JPS6210759A - Deciding device for manufacturing start time of textile goods or knitted goods - Google Patents

Deciding device for manufacturing start time of textile goods or knitted goods

Info

Publication number
JPS6210759A
JPS6210759A JP60150845A JP15084585A JPS6210759A JP S6210759 A JPS6210759 A JP S6210759A JP 60150845 A JP60150845 A JP 60150845A JP 15084585 A JP15084585 A JP 15084585A JP S6210759 A JPS6210759 A JP S6210759A
Authority
JP
Japan
Prior art keywords
yarn
amount
category
delivery date
file
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP60150845A
Other languages
Japanese (ja)
Other versions
JPH0355853B2 (en
Inventor
Yoshiaki Uematsu
植松 芳哲
Toshimitsu Miyanochi
宮後 俊光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kanebo Ltd
Original Assignee
Kanebo Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kanebo Ltd filed Critical Kanebo Ltd
Priority to JP60150845A priority Critical patent/JPS6210759A/en
Publication of JPS6210759A publication Critical patent/JPS6210759A/en
Publication of JPH0355853B2 publication Critical patent/JPH0355853B2/ja
Granted legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Abstract

PURPOSE:To exactly and in real time decide the optimum manufacturing start time of each of textile or knitted goods by inputting in order a requested delivery date, the period of manufacturing or the arrival date of yarn necessary for the manufacturing, etc. CONSTITUTION:When the arrival instruction of the yarn is obtained, the kinds of the yarn, an arrival quantity instructed and the arrival date are inputted in order to a yarn ledger file 11 by a yarn ledger inputted means 101. Also, when the yarn that the arrival is instructed is delivered actually, a delivered quantity and a delivery date are inputted, and when it is shipped for the manufacturing, a shipping quantity is inputted to the yarn ledger file 11 in order. When the yarn ledger file 11 or yarn required quantity file 12 is updated, the input or the output quantity of a yarn balance file 103 is updated by an input updating means 104 or an output updating means 105 and the accumulated totals balance of each section in the yarn balance file 103 is updated by an accumulated totals balance updating means 106. Thereby, the optimum manufacturing start time of goods can be decided in real time and with accuracy.

Description

【発明の詳細な説明】 [産業上の利用分野] 本発明は、織物または編物製品を受注生産するにあたっ
て、客先の望むその製品の納期、製造に要する期間、そ
の製品の製造に必要な原糸の入荷納期等にもとづいて、
製造開始時期を決定する装置に関する。
Detailed Description of the Invention [Industrial Field of Application] The present invention is applicable to manufacturing woven or knitted products to order by determining the delivery date desired by the customer, the period required for manufacturing, and the raw materials necessary for manufacturing the product. Based on the arrival and delivery date of the yarn, etc.
This invention relates to a device for determining when to start manufacturing.

[従来の技術とその問題点] 織物または編物製品を受注生産するにあたっては、その
製品の製造に必要な原糸の在庫が常に必要量を満たして
いるとは限らないので、入荷の指図がなされた原糸の入
荷納期、その製品について客先が希望する納期、製造に
要する期間等にもとづいて、・製品の製造開始時期を決
定−1これによりその製品について実際に可能な納期を
決定する必要があり、また、これにもとづいて、注文の
契約内容を変更したり、さらに、新たに原糸の入荷を指
図する必要がある。従来は、第6図に示すような原糸バ
ランス表を作成して、手計算で織物または編物製品の製
造開始日を決定していた。
[Prior art and its problems] When manufacturing woven or knitted products to order, the stock of raw yarn necessary for manufacturing the product does not always meet the required amount, so it is difficult to receive orders. Based on the arrival and delivery date of the raw yarn, the customer's desired delivery date for the product, the period required for manufacturing, etc., ・Determine when to start manufacturing the product.-1 From this, it is necessary to determine the actually possible delivery date for the product. Based on this, it is necessary to change the contract contents of the order or to instruct the arrival of new yarn. Conventionally, a yarn balance table as shown in FIG. 6 was prepared and the production start date of a woven or knitted product was determined by hand calculation.

この原糸バランス表は、原糸の種類ごとに、ページが分
けられており、各ページには、インプット量、アウトプ
ット量、累計残の各欄が設けられ、各欄は、月ごとに区
分されている。インプット量の欄には、入荷が指図され
た原糸の量、または既に入荷流の原糸については入荷さ
れた量と実際に織物製造に使われるために出荷された量
との差が記され、アウトプット量の欄には、織物または
編物の製造に必要な原糸の聞が記され、各月の累計残の
欄には、その月までのアウトプット量の合計とその月ま
でのインプット量の合計との差が記されている。
This yarn balance table is divided into pages for each type of yarn, and each page has columns for input amount, output amount, and cumulative balance, and each column is divided by month. has been done. In the input quantity column, the amount of raw yarn ordered to be received or, for raw yarn already in the incoming stream, the difference between the received amount and the amount actually shipped for use in textile manufacturing is recorded. In the output amount column, the amount of raw yarn required for manufacturing woven or knitted products is recorded, and in the cumulative balance column for each month, the total output amount up to that month and the input amount up to that month are recorded. The difference from the total amount is recorded.

ここで、原糸の紡績の指図がなされており、その納期が
4月に2000ka、5月に3000kg、 6月に2
000 kgであったとする。これらの量は各月のイン
プット量の欄に記入する。
Instructions for spinning the raw yarn are given here, and the delivery dates are 2,000 ka in April, 3,000 kg in May, and 2 in June.
000 kg. Enter these amounts in the input amount column for each month.

4月に織物aの注文があり、原糸GB・2/48・10
000000 (銘柄・番手・色相を示す)の必要量が
1000kGであった場合には、原糸GB・2/48・
1oooooooが登録されたページにおいて、4月の
アウトプット量の欄にこの但を記入する。3月の累計残
が0であるとすると、4月の累計残は、インプットm 
2000 kaからアウトプット量1000kgを差し
引いて1000kaとなる。
There was an order for fabric a in April, yarn GB 2/48/10
If the required amount of 000000 (indicating the brand, count, and hue) is 1000kG, the yarn GB, 2/48,
On the page where 1oooooooo is registered, enter this proviso in the April output amount column. Assuming that the cumulative balance for March is 0, the cumulative balance for April is input m
Subtract the output amount of 1000 kg from 2000 ka to get 1000 ka.

