JPS60129393A JP23502783A JP23502783A JPS60129393A JP S60129393 A JPS60129393 A JP S60129393A JP 23502783 A JP23502783 A JP 23502783A JP 23502783 A JP23502783 A JP 23502783A JP S60129393 A JPS60129393 A JP S60129393A
Authority
JP
Japan
Prior art keywords
shaft
support frame
frame
bulkhead
excavator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP23502783A
Other languages
Japanese (ja)
Inventor
汐崎 実
誠 太田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Construction Machinery Co Ltd
Original Assignee
Hitachi Construction Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Construction Machinery Co Ltd filed Critical Hitachi Construction Machinery Co Ltd
Priority to JP23502783A priority Critical patent/JPS60129393A/en
Publication of JPS60129393A publication Critical patent/JPS60129393A/en
Pending legal-status Critical Current

Links

Landscapes

  • Perforating, Stamping-Out Or Severing By Means Other Than Cutting (AREA)

Abstract

(57)【要約】本公報は電子出願前の出願データであるた
め要約のデータは記録されません。
(57) [Summary] This bulletin contains application data before electronic filing, so abstract data is not recorded.

Description

【発明の詳細な説明】 本発明は、地盤に立坑を掘削する立坑掘削機に関するも
のである。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a shaft excavator for excavating a shaft in the ground.

従来、立坑を掘削する手段として手掘りと機械掘りとが
ある。以下、従来の立坑の掘削を第1図および第2図を
参照して説明する。
Conventionally, methods for excavating vertical shafts include manual digging and mechanical digging. Hereinafter, conventional shaft excavation will be explained with reference to FIGS. 1 and 2.

掘削した立坑1の坑壁にコルゲートリング4を巻立てて
立坑1の坑壁の崩壊を防ぐようにし、そのコルダートリ
ング4にガイドレール5およヒ支持フレーム8を立坑1
の軸方向に敷設し、そのガイドレール5および支持フレ
ーム8にエレベータ6およびスキツf3を走行可能に係
合させる。なお、図中符号2は立坑1の底、7は前記ガ
イドレール5の下端部に取付けたハシゴである0次に・
その操作について説明する。エレベータ6およびハシゴ
7により作業員や資材または油圧ショベルなどの掘削機
を立坑lの底2に送り、坑底2金手掘りゃ機械掘りによ
り掘削し、その掘削しにズリ全スキップ3に積み込み、
スキツf3に地上に運んでズリ全立坑1外に排出し、コ
ルゲートリング4の1リング分掘削したところで、立坑
1の坑壁にコルゲートリング4を巻立て、以下上述の操
作を繰返して立坑lを掘削する。
A corrugated ring 4 is wrapped around the wall of the excavated shaft 1 to prevent the wall of the shaft 1 from collapsing, and a guide rail 5 and a support frame 8 are attached to the corrugated ring 4.
The elevator 6 and the skid f3 are engaged with the guide rail 5 and support frame 8 in the axial direction of the elevator. In the figure, reference numeral 2 is the bottom of the shaft 1, and 7 is a ladder attached to the lower end of the guide rail 5.
The operation will be explained. Send workers, materials, or excavators such as hydraulic excavators to the bottom 2 of the shaft 1 using the elevator 6 and ladder 7, excavate the bottom 2 by hand or by machine, and load the excavated waste into the skip 3.
After transporting the waste to the ground using the skid f3 and discharging all the waste outside the shaft 1, and excavating one ring of the corrugated ring 4, wrap the corrugate ring 4 around the shaft wall of the shaft 1, and repeat the above operations to open the shaft 1. dig.

ところが、上述の従来の立坑の掘削は、手掘りまたは油
圧ショベルなどの機械掘りにより立坑1を掘削するもの
であるから、手掘りの場合は重労働であり作業能率が悪
い。また、機械(A11りの場合は狭いスペースの立坑
1内で自由に掘削作業を行え得ることが少なく作業能率
が悪い。かつ、油圧ショベル等など坑底2で掘削する場
合、油圧ショベル自身の裏下側の掘削が出来なかった。
However, in the conventional shaft excavation described above, the shaft 1 is excavated by hand or by a machine such as a hydraulic excavator, and therefore, manual digging is hard labor and work efficiency is low. In addition, when using a machine (A11 type), it is difficult to perform excavation work freely in the narrow space of the vertical shaft 1, resulting in poor work efficiency. It was not possible to excavate the lower part.

