JPS6037165B2 - Blast furnace furnace wall repair method and repair device - Google Patents

Blast furnace furnace wall repair method and repair device

Info

Publication number
JPS6037165B2
JPS6037165B2 JP4168482A JP4168482A JPS6037165B2 JP S6037165 B2 JPS6037165 B2 JP S6037165B2 JP 4168482 A JP4168482 A JP 4168482A JP 4168482 A JP4168482 A JP 4168482A JP S6037165 B2 JPS6037165 B2 JP S6037165B2
Authority
JP
Japan
Prior art keywords
deck
furnace
fixed
work
gondola
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP4168482A
Other languages
Japanese (ja)
Other versions
JPS58161712A (en
Inventor
洋一 渡辺
礼三 村上
孝一 小林
弘 金谷
博正 北林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JFE Steel Corp
Original Assignee
Kawasaki Steel Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kawasaki Steel Corp filed Critical Kawasaki Steel Corp
Priority to JP4168482A priority Critical patent/JPS6037165B2/en
Publication of JPS58161712A publication Critical patent/JPS58161712A/en
Publication of JPS6037165B2 publication Critical patent/JPS6037165B2/en
Expired legal-status Critical Current

Links

Landscapes

  • Blast Furnaces (AREA)
  • Furnace Housings, Linings, Walls, And Ceilings (AREA)

Description

【発明の詳細な説明】 本発明は高炉炉壁の改修方法と改修装置に係り、特に高
炉吹卸し時における炉壁改修期間の短縮と作業の安全保
持を目的とする改修方法と装置に関する。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a method and apparatus for repairing a blast furnace wall, and more particularly to a method and apparatus for repairing a blast furnace wall for the purpose of shortening the period for repairing the wall and maintaining work safety during blast furnace blowdown.

高炉の吹卸し時における炉肇の改修に際しては、吹止め
後の高炉羽□レベルに関口部を設け、上部の内容物を掻
き出して空炉状態にされるが、このような状態では炉内
壁には付着物や損傷れんがなどが一般に不安定な状態で
残るのが常態である。
When repairing the furnace arm when blowing down a blast furnace, a barrier is installed at the level of the blast furnace vane after the blowdown is stopped, and the contents of the upper part are scraped out to leave the furnace in an empty state. It is normal for deposits and damaged bricks to remain in an unstable state.

従って改修に際して、これら不安定な残存物が突然に落
下して改修作業を危険にするおそれがあるので、炉内の
冷却装置、れんがの取り換えまたは補修を安全な状態の
もとで行なうためには、先ずこれら不安定な付着物や損
傷れんが等を予め撤去することが必要である。従来はこ
のような場合には、炉頂装入装置を撤去するか、または
炉体上方の鉄皮を閉口して、炉内に足場を吊り下げて付
着物やれんがを解体する方法か、あるいは鉄皮内の残存
れんがや付着物に火薬を装填して、火薬の破壊力を利用
した解体方法などが実施されていた。
Therefore, during renovation, there is a risk that these unstable remnants may suddenly fall and make the renovation work dangerous, so in order to replace or repair the cooling system and bricks inside the furnace, it is necessary to First, it is necessary to remove these unstable deposits, damaged bricks, etc. in advance. Conventionally, in such cases, the methods of removing the furnace top charging device, closing the steel shell above the furnace body, suspending scaffolding inside the furnace, and dismantling the deposits and bricks, or Demolition methods were used, such as loading gunpowder into the remaining bricks and deposits inside the steel shell and utilizing the destructive power of gunpowder.