そしてこのとき、5月の累計残は、4月の累計残100
0k(Jと5月のインプットIf13000kaとの和
から40・0Okoとなり、6月の累計残は、5月の累
計残4000k(]と6月のインプット口2000ka
との和から6000k(1,!=なる。
And at this time, the cumulative balance of May is 100 of the cumulative balance of April.
The sum of 0k (J and May's input if 13,000ka gives 40.0Oko, and the cumulative balance for June is the sum of May's cumulative balance of 4,000k () and June's input if 2,000ka.
The sum becomes 6000k (1,!=.

次に、織物すの注文があり、上記原糸の必要量が100
0koであった場合には、4月の累計残が1000k(
+であり、必要量を満たすので、4月のアウトプット量
の欄にそのaを記入する。
Next, there is an order for woven fabrics, and the required amount of the above yarn is 100.
If it is 0ko, the cumulative balance for April is 1000k (
+ and satisfies the required amount, so write a in the April output amount column.

この時点では、4月の累計残は、織物aの注文があった
ときの累計残1000kaから今回のアウトプットIt
1000kaを差し引いてOkgとなる。したがって、
5月の累計残は、4月の累計残Okgと5月のインプッ
ト13000kgとの和から3000 kgとなり、6
月の累計残は、5月の累計残3000kgと6月のイン
プット量2000kaとの和から5000 haとなる
At this point, the cumulative balance for April is the current output It
Subtract 1000ka to get Okg. therefore,
The cumulative balance for May is 3,000 kg, which is the sum of the cumulative balance for April and the input of 13,000 kg for May, which is 6
The cumulative balance for the month is 5,000 ha, which is the sum of the cumulative balance of 3,000 kg in May and the input amount of 2,000 ka in June.

さらに、織物Cの注文があり、上記原糸の必要量が50
0 kaであると、4月の累計残はOk(+であるので
、5月のアウトプット量の欄に必要ff1500kaを
記入する。したがって、この時点では4月の累計性はO
kgであるので、5月の累計性は、5月のインプットf
f13000kaからアウトプットff1500kgを
差し引いて2500kaとなり、6月の累計性は450
0koとなる。
Furthermore, there is an order for woven fabric C, and the required amount of the above yarn is 50
If it is 0 ka, the cumulative balance in April is OK (+), so enter the required ff1500 ka in the output amount column for May. Therefore, at this point, the cumulative balance in April is O.
kg, so the cumulativeness of May is the input f of May.
Subtract the output ff1500kg from f13000ka to get 2500ka, and the cumulative effect in June is 450
It becomes 0ko.

したがって、織物a及び織物すは4月に製造を開始し、
織物Cは5月に製造を開始することとなる。しかしなが
ら、その織物について客先が希望する納期は、受注の順
とは無関係に、その織物ごとに異なっており、したがっ
て、例えば、織物a及び織物Cの納期が6月で、織物す
の納期が7月であり、どの織物ついても製造に要する期
間が2か月である場合、織物°Cの製造は納期に間に合
わないことになる。このような場合は、織物すの納期が
7月であり、1か月の余裕があるので、織物すの製造開
始日を5月に、織物Cの製造開始日を4月に組み換えな
ければならない。
Therefore, production of textiles a and s will start in April,
Production of Fabric C will begin in May. However, the delivery date desired by the customer for the textiles differs for each textile, regardless of the order of orders. Therefore, for example, the delivery date for textiles A and C is June, and the delivery date for textiles A is in June. If it is July and the production time for any fabric is two months, the production of the fabric °C will not meet the delivery date. In such a case, the delivery date for the woven fabric is in July, and there is one month to spare, so the production start date for the woven fabric must be changed to May, and the production start date for woven fabric C to April. .

このようにして、製造開始日を組み換えると、4月及び
5月の累計性が変ってしまうため、結局すべての累計性
を計算しなおす必要がある。
If the manufacturing start dates are rearranged in this way, the cumulativeness of April and May will change, so it will be necessary to recalculate all cumulativeness.

このように、原糸バランス族を作成するには、非常に手
間がかかるため、従来は月に1度ずつしか新しい原糸バ
ランス族を作成していなかった。したがって、大まかな
予定しかたたず、また、製品の注文や原糸の入荷指図等
の状況は日々変化するため、織物または編物製品を受注
生産する際に正確な納期が把握されないという不都合が
生じていた。しかも、現在では、原糸の種類が極めて多
いために、原糸バランス族を作成する作業の優が膨大と
なるという問題点もあった。
In this way, it takes a lot of effort to create a yarn balance family, so conventionally a new yarn balance family was created only once a month. Therefore, only a rough schedule can be set, and the status of product orders and yarn arrival instructions changes daily, resulting in the inconvenience of not knowing the exact delivery date when manufacturing woven or knitted products to order. Ta. Moreover, since there are so many types of yarn at present, there is a problem in that the work required to create a yarn balance family is enormous.

したがって本発明の目的は、織物または編物製品を受注
生産するにあたって、その製品の希望納期、製造に要す
る期間、その製造に必要な原糸の入荷納期等を逐次入力
することによって、それぞれの織物または編物製品の最
適な製造開始時期をリアルタイムにかつ正確に決定する
ことができる装置を提供することにある。
Therefore, an object of the present invention is to manufacture woven or knitted products to order by sequentially inputting the desired delivery date of the product, the period required for manufacturing, the arrival and delivery date of raw yarn necessary for the manufacturing, etc. An object of the present invention is to provide a device that can accurately determine the optimal time to start manufacturing knitted products in real time.

[問題点を解決するための手段] 本発明の装置の構成を第1図に基づいて説明する。[Means for solving problems] The configuration of the apparatus of the present invention will be explained based on FIG.

