JPS6011023Y2 - Climbing derrick for power transmission tower assembly - Google Patents

Climbing derrick for power transmission tower assembly

Info

Publication number
JPS6011023Y2
JPS6011023Y2 JP1754580U JP1754580U JPS6011023Y2 JP S6011023 Y2 JPS6011023 Y2 JP S6011023Y2 JP 1754580 U JP1754580 U JP 1754580U JP 1754580 U JP1754580 U JP 1754580U JP S6011023 Y2 JPS6011023 Y2 JP S6011023Y2
Authority
JP
Japan
Prior art keywords
boom
steel pole
steel
booms
support frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP1754580U
Other languages
Japanese (ja)
Other versions
JPS56118518U (en
Inventor
映吉 余語
Original Assignee
近畿イシコ株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 近畿イシコ株式会社 filed Critical 近畿イシコ株式会社
Priority to JP1754580U priority Critical patent/JPS6011023Y2/en
Publication of JPS56118518U publication Critical patent/JPS56118518U/ja
Application granted granted Critical
Publication of JPS6011023Y2 publication Critical patent/JPS6011023Y2/en
Expired legal-status Critical Current

Links

Landscapes

  • Jib Cranes (AREA)

Description

【考案の詳細な説明】 この考案は、送電用鉄塔の組立用に使用するクライミン
グデリックに関するものである。
[Detailed description of the invention] This invention relates to a climbing derrick used for assembling power transmission towers.

送電鉄塔の組立てには、鉄塔の組立進行に追従して、鉄
柱を地上よりせり上げて行くクライミングデリックが使
用される。
When assembling power transmission towers, a climbing derrick is used to raise the steel poles above the ground as the towers are being assembled.

従来のクライミングデリックは、せり上げ式鉄柱の両側
に二組にブームを、鉄柱への取付位置を中心に各々俯仰
と旋回が自在となるよう取付け、一方のブームを地上の
アンカーに固定し、他方のブームを鉄塔材料の吊上げ用
に使用するようにした構造であり、ブームの旋回は人力
により地上からワイヤーを介して行なうようにしていた
Conventional climbing derricks have two sets of booms mounted on both sides of a raised steel pole, each of which can be raised and turned freely around the mounting position on the steel pole.One boom is fixed to an anchor on the ground, and the other boom is fixed to an anchor on the ground. The structure was such that the boom was used to lift the steel tower material, and the boom was rotated manually from the ground via wires.

上記のように、一方のブームを地上のアンカーと固定す
る構造では、吊荷側ブームを旋回させた場合、両側ブー
ムの方向が一致しなくなり、鉄柱をはさむ両側のバラン
スがくずれるのでブームの吊上荷重が極端に低下すると
いう問題が生じる。
As mentioned above, in a structure in which one boom is fixed to an anchor on the ground, when the boom on the lifting side is rotated, the directions of both booms will not match, and the balance on both sides of the steel pole will be lost, so the boom cannot be lifted. A problem arises in that the load is extremely reduced.

また、ブームの旋回を地上からのワイヤー操作によって
制御する手段では、作業が面倒で円滑な操作が行えない
と共に、特に鉄柱の頂部に変位が生じるとブームには自
動的に旋回力が発生し、従ってブーム旋回の人力制御で
は極めて危険を伴うという問題がある。
In addition, the method of controlling the swing of the boom by wire operation from the ground is cumbersome and does not allow for smooth operation, and in particular, when the top of the steel pole is displaced, a swing force is automatically generated in the boom. Therefore, there is a problem in that manual control of boom rotation is extremely dangerous.

さらに、鉄柱に対するブームの取付けは、鉄柱の組立途
中において行なわなければならないので、最初の鉄柱組
立作業が煩雑であるという欠点がある。
Furthermore, since the boom must be attached to the steel pole during the assembly of the steel pole, there is a drawback that the initial assembly of the steel pole is complicated.

