 53.
4, and a hanging leg piece 55 is formed at the lower end of the horizontal part 54.
, the upper part of the horizontal part 54#a is raised up and its upper end is bent to provide a metal roof plate engaging piece 56 that is engaged with the engagement waterproof wall that is the rising part of each metal roof plate, and At the upper part of the horizontal part 54, lower engaging drainage grooves 57 are formed which are integrally opened upward on both sides of the main body 51. 53
a is installed inside the rising wall 53 (the upper connecting member 3
This is a fitting protrusion that fits into the fitting recess 35 of the hanging engagement support leg 33 of No. 1.

下部接続部材50の本体51の支持溝51aには長手方
向略中夫に固定用丸孔58が穿設され、その両側に一定
の間隔をおいて長孔よりなる摺動取付孔59が穿設され
、前記支持溝51aの長手方向棟部りには長手方向に1
oommの距離移動自在な調整目盛60を有する長さ調
整取付長孔61が穿設されている。
A fixing round hole 58 is bored in the support groove 51a of the main body 51 of the lower connecting member 50 approximately in the longitudinal direction, and sliding mounting holes 59 made of elongated holes are bored on both sides of the fixing hole 58 at a constant interval. The longitudinal ridge of the support groove 51a has a longitudinal direction.
A length adjustment mounting elongated hole 61 having an adjustment scale 60 that can be freely moved over a distance of oomm is bored.

46は下部接続部材50の中央に装着される垂下係合支
脚であり、前記下部接続部材50の支持溝51aに嵌合
する突部47を有し、該突部47上面には前記支持溝5
1aの固定用丸孔58に嵌入するボルト48を設け、前
記突部47両側下部にはU字型係合部53の下面に当接
する水平フランジ49を設け、前記突部47の一端下部
には垂下する支脚部46aを設り、第8b図及−び第8
C図に示すように、垂下係合支脚46は係合桟木5Cに
固定した接続部材固定金具Tと隣接し、断熱材7に係合
するように取付けられる。
Reference numeral 46 denotes a hanging engagement support leg attached to the center of the lower connecting member 50, and has a protrusion 47 that fits into the support groove 51a of the lower connecting member 50, and the upper surface of the protrusion 47 has the support groove 5.
A bolt 48 that fits into the fixing round hole 58 of 1a is provided, a horizontal flange 49 that comes into contact with the lower surface of the U-shaped engaging portion 53 is provided at the bottom of both sides of the projection 47, and a horizontal flange 49 is provided at the bottom of one end of the projection 47. A hanging support leg 46a is provided, and FIGS.
As shown in Fig. C, the hanging engagement supporting leg 46 is adjacent to the connecting member fixing fitting T fixed to the engagement crosspiece 5C, and is attached so as to engage with the heat insulating material 7.

そして、下部接続部材50は野地面長さが標準の場合に
は、第9a−1図及び第9a−2図に示すように、接続
部材固定金具Tのボルト67が下部接続部材50の摺動
取付孔59の中央に位置すると共に、最も棟寄りの接続
部材固定金具Tのボルト67が下部接続部材50の長さ
調整取付長孔61の中央となる調整目盛60の○に位置
して標準となり、野地面長さが標準より短い場合には、
第9b−1図及び第9b−2図に示すように、接続部材
固定金具Tのボルト67が摺動取付孔59に対して下部
接続部材50の長手方向棟寄寄りに位置すると共に、最
も棟部寄りの接続部材固定金具Tのボルト67が下部接
続部材50の長さ調整取付長孔61のマイナスとなる調
整目盛60の軒先方向に・位置してマイナス調整取付と
なり、また、野地面長さが標準より長い場合には、第9
0−1図及び第90−2図に示すように、接続部材固定
金具Tのボルト67が摺動取付孔59に対して下部接続
部材50の端部寄りに位置すると共に、最も棟部寄りの
接続部44固定金具Tのボルト67が下部接続部材50
の長さ調整取付長孔61のプラスどなる調整目盛60の
棟方向に位置してプラス調整取(dとなる。
When the lower connecting member 50 has a standard length of field surface, the bolt 67 of the connecting member fixing fitting T slides on the lower connecting member 50, as shown in FIGS. 9a-1 and 9a-2. The bolt 67 of the connecting member fixing fitting T located in the center of the mounting hole 59 and closest to the ridge is located at the center of the length adjustment mounting slot 61 of the lower connecting member 50 at the ○ mark on the adjustment scale 60, making it standard. , if the field length is shorter than the standard,
As shown in FIGS. 9b-1 and 9b-2, the bolt 67 of the connecting member fixing fitting T is located closer to the ridge in the longitudinal direction of the lower connecting member 50 with respect to the sliding mounting hole 59, and The bolt 67 of the connecting member fixing fitting T closer to the lower part is located in the direction of the eave of the adjustment scale 60, which is the negative of the length adjustment installation elongated hole 61 of the lower connection member 50, resulting in negative adjustment installation. is longer than the standard, the ninth
As shown in Figures 0-1 and 90-2, the bolt 67 of the connecting member fixing fitting T is located closer to the end of the lower connecting member 50 with respect to the sliding mounting hole 59, and is located closest to the ridge. The bolt 67 of the connecting part 44 fixing fitting T is connected to the lower connecting member 50
A positive adjustment hole (d) is located in the direction of the ridge of the positive adjustment scale 60 of the length adjustment installation elongated hole 61.

さらに、下部接続部材50は熱膨張に対して中央より長
手方向に熱(習動して、熱膨張(歪)を吸収する取付描
込となっており、標準取付の場合には、第98−1図及
び第9a−2図に示すように、接続部材固定金具Tのボ
ルト67が下部接続部材50の1習勅取付孔59の中央
に位置し、下部接続部材50の両端と野地幅の両端がそ
ろって定位置となり、下部接続部材50が熱膨張により
標準よりプラスに膨張を行うと、第9b−1図及び第9
b−2図に示すように、接続部材固定金具下のボルト6
7が摺動取付孔59に対して下部接続部材50の長手方
向棟寄寄りに位置し、前記下部接続部材50の両端が野
地幅の両端より突出してプラス(習動取付となり、また
、第9C−1図及び第90−2図に示ずように、下部接
続部材50が標準よりマイナスに縮小を行うと、接続部
材固定金員Tのボルト67が取付孔59に対して下部接
続部材50の端部寄りに位置し、野地幅の両端が下部接
続部材50の両端より突出してマイナス摺動取付となる
Furthermore, the lower connecting member 50 is designed to absorb thermal expansion (distortion) from the center in the longitudinal direction. As shown in Figure 1 and Figures 9a-2, the bolt 67 of the connecting member fixing fitting T is located in the center of one fitting hole 59 of the lower connecting member 50, and is located at both ends of the lower connecting member 50 and both ends of the field width. 9b-1 and 9 when the lower connecting member 50 expands more than the standard due to thermal expansion
As shown in Figure b-2, bolt 6 below the connection member fixing fitting.
7 is located closer to the ridge in the longitudinal direction of the lower connecting member 50 with respect to the sliding mounting hole 59, and both ends of the lower connecting member 50 protrude from both ends of the width of the field, resulting in a 9th C As shown in FIG. 1 and FIG. 90-2, when the lower connecting member 50 is reduced to a minus value from the standard, the bolt 67 of the connecting member fixing member T is inserted into the mounting hole 59 of the lower connecting member 50. It is located near the end, and both ends of the field width protrude from both ends of the lower connecting member 50, resulting in negative sliding attachment.

この際、前記下部接続部材50は支持溝51aの長手方
向棟寄付近の固定用丸孔58が接続部材固定金具Tのボ
ルト67と垂下係合支脚46のボルト48に挿通され、
座金を介してナラ1〜により固定され、摺動取付孔59
が接続部材固定金具下のボルト48に摺動自在に挿通さ
れる。
At this time, in the lower connecting member 50, the fixing round hole 58 near the longitudinal ridge of the support groove 51a is inserted into the bolt 67 of the connecting member fixing fitting T and the bolt 48 of the hanging engagement support leg 46,
It is fixed by the nuts 1 through the washers, and the sliding mounting holes 59
is slidably inserted into the bolt 48 under the connecting member fixing fitting.

下部接続部材50は、!!1棧木桟木地板最上端部より
70mm下げた位置に固定されたことにより、周辺の構
成部材に支障なく調整取付を完璧に行なうことができ、
下部接続部材50の加工も必要なく簡単に取付作業を行
なえる。
The lower connecting member 50 is! ! 1. By being fixed at a position 70mm lower than the top edge of the base plate, adjustment and installation can be carried out perfectly without disturbing the surrounding components.
The attachment work can be easily performed without requiring any processing of the lower connecting member 50.

第10図及び第16a図は上部接続部材31を示し、本
体32は中空に形成され、前記本体32の下部両側には
抑止突部34を形成し、前記抑止突部34には垂下係合
支脚33を設け、該垂下係合支脚33外側には抑止突部
34の下部に嵌合凹部35を設け、前記本体32の上部
両側には立上り部36を設けて一ヒブ51ii1故部を
形成し、該立上り部36内側には嵌合凸部36aを設け
、前記本体32の中間部外側は張出して、上部支持溝3
7及び上部排水溝38を形成する。前記上部接続部材3
1の本体32の水平部には長手方向棟寄と軒先寄りに取
付孔39が穿設され、前記水平部の長手方向棟寄りに(
よ下部接続部材50の長さ調整取付長孔61に相当して
調整取付用長孔40が穿設されている。
10 and 16a show an upper connecting member 31, a main body 32 is formed hollow, a restraining protrusion 34 is formed on both sides of the lower part of the main body 32, and the restraining protrusion 34 has a hanging engagement support leg. 33, a fitting recess 35 is provided on the outer side of the hanging engagement support leg 33 at the lower part of the restraining protrusion 34, and rising portions 36 are provided on both sides of the upper part of the main body 32 to form a rear part of the hib 51ii1. , a fitting convex portion 36a is provided on the inside of the rising portion 36, and the outside of the intermediate portion of the main body 32 protrudes to form the upper support groove 3.
7 and an upper drainage groove 38 are formed. The upper connecting member 3
1, mounting holes 39 are bored in the horizontal part of the main body 32 in the longitudinal direction near the ridge and the eaves, and mounting holes 39 (
An adjustment attachment elongated hole 40 is bored corresponding to the length adjustment attachment elongated hole 61 of the lower connecting member 50.

そして、上部接続部材31と下部接続部材50は下部接
続部材50に固定した軒先用ポル1〜83Δど中間用ボ
ルト83Bを上部接続部材31の取付孔39に挿通する
と共に、前記下部接続部材50の長さ調整取付長孔61
に固定した線用ポル1〜830を前記上部接続部材31
の調整堰イ4用長孔40に挿通し、座金を介してナツト
により取付【:lられ、標準取付においては第11a図
に示すように、野地幅の端部と中間部接続部材Δの−(
弱部とがそろっている。
The upper connecting member 31 and the lower connecting member 50 are connected to each other by inserting the intermediate bolts 83B fixed to the lower connecting member 50 such as poles 1 to 83Δ for eaves into the mounting holes 39 of the upper connecting member 31, and Length adjustment mounting slot 61
The wire ports 1 to 830 fixed to the upper connecting member 31
It is inserted into the elongated hole 40 for the adjustment weir 4 and installed with a nut through the washer.In standard installation, as shown in Figure 11a, the - of the connecting member Δ between the end of the field width and the middle part (
Weak areas are all there.

中間部接続部材Aが熱膨張によって標準より仲長を行う
と、第11b図に示ずように、野地幅の端部より中間部
接続部材Aの端部が突出してプラス調整取付となり、中
間部接続部材Aが標準より縮小すると、第11c図に示
すように、中間部接続部材への端部より野地幅の端部が
突出してマイナス調整取付となる。
When the intermediate part connecting member A is made longer than the standard length due to thermal expansion, the end of the intermediate part connecting member A protrudes from the edge of the field width, resulting in a positive adjustment installation, as shown in Fig. 11b. When the connecting member A is reduced in size from the standard size, as shown in FIG. 11c, the end of the field width protrudes from the end to the intermediate connecting member, resulting in a negative adjustment installation.

第12a図〜第12c図は金属屋根板の構造を示ずもの
で、第12a図、第13a図及び第13b図において、
軒先金rFS屋根板85は、一端を下方に曲げた軒先水
切部86と、他端を上方に1曲げた本選係合壁87を有
し、両側には下部接続部材50の金属屋根板係合片58
と係合する立上り部である係合防水壁88が設けられる
Figures 12a to 12c do not show the structure of the metal roof plate, and in Figures 12a, 13a, and 13b,
The eaves metal rFS roof plate 85 has an eave drain part 86 with one end bent downward, and a final engagement wall 87 with the other end bent upward once, and metal roof plate engagement of the lower connecting member 50 is provided on both sides. Piece 58
An engaging waterproof wall 88 is provided which is a rising portion that engages with the engaging waterproof wall 88 .

第12b図、第13c図において、中間金属屋根板89
は、一端に前記本選係台壁87と係合する係合水切部9
0を設け、他端に本選係合壁91を設け、両側には軒先
金属屋根板85と同様に係合防水壁92を設ける。
In FIGS. 12b and 13c, the intermediate metal roof plate 89
has an engaging drain portion 9 that engages with the final selection table wall 87 at one end.
0 is provided, a final selection engagement wall 91 is provided at the other end, and engagement waterproof walls 92 are provided on both sides in the same manner as the eaves metal roof plate 85.

第12c図、第13d図において、裸金属屋根板93は
一端に中間金属屋根板89の本選係合壁91と係合する
係合水切部94を設け、他端に上方に曲げた防水壁95
を設け、両側に立上り部である係合防水壁96を設ける
12c and 13d, the bare metal roofing board 93 is provided with an engaging drainage part 94 at one end that engages with the final engagement wall 91 of the intermediate metal roofing board 89, and an upwardly bent waterproof wall 95 at the other end.
and engagement waterproof walls 96, which are rising portions, are provided on both sides.

そして、金属屋根板の本選係合壁と係合防水壁とは第1
4a図と第14b図に示すように取付けの調整が可能と
なっている。
And, the main selection engagement wall and the engagement waterproof wall of the metal roof plate are the first
The attachment can be adjusted as shown in Figures 4a and 14b.

次に、各金属屋根板の下部接続部材50への取付は及び
各金属屋根板の連結について説明する。
Next, the attachment of each metal roof plate to the lower connection member 50 and the connection of each metal roof plate will be explained.

第15図は各金属屋根板の取付を示寸図で、始めに軒先
金属屋根板85の軒先水切部86を軒先側にして、軒先
桟木5Δに固定した軒先支持材10の水平部に係合し、
両側に設けた係合防水壁88を下部接続部材50の金l
1ri屋根板係合片56にはめ込み、次に中間金属屋根
板89の係合水切部90を軒先金属屋根板85の本選係
合壁87に係合し、両側の係合防水壁92を下部接続部
材50の金属屋根板係合片56にはめ込み、最後に裸金
属屋根板93を矢印方向に移動して係合水切部94を中
間金属屋根板89の本選係合壁91と係合さゼ、両側の
係合防水壁96を下部接続部材50の金属屋根板係合片
56にはめ込むことにより順次取付けられる。
FIG. 15 is a dimensional drawing showing the installation of each metal roof plate. First, the eave drain part 86 of the eave metal roof plate 85 is placed on the eave side, and the eave edge support material 10 is engaged with the horizontal part of the eave support member 10 fixed to the eave edge crosspiece 5Δ. death,
The engagement waterproof walls 88 provided on both sides are connected to the bottom connecting member 50.
1ri into the roof plate engagement piece 56, then engage the engagement drainage part 90 of the intermediate metal roof plate 89 with the final engagement wall 87 of the eaves metal roof plate 85, and connect the engagement waterproof walls 92 on both sides at the bottom. Fit the metal roof plate engaging piece 56 of the member 50, and finally move the bare metal roof plate 93 in the direction of the arrow to engage the engagement drain portion 94 with the final engagement wall 91 of the intermediate metal roof plate 89; The engaging waterproof walls 96 on both sides are sequentially attached by fitting them into the metal roof plate engaging pieces 56 of the lower connecting member 50.

中間部接続部材へは、第16a図、第16b図に示すよ
うに、上部接続部材31及び下部接続部材50から構成
されている。
The intermediate connecting member is composed of an upper connecting member 31 and a lower connecting member 50, as shown in FIGS. 16a and 16b.

Pは採光ガラス枠固定金具で、前記下部接続部材31の
上部支持溝37を覆うように載置し、前記上部支持@3
7を利用してねじ41で固定される3、採光ガラス枠固
定金具Pは、上部に棟方向に開口する係合段部42を有
し、ここに、採光ガラス枠Bを上方から嵌合する。83
A、83B、83Cは上部接続部材31と下部接続部材
50を連結するボルトで、83Aは軒先用ボルト、83
Bは中間用ボルト、83Gは線用ボルトである。
P is a fitting for fixing the lighting glass frame, which is placed so as to cover the upper support groove 37 of the lower connection member 31, and is attached to the upper support @3.
3. The lighting glass frame fixing fitting P, which is fixed with screws 41 by using 7, has an engagement step 42 at the top that opens in the direction of the ridge, into which the lighting glass frame B is fitted from above. . 83
A, 83B, and 83C are bolts that connect the upper connecting member 31 and the lower connecting member 50, 83A is an eaves bolt, and 83
B is an intermediate bolt, and 83G is a wire bolt.

第160図は、上部接続部材31の上方開放部を覆う中
間部接続部材カバーDを示し、平面部本体下面に上部接
続部材31の立上り部36の内側に設けた嵌合凸部36
aに係合する嵌合凹部62aを有する垂下脚片62を2
条設け、その間外側には軒先方向端部にその一端を突出
して水切片63aを有する垂下水切抑止片63を設(づ
、前記平面部本体の下面両端には係合片64を設け、前
記平面部本体の棟部寄り端部には上部接続部材31の調
整取付用長孔40に相当して調整取付用長孔65が形成
され、前記中間部接続部材カバーDの上部には図示しな
い軒先装飾補強板が係合片64を利用して摺動自在に係
合している。
FIG. 160 shows an intermediate connecting member cover D that covers the upper open portion of the upper connecting member 31, and a fitting convex portion 36 provided inside the rising portion 36 of the upper connecting member 31 on the lower surface of the flat body.
2. The hanging leg piece 62 having a fitting recess 62a that engages with the
A drooping drain prevention piece 63 is provided on the outer side thereof and has a water cutter 63a with one end protruding from the end in the direction of the eave. A long hole 65 for adjustment and attachment is formed at the end of the main body near the ridge, corresponding to the long hole 40 for adjustment and attachment of the upper connection member 31, and an eaves decoration (not shown) is formed in the upper part of the intermediate connection member cover D. The reinforcing plate is slidably engaged using the engagement piece 64.