(101)は原糸台帳入力手段であり、入荷指図があっ
た原糸について、その原糸の種類、入荷指図量および入
荷量、出荷量、及び、入荷納期および入荷量を原糸台帳
ファイル(11)に逐次入力するものである。
(101) is a yarn ledger input means, which inputs the yarn type, received instruction amount, amount received, shipped amount, delivery date and amount received into the yarn ledger file ( 11) are input sequentially.

(102)は原糸所要量入力手段であり、製造指図、す
なわち受注があった織物または編物製品について、その
製品に必要な原糸の種類、その必要量、製品の納期およ
び製品の製造に要する期間を原糸所要量ファイル(12
)に逐次入力するものである。
(102) is a means for inputting the required amount of yarn, and it is a manufacturing instruction, that is, for a woven or knitted product for which an order has been received, the type of yarn required for the product, its required amount, the delivery date of the product, and the amount required for manufacturing the product. Enter the period in the yarn requirement file (12
) is input sequentially.

(103)は原糸バランスファイルであり、一定期間を
一定日数ずつの区分に区切って、原糸の種類別に、原糸
の入荷指図量または入荷量と出荷量との差を所定の区分
にインフッ1〜涜として登録し、前記製品の製造に必要
な原糸の必要量を所定の区分にアウトプットはとして登
録し、各区分において、その区分までのインプット量の
合計とその区分までのアウトプット通の合計との差を累
計性として登録したものである。
(103) is a yarn balance file, which divides a certain period into sections of a certain number of days, and inputs the instructed arrival amount of yarn or the difference between the arrival amount and shipping amount into predetermined categories for each type of yarn. Register as 1 to 1, and register the required amount of raw yarn necessary for manufacturing the product as the output in a predetermined category, and for each category, calculate the total input amount up to that category and the output up to that category. The difference between the total and the total is registered as a cumulative total.

(104)はインプット更新手段であり、前記原糸台帳
ファイル(11)が更新されると、それにもとづいて、
原糸バランスファイル(103)において、未入荷の原
糸については入荷納期の属する区分にその入荷指図量を
、入荷済みの原糸については入荷量の属する区分にその
入荷量と出荷量との差をインプット量として登録するも
のである。
(104) is an input updating means, and when the yarn ledger file (11) is updated, based on it,
In the yarn balance file (103), for yarn that has not yet arrived, the incoming instruction amount is shown in the category to which the incoming delivery date belongs, and for yarn that has already arrived, the difference between the incoming amount and the shipping amount is shown in the category to which the incoming amount belongs. is registered as the input amount.

(105)はアウトプット更新手段であり、前記原糸所
要量ファイル(12)が更新されると、それにもとづい
て、原糸バランスファイル(103)において、アウト
プット渚を次のようにして変更するものである。各原糸
について、その原糸を使用する製品の納期から製造に要
する期間だけ遡った日の属する区分を納期指標区分とし
かつ現時点から所定期間後の区分を最終区分とし、納期
指標区分から最終区分までのすべての区分のそれぞれの
累計性がその原糸の必要堡以上であることを条件として
、その納期指標区分に必装量をアウトプット量として登
録し、前記条件を満さない場合には、最終区分を限度と
して前記条件を満すまで納期指標区分を一つずつ後の区
分へずらし、前記条件を満した場合にはその納期指標区
分に必要量をアウトプット量として登録し、前記条件を
満さない場合には最終区分に必要量をアウトプット量と
して登録する。
(105) is an output update means, and when the yarn requirement file (12) is updated, the output shore is changed in the yarn balance file (103) based on it as follows. It is something. For each raw yarn, the classification that belongs to the date that is the period required for manufacturing from the delivery date of the product that uses the raw yarn is set as the delivery date index class, and the class after a predetermined period from the current time is the final class, and from the delivery date index class to the final class. On the condition that the cumulative totality of all categories up to that point is greater than or equal to the required volume of yarn, the required quantity is registered as the output quantity for that delivery date index category, and if the above conditions are not met, , shift the delivery date index category one by one to the next category until the above conditions are met, with the final category as the limit, and when the above conditions are met, register the required quantity as the output quantity in that delivery date index category, and then apply the above conditions. If the required amount is not satisfied, register the required amount as the output amount in the final classification.

(ioe)は累計残更新手段であり、前記インプット量
及びアウトプット量が更新されると、それにもとづいて
、原糸バランスファイル(103)において、各区分の
累計残を更新するものである。
(ioe) is a cumulative remaining update means, and when the input amount and output amount are updated, the cumulative remaining amount of each category is updated in the yarn balance file (103) based on the updated input amount and output amount.

[作 用] ある原糸の入荷指図があると、その原糸の種類、入荷指
図量、及び入荷納期を、原糸台帳入力手段(101)に
よって原糸台帳ファイル(11)に逐次入力する。また
、入荷指図があった原糸が現実に入荷されると、その入
荷量及び入荷量を、そして実際に織物または編物製品の
製造に使用するために出荷されると、その出荷量を原糸
台帳入力手段(101)によって原糸台帳ファイル(1
1)に逐次入力する。原糸の入荷指図としては、紡績工
場に原糸の紡績を指図する場合や、商社等を通じて原糸
を購入するよう指図する場合がある。また、織物または
編物製品の製造指図、すなわち、注文があると、その製
品の製造に必要な原糸の種類、その必要量、製品の納期
及び製品の製造に要する期間を、原糸所要量入力手段(
102)によって原糸所要量ファイル(12)に逐次入
力する。
[Operation] When there is an order for the arrival of a certain yarn, the type of yarn, the amount of arrival instructions, and the arrival delivery date are sequentially input into the yarn ledger file (11) by the yarn ledger input means (101). In addition, when raw yarn for which a receiving instruction has been given is actually received, we will calculate the amount and volume of the received yarn, and when it is actually shipped for use in the production of woven or knitted products, we will calculate the amount of shipped yarn. The yarn ledger file (1
1) Input sequentially. Instructing the arrival of raw yarn may include instructing a spinning factory to spin the yarn or instructing a trading company to purchase the yarn. In addition, when there is a manufacturing instruction for a woven or knitted product, that is, an order, the required amount of yarn is input, including the type of yarn necessary for manufacturing the product, its required amount, the delivery date of the product, and the period required for manufacturing the product. means(
102) is sequentially input into the yarn requirement file (12).