この考案は、上記のような問題点や欠点を解消するため
に威されたものであり、ブームの旋回が極めて円滑に、
しかも安全に行なえ、更にブームの吊上荷重が優れ組立
ての容易なりライミングデリックを提供することが目的
である。
This idea was developed to solve the problems and drawbacks mentioned above, and allows the boom to turn extremely smoothly.
Moreover, the purpose is to provide a rimming derrick that can be carried out safely, has a good boom lifting load, and is easy to assemble.

以下、この考案の実施例を添付図面に基づいて説明する
Hereinafter, embodiments of this invention will be described based on the accompanying drawings.

図示のように、下部ベース1に架台2を組立て、ベース
1中夫の架台2で囲まれた部分に鉄柱3を組立てる。
As shown in the figure, a pedestal 2 is assembled to a lower base 1, and an iron column 3 is assembled to a portion of the base 1 surrounded by the pedestal 2.

上記架台2は適当な長さに形成された柱材2aを用い、
これをクレーンで順次積重ねてボルト締めで固定し、中
間ベース4や上部ベース5を設け、料地支線6により支
持して組立てるものである。
The pedestal 2 uses pillars 2a formed to an appropriate length,
These are stacked one by one using a crane and fixed with bolts, an intermediate base 4 and an upper base 5 are provided, and they are supported by a land branch line 6 and assembled.

上記鉄柱3も架台2と同様の各種柱材3aを用い、せり
上げつつ順次継ぎ足して組立てるものであり、鉄柱3の
上昇は上部及び中間ベース4,5に取付けたガイドロー
ラ7等で垂直に誘導される。
The above-mentioned steel column 3 is also assembled by using various column materials 3a similar to those of the pedestal 2, and adding them one after another while raising the steel column 3. The rise of the steel column 3 is guided vertically by guide rollers 7, etc. attached to the upper and intermediate bases 4 and 5. be done.

鉄柱3のせり上げは、上下ベース1,5及び鉄柱3の最
下部柱材に取付けたブラケットにせり上用ワイヤロープ
を掛巻し、(図示省略)このロープを地上のウィンチで
巻取ることにより、柱材3aの長さだけ間歇的にせり上
げて行くものである。
The steel pole 3 can be raised by winding a wire rope for raising the height around the brackets attached to the upper and lower bases 1 and 5 and the lowest pillar material of the steel pole 3 (not shown), and winding this rope with a winch on the ground. , is intermittently raised by the length of the pillar material 3a.

前記鉄柱3の途中に、旋回取付機構11で二組のブーム
12と13が取付けられでにる。
Two sets of booms 12 and 13 are attached to the middle of the steel pole 3 by a rotating attachment mechanism 11.

上記旋回取付機構11は第2図に示すように、鉄柱3を
通過させることができる角型の透孔14を中央に設けら
れた支持枠15と、この支持枠15の上部に旋回環16
を介して回動自在となるよう取付けられたブーム取付枠
17と、支持枠15にブーム取付枠17を旋回させるよ
う取付けられた駆動機構18とで構成されている。
As shown in FIG. 2, the pivot mounting mechanism 11 includes a support frame 15 provided in the center with a rectangular through hole 14 through which the steel column 3 can pass, and a pivot ring 16 on the top of the support frame 15.
The boom mounting frame 17 is constructed of a boom mounting frame 17 that is rotatably mounted via a boom mounting frame 17, and a drive mechanism 18 that is mounted to the support frame 15 so as to rotate the boom mounting frame 17.

上記駆動機構18はモータと減速機等を用い、その出力
軸の歯車19を旋回環16の外輪に設けた歯車と噛合さ
せ、外輪と固定したブーム取付枠17を地上からの遠隔
操作によって所望の角度を旋回させることができるよう
になっている。
The drive mechanism 18 uses a motor, a speed reducer, etc., and the gear 19 of its output shaft meshes with the gear provided on the outer ring of the swing ring 16, and the boom mounting frame 17 fixed to the outer ring is controlled by remote control from the ground. The angle can be rotated.