しかしこのような方法では装入装置の撤去は大仕掛けな
工事となり、それだけ改修期間が長くなり、また従来の
足場組はとかく不安定であったため、炉壁に付着した付
着物やれんがを完全に撤去することが出来なかった。ま
た火薬の破壊力による方法では、火薬の爆発時に鉄皮や
冷却装置を破損する欠点がある。本発明は上記従釆方法
の欠点・問題点を解決するためになされたものであって
、炉頂関口部(以下炉□部と称す。)に支持梁を構架し
、この支持梁からワイヤにより作業デッキを吊り下し、
作業員がその作業デッキ上からプレー力などの破砕機を
使用して、炉頂部から羽口レベルへと順次炉壁の付着物
や損傷れんがを取り除き、上部からの落下物のない安全
な状況下で引きつづき上記作業デッキによって改修作業
が出来るようにすることによって、本発明の目的が達成
されるに至ったのである。本発明を実施するには、炉頂
部の装入装層を撤去して改修装置を設置することは勿論
可能であり作業も容易であるが、装入装置を撤去すれば
復旧にそれだけの時間と経費を要することは当然であっ
て、しかも操業の遅延による損失も大きいので、本発明
において袋入装置は撤去せずに羽○レベルにおける閉口
部より作業デッキを挿入して設置する方法と、そのため
の作業デッキの構造に新規な機構が組み入れられている
However, with this method, removing the charging equipment would be a major undertaking, which would lengthen the repair period.Furthermore, the conventional scaffolding was unstable, so it was impossible to completely remove the deposits and bricks that had adhered to the furnace wall. It was not possible to remove it. In addition, methods that rely on the destructive power of gunpowder have the disadvantage that the iron shell and cooling device are damaged when the gunpowder explodes. The present invention has been made in order to solve the drawbacks and problems of the above-mentioned follow-up method, and includes constructing a support beam at the furnace top entrance (hereinafter referred to as the furnace □ section), and connecting wires from this support beam. Hang the work deck,
Workers use a crusher such as a play force from the top of the work deck to sequentially remove deposits and damaged bricks from the furnace wall from the top of the furnace to the tuyere level, under safe conditions without falling objects from above. The object of the present invention has been achieved by making it possible to carry out repair work using the work deck. In order to carry out the present invention, it is of course possible and easy to remove the charging layer at the top of the furnace and install a repair device, but if the charging device is removed, it will take that much time for restoration. Naturally, it costs money, and there is also a large loss due to delays in operation, so the present invention proposes a method in which a work deck is inserted and installed from the closed part at the feather level, without removing the bagging device, and the method for installing it. A new mechanism is incorporated into the structure of the work deck.

すなわち本発明では、炉頃装入装置はそのまま存置し、
マンホールから挿入される部材によって炉□部に支持梁
を横架して固定デッキを設置し、作業デッキは折りたた
み式の伸縮自在の構造にしてほぼ完成されたものを、縮
小して羽□レベル関口部から炉内に挿入し、上部の固定
デッキに巻き上げて設置する方法と、この方法に適応し
た装置を提供するものである。
That is, in the present invention, the furnace charging device remains as it is,
A fixed deck was installed with support beams placed horizontally over the furnace section using members inserted through the manhole, and the working deck was made into a foldable and telescoping structure. The present invention provides a method for inserting the furnace into the furnace, rolling it up and installing it on the upper fixed deck, and a device adapted to this method.

本発明の要旨は次の通りである。The gist of the invention is as follows.

【i’炉□部に支持梁を構架して固定デッキを設置する
工程、{ii’ 作業デッキに操作デッキ組立部村およ
びゴンドラを搭載し、羽口レベル関口部より炉内に挿入
する工程、剛 挿入された作業デッキを、炉頂部に設け
られた固定デッキに巻き上げて仮止めする工程、(N}
作業デッキに搭載して巻き上げられた操作デッキを、
固定デッキの支持梁に固設する工程、M 同ゴンドラを
、固定デッキ支持梁に昇降可能に吊下げ設置する工程、
Wi} 最後に作業デッキを固定デッキに昇降可能に取
付けた後、前記仮止めを解除する工程、上記の工程によ
って、固定デッキ支持梁に支持された操作デッキ、作業
デッキおよびゴンドラが、空炉状態の高炉内に設置され
、ついで操作デッキにおいて、作業デッキの昇降手段を
操作して作業デッキを所定位置に移動し、作業員はゴン
ドラによって作業デッキに移乗し、作業デッキを安定さ
せた後、改修作業を行ない、ついでゴンドラによって再
び操作デッキに帰り、作業デッキを次の所定位置に移動
させて、上述のような改修作業を繰返し実施する方法で
ある。
[i' Step of constructing a support beam and installing a fixed deck on the furnace □ section, {ii' Step of mounting the operation deck assembly section and gondola on the working deck and inserting it into the furnace from the tuyere level entrance section, Rigid The process of rolling up and temporarily fixing the inserted working deck to the fixed deck installed at the top of the furnace, (N}
The operation deck is loaded onto the work deck and rolled up.
A process of fixing the gondola to a support beam of a fixed deck,
Finally, after the work deck is attached to the fixed deck so that it can be raised and lowered, the temporary fixing is released, and the operation deck, the work deck, and the gondola supported by the fixed deck support beams are brought into an empty furnace state. The work deck is then installed in a blast furnace, and then on the operation deck, the work deck is moved to a specified position by operating the lifting means of the work deck.The workers are transferred to the work deck by a gondola, and after stabilizing the work deck, the renovation begins. In this method, the work is carried out, and then the gondola returns to the operation deck, the work deck is moved to the next predetermined position, and the above-mentioned repair work is repeated.

