JPS6140992A - Production of tubelar underground hollow part - Google Patents

Production of tubelar underground hollow part

Info

Publication number
JPS6140992A
JPS6140992A JP16420285A JP16420285A JPS6140992A JP S6140992 A JPS6140992 A JP S6140992A JP 16420285 A JP16420285 A JP 16420285A JP 16420285 A JP16420285 A JP 16420285A JP S6140992 A JPS6140992 A JP S6140992A
Authority
JP
Japan
Prior art keywords
lining
layer
mixture
paste
shaft
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP16420285A
Other languages
Japanese (ja)
Inventor
クレメンス・フインステルウアルデル
ゲルト・マルテイン
ノルベルト・ツエイエウスキー
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Walter Bau AG
Original Assignee
Dyckerhoff and Widmann AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dyckerhoff and Widmann AG filed Critical Dyckerhoff and Widmann AG
Publication of JPS6140992A publication Critical patent/JPS6140992A/en
Pending legal-status Critical Current

Links

Landscapes

  • Rigid Pipes And Flexible Pipes (AREA)

Abstract

(57)【要約】本公報は電子出願前の出願データであるた
め要約のデータは記録されません。
(57) [Summary] This bulletin contains application data before electronic filing, so abstract data is not recorded.

Description

【発明の詳細な説明】 この発明は■削中に地山と地圧を 吸収する覆工との間に中間層を形成するためにベースト
状材料を入れる、管状、地下中空部を製造する九めの方
法に関する。
DETAILED DESCRIPTION OF THE INVENTION This invention consists of: (i) manufacturing a tubular, underground hollow part into which a base-like material is placed to form an intermediate layer between the ground and a lining that absorbs earth pressure during excavation; Regarding the method of

特願昭60−57785の発明は、地圧を吸収する覆工
の外面と地山との間に、地山と覆工の間の相対摺動がよ
り大きい場合に可塑変形によって力の相互伝達を限定す
る材料の層を設ける、管状地下中空部に関する。前記層
唸たとえばベントナイトと水のような粘土鉱物から成る
ペースト状の混合物から作るのが好都合である。
The invention of Japanese Patent Application No. 60-57785 discloses a mutual transmission of force between the outer surface of a lining that absorbs ground pressure and the ground by plastic deformation when the relative sliding between the ground and the lining is larger. Relating to a tubular underground cavity provided with a layer of material that defines the Conveniently, the layer is made from a pasty mixture of clay minerals, such as bentonite and water.

この材料は覆工の製造の進展と共に投入される。This material will be added as the lining manufacturing progresses.

前記特願昭60−57785の発明ではたとえば交通ト
ンネル、配管等である管状地下中空部は地中に必ずしも
水平ではなく、たとえば坑の形状にして垂直に設けられ
ている。
In the invention of Japanese Patent Application No. 60-57785, the tubular underground hollow parts, such as traffic tunnels, pipes, etc., are not necessarily installed horizontally in the ground, but are provided vertically in the shape of a pit, for example.

水平に延長するトンネル構造物に似て坑構造物も外部か
ら加わる荷重の力によって、また周囲の土壌中の運動の
結果生じる強制力によって応力を受ける。外部荷重が不
変の基準であるのに対して、運動の結果生じる強制力か
ら成る負荷は構造の穐類によって影響されることがある
Similar to horizontally extending tunnel structures, mine structures are stressed by externally applied loading forces and by forcing forces resulting from movement in the surrounding soil. While external loads are a constant criterion, loads consisting of forcing forces resulting from movement can be influenced by the structure's enclosure.

強制力はその原因が構造物自体にあるかまたはこの構造
物を囲む地山にある。構造物から生じる強制力はたとえ
ば覆工のコンクリートの縮化の際に生じるかまたは温度
差によって生じる。
Forces originate either in the structure itself or in the ground surrounding the structure. Forces arising from the structure occur, for example, during shrinkage of the concrete of the lining or due to temperature differences.

