JPS5935821B2 - Construction elevator installation method - Google Patents

Construction elevator installation method

Info

Publication number
JPS5935821B2
JPS5935821B2 JP55118900A JP11890080A JPS5935821B2 JP S5935821 B2 JPS5935821 B2 JP S5935821B2 JP 55118900 A JP55118900 A JP 55118900A JP 11890080 A JP11890080 A JP 11890080A JP S5935821 B2 JPS5935821 B2 JP S5935821B2
Authority
JP
Japan
Prior art keywords
rope
machine room
hoisting
construction
construction elevator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP55118900A
Other languages
Japanese (ja)
Other versions
JPS5742482A (en
Inventor
和久 古市
弘 羽間
道夫 大森
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujitec Co Ltd
Original Assignee
Fujitec Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujitec Co Ltd filed Critical Fujitec Co Ltd
Priority to JP55118900A priority Critical patent/JPS5935821B2/en
Publication of JPS5742482A publication Critical patent/JPS5742482A/en
Publication of JPS5935821B2 publication Critical patent/JPS5935821B2/en
Expired legal-status Critical Current

Links

Landscapes

  • Types And Forms Of Lifts (AREA)
  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Description

【発明の詳細な説明】 本発明は、建築工事が下層から上層に順次移っていく過
程に合わせて、機械室を順次上方に移動させていく移動
機械室形エレベータにおいて、機械室の上方への移動時
すなわちエレベータ昇降路行程延長時の工法に関するも
ので、更に詳細には巻上ロープの繰り出し方法に関する
[Detailed Description of the Invention] The present invention provides a mobile machine room type elevator that sequentially moves the machine room upward in accordance with the process in which construction work is sequentially transferred from the lower floor to the upper floor. The present invention relates to a construction method during movement, that is, when extending the journey of an elevator hoistway, and more specifically relates to a method for paying out a hoisting rope.

近年、高層ビル建築技術の発達は目ざましく、これに伴
って建築工事の効率向上のため建築工事の進行過程に合
わせ、昇降路に段階的に機械室を仮設し、この仮設機械
室にてかごを運転し、昇降路等の工事を行なう工事用エ
レベータが多く用いられている。
In recent years, the development of high-rise building construction technology has been remarkable, and in order to improve the efficiency of construction work, temporary machine rooms have been built in stages in the hoistway as the construction work progresses, and cars are operated in these temporary machine rooms. Construction elevators are often used to operate hoistway construction work.

この場合仮設機械室の上方への移動の都度、前工程に要
した巻上ロープ(以下、単にロープという)を廃棄し、
新たに必要昇降行程分のロープをセットしていたのでは
、作業能率が低下するばかりでなくロープが無駄になる
ため、予め最終行程に必要な長さのロープを巻取ってお
く巻取り装置と、ロープ繰り出し装置とを備え、機械室
の上方への移動と共に順次ロープを繰り出す方法が一般
にとられている。
In this case, each time the temporary machine room is moved upwards, the hoisting rope (hereinafter simply referred to as rope) required for the previous process is discarded.
If a new rope is set for the required lifting stroke, the work efficiency will not only decrease, but the rope will also be wasted. , a rope payout device, and a method is generally adopted in which the ropes are sequentially paid out as the machine moves upward from the machine room.

第1図及び第2図により一般的な工事用エレベータの構
成と機械室移動時のロープ繰り出し方法を説明する。
The configuration of a general construction elevator and the method of letting out a rope when moving to a machine room will be explained with reference to FIGS. 1 and 2.

建築物受梁1上に支持された仮設の機械室2にはロープ
繰り出し装置3、ロープ巻取り装置4、巻上装置5及び
そらせ車6が、また上部には吊り上げフック7が設けら
れている。
A temporary machine room 2 supported on a building support beam 1 is equipped with a rope payout device 3, a rope winding device 4, a hoisting device 5, and a deflection wheel 6, and a lifting hook 7 is provided at the top. .

ここでロープ繰り出し装置3はエレベータのサービス運
転時にはロープ8を保持してロープ8の繰り出しを阻止
し、機械室2の上方への移動時には保持力を緩めてロー
プ8を繰り出し得る構造となって、いる。
Here, the rope payout device 3 has a structure that holds the rope 8 and prevents the rope 8 from being paid out during the service operation of the elevator, and allows the rope 8 to be paid out by loosening the holding force when moving upwards in the machine room 2. There is.