次に上記の方法を実施するための本発明の装置の骨子は
、炉口部に構架した支持梁よりなる固定デッキと、その
固定デッキ支持梁に固定して吊設された操作デッキと、
その操作デッキの下方に、固定デッキ支持梁に昇降可能
に吊下げ支持され、炉径方向に折りたたみかつ伸縮自在
の張り出し部材を具備した作業デッキと、操作デッキと
作業デッキの間を連絡するための昇降可能に吊設された
ゴンドラとで構成された炉壁改修装置である。
Next, the gist of the device of the present invention for carrying out the above method is as follows: a fixed deck made of a support beam constructed at the furnace mouth; an operation deck fixed and suspended from the fixed deck support beam;
Below the operation deck, there is a work deck that is suspended from a fixed deck support beam so that it can be raised and lowered, and is equipped with an overhang member that can be folded and expanded in the radial direction of the furnace, and a work deck for communicating between the operation deck and the work deck. This furnace wall repair device consists of a gondola that is suspended so that it can be raised and lowered.

次に本発明を具体的な実施態様に基づいて、図面により
詳細に説明する。第1図は実施例の概略図、第2図は断
面説明図、第3図は第2図におけるA−A視図である。
Next, the present invention will be explained in detail with reference to the drawings based on specific embodiments. FIG. 1 is a schematic diagram of the embodiment, FIG. 2 is an explanatory cross-sectional diagram, and FIG. 3 is a view taken along line AA in FIG.

図中1は大ベル、12は高炉鉄皮、5はアーマリングウ
ヱアリングプレートを示し、固定デッキ2は支持主梁1
3(第4図参照)によりマンホール部Mに固定して設け
られている。固定デッキ2の下には操作デッキ6が固定
して設置され、作業デッキ11は作業デッキ吊ワイヤ7
でチェンブロツク4を介して4個所(第8図4a参照)
で固定デッキ2に昇降可能に吊り下げられている。また
ゴンドラ9はゴンドラ昇降用ワイヤ8によって、固定デ
ッキ2に昇降可能に吊り下げられ、操作デッキ6と作業
デッキ11の間を昇降して作業員を運搬する。なお作業
デッキ11上の作業員は作業デッキ廻りに設けられた手
摺10で保護されている。また14は、作業デッキ11
を固定デッキ2に仮吊りするための仮設のハンガで(第
5図参照)、作業デッキ11がチェンブロツク4および
作業デッキ吊ワイヤ7によって吊り下げられるまでの間
、作業デッキを支持するために溶接固定され、吊下げ完
了時点で撤去されるものである。次に本発明の装置にお
ける主要構成である作業デッキについて、その動作・構
造を以下に説明する。作業デッキが具備しなければなら
ない機能としては、先ず作業員が作業デッキ上に搭乗し
、ブレーカー等によって炉墜に付着している付着物やれ
んがを撤去する動作が容易でなければならないし、また
作業デッキは高炉炉内を炉□部から羽口レベルまで昇降
するので、下部に降りて行くにつれて次第に炉壁方向に
拡大する必要がある。
In the figure, 1 is the large bell, 12 is the blast furnace shell, 5 is the armor ring waring plate, and the fixed deck 2 is the supporting main beam 1.
3 (see FIG. 4) and is fixed to the manhole portion M. An operating deck 6 is fixedly installed under the fixed deck 2, and the working deck 11 is connected to a working deck hanging wire 7.
4 locations via chain block 4 (see Figure 8 4a).
It is suspended from the fixed deck 2 so that it can be raised and lowered. Further, the gondola 9 is suspended from the fixed deck 2 by a gondola lifting wire 8 so that it can rise and fall, and moves up and down between the operation deck 6 and the work deck 11 to transport workers. Note that the workers on the work deck 11 are protected by handrails 10 provided around the work deck. 14 is the work deck 11
This is a temporary hanger for temporarily suspending the work deck from the fixed deck 2 (see Fig. 5), and is welded to support the work deck until the work deck 11 is suspended by the chain block 4 and the work deck hanging wire 7. It is fixed and removed when the hanging is completed. Next, the operation and structure of the working deck, which is the main component of the apparatus of the present invention, will be explained below. The functions that the work deck must have include: First, it must be easy for workers to board the work deck and use breakers etc. to remove deposits and bricks attached to the reactor core. Since the working deck moves up and down inside the blast furnace from the furnace section to the tuyere level, it needs to gradually expand toward the furnace wall as it descends to the bottom.