地山から生じる強制応力はたとえば地盤沈下の結果であ
る。鉱業の分野では地盤移動の結果による構造物の強制
応力は特に大きい。
Forced stresses arising from the ground are, for example, the result of ground subsidence. In the mining sector, forced stresses in structures as a result of ground movement are particularly large.

炭層の採掘は通常、生じた中空間の充填なしに行なわれ
るので、その結果採掘場と周囲の領域では全景及び建物
が少しずつ沈下する。その場合表面に近い層の影響は深
所における個々の採掘場正面の進行に合わせて波状に起
こる。これは場所によって異なる沈下と水平の圧縮を九
は実装を舟状海食形成の結果として伴う進行性の単独沈
下盆地の形となって表れる。時間の経過と共に沈下と変
化する前兆の強力な水平応力を伴う多数の孤立波が地下
の各点を捕らえる。
Mining of coal seams is usually carried out without filling the resulting hollow spaces, which results in gradual subsidence of the entire landscape and buildings in the mining site and the surrounding area. In this case, the influence of the near-surface layer occurs in waves as the individual mine front advances at depth. This manifests itself in the form of progressive single-subsidence basins, with localized subsidence and horizontal compaction resulting in the formation of sculptures. Numerous solitary waves capture each point underground with strong horizontal stresses that subside and change over time.

たとえば石炭鉱業で1000メ一トル以・上の中に凍結
によって掘シ下けられる。
For example, in coal mining, coal is dug down to depths of 1,000 meters or more due to freezing.

一つの立坑の覆工を製造するには特に二つの構造原理が
知られている。その一つによれば鉄筋コンクリート製の
覆工が地盤と摩擦係合的にかみ合う。立坑を前記の影響
による破壊から守るために、この種の立坑では採掘はよ
ル長い距離でのみ行うべきで、そうすれば前記の影響は
立坑の領域では生じない。このことは前記の領域にある
多少多量の地下資源の採掘はできないことを意味する。
In particular, two construction principles are known for producing the lining of a shaft. According to one of them, a reinforced concrete lining engages with the ground in a frictional manner. In order to protect the shaft from destruction due to the above-mentioned effects, mining should only be carried out over long distances in shafts of this type, so that the above-mentioned effects do not occur in the area of the shaft. This means that the somewhat large amount of underground resources in the area cannot be mined.

成る程立坑の支保のこの態様はその施行が比較的安いが
、しかし立坑を包囲する領域の地下資源の採掘の放棄と
それによって必要となるより長い水平の搬送路のために
この態様は不経済である。
Admittedly, this mode of shaft shoring is relatively cheap to implement, but the abandonment of the extraction of underground resources in the area surrounding the shaft and the longer horizontal conveyance paths required thereby make this mode uneconomical. It is.

この欠点を除くために、いわゆる「滑動支保」の原理が
開発された。即ち覆工と地山との間にれき清から成る滑
層を設けるのである。この滑層は建物に対する地盤運動
の影響を和らげて、その安定に関しては解決不可能な問
題はなくなった。この滑動支保には、比較的高価である
とわれ、掘シ下げ行程中にます地山の一次安定のための
補助支保として空積みを行う。次に立坑の最深領域に本
来の覆工のための基礎を作シ、とを有するサンドインチ
構造とする。その場合補助支保と覆工との間の環状空間
にれき清を詰める。この建設方法は第一の構造原理よシ
安全支保としての空積みを余計に必要とし、著しく長い
建設時間がかかる。何となれば覆工を立坑掘シ下げと補
助立坑の製造後にやつと下から上へ向かって施工して行
くことができるからである。建設時間の延長の結果は更
に高価になる。
To eliminate this drawback, the so-called "sliding shoring" principle was developed. In other words, a slippery layer made of gravel is provided between the lining and the ground. This slip layer moderated the effects of ground movements on the building, and there were no longer any unsolvable problems regarding its stability. This sliding support is said to be relatively expensive, and is used as an auxiliary support for the primary stabilization of the ground during the excavation process. Next, the foundation for the original lining will be constructed in the deepest area of the shaft, and a sand inch structure will be constructed. In that case, fill the annular space between the auxiliary shoring and the lining with debris. In addition to the first structural principle, this construction method requires additional empty stacks for safety support and takes a significantly longer construction time. This is because the lining can be constructed from the bottom to the top after the shaft has been lowered and the auxiliary shaft has been manufactured. The result of extended construction time is even more expensive.