そして、下部接続部材50.上部接続部材31゜中間部
接続部材カバーDを規格寸法として長さの差が10Cm
mの複数の規格製品とすることにより、現場での切りつ
め、孔あけ等の加工を行なう必要をなくする。
And the lower connecting member 50. Upper connecting member 31゜The difference in length is 10 cm with middle connecting member cover D as the standard dimension.
By producing multiple standard products of m, there is no need for on-site processing such as cutting and drilling.

第17図は接続部材固定金具Tを示す。接続部材固定金
具Tは、前記下部接続部材50の支持溝51aに嵌合す
る突部66aを有し、前記突部66a一端に目測ガイド
切欠部11を形成し、該突部66a上面には前記支持溝
518の固定用丸孔58と摺動取付孔59に嵌入する下
部接続部材50の支持溝518部分の厚みよりやや長い
ねじを有しない大径部を有するボルト67を設け、前記
突部66aの他端下部には各植木に係合する支脚片68
を設ける。突部66a両側下部に設けた水平フランジ6
6bには取付孔69を設け、釘等により各植木に固定す
る。
FIG. 17 shows a connecting member fixing fitting T. The connection member fixing fitting T has a protrusion 66a that fits into the support groove 51a of the lower connection member 50, a visual guide notch 11 is formed at one end of the protrusion 66a, and the upper surface of the protrusion 66a has the A bolt 67 having a large diameter portion without a thread, which is slightly longer than the thickness of the support groove 518 portion of the lower connecting member 50, is provided to fit into the fixing round hole 58 and the sliding mounting hole 59 of the support groove 518, and the protrusion 66a At the bottom of the other end is a supporting leg piece 68 that engages with each plant.
will be established. Horizontal flanges 6 provided at the bottom of both sides of the protrusion 66a
A mounting hole 69 is provided in 6b, and the mounting hole 69 is fixed to each plant using nails or the like.

第18図に示すように、採光ガラス枠B(1)縦桟11
0と中間部接続部材カバーDの垂下水切抑止片63との
間には間隔が設けられ、その間隔は熱気排出孔を兼ねた
侵入水の凍結破損防止部151を形成する。
As shown in FIG. 18, lighting glass frame B (1) vertical bar 11
0 and the drooping water drain prevention piece 63 of the intermediate connecting member cover D, the interval forms a freeze breakage preventing portion 151 for intruding water that also serves as a hot air discharge hole.

中間部接続部材カバー〇の垂下脚片62と垂下水切抑止
片63の間に採光ガラス枠Bの縦桟110の水運防水壁
114が嵌合するが、該水運防水壁114の両側には空
間が、頂部には隙間が形成されている。
The water transport waterproof wall 114 of the vertical frame 110 of the daylighting glass frame B fits between the hanging leg piece 62 of the intermediate connection member cover 〇 and the hanging water drain prevention piece 63, but there is a space on both sides of the water transport waterproof wall 114. , a gap is formed at the top.

また、上部接続部材31.採光ガラス枠B、中間部接続
部材カバーDの組合せは、軒先部から棟部に至る煙突状
空間152を形成する。
Further, the upper connecting member 31. The combination of the lighting glass frame B and the intermediate connecting member cover D forms a chimney-shaped space 152 extending from the eaves to the ridge.

これら熱気排出溝と凍結破損防止部151.煙突状空間
152及び後述する棟冠■の棟部熱気排出孔Jからは、
エネルギー集版器Sに有害な熱気が外部に排出され、凍
結破損防止部151に溜まる水はその広さにより凍結に
よって器具を破樋することがない。
These hot air exhaust grooves and freeze damage prevention section 151. From the chimney-shaped space 152 and the ridge hot air exhaust hole J of the ridge crown ■, which will be described later,
Hot air that is harmful to the energy collector S is discharged to the outside, and the water that collects in the freeze damage prevention part 151 is large enough to prevent the equipment from being damaged by freezing.

野地面に固定された接続部材間には、採光ガラス枠Bが
取付けられる。採光ガラス枠Bは上[1゜下桟1両縦桟
及びガラスで構成され、その内面部にL字型段部を形成
し、ここにアモルファスシリコンまたはシリコン結晶体
等からなる太陽光電池等のエネルギー集版器Sを装4す
る。そして、第1図に示すように、軒先から棟部に至る
間に複数個のものがその上下端で所定間隔を保って組合
わされる。
A lighting glass frame B is attached between the connecting members fixed to the field surface. The daylighting glass frame B is composed of an upper [1°] lower bar, 1 vertical bar, and glass, and an L-shaped step is formed on the inner surface of the frame. Install the collector S. As shown in FIG. 1, a plurality of pieces are combined at their upper and lower ends with a predetermined spacing between them from the eave to the ridge.

第19図は下部接続部材50と上部接続部材31との取
付図であり、軒先側を軒先用ボルト83Cで固定し、前
記上部接続部材31には軒先部りに上部支持溝37を利
用してボルト4.3で第20図の軒先係合金具44を固
定し、前記軒先係合金具114は」二部に図示しない防
塵・配線点検カバーGを係止する係合面45をイfして
いる(金属[!根板は図示省略)。そして、上部接続部
材31の上方開放部に中間部接続部材カバー〇を上方よ
り押圧して嵌合係合する なお、下部接続部材50はアルミ合金等の金属あるいは
合成樹脂等よりなる。
FIG. 19 is an installation diagram of the lower connecting member 50 and the upper connecting member 31, in which the eaves side is fixed with eaves bolts 83C, and the upper connecting member 31 is attached using the upper support groove 37 at the eaves edge. Fix the eaves-edge engaging fittings 44 shown in FIG. 20 with bolts 4.3, and the eaves-engaging fittings 114 have an engaging surface 45 that engages a dustproof/wiring inspection cover G (not shown) on the second part. (Metal [! Root plate not shown). Then, the intermediate connecting member cover 〇 is pressed from above to the upper open portion of the upper connecting member 31 to fit into the upper opening portion.The lower connecting member 50 is made of metal such as aluminum alloy, synthetic resin, or the like.

第21a、21b図は側部接続部材A′を示し、第21
a図は側下部接続部材70、第21b図は側下部接続部
材76、第21c図は側部接続部材カバーD′を示す。
Figures 21a and 21b show the side connecting member A';
Fig. 21a shows the lower side connecting member 70, Fig. 21b shows the lower side connecting member 76, and Fig. 21c shows the side connecting member cover D'.

側部接続部材A′の片半分側の構成は前記中間部接続部
材Aとまったく同一であるから、同一部位には同一符号
を付して説明を省略する。側部接続部材A′の残りの半
分側には採光ガラス枠Bや金属屋根板が取付けられない
ので、この側の側下部接続部材70には上部支持溝37
や上部排水溝38が、側下部接続部材76には下部係合
排水溝57が、側上部接続部材カバーD′には垂下水切
抑止片63が設けられていない。
Since the configuration of one half of the side connecting member A' is exactly the same as that of the intermediate connecting member A, the same parts are given the same reference numerals and the explanation thereof will be omitted. Since the lighting glass frame B and the metal roof plate are not attached to the remaining half side of the side connection member A', the upper support groove 37 is attached to the lower side connection member 70 on this side.
The lower side connecting member 76 is not provided with the lower engaging drain groove 57, and the side upper connecting member cover D' is not provided with the hanging drainage prevention piece 63.

側下部接続部材70の本体71の残り半分側には立上り
部72を設け、立上り部36と前記立上り部72とによ
り上方開放部を形成し、該立上り部36.72には嵌合
凸部73を設け、前記立上り部72上縁を外側に折曲げ
て嵌合凸部74を形成し、本体71の下面他側には側下
部接続部材76の外部垂下脚片78に係合する係合片7
5を形成する。側下部1a続部材76の残り半分側には
他方の立上り壁53の上端に直角に張出した上部片77
を形成し、前記上部片77の外縁より下方に垂下する2
条の水切片78aを有する外部垂下脚片78を設け、面
記立トり壁53と前記外部垂下脚片78間には支持溝5
1aの他側にr方に間口したプラスマイナス係合調整部
7つを形成し、前記立上り壁53の下部を支脚片80と
し、また、側上部接続部材カバーD′の残り半分には中
間部接続部材カバー〇と異なって垂下水切抑止片が設け
られず、側下部接続部材70の嵌合凸部74が1■合す
る嵌合凹部81を設け、その平面部本体の棟寄り端部に
側下部接続部材76の調整取付用長孔に相当して調整取
付用長溝82を形成する。側部接続部材A′は、第21
a図、第21山図に示すように、側下部接続部材70及
び側下部接続部材76から構成される装置 そして、第22図に示すように、採光ガラス枠Bの[1
110側面と側部接続部材カバーD′の垂下水切抑止片
63との間には間隔を有し1.(7゜間隔は凍結破損防
止部151を形成し、また、側下部接続部材70.採光
ガラス枠B、側部接続部材カバーD′の組合せは、煙突
状空間152を形成し、側下部接続部材70の嵌合凸部
74が側部接続部材カバーD′の嵌合凹部81に嵌入し
て…圧強化構造を形成し、プラスマイナス係合調整部7
つは凍結防止空間ともなる。
A rising portion 72 is provided on the remaining half side of the main body 71 of the lower side connecting member 70, and the rising portion 36 and the rising portion 72 form an upper open portion, and the rising portion 36.72 has a fitting convex portion 73. The upper edge of the rising portion 72 is bent outward to form a fitting convex portion 74, and the other side of the lower surface of the main body 71 has an engaging piece that engages with the external hanging leg piece 78 of the side lower connecting member 76. 7
form 5. On the remaining half side of the side lower part 1a connecting member 76, there is an upper piece 77 extending at right angles to the upper end of the other rising wall 53.
2 that hangs downward from the outer edge of the upper piece 77.
An external hanging leg piece 78 having a strip water section 78a is provided, and a support groove 5 is provided between the surface standing wall 53 and the external hanging leg piece 78.
Seven plus/minus engagement adjustment parts opening in the r direction are formed on the other side of 1a, the lower part of the rising wall 53 is used as a supporting leg piece 80, and the remaining half of the side upper connecting member cover D' is provided with an intermediate part. Unlike the connecting member cover 〇, a hanging water drain prevention piece is not provided, and a fitting concave portion 81 into which the fitting convex portion 74 of the side lower connecting member 70 fits is provided, and a side A long groove 82 for adjustment and attachment is formed corresponding to the long hole for adjustment and attachment of the lower connecting member 76 . The side connecting member A' is the 21st
As shown in FIG.
1. There is a gap between the side surface of 110 and the drooping drainage prevention piece 63 of the side connection member cover D'. (The 7° interval forms a freeze damage prevention part 151, and the lower side connecting member 70. The combination of the lighting glass frame B and the side connecting member cover D' forms a chimney-shaped space 152, and the lower side connecting member The fitting convex portion 74 of 70 fits into the fitting recess 81 of the side connection member cover D' to form a pressure reinforcement structure, and the plus/minus engagement adjustment portion 7
One area also serves as an antifreeze space.

次に、野地幅の誤差調整について説明する。Next, error adjustment of field width will be explained.

第24図は、太陽エネルギー実収屋根の横断面図を示し
、各金属屋根板はその立上り部である係合防水壁を下部
接続部材50,7.5に係合することにJ:り横方向に
順次接続されている。接続部材は、図面右から側部接続
部材A′、中間部接続部材△が図示されている。Cは側
部補強材、27は前記011部補強材Cに取付けられた
側部脱着カバーである。野地幅の誤差調整は側下部接続
部材76に設けたプラスマイナス係合調整部7つにて行
う。
FIG. 24 shows a cross-sectional view of the solar energy harvesting roof. are connected sequentially. As for the connecting members, a side connecting member A' and an intermediate connecting member Δ are shown from the right in the drawing. C is a side reinforcing member, and 27 is a side removable cover attached to the 011 reinforcing member C. The field width error adjustment is performed by seven plus/minus engagement adjustment parts provided on the lower side connecting member 76.

標準取付の場合は、第25a図に示すように、プラスマ
イナス係合調整部7つに嵌合される側部補強+、I C
の防水壁15は側下部接続部材76のプラスマイナス係
合調整部7つ内の略中夫に位;mする。
In the case of standard installation, as shown in Figure 25a, the side reinforcement +, IC
The waterproof wall 15 is located approximately at the center of the seven plus/minus engagement adjustment portions of the lower side connecting member 76.

第25C図に示すように、野地幅が標準よりグ、θい場
合は、側部接続部材A′の一部が屋根外方に出てしまう
ので、側部補強材Cの防水壁15は側下部1a続部材7
6のプラスマイナス係合調整部7つ内の内側寄りに係合
位置覆る。
As shown in Fig. 25C, if the width of the field is wider than the standard width, a part of the side connecting member A' will protrude outside the roof, so the waterproof wall 15 of the side reinforcing member C will be Lower part 1a continuation member 7
The engagement position is covered on the inside of the 7 plus/minus engagement adjustment parts of 6.

また、第25b図に示ずように、野地幅が標準より長い
場合は、側部接続部材Δ′は屋根内方に設置されるので
、側部補強材Cの防水壁15は側下部接続部材76のプ
ラスマイナス係合調整部7つ内の外側帯りに係合位置す
る。
Furthermore, as shown in Fig. 25b, when the field width is longer than the standard width, the side connecting member Δ' is installed inside the roof, so the waterproof wall 15 of the side reinforcing member C is connected to the lower side connecting member. It is engaged with the outer band within the seven plus/minus engagement adjustment portions of 76.

そして、側下部接続部材76の外部垂下脚片78には2
条の水切片78aが形成されているので、側部補強材C
の水切片16を有する防水壁15と共に雨仕舞を完璧に
行うことができる。
The outer hanging leg piece 78 of the lower side connecting member 76 has two
Since the strip water section 78a is formed, the side reinforcing material C
With the waterproof wall 15 having the water intercept 16, it is possible to completely shut down the rain.

また、側下部接続部材76は、第23a図及び第23b
図に示すように、下部接続部材50と同様ニ、その中央
に装着された垂下係合支脚46と係合1木5Cに固定し
た接続部材固定金具TにょすIIR(=rけられて、そ
の棟寄り後方が、棟桟木5Eより突出しており、側下部
接続部材76は下部接続部材50と同様に野地面長さが
標準の場合には、第25a−1図及び第25a−2図に
示すように、接続部材固定金具Tのボルト67が側下部
接続部材76の1習動取付孔59の中央に位置すると共
に、最も凍寄りの接続部材固定金具Tのボルト67が側
下部接続部076の長さ調整取付長孔61の中央となる
調整目盛60のOに位置して標準数イ1となり、野地面
長さが標準より短い場合には、第26b−1図及び第2
6 b−2図に示すように、接続部材固定金具Tのボル
ト67が摺動取付孔59に対して側下部接続部材76の
長手方向棟寄寄りに位置すると共に、最も棟寄りの接続
部材固定金具Tのボルト67が側下部接続部材76の長
さ調整取付長孔61のマイナスとなる調整目盛60の軒
先方向に位置してマイナス調整取付となり、野地面長さ
が標準にり長い場合には、第26C−1図及び第26 
c−2図に示すように、接続部材固定金員下のボルト6
7が摺動取付孔59に対して側下部接続部材76の端部
寄りに位置づるど共に、最ら棟部寄りの接続部材固定金
具Tのポル1へ67が側下部接続部材7Gの長さ調整取
付長孔61のプラスどなる調整目盛60の棟方向に位置
してプラス調114取付となる。
Further, the lower side connecting member 76 is shown in FIGS. 23a and 23b.
As shown in the figure, similar to the lower connection member 50, the hanging engagement support leg 46 attached to the center and the connection member fixing bracket T fixed to the engagement 1 tree 5C are shown. If the rear of the ridge protrudes from the ridge beam 5E, and the lower side connecting member 76 has a standard length of the field surface like the lower connecting member 50, it is shown in FIGS. 25a-1 and 25a-2. As shown, the bolt 67 of the connecting member fixing fitting T is located in the center of one free-motion mounting hole 59 of the lower side connecting member 76, and the bolt 67 of the connecting member fixing fitting T closest to the frozen side is located in the lower side connecting part 076. It is located at O of the adjustment scale 60, which is the center of the length adjustment installation elongated hole 61, and becomes the standard number 1, and if the field surface length is shorter than the standard,
As shown in Fig. 6 b-2, the bolt 67 of the connecting member fixing fitting T is located closer to the longitudinal ridge of the lower side connecting member 76 with respect to the sliding mounting hole 59, and the connecting member fixing member closest to the ridge is located. If the bolt 67 of the metal fitting T is located in the direction of the eaves of the adjustment scale 60, which is the minus of the length adjustment mounting slot 61 of the lower side connecting member 76, and the field surface length is longer than the standard, , Figure 26C-1 and Figure 26
As shown in Figure c-2, bolt 6 below the connection member fixing member.
7 is located near the end of the lower side connecting member 76 with respect to the sliding mounting hole 59, and 67 is the length of the lower side connecting member 7G to the port 1 of the connecting member fixing fitting T closest to the ridge. It is located in the direction of the ridge of the adjustment scale 60 of the adjustment mounting elongated hole 61 and has a positive adjustment 114 mounted thereon.

なお、側下部接続部’rA 76は中間部接続部+A 
Aの下部接続部材50と同様に接続部材固定金−TにJ
:り槽動可能に取イ」【プられ、接続部材△、A′はア
ルミ会合等の金属あるいは合成樹脂等を用いることがで
きる、。
In addition, the lower side connection part 'rA 76 is the middle part connection part +A
Similar to the lower connecting member 50 of A, connect the connecting member fixing metal to T and J.
The connection members △ and A' can be made of metal such as aluminum or synthetic resin.