しかも・坑底2の隅9がパケットで掘れなく、結局手掘
り。
Moreover, corner 9 of bottom 2 of the pit could not be dug with a packet, so in the end it was dug by hand.

によらなければならないなどの欠点がある。There are disadvantages such as having to rely on

本発明は、上述の諸欠点を改善した立坑掘削機 。The present invention is a shaft excavator that has improved the above-mentioned drawbacks.

全提供せんと、するものであるO 本発明は、第1支持フレームと絽2支持フレームとを相
互に摺動可能に装着し、その第1支持フレームと第2支
持フレームとにグリ・ソ/f装置をそれぞれ設け、その
グリッツ母装置により前記第1支持フレームおよび第2
支持フレームを立坑内に固定しKりまたは昇降させたり
するように林成い前記第1支持フレームまたは第2支持
フレームに掘削機を、第1支持フレームおよび第2支持
フレームの摺動方向と同方向に摺動する摺動手段と、第
1支持フレームおよび第2支持フレームの軸を中心軸と
して回動する第1回動手段と、その第1回動手段の中心
軸から偏心した軸を中心軸として回動する第2回動手段
とを介して摺動、公転、自転可能に装着したことを特徴
とする。
According to the present invention, a first support frame and a second support frame are slidably attached to each other, and the first support frame and the second support frame are provided with f devices are respectively provided, and the grit mother devices support the first support frame and the second support frame.
The support frame is fixed in the shaft and the excavator is mounted on the first support frame or the second support frame in the same direction as the sliding direction of the first support frame and the second support frame. a sliding means that slides in the direction, a first rotating means that rotates about the axes of the first support frame and the second support frame, and an axis that is eccentric from the central axis of the first rotating means. It is characterized in that it is mounted so that it can slide, revolve, and rotate via a second rotation means that rotates as an axis.

以下、本発明の立坑掘削機の一実施例を第3図乃至第6
図を参照して説明1−る。
An embodiment of the shaft excavator of the present invention is shown in Figs. 3 to 6 below.
Explanation 1-1 with reference to the drawings.

図中、第1図および第2図と同符号”+を同一のものを
示す。
In the figure, the same symbol "+" as in FIGS. 1 and 2 indicates the same thing.

1 しかして、この実施例における爽発明の立坑掘削機
は、第1支持フレームとしての外フレーム1゜と・第2
支持フレームとしての内フレーム11と、第1グリツパ
装置13と、第2グリツパ装置18と、摺動手段2]と
、第1回動手段δと、第2回動手段33と、掘削機41
とを備える。
1. Therefore, the shaft excavator according to the invention in this embodiment has an outer frame 1° as the first support frame and a second support frame.
Inner frame 11 as a support frame, first gripper device 13, second gripper device 18, sliding means 2], first rotation means δ, second rotation means 33, excavator 41
Equipped with.

前記外フレーム10は、コルゲートリング4の径より小
さい径の円筒形状金な丁。一方、前記内フレーム11は
外径が前記外フレーム10の内径より若干小さい円筒形
状をなす。この内フレーム11t−外フレーム10中に
挿入し、この外フレーム10の外側面の中間部と、内フ
レーム1Oの第2グリツツ?装置18のグリツノヤガイ
ド18aとに摺動ジヤツキ12の両端を回動可能に取付
け、この摺動ジヤツキ12を伸縮作動させることKより
、外フレーム10と内フレーム11とは外フレーム1O
および内フレームl】の軸方向に相互に摺動することが
できる。
The outer frame 10 is a cylindrical metal knife with a diameter smaller than the diameter of the corrugated ring 4. On the other hand, the inner frame 11 has a cylindrical shape whose outer diameter is slightly smaller than the inner diameter of the outer frame 10. This inner frame 11t is inserted into the outer frame 10, and the middle part of the outer surface of this outer frame 10 and the second grit of the inner frame 1O are connected to each other. Both ends of the sliding jack 12 are rotatably attached to the grip guide 18a of the device 18, and the sliding jack 12 is operated to expand and contract.The outer frame 10 and the inner frame 11 are connected to the outer frame 1O.
and the inner frame l] can slide relative to each other in the axial direction.

