JPS6192221A - Method of installing isolator serving as earthquake-proof measure - Google Patents

Method of installing isolator serving as earthquake-proof measure

Info

Publication number
JPS6192221A
JPS6192221A JP21218984A JP21218984A JPS6192221A JP S6192221 A JPS6192221 A JP S6192221A JP 21218984 A JP21218984 A JP 21218984A JP 21218984 A JP21218984 A JP 21218984A JP S6192221 A JPS6192221 A JP S6192221A
Authority
JP
Japan
Prior art keywords
isolator
concrete
base plate
frame
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP21218984A
Other languages
Japanese (ja)
Inventor
Takeaki Oota
武昭 太田
Akira Wakatsuki
若月 昭
Takashi Yokoyama
隆司 横山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Unitika Ltd
Original Assignee
Unitika Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Unitika Ltd filed Critical Unitika Ltd
Priority to JP21218984A priority Critical patent/JPS6192221A/en
Publication of JPS6192221A publication Critical patent/JPS6192221A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/34Foundations for sinking or earthquake territories

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Foundations (AREA)
  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

PURPOSE:To decrease acceleration of response of a building, by a method wherein, after the foundation of a frame is concreted in a concrete foundation board to form a support stand, an isolator is secured, and an upper base plate is secured thereon. CONSTITUTION:Frames 9 are assembled on a foundation 3, concrete is placed in a manner that the foundation of the frames 9 is buried to form a concrete foundation board 20. Forms 21 are assembled on the foundation board 20, concrete is placed to form a support stand 22, and an isolator 2 is placed for securing. An upper base plate 24 is secured to a top plate 6 of the isolator 2, forms 27 for forming an upper structure are temperarily set to build the upper structure 1. This enables increase of the mounting strength of the isolator, and permits to provide sufficient holding strength against large earthquake.

