JPS6062504A - Method of constructing boiler - Google Patents

Method of constructing boiler

Info

Publication number
JPS6062504A
JPS6062504A JP16998983A JP16998983A JPS6062504A JP S6062504 A JPS6062504 A JP S6062504A JP 16998983 A JP16998983 A JP 16998983A JP 16998983 A JP16998983 A JP 16998983A JP S6062504 A JPS6062504 A JP S6062504A
Authority
JP
Japan
Prior art keywords
steel frame
boiler
present
piping
attached
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP16998983A
Other languages
Japanese (ja)
Inventor
神谷 泰彰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
IHI Corp
Original Assignee
IHI Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by IHI Corp filed Critical IHI Corp
Priority to JP16998983A priority Critical patent/JPS6062504A/en
Publication of JPS6062504A publication Critical patent/JPS6062504A/en
Pending legal-status Critical Current

Links

Landscapes

  • Fluidized-Bed Combustion And Resonant Combustion (AREA)
  • Control Of Steam Boilers And Waste-Gas Boilers (AREA)

Abstract

(57)【要約】本公報は電子出願前の出願データであるた
め要約のデータは記録されません。
(57) [Summary] This bulletin contains application data before electronic filing, so abstract data is not recorded.

Description

【発明の詳細な説明】 本発明は、ボイラー鉄骨の建方時に鉄骨に据付けるダク
ト類、配管類、機器類を鉄骨内に取り込みながら鉄骨の
建造を行うようにしたボイラーの建設方法(通称ビラ−
ミツド工法)に関するものである。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a boiler construction method (commonly known as a boiler construction method) in which the steel frame is constructed while incorporating ducts, piping, and equipment installed in the steel frame into the steel frame. −
This is related to the Mitsud method.

従来ボイラーを建設する場合には、鉄骨を建ててしまっ
た後、ボイラ一本体耐圧部の据付けに合わせてククト頬
、配管類、機器類をウイシチ等により鉄骨内に引き込み
、取付けを行っていた。しかし、斯かる従来工法では、
ボイラ一本体側圧部の据付けとダクト類、配管類、機器
類等各種部材の据付けが錯綜し又、引き込みのさい、大
型ブロック化はできず、小さい部材として取込み組立て
据付けていたので、高床作業が多く、安全性も悪く且つ
据付は工期が長期にわたるという欠点があった。
Conventionally, when constructing a boiler, after the steel frame had been erected, the pipes, piping, and equipment were pulled into the steel frame using wires, etc., and installed in conjunction with the installation of the pressure-resistant parts of the boiler body. However, in such conventional construction method,
The installation of the side pressure section of the boiler main body and the installation of various parts such as ducts, piping, equipment, etc. were complicated, and when pulling in, it was not possible to make large blocks, but small parts were brought in, assembled and installed, so work on raised floors was difficult. In many cases, the drawbacks were that safety was poor and installation took a long time.

本発明は上述の観点に鑑み、ボイラーの建設を短期間で
行い得るようにしたボイラーの建設方法を提供すること
を目的としてなしたものである。
The present invention has been made in view of the above-mentioned viewpoints, and an object of the present invention is to provide a boiler construction method that enables the boiler to be constructed in a short period of time.

本発明によれば、ボイラー鉄骨の建方に並行してダクト
類、配管類、機器類等の部材を鉄骨の部材とみなして鉄
骨の建方に合せながら、鉄骨内に取り込み、ボイラー鉄
骨を建造している。
According to the present invention, in parallel with the erection of the boiler steel frame, members such as ducts, piping, equipment, etc. are regarded as steel frame members and incorporated into the steel frame in accordance with the erection of the steel frame, and the boiler steel frame is constructed. are doing.

従って、鉄骨建方の完了時に鉄骨内への上記部材の取り
込みは完了するので、ボイラ一本体の据付は工事と輻輳
することもなく、大幅な工期の短縮が可能となる。又、
上記部材を、工場又は地上で大型ブロック化し、取込む
ことが可能となるので、高床作業も減り安不性がその分
だけよくなる。
Therefore, since the above-mentioned members are completely inserted into the steel frame when the steel frame erection is completed, the installation of the boiler main body is not complicated with the construction work, and the construction period can be significantly shortened. or,
Since the above-mentioned members can be made into large blocks in a factory or on the ground and then brought in, the need for work on elevated floors is reduced and safety is improved accordingly.

以下、本発明の実施例を図面を参照しつつ説明する。Embodiments of the present invention will be described below with reference to the drawings.