前記第1グリツツぐ装置13は、第5図に示すように、
筒状のグリツノヤガイド13&の一端を外フレーム10
の外側面の上端に外フレーム10の径方向に、かつ十字
状に固定する。このグリッパガイド13a中にグリツノ
ヤニ4ヲグリツノ母ガイド13mおよびグリッパ14の
長手方向に摺動可能に挿入する。このグリッツf14は
その先端が閉塞され、そのグリッパ14の先端と外フレ
ーム10とにグリシ/やジヤツキ15の両5)f1回動
可能に取付ける。前記グリッパ14の先端にグリッパシ
ュー16を取付ける。一方、前記第2グリツパ装置18
は、上述の第1グリツパ装置13と同様に、グリッパガ
イド18aと、グリッパ19と、グリッツ母シュー肋と
、グリッ/母ジすツキC図示せず)とからなる。この第
2グリツツ母装置18および第1グリッパ装置13ヲ作
動させてグリッツやシューIおよび16t−コルゲート
リング4のフランジ17に係合させたり保合を外したり
てることにより、外フレーム10および内フレーム11
 t−立坑1内に固定したりまたは昇降させたりするこ
とができる。また、この第1グリツパ装置13および第
2グリツパ装置18は、十字方向にかつ上下同位置に鰻
け、隣り合うグリッパ装置13 、18の間に空間部が
形成され、この空間部にスキップ3やエレベータ6など
を通すことができる。
The first grinding device 13, as shown in FIG.
Connect one end of the cylindrical Gritsunoya guide 13 to the outer frame 10
It is fixed to the upper end of the outer surface of the outer frame 10 in the radial direction of the outer frame 10 in a cross shape. The grit resin 4 is slidably inserted into the gripper guide 13a in the longitudinal direction of the grit base guide 13m and the gripper 14. The tip of the grit f14 is closed, and the gripper 14 and the outer frame 10 are rotatably attached to the gripper 15 and the gripper 15. A gripper shoe 16 is attached to the tip of the gripper 14. On the other hand, the second gripper device 18
Like the first gripper device 13 described above, it is composed of a gripper guide 18a, a gripper 19, a grit mother shoe rib, and a grip/mother grip C (not shown). By operating the second grit master device 18 and the first gripper device 13 to engage or disengage the grits, the shoe I, and the flange 17 of the 16t corrugated ring 4, the outer frame 10 and the inner frame 11
It can be fixed in the T-shaft 1 or raised and lowered. Further, the first gripper device 13 and the second gripper device 18 are arranged in a cross direction at the same position above and below, and a space is formed between the adjacent gripper devices 13 and 18, and a skip 3 and a space are formed in this space. Elevator 6 etc. can be passed through.

前記摺動手段2】は、前記内フレーム11の内側面にコ
字形形状のガイドフレーム21ai相対向させ、かつ内
フレーム11の軸方向に固定する・このガイドフレーム
21mに薄い箱形形状の摺動フレームnをガイドフレー
ム21mに沿って摺動可能に係合する。この摺動フレー
ム四の両端部に開口部を中間部から下端にかけて設ける
と共に、この摺動フレーム四の両側面にリプ24ヲ中間
部から下端にかけて設ける。この摺動フレームn内のほ
ぼ中間部と、前記ガイドフレーム21mの上端とに摺動
ジヤツキおの両端を回動自在に取付ける。この摺動ジヤ
ツキ23ヲ伸縮させることにより摺動フレーム22ヲガ
イドフレーム21mの長手方向、すなわち外フレーム1
0および内フレーム11の軸方向に摺動させることがで
きる。
The sliding means 2] has a U-shaped guide frame 21ai facing the inner surface of the inner frame 11 and is fixed in the axial direction of the inner frame 11.A thin box-shaped sliding member is attached to the guide frame 21m. The frame n is slidably engaged along the guide frame 21m. Openings are provided at both ends of the sliding frame 4 from the middle to the lower end, and lips 24 are provided on both sides of the sliding frame 4 from the middle to the lower end. Both ends of the sliding jack are rotatably attached to a substantially middle portion of the sliding frame n and to the upper end of the guide frame 21m. By expanding and contracting this sliding jack 23, the sliding frame 22 is moved in the longitudinal direction of the guide frame 21m, that is, the outer frame 1
0 and the inner frame 11 in the axial direction.