そして、本発明の特徴の1つは、炉頂装入装置を撤去す
ることなく炉壁改修装置を設置するものであるが、羽口
レベルでの炉内組立ては、上部から付着物や損傷れんが
が落下する危険があり、また炉口部の固定デッキ上での
組立ては大ベルがあって、ソロバン玉のマンホールMか
らの材料取込みでは全くの小部村からの組立てになり、
実際的でないので、羽口レベルから作業デッキを挿入す
ることになる。従って、羽□レベルの鉄皮関口部を大き
くしないためには、作業デッキは可能な限り小形化しな
ければならない。このような機能を作業デッキに具備さ
せるために、次のような手段が講じられている。すなわ
ち作業デッキ11は第8図に示すように、関脚した状態
で梁l1″で形成される八角形状をしているが、炉内に
挿入時には、第4,5,8図に示すように梁11″で形
成される2辺を折りたたんだ状態で炉内に取込む。
One of the features of the present invention is that the furnace wall repair device can be installed without removing the furnace top charging device, but the furnace interior assembly at the tuyere level eliminates deposits and damaged bricks from the top. There is a danger that the materials may fall, and there is a large bell when assembling on the fixed deck at the mouth of the furnace, and when materials are taken in from the manhole M of the Soroban ball, assembly must be done entirely from Kobe Village.
As this is impractical, the working deck will be inserted from the tuyere level. Therefore, in order to avoid increasing the size of the iron skin entrance at the wing level, the working deck must be made as small as possible. In order to equip the working deck with such a function, the following measures have been taken. In other words, as shown in Fig. 8, the working deck 11 has an octagonal shape formed by the beams l1'' in the connected state, but when inserted into the furnace, the working deck 11 has an octagonal shape as shown in Figs. The two sides formed by the beam 11'' are folded and taken into the furnace.

炉口部固定デッキ2の主支持梁13に、作業デッキ11
上に仮設されたハンガ14にW部で仮熔接後、第5図に
示すように折りたたんである部分11を、A部を中心に
両側に開き、A部を溶暖固定して八角形状にする。なお
CB−1,2,3はチェンフロツクである。例えば、1
845あの高炉においては、炉口部の内蓬は720仇収
程度であるので、作業デッキ1 1の八角形の1辺の大
きさは第8図に示すように2000〜300仇収程度で
、炉壁と作業デッキは500〜60仇舷の間隔となる。
The work deck 11 is attached to the main support beam 13 of the furnace mouth fixed deck 2.
After temporarily welding the W portion to the hanger 14 temporarily installed above, the folded portion 11 is opened on both sides centering on the A portion as shown in Fig. 5, and the A portion is melted and fixed to form an octagonal shape. . Note that CB-1, 2, and 3 are chain locks. For example, 1
845 In that blast furnace, the inner wall of the furnace mouth is about 720 mm, so the size of one side of the octagon of the working deck 11 is about 2000 to 300 mm, as shown in Figure 8. The distance between the furnace wall and the working deck is 500 to 60 yards.

次に作業デッキ11が炉口部より下方に降りるに従って
、当初の八角形では炉壁と作業デッキの距離が次第に離
れるので(高炉炉腹部では内径が1000仇奴以上とな
る)、炉壁の付着物をプレー力で除去する作業が困難と
なる。
Next, as the working deck 11 descends from the furnace mouth, the distance between the furnace wall and the working deck gradually increases in the original octagonal shape (inner diameter of the blast furnace belly is more than 1000 mm). It becomes difficult to remove the kimono using playing force.

そこで作業デッキ11は第8図に示すように、張り出し
部16,16′をボックス16″に収納した状態で作業
デッキ11上に取り付け、操業デッキ6上で円周方向に
張り出すことが出来るような構造となっている。張り出
し部16,16′の骨は、ボックス構造16″の中にH
ビーム16,16′が入っており(第8図C参照)、ス
ライド完了後、ボックス上部に敬付けたナットNにより
、完全に固定することが出釆る。このようにして円周方
向にHビーム16,16′を張り出した後、上面に厚鋼
板を張ることにより、作業デッキ11を炉内径より僅か
に小さくなるようにしながら、徐々に降下させてゆくこ
とが出来る。なお作業デッキ11は、固定デッキ2から
吊り下げられた状態で炉墜から500〜60比奴離れて
おり、作業員が作業デッキ11上で、炉壁付着物をプレ
ー力で破砕する時には、作業デッキが左右に振れるおそ
れがあるので、Hフレーム収納ボックス16^の側面に
設けた管体15′に、第2図に示す振れ止め15が摺動
可能に取り付けられている。
Therefore, as shown in FIG. 8, the work deck 11 is mounted on the work deck 11 with the overhanging parts 16, 16' housed in a box 16'', so that it can be extended over the operation deck 6 in the circumferential direction. The bones of the overhanging parts 16, 16' are inserted into the box structure 16''.
Beams 16 and 16' are included (see Fig. 8C), and after the sliding is completed, it can be completely fixed with a nut N placed on the top of the box. After extending the H beams 16, 16' in the circumferential direction in this manner, by placing a thick steel plate on the upper surface, the working deck 11 is gradually lowered while making it slightly smaller than the inner diameter of the furnace. I can do it. The work deck 11 is suspended from the fixed deck 2 and is 500 to 60 meters away from the reactor crash. To prevent the deck from swinging from side to side, a steady rest 15 shown in FIG. 2 is slidably attached to a tube 15' provided on the side surface of the H frame storage box 16^.

