JPS61242299A - Method of backfilling pilot pipe excavated trace - Google Patents

Method of backfilling pilot pipe excavated trace

Info

Publication number
JPS61242299A
JPS61242299A JP8200485A JP8200485A JPS61242299A JP S61242299 A JPS61242299 A JP S61242299A JP 8200485 A JP8200485 A JP 8200485A JP 8200485 A JP8200485 A JP 8200485A JP S61242299 A JPS61242299 A JP S61242299A
Authority
JP
Japan
Prior art keywords
target
backfilling
tip
case
pilot
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP8200485A
Other languages
Japanese (ja)
Other versions
JPH0344632B2 (en
Inventor
幸一 原
大網 幸雄
鷹巣 征行
花田 正紀
久雄 竹内
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tokyu Construction Co Ltd
Koken Boring Machine Co Ltd
Original Assignee
Tokyu Construction Co Ltd
Koken Boring Machine Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tokyu Construction Co Ltd, Koken Boring Machine Co Ltd filed Critical Tokyu Construction Co Ltd
Priority to JP8200485A priority Critical patent/JPS61242299A/en
Publication of JPS61242299A publication Critical patent/JPS61242299A/en
Publication of JPH0344632B2 publication Critical patent/JPH0344632B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

(57)【要約】本公報は電子出願前の出願データであるた
め要約のデータは記録されません。
(57) [Summary] This bulletin contains application data before electronic filing, so abstract data is not recorded.

Description

【発明の詳細な説明】 〔産業上の利用分野〕 本発明は、土木工事において、地下に下水管やケーブル
布設用管等を埋設するために埋設管推進工法によって横
孔を施工中に、穿孔用パイロット推進管を引き抜く必要
が生じた場合に、パイロット管の掘削跡を一時的に埋戻
しする方法に関する。
[Detailed Description of the Invention] [Field of Industrial Application] The present invention provides a method for drilling horizontal holes during construction of underground pipes, cable laying pipes, etc., using the underground pipe propulsion method in civil engineering work. This invention relates to a method for temporarily backfilling the excavated remains of a pilot pipe when it becomes necessary to pull out the pilot pipe.

〔従来の技術〕[Conventional technology]

250〜1000mmφ程度の小口径の下水管等を埋設
するために、埋設管推進工法によって横孔を施工する場
合、発進立坑に推進機を設置し、パイロット管先端に打
撃ハンマーを取りつけ、パイロット管内にオーガーを挿
通し、パイロット管とオーガーとを互いに逆回転させつ
つ給進し、パイロット管の推進を行う。
When constructing a horizontal hole using the buried pipe propulsion method in order to bury a small-diameter sewage pipe, etc. of approximately 250 to 1000 mmφ, install a propulsion device in the starting shaft, attach a hammer to the tip of the pilot pipe, and insert it into the pilot pipe. The auger is inserted and the pilot tube and auger are fed while rotating in opposite directions to propel the pilot tube.

パイロット管の推進中に、打撃ハンマーの故障等が生じ
た場合は、パイロット管を引抜き、故障回復後回推進を
行う必要がある。このような場合に、パイロット管を引
抜いた掘削跡を一時的に砂等によって埋戻しをしておき
、この砂等を排除しつつ再推進すれば元の状態に復帰す
ることが非常に容易である。しかし、パイロット管を引
抜いてから埋戻しを行うことは孔壁が崩壊し、十分な埋
戻しができなかった。
If a failure of the impact hammer occurs during propulsion of the pilot tube, it is necessary to pull out the pilot tube and perform another propulsion after the failure is recovered. In such a case, it is very easy to return to the original state by temporarily backfilling the excavation site where the pilot pipe was pulled out with sand, etc., and then re-propelling while removing this sand, etc. be. However, if the pilot pipe was pulled out and then backfilled, the hole wall would collapse and sufficient backfilling could not be achieved.

本発明者らは、さきに、パイロット管内に中空軸を有す
るす−ガーを用い、先端部には複数のダウンザホールハ
ンマーを並設してこのハンマ一群の中央部を中空空間と
し、この中空空間に光源を配して、この光源をオーガー
中空軸を通してトランシットで後方から観測し、孔曲り
を修正することのできる推進装置を、特願昭59−24
0983で提案している。
The present inventors first used a suger with a hollow shaft inside the pilot tube, installed a plurality of down-the-hole hammers in parallel at the tip, and created a hollow space in the center of the group of hammers. A patent application filed in 1984-24 proposed a propulsion device that could correct hole bending by arranging a light source and observing this light source from behind with a transit through the auger's hollow shaft.
It was proposed in 0983.