何となれば全建設時間中土壌凍結の維持に必要な凍結装
置を駆動していなければならないからである。
This is because the freezing equipment necessary to maintain soil freezing must be operated during the entire construction period.

この発明の基本課題は、滑動支保の原理に従って立坑覆
工を建造できる確実で且つ経済的な方法を開発すること
にある。
The basic task of the invention is to develop a reliable and economical method for constructing shaft linings according to the principle of sliding shoring.

この発明は前記の課題を次の特徴によって解決する。即
ち滑動支保の原理に基づいて形成される立坑を製造する
ために土壌安定み保遺→に料金立坑の完成後再びペース
ト状に戻すのである。
The present invention solves the above problems by the following features. That is, in order to manufacture a shaft formed based on the principle of sliding shoring, the soil is stabilized and then returned to a paste state after the toll shaft is completed.

覆)91(1)7に軒の来f状悪のペーストから同化へ
の変化を通じて建設状態中に立坑の覆工と地山の間の限
界せん新店力結合を行うことにあるということになる。
91 (1) 7, it follows that the change from the bad paste to the assimilation of the eaves will result in a critical connection between the lining of the shaft and the ground during the construction state. .

このようにして覆工のその都度完成される部分を地山に
固定して、その結果覆工を掘多下げの行程中に上から下
へ向かって製造することができる。
In this way, the respectively completed part of the lining can be fixed to the earth, so that the lining can be manufactured from top to bottom during the digging process.

一つの流体静力学的圧力状態を構成する前提は、滑層に
、粘着力はあるが、内部摩擦のただ一つの極めて小さな
角度しかない材料を用いるということである。それらの
材料は一定の限界値までは固体と同様の挙動であるが、
しかしこの限界値よシ上では塑性物体のようである。こ
れに反してたとえばれき清拡全応力範囲を通じて粘着性
のない塑性物体のように挙動する。これらの特性は建設
状態には必要で、これらの特性によって材料は地山と覆
工との間の下に向かって開いた環状室から出て行かない
一方覆工から地山への力の伝達を行うことができる。凝
集ノ乞fヒ 性は、冷却作用の結果による滑層の材料の1m状態の変
化によって変えることができる。たとえは温度低下によ
って十分な剛性と地山にM−)″る可能な結合ができる
まで上昇させるζ七ができる。
The premise of creating a hydrostatic pressure state is to use a material in the slip layer that is sticky but has only one extremely small angle of internal friction. These materials behave like solids up to a certain limit, but
However, above this limit value, it appears to be a plastic object. On the contrary, for example, it behaves like a non-cohesive plastic body throughout the entire stress range. These properties are necessary for construction conditions and prevent the material from leaving the downwardly open annular chamber between the earth and lining, while preventing the transmission of forces from the lining to the earth. It can be performed. The agglomeration resistance can be changed by changing the 1m state of the material of the slip layer as a result of the cooling action. For example, by decreasing the temperature, ζ7 can be increased until there is sufficient stiffness and possible bonding to the ground.