前記のように原糸台帳ファイル(11)または原糸所要
量ファイル(12)が更新されると、それにもとづいて
、インプット更新手段(104)またはアウトプット更
新手段(105)によって、原糸バランスファイル(1
03)のインプット量またはアウトプット岱が更新され
るとともに、累S1残更新手段(106)によって、原
糸バランスファイル(103)の各区分の累計残が更新
される。
When the yarn ledger file (11) or yarn requirement file (12) is updated as described above, the input update means (104) or output update means (105) updates the yarn balance file based on the update. (1
03) is updated, and the cumulative S1 remaining update means (106) updates the cumulative remaining amount of each category in the yarn balance file (103).

それぞれの織物または編物製品についてアウトプット量
が登録された区分が、その製造を開始すべき時点の属す
る区分となり、この時点と製造に要する期間とからそれ
ぞれの製品について実際に可能な納期が求まる。
The category in which the output amount is registered for each woven or knitted product becomes the category to which the time when its production should start belongs, and the actually possible delivery date for each product is determined from this point and the period required for production.

[実施例] 以下、本発明の一実施例を図面を用いて説明する。[Example] An embodiment of the present invention will be described below with reference to the drawings.

本実施例の装置は、第2図に示すように、CPLJ、R
OM、RAMからなるマイクロコンピュータ(1)、磁
気ディスク、磁気テープ等の補助記憶装置(2)、キー
ボード等の入力装置(3)、及びCRTディスプレイ等
の表示装置(4)から構成されている。
As shown in FIG. 2, the device of this embodiment has CPLJ, R
It consists of a microcomputer (1) consisting of OM and RAM, an auxiliary storage device (2) such as a magnetic disk or magnetic tape, an input device (3) such as a keyboard, and a display device (4) such as a CRT display.

補助記憶装置(2)には、入荷の指図があった原糸に関
する情報を登録した原糸台帳ファイル(11)、製造の
指図があった織物に必要な原糸に関する情報を登録した
原糸所要量ファイル(12)、この原糸台帳ファイル(
11)及び原糸所要量ファイル(12)にもとづいて製
造開始日を決定するために使用される原糸バランスファ
イル(103)が記憶されている。
The auxiliary storage device (2) contains a yarn ledger file (11) that registers information about the yarn for which receiving instructions have been given, and a yarn requirement file (11) that registers information about the yarn necessary for the fabric for which manufacturing instructions have been given. quantity file (12), this yarn ledger file (
11) and a yarn balance file (103) used to determine the production start date based on the yarn requirement file (12).

そして、マイクロコンピュータ(1)には、次のプログ
ラムが格納されている。すなわち、入力装置(3)を用
いて、入荷指図があった原糸の情報が入力されると、そ
の情報を原糸台帳ファイル(11)に登録するプログラ
ム、製造指図があった織物に必要な原糸の情報が入力さ
れるとその情報を原糸所要量ファイル(12)に登録す
るプログラム、この原糸台帳ファイル(11)または原
糸所要量ファイル(12)が更新されると、それにもと
づいて原糸バランスファイル(103)を用いて、織物
の製造開始日を決定するプログラムである。
The following program is stored in the microcomputer (1). In other words, when information about the yarn for which there is a receiving order is entered using the input device (3), a program that registers that information in the yarn ledger file (11), and a program necessary for the fabric for which there is a manufacturing instruction are input. When the yarn information is input, the program registers the information in the yarn requirement file (12), and when the yarn ledger file (11) or the yarn requirement file (12) is updated, the program registers the information in the yarn requirement file (12). This is a program that determines the production start date of a woven fabric using a yarn balance file (103).

すなわち、入力装置(3)とマイクロコンピュータ(1
)とによって、原糸台帳入力手段(101)及び原糸所
要量入力手段(102)を構成し、マイクロコンピュー
タ(1)によって、インプット更新手段(104) 、
アウトプット更新手段(105)及び累計残更新手段(
106)を構成している。
That is, the input device (3) and the microcomputer (1)
) constitute a yarn ledger input means (101) and a yarn required amount input means (102), and the microcomputer (1) constitutes an input updating means (104),
Output updating means (105) and cumulative remaining updating means (
106).

原糸台帳ファイル(11)には、第3図に示すように、
入荷指図があった原糸について、その原糸の種類、すな
わち、銘柄、番手、色相、及び、入荷指図量、入荷量、
出荷量、入荷納期、及び入荷量が登録されている。この
ファイルは、入荷指図があった原糸について、その原糸
が実際に入荷されたり、織物製造に使用するために出荷
された場合には、その内容が逐次変更されてゆく。
In the yarn ledger file (11), as shown in Figure 3,
Regarding the raw yarn for which there is an order for arrival, the type of yarn, i.e., brand, count, hue, and the amount of arrival instructions, amount of arrival,
The shipping amount, arrival delivery date, and arrival amount are registered. The contents of this file are sequentially changed when the raw yarn for which a delivery instruction has been given is actually received or shipped for use in textile manufacturing.

また、原糸所要量ファイル(12)には、第4図に示す
ように、製造指図があった織物について、すなわち、注
文を受けた織物について、その織物の製造に必要な原糸
の種類ごとに、その織物の約定番号、銘柄、番手、色相
、その原糸の必要量、客先が希望する織物納期、製造に
要する製造期間、織物の受注臼とその日における受注の
順序、及びバランスポジションが登録されている。バラ
ンスポジションとは、受注したその織物の製造の開始時
期、すなわち、原糸を投入すべき時期を示すものであり
、後述する原糸バランスファイル(103)を用いて求
められるものである。
In addition, as shown in Figure 4, the yarn requirements file (12) contains information about the types of yarn required to manufacture the fabrics for which there are manufacturing instructions, that is, for the fabrics that have been ordered. In addition, the contract number, brand, count, hue of the fabric, the required amount of raw yarn, the customer's desired fabric delivery date, the manufacturing period required for production, the order of orders for the fabric and the order received on that day, and the balance position. Registered. The balance position indicates the start time of manufacturing the ordered textile, that is, the time when yarn should be introduced, and is determined using a yarn balance file (103) to be described later.