Description

【発明の詳細な説明】 産業上針U粉纂□ 本発明は建築物とその基礎の間に設置されて、地盤から
建築物に伝わる地震エネルギーを減少させるアイソレー
タの設置方法に関する。 JLLΔ皮貫 建築物の地震による破壊を防止する構造の1つとして、
第1図に呆すように上部構造体である建築物(1)をア
イソレータ(2)を介して、下部構造体である建築物の
基礎(3)の上に載置支持するものがある。なおこのア
イソレータ(2)は建築物(1)とその基礎(3)の間
の複数箇所に配置されている。上記アイソレータ(2)
は第2図及び第3図に示すように、鋼板等の剛性板(4
)(4)−・と天然ゴムやネオプレンゴム等の薄い弾性
板(5)(5)−を交互に重ね合せ、各々を接着固定し
て形成したものである。図示したアイソレータ(2)は
両端の剛性板(4’)  (4”)をフランジ付きのも
のとし、これに重ね合わせた正方形の天板(6)及び底
板(7)にフランジを利用してボルト(8)(8)・−
・で締着している。このアイソレータ(2)は剛性板(
4)(4)−の間に薄い弾性板(5)(5)・−が挾ま
れているので、大きな鉛直載荷能力とゴムのせん断変形
による小さな水平バネ剛性を持っている。従って重量物
である上部構造体(1)を安定性良く支え、水平方向の
動きを弱いバネで規制したことになる。このように支持
すると、構造体の系全体の水平方向の振動周期を増大さ
せ、それを地震の最大エネルギー成分の周期よりも大き
くする。従って地震発生時の地盤からの入力に対する建
築物の応答加速度を減少させ、建築物を地震から保護す
ることができる。 溌息友邂訣↓jah−1A」11点 上記アイソレータを実際の建築物に設置するには、次に
列挙する課題を解決する必要がある。 第1に建築物は大重量で振動時に大きな動きをするもの
であるから、アイソレータの取付強度を大きく取らなけ
ればならない。 第2に設置工程を簡略化するため、アイソレータ自体を
建築物又はその基礎の一部分として施工時に同時に組み
付けることができる工法が望まれる。 第3にアイソレータは長年月にわたって使用するもので
あるから、取付構造の外気に蝕れる金属部分を極力小さ
くすることが望まれる。 第4に免震作用の結果及び経年変化によりアイソレータ
が劣化した場合に取換えできるようにしなければならな
い。 第5に容易にアイソレータを取換えできるように、上部
構造体を大きく持ち上げなくても、アイソレータを水平
方向にスライドさせて取や外せるようにすることが望ま
れる。 、占  ° るた の 本発明は上記課題を解決できるアイソレータの設置方法
を提供するものである。 すなわち本1発明は複数枚の剛性板と一枚以上の弾性板
とを交互に重ね合わせて形成したアイソレータを上部構
造体と下部構造体の間に設置する方法であって、アイソ
に一部の取付は用のナツト部材を上端に突出形成したフ
レームの根部を下部構造体であるコンクリート基礎盤内
にコンクリート打ちする工程、コンクリート基礎盤から
上方に突出しケフレームの周囲に型枠を設はナット部材
の上端面のみが露呈する高さでフレームを覆うようにコ
ンクリートを打込んで受台を形成する工程、受台の上に
アイソレータを載せアイソレータの底板を取付用ボルト
でナット部材に締着固定する工程、上方に脚体が突出形
成され下面に開口する雌ネジが形成された上部ベースプ
レートをアイソレータ上に重ね1、アイソレータ側から
上部ベースプレートの雌ネジに蝮装した取付用ボルトに
よって上部ベースプレートをアイソレータの天板に締着
固定する工程、及び上部構造体形成用の型枠を上部ベー
スプレートがその底面の一部を形成するように仮設し上
部構造体の鉄筋を組立てた後上部ベースプレートの脚体
が埋込まれる状態で上部構造体をコンクリート打ちによ
り形成する工程を含、む免震用アイソレータの設置方法
である。 皇胤皿 本発明によるアイソレータの設置方法及び設置後のアイ
ソレータの取換え方法について第4図乃至第20図を参
照しながら工程順に従って以下説明する。 まず、第4図に示すように基礎(3)上にフレーム(9
)を組立てる。この組立ての手順は次のようである。 まず第1図に示す構造における基礎杭(10)の打ち込
み、割石(11)の敷設、及び捨てコンクリート(12
)の打ち込みまでの工程が終了した状態で、断面り字状
の形鋼よりなる四本の支柱(13)  (13)−・を
基礎杭(10)の上部位置で捨てコンクリート(12)
内に部分打ち込みする、次に支柱(13)  (13)
−・の墨出しをしておき、鋼棒(14)  (14)−
を用いて、支柱(13)(13) −を取り囲む井桁部
分と井桁部分上に渡された桁部分とからなるベース配筋
(15)を組付ける。次に屈曲形状の多数本の調筋(1
6)(16)−・−をベース配筋(15)から下方に延
びるように組合せ配置して補強筋(17)を組立てる、
次に各支柱(13)  (13)−の鉛直度、ベース配
筋(15)の水平度及び各部の寸法をチェックした後、
ベースプレー) (18) ヲベース配筋(15)上に
取付ける。このブースプレート(1B)の上面四隅には
ナツト部材である袋ナツト(19)(19) −が固着
されている0以上によってフレーム(9)の組立てが終
了するが、各部分は全て溶接により固着される。このフ
レーム(9)の機能は、後、述する受台の鉄筋となると
同時に、上方に突出形成した雌ネジを有するナット部材
を強固に支持することで、上記以外の構造にすることも
できる。 次に第5図に示すようにフレーム(9)の根部を埋込む
ようにしてコンクリートを打ち込み、コンクリート基礎
盤(20)を形成する。 コンクリート基礎盤(20)が乾けば第6図に示すよう
にコンクリート基礎盤(20)の上に突出したフレーム
(9)の上部を囲むようにして受台形成用の型枠(21
)を組立てる。 次にこの型枠(21)内にコンクリートを流し込み、フ
レーム(9)の上部に固設したナツト部材である袋ナツ
ト(19)  (19)−・の上面のみが露呈する高さ
で水平面に均らす。この作業時には袋ナラ) (19)
  (19) −・の上面を保護材で覆って、雌ネジ内
にコンクリートが流れ込まないようにする。流し込んだ
コンクリートの上面を養生し、このコンクリートが硬化
して受台(22)が形成されると、第7図に示すように
型枠(21)を解体して取り外す。 次に第8図に示すように四本の支柱(13)(13) 
−・−の受台(22)からの突出部を切断除去し、ナッ
ト部材である袋ナツト(19)  (19)−・の雌ネ
ジ内部を倉入りに清掃する。 次に第9図に示すように、受台(22)上にアイソレー
タ(2)を載置し、取付用ボルト(23)(23) −
・でアイソレータの底板(7)をナツト部材である袋ナ
ット(19)  (19)−・に締着固定する。このと
き袋ナツト(19)  (19)・−の雌ネジ内には取
付用ボルト(23)  (23)−・−の錆付きを防ぐ
ためグリースを充填しておく。 次にアイソレータ(2)の天板(6)を倉入りに清掃し
た後、第10図に示すように、上部ベースプレート(2
4)を、アイソレータ(2)の天板(6)の上に重ね、
アイソレータの天板(6)に図示しない取付用ボルトに
より締着固定する。この上部ベースプレー) (24)
は上面に多数の脚体(25)  (25)−・−・が突
出形成され、下面に開口する袋ナット(26)  (2
6)−−−m−等よりなる雌ネジが形成されている。取
付用ボルトはアイソレータの天板(6)の貫通孔を通し
て上部ベースプレー) (24)の防錆用のグリースが
充填された雌ネジに甥装される。 次に第11図に示すように上部構造体形成用の型枠(2
7)を、上部ベースプレート(24)がその底面の一部
を形成するように仮設する。(28)は型枠(27)の
底板部、(29)は底板部(28)が撓むのを防止する
支持脚である。上部構造体(1)の図示しない地中梁お
よび1階スラブの鉄筋組立を行った後、コンクリートを
打ち込み、このコンクリートが乾いた後に、この枠体(
27)を取り外すと、第12図に示すようにアイソレー
タ(2)廻りの工事が完了する。 上記工程によって設置されたアイソレータ(2)は、容
易に取替えることができる。以下取替え工程について説
明する。 まず取り換えの準備として第13図に示すように保護用
の木製の版(30)を下に敷いて枕木(32)  (3
2)を下部構造体(3)と上部構造体(1)の間に置き
、くさび形状のキャンバ−4(32)  (32)の先
端を枕木(31)  (31)と版(30)の間に揮し
込む。 次に第14図に示すように保護用の木製の版(33) 
 (33)を両端に挟んだ状態でジヤツキ(34)を上
部構造体(1)と下部構造体(3)の間に置く。そして
アイソレータ(2)を上部構造体(1)に固定している
取付用ボルト(図示せず)を取り外した後、ジヤツキ(
34)を油圧ポンプ(手動)にて徐々に上昇させる。約
2cm〜3C111位上部構造体(1)を上昇させた時
点で、キャンバ−(32)  (32) G打込む。こ
れによって上部構造体(1)は枕木(31)  (31
)によって支持されるようになる。この状態で上部構造
体(1)が安定していることをmiした後、アイソレー
タ(2)を下部構造体(3)の受台(22)に固定して
いる取付用ボルト(23)  (23)・−・を取り外