このような性質をもつ材料はたとえヴペントナイトと水
のような、粘土鉱唆から成る混合物である。この混合物
には場合によっては不活性の充填材、たとえば岩石粉末
、特に水晶粉末、石灰石粉末等をも添加することができ
る。その場合それら成分の混合比は、覆工と地山との間
の、下方に向かって開いた中空間中にペースト状の混合
物が混合物に特有の凝集性によって維持されるように選
定される。このような混合物は外圧の下で圧密になシ、
その場合この圧力の関数として一定の水分が設定される
。この圧密工程には同時に容量減少が伴う。後の圧力状
態に対応する水分を含む混合物が組み込まれると、混合
物の容量は一定になる。しかし水分が多いと、混合物の
容積は縮小する。この特性によって安全支保と本来の覆
工との間の土庄荷重の分割も可能になる。同時に覆工は
安全支保と連結される。というのは、安全支保の変形が
不っシ合いに大きくなると、追加的圧力が中間層を介し
て覆工の上に移るからである。
Materials with such properties are even mixtures of clay minerals, such as vupentonite and water. Optionally, inert fillers can also be added to the mixture, such as rock powder, in particular quartz powder, limestone powder, etc. The mixing ratio of these components is then selected in such a way that the pasty mixture is maintained in the downwardly open hollow space between the lining and the earth due to the characteristic cohesive properties of the mixture. Such a mixture can be consolidated under external pressure;
A constant moisture content is then set as a function of this pressure. This consolidation process is accompanied by a volume reduction. When a water-containing mixture corresponding to the later pressure state is incorporated, the volume of the mixture becomes constant. However, if the water content is high, the volume of the mixture will shrink. This feature also allows for the division of the shoring loads between the safety shoring and the actual lining. At the same time, the lining is connected to the safety support. This is because if the deformation of the safety shoring becomes disproportionately large, additional pressure will be transferred through the intermediate layer onto the lining.

安全支保が存在しなければ、覆工から土壌への土庄の転
移は、適切に圧密変形の総量を定めることによって達成
することができる。この総量は水分、層厚、充填材分量
、実際の圧密応力の関数である。この圧密応力は、荷重
転移があった後の土圧に対応する。
In the absence of safety shoring, the transfer of soil shoals from the lining to the soil can be achieved by appropriately determining the amount of consolidation deformation. This total amount is a function of moisture content, layer thickness, filler content, and actual consolidation stress. This consolidation stress corresponds to the earth pressure after the load transfer.

密変形によって起こせるように選定するのが目的に適っ
ている。
It is suitable for the purpose to select such that it can be caused by dense deformation.

脆性岩石中の立坑の掘シ下げは通常土壌凍結の遮蔽装置
中で行なわれるので、溶剤としての水との混合物を滑層
の材料として使用することには、凍結体の維持に必要な
装置を使って滑層の材料をも凍結のために利用できると
いう利点がある。こうしてその材料は、凍結体を維持し
ておかなければならない建設状態継続中内側支保と地山
の間の確実な結合を保証する。立坑の完成後の凍結装置
の!1所とそれに続く土壌の解凍の後にはこの剛性結合
が再び滑動する支保の所望の作用に戻る。
Since the excavation of shafts in brittle rocks is usually carried out in soil freezing shielding equipment, the use of a mixture with water as a solvent as the material for the slip layer requires the equipment necessary to maintain the frozen body. The advantage is that even the material of the slip layer can be used for freezing. The material thus guarantees a reliable connection between the inner shoring and the foundation during the continuation of the construction conditions in which the frozen body must be maintained. Freezing equipment after the shaft is completed! After one point and subsequent thawing of the soil, this rigid connection returns again to the desired action of the sliding support.

滑層の材料の凍結は外側の凍結体の働きに任かされる。Freezing of the material of the slip layer is left to the action of the outer freezing body.

この凍結は次のようにしても促進される。即ち覆工の既
に製造された部分の内側に凍結装置を追加導入する。こ
れらの凍結装置は覆工のコンクリートを通してその後ろ
にある滑層に作用するかまたは凍結を最も強力−に促進
することであるが、滑層自体に冷却剤循環用凍結管を設
けることができる。この凍結管には支保の前進につれて
冷却液が供給される。
This freezing can also be promoted as follows. That is, an additional freezing device is introduced inside the already manufactured part of the lining. These freezing devices act on the slip layer behind it through the concrete of the lining, or most strongly promote freezing, but the slip layer itself can be provided with freezing pipes for circulating coolant. Coolant is supplied to this cryotube as the support advances.