前記第1回動手段5は、前記摺動手段21の摺動フレー
ムηの下1i11K固定側バルクヘッド25mの上面を
固定する。この固定側バルクヘッド25&の下面にベア
リング26ヲ介して回動側バルクヘッドnを、外フレー
ム10および内フレーム11の軸を中心として回転可能
に設ける。すなわち、固定側バルクヘッド25mの下面
にベアリング九のインナレース’を固定し、そのベアリ
ングかのアウタレースに回動側バルクヘッド27ヲ固定
する。前記固定側バルクヘッド25aの上面にオイルモ
ータ28′ft搭載し、そのオイルモータ列の回転軸に
ピニオン29ヲ固定し、一方前記ペアリングあのアウタ
レースの外側面にギヤ30ヲ設け、そのギヤ(9)に前
記オイルモータ列のピニオン29vi−噛合させる。オ
イルモータ列を駆動させることにより、回動側バルクヘ
ッドnを固定側バルクヘッド25mに対して外フレーム
10および内フレーム11の軸を中心として回転させる
ことができるように構成する。32は固定側バルクヘッ
ド25mの中心、すなわち回動側バルクヘッドIの回転
中心軸上に設けにスウイペルジョイントであって、地上
などの固定側から回転側バルクヘッドnに設けたアクチ
ュエータに圧油を供給する。
The first rotation means 5 fixes the upper surface of the lower 1i11K fixed side bulkhead 25m of the sliding frame η of the sliding means 21. A rotating bulkhead n is provided on the lower surface of the stationary bulkhead 25 & via a bearing 26 so as to be rotatable about the axes of the outer frame 10 and the inner frame 11. That is, the inner race of bearing 9 is fixed to the lower surface of the stationary bulkhead 25m, and the rotating bulkhead 27 is fixed to the outer race of the bearing. An oil motor 28'ft is mounted on the upper surface of the fixed side bulkhead 25a, and a pinion 29 is fixed to the rotating shaft of the oil motor row. ) is engaged with the pinion 29vi of the oil motor row. By driving the oil motor train, the rotating bulkhead n can be rotated about the axes of the outer frame 10 and the inner frame 11 relative to the stationary bulkhead 25m. 32 is a swipel joint installed at the center of the fixed side bulkhead 25m, that is, on the rotation center axis of the rotating side bulkhead I, and is a swipel joint that applies pressure from the fixed side such as the ground to the actuator installed on the rotating side bulkhead n. Supply oil.