次に、円冠しは、第27図に示すように棟冠Iに取付け
られ、円冠りには棟冠Iと側下部)&続部070及び側
部補強材Cにle;合する切欠部97と断面U字数付溝
98が形成される。M′は断面U字数付溝98に係合J
る巴)11.用の連結具部祠であり、N′は側部接続部
材カバーD′に摺動自在に装着した連結貝部月M′ と
係合する巴冠取付部材であり、巴冠しは棟冠Iの側部へ
矢印方向より嵌合する。
Next, the round crown is attached to the ridge I as shown in Figure 27, and the round crown has a notch that fits the ridge I and the lower side) A portion 97 and a numbered groove 98 having a U-shaped cross section are formed. M' is engaged with the cross-section U-shaped numbered groove 98 J
Ru Tomoe) 11. N' is a tomoe crown mounting member that engages with the connecting shell part M' slidably attached to the side connecting member cover D'; Fit into the side part in the direction of the arrow.

次1.:、防塵キャップEの側部接続部材カバーD′へ
の取付けは、第28b図に示す切欠係合凹部99ど軒先
部吸気孔1」及び取付支持板100を有する防塵キャッ
プFを第28a図に示すように、側部接続部材A′に嵌
合し、側部接続部材カバーD′に摺動自在に係合した第
28C図の軒先補強(,9191を取付支持板100に
係合し、防塵キせツブ[は舶後左右上下を嵌合して軒先
用ポル1へ83Aで耐風圧性をもたけて強固に緊結固定
し、点検整備に脱着容易な構造とする。
Next 1. : To attach the dust-proof cap E to the side connecting member cover D', attach the dust-proof cap F having the notch engagement recess 99 shown in FIG. As shown, the eaves reinforcement (, 9191 of FIG. 28C, which is fitted into the side connection member A' and slidably engaged with the side connection member cover D', is engaged with the mounting support plate 100, and the dustproof The kisetsubu [fits on the left, right, top and bottom of the rear of the ship, and is securely fastened to the eaves pole 1 with 83A to ensure wind pressure resistance, making it easy to attach and detach for inspection and maintenance.

また、第29図に示すように、棟部は側部接続部材70
の嵌合凸部74と棟冠取付部材N′の嵌合四部101と
が係合して風圧強化構造となるよう形成される。
Further, as shown in FIG. 29, the ridge portion is connected to the side connecting member 70
The fitting protrusion 74 and the four fitting parts 101 of the ridge crown attachment member N' are formed to engage with each other to form a wind pressure reinforced structure.

次に、第30図・〜第33図を参照して軒先構造につい
て説明する。
Next, the structure of the eaves will be explained with reference to FIGS. 30 to 33.

第30a図及び第32a図のGは、防寒・配線点検カバ
ーで、′?R30a図に示すように、本体上面棟方向端
部に立上り本選係合壁160を形成し、両側端部に水切
片161aを有する立上り本選防水壁161を形成し、
軒先端部に重下水切片162を形成する。この本選係合
壁160はその先;・)頂部に防塵・山水防止パツキン
のためのパツキン係合突片160aを有している。jl
IT先部下面には垂下板163を設け、その端部には、
軒先支持材10kに嵌合係合する張出嵌合凹部164を
形成する。垂下板163中間部棟側内面部に棟方向に張
出係合突片165を設け、該突片コロ5端部に立上り嵌
合凸部166を形成づる。垂下板163中間部外面部に
は軒先部吸気孔1−(を穿設し、その上部に庇168を
形成づる。167は、本体上面中央の長手方向に形成し
た軒先係合金具44と係合する係合突片である。
G in Figures 30a and 32a is a cold protection/wiring inspection cover; As shown in FIG. R30a, a rising final selection engagement wall 160 is formed at the end in the direction of the upper surface of the main body, and a rising main selection waterproof wall 161 having water sections 161a is formed at both ends,
A heavy sewage section 162 is formed at the tip of the eaves. This final selection engagement wall 160 has a seal engagement protrusion 160a at its top for dust-proofing and protection against landscape and water. jl
A hanging plate 163 is provided on the lower surface of the IT tip, and at the end thereof,
An overhanging fitting recess 164 is formed to fit and engage with the eaves support member 10k. An engaging protrusion 165 is provided on the inner surface of the intermediate portion of the hanging plate 163 on the ridge side, extending in the direction of the ridge, and a rising fitting convex portion 166 is formed at the end of the protruding piece roller 5. An eaves intake hole 1-() is bored in the outer surface of the intermediate part of the hanging plate 163, and an eaves 168 is formed above the eaves.The eaves 167 engages with an eave engagement fitting 44 formed in the longitudinal direction at the center of the upper surface of the main body. This is an engaging protrusion.

第30b図は軒先防塵装置Uを示すもので、上壁212
.底壁2]3.端壁214よりなる枠体の一側に合成樹
脂、金属等の防塵網215が設けられ、その下端に嵌合
凹部216が形成されている。そして、この嵌合凹部2
16を防塵・配線点検カバーGの嵌合凸部166に挿入
することにより、軒先防寒装置(Jは防塵・配線点検カ
バーGの上面ど張出係合突片165と垂下板163どの
間に収められる。
Fig. 30b shows the eaves dust prevention device U, in which the upper wall 212
.. Bottom wall 2]3. A dustproof net 215 made of synthetic resin, metal, etc. is provided on one side of the frame consisting of an end wall 214, and a fitting recess 216 is formed at the lower end thereof. Then, this fitting recess 2
16 into the fitting protrusion 166 of the dustproof/wiring inspection cover G, the eaves cold protection device (J is fitted between the engaging protrusion 165 protruding from the upper surface of the dustproof/wiring inspection cover G and the hanging plate 163). It will be done.

防寒、配線点検カバー〇の取付(づは次のように行われ
る。本選係合壁160のパツキン係合突片160i1に
防塵・雨水防止用のパツキン217(第331)図)を
嵌めて軒先部採光ガラス枠B1の下41111の水切嵌
合凹部118内に嵌挿し、両側端部の本選防水壁161
を中間部接続部材カバー〇の重下水切抑止片63の内側
に欧め、該防水壁161の頂部を中間部接続部材カバー
〇に当接Jる。そして、係合突片167を軒先係合金具
44の1糸合面45の端部に係合することにより、防塵
・配線点検カバー〇を定位置に取付ける。張出嵌合凹部
164は、軒先支持材10に嵌合される軒先金属屋根板
85の軒先水切部86と嵌合する、。
Installation of the cold protection and wiring inspection cover 〇 (This is done as follows. Fit the dustproof and rainwater prevention gasket 217 (Fig. 331) into the gasket engaging protrusion 160i1 of the final selection engagement wall 160) and attach it to the eaves. Fit into the drainage fitting recess 118 at the bottom 41111 of the daylighting glass frame B1, and close the main selection waterproof walls 161 at both ends.
is placed inside the heavy sewage drain prevention piece 63 of the intermediate connecting member cover 〇, and the top of the waterproof wall 161 is brought into contact with the intermediate connecting member cover 〇. Then, by engaging the engaging protrusion 167 with the end of the one thread mating surface 45 of the eave edge engaging fitting 44, the dustproof/wiring inspection cover 〇 is attached to the fixed position. The protruding fitting recess 164 fits into the eaves drainage part 86 of the eaves metal roof plate 85 that is fitted to the eaves supporting material 10 .

以上のように、防塵・配線点検カバーGの各個所が1茨
合係合すると、防塵・配線点検カバー〇の軒先内部下面
は上部接続部材31に取付けたIH先係合金具44に載
置され、防塵・配線点検カバー〇は、このΦ■先係合金
具44に防寒・配線点検カバーG1.:設けた係合突片
167を係合して取付けられる。防寒・配線点検−hバ
ーGは、1fij lね左イコーL下を1■合係合して
ボルト等の固定具を一切使用けずに耐風圧性をもたぜ、
強固に緊結固定される。
As described above, when each part of the dustproof/wiring inspection cover G is engaged with one thorn, the inner lower surface of the eaves of the dustproof/wiring inspection cover 〇 is placed on the IH front engagement metal fitting 44 attached to the upper connection member 31. , the dustproof/wiring inspection cover 〇 is attached to this Φ■ preceding metal fitting 44 with the cold protection/wiring inspection cover G1. : It is attached by engaging the provided engaging protrusion 167. Cold protection/wiring inspection - H bar G is 1fij L and left equal L is engaged with 1■ to provide wind pressure resistance without using any fixing devices such as bolts.
It is firmly fixed.

また、防1唐・配線点検カバーGは、ポル1〜等の固定
具を一切使用しない装着固定で点検整備に、脱着容易な
構造になっている。
In addition, the POL 1 and wiring inspection cover G has a structure that makes it easy to install and remove for inspection and maintenance without using any fixing devices such as POL 1.

第3241図のEは防(ω二)−ヤップを示し、本体は
箱型に形成されている。箱型本体内面上部にキャップ取
付支持板174を取付け、該支持板174は内部に軒先
装飾補強板191と係合する嵌合部175を有し、該支
持板174他端は外方に張出して係合突片176を形成
する。該係合突片176の端部は切欠いて取付0字孔1
77を設ける。
E in FIG. 3241 indicates the prevention (ω2)-YAP, and the main body is formed into a box shape. A cap attachment support plate 174 is attached to the upper inner surface of the box-shaped main body, and the support plate 174 has a fitting part 175 that engages with the eave decoration reinforcing plate 191 inside, and the other end of the support plate 174 extends outward. An engaging protrusion 176 is formed. The end of the engaging protrusion 176 is cut out to form a mounting hole 1.
77 will be provided.

178は喘立突部である。箱型本体中間一部棟方向取付
部に上下に切欠係合部179.180をy2 +−rる
。箱型本体下部下面に流水孔を賄ねた底吸気孔181を
設け、箱型本体軒先方向面には軒先部吸気孔Hと庇18
2とを設ける。
178 is a stridor protrusion. Cutout engaging portions 179 and 180 are provided at the top and bottom of the middle portion of the box-shaped main body in the ridge direction mounting portion. A bottom air intake hole 181 that serves as a water flow hole is provided on the lower surface of the lower part of the box-shaped body, and an eave-side air intake hole H and an eaves 18 are provided on the side facing the eaves of the box-shaped body.
2 will be provided.

第31a図〜第31C図に示すように、防塵キャップE
の内部には第31b図に示すキャップ防塵8置Vが設け
られる。このキャップ防塵装置Vはその前面及び底面に
防塵網218を有していて、その底壁端部が防寒キャッ
プE底面に形成した嵌合突片220の内面に係合し、そ
の前面が防塵キャップEの前壁左右端に当接することに
よって防塵キャップE内に着脱自在に収納される。
As shown in Figures 31a to 31C, the dustproof cap E
Inside, eight dust-proof caps V shown in Fig. 31b are provided. This cap dustproof device V has a dustproof net 218 on its front and bottom surfaces, the end of the bottom wall of which engages with the inner surface of a fitting protrusion 220 formed on the bottom surface of the cold protection cap E, and the front surface of the dustproof net 218 It is removably housed in the dustproof cap E by coming into contact with the left and right ends of the front wall of E.

次に、防仰キVツブEの取付けを説明する。防塵キレツ
ブ本体のキャップ取付支持板174を上部接続部材31
の上方開放部に挿入する。該キャップ取付支持板174
の取付0字孔177は、上部接続部材31の上方開放部
に露出している軒先用ボルト83Aにまたがって係合し
、同時に本体中間部の切欠係合部179,180が防塵
・配線点検カバー〇の軒先部上部の垂下水切片162と
下部の張出嵌合凹部164にそれぞれ嵌合係合する。
Next, the installation of the protection key V-button E will be explained. Attach the cap mounting support plate 174 of the dustproof grip main body to the upper connecting member 31.
Insert it into the upper opening. The cap mounting support plate 174
The mounting hole 177 straddles and engages the eaves bolt 83A exposed in the upper open part of the upper connection member 31, and at the same time, the notch engagement parts 179 and 180 in the middle part of the main body are connected to the dustproof/wiring inspection cover. It is fitted and engaged with the hanging water section 162 at the upper part of the eave edge part and the protruding fitting recess 164 at the lower part, respectively.

次に、張出した係合突片176の端室突部178に座金
183を当接して露出している軒先用ボルト83Aにナ
ラh 184で緊結固定する。
Next, a washer 183 is brought into contact with the end chamber protrusion 178 of the protruding engagement protrusion 176 and tightly fixed to the exposed eaves bolt 83A with a lug h 184.

192は軒先組立体を構成する軒先脱着用連結カバーで
あり、その長さは締結体となる軒先用ポル1〜83Aを
隠蔽するようにされており、上部接続部材31の軒先用
ボルト83Aが見える上方開放部を覆い、下面には上部
接続部材31の立上り部36の内側に設けた嵌合凸部3
6aに係合する嵌合凹部193を有する垂下脚片194
を2条、その両側に防塵・配線点検ノJバーGの水運防
水壁161に設けた水切片161aと対向するそれぞれ
2条の水切片195aを有する垂下水切抑止片195を
2条、下面両端には係合片196を2条それぞれ設け、
前記垂下水切抑止片195の棟部寄りには軒先部採光ガ
ラス枠B1の縦桟110に嵌合する切欠部197が形成
されている。
Reference numeral 192 is a connection cover for attaching and detaching the eave which constitutes the eaves assembly, and its length is such that it hides the eaves poles 1 to 83A that serve as fasteners, and the eaves bolts 83A of the upper connecting member 31 are visible. A fitting convex portion 3 is provided on the lower surface of the upper opening portion and is provided inside the rising portion 36 of the upper connecting member 31.
A hanging leg piece 194 having a fitting recess 193 that engages with 6a
Two strips of hanging water cut prevention strips 195 each having two strips of water strips 195a facing the water strips 161a provided on the water transport waterproof wall 161 of the dustproof/wiring inspection J-bar G on both sides, on both ends of the lower surface. is provided with two engaging pieces 196,
A notch 197 is formed near the ridge of the drooping drainage prevention piece 195 to fit into the vertical bar 110 of the eaves daylighting glass frame B1.

防昭キt・ツブEが固定された後、中間部接続部材カバ
ーDと軒先脱着用連結カバー192を上部接続部材31
の上方開放部に嵌合係合する。
After the anti-shoki T and knob E are fixed, the intermediate connecting member cover D and the connecting cover 192 for attaching and detaching the eaves are attached to the upper connecting member 31.
Fittingly engages with the upper opening part of.

中間部接続部材カバーDは、第160図にも示すJ:う
に、軒先方向端部に水切片63aを有する垂下水切抑止
片63の一部が突出して形成され工おり、前記中間部接
続部材カバーDの上部には、軒先装飾補強板191が係
合片64を利用して摺動自在に係合している。
The intermediate connecting member cover D is formed by protruding a part of a drooping drain prevention piece 63 having a water cutter 63a at the end in the direction of the eaves, as shown in FIG. 160. An eave decoration reinforcing plate 191 is slidably engaged with the upper part of D using an engagement piece 64.

中間部接続部材カバーDが上部接続部材31に嵌合係合
した後、第32C図に示すように、軒先用ボルト83A
の見える軒先寄りの前記上部接続部材31に軒先脱着用
連結カバー192を嵌合係合して、垂下水切抑止片19
5を前記中間部接続部材カバー〇の垂下水切片63の突
出する部分に嵌合し、軒先装飾補強板191を軒先方向
に摺動移動して、前記中間部接続部材カバー〇と前記軒
先脱着用連結カバー192との接続部198を被覆し、
防塵キ17ツブE内のキャップ取付支持板174の嵌合
部175に係合する。
After the intermediate connecting member cover D is fitted and engaged with the upper connecting member 31, as shown in FIG. 32C, the eaves bolt 83A
The connecting cover 192 for attaching and detaching the eaves is fitted and engaged with the upper connecting member 31 near the eaves where you can see the eaves, and the drooping drainage prevention piece 19 is connected.
5 into the protruding portion of the hanging water section 63 of the intermediate connecting member cover 〇, and slidingly move the eaves decoration reinforcing plate 191 toward the eaves to attach and detach the intermediate connecting member cover 〇 and the eaves. Covering the connection part 198 with the connection cover 192,
It engages with the fitting part 175 of the cap attachment support plate 174 inside the dustproof lug 17 tab E.

軒先部に取付けた防塵キャップEは、前後左右上下が嵌
合されており、軒先用ボルト83Aで耐風圧性をもたせ
、強固に緊結固定される。また、防塵キャップEは、軒
先装飾補強板191を中間部接続部材カバ一部上に囲動
して、軒先脱着用連結カバー192を上部接続部材31
より抜取り、軒先用ボルト83Aによる固定で点検整備
に脱着容易な構造になっている。
The dustproof cap E attached to the eaves part is fitted at the front, back, left, right, top and bottom, and is tightly fastened with wind pressure resistance using the eaves bolts 83A. In addition, the dustproof cap E has the eaves decoration reinforcing plate 191 moved over a part of the intermediate connection member cover, and the eaves eave attachment/detachment connection cover 192 attached to the upper connection member 31.
It has a structure that makes it easy to remove and remove for inspection and maintenance by pulling it out and fixing it with the eaves bolt 83A.

なお、側部接続部材カバーD′に対する軒先脱着用連結
カバーも上記と同様になっている。
The connecting cover for attaching and detaching the eaves to the side connecting member cover D' is also similar to the above.

次に、軒先部採光ガラス枠B+、中間部採光ガラス枠B
2及び棟部採光ガラス忰B3について順次説明する。
Next, the eave part lighting glass frame B+, the middle part lighting glass frame B
2 and the ridge lighting glass window B3 will be explained in order.

第34図〜第37図を参照して、軒先部採光ガラス枠B
1について説明1“る。
With reference to Fig. 34 to Fig. 37, eave part lighting glass frame B
Explanation about 1.

軒先部採光ガラス枠B1は、2木の縦1110゜11o
、下桟111.上棧112及びガラス板113とで構成
されている。縦桟110は第3b図。
The eaves lighting glass frame B1 is 1110° 11o vertically of 2 pieces of wood.
, lower pier 111. It is composed of an upper deck 112 and a glass plate 113. The vertical bar 110 is shown in FIG. 3b.