この装置は複数のダウンザホールハンマーを並列に内蔵
し、そのハンマ一群が囲繞する中央部空間に推進装置発
進端から観測可能に発光ダイオードを配設したもので、
ドリルビットの近くに発光ダイオードをつけたターゲッ
ト部をセットすることによって、推進管の先端の軸心が
少しでも偏心するとトランシットの中心を外れたダイオ
ードの移動を直ちに検出することができる。従って、ハ
ンマ一群を収納した偏心管を操作することなどによって
、速やかに孔曲り修正をすることができる優れた装置で
ある。
This device contains multiple down-the-hole hammers in parallel, and a light-emitting diode is installed in the central space surrounded by the group of hammers so that it can be observed from the starting end of the propulsion device.
By setting a target section with a light emitting diode near the drill bit, if the axis of the tip of the propulsion tube is even slightly eccentric, the movement of the diode away from the center of the transit can be immediately detected. Therefore, it is an excellent device that can quickly correct hole curvature by operating the eccentric tube housing a group of hammers.

本発明者らは、このオーガー軸の中空部を利用して、パ
イロット管先端に埋戻砂等を供給しながらノぐイロット
管を推進装置発進端側に後退させることにより、パイロ
ット管掘削跡に十分な埋戻しを行うことについて研究を
重ね、本発明方法を完成した。
The present inventors utilized the hollow part of this auger shaft to retract the pilot pipe toward the starting end of the propulsion device while supplying backfilling sand, etc. to the tip of the pilot pipe, thereby filling the excavation site of the pilot pipe. After repeated research on how to perform sufficient backfilling, the method of the present invention was completed.

〔発明が解決しようとする問題点〕[Problem that the invention seeks to solve]

埋設管推進工法によって横孔を施工中に、穿孔用パイロ
ット推進管を引き抜く必要が生じた場合に、パイロット
管を引抜いた後に埋戻しを行うのでは孔壁が崩壊し十分
な埋戻しができない0本発明は、パイロット管の後退と
ともに掘削跡を砂等によって埋戻しすることによって十
分な埋戻しができる方法を提供し、上記欠点を解決しよ
うとするものである。
If it becomes necessary to pull out the pilot propulsion tube for drilling while constructing a horizontal hole using the buried tube propulsion method, backfilling after pulling out the pilot tube will cause the hole wall to collapse and insufficient backfilling. The present invention aims to solve the above-mentioned drawbacks by providing a method that allows sufficient backfilling by backfilling the excavation site with sand or the like as the pilot pipe retreats.

〔問題点を解決するための手段〕[Means for solving problems]

第1図を参照して本発明方法を説明する。 The method of the present invention will be explained with reference to FIG.

本発明は、複数のダウンザホールハンマー3を用いるパ
イロット管推進工法に適用される技術手段であって次の
a)〜d)の工程から成る。
The present invention is a technical means applied to a pilot pipe propulsion method using a plurality of down-the-hole hammers 3, and consists of the following steps a) to d).

a)パイロット管lの先端部に取りつけるターゲット部
2を予め推進装置発進端から抜取可能に1i1;Wシて
おき、 b)推進装置発進端からオーガー4の中空管中にターゲ
ット部2を抜取るロッド5を挿通し、この抜取ロッド5
の先端を前記ターゲット部2に係合させて前記ターゲッ
ト部2を抜取り。
a) The target part 2 to be attached to the tip of the pilot pipe l is set in advance so that it can be pulled out from the propulsion device starting end, and b) The target part 2 is pulled out from the propulsion device starting end into the hollow tube of the auger 4. Insert the extraction rod 5 into the extraction rod 5.
The tip of the target part 2 is engaged with the target part 2, and the target part 2 is extracted.

C)次いで前記オーガー4の中空管内に埋戻材送入スク
リュー6を挿入し、(あるいはスクリューに限らす圧送
パイプでもよい) d)掘削跡7に埋戻材8を送入しつつ前記パイロ−/ 
)管lを後退させて引抜く。
C) Next, insert the backfilling material feeding screw 6 into the hollow pipe of the auger 4 (or a pressure feeding pipe may be used instead of the screw); d) While feeding the backfilling material 8 into the excavation site 7, /
) Retract the tube l and pull it out.