覆工は鉄筋コンクリートで作ることができる。The lining can be made of reinforced concrete.

つて区分毎に作ることができる。覆工は軸方向にもプレ
ストレスすることができる。そうしたら縦プレストレス
は、コンクリートの圧縮歪みもスチールの引張伸張も利
用されるように選定するのがよい。
It can be created for each category. The lining can also be prestressed in the axial direction. The longitudinal prestress should then be selected so that both the compressive strain of the concrete and the tensile extension of the steel are utilized.

局覆工はただ一つのスチールジャケットから構成するこ
とができる。
The station lining can consist of only one steel jacket.

この発明の方法によれば前記のように補助支保なしでも
また補助支保を用いても作業するこに作られる。
According to the method of the invention, it is possible to work both without and with auxiliary support as described above.

以下に図についてこの発明を詳説する。The invention will be explained in detail below with reference to the figures.

この発明による立坑1の製造にはまず脆性土壌2中に自
体公知の仕方で凍結体3が作られる。
To manufacture the shaft 1 according to the invention, a frozen body 3 is first produced in a known manner in a brittle soil 2.

を鉄筋コンクリートで開始される。この上部冠状部は立
坑口6を確保し、円筒状の延長部7で立坑壁を予めきめ
る。
Begins with reinforced concrete. This upper crown secures the shaft entrance 6 and predefines the shaft wall with a cylindrical extension 7.

掘シ下げは自体公知の方法で捕捉器8t−用いてまず地
表4から、次に足場9から行なわれる。
The excavation is carried out in a manner known per se using a catcher 8t, first from the ground surface 4 and then from the scaffolding 9.

この足場は引き網10で立坑内に降ろされる。This scaffold is lowered into the shaft with a dragnet 10.

足場9には鉄筋コンクリート製の立坑の覆工12用の環
状の型枠11がある。この載枠11はそれぞれ内側、外
側、下側端間で覆工12の環状部分12′を包囲してい
る。この型枠は連続的に一緒に引っ張られる溝枠の様式
に従って構もできる。型枠11の構成はこの発明の目的
ではない。
The scaffolding 9 has an annular formwork 11 for a shaft lining 12 made of reinforced concrete. This mounting frame 11 surrounds an annular portion 12' of the lining 12 between its inner, outer and lower ends, respectively. This formwork can also be constructed according to the pattern of gutter frames that are continuously pulled together. The configuration of formwork 11 is not an object of this invention.

覆工12の外面と地山2の壁15と6間にはる。この材
料は最終状態で地山2と覆工12との間に滑層15を形
成する。この材料は粘土鉱物または類似物、たとえばベ
ントナイトと、水のペースト状混合物からできている。
It fits between the outer surface of the lining 12 and the walls 15 and 6 of the ground 2. This material forms a slip layer 15 between the ground 2 and the lining 12 in its final state. This material is made of a pasty mixture of clay minerals or similar materials, such as bentonite, and water.

この混合物には費用の関係からたとえば岩石粉末のよう
な充填材を添加することができる。材料は最後に作られ
次区分の上端部からその都度中空間14に押し込まれる
。材料は中で分散されるが、覆工12または地山2の壁
13への凝集性と粘着性によって、下に向かって開いた
中空間14から出て行くのが阻止される。
For reasons of cost, fillers such as rock powder can be added to this mixture. The material is produced last and is then forced in each case into the hollow space 14 from the upper end of the next section. The material is dispersed inside, but is prevented from leaving the downwardly open hollow space 14 by the cohesion and adhesion to the walls 13 of the lining 12 or the ground 2.