ロープ8はロープ巻取り装置4より、ロープ繰り出し装
置3を経て釣り合い錘11のシーブ12、そらせ車6、
巻上装置5、かご9、のシーブ10へと掛は渡され、他
端が機械室2に到っている。
The rope 8 is passed through the rope winding device 4, the rope feeding device 3, the sheave 12 of the counterweight 11, the deflection wheel 6,
The hook is passed to the sheave 10 of the hoisting device 5, the car 9, and the other end reaches the machine room 2.

13はバッファである。以上の構成において建築工事が
進行し、機械室2を距離Aだけ上昇させる場合には、第
1図に示すようにまずかと9を機械室2の下部にチェー
ンブロック14等で吊り下げ、一方釣り合い錘11はピ
ット下部まで下げて固定する。
13 is a buffer. When the construction work progresses with the above configuration and the machine room 2 is to be raised by a distance A, as shown in FIG. The weight 11 is lowered to the bottom of the pit and fixed.

次にロープ繰り出し装置3を調整してロープ8の保持力
を緩め、且つロープ巻取り装置4を回転可能とする。
Next, the rope payout device 3 is adjusted to loosen the holding force on the rope 8, and the rope winding device 4 is made rotatable.

しかる後、機械室2並びにこれに吊り下げられたかと9
をタワークレーン15等によりフック7を介して吊り上
げる。
After that, machine room 2 and the 9 hanging there
is lifted up via the hook 7 by a tower crane 15 or the like.

この場合ロープ繰り出し装置3によるロープ8の保持力
をロープ8が自重で落下しない程度の値に保つと、タワ
ークレーン15に過大な負荷を与えることなくロープ8
はロープ巻取り装置4より機械室2の移動に応じて自動
的に繰り出されることになる。
In this case, if the holding force of the rope 8 by the rope feeding device 3 is maintained at a value that prevents the rope 8 from falling due to its own weight, the rope 8 can be
is automatically unwound by the rope winding device 4 in accordance with the movement of the machine room 2.

機械室2の移動後は第2図に示すように受梁16により
機械室2を建物に固定し、次にロープ繰り出し装置3を
復旧してロープ8を保持し、チェーンブロック14を徐
々に緩めて取り除き機械室の移動作業を完了する。
After moving the machine room 2, as shown in Fig. 2, fix the machine room 2 to the building with support beams 16, then restore the rope feeder 3 to hold the rope 8, and gradually loosen the chain block 14. to complete the movement of the machine room.

ところで上記のような方法によると、機械室2の移動と
ロープ8の繰り出しが同時に行なわれることになるが、
一般に建設用タワークレーン15の巻上速度は早く、ま
たタワークレーン15の操作者はロープ8の繰り出し状
況を直接確認することが困難であるため、例えばロープ
繰り出し装置3に何らかの異常が生じて、ロープ8が拘
速されたり或いはロープ8が必要以上に繰り出されて他
の機器に巻付く恐れも考えられ、非常に大きな危険と困
難とを伴うものであった。
By the way, according to the method described above, the movement of the machine room 2 and the feeding out of the rope 8 are performed at the same time.
In general, the hoisting speed of the construction tower crane 15 is fast, and it is difficult for the operator of the tower crane 15 to directly check the situation of the rope 8 being paid out. There is a possibility that the rope 8 may be restrained or the rope 8 may be unrolled out more than necessary and become wrapped around other equipment, which is accompanied by great danger and difficulty.

本発明はこうした点に注目しなされたもので、機械室2
の移動作業とロープの繰り出し作業とを別々に行なうこ
とができ、従って機械室2内でロープ8の繰り出し状況
を確認しながら操作できる、安全でしかも効率のよいロ
ープ繰り出し方法を提供するものである。
The present invention was made with attention to these points, and the machine room 2
To provide a safe and efficient rope letting-out method in which the moving work of the rope 8 and the rope letting-out work can be carried out separately, and therefore the operation can be performed while checking the paying-out status of the rope 8 in the machine room 2. .