二組の12と13は、ブーム取付枠17の外周部で、鉄
柱3の軸芯を挾む両側の位置に各々俯仰自在となるよう
取付けられている。
The two sets 12 and 13 are attached to the outer peripheral portion of the boom mounting frame 17 at positions on both sides of the axis of the steel column 3 so as to be able to move up and down.

従って両ブーム12と13はその長手方向の軸線が鉄柱
3の軸芯を通る同一線上に沿う状態で、旋回することに
なる。
Therefore, both booms 12 and 13 turn with their longitudinal axes running along the same line passing through the axis of the steel column 3.

両ブーム12と13において、何れか一方のブームには
その先端にカウンターエイト20を着脱自在に吊下げ、
もう一方のブームのクレーン作業時における釣合いを行
なうようになっている。
In both booms 12 and 13, a counter eight 20 is removably suspended from the tip of one of the booms.
It is designed to provide balance during crane operations on the other boom.

前記鉄柱3の上端には、第1図のように、取付フレーム
21と旋回環22によってシーブブロック23がフリー
回転するように取付けられ、ブーム12,13の俯仰を
行なうワイヤロープ24及び巻上用のワイヤロープ25
を各々このシーブブロック23に集めるようになってい
る。
As shown in FIG. 1, a sheave block 23 is attached to the upper end of the steel column 3 so as to freely rotate by means of a mounting frame 21 and a turning ring 22, and a wire rope 24 for raising and lowering the booms 12 and 13 and a wire rope 24 for hoisting are attached. wire rope 25
are collected in this sieve block 23.

上記シーブブロック23によって鉄柱3の上端中央部に
集められたワイヤロープ24,25は、鉄柱3内を下方
に導き、鉄柱3の前記支持枠15の下部よりも下方の位
置に取付けた固定シーブ26を介して鉄柱3の外部に誘
導し、更に下降させて地上近くでウィンチ27に導き、
このウィンチ27の操作による巻取、巻戻しにより、ブ
ーム12.13の俯仰と、ウェイト20及び吊荷の上下
を行なうものである。
The wire ropes 24 and 25 gathered at the center of the upper end of the steel column 3 by the sheave block 23 are guided downward inside the steel column 3, and a fixed sheave 24 is attached to the steel column 3 at a position below the lower part of the support frame 15. guided to the outside of the steel pillar 3 via the
By winding and unwinding by operating the winch 27, the boom 12, 13 is raised and raised, and the weight 20 and the suspended load are raised and lowered.

なお、巻上用のワイヤロープ25は、ブームの先端から
一旦ブームフート付近に導き、シーブ28を介して鉄柱
3に沿うよう上方に屈曲させ、シーブブロック23に導
くようにし、巻上用ワイヤロープ25の張力がブーム俯
仰力に加わり、ブームの俯仰の制御が不能となるのを防
いでいる。
The hoisting wire rope 25 is first guided from the tip of the boom to the vicinity of the boom foot, bent upward along the steel column 3 via the sheave 28, and guided to the sheave block 23. The tension added to the boom elevation force prevents the boom elevation from becoming uncontrollable.

なお、図中29は組立途中の鉄塔を示すものであり、必
要に応じこの鉄塔29と鉄柱3のガイドとを水平支線用
ワイヤロープによって連結し、鉄柱3の直立強度を安定
させるようにする。
In the figure, reference numeral 29 indicates a steel tower that is in the process of being assembled, and if necessary, the steel tower 29 and the guide of the steel column 3 are connected by a horizontal branch wire rope to stabilize the upright strength of the steel column 3.

この考案のクライミングデリックは上記のような構成で
あり、次にその組立順序と使用の方法を説明する。
The climbing derrick of this invention has the above-mentioned structure, and the assembly order and method of use will be explained next.

水平に敷設した下部ベース1上に架台2を組立て、上部
ベース5上に旋回取付機構11を載置した状態で、下部
ベース1上に鉄柱3の組立てを行なう。
The pedestal 2 is assembled on the lower base 1 laid horizontally, and the iron column 3 is assembled on the lower base 1 with the swing mounting mechanism 11 placed on the upper base 5.