第36図及び第37図に示すように押出型材製で、内側
にガラス板113及びエネルギー集版器Sを嵌める段部
を形成し、上部に水切片1 j4aを有する水運防水壁
114を、下部に垂下脚片115を備え、この垂下脚片
115に上桟112寄りに熱気排出切欠部116を設け
て熱気排出部とする。
As shown in FIGS. 36 and 37, it is made of extruded material and has a stepped part on the inside into which the glass plate 113 and the energy collector S are fitted, a water transport waterproof wall 114 having a water cutter 1j4a on the upper part, and a water transport waterproof wall 114 on the lower part. A hanging leg piece 115 is provided, and a hot air exhaust notch 116 is provided in the hanging leg piece 115 near the upper crosspiece 112 to serve as a hot air exhaust part.

垂下脚片115は上部接続部材31の上部支持溝37に
係合する。
The depending leg piece 115 engages with the upper support groove 37 of the upper connecting member 31.

下+a1iiには、第36図に示すように、カバ一体で
あるガラス板113が係合する水切片117aを有する
係合水切117を設け、前記水切片117aの下方に防
塵・配線点検カバーGの本選係合壁160が嵌合する水
切嵌合凹部118を設ける。11っは軒先係合排水突片
、120は下桟下部に設けた排水係合突部で、採光ガラ
ス枠固定金臭1〕に嵌合係合する。下桟111とm桟1
10どはねじ121によって接続固定される。
As shown in FIG. 36, the bottom +a1ii is provided with an engaging drainer 117 having a water section 117a with which the glass plate 113 integrated with the cover engages, and a dustproof/wiring inspection cover G is provided below the water section 117a. A drain fitting recess 118 into which the final selection engagement wall 160 fits is provided. Reference numeral 11 denotes an eave engagement drainage protrusion, and 120 indicates a drainage engagement protrusion provided at the lower part of the lower frame, which fits and engages with the lighting glass frame fixing metal odor 1]. Lower crosspiece 111 and m crosspiece 1
10 are connected and fixed by screws 121.

11111は、その両端にのみガラス板113よりなる
カバ一体が嵌合する嵌合部111aを設【ノ、その中間
部には嵌合部がなく、ガラス板113上部に突出するも
のがない。
11111 has fitting parts 111a on both ends into which the cover made of the glass plate 113 is fitted, but there is no fitting part in the middle part and there is nothing protruding above the glass plate 113.

上r! 112は、第37図に示すように、内側にガラ
ス板113が嵌まる溝122を、その反対側」二部に防
塵・雨水防I[パツキンを係合するパツキン係合突片1
23aを先端に有する防水壁123’: =2 uる1
、1−1′l下万張出し部には係合排水突片キ124を
設け、該係合排水突片124は中間部採光ガラス枠[3
2の下+1131の排水係合突部135に係合りる。係
合排水突片124の下方には、係合突部125を形成し
て採光ガラス(4゛固定金具[)に嵌合係合4−る。軒
先部採光ガラス枠B1は、前記F[艷111の排水係合
突部120及び上(l」12の係合突部125を採光ガ
ラス枠固定金具Pに嵌合係合づることにより接続部材に
Vj ’4固定する。
Upper r! 112, as shown in FIG.
Waterproof wall 123' having 23a at the tip: =2 uru1
, 1-1'l is provided with an engaging drainage protrusion 124 on the lower overhang, and the engaging drainage protrusion 124 is attached to the middle lighting glass frame [3
It engages with the drainage engaging protrusion 135 at the bottom +1131 of 2. An engagement protrusion 125 is formed below the engagement drainage protrusion 124 and is engaged with the lighting glass (4' fixing metal fitting). The eaves daylighting glass frame B1 is made into a connecting member by fitting and engaging the drainage engaging protrusion 120 of the F[111] and the engaging protrusion 125 of the upper (l) 12 with the daylighting glass frame fixing fitting P. Vj '4 is fixed.

なお、パラ−ヤングが経年変イし等で損傷し漏水が生じ
た場合、排水係合突部120はす1水il′1′812
(5を形成し、中間部接続部材Aの上部排水Fj 38
に連絡して漏水を軒先に流す。上桟112と縦+111
0と(よねじ127によって接続固定される。128は
縦桟110の下部内側に設けた防水板であって、縦?!
 110に2本のねじで取付けられている。
In addition, if the para-young is damaged due to aging and water leaks, the drainage engaging protrusion 120
(forming 5, upper drainage Fj 38 of middle part connecting member A
Contact us and drain the leakage to the eaves. Upper crosspiece 112 and vertical +111
0 and (connected and fixed by a screw 127. 128 is a waterproof plate provided inside the lower part of the vertical beam 110, and is vertical?
110 with two screws.

次に、第38図〜第41図を参照して、中間部採光ガラ
ス枠B21こついてに1明する。。
Next, with reference to FIGS. 38 to 41, we will explain about the intermediate lighting glass frame B21. .

中間部採光ガラス枠B2は、2本の1従桟130゜13
0、下4131 、上桟132シびガラス板113とで
構成されている。両線fl130,1301’9び十F
x 132の構成は、前記軒先部採光ガラス枠13 +
の両11110.110及び上1112の11′+1成
と同一であるから、同一部位には同一符号を(N1シ説
明を省略4る。
The middle lighting glass frame B2 has two one-piece 130°13
0, a lower part 4131, an upper crosspiece 132, and a frosted glass plate 113. Both lines fl130, 1301'9bijuF
The configuration of x 132 is as follows:
Since it is the same as both 11110.110 and the 11'+1 configuration of the upper 1112, the same parts are denoted by the same reference numerals (N1 and explanation will be omitted).

下tI 131は、第40図に示すように、ガラス]及
113が係合づる係合水切133を設(プ、その下部に
排水係合突部135を設け、該係合水切133とIJF
水係合突部135とで水切嵌合凹部13(らを1(ニ成
し、これを前記ΦF先部採光がうス枠B1の14111
2.張出部である係合排水突片124に嵌合係合する。
As shown in FIG. 40, the lower tI 131 is provided with an engaging drain 133 with which the glass and the glass 113 are engaged, and a drain engaging protrusion 135 is provided at the lower part of the lower part, and the engaging drain 133 and the IJF
The water engagement protrusion 135 and the water draining fitting recess 13 (1) are formed, and the ΦF tip lighting is connected to the 14111 of the frame B1.
2. It fits and engages with the engagement drainage protrusion 124 which is a projecting portion.

そして、この下桟131もガラス1反113よりなるカ
バ一体が嵌合する嵌合部131aはその両端部のみに形
成され、ぞの中間部には1■合部が形成されていない。
In this lower crosspiece 131, fitting parts 131a into which the cover made of glass 113 is fitted are formed only at both ends, and no fitting part 131a is formed in the middle part thereof.

また、上1132の上部には防塵・雨水防止パツキンを
係合するパツキン係合突片123aを先端に右する防水
壁123が設けられる。
Furthermore, a waterproof wall 123 is provided at the upper part of the upper part 1132, with a packing engaging protrusion 123a that engages a dust-proof/rainwater-proof packing at its tip.

次に、第42図〜第45図を参照して、棟部採光ガラス
枠B3について説明する。
Next, the ridge lighting glass frame B3 will be described with reference to FIGS. 42 to 45.

棟部採光ガラス枠B3は、2本の縦桟140゜140、
下i′1141.上fi 142皮びガラス板113と
で構成されている。
The ridge lighting glass frame B3 has two vertical bars 140°140,
Lower i'1141. It consists of an upper fi 142 and a glass plate 113.

両線桟140,140の構成は、前記軒先部採光ガラス
枠[31の両1rlllo、110及び中間部採光カラ
ス枠B2の両U+1130.130の構成ど同一であり
、下+1141の構成は、前記中間部採光ガラス枠B2
の下桟131の構成と同一であるから、同一部位には同
−符号を句し7で示し、説明を省略する。
The configurations of both line crosspieces 140, 140 are the same as the configurations of both 1rlllo and 110 of the eaves part lighting glass frame [31 and both U+1130.130 of the middle part lighting glass frame B2, Lighting glass frame B2
Since the structure is the same as that of the lower crosspiece 131, the same parts are designated with the same reference numeral 7 and the explanation will be omitted.

上1142は、下部に採光ガラス枠固定金具Pの係合段
部42に嵌合係合する係合突部143を形成づる。上桟
142上面部は前記軒先部及び中間部採光ガラス枠B+
 、82の上桟112,132と異なり、ト方〈棟冠内
中心方向)に長く張出してrA整有効而面44が形成さ
れ、端部に水切145aを右する調整取付部145が設
けられて1bす、前記調整有効面144の上面には面戸
プラスマイナス調整装置221を軒先方向または印部上
方方向に)27動自在に装着し、前記調整有効而144
を除く上桟142を上桟本体とする。
The upper part 1142 has an engaging protrusion 143 formed at the lower part thereof to be engaged with the engaging step part 42 of the lighting glass frame fixing fitting P. The upper surface part of the upper crosspiece 142 is the eaves part and the middle part lighting glass frame B+
, 82, an rA adjusting surface 44 is formed by extending long toward the rear (toward the center of the ridge crown), and an adjustment mounting portion 145 is provided at the end to hold a drainer 145a. 1b, a door plus/minus adjustment device 221 is mounted on the upper surface of the adjustment effective surface 144 so as to be movable (27) in the direction of the eaves or in the upward direction of the mark;
The upper crosspiece 142 excluding the upper crosspiece is the upper crosspiece main body.

面戸プラスマイナス調整装置221は、通常の面戸板を
兼ね、防水構造を備えて枠体の1つである棟部採光ガラ
スB3に設けられ、第46図に示づ−ように、水平部両
側には前記枠体の長さ方向に100mmの距離移動自在
な調整目盛222を有する長孔223が設けられ、棟部
寄りには両側に取付孔224を有し、上端に本選225
aを有づる防水壁225が設けられ、軒先部寄りには上
端に水切片226を有し、その下部に水切227を有す
る面戸防水壁228が設けられている。229は上記面
戸防水壁228の両側寄りに設けられた切欠部、230
は散水管Kを係合する係合片、231は水平部軒先寄り
の下面に設けた支脚部である。
The side door plus/minus adjustment device 221 doubles as a normal side door plate, has a waterproof structure, and is installed on the ridge lighting glass B3, which is one of the frames, as shown in FIG. is provided with an elongated hole 223 having an adjustment scale 222 that can be moved by a distance of 100 mm in the length direction of the frame, has mounting holes 224 on both sides near the ridge, and has a final selection 225 at the upper end.
A waterproof wall 225 is provided with a water-proof wall 225, and a water-proof wall 228 having a water cutter 226 at its upper end and a water cutter 227 at its lower part is provided near the eaves. 229 is a notch provided on both sides of the waterproof wall 228; 230;
231 is an engagement piece that engages the water sprinkler pipe K, and 231 is a support leg provided on the lower surface near the eaves of the horizontal portion.

次に、面戸プラスマイナス調整装置221の棟部採光ガ
ラス枠B3への取付けについて説明すると、第46図に
示すように、前記棟部採光ガラス枠B3の上11142
に設けた調整取付部145に形成した取付孔146にボ
ルト232を挿通し、面戸プラスマイナス調整装置22
1の長孔223を前記ボルト232に嵌合した後、前記
ボルト232に長孔223と係合する指示体233を挿
通し、座金234を介してナツト235により緊結固定
し、その支脚部231を調整有効面144上に係合する
Next, to explain how to attach the side door plus/minus adjustment device 221 to the ridge lighting glass frame B3, as shown in FIG.
Insert the bolt 232 into the mounting hole 146 formed in the adjustment mounting part 145 provided in the side door plus/minus adjustment device 22.
After fitting the elongated hole 223 of 1 to the bolt 232, the indicator 233 that engages with the elongated hole 223 is inserted into the bolt 232, and is tightly fixed with a nut 235 via a washer 234, and the support leg 231 is fixed. It engages on the adjustment effective surface 144.

そして、第47図に示1−ように、棟部採光ガラス枠B
3の上!1142に面戸プラスマイナス調整装置221
を取付iノだ後、前記面戸プラスマイナス調整装置22
1の切欠部229に洗浄装置Qと散水管にの連結部23
6を上方より係合し、散水管Kを係合片230上に載置
した後、上部に面戸プラスマイナス調整装置221の水
切片226に1さ;合する嵌合部237と横方向に前記
連結部236に係合する切欠部238とを右する仕切板
239を横方向から取(=Jけ、第48図に示すように
、前記連結部236を切欠部238に係合することによ
って散水管Kを係止し、洗i7+装置Qを前記面戸プラ
スマイナス調整装置221の水平面上方に位置させる。
Then, as shown in FIG. 47, the ridge lighting glass frame B
Above 3! 1142, side door plus/minus adjustment device 221
After installing the door, adjust the side door plus/minus adjustment device 22.
A connection part 23 between the cleaning device Q and the water sprinkling pipe is installed in the notch 229 of 1.
6 from above, and after placing the water sprinkler pipe K on the engaging piece 230, the fitting part 237 that fits into the water section 226 of the side door plus/minus adjustment device 221 is placed on the upper part in the horizontal direction. The notch 238 that engages with the connecting portion 236 is removed from the right by removing the partition plate 239 from the side (=J), as shown in FIG. 48, by engaging the connecting portion 236 with the notch 238 The water sprinkler pipe K is locked, and the washing i7+ device Q is positioned above the horizontal plane of the surface door plus/minus adjustment device 221.

240は防水カバーであり、水平部の棟部より上方には
上端に水切片241を有し、両側よりに長孔よりなる(
習動取付孔242を有する防水壁243が設けられ、軒
先寄りには洗浄装置Qを上方より嵌合する嵌合部244
を設け、水平部下面には中間部接続部材カバーD上で防
水カバー240を支持する支脚部245が設けられる。
240 is a waterproof cover, which has a water section 241 at the upper end above the ridge of the horizontal part, and has long holes on both sides (
A waterproof wall 243 having a flexible mounting hole 242 is provided, and a fitting part 244 for fitting the cleaning device Q from above is provided near the eaves.
A support leg 245 for supporting the waterproof cover 240 on the intermediate connecting member cover D is provided on the horizontal lower surface.

防水カバー240の面戸プラスマイナス調整装置221
への取付けは、面戸プラスマイナス調整装置221の防
水壁225に設けた取付孔224に取付ポルl−246
を挿通し、嵌合部244が洗f?’ 装置Qを覆うよう
にして、1習動取付孔242を前記取付ボルト246に
嵌合し、座金247を介してナツト248を螺着するこ
とによりこれを行なう。防水カバー240が取付けられ
た後、第49図に示すように棟冠■を装着する。
Waterproof cover 240 side door plus/minus adjustment device 221
For installation, attach the mounting port l-246 to the mounting hole 224 provided in the waterproof wall 225 of the side door plus/minus adjustment device 221.
is inserted, and the fitting part 244 is cleaned f? ' This is done by fitting the attachment bolt 246 into the 1st movement attachment hole 242 so as to cover the device Q, and screwing the nut 248 through the washer 247. After the waterproof cover 240 is attached, the ridge crown (2) is attached as shown in FIG.

また、中間部接続部材カバーDは、第47図及び第48
図に示すように、棟部寄りに設けた調整取付用長溝65
を線用ボルト83cを利用して座金を介してナツトによ
り強固に緊結固定し、耐風圧性をもたせている。
Moreover, the intermediate part connecting member cover D is shown in FIGS. 47 and 48.
As shown in the figure, a long groove 65 for adjustment mounting is provided near the ridge.
The wire bolts 83c are firmly tightened and fixed with nuts through washers to provide wind pressure resistance.

次に、各採光ガラス枠B+ 、B2 、B3の接続部材
への取付は及び各採光ガラス枠B+ 、B2 。
Next, each daylighting glass frame B+, B2, B3 is attached to the connection member, and each daylighting glass frame B+, B2 is attached.

B3の連結について説明する。The connection of B3 will be explained.

第50図及び第51図は、軒先部採光ガラス枠B1の取
(=Jけ前の図及び取(=J Iノ後の図を示す。Pは
中間部接続部材Δに固定した採光ガラス枠固定金員で、
上部に棟の方向に間口する係合段部42を有し、ここに
軒先部採光ガラス枠B1の下(−1111の排水係合突
部120を上方から嵌め、同(1に、軒先部採光ガラス
枠B1の上桟112の係合突部125を採光ガラス枠固
定金具Pの係合段部42に上方から嵌合し、これにより
軒先部採光ガラス枠B1は中間部接続部材Aに取付けら
れる。
Figures 50 and 51 show the installation of the lighting glass frame B1 at the eaves (=J front view and the installation (=JI) rear view. P is the lighting glass frame fixed to the intermediate connecting member Δ. Fixed amount,
The upper part has an engaging stepped part 42 opening in the direction of the ridge, into which the drainage engaging protrusion 120 of -1111 is fitted from above under the eaves lighting glass frame B1. The engagement protrusion 125 of the upper crosspiece 112 of the glass frame B1 is fitted into the engagement step 42 of the lighting glass frame fixing fitting P from above, thereby attaching the eaves daylighting glass frame B1 to the intermediate connection member A. .

Gは防塵・配線点検カバーで、パツキン係合突片160
aに防塵・雨水防止用のパツキン217を係合した水運
係合壁160が形成され、それが下r1111の上部に
設けた水切嵌合凹部−118内に10:合され、防塵・
配線点検カバー〇の上面板は軒先係合IJI水突片11
9に当接する。
G is a dust-proof/wiring inspection cover with 160 pieces of seal engagement protrusion.
A water conveyance engaging wall 160 is formed on a to which a gasket 217 for dustproofing and rainwater prevention is engaged, and it is fitted into a drainage fitting recess 118 provided at the upper part of the lower r1111 to provide dustproofing and rainwater prevention.
The top plate of the wiring inspection cover is the eave engagement IJI water projection piece 11
Contact with 9.