以下本発明による機械室移動作業の手順を第3図乃至第
6図により説明する。
The procedure for moving the machine room according to the present invention will be explained below with reference to FIGS. 3 to 6.

まず第3図に示す如く、かご9をチェーンブロック14
等により機械室2の下部に吊り下げた状態で、タワーク
レーン15により吊り上げフック7を介して機械室2を
かと9、釣り合い錘11と共に一体で吊り上げる。
First, as shown in Figure 3, the car 9 is moved to the chain block 14.
etc., and the machine room 2 is lifted together with the heel 9 and the counterweight 11 by a tower crane 15 via the lifting hook 7.

この時ロープ繰り出し装置3はロープ8を保持し、ロー
プ8を繰り出し得ない状態となっている。
At this time, the rope payout device 3 holds the rope 8 and is in a state in which it cannot pay out the rope 8.

機械室2を所定の位置まで吊り上げ後は第4図に示す如
く、受梁16により機械室2を建築物に固定する。
After lifting the machine room 2 to a predetermined position, the machine room 2 is fixed to the building using support beams 16, as shown in FIG.

次に第5図に示す如く、タワークレーン15を機械室2
より切り離して釣り合い錘11を吊り下げる。
Next, as shown in FIG. 5, the tower crane 15 is moved to the machine room 2.
Separate it further and hang the counterweight 11.

その後ロープ繰り出し装置3を調整してロープ8の保持
力を緩め、タワークレーン15の操作により釣り合い錘
11を徐々に下げていくとロープ8がロープ巻取り装置
4より繰り出されることになる。
Thereafter, the rope payout device 3 is adjusted to loosen the holding force on the rope 8, and the counterweight 11 is gradually lowered by operating the tower crane 15, so that the rope 8 is paid out from the rope winding device 4.

釣り合い錘11を所定の位置まで吊り下げた後、ロープ
繰り出し装置3を復旧してロープ8を保持し、ロープ8
が繰り出し得ない状態であることを確認して釣り合い錘
11よりタワークレーン15を切り離し、次にチェーン
ブロック14を徐々に緩メチ取り除き機械室2の移動作
業を完了する。
After suspending the counterweight 11 to a predetermined position, the rope feeding device 3 is restored and the rope 8 is held.
After confirming that the tower crane 15 is in a state where it cannot be extended, the tower crane 15 is separated from the counterweight 11, and then the chain block 14 is gradually removed, and the work of moving the machine room 2 is completed.

以上のように本発明によれば機械室2の移動とロープ8
の繰り出し作業とを別々に行なうことができ、しかもロ
ープ8の繰り出しはタワークレーン15等の操作により
釣り合い錘11の自重を利用して行なうため、前述のよ
うな危険を伴うことなく安全なロープ繰り出し作業を提
供することができる。
As described above, according to the present invention, the movement of the machine room 2 and the rope 8
Moreover, since the rope 8 is fed out using the weight of the counterweight 11 by operating the tower crane 15, etc., the rope 8 can be fed out safely without the dangers described above. can provide work.

なお、上記の実施例において、かご9と釣り合い錘11
とを入れ替えても同様の手順方法で実施が可能である。
In addition, in the above embodiment, the cage 9 and the counterweight 11
It is possible to perform the same procedure even if the two are replaced.

【図面の簡単な説明】[Brief explanation of drawings]

第1図は工事用エレベータの一例を示す全体図、第2図
は第1図の機械室上昇後を示す図、第3図乃至第6図は
本発明によるロープ繰り出し方法の手順を示す図。 1.16,17・・・・・・受梁、2・・・・・・機械
室、3・・・・・・ロープ繰り出し装置、4・・・・・
・ロープ巻取り装置、5・・・・・・巻上装置、8・・
・・・・巻上テープ、9・・・・・・かご、11・・・
・・・釣り合い錘、14・・・・・・チェーンブロック
、15・・・・・・タワークレーン。
FIG. 1 is an overall view showing an example of a construction elevator, FIG. 2 is a view showing the machine room after being raised in FIG. 1, and FIGS. 3 to 6 are views showing the procedure of the rope payout method according to the present invention. 1.16, 17...Beam, 2...Machine room, 3...Rope feeding device, 4...
・Rope winding device, 5...Hoisting device, 8...
... Winding tape, 9 ... Basket, 11 ...
...Counterweight, 14...Chain block, 15...Tower crane.