第1図及び第2図は本発明の第1実施例で鉄骨を建潰す
る際にタクトをも据付けるようにした例である。第1図
及び第2図中(11は支柱、(2)は梁、(3)は小梁
、(4)はトラッククレーン、(5)は梁(2)又は(
3)が地上に仮置きされている場合に作業員(6)によ
って梁(2)の下面に取付けられた従来公知のバンカー
、(7)はダクトである。
FIGS. 1 and 2 show an example of a first embodiment of the present invention in which a tactile system is also installed when a steel frame is demolished. In Figures 1 and 2 (11 is a column, (2) is a beam, (3) is a small beam, (4) is a truck crane, (5) is a beam (2) or (
3) is a conventionally known bunker attached to the lower surface of the beam (2) by a worker (6) when it is temporarily placed on the ground, and (7) is a duct.

地上で作業員によりハンガー(5)を取付けられた、タ
フl−f力の上面に位置すべき梁(2)又は(3)は、
1−ラッククレーン(4)により吊上げられて支柱(1
)にポ/”+1こより取付けられる。梁(2)又は(3
)はトラッククレーン(4)のブームの邪魔にならない
よう前面の部分は取付けないでおく。
The beam (2) or (3) to be located on the upper surface of the tough l-f force is attached with a hanger (5) by a worker on the ground.
1-Rack crane (4) lifts the column (1)
) is attached to the beam (2) or (3).
), leave the front part unattached so as not to interfere with the boom of the truck crane (4).

次に地−Lに置いである所定長さのダクト(7)をトラ
ッククレーン(4)cこより吊上げて該ダクト(カを梁
(2)の数句けてない側から鉄管内に入れ、すでに据付
けの終っている鉄′清内所要階床面にダクl−+71を
仮置きし、次いで地上でハンガー(5)を取付りられた
梁(2)をトラッククレーン(4)により吊上げて支柱
(1)の前面側に取付け、又必要に応じてハンガー(5
)を取付けられた小梁(3)をトラッククレーン(4)
で吊上げて梁(2+ +21間に取付けた後、トラック
クレーン(4)で鉄骨内所要階床面に仮置きしであるダ
クト(7)を再度吊上げて梁(2)や小梁(3)のハン
ガー(5)Oこセットさし吊下げる。従って、ハンガー
自体の梁への取付けは全て地上でできるため従来のよう
に取付けのための足場が不要さなり、且つ、ダクトの据
付けは鉄骨建方用のトラッククレーン等の重機で吊揚げ
ができるので、従来面単位のタクト取込み後立体化を図
っていたものが、工場又は地上で立体ブロック化したダ
クトの据付が可能きなり、重機の稼動率が向上し、据付
は工程の短縮が図れる。
Next, lift the duct (7) of a predetermined length placed on the ground L from the truck crane (4) and insert the duct into the steel pipe from the side a few meters away from the beam (2). Temporarily place the duct l-+71 on the required floor surface of the ironworks that has been installed, and then lift the beam (2) with the hanger (5) attached from the ground using the truck crane (4). 1), or attach it to the front side of the hanger (5) if necessary.
) with the small beam (3) attached to the truck crane (4)
After lifting it up and installing it between the beams (2+ +21), the truck crane (4) lifts up the duct (7), which is temporarily placed on the required floor surface inside the steel frame, again and attaches it to the beam (2) and small beam (3). Hanger (5) is hung from an O-shaped set.Therefore, the hanger itself can be attached to the beam on the ground, eliminating the need for a scaffolding like in the past, and the duct can be installed using steel frame construction. Since lifting can be carried out using heavy equipment such as a commercial truck crane, it is now possible to install ducts in three-dimensional blocks at a factory or on the ground, instead of the conventional method of creating three-dimensional structures after taking in the takt time of each surface. and the installation process can be shortened.

第3図は本発明の第2実施例で、気水分離タンクのよう
な縦ζこ長い(約2411I )機器を据伺ける例を示
す。図中(8)は気水分離タンクである。
FIG. 3 shows a second embodiment of the present invention, and shows an example in which a vertically long (approximately 2411 I) equipment such as a steam/water separation tank can be installed. In the figure, (8) is a steam/water separation tank.