前記第2回動手段33は、前記第1回動手段5の回動側
バルクヘッドυの下面に上バルクヘッド33aを固定す
る。この上バルクヘッド33aの下面にベアリング34
ヲ介して下バルクヘッド35vf−1前記第1回動手段
50回転中心軸より偏心しに軸全中心として回転可能に
設ける。すなわち、上バルクヘット33mの下[Kベア
リングあのインナレースを固定し、そのベアリングあの
アウターレースに下バルクヘッド35ヲ固定する。前記
上バルクヘッド33mの上面にオイルモータ36ヲ搭載
し、そのオイ ・ルモータあの回転軸にピニオン37ヲ
固定し、−万前記ペアリングあのアウタレースの外側面
にギヤ38を設け、そのギヤおに前記オイルモータあの
ピニオン37ヲ噛合させる。オイルモータ36全駆動さ
せることKより、下バルクヘッド35ヲ上バルクヘッド
33mに対して第1回動手段5の回動中心軸より偏心し
に軸を中心として回転させることができるように構成す
る。40は上バルクヘッド33aの中心、すなわち、下
バルクヘッドあの回転中心軸上に設けにスウ′イペルジ
ョイントであって、地上などの固定側から回転側の下バ
ルクヘッドあに設けたブームツヤツキ43およびパケッ
トジヤツキ46に圧油を供給する〇 前記掘削機41は、前記第2回動手段35の下バルクヘ
ッド35mの下面に装備する。丁なわち・ 第2回動手
段あの下バルクヘッド35の下面にブーム42の上端を
ビン41mにより枢支し、そのブーム42のほぼ中央部
と下バルクヘッドあの下面とにブームジヤツキ430両
端をそれぞれピンにより枢支し、前記ブーム42の下端
にパケット45の上部をビン44により枢支し、そのパ
ケット45の上部とブーム42の上端とにパケットジヤ
ツキ46の両端をそれぞれピンにより枢支する、なお、
図中符号47は前記)9ケツ)30の下部に設けた爪で
あって、ブームジヤツキ43およびパケットジヤツキ4
6の操作およびその力により坑底2を掘削する。
The second rotation means 33 fixes the upper bulkhead 33a to the lower surface of the rotation side bulkhead υ of the first rotation means 5. A bearing 34 is provided on the lower surface of the upper bulkhead 33a.
The lower bulkhead 35vf-1 is provided eccentrically from the rotational center axis of the first rotation means 50 so as to be rotatable about the entire axis. That is, the inner race of the K bearing under the upper bulkhead 33m is fixed, and the lower bulkhead 35 is fixed to the outer race of the bearing. An oil motor 36 is mounted on the upper surface of the upper bulkhead 33m, a pinion 37 is fixed to the rotating shaft of the oil motor, and a gear 38 is provided on the outer surface of the outer race of the pairing. Engage that pinion 37 of the oil motor. By fully driving the oil motor 36, the lower bulkhead 35 can be rotated about an axis eccentrically relative to the rotation center axis of the first rotation means 5 with respect to the upper bulkhead 33m. . Reference numeral 40 is a sweeper joint provided at the center of the upper bulkhead 33a, that is, on the rotation center axis of the lower bulkhead, and a boom glossy joint 43 and 40 provided from the fixed side such as the ground to the rotating side of the lower bulkhead. Supplying pressure oil to the packet jack 46 The excavator 41 is installed on the lower surface of the lower bulkhead 35m of the second rotation means 35. The upper end of the boom 42 is pivotally supported on the lower surface of the lower bulkhead 35 of the second rotation means by means of a pin 41m, and both ends of the boom jack 430 are pinned to approximately the center of the boom 42 and to the lower surface of the lower bulkhead. The upper part of the packet 45 is pivotally supported to the lower end of the boom 42 by a pin 44, and both ends of a packet jack 46 are pivotally supported to the upper part of the packet 45 and the upper end of the boom 42 by pins. ,
Reference numeral 47 in the figure is a claw provided at the bottom of the above-mentioned 9-piece) 30, which is used for the boom jack 43 and the packet jack 4.
The bottom hole 2 is excavated by the operation in step 6 and its force.

この実施例における本発明の立坑掘削機は、以上の如き
構成よりなり、以下その操作について説明する〇 まず、外フレーム10および内フレーム11ヲ第1グリ
ツツや装置13のグリッパ14と第2ダリツd装置18
のグリッパ19を張ることによってコルダートリング4
に支持させ、立坑1のほぼ中央部に固定す第1回動手段
50回動側ノZルクヘッドnと第2回動手段35の下バ
ルクヘッド35aTh旋回させることによって、掘削パ
ケット47を公転、自転させて坑底2のどの方向にも向
けることが出来る。立坑1の断面が大きく、ブーム42
.掘削ノ4ケット45単独の掘削範囲だけでは坑底2の
全域の掘削が力・々−出来ない場合でも、第2回動手段
33の上フレーム33aK立坑1の中心軸から偏心させ
て下バルクヘッド35ヲ旋回可能に支持しているので、
坑底2の隅9も容易に掘削範囲の中圧入ってくる。坑底
2の掘削を行いズリはスキツf3に掘削パケット45に
より積み込み立坑1外に排出する。
The shaft excavator of the present invention in this embodiment has the above-mentioned configuration, and its operation will be explained below. First, the outer frame 10 and the inner frame 11 are connected to the first grit, the gripper 14 of the device 13, and the second darn d. device 18
By tensioning the gripper 19 of the cordat ring 4
The drilling packet 47 is rotated around the revolution and rotation of the first rotating means 50, which is supported by the shaft 1, and the lower bulkhead 35aTh of the second rotating means 35. It can be turned in any direction on the bottom of the pit 2. The shaft 1 has a large cross section, and the boom 42
.. Even if it is not possible to excavate the entire area of the bottom 2 with the excavation range of the excavation socket 45 alone, the upper frame 33aK of the second rotation means 33 can be moved eccentrically from the center axis of the shaft 1 to lower the lower bulkhead. 35 is supported so that it can rotate,
The corner 9 of the pit bottom 2 also easily enters the intermediate pressure of the excavation range. The bottom 2 of the pit is excavated, and the waste is loaded into the excavation packet 45 into the excavation tank f3 and discharged out of the shaft 1.