鉄柱3は柱材3aのせり上げによって行なうものである
が、初期の鉄柱組立において、柱材3aは、旋回取付機
構11における透孔14及びブーム取付枠17内を通過
して上昇する。
The construction of the steel column 3 is carried out by raising the column material 3a, and in the initial assembly of the steel column, the column material 3a passes through the through hole 14 in the swing attachment mechanism 11 and the inside of the boom attachment frame 17 and is elevated.

旋回取付機構11の上方に鉄柱3が所定長さ突出すると
、支持枠15を鉄柱3にボルト止によって固定しブーム
取付枠17の両側に各々ブーム12.13を取付け、鉄
柱3の上端に予じめ装着したシーブブロック23や固定
シーブ26、シーブ28等を介して俯仰用ワイヤロープ
24及び巻上用ワイヤロープ25を配置し、これをウィ
ンチ27て巻取るようにすると共に、一方のブーム12
にカウンターウェイト20を吊下げた第1図の状態とす
る。
When the steel pole 3 protrudes a predetermined length above the swing mounting mechanism 11, the support frame 15 is fixed to the steel pole 3 with bolts, and the booms 12 and 13 are attached to both sides of the boom attachment frame 17, and the booms 12 and 13 are attached to the upper end of the steel pole 3 in advance. The elevating wire rope 24 and the hoisting wire rope 25 are arranged through the sheave block 23, fixed sheave 26, sheave 28, etc. attached to the boom, and are wound up with the winch 27.
The counterweight 20 is suspended as shown in Fig. 1.

この状態でもう一方のブート13を用いて鉄塔材料を吊
上げ、鉄塔29の組立てを行なうものである。
In this state, the other boot 13 is used to lift the steel tower material and the steel tower 29 is assembled.

鉄塔29の組立てが進行すると鉄柱3のせり上げを行な
い、ブーム12.13を上昇させて組立て位置を上部に
移行する。
As the assembly of the steel tower 29 progresses, the steel pole 3 is raised, the booms 12 and 13 are raised, and the assembly position is moved to the upper part.

鉄塔の組立て時において、吊上用ブームの旋回は地上か
ら駆動機構18を制御して行なうものであり、両側のブ
ーム12と13は常時一体となって旋回するので、ウェ
イト20のバランス効果が常に有効に作用することにな
り、ブーム旋回時にはシーブブロック23は旋回動する
ことになるので、ワイヤロープ24゜25のさばきが自
動的に行なわれることになる。
When assembling a steel tower, the lifting boom is rotated by controlling the drive mechanism 18 from the ground, and since the booms 12 and 13 on both sides always rotate together, the balance effect of the weight 20 is always maintained. This works effectively, and since the sheave block 23 rotates when the boom rotates, the wire ropes 24 and 25 are automatically separated.

また、ウェイト20を吊下け゛たブーム12は、必要な
場合においては、もう一方のブームの吊上げ荷重に応じ
て俯仰角度を変化させたり、ウェイトの取替を行なうこ
とによりバランスを取るものであり、ウェイト20を吊
下げたブームは俯仰が可能なので、小さいテールスイン
グを必要とするときは、このブームを起して半径を小さ
くシ、カウンタウェイトを増大してバランスを取ること
ができ、鉄柱3に対して極めて高い位置にまで鉄塔29
を組むことができる。
In addition, the boom 12 with the weight 20 suspended thereon is balanced by changing the elevation angle or replacing the weight according to the lifting load of the other boom, if necessary. The boom on which the weight 20 is hung can be lifted up and down, so when a small tail swing is required, the boom can be raised to reduce the radius, and the counterweight can be increased to maintain balance. The steel tower 29 is located at an extremely high position.
can be assembled.

また、作業完了時には、カウンターウェイト20を地上
に降下させた後、両ブーム12.13を垂直に巻き起し
、鉄柱3の降下を行なうものである。
Further, when the work is completed, after the counterweight 20 is lowered to the ground, both booms 12 and 13 are vertically rolled up and the steel pole 3 is lowered.