次に原糸バランスファイル(103)について説明する
。このバランスファイルは第5図に示すように、原糸の
種類ごとに各ページが区分され、各ページには、インプ
ット量、アウトプット量、累計列の欄が設けられ、各欄
は1か月ごとに区分されている。この1か月という区分
は、説明を簡単にするための便宜上のものであり、実際
に実施する場合には10日、1週間という短い区分にす
るのが好ましい。
Next, the yarn balance file (103) will be explained. As shown in Figure 5, each page of this balance file is divided by type of yarn, and each page has columns for input amount, output amount, and cumulative total, and each column is for one month. It is categorized by. This division of one month is for convenience to simplify the explanation, and when actually implemented, it is preferable to use short divisions of 10 days or one week.

インプット量の欄には、未入荷の原糸については入荷納
期の属する区分にその入荷指図■が登録され、入荷済み
の原糸については入荷量の属する区分に、その入荷量、
または実際に織物の製造に使われるために出荷された場
合は入荷量と出荷量との差が登録されている。このイン
プット量の登録は、原糸台帳ファイル(11)にもとづ
いて行なわれる。
In the input quantity column, for raw yarn that has not yet arrived, its arrival instruction ■ is registered in the category to which the arrival delivery date belongs, and for yarn that has already arrived, the received quantity,
Or, if the product is actually shipped for use in the manufacture of textiles, the difference between the amount received and the amount shipped is registered. This input amount is registered based on the yarn ledger file (11).

また、アウトプット量の欄には、注文を受けた織物の製
造に必要な原糸の必要量が所定の区分に登録されている
。さらに、累計列の欄には、各区分において、その区分
までのインプット量の合計とその区分までのアウトプッ
ト量の合計との差が登録されている。
Further, in the output amount column, the required amount of raw yarn necessary for manufacturing the ordered textile is registered in a predetermined category. Further, in each category, the difference between the total input amount up to that category and the total output amount up to that category is registered in the cumulative total column column.

アウトプット量の欄の登録は原糸所用量ファイル(12
)にもとづいて、次に示すようにして行われる。まず、
その原糸を使用する製品の納期から製造に要する期間だ
け遡った日の属する区分を納期指標区分とし、かつ、現
時点から所定期間後の区分を最終区分とする。納期指標
区分から最終区分までのすべての区分のそれぞれの累計
列がその原糸の必要量以上であることを条件として、そ
の納期指標区分に必要量をアウトプットωとして登録す
る。前記条件を満さない場合には、最終区分を限度とし
て前記条件を満すまで納期指標区分を一つずつ後の区分
へずらし、前記条件を満した場合には、その納期指標区
分に必要量をアウトプット量として登録する。
To register the output amount column, use the Yarn Requirement File (12
), it is carried out as follows. first,
The classification that belongs to the date that is back by the period required for manufacturing from the delivery date of the product using the yarn is the delivery date index classification, and the classification after a predetermined period from the current time is the final classification. On the condition that each cumulative total column of all categories from the delivery date index category to the final category is greater than or equal to the required amount of yarn, the required amount is registered in that delivery date index category as output ω. If the above conditions are not met, shift the delivery date index category one by one to the next category until the above conditions are met, up to the last category, and if the above conditions are met, the required amount for that delivery date index category. is registered as the output amount.

納期指標区分を最終区分までずらしても前記条件を満た
さない場合には、最終区分に必要量をアウトプット量と
して登録する。
If the above conditions are not satisfied even after shifting the delivery date index classification to the final classification, the required amount is registered as the output amount in the final classification.

第  1  表 上記のことを以下に具体的に説明する。第5図に示す原
糸QB・2/48・10000000の場合には、イン
プット量として4月に2000ka、5月に3000 
kg、6月に2000 kgが登録されている。
Table 1 The above will be explained in detail below. In the case of yarn QB・2/48・10000000 shown in Figure 5, the input amount is 2000ka in April and 3000ka in May.
kg, 2000 kg was registered in June.

本実施例では、原糸GB・2/48・10000000
を必要とする第1表に示す織物a、b、c、d、eの注
文がこの順にあった場合について説明する。
In this example, raw yarn GB・2/48・10000000
A case will be explained in which there are orders for fabrics a, b, c, d, and e shown in Table 1, which require , in this order.

この織物a−eの製造に要する期間はいずれも2か月で
あるとする。
It is assumed that the period required to manufacture fabrics a to e is two months.

まず、織物aの注文があった場合、その納期が6月15
日であるので、製造に要する期間である2か月だけ遡っ
た日の属する区分、すなわち、4月を納期指標区分とす
る。またここにおいては、6月を最終区分とする。3月
の累計残がOkaであったとすると、織物aの受注前に
おいては、累計残は、4月が2000kg、5月が30
00 kg、6月が2000 kaであり、納期指標区
分4月から最終区分6月までのすべての区分において累
計残が必要11000koより多いので、納期指標区分
である4月のアウトプット量の欄に必要量1000ko
を登録する。この時点で、4月の累計残は、インプット
1i2000k(]からアウトプット11000kgを
差し引いて1000klllとなり、5月の累計残は、
4月の累計残1000koと5月のインプット量300
0k(+との和から4000 kaとなり、また、6月
の累計残は、5月の累計残4000 koと6月のイン
プット量2000 k(]との和から6000kgとな
る。
First, if there is an order for fabric a, the delivery date is June 15th.
Therefore, the delivery date index category is set to the category that belongs to the date that is two months back, which is the period required for manufacturing, that is, April. Also, here, June is the final classification. Assuming that the cumulative balance in March was Oka, the cumulative balance was 2000 kg in April and 30 kg in May before receiving the order for fabric a.
00 kg, June is 2000 ka, and the cumulative balance in all categories from the delivery date indicator category April to the final category June is more than the required 11000 ko, so in the column of output amount for April, which is the delivery date indicator category. Required amount 1000ko
Register. At this point, the cumulative balance for April is 1000klll by subtracting the output 11000kg from the input 1i2000k(], and the cumulative balance for May is:
Total remaining 1000ko in April and input amount in May 300ko
The sum of 0k (+) gives 4000 ka, and the cumulative balance for June is 6000 kg, the sum of May's cumulative 4000 ko and June's input amount of 2000 ka.