す。 次に第15図に示すように受台(22)上面のコンクリ
ート部分を2〜30程度ベースプレート(18)が露呈
するように折りとばし、アイソレータ(2)を取り外す
。この取り外し時にアイソレータ(2)はベースプレー
ト(18)に固着された袋ナラ) (19)  (19
)−・−の上面とのみ接するので、アイソレータ(2)
を水平方向にスライドさせるのは容易である。 次に折りとばし部分に付着しているコンクリートの破片
等を取り除き、交換用の新しいアイソレータ(2)を交
換前のアイソレータと同じ位置にセットする。そして新
しいアイソレータ(2)を受台(22)の袋ナツト(1
9)  (19)・−・に取付用ボルト(23)  (
23)−・で仮締めし、さらに上部構造体(1)とも取
付用ボルトで仮締めする。なおこのとき防錆用のグリー
スをネジ孔内に封入しておく。この後受台(22)の周
囲に第16図に示すように型枠(35)を配置し、受台
(22)の折りとばした部分にコンクリートを注入して
受台(22)が元の形状になるように整形する。 コンクリートが硬化すれば第17図に示すように型枠(
35)を撤去する。 次にジヤツキ(34)を油圧ポンプ(手動)にて伸張さ
せ、上部構造体(1)の支持を枕木(31)  (31
)からジヤツキ(34)に代行させ、キャンバ―(32
)  (32)を第18図に示すように引き抜く。 さらに第19図に示すように枕木(31)  (31)
、キャンバ−(32)  (32)及び版(3o)を取
り除き、ジヤツキ(34)を収縮させて上部構造体(1
)をアイソレータ′(2)に支持させ、アイソレータ(
2)上下の取付′ボルト(23)  (2’3)・−・
を・本締めする。     次に第20図に示すようにジヤツキ(34)を版(33
)  (33)とともに撤去した後、受台(22)及び
アイソレータ(2)廻りを清掃してアイソレータ(2)
の取り換えが完了する。 発!皮班来 本発明のアイソレータの取付構造はアイソレータを取り
付は固定する上部構造体側及び下部構造体側の雌ネジが
コンクリート内に埋込まれた鉄筋等によって強固に保持
されているので、アイソレータの取付強度を大きくとる
ことができ、大地震に対しても充分な保持強度を保てる
。 また本発明によるアイソレータの設置は、下部構造体で
ある建築物の基礎の上に上部構造体である地中梁及び−
階スラブを形成する工程中に行うことができるから、建
設中に他の仮支持体を用い上部構造体の完成後にアイソ
レータを取付けるといったような面倒な工法を採用する
必要がない。 また本発明の取付構造は上部構造体側及び下部構造体側
の外面に露呈する金属部分が小さく、アイソレータを取
付ると、その露呈部分がアイソレータによって覆われて
しまうので、腐食しにくく長年月にわたる使用が保証で
きる。 また本発明の取付構造は、下部構造体側に受台が突出形
成され、受金内のフレームはナット部材である袋ナツト
が上方に突出した形状であるので、受台の上部コンクリ
ートを折りとばし、アイソレータの底板がナット部材の
上面にのみ接触した状態で交換を行うことができる。す
なわち上部構造体のジヤツキアップ量が小さくても、ア
イソレータを水平方向にスライドさせたときの接触抵抗
が小さく、小ストロークのジヤツキで容易に交換を行う
ことができる。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a method for installing an isolator that is installed between a building and its foundation to reduce seismic energy transmitted from the ground to the building. As one of the structures to prevent the destruction of JLLΔ skin-pierced buildings due to earthquakes,
As shown in FIG. 1, there is a structure in which a building (1), which is an upper structure, is placed and supported on a foundation (3) of a building, which is a lower structure, via an isolator (2). Note that the isolators (2) are arranged at multiple locations between the building (1) and its foundation (3). The above isolator (2)
As shown in Figures 2 and 3, rigid plates such as steel plates (4
) (4) -- and thin elastic plates (5) (5) -- made of natural rubber, neoprene rubber, etc. are alternately stacked and fixed by adhesive. The illustrated isolator (2) has rigid plates (4') (4'') on both ends with flanges, and the flanges are used to bolt bolts to the square top plate (6) and bottom plate (7) superimposed on these. (8) (8)・-
・It is fastened with. This isolator (2) is a rigid plate (
4) Since the thin elastic plates (5) (5) and - are sandwiched between (4) and -, it has a large vertical loading capacity and a small horizontal spring stiffness due to shear deformation of the rubber. Therefore, the heavy upper structure (1) is supported with good stability, and its movement in the horizontal direction is restricted by weak springs. Such support increases the horizontal vibration period of the entire system of structures, making it greater than the period of the maximum energy component of the earthquake. Therefore, the response acceleration of the building to input from the ground during an earthquake can be reduced, and the building can be protected from the earthquake. 11 points In order to install the above isolator in an actual building, it is necessary to solve the following problems. First, since buildings are heavy and move a lot when vibrating, the mounting strength of the isolator must be increased. Secondly, in order to simplify the installation process, a construction method is desired in which the isolator itself can be assembled into a building or as part of its foundation at the same time as construction. Thirdly, since the isolator is used for many years, it is desirable to minimize the metal parts of the mounting structure that are corroded by the outside air. Fourthly, it must be possible to replace the isolator when it deteriorates as a result of seismic isolation or aging. Fifth, in order to easily replace the