〔作用〕[Effect]

複数のダウンザホールハンマーの中央部の中空部とこれ
に後続するオーガーの中空部とを利用することにより、
パイロット管の引抜き後退と同時並行的に掘削跡の埋戻
しを行うことが可能となり、従って孔壁の崩壊を起さず
に十分な埋戻しを行うことができるので、埋戻し不良に
よる孔壁崩壊や地盤沈下を生じることがない。
By utilizing the hollow part of the central part of multiple down-the-hole hammers and the hollow part of the auger following this,
It is now possible to backfill the excavation site at the same time as the pilot pipe is withdrawn and retreated, making it possible to perform sufficient backfilling without causing collapse of the hole wall, thereby preventing collapse of the hole wall due to poor backfilling. There is no possibility of land subsidence or land subsidence.

〔実施例〕〔Example〕

以下図面によって本発明の実施例を詳細に説明する。 Embodiments of the present invention will be described in detail below with reference to the drawings.

第2図は本発明の実施に供されるパイロット管の先端部
近傍を示す一実施例装置の(a)縦断面図、(b)ター
ゲットケースの斜視図、(C)ターゲット収納部の部分
斜視図である。
FIG. 2 is (a) a longitudinal cross-sectional view of an embodiment of the apparatus showing the vicinity of the tip of the pilot tube used for implementing the present invention, (b) a perspective view of the target case, and (C) a partial perspective view of the target storage section. It is a diagram.

パイロット管lの先端部には5複数のダウンザホールハ
ンマー3が内蔵され、その中心部にターゲット部2が装
着されている。ターゲット部2は、所要部品をターゲッ
トケース11内に内蔵し、ダウンザホールハンマーを保
持する本体20の中心部に穿設された中空孔(収納部)
21内に収納されており、パイロット管1の推進装置側
から抜取ることができるように装着されている。
A plurality of five down-the-hole hammers 3 are built into the tip of the pilot tube 1, and a target section 2 is attached to the center thereof. The target part 2 has a hollow hole (storage part) drilled in the center of a main body 20 that houses necessary parts in a target case 11 and holds a down-the-hole hammer.
21, and is attached so that it can be extracted from the propulsion device side of the pilot tube 1.

第2図の構造例では、ターゲットケース11は、パイロ
ット管の先端側(以下単に先端側という)をスプリング
14を介してカバー13により支持され、推進装置側(
以下尾端側という)をケース側かかり17と本体側かか
り22によって係止されて固定されている。
In the structural example shown in FIG. 2, the target case 11 is supported by a cover 13 on the tip side of the pilot tube (hereinafter simply referred to as the tip side) via a spring 14, and on the propulsion device side (
The tail end side (hereinafter referred to as the tail end side) is locked and fixed by a case side hook 17 and a main body side hook 22.

カバー13はターゲットケース11の先端側を支持する
もので、カバー13の背面に取りつけられた皿型または
菊花型の板ばね15の先端部を。
The cover 13 supports the tip side of the target case 11, and supports the tip of a dish-shaped or chrysanthemum-shaped leaf spring 15 attached to the back of the cover 13.

ターゲット収納部21内に設けたリング状凹部に挿入し
て固定されている。
It is inserted and fixed into a ring-shaped recess provided in the target storage section 21.

ターゲット部2は、第2図(b、)に示すように、ター
ゲットケース11の外周にケース側かかり17とガイド
板18が突設され1尾端側に抜取係合部19を備えてい
る。ケース側かかり17はケース11の外周の%より短
い円周方向長さをもち、円周上の対称位置に2個設けら
れる。ケース側かかり17の尾端側の面17aは、第2
図(C)に示すターゲット収納部21の内面に突設した
本体側かかり22の先端側の面22aと係合するもので
、相互に凹凸により係合するように形成される。
As shown in FIG. 2(b), the target section 2 includes a case-side hook 17 and a guide plate 18 protruding from the outer periphery of the target case 11, and a pull-out engagement section 19 at one tail end. The case-side hooks 17 have a length in the circumferential direction shorter than % of the outer circumference of the case 11, and two of them are provided at symmetrical positions on the circumference. The tail end side surface 17a of the case side barb 17 is a second
It engages with the front end side surface 22a of the main body side hook 22 protruding from the inner surface of the target storage section 21 shown in FIG.