次に、織物すの注文があると、その納期が7月15日で
あるので、納期指標区分は5月となる。このとき、5月
及び6月の累計残はそれぞれ4000kg及び6000
 kgであり、いずれも、必要11000kaよりも多
いので、納期指標区分である5月のアウトプット量の欄
に必要量1000 kaを登録する。この時点で、4月
の累計残は1000kgのままであり、5月の累計残は
、4月の累計残10001C1に5月のインプット量3
000kgを加え5月のアウトプット量1000hを引
いて3000koとなる。そして、6月の累計残は、5
月の累計残3000kaに6月のインプット量2000
 kaを加えて5000 kaとなる。
Next, when there is an order for textiles, the delivery date is July 15th, so the delivery date index classification is May. At this time, the cumulative balance for May and June is 4,000 kg and 6,000 kg, respectively.
kg, which are both greater than the required amount of 11000 ka, so the required amount of 1000 ka is registered in the output amount column for May, which is the delivery date index category. At this point, the cumulative balance for April remains 1000kg, and the cumulative balance for May is 10001C1 plus the input amount for May 3.
Adding 000kg and subtracting May's output of 1000h results in 3000ko. And the cumulative balance for June is 5
Monthly cumulative balance 3000ka and June input amount 2000ka
Add ka to get 5000 ka.

さらに、織物Cの注文があると、その納期が6月15日
であるので、納期指標区分は4月となる。このとき、4
月、5月、6月の累シ1残は、それぞれ1000ka、
3000ko15000klJであり、必要ff150
0kaよりも多いので、納期指標区分である4月のアウ
トプットはの欄に必要ff1500kaを登録する。こ
の時点で、4月、5月、6月の累計残は、上記と同様に
して、それぞれ500ko、250Ofto、4500
kaとなる。
Furthermore, when there is an order for fabric C, the delivery date is June 15th, so the delivery date index classification is April. At this time, 4
The remaining cumulative amount of 1,000 ka for May, May, and June is 1,000 ka each.
3000ko15000klJ, required ff150
Since it is more than 0ka, register the required ff1500ka in the April output column, which is the delivery date index category. At this point, the cumulative balance for April, May, and June is 500ko, 250Ofto, and 4500Ko, respectively, in the same way as above.
It becomes ka.

次に、織物dの注文があると、その納期指標区分は5月
となり、そのときの5月及び6月の累計残はそれぞれ2
500ka、4500koであり、必要ff12300
koよりも多いので、納期指標区分である5月のアウト
プット量の欄に必要m 2300 kgを登録する。こ
の時点で、4月、5月、6月の累計残は、上記と同様に
して、それぞれ500kg、200ko、2200ko
となる。
Next, when there is an order for fabric d, its delivery date index category becomes May, and the cumulative balance for May and June at that time is 2.
500ka, 4500ko, required ff12300
Since the amount is more than ko, the required m 2300 kg is registered in the output amount column for May, which is the delivery date indicator category. At this point, the cumulative balance for April, May, and June is 500 kg, 200 ko, and 2200 ko, respectively, in the same way as above.
becomes.

ここで、織物eの注文があると、その納期指標区分は4
月となる。このとき、4月及び6月の累計残はそれぞれ
500 ko及び2200koであり、必要1400k
aより多いが、5月の累計残が200 kgであり、必
要量より少ないので、納期指標区分を5月へずらす。し
かしこの状態でも、5月の累計残が必要Mよりも少なく
、納期指標区分である5月から最終区分である6月まで
のすべての区分が必要mよりも多いという条件を満たさ
ないので、さらに、納期指標区分を6月へずらす。する
と、6月の累計残は必要量よりも多いので、納期指標区
分である6月のアウトプット量の欄へ必要ff1400
koを登録する。
Here, if there is an order for fabric e, its delivery date index classification is 4.
Becomes the moon. At this time, the cumulative balance for April and June is 500 ko and 2200 ko, respectively, and the required 1400 ko
Although it is more than A, the cumulative balance in May is 200 kg, which is less than the required amount, so the delivery date indicator category is shifted to May. However, even in this state, the cumulative balance in May is less than the required M, and the condition that all categories from the delivery date index category of May to the final category of June are greater than the required m is not satisfied. , the delivery date indicator category will be shifted to June. Then, the cumulative balance for June is greater than the required amount, so the required ff1400 is entered in the June output amount column, which is the delivery date indicator category.
Register ko.

このように、納期指標区分から最終区分までのすべての
区分のそれぞれの累計残がその原糸の必要量以上である
ことを条件として、その納期指標区分に必要量をアウト
プット量として登録することの技術的意味は次のことに
ある。例えば、上記の場合、織物eの注文があったとき
に、4月の累計残が500 kaであり、必要量の40
0kOよりも多いので、4月のアウトプット量の欄に必
要量を登録すると、このことによって、5月に製造を開
始する予定の織物dに必要な原糸が不足してしまうとい
う不都合が生じる。
In this way, on the condition that the cumulative balance of all categories from the delivery date indicator category to the final category is greater than or equal to the required amount of yarn, the required amount can be registered as the output amount for that delivery date indicator category. The technical meaning of is as follows. For example, in the above case, when there is an order for fabric e, the cumulative balance in April is 500 ka, and the required amount is 40 ka.
Since it is more than 0 kO, if you register the required amount in the April output amount column, this will cause the inconvenience that there will be a shortage of raw yarn necessary for fabric d, which is scheduled to start production in May. .

このような不都合は、納期指標区分から最終区分までの
すべての区分において累計残がその原糸の必要量以上で
ある場合だけその区分にアウトプット量として登録する
ことによって防ぐことができる。
This kind of inconvenience can be prevented by registering the amount of output in all categories from the delivery date index category to the final category only when the cumulative balance is greater than or equal to the required amount of yarn in that category.