次に第1,2図に示すように、炉内設置される固定デッ
キ2、操作デッキ6、ゴンドラ9、作業デッキ11の各
デッキを炉内へ取込み設置する手順について説明する。
Next, as shown in FIGS. 1 and 2, a procedure for taking and installing the fixed deck 2, operating deck 6, gondola 9, and work deck 11 installed in the furnace into the furnace will be explained.

(手順 1)先ずソロバン玉下部にあるマンホールMか
ら、固定デッキ2の主梁13を炉口部に取り込み、これ
をメイン支持梁にして、炉口部に固定デッキ2を設置す
る。
(Procedure 1) First, take the main beam 13 of the fixed deck 2 into the furnace mouth through the manhole M at the bottom of the soroban ball, use this as the main support beam, and install the fixed deck 2 at the furnace mouth.

(手順 2) 作業デッキ11を折りたたんだ状態でゴンドラ9、操作
デッキ6の機材を搭載して、羽口レベル関口部17から
炉内に挿入する。
(Step 2) With the working deck 11 folded, the gondola 9 and the equipment on the operating deck 6 are loaded and inserted into the furnace from the tuyere level entrance section 17.

(手順 3) 次に、作業デッキ11を固定デッキ2の主梁13の下面
迄、ウィンチ18で引き上げて一且固定し、ハンガー4
を固定デッキ主梁13に掛けた後溶接固定Wする。
(Step 3) Next, use the winch 18 to pull up the working deck 11 to the bottom of the main beam 13 of the fixed deck 2 and secure it once, and then
is hung on the fixed deck main beam 13 and then fixed by welding W.

(第4,5図参照)(手順 4) 折りたたんだ状態の作業デッキ11を第5図に示すよう
に、チヱンプロツクCBI〜3を用いて両側に開き、開
いた後A部を溶接固定することにより、第8図に示す八
角形状の作業デッキ11とする。
(See Figures 4 and 5) (Step 4) As shown in Figure 5, the folded work deck 11 is opened on both sides using chain locks CBI~3, and after opening, the A section is fixed by welding. , an octagonal work deck 11 shown in FIG.

(手順 5) 固定デッキ2および作業デッキ上で、ゴンドラ9と操作
デッキ6とを組立て夫々固定デッキに取り付ける。
(Step 5) On the fixed deck 2 and the work deck, assemble the gondola 9 and the operation deck 6 and attach them to the fixed deck, respectively.

以上で固定デッキ2、操作デッキ6、ゴンドラ9、作業
デッキ11が炉□部に設置されたことになる。
With the above steps, the fixed deck 2, the operation deck 6, the gondola 9, and the work deck 11 have been installed in the furnace section.

そして、これら各デッキは次のような機能を持っている
。固定デッキ2・・・・・・ソロバン玉マンホールM′
より出入する作業員は固定デッキ2の上に、仮設階段1
9を使用して降りる。
Each of these decks has the following functions: Fixed deck 2... Soroban ball manhole M'
Workers entering and leaving from
Use 9 to get off.

このデッキは主梁13によって、操作デッキ6、ゴンド
ラ9、作業デッキ11を吊り下げている。操作デッキ6
・・・・・・固定デッキ2より支柱をとり吊設固定され
ている。
This deck suspends an operation deck 6, a gondola 9, and a work deck 11 by a main beam 13. Operation deck 6
・・・・・・It is suspended and fixed by a support from the fixed deck 2.

作業デッキ11の吊り下し作業は、すべてこの操作デッ
キ上でチェンブロック4を操作して行なう。尚この時ハ
ンガー4の熔接部を外し、ワイヤ一7に吊りかえておく
。2川ま昇降タラップである。
All operations for suspending the work deck 11 are performed by operating the chain block 4 on this operation deck. At this time, remove the welded part of the hanger 4 and replace it with the wire 7. There is a ramp going up and down 2 rivers.

ゴンドラ9・・・・・・操作デッキ6と作業デッキ11
との間を作業員を乗せて昇降する。
Gondola 9... Operation deck 6 and work deck 11
A worker is lifted up and down between the two.

作業デッキ11・・・・・・操作デッキ6上で操作して
、所定の位置まで移動して固定した時点で、裸作デッキ
6からゴンドラ9で作業デッキ11に乗り移り作業を行
なう。
Work deck 11: When operated on the operation deck 6, moved to a predetermined position and fixed, the gondola 9 is transferred from the bare work deck 6 to the work deck 11 for work.

次に、これらのデッキ、ゴンドラを使用して炉壁の付着
物・れんがを、落下の危険のない安全な状態まで撤去す
る作業の方法手順を以下に説明する。
Next, we will explain the procedure for using these decks and gondolas to remove deposits and bricks from the furnace walls to a safe state without any risk of falling.