坑底2の掘削を行うにつれて掘削部が深くなるが・摺動
手段21の摺動ジヤツキ23を伸ばし、掘削位置の調整
を行い掘削する。
As the bottom 2 is excavated, the excavated portion becomes deeper, but the sliding jack 23 of the sliding means 21 is extended to adjust the excavation position and excavate.

このようにしてコルダートリング4の1リング分の掘削
が完了すると坑底2に於て新しくコルゲートリング4を
巻き立て、坑壁ヲ葆護する。次の掘削工程に入りまた掘
削を繰り返す。
When the excavation of one corrugate ring 4 is completed in this way, a new corrugate ring 4 is wound up at the bottom 2 of the pit to protect the shaft wall. Enter the next excavation process and repeat the excavation.

内フレーム11の位置が摺動手段2】の摺動ジヤツキお
の深さ方向の位置調整をしても坑底2の掘削が出来ない
位置まで坑底2から離れてしまった場合には、内フレー
ム11の第2グリツツ!装置18のグリッパ19ヲゆる
め、摺動ジヤツキ12により内フレーム11ヲ坑底2方
向に移動させ、グリッパ19ヲ押し付けてコルゲートリ
ング4に内フレーム11を固定する。次に外フレーム1
0の第1グリツ/4’装置13のグリッパ14ヲゆるめ
て摺動ジヤツキ12により外フレーム10ヲ引き下ろし
、グリッパ14ヲ押し付けてコルダートリング4に外フ
レーム10ヲ固定する。
If the position of the inner frame 11 has moved away from the bottom of the pit 2 to a point where the bottom of the pit 2 cannot be excavated even after adjusting the position of the sliding jack of the sliding means 2 in the depth direction, Second grit of frame 11! The gripper 19 of the device 18 is loosened, the inner frame 11 is moved in two directions at the bottom of the mine by the sliding jack 12, and the inner frame 11 is fixed to the corrugated ring 4 by pressing the gripper 19. Next, outer frame 1
The gripper 14 of the first grit/4' device 13 of No. 0 is loosened, the outer frame 10 is pulled down by the sliding jack 12, and the gripper 14 is pressed to fix the outer frame 10 to the cord ring 4.

このように外フレーム10、内フレーム11ヲコルr−
トリング4に固定した状態で・あらたに立坑底の掘削を
行うのである。
In this way, the outer frame 10 and the inner frame 11 are
With the shaft fixed to the tring 4, the bottom of the shaft is newly excavated.

外フレーム10、内フレーム11は立坑1の中心部近傍
にあり、第1.第2グリツツ4装置13 、18はそれ
ぞれの内、外フレーム10 、11から脚のように伸ば
し立坑壁のコルゲートリング4に固定するので、外フレ
ーム10とコルゲートリング4の間及び隣り合うグリッ
ツや間にスキップ3やエレベータ6を配置することが出
来、ズリの巻上げ作業や人、材料の昇降が可能となる。
The outer frame 10 and the inner frame 11 are located near the center of the shaft 1. The second grit 4 devices 13, 18 extend like legs from the inner and outer frames 10, 11 and are fixed to the corrugated ring 4 on the shaft wall, so that the second grit 4 devices 13 and 18 extend between the outer frame 10 and the corrugated ring 4 and between adjacent grits and A skip 3 and an elevator 6 can be placed at the top, making it possible to hoist up waste and move people and materials up and down.

立坑の掘削が完了した時点では第1.第2グリッパ装置
13.18’t−縮めることにより、掘削機を含めた内
外フレーム10”、’ 11 ’にクレーンにより巻上
げ回収することが可能であり、または内外フレーム10
 、11を第1.′第2グリッパ装置13 、18の動
作により摺動をくり返して立坑上まで戻り回収すること
が出来る。このようにしてこの立坑掘削機は別の立坑掘
削に転用することが可能である。
When the vertical shaft excavation is completed, the 1st. By retracting the second gripper device 13.18't, it is possible to hoist and recover the inner and outer frames 10" and '11' including the excavator by a crane, or the inner and outer frames 10"
, 11 as the first. 'By the operation of the second gripper devices 13 and 18, it is possible to repeat the sliding movement to return to the top of the shaft and collect it. In this way, the shaft excavator can be repurposed for other shaft excavations.