このようにしてアウトプット堡の登録された区分がそれ
ぞれの織物に必要な原糸のバランスポジションとなり、
これが各原糸所要量ファイル(12)に登録される。そ
してこのバランスポジションが織物の最適な製造開始日
の属する区分となる。この場合、織物eについては、納
期に間に合わないことがわかり、この場合は、布中に出
回っている原糸を買う等の入荷指図を行なって、原糸を
補うことによって納期に間に合うように製造することが
できる。
In this way, the registered classification of the output area becomes the balance position of the raw yarn required for each textile,
This is registered in each yarn requirement file (12). This balance position then becomes the category to which the optimal manufacturing start date of the textile belongs. In this case, it turns out that fabric e will not be able to meet the delivery date.In this case, we will instruct the fabric to arrive in time, such as by purchasing the raw yarn that is available in the fabric, and supplement the raw yarn so that it can be manufactured in time for the delivery date. can do.

本実施例においては、製造開始時期を製造開始日とし、
日を単位として求めているが、例えば、時間を単位とし
て、また、週を単位として求めることもできる。
In this example, the manufacturing start time is the manufacturing start date,
Although the calculation is performed in units of days, it is also possible to calculate in units of hours or weeks, for example.

なお第3図〜第5図は原糸台帳ファイル(11)、原糸
所要量ファイル(12)、原糸バランスファイル(10
3)の構成の説明を容易にするために描かれたものであ
り、実際には、前記の内容が補助記憶装置(2)に記憶
されている。
Figures 3 to 5 show the yarn ledger file (11), the yarn requirement file (12), and the yarn balance file (10).
3) is drawn to facilitate explanation of the configuration; in reality, the above contents are stored in the auxiliary storage device (2).

[発明の効果] 以上詳述したように、本発明の装置によると、織物また
はIQ織製品を受注生産するにあたって、客先が望む製
品の納期、製造に要する期間、その製造に必要な原糸の
入荷納期等を逐次入力することによって、それぞれの織
物または編物製品の最適な製造開始時期をリアルタイム
に正確に決定することができ、このことによって、その
製品について実際に可能な納期が求まる。したがってそ
れにもとづいて、原糸の入荷の指図や前記製品の受注等
を適切に行うことができる。
[Effects of the Invention] As detailed above, according to the apparatus of the present invention, when fabrics or IQ woven products are made to order, the delivery date of the product desired by the customer, the period required for manufacturing, and the raw yarn necessary for the manufacturing can be adjusted. By sequentially inputting the arrival and delivery date of each item, the optimal production start time for each woven or knitted product can be accurately determined in real time, and thereby the actually possible delivery date for that product can be determined. Therefore, based on this information, it is possible to appropriately instruct the arrival of raw yarn, accept orders for the products, and the like.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は、本発明の詳細な説明するためのブロック図、 第2図は、本発明の一実施例の装置を示すブロック図、 第3図は、原糸台帳ファイルを示す図、第4図は、原糸
所要量ファイルを示す図、第5図は、原糸バランスファ
イルを示す図、第6図は、従来の原糸バランス表を示す
図である。 符号の説明 (101)・・・原糸台帳入力手段 (102)・・・原糸所要量入力手段 (103)・・・原糸バランスファイル(104)・・
・インプット更新手段 (105)・・・アウトプット更新手段(106)・・
・累計残更新手段 (11)・・・・・・原糸台帳ファイル(12)・・・
・・・原糸所要量ファイル(1)・・・・・・マイクロ
コンピュータ(2)・・・・・・補助記憶装置 (3)・・・・・・入力装置 (4)・・・・・・表示装置
FIG. 1 is a block diagram for explaining the present invention in detail. FIG. 2 is a block diagram showing an apparatus according to an embodiment of the present invention. FIG. 3 is a diagram showing a yarn ledger file. 5 is a diagram showing a yarn requirement file, FIG. 5 is a diagram showing a yarn balance file, and FIG. 6 is a diagram showing a conventional yarn balance table. Explanation of symbols (101)... Yarn ledger input means (102)... Yarn required amount input means (103)... Yarn balance file (104)...
・Input update means (105)...Output update means (106)...
・Cumulative remaining update means (11)... Yarn ledger file (12)...
... Yarn requirement file (1) ... Microcomputer (2) ... Auxiliary storage device (3) ... Input device (4) ...・Display device

Claims (1)