(手順 6) 固定デッキ2に、ハンガ14で吊り下げてあった作業デ
ッキ11を、第2,6,7図に示す吊り点7,7′,7
″にワイヤロープ、手巻チェーンブロックにより吊り換
え、ハンガ14を撤去する。
(Step 6) The working deck 11, which was suspended from the fixed deck 2 by the hangers 14, is attached to the hanging points 7, 7', and 7 shown in Figures 2, 6, and 7.
'' using a wire rope and a hand-wound chain block, and remove the hanger 14.

(手順 7)固定デッキ2よりワイヤロープで吊り下げ
られた作業デッキ11を、4台の手巻チェーンフロック
4を操作デッキ上から操作して、1のピッチで下降させ
吊りワイヤーロープ4点を緊張させる。
(Step 7) The working deck 11 suspended from the fixed deck 2 with wire ropes is lowered at a pitch of 1 by operating four hand-wound chain flocks 4 from above the operating deck, and the four points of the hanging wire ropes are tensioned. let

次にチェンブロック4台はゆるめ、計4点のワイヤロー
プで固定する。このようにしてワイヤロープ7,7′,
7″を交互に使用−取り換えの操作を繰り返して、所定
のピッチで下降してゆく方法の詳細は、第6,7図から
容易に知ることが出来る。所定の場所まで下降し安定し
た時点で、作業員は操作デッキ6からゴンドラ9で作業
デッキ11に移乗する。まず作業デッキ11上から炉壁
に向け90o方向に4個所の振れ止め15を伸し、安定
した状態にしてから炉壁面に付着している付着物・損傷
れんがを撤去する。尚以上は、炉壁面の付着物・れんが
除去などの改修工事について記載したが、改修時におけ
るれんが構築や冷却器交換などの場合にも適用出来るの
は言うまでもない。
Next, loosen the four chain blocks and secure them with wire ropes at four points in total. In this way, the wire ropes 7, 7',
The details of how to descend at a predetermined pitch by repeating the operation of alternately using and replacing the 7" can be easily seen from Figures 6 and 7. , the worker transfers from the operation deck 6 to the work deck 11 using the gondola 9. First, extend the steady rests 15 at four locations from the top of the work deck 11 toward the furnace wall in the 90o direction, and after making it stable, Remove adhered materials and damaged bricks.Although the above describes repair work such as removing materials and bricks from the furnace wall, it can also be applied to cases such as building bricks and replacing coolers during renovations. Needless to say.

本発明は、以上に説明したような構成であるので、固定
デッキから4ケ所の吊りワイヤで吊り下げられている作
業デッキを、3本7,7′,7″の吊り点を交互に換え
ることにより(第7図参照)、徐々に炉□部から羽□レ
ベルまで降ろし、炉内径が広がるにつれて作業デッキを
拡張してゆ「く事およびゴンドラに作業員が退避できる
ので、炉内壁に付着している付着物やれんがなどを完全
に撤去することができる。従って、それ以後の炉底掻き
出し工事、れんが、冷却装置の改修工事を、上方から付
着物、れんが類の落下の心配なしに、安全に進めること
が出釆る。更に、本発明では羽□レベルにおける鉄皮関
口部から改修装置を炉内へ挿入することが出来るので、
炉頂装入装置の撤去が不要で、冷却装置や余分な鉄皮の
破損などの発生もなく、短期間の改修で、速やかな火入
れ操業が可能となる効果は絶大である。
Since the present invention has the configuration described above, the working deck, which is suspended from the fixed deck by four hanging wires, can be changed by alternating the three hanging points 7, 7', and 7''. (see Figure 7), the furnace is gradually lowered from the □ section to the wing □ level, and as the inner diameter of the furnace expands, the work deck is expanded and the workers can evacuate to the gondola. Therefore, subsequent work to scrape out the bottom of the hearth and repair work on bricks and cooling equipment can be done safely without worrying about deposits or bricks falling from above. In addition, in the present invention, the repair device can be inserted into the furnace from the shell entrance at the feather level.
There is no need to remove the furnace top charging device, there is no damage to the cooling device or excess steel shell, and the effect is tremendous as it enables quick firing operations with a short period of modification.