本体側かかり22の円周方向長さもイ円周より短い円周
方向長さをもち1円周上に180’の位置に対称に2ヶ
設けられる。
The body-side barbs 22 have a circumferential length shorter than the circumference of A, and two barbs 22 are symmetrically provided at positions 180' on one circumference.

ケース側かかり17の外径は収納部21の孔径に遊嵌す
る寸法であり、本体側かかり22の内径はターゲットケ
ース11の外径が遊嵌する寸法となっている。
The outer diameter of the case-side barb 17 is such that it fits loosely into the hole diameter of the storage portion 21, and the inner diameter of the main body-side barb 22 is such that the outer diameter of the target case 11 fits loosely therein.

ターゲットケース11のガイド板18も属円周より短い
円周方向長さを有し、円周上に対称に2ケ配置された突
出体で、その外径は収納部21の孔径に遊嵌する寸法で
、ターゲットケースを収納部zl内にほぼ同心に保持す
るものである。
The guide plate 18 of the target case 11 also has a length in the circumferential direction shorter than the main circumference, and is two protruding bodies arranged symmetrically on the circumference, and the outer diameter of the guide plate 18 fits loosely into the hole diameter of the storage part 21. The dimensions are such that the target case is held approximately concentrically within the storage section zl.

抜取係合部19は、後述のターゲット部抜取り工程にお
いて引抜きロッド5の先端部と係合し、ロッド5が、タ
ーゲットケース11を先端側に押し、これを90度回転
させ、さらに尾端側へ連行することのできる形状を有す
る。第2図(b)にはL字形の切欠きを示したが、L字
形や丁字形の溝または突起をケースの端面または内径に
設けたものでももちろんよい。
The extraction engaging part 19 engages with the tip of the extraction rod 5 in the target extraction process described later, and the rod 5 pushes the target case 11 toward the tip, rotates it 90 degrees, and then moves it toward the tail end. It has a shape that allows it to be carried along. Although an L-shaped notch is shown in FIG. 2(b), it is also possible to provide an L-shaped or T-shaped groove or protrusion on the end face or inner diameter of the case.

この実施例装置を用いた場合の本発明方法のターゲット
部抜取り工程を第3図によって説明する0通常の状態で
はターゲットケース11は第3図(a)に示すように先
端側をカバー13、スプリング14によって、尾端側を
ケース側かかり17と本体側かかり22の係合によって
、半径方向をケース側かかり17とガイド板18の外径
によって、それぞれ支持されて、収納部21内に固定し
保持されている。
The target part extraction process of the method of the present invention using this embodiment device will be explained with reference to FIG. 14, the tail end side is supported by the engagement between the case side hook 17 and the main body side hook 22, and the radial direction is supported by the case side hook 17 and the outer diameter of the guide plate 18, respectively, and fixed and held within the storage section 21. has been done.

ターゲット部を抜取るには、第3図(b)に示すように
尾端側から引抜き用ロッド5を挿入し・ロッド5の先端
部に設けられている突起等から成る保合部をターゲット
ケース11の抜取り係合部19に係合させ、ターゲット
ケース11をスプリング24に抗して先端側へ押し込み
、ケース側かかり17と本体側かかり22との保合を解
除し。
To remove the target part, insert the extraction rod 5 from the tail end as shown in Figure 3(b), and insert the retaining part consisting of a protrusion etc. provided at the tip of the rod 5 into the target case. 11, the target case 11 is pushed toward the tip side against the spring 24, and the engagement between the case side hook 17 and the main body side hook 22 is released.

次いでロッド5に捩り力を加えてターゲットケース11
を90度回転させ、ケース側かかり17と本体側かかり
22とを不干渉状態にすれば、ターゲットケースを尾端
側へ抜取ることができる。
Next, by applying a twisting force to the rod 5, the target case 11 is
By rotating the target case by 90 degrees so that the case-side hook 17 and the main body-side hook 22 are in a non-interfering state, the target case can be pulled out toward the tail end.