第52図及び第53図は、中間部採光ガラス枠B、の取
付り前の図及び取付は後の図を示す。中間部採光ガラス
枠132の王様131に設5jた排水係合突部]35に
より形成される水切嵌合凹部136を、前記1ト[先部
採光ガラス枠B1の上+1112の係合排水突片124
に嵌合係合し、上(!132の係合突部125を中間部
接続部材△に固定された採光ガラス枠固定金具Pの係合
段部42に嵌合係合Mることにより、中間部採光ガラス
枠B2は、’l’l先部採光ガラス枠B1に連結し、中
間部接続部J、4 Aに取付けられる。
FIGS. 52 and 53 show the intermediate lighting glass frame B before it is installed and after it is installed. The drain fitting recess 136 formed by the drain engaging protrusion 5j provided on the king 131 of the intermediate daylighting glass frame 132 is connected to the above-mentioned 1 point [the engaging drain protrusion on the top +1112 of the front daylighting glass frame B1]. 124
By fitting and engaging the upper (!132) engaging protrusion 125 with the engaging stepped portion M of the lighting glass frame fixing fitting P fixed to the intermediate part connecting member △, the intermediate The partial daylighting glass frame B2 is connected to the front side daylighting glass frame B1, and is attached to the middle part connection part J, 4A.

棟部採光カラス枠B3の取(=jけは、第54図及び第
55図に示づように、前記中間部採光ガラス枠B2の取
付けと同様に行われる。このようにして、第51図、第
53図及び第55図に示す如く、各採光ガラス枠B+ 
、B2 、B3の上桟、下はは嵌合係合して防昨並びに
防水構造を形成する。
The installation of the ridge lighting glass frame B3 (=j) is carried out in the same manner as the installation of the middle lighting glass frame B2, as shown in FIGS. 54 and 55. In this way, as shown in FIG. , as shown in FIGS. 53 and 55, each lighting glass frame B+
, B2, and B3 are fitted and engaged to form a stormproof and waterproof structure.

そして、第56図(a)〜(h)に示すように、1+I
T51[;部採光ガラス枠F3+、中間部採光ガラス枠
B29棟部採光がラス枠B3を取付けることにより、係
合水切117.133ど防水壁123との空間に凍結破
(心1防止部147を形成し、126は排水溝であり、
係合排水突片124とJtに」一部接続部月31の上部
排水面38に通じ、採光ガラス枠Bのバッキングの経(
V変化i13太陽士ネルギー集収屋根の組合せ外面部か
らの万一の場合の漏水を外部に排出りる。
Then, as shown in FIGS. 56(a) to (h), 1+I
T51[; part lighting glass frame F3+, middle part lighting glass frame B29 ridge part lighting, by attaching lath frame B3, freeze breakage (core 1 prevention part 147 126 is a drainage ditch;
The engaging drainage protrusion 124 and Jt' partially connected part connects to the upper drainage surface 38 of the month 31, and connects the backing of the lighting glass frame B (
V change i13 Solar Energy Collection Roof combination to drain water leakage from the outer surface part to the outside in case of an emergency.

イ1お、採光ガラス枠Bの縦+111/′Iと中間部1
8杖部(Δカバー〇の垂下脚片62と垂下水切抑止片6
3と上部接続部材31の1一部支持!j437ど上部排
水m″′138と上部接続部材50の五部係合排水;1
へ57と金属屋根板とで完璧の防水(構造を形成ゴるっ
次に、棟構造について説明Jる。
A1 O, vertical +111/'I of lighting glass frame B and intermediate part 1
8 Cane part (Δ cover〇 hanging leg piece 62 and hanging water cut prevention piece 6
3 and 1 part of the upper connecting member 31 is supported! j437 Upper drainage m'''138 and upper connecting member 50 five-part engagement drainage; 1
Next, I will explain about the ridge structure.

棟冠Iは、並列する接続部材の棟方向端部上面に載置し
て棟部構造を構成づる部材で、第57図に示すように、
本体側面長手方向に棟部熱気排出化J、庇201を形成
し、本体側面内側に排水溝202を形成づる。203は
排水溝202の)γ上り突片であり、ここに本選204
を有する防水板205を固定し補強する。本体側面下部
には長手方向に断面0字型取(=j溝206を形成づ゛
る。
The ridge cap I is a member that is placed on the upper surface of the ends in the ridge direction of the parallel connecting members to form the ridge structure, and as shown in FIG. 57,
A ridge for discharging hot air and an eave 201 are formed in the longitudinal direction of the side surface of the main body, and a drainage groove 202 is formed inside the side surface of the main body. 203 is the )γ rising protrusion of the drainage ditch 202, and the main selection 204 is here.
The waterproof plate 205 having the following properties is fixed and reinforced. A 0-shaped cross section (=J groove 206) is formed in the lower part of the side surface of the main body in the longitudinal direction.

棟冠lは、第57図〜第59図に示すように取付けられ
る。あらかじめ、中間部接続部材カバーD十に、該中間
部接続部材カバー〇の両側に設けた係合片64を利用し
て棟冠装飾取付部材Nを開動自在【こに谷しておき、中
間部接続部材カバーD上に小父冒された棟冠Iの断面U
字型取付溝206に連結具部材Mの係合部209を引掛
り、該連結ロ部伺パノ14−中間部接続部材力バ−〇の
上面に叔;6づう1.載量された連結具部+4Mの平面
に、先に中間部I8臥部14 ;JJバーDに装4した
棟冠装篩取+’−J部口N !i1S動移IJ] シて
連結具部材IVIの′17面部上部を波音して1さく挿
し係合しC棟冠Iを固定する。211は棟冠接続カバー
である。
The ridge cap l is attached as shown in FIGS. 57 to 59. In advance, the ridge crown decoration mounting member N can be freely opened by using the engaging pieces 64 provided on both sides of the intermediate connecting member cover D1. Cross-section U of the ridge I on the connecting member cover D
Hook the engaging portion 209 of the connector member M into the letter-shaped mounting groove 206, and attach it to the upper surface of the connecting lower pane 14-intermediate connecting member force bar〇; On the plane of the loaded connector part +4M, the ridge crown mounting sieve which was previously attached to the middle part I8 and the lying part 14; JJ bar D +'-J part mouth N! i1S movement IJ] Then, insert and engage the upper part of the '17 surface of the connector member IVI by making a wave, and fix the C ridge crown I. 211 is a ridge connection cover.

融雪用の散水装置Qは、棟部採光ガラス枠B3の上桟1
42に設けた面戸プラスマイナス調整装量′221上で
棟冠1と同方向に配設され、前記洗郡装:?i Qに連
絡した散水管にの散水孔210は棟冠Iの1;端より棟
部採光ガラス枠B3上に臨lυで設けられる。
The water sprinkler Q for snow melting is installed on the upper pier 1 of the ridge lighting glass frame B3.
It is arranged in the same direction as the ridge crown 1 on the side door plus/minus adjustment amount '221 provided at 42, The water sprinkling hole 210 connected to the water sprinkling pipe connected to the iQ is provided on the ridge lighting glass frame B3 from the 1 end of the ridge crown I, facing lυ.

?lIi冠目ま、下部接続部材50.上と11〜接続部
祠31に、棟部ポル1〜83Cで一体にに肴された中間
部接続部材カバーDに連結具部材Mと棟冠装飾取イ、1
部材Nとで棟部構造が耐風圧性を有して強固に緊結固定
される。
? lIi crown, lower connecting member 50. Upper and 11 to connecting part shrine 31, middle part connecting member cover D, which is provided integrally with ridge part ports 1 to 83C, connecting member M and ridge crown decoration A, 1
The ridge structure has wind pressure resistance and is firmly fastened to the member N.

棟冠Iの装着固定は、連ts’!貝部材Mと棟冠装飾取
付部材Nどて装置1η定さ11、点検整備に税4容易な
(/11造になっており、棟+1が造は熱qδ(服に対
しτ棟冠が長手方向に熱店動]ノ、接続部材は長手方向
に熱1習動して、棟冠Iと接続部(イは相互に熱摺動し
て熱膨張(歪)を吸収づる取イ」構造(こむってい侃 本発明は、以上のように構成され取付けられるが、敷地
または家屋構造の関係で野地長さつ野地幅が標準どおり
ではない場合でも誤差を調整して取付けることができる
The attachment and fixation of the ridge crown I is continuous! Shell member M and ridge crown decoration mounting member N attachment device 1 η fixed 11, inspection and maintenance tax 4 easy (/11 construction, ridge + 1 structure is heat q δ (with respect to clothes τ ridge crown is longitudinal) The connecting member thermally moves in the longitudinal direction, and the ridge cap I and the connecting part (A) have a structure (A) that thermally slides against each other to absorb thermal expansion (strain). The present invention is configured and installed as described above, but even if the length and width of the field are not standard due to the site or structure of the house, the installation can be performed by adjusting the error.

以下、棟部及び側部の誤差を調整する取イリ施丁法につ
いて)ホベる。
The following is a method for adjusting the errors in the ridge and sides.

第60図において、へは家屋の間口長さ、Bは片流間口
長さ、Cは中T光量さ、Dは片流間口長さBと軒先長さ
Cを加えた長さ、Eは野地板長さ、Fは軒先部配線スペ
ース、Gは棟部配線スペース、Hは調整有効長さ、■は
採光スペースとする。
In Figure 60, H is the frontage length of the house, B is the length of one-way frontage, C is the amount of light in the middle T, D is the sum of the length of one-way frontage B and the eaves length C, and E is the length of the frontage of the house. The length of the base plate, F is the wiring space at the eaves, G is the wiring space at the ridge, H is the effective adjustment length, and ■ is the lighting space.

そして、第61図に示すように、底辺がb、高さがh、
斜辺がρ、底辺すと斜辺文とのなす角度がαである直角
三角形を考える。
Then, as shown in Fig. 61, the base is b, the height is h,
Consider a right triangle whose hypotenuse is ρ and the angle between the base and the hypotenuse is α.

軒先配線スペース(軒先部採光ガラス枠B1下端と野地
板2下端との距離)F= 100mm、8部配線スペー
ス(棟冠Iの幅)G=120mm、調整有効長さ(棟部
採光ガラス枠B3上端と棟冠I側面との距離)H=70
mmとし、採光ガラス枠Bの規格寸法をそれぞれ長さの
差が等間隔にAニア00mm、 B : 800mm、
 C: 900mm、 D : 1000mmの4種類
の枠体とする。ただし、棟部採光ガラス枠B3の長さに
は調整有効面144の長さを含まないものとする。そし
て、4寸5分勾配の場合b=100.h=45となるか
ら、u=109゜5、α=24.1°となり、間口Aが
2.0間から0.5間の間隔で5.0間までを考え、軒
先長さC=455mmとすると、第1表に示すように、
片流間口B、11流間口Bと軒先長さCを加えた長さD
、野地板長さE、採光スペースr=E−(F+ G +
 )−1) 、採光ガラス枠Bの組合せ寸法、棟部誤差
調整寸法がそれぞれ算出ざ杭る。
Eave wiring space (distance between the lower end of the eaves daylighting glass frame B1 and the bottom edge of the field board 2) F = 100mm, 8th wiring space (width of ridge crown I) G = 120mm, effective adjustment length (ridge daylighting glass frame B3) Distance between top end and ridge crown I side) H=70
mm, and the standard dimensions of the lighting glass frame B are A: 00 mm at equal intervals, B: 800 mm,
There are four types of frames: C: 900mm and D: 1000mm. However, the length of the ridge lighting glass frame B3 does not include the length of the effective adjustment surface 144. In the case of 4 dimensions and 5 minutes slope, b=100. Since h = 45, u = 109°5, α = 24.1°, and considering the frontage A from 2.0 to 5.0 with an interval of 0.5, eave length C = 455 mm. Then, as shown in Table 1,
Length D, which is the sum of single-stream frontage B, 11-stream frontage B and eaves length C
, field board length E, lighting space r=E-(F+G+
)-1), the combined dimensions of the lighting glass frame B, and the ridge error adjustment dimensions are calculated.

5寸8分勾配の場合には、b=100.  h=58と
なるからu=115.6、α−30,0’ となり、φ
■先光量C=303mmとすると第2表のような採光ガ
ラス枠Bの組合せとなり、棟部誤差調整寸法が締出され
、3寸勾配の場合にはb−100、h=30となるから
、ρ=104.4、α=16.4°となり、軒先長さC
=606mmとすると第3表に示すような採光ガラス枠
Bの組合せとなり、棟部誤差調整寸法が算出される。
In the case of a slope of 5 inches and 8 minutes, b=100. Since h=58, u=115.6, α-30,0', and φ
■If the front light amount C = 303 mm, the combination of lighting glass frame B as shown in Table 2 will be obtained, and the ridge error adjustment dimension will be excluded, and in the case of a 3-inch slope, b-100 and h = 30. ρ = 104.4, α = 16.4°, and the eave length C
= 606 mm, the combination of lighting glass frame B as shown in Table 3 is obtained, and the ridge error adjustment dimension is calculated.

棟部は、第628−1図及び第628−2図に示すよう
に、野地面が標準で、棟桟木5Eに装着した接続部材固
定金具Tのポル1〜67が下部接続部材50の長さ調整
取付長孔61の中央である調整目盛60のOに位置する
とぎ、第63図に示ずように、棟部採光ガラス枠B3の
端部が棟冠1のほぼ中央に位置し、棟冠lの面戸板定位
首となる面戸プラスマイナス調整装置221の長孔22
3に係合した指示体233が調整目盛222のOを指示
づ−るように取付番ブられて標準取付となり、前記面戸
板プラスマイナス調整装置221の軒先側が棟冠■の軒
先部側に近接し、防水壁を形成して棟冠1内に納まり、
調整有効面の長さは70mmとなる。
As shown in FIG. 628-1 and FIG. 628-2, the ridge part is a standard field surface, and the poles 1 to 67 of the connecting member fixing fitting T attached to the ridge beam 5E are the same as the length of the lower connecting member 50. When positioned at O on the adjustment scale 60, which is the center of the adjustment mounting elongated hole 61, the end of the ridge daylighting glass frame B3 is located approximately at the center of the ridge cap 1, as shown in FIG. The long hole 22 of the side door plus/minus adjustment device 221 which serves as the positioning head of the side door plate of l.
The indicator 233 engaged with 3 indicates O on the adjustment scale 222, and the installation number is changed to standard installation. and form a waterproof wall and fit within the ridge crown 1,
The length of the effective adjustment surface is 70 mm.

第54 a−1図及び第64 a−2図に示すように、
野地面が標準より短く、棟桟木5Fに装着した接続部材
固定金具Tのボルト67が下部接続部材50の長さ調整
取付長孔61のマイナス側となる軒先寄りで調整目盛6
0のマイナス50に位置するとき、第65図に示すよう
に、棟部採光ガラス枠B3の端部が棟冠Iの中央より棟
部採光ガラス枠B3の反対側に位置し、棟冠■の面戸板
防水構造が不可能になった場合、面戸プラスマイナス調
整装置221を軒先方向に摺動させて、長孔223に係
合した指示体233が調整目盛222のOより棟部寄り
のプラス50を指示するように取付けられてマイナス調
整取付となり、前記面戸プラスマイナス調整装置221
が棟冠I内に納まると共に前記棟冠lの面戸板を兼ねて
棟冠lの軒先側に近接し、防水(14造を可能にして調
整有効面の良さは20mmとなり、棟部採光ガラス枠B
3のエネルギー束数覆るガラス面は棟冠Iと2[i r
JlをItき、マイナス調整してしエネルギー束数に損
失を与えることなく棟部採光ガラス枠B3の採光ガラス
面は全表面が有効にエネルギーを集取する。
As shown in Figures 54a-1 and 64a-2,
The field surface is shorter than the standard, and the adjustment scale 6 is located near the eaves where the bolt 67 of the connection member fixing fitting T attached to the ridge beam 5F is on the minus side of the length adjustment mounting hole 61 of the lower connection member 50.
When it is located at minus 50 of 0, the end of the ridge daylighting glass frame B3 is located on the opposite side of the ridge daylighting glass frame B3 from the center of the ridge cap I, as shown in FIG. If the waterproof structure of the door panel becomes impossible, slide the door plus/minus adjustment device 221 toward the eaves so that the indicator 233 engaged with the elongated hole 223 adjusts to the plus point closer to the ridge than O on the adjustment scale 222. 50 is installed to indicate the negative adjustment, and the above-mentioned side door plus/minus adjustment device 221
is housed within the ridge cap I, and is close to the eave side of the ridge cap I, serving as the side door panel of the ridge cap I, making it waterproof (14 structures are possible, the adjustment effective surface is 20 mm, and the ridge daylighting glass frame B
The glass surface covering the energy flux number of 3 is the ridge cap I and 2[i r
By subtracting Jl and making a negative adjustment, the entire surface of the lighting glass surface of the ridge lighting glass frame B3 effectively collects energy without causing any loss in the number of energy fluxes.

また、第66a−1図及び第66a−2図に示すように
、野地面が標準より長く、凍(1本5Fに装身5した接
続部材固定金具下のボルト67が下部接続部材50の長
さ調整取fNJ長孔61のプラス側どなる棟寄りで調整
目盛60のプラス50に位置するとき、第67図に示す
ように、棟部採光ガラス枠B3の端部が棟冠Iの中央よ
り棟部採光ガラス枠B3側に位置し、面戸プラスマイナ
ス調整装置221を定位置に設定できず、面戸板と防水
壁の構造が不可能になった場合1面戸プラスマイナス調
整装置221を棟部方向に摺動させて、長孔223に係
合した指示体233が調整目盛222のOより軒先寄り
のマイナス50を指示するように取付1ノられ、プラス
調整取付となり、前記面戸プラス調91ff )% j
賀221が棟冠Iにh「実に納まると毬(5t+Ji 
’H:I!の面戸板を41.〕て(41冠1のφ1′ん
側に近接し、防水u4造を可能にして調整イ1効面の長
さく4120n+mとhろ。
In addition, as shown in FIGS. 66a-1 and 66a-2, the field surface is longer than the standard, and the bolts 67 under the connecting member fixing fittings mounted on the 5th floor are longer than the lower connecting member 50. When the adjustment scale 60 is located at +50 on the positive side of the adjustment scale fNJ long hole 61, as shown in FIG. If the front door plus-minus adjustment device 221 cannot be set in the fixed position and the structure of the front door board and waterproof wall becomes impossible, the one-side door plus-minus adjustment device 221 can be moved to the ridge. The indicator 233 engaged with the elongated hole 223 is installed so as to indicate the minus 50 point closer to the eaves than the O of the adjustment scale 222, resulting in a plus adjustment installation, and the above-mentioned side door plus tone 91ff is installed. )% j
221 is attached to the ridge crown I.
'H:I! 41. ] (Close to the φ1' side of the 41 crown 1, it is possible to make a waterproof U4 structure, and the length of the adjustable surface is 4120n+m.