鉄骨高さ20m以上になるーよう鉄骨を1節ないし2節
建方後、図示してないトレーラ上に横置きされた気水分
離タンク(8)を据付は場所へ搬入してトレーラを逃が
し、主クレーンである1゛ラツククレーン(4)及び補
助クレーンにより地切りし、トラッククレーン(4)に
より吊下げて据付は位置の真下に縦向きにして吊込み、
ワイヤーロープ(9)lこて気水分離タンク(8)を鉄
骨に固縛し、仮置きをする。しかる後、鉄骨の残りの部
分を建てた後、気水分離タンク(8)を所定のレベルに
吊揚げ、鉄骨に固定する。
After erecting one or two sections of the steel frame so that the height of the steel frame is 20 m or more, the steam/water separation tank (8) placed horizontally on a trailer (not shown) is installed, and the trailer is moved to the location and the trailer is released. The main crane (1゛ rack crane (4)) and the auxiliary crane are used to cut the ground, and the truck crane (4) is used to lift it up, and the installation is carried out vertically directly below the position.
Wire rope (9) l Trowel Secure the steam/water separation tank (8) to the steel frame and temporarily store it. After that, the rest of the steel frame is erected, and the steam/water separation tank (8) is lifted to a predetermined level and fixed to the steel frame.

第4図は本発明の第6実施例で、単独重量物の配管■呻
が小梁(3)に対し平行に取付けられる例を示す。図中
αυは足場チェーン、(6)は足場、C13はバンド、
0→は台付きワイヤーである。
FIG. 4 shows a sixth embodiment of the present invention, in which a single heavy pipe is installed parallel to a small beam (3). In the figure, αυ is a scaffold chain, (6) is a scaffold, C13 is a band,
0→ is a wire with a stand.

第2図と同様にバンカー(5)を地上で取付けた小梁(
3)をトラッククレーン(4)等により吊上げて所定の
梁に取付け、小梁(3)cこ足場α力を有する足場チェ
ーンαηを吊下げ、予め鉄骨内の下階に仮置きしである
所定の位置に取付けられたバンドα騰付きの配管0〔を
1−ラック・り・レーン(4)により再び吊上げて小梁
(3)の下に位置させ、作業員(6)が足場(6)に乗
ってハンガー(5)を配管(It)に取付けられたハン
ドσ場に固定し、台付きワイヤーα→を配管αeから取
外ず。これlこよって配管θ〔の吊上げが完了する、 第5図は本発明の第4実施例で、小梁(3)と配管Ql
(!:が交差する場合を示す、 この場合にも、第3実施例の場合と同様、ハンガー(5
)を地上で取付けた小梁(3)をトラッククレーン(4
)等により吊上げて所定の梁(2)ζこ取付け、小梁(
3)1こ、足場oカを連結された足場チェーン0υを吊
下げ、予め鉄骨内の下階に仮置きしである配管00)を
トラッククレーン(4)により再び吊上げて上床の小梁
(3)の下に位置させ、作業政(6)が足場q2に乗っ
てハンガー(5)を配管001に取付けられたバノl”
Q場に固定し、台付きワイヤー(14)を配管0呻から
取外し、その後で上床の梁の残りを取付ける。
Similar to Figure 2, the bunker (5) is attached to the small beam (
3) is hoisted by a truck crane (4), etc. and attached to a specified beam, and a scaffolding chain αη having a force α is suspended from the small beam (3). Piping 0 with a raised band attached to the position is lifted again by the 1-rack lane (4) and placed under the small beam (3), and the worker (6) lifts it onto the scaffold (6). , and fix the hanger (5) to the hand σ field attached to the pipe (It), without removing the wire α → from the pipe αe. This completes the lifting of the pipe θ. Figure 5 shows the fourth embodiment of the present invention, in which the small beam (3) and the pipe
(!: Indicates a case where they intersect. In this case, as in the third embodiment, the hanger
) attached on the ground (3) is transported by a truck crane (4).
), etc., and attach the specified beam (2)
3) 1) The scaffolding chain 0υ connected to the scaffolding is suspended, and the piping 00), which has been temporarily placed on the lower floor inside the steel frame, is lifted again using the truck crane (4) and the small beam (3) on the upper floor is lifted up again using the truck crane (4). ), and the worker (6) stands on the scaffolding q2 and attaches the hanger (5) to the pipe 001.
Fix it in the Q field, remove the wire with stand (14) from the pipe 0, and then install the rest of the beams on the upper floor.