次に第3図(C)に示すように、埋戻し用スクリュー6
を孔21中を挿通し、このスクリューの先端でカバー1
3の中心部を押すと板ばね15の係止が脱離して、カバ
ー13を先端側外方へ押し出すことができ、スプリング
14も押し出される。
Next, as shown in FIG. 3(C), the backfilling screw 6
Insert the screw into the hole 21, and use the tip of this screw to tighten the cover 1.
When the center of the cover 3 is pressed, the locking of the leaf spring 15 is released, and the cover 13 can be pushed outward toward the distal end, and the spring 14 is also pushed out.

かくして、スクリュー6により、砂等を推進機側からパ
イロット管先端側掘削跡に送入することができる。
In this way, the screw 6 can feed sand or the like from the propulsion machine side to the excavation trace on the tip side of the pilot pipe.

第4図は、ターゲットケース11の固定構造の別の実施
例を示したもので、ターゲ7)ケース11の外径にねじ
31を設け、収納部21の内径に設けためねじと螺合さ
せておき、ターゲットケース11を抜取るときは、ねじ
32をもつテーパータップ33を先端部に装着した引抜
き用ロッド5aを用いて、ターゲットケース11を尾端
側へ抜取る。ねじ31とねじ32は一方が右ねじ。
FIG. 4 shows another embodiment of the fixing structure of the target case 11, in which a screw 31 is provided on the outer diameter of the target case 11 and screwed together with a female screw provided on the inner diameter of the storage portion 21. When the target case 11 is to be pulled out, the target case 11 is pulled out toward the tail end using a pull-out rod 5a equipped with a taper tap 33 having a screw 32 at its tip. One of the screws 31 and 32 is a right-hand thread.

他方が左ねじである。The other one is left-handed.

第4図ではターゲットケース11の内径にテーパータッ
プ33と螺合するテーパーめねじ34を示しているが、
このテーパーめねじは必ずしも必要ではなく、省略して
もテーパータップ33をターゲットケースに係合させる
ことが可能である。
FIG. 4 shows a tapered female thread 34 screwed into the taper tap 33 on the inner diameter of the target case 11.
This tapered female thread is not necessarily necessary, and even if omitted, the tapered tap 33 can be engaged with the target case.

第5図〜第7図はターゲットケース11の固定構造と抜
取り構造の別の実施例を示したものである。
5 to 7 show other embodiments of the fixing structure and extraction structure of the target case 11.

第5図では、ターゲット部11は、スナップリング41
を用いて収納部21内に固定され、ターゲット部の内径
に抜取具50と係合するリング状の溝43を設けてあり
、この溝43に抜取具50の抜取係合部51が係合する
ようになっている。
In FIG. 5, the target portion 11 includes a snap ring 41
A ring-shaped groove 43 that engages with the extraction tool 50 is provided on the inner diameter of the target portion, and the extraction engagement portion 51 of the extraction tool 50 engages with this groove 43. It looks like this.

スナップリング41はターゲット部11を収納部21内
に保持するともに、ターゲト部11を引抜く強力な力を
加えたときには、剪断することが可能な強度を有しター
ゲット部を抜取ることができるようになっている。
The snap ring 41 holds the target part 11 in the storage part 21, and has enough strength to shear when a strong force is applied to pull out the target part 11, so that the target part can be pulled out. It has become.

抜取具50は、第5図(b)に示すように、−その先端
部52の形状がターゲラ)11の内径に容易に挿入する
ことができる形状となっており、その先端部52に長手
方向に長い透孔53を穿設しである。この透孔53内に
抜取係合部51が取付けられている。この抜取係合部5
1は第6図に示すように、左右対称のV金物54.56
をスプリング55を介して組み合わせ、透孔53内に収
納してピン57、スナップリング58により抜取具50
の本体に取付けられている。2個のV金物54.56は
スプリング55の作用により、互い反発して、ビン57
を中心として透孔53から突出する方向に揺動する。
As shown in FIG. 5(b), the extractor 50 has a distal end 52 shaped such that it can be easily inserted into the inner diameter of the target blade 11, and the distal end 52 has a longitudinal direction. A long through hole 53 is bored in the hole. A extraction engaging portion 51 is attached within this through hole 53. This extraction engaging portion 5
1 is a symmetrical V hardware 54.56 as shown in Figure 6.
are combined via a spring 55, housed in the through hole 53, and removed using a pin 57 and a snap ring 58 to remove the extraction tool 50.
is attached to the main body of the The two V hardware 54 and 56 repel each other due to the action of the spring 55, and the bottle 57
It swings in the direction of protruding from the through hole 53 about the center.