【特許請求の範囲】 1、次のa)〜f)の要素からなることを特徴とする織
物または編物製品の製造開始時期の決定装置。 a)入荷指図があつた原糸について、その原糸の種類、
入荷指図量および入荷量、出荷量、及び、入荷納期およ
び入荷日を原糸台帳ファイルに逐次入力する原糸台帳入
力手段 b)製造指図があつた前記製品について、その製品に必
要な原糸の種類、その必要量、製品の納期および製品の
製造に要する期間を原糸所要量ファイルに逐次入力する
原糸所要量入力手段 c)一定期間を一定日数ずつの区分に区切って原糸の種
類別に、原糸の入荷指図量または入荷量と出荷量との差
を所定の区分にインプット量として登録し、前記製品の
製造に必要な原糸の必要量を所定の区分にアウトプット
量として登録し、各区分において、その区分までのイン
プット量の合計とその区分までのアウトプット量の合計
との差を累計残として登録した原糸バランスファイル d)前記原糸台帳ファイルが更新されると、それにもと
づいて、原糸バランスファイルにおいて、未入荷の原糸
については入荷納期の属する区分にその入荷指図量を、
入荷済みの原糸については入荷日の属する区分にその入
荷量と出荷量との差をインプット量として登録するイン
プット更新手段 e)前記原糸所要量ファイルが更新されると、それにも
とづいて、原糸バランスファイルにおいて、各原糸につ
いて、その原糸を使用する製品の納期から製造に要する
期間だけ遡つた日の属する区分を納期指標区分としかつ
現時点から所定期間後の区分を最終区分とし、納期指標
区分から最終区分までのすべての区分のそれぞれの累計
残がその原糸の必要量以上であることを条件として、そ
の納期指標区分に必要量をアウトプット量として登録し
、前記条件を満さない場合には、最終区分を限度として
前記条件を満すまで納期指標区分を一つずつ後の区分へ
ずらし、前記条件を満した場合にはその納期指標区分に
必要後をアウトプット量として登録し、前記条件を満さ
ない場合には最終区分に必要量をアウトプット量として
登録するアウトプット更新手段 f)前記インプット量及びアウトプット量が更新される
と、それにもとづいて、原糸バランスファイルにおいて
、各区分の累計残を更新する累計残更新手段
[Scope of Claims] 1. A device for determining when to start manufacturing a woven or knitted product, characterized by comprising the following elements a) to f). a) Regarding the raw yarn for which receiving instructions have been given, the type of yarn,
Yarn ledger input means for sequentially inputting the received instruction amount, received amount, shipped amount, received delivery date, and received date into the yarn ledger file b) For the above-mentioned product for which a manufacturing instruction has been given, the amount of yarn necessary for that product. Yarn requirement input means that sequentially inputs the type, its required amount, product delivery date, and time required for manufacturing the product into a yarn requirement file c) Divide a certain period into sections of a certain number of days and divide by type of yarn. , the incoming quantity of yarn or the difference between the incoming quantity and the shipped quantity is registered as an input quantity in a predetermined category, and the required quantity of yarn necessary for manufacturing the product is registered as an output quantity in a predetermined category. , for each division, a yarn balance file in which the difference between the total amount of input up to that division and the total amount of output up to that division is registered as the cumulative balance d) When the yarn ledger file is updated, Based on this, in the yarn balance file, for yarn that has not yet arrived, the amount of arrival instructions is entered in the category to which the arrival delivery date belongs.
Input updating means for registering the difference between the received amount and the shipped amount as the input amount in the category to which the received date belongs for the yarn that has already arrived e) When the yarn requirement file is updated, the raw yarn is In the yarn balance file, for each raw yarn, the classification that belongs to the date that goes back by the period required for manufacturing from the delivery date of the product using the raw yarn is set as the delivery date index classification, and the classification after a specified period from the current time is the final classification, and the delivery date is set as the final classification. Provided that the cumulative balance of all categories from the index category to the final category is greater than or equal to the required amount of yarn, the required amount is registered as the output amount in that delivery date index category, and the above conditions are met. If not, shift the delivery date index category one by one to the next category until the above conditions are met, using the final category as the limit, and if the above conditions are met, register the required amount in that delivery date index category as the output amount. and, if the above conditions are not met, an output update means for registering the required amount as an output amount in the final classification. , a cumulative balance update means for updating the cumulative balance of each category.
JP60150845A 1985-07-08 1985-07-08 Deciding device for manufacturing start time of textile goods or knitted goods Granted JPS6210759A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP60150845A JPS6210759A (en) 1985-07-08 1985-07-08 Deciding device for manufacturing start time of textile goods or knitted goods

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP60150845A JPS6210759A (en) 1985-07-08 1985-07-08 Deciding device for manufacturing start time of textile goods or knitted goods

Publications (2)

Publication Number Publication Date
JPS6210759A true JPS6210759A (en) 1987-01-19
JPH0355853B2 JPH0355853B2 (en) 1991-08-26

Family

ID=15505634

Family Applications (1)

Application Number Title Priority Date Filing Date
JP60150845A Granted JPS6210759A (en) 1985-07-08 1985-07-08 Deciding device for manufacturing start time of textile goods or knitted goods

Country Status (1)

Country Link
JP (1) JPS6210759A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04134559A (en) * 1990-09-26 1992-05-08 Kanebo Ltd Raw material ordering system
US5771172A (en) * 1990-04-28 1998-06-23 Kanebo, Ltd. Raw materials ordering system

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5771172A (en) * 1990-04-28 1998-06-23 Kanebo, Ltd. Raw materials ordering system
US5914878A (en) * 1990-04-28 1999-06-22 Kanebo, Ltd. Raw materials ordering system
US7197481B1 (en) 1990-04-28 2007-03-27 Kanebo Trinity Holdings, Ltd. Flexible production and material resource planning system using sales information directly acquired from POS terminals
JPH04134559A (en) * 1990-09-26 1992-05-08 Kanebo Ltd Raw material ordering system

Also Published As

Publication number Publication date
JPH0355853B2 (en) 1991-08-26

Similar Documents

Publication Publication Date Title
US20090132570A1 (en) Cost Element Managing System
JPS6210759A (en) Deciding device for manufacturing start time of textile goods or knitted goods
US20130268323A1 (en) Data processing system for pricing, costing and billing of financial transactions
JPS62224561A (en) Work load display system
JP2002240949A (en) Method and device for supporting storage/deivery and inventory control, storage medium and program
JPH0675975A (en) Production schedule method
JP2847275B2 (en) Delivery management system for coiled products
JP3296318B2 (en) Demand forecasting method, demand forecasting device, and storage medium storing demand forecasting program
JP2001076082A (en) System and method for optimizing distribution flow
JPH08241353A (en) Stocking plan support device
JPH0830685A (en) Method for generating arrow diagram load master by machine kind
JP2000047712A (en) Demand display method enabling multiple buckets
JP2022044521A (en) Daily cash flow chart output system and program
Fry et al. Bi-criterion single-machine scheduling with forbidden early shipments
JP3143413U (en) Evaluation balance management system for added elements in import customs declaration
Stanley On the frequency of Friday the thirteenth
JPH0512303A (en) Production control method for iron and steel industry
JPS62152658A (en) Due date management and process device
Nagovitsin The management structure of a production association
CN109767254A (en) A kind of method of cost accounting
JPH04311258A (en) Production scheduling device
JPH0877250A (en) Steel material production control system in steel industry
Schwenk Employment cost index rebased to June 1989
JP2000117568A (en) Assembling process design system
JP2001117970A (en) Device for preparing report of corporation tax/local tax corresponding to direct entry