Claims (1)

【特許請求の範囲】[Claims] 1 かと、釣り合い錘、巻上装置、巻上ロープ、この巻
上ロープの余剰部分を巻板っておくロープ巻取り装置及
びロープ繰り出し装置とを備え、建築工事進行過程にあ
わせて昇降路に段階的に機械室を仮設し、この機械室の
上方への移動時には前記巻上ロープをロープ繰り出し装
置を介してロープ巻取り装置より繰り出す工事用エレベ
ータにおいて、巻上ロープの繰り出しはかと又は釣り合
い錘のどちらか一方を機械室又は建築物に固定し、他方
をタワークレーン等により吊り下げながらその自重を利
用して下降させることにより行ない、且つ機械室の移動
後に行なうことを特徴とした工事用エレベータの据付工
法。
1. It is equipped with a counterweight, a hoisting device, a hoisting rope, a rope winding device for winding up the excess portion of this hoisting rope, and a rope feeding device, and is installed in stages on the hoistway according to the progress of construction work. In a construction elevator, a machine room is temporarily constructed, and when the machine room is moved upward, the hoisting rope is paid out from a rope winding device via a rope payout device. A construction elevator characterized in that one of the elevators is fixed to a machine room or a building and the other is lowered using its own weight while being suspended by a tower crane, etc., and the elevator is operated after the machine room has been moved. Installation method.
JP55118900A 1980-08-27 1980-08-27 Construction elevator installation method Expired JPS5935821B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP55118900A JPS5935821B2 (en) 1980-08-27 1980-08-27 Construction elevator installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP55118900A JPS5935821B2 (en) 1980-08-27 1980-08-27 Construction elevator installation method

Publications (2)

Publication Number Publication Date
JPS5742482A JPS5742482A (en) 1982-03-10
JPS5935821B2 true JPS5935821B2 (en) 1984-08-30

Family

ID=14747942

Family Applications (1)

Application Number Title Priority Date Filing Date
JP55118900A Expired JPS5935821B2 (en) 1980-08-27 1980-08-27 Construction elevator installation method

Country Status (1)

Country Link
JP (1) JPS5935821B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61292563A (en) * 1985-06-20 1986-12-23 Mazda Motor Corp Rotation detector

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61292563A (en) * 1985-06-20 1986-12-23 Mazda Motor Corp Rotation detector

Also Published As

Publication number Publication date
JPS5742482A (en) 1982-03-10

Similar Documents

Publication Publication Date Title
JPH07100582B2 (en) Elevator work platform and elevator installation method
JPH0829904B2 (en) Elevator installation method
JP6969686B2 (en) How to extend the lift of a construction elevator
JPS5935822B2 (en) Construction elevator installation method
JP2001114484A (en) Construction method for suspending elevator main rope
JPH09278325A (en) Construction work elevator lifting method and construction work elevator device
JP2705534B2 (en) Elevator equipment for construction
JPS5935821B2 (en) Construction elevator installation method
JPS5934633B2 (en) Construction elevator installation method
JP5841929B2 (en) How to change the main rope of the elevator
JPS5952148B2 (en) Construction elevator installation method
JPH05262475A (en) Installation method of elevator
JPS5918309B2 (en) Installation method of mobile mechanical room elevator
JP2815251B2 (en) Elevator main cable replacement method
JPH08133634A (en) Jumping method for jump-up elevator
JPH02300081A (en) Installation work method for elevator
JP2549726Y2 (en) Construction lift
JPH05201648A (en) Installation of elevator
JPH01181689A (en) Lift rope replacing method
JP5058181B2 (en) How to hang an elevator rope
JPH10203751A (en) Main rope replacing method of 2:1 roping elevator and device thereof
JPH0733355A (en) Installation method for elevator
JP6207461B2 (en) Hoisting method for hoisting elevators
JP2003073052A (en) Rope installing method of elevator and rope guide device
JPS6026051Y2 (en) Construction elevator machine room