isolator, it is desirable to be able to remove the isolator by sliding it horizontally without having to lift the upper structure significantly. The present invention by Uruta provides an isolator installation method that can solve the above problems. That is, the present invention 1 is a method of installing an isolator formed by alternately stacking a plurality of rigid plates and one or more elastic plates between an upper structure and a lower structure, Installation is a process of pouring concrete into the concrete foundation board that is the lower structure at the root of the frame with a nut member protruding from the upper end, and a formwork is installed around the frame to protrude upward from the concrete foundation board. The process of forming a pedestal by pouring concrete to cover the frame at a height where only the top end surface is exposed, placing the isolator on top of the pedestal, and securing the bottom plate of the isolator to the nut member with mounting bolts. In the process, the upper base plate, which has legs protruding from above and female threads opening from the bottom, is stacked on top of the isolator. After the process of fastening and fixing to the top plate, and the temporary construction of the formwork for forming the upper structure so that the upper base plate forms a part of its bottom surface, and the assembly of the reinforcing bars of the upper structure, the legs of the upper base plate are buried. This is a method for installing a seismic isolation isolator, which includes the step of forming a superstructure by pouring concrete in a state in which the seismic isolator is installed. A method for installing an isolator according to the present invention and a method for replacing the isolator after installation will be described below in the order of steps with reference to FIGS. 4 to 20. First, as shown in Figure 4, place the frame (9) on the foundation (3).
) assemble. The assembly procedure is as follows. First, in the structure shown in Figure 1, the foundation piles (10) are driven, the split stones (11) are laid, and the concrete (12
) are completed, the four pillars (13) (13)-- made of steel sections with a cross-section are discarded at the top of the foundation pile (10) and concrete (12) is placed.
Partially drive inside, then post (13) (13)
-. Mark out the steel bar (14) (14) -
Assemble the base reinforcement (15), which consists of a parallel cross section surrounding the pillars (13) (13) and a cross girder section extending over the double cross section. Next, a large number of bending bars (1
6) Assemble the reinforcing bars (17) by combining and arranging (16) --- to extend downward from the base reinforcement (15).
Next, after checking the verticality of each pillar (13) (13)-, the horizontality of the base reinforcement (15), and the dimensions of each part,
Base play) (18) Install on the base reinforcement (15). Cap nuts (19) (19) -, which are nut members, are fixed to the four corners of the upper surface of this booth plate (1B).The assembly of the frame (9) is completed by 0 or more, but all parts are fixed by welding. be done. The function of this frame (9) is to serve as a reinforcing bar for the pedestal, which will be described later, and at the same time to firmly support a nut member having a female screw formed protruding upward, so that it can also have a structure other than the above. Next, as shown in FIG. 5, concrete is poured so as to embed the roots of the frame (9) to form a concrete foundation (20). Once the concrete foundation (20) is dry, as shown in Figure 6, a formwork (21) for forming a pedestal is placed around the upper part of the frame (9) protruding above the concrete foundation (20).
) assemble. Next, concrete is poured into this formwork (21), and the cap nut (19), which is a nut member fixed on the top of the frame (9), is leveled on a horizontal surface at a height that only the top surface of the nut (19) is exposed. Ras. During this work, empty the bag) (19)