以上のように、この考案によると、鉄柱の両側に取付け
たブームを駆動機構による動力で旋回させるようにした
ので、ブームの旋回作業が極めて円滑に、しかも安全に
行なえると同時に、両ブームは一体に旋回し一方のブー
ムをカウンターウェイトの吊下げ用としたので、両ブー
ムの軸線は常に同一線上に沿って位置することになり、
バランスが安定するので吊上荷重の変動が極めて少なく
なり吊上げの性能向上を計ることができるまた、支持枠
の中央に鉄柱を通過し得る透孔が設けられているので、
初期の鉄柱組立作業が極めて容易となる。
As described above, according to this invention, the booms attached to both sides of the steel pole are rotated by the power of the drive mechanism, so the boom can be rotated extremely smoothly and safely, and at the same time, both booms Since the booms rotate together and one boom is used for suspending the counterweight, the axes of both booms are always located along the same line.
Since the balance is stable, fluctuations in the lifting load are extremely reduced, improving lifting performance.Also, since there is a through hole in the center of the support frame that allows the steel column to pass through,
Initial steel pole assembly work becomes extremely easy.

さらに、カウンターウェイトを吊下げ′たブームは俯仰
が自由なので、ブームを起してウェイトを増大すればバ
ランスを取ることが可能であり、鉄柱の上部まで鉄塔の
組立てが行なえるので、鉄柱せり上げ作業数を減少でき
、鉄塔組立作業の能率向上に寄与することができる。
Furthermore, since the boom with the counterweight suspended can be raised or raised freely, it is possible to maintain balance by raising the boom and increasing the weight.As the tower can be assembled to the top of the steel pole, it is possible to raise or lower the steel pole. The number of operations can be reduced and the efficiency of tower assembly operations can be improved.

また、鉄柱の上端にシーブブロックを回動自在に取付け
、両側ブームの巻上用及び俯仰用ロープをこのシーブブ
ロックに集めて鉄柱内を下方に導き支持枠よりも下方の
位置で鉄柱の外側に誘導するようにしたので、ブームの
巻上用及び俯仰用ワイヤロープのさばきが、ブームの旋
回にもかかわらず簡単に行なえる等の優れた効果があり
、ブームの旋回は小型の駆動機構のみを鉄柱上に設置す
ればよいのでデリック構造が軽量となり、設備費用を廉
価とすることができる。
In addition, a sheave block is rotatably attached to the upper end of the steel pole, and the hoisting and elevating ropes of both booms are collected in this sheave block and guided downward inside the steel pole to the outside of the steel pole at a position below the support frame. Since the wire rope is guided, the wire rope for hoisting and elevating the boom can be easily handled even though the boom is turning. Since it only needs to be installed on a steel pole, the derrick structure is lightweight and equipment costs can be reduced.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図はこの考案に係るクライミングデリックの使用状
態を示す正面図、第2図は同上の要部を拡大した縦断面
図である。 3・・・・・・鉄柱、11・・・・・・旋回取付機構、
12,13・・・・・・ブーム、14・・・・・・透孔
、15・・・・・・支持枠、17・・・・・・ブーム取
付枠、18・・・・・・駆動機構、20・・・・・・カ
ウンターウェイト、23・・・・・・シーブブロック、
24・・・・・・俯仰用ワイヤロープ、25・・・・・
・巻上用ワイヤロープ。
FIG. 1 is a front view showing the climbing derrick according to the invention in use, and FIG. 2 is an enlarged vertical cross-sectional view of the main parts of the same. 3... Iron pillar, 11... Swivel mounting mechanism,
12, 13...Boom, 14...Through hole, 15...Support frame, 17...Boom mounting frame, 18...Drive Mechanism, 20... Counterweight, 23... Sheave block,
24... Wire rope for elevation, 25...
・Wire rope for hoisting.