抜取具50を収納部21に差し込むと抜取係合部51の
V金物54.56は収納部21の内径を摺動して前進し
、第5図C&’)に示す状態で挿入されるとV金物54
.56がターゲット部21の内径の溝43に係合する。
When the extraction tool 50 is inserted into the storage part 21, the V hardware 54,56 of the extraction engagement part 51 slides on the inner diameter of the storage part 21 and moves forward, and when inserted in the state shown in FIG. Hardware 54
.. 56 engages with the groove 43 in the inner diameter of the target portion 21 .

この状態で抜取具5゜を第5図の向って右方向に引張る
と、スナップリング41が剪断されてターゲット部11
を抜取ることができる。
In this state, when the extractor 5° is pulled to the right in FIG. 5, the snap ring 41 is sheared and the target portion 11
can be extracted.

第7図は第5図のスナップリングの代りに。Figure 7 is a replacement for the snap ring in Figure 5.

ターゲット部11の外径に突出した突出片42を、収納
部21内の凹部に嵌入させ、ターゲット部の長手方向の
動きを拘束して係止させる構造のものであある。突出片
42は凹部に嵌入する頭部が半球体状をなしており、タ
ーゲラ)11に強力な軸方向力を加えると係止を解除す
ることができるようになっている。
A protruding piece 42 protruding from the outer diameter of the target part 11 is fitted into a recess in the storage part 21 to restrain and lock the target part from moving in the longitudinal direction. The protruding piece 42 has a hemispherical head that fits into the recess, and can be unlocked by applying a strong axial force to the target blade 11.

本発明に用いる埋戻材料としては砂等が好ましいが、場
合により発泡モルタル等を用いることによ&1、一層緻
密な埋戻し充填とすることができる。
Although sand or the like is preferable as the backfilling material used in the present invention, even more dense backfilling can be achieved by using foamed mortar or the like in some cases.

〔発明の効果〕〔Effect of the invention〕

本発明は以上のように構成されているので、(1)パイ
ロット管の引抜きによる地盤沈下が起きない。
Since the present invention is configured as described above, (1) ground subsidence due to pulling out of the pilot pipe does not occur;

(2)パイロット管の推進中に故障等によりパイロット
管の引抜きを要する場合に、孔壁の崩壊を起さずに故障
の修理をすることができ、容易に元の状態に復帰するこ
とができる。
(2) If the pilot tube needs to be pulled out due to a failure during propulsion, the failure can be repaired without collapsing the hole wall, and the original state can be easily restored. .

等の優れた効果を奏する。It has excellent effects such as

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は本発明の実施例の工程図、第2図は本発明の実
施に用いる抜取可能なターゲット部の固定構造を示す(
a)縦断面図、(b)ターゲットケースの斜視図、(c
)収納孔の部分斜視図、第3図は第2図の装置の抜取工
程の説明図、第4図、第5図、第7図はターゲット部固
定構造の別の例を示す要部説明図、第6図は第5図の抜
取具の抜取部の分解斜視図である。 1・・・パイロット管 2・・・ターゲット部3・・・
タウンサホールハンマー 4・・・オーガー   5・・・ロアドロ・・・スクリ
ュー  7・・・掘削跡8・・・埋戻材    11・
・・ターゲットケース13・・・カバー   14・・
・スプリング15・・・板ばね   17・・・ケース
側かかり18・・・ガイド板  19・・・抜取係合部
20・・・本体    21・・・収納部22・・・本
体側かかり 31.32・・・ねじ 33・・・タップ41・・・ス
ナップリング 42・・・突出片   43・・・溝 50・・・抜取具   51・・・抜取係合部52・・
・先端部   53・・・透孔54.56・・・V金物 55・・・スプリング 57・・・ピン 出 願 人 東急建設株式会社 鉱研試錐工業株式会社
Fig. 1 shows a process diagram of an embodiment of the present invention, and Fig. 2 shows a fixing structure of a removable target part used in implementing the present invention.
a) Longitudinal cross-sectional view, (b) perspective view of the target case, (c
) A partial perspective view of the storage hole, FIG. 3 is an explanatory diagram of the extraction process of the device in FIG. , FIG. 6 is an exploded perspective view of the extractor of the extractor of FIG. 5. 1...Pilot tube 2...Target part 3...
Townsahole hammer 4... Auger 5... Load drawer... Screw 7... Excavation trace 8... Backfilling material 11.
...Target case 13...Cover 14...
・Spring 15...Plate spring 17...Case side hook 18...Guide plate 19...Extraction engagement part 20...Body 21...Storage part 22...Body side hook 31.32 ...Screw 33...Tap 41...Snap ring 42...Protruding piece 43...Groove 50...Extraction tool 51...Extraction engagement part 52...
・Tip 53...Through hole 54.56...V hardware 55...Spring 57...Pin Applicant Tokyu Construction Co., Ltd. Koken Drilling Industry Co., Ltd.