(19) Cover the top surface of - with a protective material to prevent concrete from flowing into the female thread. The upper surface of the poured concrete is cured, and when the concrete hardens to form the pedestal (22), the formwork (21) is dismantled and removed as shown in FIG. Next, as shown in Figure 8, the four pillars (13) (13)
Cut and remove the protruding parts from the pedestals (22) of -, and thoroughly clean the insides of the female threads of the cap nuts (19) (19), which are nut members. Next, as shown in Fig. 9, place the isolator (2) on the pedestal (22) and attach the mounting bolts (23) (23) -
- Tighten and fix the bottom plate (7) of the isolator to the cap nut (19) (19) - which is a nut member. At this time, fill the internal threads of the cap nuts (19) (19) with grease to prevent the mounting bolts (23) (23) from rusting. Next, after thoroughly cleaning the top plate (6) of the isolator (2), as shown in FIG.
4) on the top plate (6) of the isolator (2),
Tighten and fix to the top plate (6) of the isolator using mounting bolts (not shown). This upper base play) (24)
The cap nut (26) (2) has a large number of protruding legs (25) (25) on the upper surface and opens on the lower surface.
6) A female thread made of ---m-, etc. is formed. The mounting bolt passes through the through hole in the top plate (6) of the isolator and is attached to the female thread of the upper base plate (24) filled with anti-rust grease. Next, as shown in Fig. 11, a mold for forming the upper structure (2
7) is temporarily installed such that the upper base plate (24) forms part of its bottom surface. (28) is a bottom plate portion of the formwork (27), and (29) is a support leg that prevents the bottom plate portion (28) from bending. After assembling the reinforcing bars for the underground beams (not shown) and the first floor slab of the superstructure (1), concrete is poured, and after this concrete has dried, this frame (
27), the work around the isolator (2) is completed as shown in FIG. The isolator (2) installed by the above process can be easily replaced. The replacement process will be explained below. First, in preparation for replacement, as shown in Figure 13, a protective wooden block (30) is placed underneath the sleeper (32) (3
2) between the lower structure (3) and the upper structure (1), and place the tip of the wedge-shaped camber 4 (32) (32) between the sleeper (31) (31) and the plate (30). to incorporate it into. Next, as shown in Figure 14, a protective wooden plate (33) is made.
A jack (34) is placed between the upper structure (1) and the lower structure (3) with the jack (33) sandwiched between both ends. Then, after removing the mounting bolts (not shown) fixing the isolator (2) to the upper structure (1), the jacks (
34) is gradually raised using a hydraulic pump (manual). When the upper structure (1) is raised approximately 2 cm to 3 C111, drive the camber (32) (32) G. As a result, the upper structure (1) is connected to the sleepers (31) (31
) will be supported by After confirming that the upper structure (1) is stable in this state, the mounting bolt (23) fixing the isolator (2) to the pedestal (22) of the lower structure (3) (23 )・-・. Next, as shown in FIG. 15, the concrete portion on the upper surface of the pedestal (22) is folded off by about 2 to 30 degrees to expose the base plate (18), and the isolator (2) is removed. At the time of this removal, the isolator (2) is attached to the base plate (18) (19) (19
)−・−, so the isolator (2)
It is easy to slide horizontally. Next, remove any concrete fragments etc. adhering to the folded part, and set a new isolator (2) for replacement in the same position as the isolator before replacement. Then, attach the new isolator (2) to the cap nut (1) of the pedestal (22).
9) Attach the mounting bolts (23) to (19)...