なお、上述の実施例においては、内ケーシング11に摺
動手段2】を装備し、その摺動手段21に第1回動手段
25ヲ装備し、その第1回動手段部に第2回動手段33
を装備したものであるが、その装備順序は上述の実施例
にのみ限定されるものではない。
In the above embodiment, the inner casing 11 is equipped with a sliding means 2, the sliding means 21 is equipped with a first rotating means 25, and the first rotating means is equipped with a second rotating means. Means 33
However, the order of installation is not limited to the above embodiment.

以上の実施例からも明らかなように、本発明の立坑掘削
機は、下記の効果を奏し得る。
As is clear from the above embodiments, the shaft excavator of the present invention can achieve the following effects.

1、人力掘削によらず、掘削機による強力掘削が可能で
ある。
1. Powerful excavation with an excavator is possible instead of manual excavation.

2、立坑底の隅の掘削も問題なく行うことが出来、かつ
坑底より浮いた位置に掘削機があるから坑底の掘削が自
由に出来る。人が坑底で掘削作業を行わないから安全な
掘削作業が出来る。 。
2. It is possible to excavate the corners of the bottom of the shaft without any problems, and since the excavator is located above the bottom of the shaft, the bottom of the shaft can be excavated freely. Safe excavation work is possible because people do not excavate at the bottom of the mine. .

3、掘削力の反力が掘削機の自重によらず、グリッツ4
’fc介して坑壁にとらせているのでさらに強力な掘削
力が得られ、硬い地層まで掘削が可能となる。
3. The reaction force of the excavation force does not depend on the excavator's own weight, and grits 4
Since it is attached to the pit wall via 'fc, even stronger digging force can be obtained, making it possible to drill into hard strata.

4、 ズリの巻上げスキップ、人、材料昇降のエレベー
タを掘削機をさけて配置することが可能となる。
4. Skips for hoisting waste, elevators for raising and lowering people and materials can be placed to avoid excavators.

5、 内外フレームの摺動動作で掘削機のフレームが自
ら立坑を上下することができる。
5. The excavator frame can move up and down the shaft by itself through the sliding movement of the inner and outer frames.

6、立坑の掘削完了時には掘削機の回収が可能である。6. The excavator can be recovered when the shaft excavation is completed.

7、 掘削断面の大きな立坑で、旋回フレーム33を使
って掘削機を偏心して配置するので、比較的小さな掘削
機で坑底隅部まで掘削が可能となる。
7. In a vertical shaft with a large excavation cross-section, the revolving frame 33 is used to position the excavator eccentrically, making it possible to excavate to the bottom corners with a relatively small excavator.

【図面の簡単な説明】 第1図は従来の立坑の掘削の手段を表わしに縦断面図、
第2図は第1図における■矢視図、第3図は本発明の立
坑掘削機の一実施例を示した縦断面図、第4図は第3図
における■矢視図、第5図は第4図におけるV−v線断
面図、第6図は第3図におけるVl−Vl線断面図であ
る。 1・・・立坑、2・・・坑底、4・・・コルグー) 1
Jング、10・・・外フレーム(il支持フレーム)、
1】・・・内フL’−A(第2支持フレーム)、13・
・・第1グリツツや装置、18・・・第2グリツi4装
置、21・・・摺動手段、5・・・第1回動手段、33
・・・第2回動手段、41・・・掘削機。 特許出願人 日立建機株式会社 代理人弁理士 秋 本 正 実 第1図 ↓ :l 2 第2図 第3図 第4図
[Brief explanation of the drawings] Figure 1 is a longitudinal sectional view showing a conventional means of excavating a vertical shaft;
Fig. 2 is a view in the direction of the ■ arrow in Fig. 1, Fig. 3 is a vertical sectional view showing an embodiment of the shaft excavator of the present invention, Fig. 4 is a view in the direction of the - arrow in Fig. 3, and Fig. 5 is a cross-sectional view taken along the line V--V in FIG. 4, and FIG. 6 is a cross-sectional view taken along the line Vl--Vl in FIG. 1...Shaft, 2...Bottom, 4...Korgu) 1
J, 10...Outer frame (il support frame),
1]...Inner frame L'-A (second support frame), 13.
...First grit or device, 18...Second grit i4 device, 21...Sliding means, 5...First rotation means, 33
...Second rotation means, 41...Excavator. Patent Applicant Hitachi Construction Machinery Co., Ltd. Representative Patent Attorney Tadashi Akimoto Figure 1↓ :l 2 Figure 2 Figure 3 Figure 4