Claims (1)

【特許請求の範囲】 1 パイロット管の先端部にターゲット部を推進装置発
進端から抜取可能に固着しておき、推進機側からオーガ
ー中空管中に抜取ロッドを挿通し、該抜取ロッドの先端
を前記ター ゲット部に係合させて前記ターゲット部を推進機側へ抜
取り、次いで前記オーガー中空管内に埋戻材送入手段を
用いて、掘削跡に埋戻材を送入しつつ前記パイロット管
を引抜くことを特徴とするパイロット管掘削跡の埋戻方
法。
[Claims] 1. A target part is fixed to the tip of the pilot tube so that it can be extracted from the starting end of the propulsion device, and an extraction rod is inserted into the auger hollow tube from the propulsion device side, and the tip of the extraction rod is is engaged with the target portion to extract the target portion toward the propulsion machine, and then, using a backfilling material feeding means into the auger hollow tube, the pilot pipe is fed while feeding the backfilling material into the excavation site. A method for backfilling a pilot pipe excavation site characterized by pulling it out.
JP8200485A 1985-04-17 1985-04-17 Method of backfilling pilot pipe excavated trace Granted JPS61242299A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP8200485A JPS61242299A (en) 1985-04-17 1985-04-17 Method of backfilling pilot pipe excavated trace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP8200485A JPS61242299A (en) 1985-04-17 1985-04-17 Method of backfilling pilot pipe excavated trace

Publications (2)

Publication Number Publication Date
JPS61242299A true JPS61242299A (en) 1986-10-28
JPH0344632B2 JPH0344632B2 (en) 1991-07-08

Family

ID=13762379

Family Applications (1)

Application Number Title Priority Date Filing Date
JP8200485A Granted JPS61242299A (en) 1985-04-17 1985-04-17 Method of backfilling pilot pipe excavated trace

Country Status (1)

Country Link
JP (1) JPS61242299A (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2012073476A1 (en) 2010-12-02 2012-06-07 日本特殊陶業株式会社 Ceramic heater element, ceramic heater, and glow plug

Also Published As

Publication number Publication date
JPH0344632B2 (en) 1991-07-08

Similar Documents

Publication Publication Date Title
KR101413405B1 (en) Drilling tool and drilling method
US9611696B2 (en) Directional drill hammer pullback device
JP2007528459A (en) One-pass punching device
EP1223306B1 (en) Ground reinforcing method
KR20190012646A (en) A Ground Punching Machine For Multistage Method And The Method Of Ground Reinforcing Using Thereof
JPS61242299A (en) Method of backfilling pilot pipe excavated trace
JP2018197436A (en) Steel pipe joint device
JP6542179B2 (en) Core material burial method
KR102379212B1 (en) anchor bolt
JP2000204870A (en) Boring device
JP4429875B2 (en) Replacement method for existing pipes
JP3298845B2 (en) Ground reinforcement method
JP2005155209A (en) Universal excavator and ground improvement method
JP3388723B2 (en) Drilling device and drilling method
AU2018102208A4 (en) Retainer device for a rock anchor, rock anchor system and associated installation method
CN218713106U (en) Excavation foundation ditch safety support device
JP7289022B1 (en) Mouth canal and mouth canal burying method
CN112780834B (en) Continuous lengthening and jacking construction method for pipeline
JP4059123B2 (en) Engagement structure and lock bolt construction method
JPH0363383A (en) Drill
JP3519829B2 (en) Underground pipe peripheral friction reduction method
JP2006104695A (en) Construction method of burying pipe in ground
JPS62153492A (en) Method and device for burying pipe
JP4714927B2 (en) Tunnel excavation method and mirror set bolt
KR100418746B1 (en) Method and device for inserting steel pipe into ground at the same time as drilling