23) Temporarily tighten with -., and then temporarily tighten with mounting bolts on the upper structure (1). At this time, seal the screw hole with anti-rust grease. After this, formwork (35) is placed around the pedestal (22) as shown in Figure 16, and concrete is poured into the folded part of the pedestal (22) so that the pedestal (22) returns to its original state. Shape it to fit the shape. Once the concrete has hardened, formwork (
35) will be removed. Next, the jack (34) is extended using a hydraulic pump (manual) to support the upper structure (1) with the sleeper (31) (31
) to Jyatsuki (34), and camber (32)
) Pull out (32) as shown in Figure 18. Furthermore, as shown in Figure 19, sleepers (31) (31)
, the camber (32) (32) and the plate (3o) are removed, the jack (34) is retracted and the upper structure (1) is removed.
) is supported by isolator ′(2), and isolator (
2) Upper and lower mounting bolts (23) (2'3) ---
・Final tighten. Next, as shown in Figure 20, the jack (34) is
) After removing it together with (33), clean the area around the pedestal (22) and the isolator (2), and remove the isolator (2).
The replacement has been completed. Depart! Since the isolator mounting structure of the present invention is such that the female screws on the upper structure side and the lower structure side that fix the isolator are firmly held by reinforcing bars embedded in concrete, it is easy to install the isolator. It can be strengthened and maintain sufficient strength even in the event of a major earthquake. Furthermore, the isolator according to the present invention is installed on the foundation of the building, which is the lower structure, on the underground beam, which is the upper structure, and -
Since this can be carried out during the step of forming the floor slab, there is no need to employ complicated construction methods such as using other temporary supports during construction and installing isolators after the superstructure is completed. In addition, the mounting structure of the present invention has a small metal part exposed on the outer surface of the upper structure side and the lower structure side, and when the isolator is attached, the exposed part is covered by the isolator, so it is less likely to corrode and can be used for many years. I can guarantee it. In addition, in the mounting structure of the present invention, the pedestal is formed protruding from the lower structure side, and the frame inside the pedestal has a shape in which a cap nut, which is a nut member, protrudes upward. Replacement can be performed with the bottom plate of the isolator contacting only the top surface of the nut member. That is, even if the amount of jacking up of the upper structure is small, the contact resistance when sliding the isolator in the horizontal direction is small, and the isolator can be easily replaced with a small stroke of jacking.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図はアイソレータを用いた免震構造を示す正面図、
第2図及び第3図はアイソレータの正面図及び平面図で
ある。第4図乃至第12図は夫々本発明のアイソレータ
の設置方法を、工程順に示す斜視図である。第13図乃
至第20図は夫々、本発明方法によって設置されたアイ
ソレータを取り換える方法を、工程順に示す斜視図であ
る。 (1) −・上部構造体(建築物)、(4”) −・剛
性板、(5) −・弾性板、(6)・−・天板、(7)
−底板、(9)・−・フレーム、(19) −・・ナツ
ト部材(袋ナツト)、(20) −・コンクリート基礎
盤、(21)・−・受台形成用の型枠、(22)・・・
・受台、(23)・−・取付用ボルト、(24)・−・
上部ベースプレート、(25)・−脚体、(26) −
雌ネジ(袋ナツト)、(27) −・・上部構造体形成
用の型枠。 #I 1図 ふ−10 第2図 w4 図 第5図
Figure 1 is a front view showing a seismic isolation structure using isolators.
FIGS. 2 and 3 are a front view and a plan view of the isolator. FIGS. 4 to 12 are perspective views showing the method of installing an isolator according to the present invention in the order of steps. FIGS. 13 to 20 are perspective views showing, in order of steps, a method for replacing an isolator installed by the method of the present invention. (1) - Upper structure (building), (4") - Rigid plate, (5) - Elastic plate, (6) - Top plate, (7)
- Bottom plate, (9) -- Frame, (19) -- Nut member (bag nut), (20) -- Concrete foundation board, (21) -- Formwork for forming a pedestal, (22) ...
・Case, (23)・−・Mounting bolt, (24)・−・
Upper base plate, (25) - Leg body, (26) -
Female screw (cap nut), (27) --- Formwork for forming the upper structure. #I Figure 1 F-10 Figure 2 w4 Figure 5