、j、って、例えば第3表の間]」△−2,5間の場合
ニ1.15、t’s >Y=スペース!=2700mm
とな【〕、抹尤ツノシス枠のCをJ3枚組合せると採光
ガラス枠の:Il 合1! ’I iAか270 On
+i+どナリ、fl 部u?j V 調”3 カOme
nど4するため、第63図に示すように取イ・1けられ
る。
, j, for example, between Table 3]'' If between △-2,5, d1.15, t's > Y = space! =2700mm
Tona [], when you combine 3 J pieces of C in the machiyotsunosis frame, you get :Il in the daylighting glass frame, 1! 'I iA or 270 On
+i+donari, fl part u? j V key”3 Ka Ome
Since n is 4, a and 1 are removed as shown in FIG.

そしC1第4表の間rT]A=3.0間の場合には採光
スペースl−3210mmとなり、採光ガラス枠の八を
2楔とBと[)どを組合ばると、採光ガラス枠の組合ぜ
寸法か3200mmとなり、棟部誤差調整が+ 10 
mmとなるため、第67図に承りように、面戸プラスマ
イ−ノース調整装置221を(東部寄りに;1夕1勤さ
ぜ、1h示休233が調整目盛222の1(0町Iを1
旨示・)る1立冒て・ボルト232にナラ1−2354
−螺着して取イ(14Jる。
Then, between C1 Table 4 rT] A = 3.0, the daylighting space is l - 3210 mm, and when the 8 of the daylighting glass frame is combined with 2 wedges and B [), the combination of the daylighting glass frame is The dimension is 3200mm, and the ridge error adjustment is +10
mm, so as shown in Fig. 67, the Mendo plus-minus adjustment device 221 (towards the east; 1st night, 1st shift, 1st day off 233 is adjusted to 1 of the adjustment scale 222 (0 town I) 1
Indication・)ru 1 adventure・Bolt 232 and Nala 1-2354
- Screw it on and remove it (14J).

、土だ、第5表の間]二1△−3.5間の場合には、抹
)しスペースl=3660mmどなり、採光ガラス枠の
Cを3俟と[)を紺合せると、採光がラスp、vの組合
せ4法が3700mmとなり、棟部誤差調整が一40m
mとなるため、第65図に示づように、面戸プラスマイ
太ス調°)βH首221を軒先1う向に回動させ、指示
体233が調整目盛222の40 mmを指示り−る位
首でポルl−232にJツl−235を螺?S−L/ 
tT爪取付jる。
, soil, between Table 5] 21△-3.5, cross out) and space l = 3660 mm, and if you match C of the lighting glass frame with 3 yen and [), the lighting will be The 4-method combination of lath p and v is 3700 mm, and the ridge error adjustment is 140 m.
m, so as shown in FIG. Screw the J-tsu l-235 into the pole l-232 with a head like that? S-L/
tInstall the T claw.

第  5  表 3寸勾配 (h =30.u=104.4.α−16,
4°)軒先(I]’E)長さ C=606mm、  軒
先部配線スペース F=100mm棟部配線スペース 
G=120mm、  調整有効長ざ H=70mm採光
がラス枠規格寸法 (A: 700mm、B:800n
+m、C:900mm。
Table 5 Dimension gradient (h = 30. u = 104.4. α-16,
4°) Eaves (I]'E) Length C = 606mm, Wiring space at the eaves F = 100mm Wiring space at the ridge
G = 120mm, effective adjustment length H = 70mm, standard dimensions of lath frame for lighting (A: 700mm, B: 800n)
+m, C: 900mm.

D:1000鮒) 面戸プラスマイナス調′ifi装置22ゴは棟部採光ガ
ラス枠B3の−hi142に対して各採光ガラス枠B+
 、B2 、[3Gの長さの差である100mmを標準
位置よりプラスに50mm、vイ;I−スニ5Qmmそ
れぞれ1習動さUることにより採光スペースIと採光万
ラス枠Bの組合せ寸法との誤差を調整することができる
D: 1000 carp) Mendo plus-minus adjustment 'ifi device 22 Go is for each lighting glass frame B+ for -hi142 of ridge lighting glass frame B3.
, B2 , [3G length difference 100 mm is increased by 50 mm from the standard position, v I; The error can be adjusted.

次に、第6表〜第12表は、第3表にお1)る2、0間
から0.5問おきに5.0間までを各間口に対して軒先
長さを90+++mずつ増減した場合の採光スペースI
とこれに対づる採光ガラス枠の組合せを表わしたもので
ある。
Next, in Tables 6 to 12, the length of the eaves was increased or decreased by 90 +++ m for each frontage from 2, 0 in 1) to 5.0 in every 0.5 questions. Daylighting space I
This figure shows the combination of a light-emitting glass frame and a corresponding lighting glass frame.

第13表〜第15表は、採光スペースに対づる採光ガラ
ス枠の組合せを表わしたものである。
Tables 13 to 15 show combinations of lighting glass frames for lighting spaces.

第  6  表 第  7  表 第  8  表 第  9  表 第  10  表 第  11   表 第  12  表 第  13  表 第  14  表 第  15  表 、J二っC,艮ざの差が100mm毎の等間隔である7
 00mm −100Qmmまでの4種項の採光ガラス
1j1を1前えて、15()ぽ、採光スペースに合せて
採光ガラス枠を組合ぜ、長さの差に相当づる±50mm
までの:Wi−?を棟部の採光JJラス枠に賃上へした
枠体のLモさ1う向に1001の距離移動自在な面Fゴ
ブラスマイリスWl!、l整′A首221によって調整
すれば採光ガラス枠を筒中に施Tすることができる。
Table 6, Table 7, Table 8, Table 9, Table 10, Table 11, Table 12, Table 13, Table 14, Table 15.
00mm - 100Qmm 4 types of daylighting glass 1j1 in front, 15 () po, combine the daylighting glass frame according to the daylighting space, ±50mm corresponding to the difference in length
Until: Wi-? 1001 distance movable surface F Gobras Smiles Wl on the other side of L Mosa 1 of the frame body that has been raised to the JJ last frame for daylighting of the ridge! , l Adjustment ' A neck 221 allows the lighting glass frame to be placed inside the cylinder.

そして、第63図、第65図及び第(37図にら示すよ
うに、棟部1を光ガラス枠B3の調整取イ・1部145
4こ取付(Jた棟冠1の面戸板を1にねる面戸プラスマ
イナス調整装置221は、標準取付、マイナス調整取付
あるいはプラス調整取(=Jのどの場合においても、前
記棟部採光ガラス枠[3;3の調整有効面144を除く
上桟本体ど前記面戸プラスマイ犬ス調整装置221の下
端との間に常に距離をJ5くため、棟冠Iの一部が前記
棟部採光ガラス枠B3のカラス板113十を覆うことか
なく太陽光が連面されず、エネルギー束数器Sを、51
tに効率よく(重用することができる。
Then, as shown in FIGS. 63, 65, and 37, the ridge 1 is adjusted by adjusting the optical glass frame B3.
The side door plus/minus adjustment device 221, which adjusts the side door plate of the ridge crown 1 to 1, can be used for standard installation, negative adjustment installation, or positive adjustment installation (=J). [3; In order to always keep a distance J5 between the upper crosspiece body except for the adjustment effective surface 144 in 3 and the lower end of the door plus my canine adjustment device 221, a part of the ridge cap I is connected to the ridge lighting glass. Without covering the glass plate 1130 of frame B3, sunlight is not exposed, and the energy flux counter S is 51
It can be used efficiently (importantly).

次に、側部の(11J部は、第68a−1図及び第68
.1−2図に示ずように、野地面か(tべ(で、tjJ
i俺木5Fに装身S Clだ接続部材固定金具王のポル
(・67が側下部IB続部材76の艮ざ調整取1′4長
孔61の中央である調整[](1各60(r)Oに1ひ
置り=るとき、第69図に示すように、棟部採光カラス
枠+33の端部が棟7iIIのほぼ中央に10(謬し、
凍3U lの面戸仮定(η:Rとなろ而1−)プラスマ
イ犬ス調整装置221の長孔223に係合した指示体2
33が調整目盛222のOを指示するように取11()
られて標準数(・1となり、棟冠Iのφ[先側に面戸ブ
ラスマイブス調整装置22コの一1iT先側が近接して
防水+1’1’JΔを(;へ成し、調整有効面の長さは
7Qmmとなる。。
Next, the side part (11J section is shown in Figures 68a-1 and 68
.. As shown in Figure 1-2, the field surface (tbe(, tjJ
iOreki 5F is equipped with S Cl connection member fixing metal fitting king port (67 is the center of the adjustment hole 1'4 long hole 61 of the lower side IB connection member 76 adjustment [] (1 each 60 ( r) When 1 row is placed in O, as shown in Fig. 69, the end of the ridge lighting crow frame +33 is placed approximately in the center of the ridge 7iII.
Indicator 2 engaged with elongated hole 223 of freezing 3U l (η:R and naroji 1-) plus my dog adjustment device 221
11() so that 33 indicates O on the adjustment scale 222.
Then, the standard number (・1 is obtained, and the tip side of the 22 mendo Brass Mibus adjustment devices 11iT is close to the φ The length will be 7Qmm.

ぞして、第7Qa−1図及び第70a−2図に示1よう
に、野地面が標準より届く、棟桟木5[に装層した接続
部材固定金具−Fのポル1−67が側下部接続部!、1
76の長さ調整取付長孔61のマイナス0111となる
軒先寄りで調整目盛60のマイ−ナス50に位置−σる
とき、第71図に示すように、(・口部採光ガラス枠B
3の端部が棟冠Iの中央より棟部+?光ガラス枠B3の
反対側に位置し、棟冠Iの面戸板防水構造が不可能とな
った場合、面戸プラスマイナス調!!!!装置221を
軒先方向に摺動させて、長孔223に係合した支持体2
33が調整目盛222のOより棟部りのプラス50を指
示するように取イク」けられてマイナス調整取付となり
、棟冠Iの中T 先ff1llに面戸プラスマイナス調
整装置221の11T先側が近接して防水構造を構成し
、調整有効面の良さは20mmとなる。
Therefore, as shown in Figure 7Qa-1 and Figure 70a-2, the pole 1-67 of the connecting member fixing bracket-F layered on the ridge beam 5 is located at the lower side, where the field surface reaches from the standard. Connection part! ,1
When the adjustment scale 60 is at minus 50 near the eaves, which is minus 0111 of the length adjustment mounting slot 61 of 76, as shown in FIG.
Is the end of ridge ridge + from the center of ridge cap I? If it is located on the opposite side of the optical glass frame B3 and the waterproof structure of the side door plate of the ridge crown I becomes impossible, the side door plus or minus style! ! ! ! By sliding the device 221 toward the eave, the support body 2 engaged with the elongated hole 223
33 is taken so as to indicate +50 of the ridge from O of the adjustment scale 222, and negative adjustment is installed. A waterproof structure is formed in close proximity, and the effective adjustment surface is 20 mm.

まl:、第72a−1図及び第72a−2図に示すよう
に、野地面が標準より長く、棟桟木5Fに装着した接扶
部祠固定金具下のボルト67が側下部接続部材76の長
さ調整取付長孔61のプラス側となる棟部りで調整目盛
60のプラス50に位置するとき、第73図に示すよう
に、棟部採光ガラス枠B3の端部が棟冠Iの中央より棟
部採光ガラス枠B3側に位置し、面戸プラスマイナス調
整装置221を定位置に設定できず、面戸板と防水壁の
構造が不可能となった場合、面戸プラスマイナス調整装
置221を棟方向に囲動させて、長孔223に係合した
指示体233が調整目盛222のOより軒先寄りのマイ
ナス50を指示するように取(NJ t)られてプラス
調整堰イ・1となり、棟冠Iの軒先側に面戸プラスマイ
ナス調整装置221の軒先側が近接して防水構造を構成
し、調整イ1効面の長さが120mmとなる。
72a-1 and 72a-2, the field surface is longer than the standard, and the bolt 67 under the connecting part shrine fixing bracket attached to the ridge beam 5F is attached to the lower side connecting member 76. When the ridge on the plus side of the length adjustment mounting slot 61 is located at plus 50 on the adjustment scale 60, the end of the ridge lighting glass frame B3 is located at the center of the ridge cap I, as shown in FIG. If the side door is located closer to the ridge lighting glass frame B3 side and the side door plus/minus adjustment device 221 cannot be set in the fixed position and the structure of the side door plate and waterproof wall is impossible, the side door plus/minus adjustment device 221 can be It is moved in the direction of the ridge, and the indicator 233 engaged with the long hole 223 is set so as to indicate -50 closer to the eaves than O of the adjustment scale 222 (NJ t), resulting in a positive adjustment weir A-1. The eaves side of the door plus/minus adjustment device 221 is close to the eaves side of the ridge crown I to form a waterproof structure, and the length of the effective surface of adjustment I is 120 mm.

第74図に示!IJ、うに、軒先部採光万ラス枠[31
のガラス板113と中間部採光ガラス枠B2のガラス板
113及σ棟部採光ガラス枠B3のガラス板113の表
面は連続してd3す、洗浄装量Qと連結した散水管にの
散水孔210は棟冠Iの下部より採光ガラス枠B上に散
水可能な構造とされ、ガラス板113上に積もった雪を
融雪し、また、ごみや塵等を洗浄して太陽電池ルーフと
しての効率を高め、採光ガラス枠Bで囲まれた構造体か
ら発生する対流現象による熱気を棟部熱気排出孔Jと軒
先部吸気孔1−1による換気機能により外部に排出する
。この際、軒先部吸気孔Hより吸入される吸気中に含ま
れる塵埃は、軒先防塵装置Uの防ljl網で濾過される
Shown in Figure 74! IJ, Uni, Lighting frame at the eaves [31
The surfaces of the glass plate 113 of the middle part lighting glass frame B2 and the glass plate 113 of the σ ridge part lighting glass frame B3 are continuous d3, and the water sprinkling hole 210 in the water sprinkling pipe connected to the cleaning amount Q is is structured so that water can be sprinkled onto the lighting glass frame B from the lower part of the ridge crown I, melting snow accumulated on the glass plate 113, and cleaning dirt and dust to increase efficiency as a solar cell roof. The hot air generated by convection from the structure surrounded by the daylighting glass frame B is discharged to the outside by the ventilation function of the ridge hot air exhaust hole J and the eaves intake hole 1-1. At this time, the dust contained in the air taken in through the eaves-side intake holes H is filtered by the anti-ljl net of the eaves-side dust-proofing device U.