【図面の簡単な説明】[Brief explanation of drawings]

第1図は実施例の全体説明図、第2図は装置の断面概略
図、第3図は第2図におけるA−A視図、第4図Aは作
業デッキを固定デッキ下方に巻き上げた状態の斜視図B
‘まハンガ詳細図、第5図A,Bは作業デッキ折りたた
み部を開いて組立てる順序の説明図、第6図は装置の正
面断面図、第7図は第6図における作業デッキ移動方法
の詳細説明図、第8図Aは作業デッキ最大径平面、Bは
A−A視、CはD部の詳細図面である。 1・・・・・・大ベル、2・・・・・・固定デッキ、3
・・・・・・シャツクル、4……チエンフロツク、5…
…アーマリングウェアリングプレート、6・・・・・・
操作デッキ、7,7′,7″・…・・作業デッキ吊ワイ
ヤ、8・・・・・・コンドラ昇降用ワイヤ、9・・・・
・・ゴンドラ、10・・・・・・手摺、11,11′,
11″・・・・・・作業デッキ、12.....・鉄皮
、13・・・・・・固定デッキ主梁、14・・・・・・
ハンガ、15・・・・・・作業デッキ振れ止め、16,
16′,16″,16a,16b・・・・・・作業デッ
キ張出し部、17・・・…羽□レベル閉口部、18…・
・・ウィンチ、19……階段、20……タラップ、M,
M・・…・マンホール、W・・・…溶接部、N…・・・
ナット。 第1図 第3図 第2図 第4図 第5図 第6図 第7図 第8図
Fig. 1 is an overall explanatory diagram of the embodiment, Fig. 2 is a schematic cross-sectional view of the device, Fig. 3 is a view taken along line A-A in Fig. 2, and Fig. 4 A is a state in which the working deck is rolled up below the fixed deck. Perspective view B
Detailed view of the hanger, Figures 5A and B are explanatory diagrams of the order of opening and assembling the folding part of the working deck, Figure 6 is a front sectional view of the device, and Figure 7 is the details of the method of moving the working deck in Figure 6. Explanatory drawings, FIG. 8A is a maximum diameter plane of the working deck, B is a view taken along line AA, and C is a detailed drawing of section D. 1...Large bell, 2...Fixed deck, 3
...Shuttle, 4...Chainfrotsk, 5...
...Armor ring wear ring plate, 6...
Operation deck, 7, 7', 7''... Working deck hanging wire, 8... Condra lifting wire, 9...
...Gondola, 10... Handrail, 11, 11',
11''...Working deck, 12.....Iron skin, 13...Fixed deck main beam, 14....
Hanger, 15... Work deck steady rest, 16,
16', 16'', 16a, 16b... Working deck overhang, 17... Feather □ level closing part, 18...
... winch, 19... stairs, 20... gangway, M,
M... Manhole, W... Welded part, N...
nut. Figure 1 Figure 3 Figure 2 Figure 4 Figure 5 Figure 6 Figure 7 Figure 8

Claims (1)

【特許請求の範囲】 1 減尺吹却しの操業によつて空炉状態にした高炉の炉
壁改修に当り、(イ) 炉頂装入装置を撤去することな
く炉頂開口部に支持梁を横架して固定デツキを組立設置
する工程、(ロ) 羽口レベルに開口部を設ける工程、
(ハ) 操作デツキ組立部材およびゴンドラを塔載した
作業デツキを上記羽口レベル開口部より炉内へ挿入する
工程、(ニ) 炉内に挿入された上記作業デツキを巻き
上げて前記固定デツキ下方に仮止めする工程、(ホ)
作業デツキに塔載されて巻き上げられた前記操作デツキ
を固定デツキ下方に固設する工程、(ヘ) 同様にして
巻き上げられた前記ゴンドラを固定デツキに昇降可能に
吊り下げて設置する工程、(ト) 前記作業デツキを固
定デツキに昇降可能に吊り下げ取付けた後、前記仮止め
を撤去する工程、上記これら工程によつて固定デツキ、
操作デツキ、ゴンドラおよび作業デツキが空炉状態の炉
内に設置され、(チ) 上記操作デツキにおいて、作業
デツキの昇降手段と張出し部材の調節手段とを操作して
作業デツキを所定の位置に安定させ、(リ) 作業員は
ゴンドラに塔乗し作業デツキに移行して改修作業を行な
い、(ヌ) 上記改修作業完了後に、作業員はゴンドラ
によつて操作デツキに復帰し、(ル) 作業デツキを次
の所定位置に移動させて改修作業を続行する。 このような手順を繰り返すことを特徴とする高炉炉壁改
修方法。 2 減尺吹却しの操業によつて空炉状態にした高炉炉壁
の改修において、炉頂部に横架した支持梁よりなる固定
デツキと、上記固定デツキの支持梁に固定して吊下げら
れた操作デツキと、該操作デツキ下方に支持梁に昇降可
能に吊下げ支持された炉径方向に折りたたみかつ伸縮自
在の張出し部を具備した作業デツキと、前記操作デツキ
と作業デツキとの間を昇降可能に前記支持梁に吊下げて
設置されたゴンドラとで構成されたことを特徴とする高
炉炉壁改修装置。
[Scope of Claims] 1. When renovating the furnace wall of a blast furnace that has been rendered empty through reduced-scale blowing operations, (a) a support beam is installed at the furnace top opening without removing the furnace top charging device; (b) The process of installing an opening at the tuyere level,
(c) Inserting the working deck carrying the operating deck assembly members and the gondola into the furnace through the tuyere level opening, (d) Hoisting up the working deck inserted into the furnace and moving it below the fixed deck. Temporary fixing process (e)
a step of fixing the operating deck, which has been hoisted up on a working deck, below a fixed deck; ) A step of removing the temporary fixing after the working deck is suspended and attached to the fixed deck so that it can be raised and lowered;
An operating deck, a gondola, and a working deck are installed in the furnace in an empty furnace state; (l) The workers ride on the gondola and move to the work deck to carry out the repair work, (v) After the above repair work is completed, the workers return to the operating deck by gondola, and (l) carry out the work. Move the deck to the next designated location and continue the repair work. A blast furnace furnace wall repair method characterized by repeating such steps. 2. In the repair of the blast furnace wall, which has been left in an empty furnace state through a down-scale blowout operation, a fixed deck consisting of a support beam suspended horizontally on the top of the furnace, and a fixed deck fixed to the support beam of the fixed deck and suspended. a working deck equipped with an overhang that is foldable and extendable in the radial direction of the furnace and is suspended from a support beam so that it can be raised and lowered below the operating deck; A blast furnace furnace wall repair device comprising: a gondola that is installed so as to be suspended from the support beam.
JP4168482A 1982-03-18 1982-03-18 Blast furnace furnace wall repair method and repair device Expired JPS6037165B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP4168482A JPS6037165B2 (en) 1982-03-18 1982-03-18 Blast furnace furnace wall repair method and repair device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP4168482A JPS6037165B2 (en) 1982-03-18 1982-03-18 Blast furnace furnace wall repair method and repair device