混合物用の溶剤として水を使うことによって、覆工12
の製造中に持ち込まれた中間層15の材料が掘シ下げの
最中に同じく凍結されうろことの前提が作られる。これ
は第1図に、型11にまず投入されたばかシの材料の領
域15aが続き、この材料がその上にある領域15b中
で凍結開始のところにあることを図示することによって
示しである。その上にある領域15cでは材料は既に凍
っていて、覆工12と凍結地山5との間の堅い、支持可
能な結合を構成している。
Lining 12 by using water as a solvent for the mixture
The material for the intermediate layer 15 brought in during the manufacture of the casing is also frozen during excavation to create the basis for the scales. This is illustrated in FIG. 1 by illustrating that there is a region 15a of raw material initially charged into the mold 11, followed by this material being at the onset of freezing in the overlying region 15b. In the overlying region 15c the material is already frozen and constitutes a rigid and supportable connection between the lining 12 and the frozen ground 5.

掘シ下げの達成と立坑底の完成の後凍結装置が遮断され
、その結果凍結体3の解凍と共に滑層15の材料も解凍
し、こうして覆工12と地山2との間に所望の滑目地が
できる。
After the completion of the downing and the completion of the shaft bottom, the freezing device is shut off, so that the frozen body 3 thaws and the material of the slip layer 15 also thaws, thus creating the desired slip between the lining 12 and the ground 2. A joint is created.

第2図には第1図と同様の画き方で、掘シ下16を入れ
るところを示しである。補助支保16は自体公知の方法
で、一定の掘シ下けの達成の後立坑壁13中に拡張部1
7を作る。この立坑壁は壁になった補助支保16の一区
分16′のための基礎として機能する。その後この区分
16′はその上にある区分16〃  の内壁に届くまで
持ち上げられる。
FIG. 2 is a drawing similar to that of FIG. 1, and shows how to insert the bottom hole 16. The auxiliary shoring 16 is constructed in a manner known per se by extending the extension 1 into the shaft wall 13 after achieving a certain depth of excavation.
Make 7. This shaft wall serves as the basis for a section 16' of the walled auxiliary support 16. This section 16' is then lifted until it reaches the inner wall of the section 16 above it.

ついで補助支保16に本来の覆工12が続き、滑層15
を形成する材料が再び補助支保16と覆工12との間の
中空間18の中に押し込まれる。その他の点ではこの立
坑支保の場合にも前記の滑動する立坑支保の場合と同様
な方法が行なわれる。
Next, the original lining 12 follows the auxiliary shoring 16, and the sliding layer 15
The material forming the lining is again forced into the hollow space 18 between the auxiliary support 16 and the lining 12. In other respects, the same procedure is followed in the case of this shaft support as in the case of the sliding shaft support described above.

【図面の簡単な説明】[Brief explanation of drawings]

第1図は製造中の立坑の垂直断面図、第2図は補助支保
を有する立坑の、第1図と同様の垂直断面図である。 図中符号 1・・・立坑、12・・・覆工、15・・・層。
FIG. 1 is a vertical sectional view of the shaft under construction, and FIG. 2 is a vertical sectional view similar to FIG. 1 of the shaft with auxiliary shoring. In the figure, reference numerals 1... vertical shaft, 12... lining, 15... layer.

Claims (1)