Claims (1)

【実用新案登録請求の範囲】[Scope of utility model registration request] 鉄柱を通過させることのできる透孔を持ちこの鉄柱の所
要位置に固定される支持枠と、前記支持枠の上部に回動
自在となるよう取付けられるブーム取付枠と、前記ブー
ム取付枠の鉄柱軸芯を挾む両側の位置に各々俯仰自在と
なるよう取付けられ、一方がカウンターエイトの吊下げ
用となる二組のブームと、前記支持枠にブーム取付枠を
旋回させるように設けられた駆動機構と、鉄柱の頂部に
回動自在となるよう取付けられたシーブブロックとから
なり、両側ブームの巻上用及び俯仰用ロープはシーブブ
ロックに集めて鉄柱内を下方に導き支持枠よりも下方の
位置で鉄柱の外側に誘導するようにしたことを特徴とす
る送電鉄塔組立用クライミングデリック。
A support frame that has a through hole through which a steel pole can pass and is fixed at a predetermined position on the steel pole, a boom mounting frame that is rotatably attached to the top of the support frame, and a steel pole shaft of the boom mounting frame. Two sets of booms are installed on both sides of the core so that they can be raised and raised freely, one of which is used for suspending the counter eight, and a drive mechanism is provided to rotate the boom mounting frame on the support frame. and a sheave block rotatably attached to the top of the steel pole, and the ropes for hoisting and elevating the booms on both sides are collected in the sheave block and guided downward inside the steel pole to a position below the support frame. A climbing derrick for assembling a power transmission tower, characterized in that it is guided to the outside of a steel pole.
JP1754580U 1980-02-09 1980-02-09 Climbing derrick for power transmission tower assembly Expired JPS6011023Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1754580U JPS6011023Y2 (en) 1980-02-09 1980-02-09 Climbing derrick for power transmission tower assembly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1754580U JPS6011023Y2 (en) 1980-02-09 1980-02-09 Climbing derrick for power transmission tower assembly

Publications (2)

Publication Number Publication Date
JPS56118518U JPS56118518U (en) 1981-09-10
JPS6011023Y2 true JPS6011023Y2 (en) 1985-04-12

Family

ID=29613891

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1754580U Expired JPS6011023Y2 (en) 1980-02-09 1980-02-09 Climbing derrick for power transmission tower assembly

Country Status (1)

Country Link
JP (1) JPS6011023Y2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4598547B2 (en) * 2005-01-28 2010-12-15 鹿島建設株式会社 Wind power generator construction method and construction equipment

Also Published As

Publication number Publication date
JPS56118518U (en) 1981-09-10

Similar Documents

Publication Publication Date Title
JPH0245274Y2 (en)
JP6628310B2 (en) Derrick for steel tower assembly and dismantling
JPS6011023Y2 (en) Climbing derrick for power transmission tower assembly
JP2855014B2 (en) Disassembled jib crane
CN2410277Y (en) All slewing crane with lifting cradle
JP4669692B2 (en) Climbing type jib crane
JPH0761773A (en) Jib crane
JP2515531B2 (en) Boom swiveling crane
CN117105114B (en) Rocker arm and holding pole crawler type integrated equipment for electric power iron tower transportation and installation
CN214570251U (en) Derrick mast lifting mechanism convenient to operate
CN211971560U (en) Column type cantilever crane
CN209797310U (en) Material lifting mechanism
CN213171206U (en) Construction elevator suspender and construction elevator
CN217126736U (en) A gin pole hoist device for roofing
CN213416059U (en) Building construction tower crane with cable stabilizing mean
CN211971561U (en) Install stable column cantilever crane
CN218758804U (en) Guide rail frame dismouting auxiliary device
CN216272650U (en) Arm head convenient to adjust and stable for movable arm tower crane
JPH028106B2 (en)
JPS6113501Y2 (en)
CN212024599U (en) Column cantilever crane convenient to transportation
JPS5846993B2 (en) Method of constructing a steel tower using a lifting crane
JP2828165B2 (en) Jib crane equipment
JPS5980864A (en) Distributor
CN112537728A (en) Adjustable counter weight device of tower machine