発明の効果 以上に述べたように、本発明の太陽エネルギー集収屋根
の中間部接続部材は、断面略溝型の本体両側に下部係合
排水溝と垂下脚片とを設け、前記本体の底部下面に長手
方向に沿う支持溝を設け、前記支持溝の両側に溝型係合
部を設け、前記支持7j4の長手方向略中夫に固定用丸
孔を設け、前記固定用丸孔の両側に間隔をおいて長孔を
設けた下部接続部材と、中空本体の下面両側に前記下部
接続部材の溝型係合部に係合する垂下係合支脚を設け、
前記中空本体の上面両側に立上り部を設け、前記中空本
体の中間部両側に張出して上部支持溝と上部排水溝とを
形成し、前記中空本体水平部の長手方向棟寄と軒先寄り
にそれぞれ取付孔を設けた上部接続部材とからなり、前
記下部接続部材の支持溝の長手方向棟部りに長さ調整取
付長孔を穿設し、前記上部接続部材の中空本体水平部の
棟部りに前記長さ調整取付長孔に相当して調整取付用長
孔を穿設したことにより、前記下部接続部材と前記下部
接続部材を規格寸法として一定間隔、例えば100mm
の長さ間隔で規格製品としておき、野地面の艮すに合ッ
た、もしくは最も近い長さの規格化された接続部材を選
出するのみで、野地面の長さが標準通りでなくても規格
品を現場で切りつめあるいは孔あけ等の加工を行なう必
要がなく、前記下部接続部材の長さ調整取付長孔と前記
上部接続部材の調整取付用長孔により野地面の長さに合
せて容易に調整取付を行なうことができる。
Effects of the Invention As described above, the intermediate connecting member of the solar energy collecting roof of the present invention has a lower engaging drain groove and a hanging leg piece on both sides of the main body having a substantially groove-shaped cross section, and the lower surface of the bottom of the main body A support groove is provided along the longitudinal direction, a groove-shaped engagement portion is provided on both sides of the support groove, a fixing round hole is provided approximately in the longitudinal direction of the support 7j4, and a space is provided on both sides of the fixing round hole. a lower connecting member provided with an elongated hole at a distance, and a hanging engagement supporting leg that engages with a groove-shaped engaging portion of the lower connecting member on both sides of the lower surface of the hollow body;
A rising portion is provided on both sides of the upper surface of the hollow body, and an upper support groove and an upper drainage groove are formed by protruding from both sides of the middle part of the hollow body, and are attached to the horizontal part of the hollow body in the longitudinal direction near the ridge and toward the eaves, respectively. an upper connecting member provided with a hole, a length adjusting mounting elongated hole is bored in the longitudinal ridge of the support groove of the lower connecting member, and a length adjusting mounting elongated hole is bored in the ridge of the horizontal part of the hollow main body of the upper connecting member. By drilling an adjustment mounting elongated hole corresponding to the length adjustment mounting elongated hole, the lower connecting member and the lower connecting member are spaced at a constant interval, for example, 100 mm as a standard dimension.
Simply create standardized products at length intervals and select the standardized connecting member that matches or is closest to the length of the field surface, even if the length of the field surface is not the standard. There is no need to perform processing such as cutting or drilling holes on the standard product on site, and it is easy to adjust the length of the field surface to suit the length of the field surface using the long holes for adjusting the length of the lower connecting member and the long holes for adjusting and installing the upper connecting member. Adjustments can be made to the installation.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は、本発明の実施例における太陽エネルギー集収
屋根の斜視図、 第2a図及び第2b図は、同上の拡大側断面図、第3a
図及び第3b図は、同上の太陽光電池の取付を示す拡大
正断面図、 第4図は、同上の下地の要部斜視図、 第5a図〜第5g図は、通常勾配の桟木施工を示す平面
図、 第5h図は、垂直壁の桟木施工を示す、正面図、第6a
図〜第6g図は、急勾配あるいは強風地域の桟木施工を
示す平面図、 第7図(a)(b)<C)は、側部組立てを順次【こ示
づ斜視図、 第80図は、下部接続部(Aの斜視図、第F3 +1図
は、下部接続部材の取付時の要部斜視図、 第83C図は、同I−の側面図、 第≦)a−1図は、下部接続部材の標準取付を示す平面
図、 第9i+−2図は、同上の要部側断面図、第9b−1図
tま、下部接続部材のマイナス調整取t−Jを示7J甲
面図、 第91)−2図は、同上の要部側断面図、第90−1図
は、上部接続部材のプラス調整取付を示す平面図、 第90−2図は、同−Fの要部側断面図、第10図は、
上部接続部材の平面図、 第11a図は、中間部接続部材の標準取付を示・j要部
側断面図、 第111)図は、中間部接続部材のプラス取付をり1ミ
ー(+ ′片部fltlln面図、第’IIC図は、中
間部接続部材のマイナス取付を示す要部側断面図、 第12a図は、軒先金属屋根板の斜視図、第12b図は
、中間金属屋根板の斜視図、第12C図は、棟金屈屋根
板の斜視図、第13a図(J、軒先金属屋根板の要部正
面図、第13b図は、軒先金属屋根板の切断右側面図、
第13c図(j、中間金属屋根板の切断右側面図、第1
3d図は棟金属屋根板の要部切断右側面図、第14a図
は、凍金属屋根板のプラス取付を示す切断側面図、 第1411図は、棟金属屋根根のマイナス取付を示す切
断側面図、 第15図は、金属屋根板取イー」を示づ一斜視図、第1
6a図は、上部接続部材の斜視図、第16b図は、下部
接続部材の斜視図、第16C図は、中間部接続部材カバ
ーの斜視図、第17図は、接続部材固定金具の斜視図、
第18図は、採光ガラス枠取付時に15ける接続部材の
要部開面図、 第19図は、下部接続部材と上部接続部材の取イ・1を
示す斜視図、 第20図は、軒先係合金具の斜視図、 第21a図は、側下部接続部材の斜視図、第21b図は
、側下部接続部材の斜視図、第21C図は、側部接続部
材カバーの斜視図、第22図は、採光ガラス枠取付時に
おける側部接続部材の要部横断面図、 第23a図は、側下部接続部材取付前の要部斜視図、 第23b図は、側下部接続部材取付後の要部斜視図、 第24図は、太陽エネルギー集収屋根の要部横断面図、 第25a図は、太陽エネルギー集収屋根の標準取付を示
す要部横断面図、 第25b図は、プラス野地幅の場合の取付を示す要部横
断面図、 第25c図は、マイナス野地幅の場合の取付を示す要部
横断面図、 第268−1図は、側下部接続部材の標準取付を示す平
面図、 第26a−2図は、同上の要部側断面図、第26 b−
1図は、側下部接続部材のマイナス調整取付を示す平面
図、 第26 b−2図は、同上の凹部側断面図、第26C−
1図は、側下部接続部材のプラス調整数イ1を示す平面
図、 第26C−2図は、同上の要部側断面図、第27図は、
装飾円冠取(qを示す斜視図、第28a図は、側部接続
部材への装飾防塵キャップ取付を示す斜視図、 第28b図は、Sl!i飾防ゆキャップの斜視図、第2
8C図は、軒先装飾補強板の斜視図、第29図は、装飾
円冠取イζJ時における側部接続部材の要部断面図、 第30a図は、防塵・配線点検カバーの斜視図、第30
b図tよ、IT先防塵装置の斜視図−1第31a図は、
防塵キャップの斜視図、第31b図は、キャップ防塵装
置の斜視図、第31C図は、キャップ防塵装置取付時の
防塵キャップの斜視図、 第32a図は、防塵・配線点検カバー及び軒先補強板の
取付を示す斜視図、 第32b図は、防塵・配線点検カバー及び軒先補強板取
側完成時における一部切断斜面図、第32C図は、中間
部接続部材カバーと軒先脱着連結カバーとの取(」を示
す平面図、第33a図は、防lα・配線点検カバー及び
軒先補強板の取付前を示ず一部切断側面図、第33b図
は、防1y・配線点検カバー及び軒先補強板の取付を示
す一部切断側面図、 第33c図は、軒先構造組立て完成をホブ一部切断側面
図、 第34図は、軒先部採光ガラス枠の平面図、第35図は
、134図(7)線A−ArjfI面図、第36図は、
第34図のPA B −B l1ll’i面図、第37
図は、第34図の線C−Cl!Ji面図、第38図は、
中間部採光ガラス枠の平面図、第39図は、第38図の
線A−A断面図、第40図は、第38図の線B−BI!
l′i面図、第41図は、第38図の線C−C断面図、
第42図は、棟部採光ガラス枠の平面図、第43図は、
第42図の線△−八へ面図、第44図は、第42図の線
B−8断面図、り〕45図は、第42図の線C−C断面
図、第46図は、面戸プラスマイナス調整装置の取付前
の斜視図、 第47図は、同トの取付後の斜視図、 第48図は、防水カバーの取fζ」而の斜視図、第49
図は、同上の取付後の要部破断斜視図、第50図は、軒
先部採光ガラス枠の取イ4前の断面図、 第51図は、同上の取イ・1後の断面図、第52図は、
中間部採光ガラス枠の取付前の断面図、 第53図は、同上の取付後の断面図、 第54図は、棟部採光ガラス枠の取fq前の断面図、 第55図は、同1−の取f=J (狡の断面図、第56
図(a)(b)(c)(d)(e)(f)(U )  
(h )は、採光ガラス枠取(4時の要部断面図、 第57図は、棟冠取付完成斜視図、 第58図は、棟冠取付工程を示す斜視図、第59図は、
棟冠数f=Jを示Jτ1視図、第60図は、家屋の戦略
図、 第61図は、屋根の片側の概略図、 第(32a−1図は、下部接続部材標準取付時の棟部平
面図、 第52 a−2図は、同上の側断面図、第63図は、棟
部の標準取付を示1要部側断面図、 第54 a−1図は、下部接続部材マイナス取付時の棟
部平面図、 第64 a−2図は、同士の側断面図、第65図は、棟
部のマイナス調整取付を示す要部側断面図、 第66a−1図は、下部接続部材プラス取付時の棟部平
面図、 第55 a−2図は、同上の側断面図、第67図は、棟
部のプラス調整取付を示−J′f3:部側断面図、 第68 a−1図は、側下部接続部材標準取付IL’l
の棟部平面図、 第68 a−2図は、同上の側[qi面図、第69図は
、棟側部の標準数イリを示す要部側断面図、 窮70a−1図は、側下部接続部材マイナス取1り1時
の棟部平面図、 第70a−2図は、同上の側断面図、 第71図は、棟側部のマイナス調整取付を示す要部側断
面図、 第72a−1図は、側下部接続部材プラス取付時の棟部
平面図、 第72a−2図は、同上の側断面図、 第73図は、棟側部のプラス調整取付を示す要部側断面
図、 第771図は、太陽エネルギー束数屋tIN完成口5の
要部斜視図である。 1・・・小木、2・・・野地板、3・・・下地祠、4・
・・金属j?根板、5△・・・軒先+1本、35[3・
・・F部中4本、1)(’i・・・係合E1木、5])
・・何丁部中4本、5[・・・棟(l木、7・・・断熱
材、8・・・破風板、9・・・配線連絡孔、10・・・
’FF 7I、支持材、10i1.10b・・・居動取
(=1孔、11・・叫」側ガイド切欠部、12・・・土
部水平部、13・・・1;部水平部、14・・・小直部
、15・・・防水壁、1(3・・・水切片、17・・・
ド向凹溝、18・・・取1・1孔、1!−)・・・1,
9動取付孔、20・・・固定具、21・・・ツツシt・
、22・・・本体部、23・・後方突出部、24・・・
固定片、25・・・固定孔、2G・・・ねじ、27・・
・側部脱nハバー、28・・突条、29・・・軒先装飾
補強板、30・・・凹溝、31・・・土部1き続部材、
32・・本体、33・・・mF係合支脚、34・・・抑
止突部、35・・・tff1合凹部1SG・・・立上り
部、36a・・・嵌合凸部、37・・・上部支持溝、3
8・・・上部す1水満、39・・・取1・l几、110
・・・調整堰1−1用長孔、41・・・ねじ、12・・
・係合段部、43・・・ポル1へ、44・・・重下係合
↑貝、45・・・係合面、46・・・重下係合支脚、4
6a・・・支脚部、47・・・突部、48・・・ボルト
、・10・・・水平フランジ、50・・・十aC+ +
と続部祠、E)1一本体、51if ・・□支1511
′II+、52 ”’ iks¥!係合部、53−・・
立トリヘ:19.53 a ・・・le:合凸部、5−
+ 4− 水平部、55・・・車下脚j″1.5G・・
・金属屋根板係合片、57・・・下部係合υ1水iM、
58・・・固定用丸孔、!−) ’)・・・因仙取付孔
、60・・・調整+21盛、61・・・良さAIJ整取
付艮孔長孔 2 =−重下肋1 )7.62a・”l&
8四部163・・中下水切抑止片、63a・・・水切片
、641・・・係合片、6!う・・・調整取付用L(満
、(36a・・・突部1.66b・・・水平フランジ、
67・・ボルト、68・・・支脚片、69・・・取付孔
、70・・・側ト部接続部+4.71・・・本体、72
・・・マ1]ユリ部、73・・・嵌合凸部、74・・・
嵌合凸部、75・・・係合片、7G・・・側下部接続部
材、77・・・上部片、78・・・外部型下脚j′l、
78a・・・水切片、71−)・・・プラスマイブス係
会調整部、80・・・支脚片、81・・・嵌合凹部、8
2・・・調整取付用長溝、83A・・・1−1先用ポル
h、83 B・・・中間用ポル[・、83G・・・N!
川用ルト、81〕・・・4IT尤金属屋(12Ij2.
8G・・・軒九水明部、87・・本選係合5!、88・
・係合防水1寸、80・・・中間金、屈屋(R板、≦〕
0・・・係合水切Ml!、91・・・水氷係合壁、92
・・・係合防水壁、93・・・抑念属屋根根、9 /I
・・・係合水切部、95・・・防水壁、9G・・・係合
防水ζ:1?、97・・・切欠部、98・・・断面U才
取(=3溝、G)9)・・・Qノ欠係合凹部、100・
・・取付部り板、l C) l・・1;l:全凹部、1
10・・・縦(l、111・・・下[1,111a・・
・1■合部、112・・・上(1,113・・・ガラス
板、′114・・・本選防水壁、114a・・・水切片
、1 ’I 5・・・Ip下脚片、116・・・熱気排
出切欠部、117・・・係合水切、117a・・・水切
片、118・・・水切11x合凹部、119・・・軒先
係合1〕[水炎j1.120・・・す1水熱合突部、1
21・・・ねじ、122・・・渦、123・・・水氷係
合壁、123a・・・パツキン係合突部、124・・・
係合11[出突片、125・・・係合突部、126・・
・1J1出満、127・・・ねじ、128・・・防水板
、130−・・縦Fl、131 ・・・下t1.131
 a −・・嵌合部、132・・・上+1.133・・
・係合水切、135・・・排水係合突部、136・・・
水切嵌合凹部、1110・・・縦桟、141・・・下桟
、141a・・・嵌合部、1.12・・・上(1,14
3・・・係合突部、144・・・調整孔り1面、111
5・・・調整取付部、145a・・・水切、1816・
・・取付孔、147.151・・・凍れlj瞼1シ)防
1ト部、152・・・煙突状空間、160・・・水氷係
合壁、160a・・・パツキン係合突片、161・・・
4く返照水壁、161a・・・水切片、162・・・重
下水切片、1(33・・・重下へ、1(34・・・張出
iさ;全凹部、1C)5・・・張出係合突)1.166
・・・嵌合凸部、1〔57・・・係合突片、16E3・
・庇、174 ・1−トンブ取イ・1支持板、175・
・・嵌合部、170・・・係合欠片、177−11Mイ
t U ’−i”孔、178 ・・Qi: r!、 =
 部、179.180・・・切欠係合部、181・・・
底吸気孔、1と32・・・庇、191・・・中f先装篩
補強板、192・・・φ151L脱着用連結カバー、1
93・・・嵌合凹部、194・・・垂下脚)′1.1つ
5・・・中下水切抑止片、195a・・・水切片、19
6・・・係合片、197・・・切欠部、198・・・I
B続部、201・・・庇、202・・・lJI水漏、2
03・・・立上り突片、204・・・本選、205・・
・防水板、20G・・・断面U字型取付溝、209・・
・係合部、210・・・散水孔、211・・・棟冠1シ
礼°Cツノバー、212・・・上壁、213・・・底壁
、214・・・端壁、215・・・防塵網、21G・・
・嵌合凹部、217・・・パツキン、218・・・防塵
網、220・・・1■合突片、221・・・面戸プラス
マイナス調整装置、222・・・調整目盛、223・、
、長孔、224・・・取付孔、225・・・防水壁、2
25a・・・本選、226・・・水切片、227・・・
水切、228・・・面戸防水壁、229・・・切欠部、
230・・・係合片、231・・・支脚部、232・・
・ボルト、233・・・指示体、234・・・座金、2
35・・・ゾッ1−1236・・・連結部、237・・
・嵌合部、238・・・切欠部、239・・・仕切板、
240・・・防水カバー、241・・・水切片、242
・・・摺動爪f4孔、243・・・防水壁、244・・
・嵌合部、245・・・支脚部、246・・・取付ポル
1−1247・・・座金、248・・・ナツト、A・・
・中間部接続部材、A′・・・側部接続部材、B・・・
採光ガラス枠、B1・・・軒先部採光ガラス枠、B2・
・・中間部採光ガラス枠、B3・・・棟部採光ガラス枠
、C・・・側部補強材、D・・・中間部接続部材カバー
、D′・・・側部接続部材カバー、E・・・装飾防ゆキ
ャップ、1:・・・11111部下隅装飾カバー、G・
・・防塵・配線点検カバー、H・・・軒先部吸気孔、1
・・・装飾棟冠、J・・・棟部熱気排出孔、K・・・散
水管、し・・・装飾円冠、M・・・摺動連結部材、M′
・・・連結具部材、N・・・棟冠装飾取付部材、N′・
・・円冠取付部材、P・・・採光ガラス枠固定金具、Q
・・・洗浄装置、S・・・エネルギー束数器、T・・・
接続部材固定金具、U・・・軒先防塵装置、■・・・キ
ャップ防塵装置。 特許出願人  不二サッシ 株式会社 第4図 5E 第5a図      第5b図 (1=2500mm)       (1=3000m
m)(1:3500mm)       (1=400
0mm)第6a図 (1=2500mm) 第6C図 (1=3500mm)  。 第6b図 (1= 3000 rryn) δ6d図 (124000mm) □プゴ □□量 第69図 (1= 5500mm) E        179 175 第32c図 第33a図 第33c図
FIG. 1 is a perspective view of a solar energy collecting roof in an embodiment of the present invention, FIGS. 2a and 2b are enlarged side sectional views of the same, and FIG. 3a is an enlarged side sectional view of the same.
Figures 3 and 3b are enlarged front cross-sectional views showing the installation of the solar cell as above, Figure 4 is a perspective view of the essential parts of the base as above, Figures 5a to 5g show the construction of a normal slope of the beams. The plan view, Figure 5h, is the front view, Figure 6a, showing the construction of vertical wall crosspieces.
Figures to Figures 6g are plan views showing the construction of piers in areas with steep slopes or strong winds. Figures 7(a), (b) and <C) are perspective views showing the side assembly. , Lower connection part (A perspective view, Figure F3+1 is a perspective view of the main part when installing the lower connection member, Figure 83C is a side view of the same I-, Figure ≦)A-1 is the lower part A plan view showing the standard installation of the connecting member, Figure 9i+-2 is a side sectional view of the main part of the same as above, Figure 9b-1 t is a top view of 7J showing the negative adjustment hole t-J of the lower connecting member, Figure 91)-2 is a side sectional view of the main part of the same as above, Figure 90-1 is a plan view showing the positive adjustment installation of the upper connection member, Figure 90-2 is a side sectional view of the main part of the same -F Figure 10 is
Figure 11a is a plan view of the upper connecting member, and Figure 11a shows the standard installation of the intermediate connecting member. Fig. 12a is a perspective view of the eaves metal roofing board, and Fig. 12b is a perspective view of the intermediate metal roofing board. Figure 12C is a perspective view of the ridge metal roof plate, Figure 13a (J) is a front view of the main parts of the eave metal roof plate, Figure 13b is a cut right side view of the eave metal roof plate,
Figure 13c (j, cut-away right side view of intermediate metal roof sheet, 1st
Figure 3d is a cutaway right side view of the main part of the ridge metal roof plate, Figure 14a is a cutaway side view showing positive attachment of the frozen metal roof plate, and Figure 1411 is a cutaway side view showing minus attachment of the ridge metal roof root. , Fig. 15 is a perspective view showing the metal roof panel.
Figure 6a is a perspective view of the upper connection member, Figure 16b is a perspective view of the lower connection member, Figure 16C is a perspective view of the intermediate connection member cover, Figure 17 is a perspective view of the connection member fixing fitting,
Fig. 18 is an open view of the main part of the connecting member at step 15 when installing the lighting glass frame, Fig. 19 is a perspective view showing the lower connecting member and upper connecting member, and Fig. 20 is the eaves fitting. Figure 21a is a perspective view of the lower side connecting member, Figure 21b is a perspective view of the lower side connecting member, Figure 21C is a perspective view of the side connecting member cover, and Figure 22 is a perspective view of the alloy tool. , Figure 23a is a cross-sectional view of the main part of the side connection member when the lighting glass frame is attached, Figure 23a is a perspective view of the main part before the lower side connection member is attached, and Figure 23b is a perspective view of the main part after the lower side connection member is attached. Figure 24 is a cross-sectional view of the main part of the solar energy collection roof, Figure 25a is a cross-sectional view of the main part showing standard installation of the solar energy collection roof, and Figure 25b is the installation in case of plus field width. Figure 25c is a cross-sectional view of the main part showing the installation in case of minus field width, Figure 268-1 is a plan view showing the standard installation of the lower side connecting member, Figure 26a- Figure 2 is a side sectional view of the main part of the same as above, No. 26b-
Fig. 1 is a plan view showing the negative adjustment installation of the lower side connecting member, Fig. 26b-2 is a side sectional view of the recessed portion of the same as above, and Fig. 26C-
Figure 1 is a plan view showing the positive adjustment number 1 of the lower side connecting member, Figure 26C-2 is a side sectional view of the same main part, and Figure 27 is:
Figure 28a is a perspective view showing the attachment of the decorative dustproof cap to the side connection member; Figure 28b is a perspective view of the Sl!i decorative dustproof cap;
Figure 8C is a perspective view of the eave decoration reinforcing plate, Figure 29 is a cross-sectional view of the main part of the side connection member when the decorative circle crown is removed, and Figure 30a is a perspective view of the dustproof/wiring inspection cover. 30
Figure 31a is a perspective view of the IT dust prevention device.
Figure 31b is a perspective view of the dustproof cap, Figure 31C is a perspective view of the dustproof cap when the dustproof cap is installed, Figure 32a is a perspective view of the dustproof/wiring inspection cover and the eaves reinforcement plate. Figure 32B is a partially cut-away slope view of the dustproof/wiring inspection cover and eave reinforcement board side when completed, and Figure 32C is a perspective view showing the installation of the intermediate connecting member cover and the eave removable connection cover. Fig. 33a is a partially cutaway side view showing the state before installation of the prevention lα/wiring inspection cover and eaves reinforcement plate, and Fig. 33b is a partially cutaway side view showing the installation of the prevention lα/wiring inspection cover and eaves reinforcement plate. Figure 33c is a partially cutaway side view of the hob showing the completed eaves structure assembly; Figure 34 is a plan view of the eaves daylighting glass frame; Figure 35 is line A (7) in Figure 134. -ArjfI surface view, Fig. 36,
PA B-B l1ll'i plane view of Fig. 34, No. 37
The figure shows the line C-Cl! in FIG. 34. The Ji plane view, Figure 38, is
A plan view of the intermediate lighting glass frame, FIG. 39 is a sectional view taken along line AA in FIG. 38, and FIG. 40 is a sectional view taken along line B-BI! in FIG. 38.
l'i side view, FIG. 41 is a sectional view taken along line C-C in FIG. 38,
Figure 42 is a plan view of the ridge lighting glass frame, Figure 43 is
FIG. 44 is a sectional view taken along line B-8 in FIG. 42; FIG. 45 is a sectional view taken along line C-C in FIG. 42; FIG. Figure 47 is a perspective view of the side door plus/minus adjustment device before installation; Figure 48 is a perspective view of the waterproof cover;
The figure is a broken perspective view of the main part after installation of the same as the above, Figure 50 is a cross-sectional view of the eaves daylighting glass frame in front of the handle 4, and Figure 51 is a sectional view of the same as the above after the handle A-1. Figure 52 is
Figure 53 is a cross-sectional view of the middle part lighting glass frame before installation; Figure 53 is a cross-sectional view of the same as above after installation; Figure 54 is a cross-sectional view of the ridge part lighting glass frame before installation; Figure 55 is the same as above. - Tori f=J
Figures (a) (b) (c) (d) (e) (f) (U)
(h) is a sectional view of the main part of the lighting glass frame (4 o'clock), Figure 57 is a completed perspective view of the ridge crown installation, Figure 58 is a perspective view showing the ridge crown installation process, and Figure 59 is
Fig. 60 is a strategic drawing of the house, Fig. 61 is a schematic diagram of one side of the roof, Fig. 32a-1 is a view of the ridge with the lower connecting member standard installed Fig. 52a-2 is a side sectional view of the same as above, Fig. 63 is a side sectional view of the main part showing the standard installation of the ridge part, Fig. 54a-1 is the lower connection member negative mounting Fig. 64a-2 is a side sectional view of the ridges, Fig. 65 is a side sectional view of the main parts showing negative adjustment installation of the ridges, Fig. 66a-1 is the lower connecting member. Fig. 55a-2 is a side sectional view of the same as above, and Fig. 67 is a side sectional view of the ridge when the ridge is mounted with positive adjustment, Fig. 68a- Figure 1 shows the standard installation IL'l of the lower side connection member.
Figure 68a-2 is a plan view of the ridge, Figure 68a-2 is a qi plane view of the same side, Figure 69 is a side sectional view of the main part showing the standard number of ridge sides, Figure 70a-1 is the side view. Fig. 70a-2 is a side sectional view of the same as above; Fig. 71 is a side sectional view of the main part showing the installation of minus adjustment on the ridge side; Fig. 72a Figure 72a-2 is a side sectional view of the same as above. Figure 73 is a side sectional view of the main part showing the positive adjustment installation of the lower side connecting member. , FIG. 771 is a perspective view of the main parts of the solar energy bundle tIN completion port 5. 1... Small tree, 2... Noji board, 3... Shimoji shrine, 4...
...metal? Root plate, 5△... Eaves + 1, 35 [3.
... 4 pieces in the F section, 1) ('i...Engagement E1 tree, 5])
...4 out of several sections, 5 [...ridge (l wood, 7...insulation material, 8...gable board, 9...wiring connection hole, 10...
'FF 7I, support material, 10i1.10b...Ido dori (=1 hole, 11...side guide notch, 12...horizontal part of soil part, 13...1; part horizontal part, 14...Small straight part, 15...Waterproof wall, 1 (3...Water section, 17...
Directional concave groove, 18... 1/1 hole, 1! -)...1,
9 movement mounting hole, 20...fixing tool, 21...tsutsushit・
, 22... Main body part, 23... Rear protrusion part, 24...
Fixing piece, 25...fixing hole, 2G...screw, 27...
・Side removal hub, 28... Projection, 29... Eave decoration reinforcement plate, 30... Concave groove, 31... Soil part 1 continuation member,
32...Main body, 33...mF engagement support leg, 34...Suppression protrusion, 35...tff1 mating recess 1SG...rising portion, 36a...fitting convex portion, 37...upper part Support groove, 3
8... Upper part is full of 1 water, 39... Takes 1.1 liters, 110
...Elongated hole for adjustment weir 1-1, 41...Screw, 12...
・Engagement step part, 43... To pole 1, 44... Double lower engagement ↑ shell, 45... Engagement surface, 46... Double lower engagement support leg, 4
6a... Support leg, 47... Protrusion, 48... Bolt, 10... Horizontal flange, 50... 10aC+ +
and Tsuzukibe shrine, E) 1-main body, 51if...□branch 1511
'II+, 52 "' iks\! Engagement part, 53-...
Standing position: 19.53 a...le: Convex part, 5-
+ 4- Horizontal part, 55...Vehicle lower leg j''1.5G...
・Metal roof plate engagement piece, 57...lower engagement υ1 water iM,
58...Fixing round hole! -) ')...Insen mounting hole, 60...Adjustment +21 mounting, 61...Goodness AIJ adjustment mounting hole long hole 2 =-heavy lower rib 1) 7.62a・"l&
8 four parts 163... Middle sewage cut prevention piece, 63a... Water cutter, 641... Engagement piece, 6! U...Adjustment mounting L (full, (36a...protrusion 1.66b...horizontal flange,
67... Bolt, 68... Support leg piece, 69... Mounting hole, 70... Side connection part +4.71... Main body, 72
...Ma1] Lily part, 73... Fitting convex part, 74...
Fitting convex portion, 75... Engaging piece, 7G... Side lower connecting member, 77... Upper piece, 78... External type lower leg j'l,
78a...Water section, 71-)...Plus microbus engagement adjustment part, 80...Support leg piece, 81...Fitting recess, 8
2... Long groove for adjustment mounting, 83A... 1-1 end pole h, 83 B... Intermediate pole [..., 83G...N!
Ruto Kawayo, 81]...4 IT Yoshi Metal Shop (12 Ij2.
8G...Enkyusui Akibe, 87...Final selection engagement 5! , 88・
・Engagement waterproof 1 sun, 80...Intermediate metal, Kuya (R plate, ≦)
0...Engagement drain Ml! , 91... water ice engaging wall, 92
... Engagement waterproof wall, 93 ... Suppression roof root, 9 /I
...Engagement drain part, 95...Waterproof wall, 9G...Engagement waterproof ζ: 1? , 97...Notch part, 98...Cross section U cutout (=3 grooves, G) 9)...Q notch engagement recessed part, 100...
...Mounting plate, l C) l...1; l: Full recess, 1
10...Vertical (l, 111...bottom [1,111a...
・1■ Joint part, 112...Top (1,113...Glass plate, '114...Main selection waterproof wall, 114a...Water section, 1'I 5...Ip lower leg piece, 116. ...Hot air discharge notch, 117...Engaging drain, 117a...Water cutter, 118...Drainer 11x matching recess, 119...Eaves engagement 1] [Water flame j1.120...S 1 hydrothermal joint protrusion, 1
21... Screw, 122... Vortex, 123... Water/ice engagement wall, 123a... Packing engagement protrusion, 124...
Engagement 11 [protruding piece, 125... engaging protrusion, 126...
・1J1 Full, 127...Screw, 128...Waterproof plate, 130-...Vertical Fl, 131...Lower t1.131
a-...Mating part, 132...Top +1.133...
・Engagement drainer, 135...Drainage engagement protrusion, 136...
Drainage fitting recess, 1110... Vertical bar, 141... Lower bar, 141a... Fitting portion, 1.12... Upper (1, 14
3... Engaging protrusion, 144... Adjustment hole 1 side, 111
5...Adjustment mounting part, 145a...Drainer, 1816.
...Mounting hole, 147.151...Freeze prevention part, 152...Chimney-shaped space, 160...Water/ice engagement wall, 160a...Putskin engagement protrusion , 161...
4-reflection water wall, 161a...water section, 162...heavy sewage section, 1 (33...heavily downward, 1 (34...projection i; full recess, 1C) 5...・Protruding engagement protrusion) 1.166
... Fitting protrusion, 1 [57... Engagement protrusion, 16E3.
・Eave, 174 ・1-Tomb handle A・1 Support plate, 175・
...Fitting part, 170...Engagement piece, 177-11M it U'-i" hole, 178...Qi: r!, =
Part, 179.180... Notch engaging part, 181...
Bottom intake hole, 1 and 32... Eave, 191... Middle f front loading sieve reinforcement plate, 192... φ151L connection cover for detachment, 1
93... Fitting recess, 194... Drooping leg)'1.1 piece 5... Middle drain cut prevention piece, 195a... Water cutter, 19
6... Engaging piece, 197... Notch, 198... I
B continuation, 201... Eaves, 202... lJI water leak, 2
03...Rising protrusion, 204...Main selection, 205...
・Waterproof board, 20G... U-shaped cross section mounting groove, 209...
・Engagement part, 210... Watering hole, 211... Ridge crown 1 degree horn bar, 212... Top wall, 213... Bottom wall, 214... End wall, 215... Dustproof net, 21G...
- Fitting recess, 217... Packing, 218... Dustproof screen, 220... 1 ■ Fitting piece, 221... Surface door plus/minus adjustment device, 222... Adjustment scale, 223...
, long hole, 224... mounting hole, 225... waterproof wall, 2
25a... Final selection, 226... Water section, 227...
Drainage, 228... Mendo waterproof wall, 229... Notch,
230... Engagement piece, 231... Support leg, 232...
・Bolt, 233... Indicator, 234... Washer, 2
35... Chilling 1-1236... Connection part, 237...
- Fitting part, 238... Notch part, 239... Partition plate,
240...Waterproof cover, 241...Water section, 242
...Sliding claw f4 hole, 243...Waterproof wall, 244...
・Mating part, 245... Support leg part, 246... Mounting pole 1-1247... Washer, 248... Nut, A...
・Middle part connecting member, A'...Side part connecting member, B...
Lighting glass frame, B1... Lighting glass frame at the eaves, B2.
... Intermediate lighting glass frame, B3... Ridge lighting glass frame, C... Side reinforcing material, D... Intermediate connection member cover, D'... Side connection member cover, E. ... Decorative protective cap, 1: ...11111 Lower corner decorative cover, G.
・・Dustproof/wiring inspection cover, H...Eaves intake hole, 1
... Decorative ridge crown, J... Ridge hot air exhaust hole, K... Water pipe, Shi... Decorative round crown, M... Sliding connection member, M'
... Connector member, N... Ridge crown decoration mounting member, N'.
・・Round crown mounting member, P ・・Nightlighting glass frame fixing bracket, Q
...Cleaning device, S...Energy flux counter, T...
Connection member fixing bracket, U...Eave dustproof device, ■...Cap dustproof device. Patent applicant Fuji Sash Co., Ltd. Figure 4 5E Figure 5a Figure 5b (1=2500mm) (1=3000m
m) (1:3500mm) (1=400
0mm) Fig. 6a (1=2500mm) Fig. 6C (1=3500mm). Fig. 6b (1 = 3000 rryn) Fig. δ6d (124000mm) □Pugo□□Amount Fig. 69 (1 = 5500mm) E 179 175 Fig. 32c Fig. 33a Fig. 33c