第6図は本発明の第5実施例で単独重量物の配管0Iが
垂直配管の場合を示・す。第2図のように地上でハンガ
ー(5)が取付けられた上床の梁(2)や小梁(3)を
取付けた後、図のように足場@を掛け、トラッククレー
ン(4)cこて配管Qlを上方より垂直に吊りおろし作
業員(6)がハンガー(5)を配管叫に取付けられたブ
ラケット(ホ)に固定し、トラッククレーン(4)のフ
ックを外す。
FIG. 6 shows a fifth embodiment of the present invention in which the piping 0I for a single heavy object is a vertical piping. After installing the upper floor beams (2) and small beams (3) with hangers (5) attached on the ground as shown in Figure 2, hang the scaffolding @ as shown in the figure and place the truck crane (4) with a trowel. The worker (6) hangs the pipe Ql vertically from above, fixes the hanger (5) to the bracket (E) attached to the pipe pipe, and removes the hook of the truck crane (4).

第7図は本発明の第6実施例で、梁(2)、小梁(3)
、配管(IO1弁(イ)、手摺りa71等を工場又は地
上で組立てたユニット(ト)をトラッククレーン(4)
により所安階まで吊上げ、梁(2)を支柱(1)の取合
い部にポルト等で接続し、又小梁(3)をすで0こ建て
られている梁(2)の取合い部にボルトで接続するよう
にした例である。
FIG. 7 shows a sixth embodiment of the present invention, in which a beam (2), a small beam (3)
, a unit (g) in which piping (IO1 valve (a), handrail A71, etc.) was assembled in a factory or on the ground using a truck crane (4)
Lift the beam (2) to the joint of the support column (1) using ports, etc., and bolt the small beam (3) to the joint of the beam (2) that has already been erected. This is an example of connecting with .

第8図は本発明の第7実施例で、配管αυや弁等を地上
又は工場で組立てた配管ブロック(,1つをトランクク
レーン(4)により予め鉄骨内所要階床面に仮置きし、
配管ブロックOI設置床面の梁+2) 4゜を組立てた
後、仮置きしである配管ブロックQOをトランククレー
ン(4)により所要位置まで再吊上げし、梁(2)下に
取付けるようにしている。
FIG. 8 shows a seventh embodiment of the present invention, in which piping blocks (one of which is assembled on the ground or in a factory) with piping αυ, valves, etc., are temporarily placed on the required floor surface inside the steel frame using a trunk crane (4).
After assembling the piping block OI installation floor beam +2) 4°, the temporarily placed piping block QO is re-lifted to the required position using the trunk crane (4) and installed under the beam (2). .

」二記各図中、同一のものには同一の符号が付なお、本
発明は上述の実施例に限定されるものではなく、本発明
の要旨を逸脱しない範囲内で種々変更を加え得ることは
勿論である。
2. In each of the figures, the same parts are denoted by the same reference numerals, and the present invention is not limited to the above-described embodiments, and various changes may be made without departing from the gist of the present invention. Of course.

本発明のボイラーの建設方法によれば、鉄骨建方の完了
時に鉄骨内への上記部材の取り込みは完了するので、ボ
イラ一本体の据伺は工事と輻輳することなく且つ、鉄骨
内に据付けるのに従来のように邪魔になる鉄骨部材の“
収伺は以前に上記部材の取込みができるので、上記部材
の大型フロック化が可能となり、大幅な工期の短縮が可
能となり、又全てのバンカーの梁や小梁への取り付けは
地上でできるため高所作業が軽減されて安全性が向上す
る、等種々の優れた効果を奏し得る。
According to the boiler construction method of the present invention, the above-mentioned components are completed within the steel frame when the steel frame erection is completed, so the erection of the boiler body is not complicated with the construction work, and it can be installed within the steel frame. However, there are no steel members that get in the way like in the past.
Since the above-mentioned parts can be taken in in advance during the collection, it is possible to make large flocks of the above-mentioned parts, which makes it possible to significantly shorten the construction period, and because all the bunker beams and beams can be attached on the ground, the height is lower. Various excellent effects can be achieved, such as reduced labor and improved safety.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図及び第2図は本発明の第1実施例の説明図、第3
図は本発明の第2実施例の説明図゛、第4図は本発明の
第6実施例の説明図、第5図は本発明の第4実施例の説
明図、第6図は本発明の!8B5実施例の説明図、第7
図は本発明の第6実施例の説明図、第8図は本発明の第
7実施列の;尻切図である。 図中(1)は支柱、(2)は梁、(3)は小梁、(4)
はトランククレーン、(5)はハンガー、(7)はダク
ト、(8)は気水分離タンク、0(])は配管、Q旧は
足場、<l3i(、はバノI・、0υは配管、(イ)は
弁、aηは手摺り、08)はユニット、Q呻はブロック
配管を示す。 ’I’:l’ lT’l“出願人 石川島播磨重工業株式会社 、第5図 第6図
1 and 2 are explanatory diagrams of the first embodiment of the present invention, and the third
The figure is an explanatory diagram of the second embodiment of the present invention, FIG. 4 is an explanatory diagram of the sixth embodiment of the present invention, FIG. 5 is an explanatory diagram of the fourth embodiment of the present invention, and FIG. 6 is an explanatory diagram of the fourth embodiment of the present invention. of! Explanatory diagram of 8B5 embodiment, 7th
The figure is an explanatory diagram of the sixth embodiment of the present invention, and FIG. 8 is a bottom cutaway diagram of the seventh embodiment of the present invention. In the diagram, (1) is a support, (2) is a beam, (3) is a small beam, and (4)
is trunk crane, (5) is hanger, (7) is duct, (8) is air-water separation tank, 0 (]) is piping, Q old is scaffolding, < l3i (, is Bano I, 0υ is piping , (A) indicates a valve, aη indicates a handrail, 08) indicates a unit, and Q indicates a block piping. 'I':l'lT'l"Applicant Ishikawajima-Harima Heavy Industries Co., Ltd., Figure 5, Figure 6