Claims (1)

【特許請求の範囲】[Claims] (1)複数枚の剛性板と一枚以上の弾性板とを交互に重
ね合わせて形成したアイソレータを上部構造体と下部構
造体の間に設置する方法であって、アイソレータの取付
け用のナット部材を上端に突出形成したフレームの根部
を下部構造体であるコンクリート基礎盤内にコンクリー
ト打ちする工程、コンクリート基礎盤から上方に突出し
たフレームの周囲に型枠を設けナット部材の上端面のみ
が露呈する高さでフレームを覆うようにコンクリートを
打込んで受台を形成する工程、受台の上にアイソレータ
を載せアイソレータの底板を取付用ボルトでナット部材
に締着固定する工程、上方に脚体が突出形成され下面に
開口する雌ネジが形成された上部ベースプレートをアイ
ソレータ上に重ね、アイソレータ側から上部ベースプレ
ートの雌ネジに螺装した取付用ボルトによって上部ベー
スプレートをアイソレータの天板に締着固定する工程、
及び上部構造体形成用の型枠を上部ベースプレートがそ
の底面の一部を形成するように仮設し上部構造体の鉄筋
を組立てた後上部ベースプレートの脚体が埋込まれる状
態で上部構造体をコンクリート打ちにより形成する工程
を含む免震用アイソレータの設置方法。
(1) A method in which an isolator formed by alternately stacking a plurality of rigid plates and one or more elastic plates is installed between an upper structure and a lower structure, the nut member for attaching the isolator The process of pouring concrete into the concrete foundation plate that is the lower structure by pouring concrete into the base of the frame, which is formed to protrude from the upper end of the frame, forms a formwork around the frame that protrudes upward from the concrete foundation plate, and only the upper end surface of the nut member is exposed. The process of pouring concrete to form a pedestal so as to cover the frame at a height, placing the isolator on the pedestal, and tightening and fixing the bottom plate of the isolator to the nut member with mounting bolts. The process of stacking the upper base plate, which is formed with a protruding female thread opening on the bottom surface, on the isolator, and fastening and fixing the upper base plate to the top plate of the isolator using a mounting bolt screwed into the female thread of the upper base plate from the isolator side. ,
Then, a formwork for forming the upper structure is temporarily constructed so that the upper base plate forms a part of its bottom surface, and after assembling reinforcing bars for the upper structure, the upper structure is concreted with the legs of the upper base plate embedded. A method for installing seismic isolation isolators that includes a process of forming by hammering.
JP21218984A 1984-10-09 1984-10-09 Method of installing isolator serving as earthquake-proof measure Pending JPS6192221A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP21218984A JPS6192221A (en) 1984-10-09 1984-10-09 Method of installing isolator serving as earthquake-proof measure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP21218984A JPS6192221A (en) 1984-10-09 1984-10-09 Method of installing isolator serving as earthquake-proof measure