【特許請求の範囲】 1)掘削中に地山と地圧を吸収する覆工 との間に中間層を形成するためにペースト状材料を入れ
る、管状地下中空部を製造するための方法において、滑
動支保の原理に基づいて形成される坑(1)を製造する
ために土壌安定中に最終覆工(12)を削孔 中に形成し、ペースト材料を入れた後硬 化状態にしてこの状態を覆工製造のための 建設期間中維持し、層(15)の材料を坑の完成後再び
ペースト状に戻すことを特徴とする、方法。 2)ペースト状材料の硬化状態をたとえば凍結、融解の
ような冷却作用によって変化させる、特許請求の範囲1
)に記載の方法。 3)ペースト材料を粘土鉱物の混合物または類似物、た
とえばベントナイトと水の混合物から製造する、特許請
求の範囲1)または2)に記載の方法。 4)混合物含水量又は層の厚さを、地山の設定された部
分応力除去に対応する変形が層の圧密変形によって起こ
りうるように選定する、特許請求の範囲3)に記載の方
法。 5)混合物に不活性充填材、特に岩石粉末、たとえば水
晶粉末、石灰石粉末、または類似のものを混合する、特
許請求の範囲4)に記載の方法。 6)成分の混合比を次のように選定してある、即ちペー
スト状の混合物を覆工(12)と地山(2)との間の下
に向かって開いた中空間(14)中で混合物固有の粘着
力によって保持する、特許請求の範囲3)〜5)のいず
れか一に記載の方法。 7)層(15)の材料を凍結するために層にの進行につ
れて冷却水が通る導管を配置する、特許請求の範囲2)
〜6)のいずれか一に記載の方法。 8)覆工(12)を鉄筋コンクリートで、足場(9)に
よって支持されたジャンピング枠によって連続的に製造
する、特許請求の範囲1)〜7)のいずれか一に記載の
方法。 9)覆工(12)を鉄筋コンクリートで、 足場(9)によって支持されたクライミングフォーム型
枠によって区分毎に製造する、特許請求の範囲1)〜7
)のいずれか一に記載の方法。 10)覆工(12)を軸方向にプレストレスする、特許
請求の範囲8)または9)に記載の方法。 11)長手方向プレストレスを、コンクリートの圧縮歪
みも鉄筋の引張り歪みも利用されるように選定する、特
許請求の範囲10)に記載の方法。 12)覆工(12)の外側及び(または)内側に金属材
料、特にスチール製の密な被覆材を 配設してある、特許請求の範囲8)〜11)のいずれか
一に記載の方法。 13)覆工(12)をスチール被覆材で作る、特許請求
の範囲1)〜7)のいずれか一に記載の方法。 14)覆工(12)の施工中に内側覆工の製作に先行す
る補助支保(16)を導入し、層(15)が覆工(12
)と補助支保(16)との間に層(15)がある、特許
請求の範囲1)〜13)のいずれか一に記載の方法。
[Claims] 1) A method for manufacturing a tubular underground hollow, in which a paste-like material is introduced to form an intermediate layer between the earth and a lining that absorbs earth pressure during excavation, comprising: In order to produce a pit (1) formed on the principle of sliding shoring, the final lining (12) is formed in the hole during soil stabilization, and after putting in the paste material it is brought to a hardening state to maintain this state. A method, characterized in that it is maintained during the construction period for the production of the lining, and that the material of the layer (15) is again turned into a paste after the completion of the pit. 2) Claim 1 in which the hardening state of the paste material is changed by a cooling action such as freezing or thawing.
). 3) A method according to claim 1) or 2), wherein the paste material is produced from a mixture of clay minerals or analogs, such as a mixture of bentonite and water. 4) The method according to claim 3), wherein the mixture water content or the layer thickness is selected in such a way that a deformation corresponding to a defined partial stress relief of the rock can occur by consolidation deformation of the layer. 5) Process according to claim 4), characterized in that the mixture is mixed with an inert filler, in particular a rock powder, such as quartz powder, limestone powder or the like. 6) The mixing ratio of the ingredients is selected as follows, that is, the paste-like mixture is mixed in the hollow space (14) that opens downward between the lining (12) and the earth (2). The method according to any one of claims 3) to 5), wherein the holding is carried out by the adhesive force inherent in the mixture. 7) arranging conduits through which cooling water passes as it progresses through the layers in order to freeze the material of the layer (15); claim 2);
The method according to any one of -6). 8) A method according to any one of claims 1) to 7), characterized in that the lining (12) is manufactured continuously in reinforced concrete by means of a jumping frame supported by scaffolds (9). 9) Claims 1) to 7, in which the lining (12) is made of reinforced concrete and manufactured section by section by climbing form forms supported by scaffolding (9).
). 10) The method according to claim 8) or 9), wherein the lining (12) is prestressed in the axial direction. 11) The method according to claim 10, wherein the longitudinal prestress is selected in such a way that both the compressive strain of the concrete and the tensile strain of the reinforcing steel are utilized. 12) The method according to any one of claims 8) to 11), characterized in that a dense covering of metallic material, in particular steel, is arranged on the outside and/or inside of the lining (12). . 13) A method according to any one of claims 1) to 7), wherein the lining (12) is made of a steel cladding. 14) During the construction of the lining (12), auxiliary shoring (16) is introduced prior to the fabrication of the inner lining, so that the layer (15)
) and the auxiliary support (16) there is a layer (15).
JP16420285A 1984-07-28 1985-07-26 Production of tubelar underground hollow part Pending JPS6140992A (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DE342882.6 1984-07-28
DE3428826 1984-07-28