Claims (1)

【特許請求の範囲】[Claims] 1)ボイラー鉄骨の建方に並行してダクト類、配管類、
機器類等の部材を鉄骨内に取り込みながらボイラー鉄骨
を建造することを特徴とするボイラーの建設方法。
1) In parallel with the erection of the boiler steel frame, ducts, piping, etc.
A boiler construction method characterized by constructing a boiler steel frame while incorporating components such as equipment into the steel frame.
JP16998983A 1983-09-14 1983-09-14 Method of constructing boiler Pending JPS6062504A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP16998983A JPS6062504A (en) 1983-09-14 1983-09-14 Method of constructing boiler

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP16998983A JPS6062504A (en) 1983-09-14 1983-09-14 Method of constructing boiler

Publications (1)

Publication Number Publication Date
JPS6062504A true JPS6062504A (en) 1985-04-10

Family

ID=15896530

Family Applications (1)

Application Number Title Priority Date Filing Date
JP16998983A Pending JPS6062504A (en) 1983-09-14 1983-09-14 Method of constructing boiler

Country Status (1)

Country Link
JP (1) JPS6062504A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007107789A (en) * 2005-10-12 2007-04-26 Babcock Hitachi Kk Installation method of boiler equipment

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4944101A (en) * 1972-08-31 1974-04-25

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4944101A (en) * 1972-08-31 1974-04-25

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007107789A (en) * 2005-10-12 2007-04-26 Babcock Hitachi Kk Installation method of boiler equipment

Similar Documents

Publication Publication Date Title
CN102444203A (en) High-altitude long-span overhanging corridor type reinforced concrete structure and construction method
CN108222066A (en) A kind of combined steel formwork support system and its construction method
JPS6062504A (en) Method of constructing boiler
CN110112681B (en) Modular cable hoist and mount lays auxiliary device
CN113152658B (en) Large-span corridor with comprehensive curtain wall at bottom and construction method
CN102392534B (en) Aluminum alloy building template assembly
CN213539408U (en) Curtain wall mounting structure
CN109555257A (en) Combined support derrick type furred ceiling and construction method
JPS58160474A (en) Working scaffold apparatus in elevator construction
CN205636936U (en) Structure of making an uproar falls in pipeline sound insulation
JPS6019861A (en) Prefabricated work scaffold
CN215254450U (en) Overhanging scaffold
JPS63277341A (en) Reverse execution of underground story
CN214423942U (en) Formwork support frame body of concrete pouring wall body of elevator shaft
JPS5953993B2 (en) Segment installation method for segment underground tanks
CN211058293U (en) Rigid formwork hanging device capable of being circulated
JP3001837U (en) Aluminum uprising hydraulic jack with fixture
JP6925707B2 (en) Basement attic structure and basement construction method using the basement attic structure
JPS5911015B2 (en) How to install shoring in the reverse winding method
CN113738139A (en) Corridor embedded-hanging type turnover vertical face protection tool and construction method thereof
JPH0369733A (en) Piping method in multi-story building
JPS5934370A (en) Hanging metal fitting apparatus
JPS6242045Y2 (en)
JPH067172Y2 (en) Hanging jig for building formwork
JPH0214265Y2 (en)