Publications (2)

Publication Number Publication Date
JPS58161712A JPS58161712A (en) 1983-09-26
JPS6037165B2 true JPS6037165B2 (en) 1985-08-24

Family

ID=12615246

Family Applications (1)

Application Number Title Priority Date Filing Date
JP4168482A Expired JPS6037165B2 (en) 1982-03-18 1982-03-18 Blast furnace furnace wall repair method and repair device

Country Status (1)

Country Link
JP (1) JPS6037165B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0379820B2 (en) * 1986-01-31 1991-12-20 Shin Kobe Electric Machinery

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101022715B1 (en) * 2008-12-15 2011-03-22 (주)포스코켐텍 Method for constructing refractories in a blast furnace
CN105108395A (en) * 2015-09-28 2015-12-02 武汉一冶钢结构有限责任公司 Blast furnace shell inner wall welding platform and erecting method thereof
CN113428814B (en) * 2021-08-02 2024-02-13 湖南德尚源耐磨工业有限公司 Reducing disc for furnace body construction and assembling method of reducing disc

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0379820B2 (en) * 1986-01-31 1991-12-20 Shin Kobe Electric Machinery

Also Published As

Publication number Publication date
JPS58161712A (en) 1983-09-26

Similar Documents

Publication Publication Date Title
CN101328746B (en) Steel structure high altitude mounting method
US3672649A (en) Shaft or stack furnace and method and apparatus for lining same
CN108678422B (en) Method for dismantling steel chimney
CN105177202B (en) A kind of blast furnace overhaul method
CN109356167A (en) Brace in Deep Footing Groove removes system and construction method
CN106522581A (en) Method for demolish chimney manually
KR100909508B1 (en) Demolition method of blast furnace body
JPS6037165B2 (en) Blast furnace furnace wall repair method and repair device
US2346033A (en) Circular scaffold
JP2006316543A (en) Movable scaffold method of caisson
JP4250290B2 (en) Construction method of shaft
JP3028071B2 (en) Top removal method and scaffold for removal work of ultra-high tubular structure
JP3405537B2 (en) Pneumatic caisson
AU2008229649B2 (en) Method and apparatus for repairing deteriorated refractory linings in large vertical shaft kilns, furnaces5 cyclones and the like
CN110077963B (en) Installation method of large tank
JP2023000184A (en) Mobile protective device and method for dismantling construction scaffold
JP5339991B2 (en) Shaft formation method
JPH068989Y2 (en) Replacement device for inner wall cooling device of bellless blast furnace
JP3589161B2 (en) Dismantling method of blast furnace bottom
JPH0634358Y2 (en) Replacement device for inner wall cooling device of bellless blast furnace
JP6224463B2 (en) Dismantling method of fireproof coating layer inside chimney
JPS5848335Y2 (en) Device to prevent debris from falling on blast furnace inner walls
PL118497B1 (en) Apparatus for visually examining and repairing tapering chimneysskhodjahhikhsja dymovych trub
JP2001003111A (en) Method for dismantling furnace bottom part in blast furnace
JPS63312908A (en) Method for repairing inner wall in blast furnace with safety