Claims (1)

【特許請求の範囲】[Claims] 第1支持フレームと第2支持フレームと全相互に摺動可
能に装着し、その第1支持フレームと第2支持フレーム
とにグリッツj装置をそれぞれ設け、そのダリツパ装置
により前記第1支持フレームオよび第2支持フレームを
立坑内に固定しにりまたは昇降させたりするように構成
し、前記第1支持フレームまたは第2支持フレームに掘
削機を、第1支持フレームおよび第2支持フレームの摺
働方向と同方向に摺動する摺動手段と、第1支持フレー
ムおよび第2支持フレームの軸全中心軸として回動する
第1回動手段と、千の第1回動手段の中心軸から偏心、
した軸を中心軸として回動する第2回動手段とを介して
摺動、、゛公転、自転可能に装着したこと全特徴とする
立坑掘削機。
A first support frame and a second support frame are all slidably attached to each other, and each of the first support frame and the second support frame is provided with a grits j device, and the grits j device is used to connect the first support frame and the second support frame. The second support frame is configured to be fixed in the shaft or moved up and down, and the excavator is attached to the first support frame or the second support frame in the sliding direction of the first support frame and the second support frame. a sliding means that slides in the same direction as the axis of the first support frame and the second support frame;
A vertical shaft excavator is equipped to be able to slide, revolve, and rotate via a second rotation means that rotates about a shaft as a central axis.
JP23502783A 1983-12-15 1983-12-15 Vertical pit drilling machine Pending JPS60129393A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP23502783A JPS60129393A (en) 1983-12-15 1983-12-15 Vertical pit drilling machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP23502783A JPS60129393A (en) 1983-12-15 1983-12-15 Vertical pit drilling machine

Publications (1)

Publication Number Publication Date
JPS60129393A true JPS60129393A (en) 1985-07-10

Family

ID=16979991

Family Applications (1)

Application Number Title Priority Date Filing Date
JP23502783A Pending JPS60129393A (en) 1983-12-15 1983-12-15 Vertical pit drilling machine

Country Status (1)

Country Link
JP (1) JPS60129393A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH03180620A (en) * 1989-12-11 1991-08-06 Kajima Corp Method and device for excavation of caisson bottom
JPH04179794A (en) * 1990-11-14 1992-06-26 Toshinori Ichitsubo Excavator for vertical shaft

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH03180620A (en) * 1989-12-11 1991-08-06 Kajima Corp Method and device for excavation of caisson bottom
JPH04179794A (en) * 1990-11-14 1992-06-26 Toshinori Ichitsubo Excavator for vertical shaft

Similar Documents

Publication Publication Date Title
CN201786244U (en) Rotary drilling rig
GB2161521A (en) A process and device for sinking wells
CN206844193U (en) Bore support integral type pile hole forming device
JPS60129393A (en) Vertical pit drilling machine
CN110259373B (en) Low headroom rotary drill
KR200204678Y1 (en) Casing apparatus of excavation machine
KR100255423B1 (en) Method and apparatus of pipe for foundation construction
JPS60129392A (en) Vertical pit drilling machine
JP6077986B2 (en) Obstacle ground pile placing device and method of placing a steel pipe pile on the obstacle ground
CN113431486A (en) Rotary drilling rig and rapid grooving construction method for diaphragm wall thereof
JP3680957B2 (en) Excavation work vehicle
JP2598548B2 (en) Drilling method and apparatus for caisson bottom
JP3064258B2 (en) Construction method of casing shaft
KR890003263B1 (en) Method and apparatus of exca-vating vertical tunnel
CN112554783A (en) Dry hole-forming drilling machine for construction in underground narrow space and construction method
CN211816237U (en) Embedded type rock-entering and middle-digging integrated static hydraulic pile machine
JP3474250B2 (en) Excavator
JP3932100B2 (en) Band device
JP3409916B2 (en) Drilling rod coupling device in excavator
JP2715275B2 (en) Excavation method
JP3250373B2 (en) Drilling rig and method of penetrating excavated body by digging rig
JP2001090465A (en) Excavator for earth drill, and earth drill
JPS6241106Y2 (en)
JP5526893B2 (en) Attitude control device for suspended excavator
JPS641637B2 (en)