Claims (1)

【特許請求の範囲】[Claims] 断面略溝型の本体両側に下部係合排水溝と垂下脚片とを
設け、前記本体の底部下面に長手方向に沿う支持溝を設
け、前記支持溝の両側に溝型係合部を設け、前記支持溝
の長手方向ほぼ中央に固定用丸孔を設け、前記固定用丸
孔の両側に間隔をおいて長孔を設けた下部接続部材と、
中空本体の下面両側に前記下部接続部材の溝型係合部に
係合する垂下係合支脚を設け、前記中空本体の上面両側
に立上り部を設け、前記中空本体の中間部両側に張出し
て上部支持溝と上部排水溝とを形成し、前記中空本体水
平部の長手方向中央と軒先寄りにそれぞれ取付孔を設け
た上部接続部材とからなり、前記下部接続部材の支持溝
の長手方向棟寄りに長さ調整取付長孔を穿設し、前記上
部接続部材の中空本体水平部の棟寄りに前記長さ調整取
付長孔に相当して調整取付用長孔を穿設したことを特徴
とする太陽エネルギー集収屋根の中間部接続部材。
A lower engaging drainage groove and a hanging leg piece are provided on both sides of a main body having a substantially groove-shaped cross section, a support groove extending in the longitudinal direction is provided on the lower surface of the bottom of the main body, and a groove-type engagement portion is provided on both sides of the support groove, a lower connecting member having a fixing round hole provided at approximately the center in the longitudinal direction of the support groove, and elongated holes provided at intervals on both sides of the fixing round hole;
Drooping engagement support legs that engage with the groove-shaped engagement portions of the lower connecting member are provided on both sides of the lower surface of the hollow body, rising portions are provided on both sides of the upper surface of the hollow body, and the upper portion extends from both sides of the middle portion of the hollow body. an upper connecting member forming a support groove and an upper drainage groove, and provided with mounting holes in the longitudinal center of the horizontal part of the hollow main body and closer to the eaves; A solar panel characterized in that a length adjustment mounting elongated hole is drilled, and an adjustment mounting elongated hole corresponding to the length adjustment mounting elongated hole is bored near the ridge of the horizontal portion of the hollow main body of the upper connecting member. Intermediate connection member of energy collection roof.
JP60184298A 1985-08-23 1985-08-23 Intermediate connection member of solar energy collecting roof Granted JPS6245852A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP60184298A JPS6245852A (en) 1985-08-23 1985-08-23 Intermediate connection member of solar energy collecting roof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP60184298A JPS6245852A (en) 1985-08-23 1985-08-23 Intermediate connection member of solar energy collecting roof

Publications (2)

Publication Number Publication Date
JPS6245852A true JPS6245852A (en) 1987-02-27
JPH0426020B2 JPH0426020B2 (en) 1992-05-06

Family

ID=16150884

Family Applications (1)

Application Number Title Priority Date Filing Date
JP60184298A Granted JPS6245852A (en) 1985-08-23 1985-08-23 Intermediate connection member of solar energy collecting roof

Country Status (1)

Country Link
JP (1) JPS6245852A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH02186046A (en) * 1989-02-21 1990-07-20 Fujisash Co Eaves comma-shaped part
KR102430930B1 (en) * 2022-02-10 2022-08-10 주식회사 탄탄구조엔지니어링 Waterproof apparatus

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH02186046A (en) * 1989-02-21 1990-07-20 Fujisash Co Eaves comma-shaped part
KR102430930B1 (en) * 2022-02-10 2022-08-10 주식회사 탄탄구조엔지니어링 Waterproof apparatus

Also Published As

Publication number Publication date
JPH0426020B2 (en) 1992-05-06

Similar Documents

Publication Publication Date Title
US5765324A (en) Skylight construction
US20130031855A1 (en) Rail mounting system for mounting skylights and the like directly to rib elevations of a raised rib metal panel roofing system
WO1990012177A1 (en) Roof collecting solar energy
JPS6245852A (en) Intermediate connection member of solar energy collecting roof
JPH0423705B2 (en)
JPH0426023B2 (en)
JPS62178650A (en) Cover frame of solar energy collecting roof
JPH0481351B2 (en)
JPH03902B2 (en)
JPH0296046A (en) Roof with solar energy collector
JPS6192254A (en) Movement control apparatus of surface door plus and minus control apparatus in solar energy collecting roof
JPH0426371B2 (en)
JPS6138051A (en) Construction of solar energy collection roof
JPH0423701B2 (en)
JPS6245854A (en) Lower connection member of solar energy collecting roof
JPH0423704B2 (en)
JPH0423703B2 (en)
JPH04196Y2 (en)
JPH019880Y2 (en)
JPH0423061B2 (en)
JPS60173251A (en) Cover frame of energy collection roof
JPH0350171Y2 (en)
JPH0421776B2 (en)
JPS61106857A (en) Cover frame of solar energy collecting roof
JPH03901B2 (en)