Publications (1)

Publication Number Publication Date
JPS6192221A true JPS6192221A (en) 1986-05-10

Family

ID=16618395

Family Applications (1)

Application Number Title Priority Date Filing Date
JP21218984A Pending JPS6192221A (en) 1984-10-09 1984-10-09 Method of installing isolator serving as earthquake-proof measure

Country Status (1)

Country Link
JP (1) JPS6192221A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103174234A (en) * 2013-03-11 2013-06-26 浙江海天建设集团有限公司 Construction method of construction damping device
JP2015055059A (en) * 2013-09-10 2015-03-23 株式会社竹中工務店 Beam connection structure and beam connection method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103174234A (en) * 2013-03-11 2013-06-26 浙江海天建设集团有限公司 Construction method of construction damping device
JP2015055059A (en) * 2013-09-10 2015-03-23 株式会社竹中工務店 Beam connection structure and beam connection method

Similar Documents

Publication Publication Date Title
US20070151173A1 (en) Method of constructing structures with seismically-isolated base
JP5190035B2 (en) Construction method of seismic isolation structure
JP2011012464A (en) Method of constructing base isolating structure, and temporary supporting structure for base isolating device
JPH102126A (en) Base isolated building
JPS6192221A (en) Method of installing isolator serving as earthquake-proof measure
JPH02164931A (en) Foundation construction method for building
JP5386214B2 (en) Foundation structure
CN115162358A (en) Assembled steel-concrete combined support system for foundation pit engineering and construction method
JP3612600B2 (en) Unit anchor and structural steel foundation beam
JPH0475322B2 (en)
JP3084654B2 (en) Construction foundation, foundation structure using the same, and construction method thereof
JPH09151463A (en) Column-integrated column base anchoring foundation structire and work execution method therefor
US3920182A (en) Heavy duty rail track assemblies
JP3809618B2 (en) Foundation pile and construction method of foundation pile
SU1133357A1 (en) Unit for joining foundation with metal upright
CN220768972U (en) Reverse-acting installation support system for foundation shock insulation support of existing masonry structure
JP3079420B2 (en) Precast concrete girder installation structure and method, and PC girder
JP3090108B2 (en) Mounting structure of laminated rubber
JPS6195136A (en) Construction of multistoried building skeletal by precast reinforced concrete unit
JP2000045542A (en) Foundation base isolation method for existing structure
JP2000186430A (en) Installation method for base isolation bearing to existing building
JPH0791810B2 (en) Bridge construction
JP3000013U (en) Precast concrete assembly foundation for stilt buildings
JPH0791811B2 (en) Bridge construction
JP2812641B2 (en) Precast concrete fabric base member and method of construction