Publications (1)

Publication Number Publication Date
JPS6140992A true JPS6140992A (en) 1986-02-27

Family

ID=6242379

Family Applications (1)

Application Number Title Priority Date Filing Date
JP16420285A Pending JPS6140992A (en) 1984-07-28 1985-07-26 Production of tubelar underground hollow part

Country Status (1)

Country Link
JP (1) JPS6140992A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008082123A (en) * 2006-09-29 2008-04-10 Shimizu Corp Vertical shaft for waste underground burying disposal facility, and vertical shaft construction method of waste underground burying disposal facility

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008082123A (en) * 2006-09-29 2008-04-10 Shimizu Corp Vertical shaft for waste underground burying disposal facility, and vertical shaft construction method of waste underground burying disposal facility

Similar Documents

Publication Publication Date Title
CN102444142B (en) Pile group column replacement expanded basement and construction method of same
US5944453A (en) Undercut excavation with protection against seismic events or excessive ground movement
CN110159294A (en) A kind of high steep landform tunnel immediately adjacent to bridge section spreading open cut tunnel construction method
EP0590760B1 (en) Undercut excavation method
US4496268A (en) Method and apparatus for constructing reinforced concrete walls in the earth
KR101746654B1 (en) Method for constructing pile for reinforce of mine hole
US4938634A (en) Process for lowering basement
US4150910A (en) Construction of underground galleries
CN109763513A (en) A kind of anchor cable lattice and the compound retaining structure of Modified soil retaining wall and its construction method
JPS6140992A (en) Production of tubelar underground hollow part
Hodgkinson Foundation design
US4431341A (en) Construction of a concrete lined chamber
Sigl et al. NATM tunnelling in Singapore old alluvium–design assumptions and construction experience
EP0170199B1 (en) Method of constructing a tubular subterranean hollow space
Khomyakov et al. Methods of restoration of deformed retaining walls in seismic conditions
KR102503396B1 (en) Waste material buried place making method
JP2004124452A (en) Foundation pile structure in bearing ground and working method of foundation pile
RU2229562C1 (en) Method of dangerous and reconstruct able building foundations reinforcement
RU2708929C1 (en) Reinforcement method of foundation base during reconstruction of buildings and structures
Buchanan DERWENT DAM-CONSTRUCTION.
CN206591526U (en) A kind of super-huge karst dead zone embedded rock pile wall-attaching type backfill steel reinforced concrete dado structure
Ho et al. Underpinning using micropiles for fragile building adjacent to deep excavation in Manhattan, New York
Motallebi et al. Permanent secant pile wall for underground transit station
Baker Jr et al. Foundation Design and Performance of the World's Tallest Building, Petronas Towers
CN104674841B (en) A kind of block stone Gravity Retaining Wall and construction method thereof