JPS5927291A - Method of fixing pipe in containment building for pressure suppression chamber of reactor container - Google Patents

Method of fixing pipe in containment building for pressure suppression chamber of reactor container

Info

Publication number
JPS5927291A
JPS5927291A JP57136473A JP13647382A JPS5927291A JP S5927291 A JPS5927291 A JP S5927291A JP 57136473 A JP57136473 A JP 57136473A JP 13647382 A JP13647382 A JP 13647382A JP S5927291 A JPS5927291 A JP S5927291A
Authority
JP
Japan
Prior art keywords
piping
suppression chamber
unit
deck beam
pressure suppression
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP57136473A
Other languages
Japanese (ja)
Other versions
JPH0142399B2 (en
Inventor
岸本 吉男
牛久保 秀雄
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
IHI Corp
Original Assignee
IHI Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by IHI Corp filed Critical IHI Corp
Priority to JP57136473A priority Critical patent/JPS5927291A/en
Publication of JPS5927291A publication Critical patent/JPS5927291A/en
Publication of JPH0142399B2 publication Critical patent/JPH0142399B2/ja
Granted legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E30/00Energy generation of nuclear origin
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E30/00Energy generation of nuclear origin
    • Y02E30/30Nuclear fission reactors

Landscapes

  • Structure Of Emergency Protection For Nuclear Reactors (AREA)

Abstract

(57)【要約】本公報は電子出願前の出願データであるた
め要約のデータは記録されません。
(57) [Summary] This bulletin contains application data before electronic filing, so abstract data is not recorded.

Description

【発明の詳細な説明】 本発明は、原子カプラントの配管据え付は工法に係り、
詳しくシよ圧力抑制室収納v1〜屋の天井デツキビーム
を分割if;IIのデツキユニットに構成し、このデツ
キビームユニットを利用して圧力抑制室内に配管を行か
う配管据えf=Jけ工法に関する。
[Detailed Description of the Invention] The present invention relates to a method for installing piping for an atomic couplant,
In detail, the present invention relates to a piping installation method in which the ceiling deck beam of the pressure suppression chamber storage v1~ is configured into divided deck units if; II, and this deck beam unit is used to run piping into the pressure suppression chamber.

従来、圧力抑制室収納建屋内圧布設きれる配管の据え付
は工法の一例とし”r、PIT1図に示−1゛技術が知
られている。
Conventionally, the technique shown in Figure PIT1 is known as an example of a construction method for installing compressed piping in a pressure suppression chamber storage building.

この従来工法tよ、まず第1図(8)に示すように、上
方を開口したザブ1/ツシヨンヂエンバ収納措築物Iを
形成しb該tFI築物1内に一1タ゛プレッションヂエ
ンバ2を搬送して据え付け(第1図(b)参照)%次い
で前記構竿物1の上部に、 II形鋼等からIiMる大
梁3を放射状に順次差し渡し、ざらにこれらを小梁によ
って相互1c連結して天;1Fデツヤビームを構rJI
 L * このデツキビーム上に、仮(般入【コ4FL
を多数形叡、したデツキプI/−に4f股n−Cそのt
lζ箔物lの開口部を閉塞し、をらに前記仮(般入口4
合から搬入される配管部材PAやその仙の付帯股UNI
を前記ザプレツションチェンバ2の上nt+に設けたモ
ルレール5によって構箔物10所定位額まで(rJ送し
たのちに、同図((1)に示すように、これらの配管部
拐PAや付帯設備を、前記デンキピーム(犬梁3の下部
1に11直次固定しながらそれらを連結17−〔据え付
はる工法である、 しかしながら、このような従来工法にあっては、配′v
71StltA’ l’A −t’ 付帯R4!11 
k テラ* 7” V  h 4 )f’R入口4aか
ら細く分割して搬入しなければからす。
According to this conventional construction method, first, as shown in Fig. 1 (8), a ceiling 1/tension embargo storage structure I with an opening at the top is formed, and a compression embargo 2 is placed inside the tFI structure 1. Transport and installation (see Figure 1(b)) Next, large beams 3 made of II section steel or the like are successively passed radially over the top of the structure structure 1, and these are roughly connected to each other by small beams. 1F Detsuya Beam construction rJI
L * On this deck beam, there is a temporary
4f crotch n-C in the plural form I/-
ζ Close the opening of the foil material 1, and then close the temporary (general entrance 4)
Piping parts PA and its attached UNI
After transporting the foil structure 10 to a predetermined position (rJ) by means of the molar rail 5 provided at the upper part of the compression chamber 2, as shown in the same figure ((1), these piping parts PA and attached This is a construction method in which the equipment is directly fixed to the lower part 1 of the dowel beam 3 and connected 17-[installed. However, in such a conventional construction method,
71StltA'l'A-t' Attachment R4!11
k tera * 7" V h 4) If it is not carried in thinly divided pieces from the f'R entrance 4a.

また、構築物l内に1偵入17た配管部、イソPAや付
帯設備f:所テ?位置・まで搬送し、さらにこれらを持
ち上げた上でデツキビームに固定するという作業手順と
なるため、現IJjlでの配管f′F業が非常に繁雑に
升って手間がか?ン)す、布だ、^[[記仮1般入口4
aや(般送用のモルレール5は、配管の4?lえイτ1
はが完了した時点でrV1塞l−たり撤去したυする必
便デ+1あり。
In addition, the piping, iso-PA, and incidental equipment that were infiltrated into the structure were also included. Because the work procedure involves transporting the pipes to the specified location, lifting them, and fixing them to the deck beam, the current piping work at IJJL is extremely complicated and time-consuming. N) It's cloth.
a (general transportation mole rail 5 is piping 4?1 τ1
At the time of completion, rV1 is occluded or removed, and there is +1.

しf01r&ってこれらの点から工期もその分、長期化
してし19などの問題があった。
Due to these points, the construction period was lengthened accordingly19.

本発明は、以上のような点を考慮し°Cなゼれたもので
、圧力抑制ネの天井デツキビームを分割型のデツキビー
ムユニツトに措成し、このデツキビームユニットに予め
配管ユニットをlfg り 付1tt でpいて圧力抑
11111宮内に配¥Iを行なう工法とし、これによっ
て現場における配管作業の省力化および工期の/s、縮
を図り1さらに仮搬入口や搬送用モノ1/−ル等の仮設
備を不要にすることが可能な原子炉格納容器圧力抑制室
内の配管据え付は工法を提供しようとするものである。
The present invention was developed in consideration of the above points, and consists of constructing a ceiling deck beam for pressure suppression into a split deck beam unit, and installing a piping unit in advance to this deck beam unit. Attached to 1tt, the construction method is to carry out pressure suppression 11111 inside the shrine, thereby saving labor on site piping work and shortening the construction period. The aim is to provide a method for installing piping inside the pressure suppression chamber of the reactor containment vessel that can eliminate the need for temporary equipment.

以下1本発明を図面に示す一実施例に基づいて説明する
The present invention will be explained below based on an embodiment shown in the drawings.

本発明による配管据え付は工法は、圧力抑制室の天井デ
ツキビームを措成する多数の大梁シよび小梁、すなわち
第2図に示すように原子炉格納8器lOの周りに放射状
に配設される大梁11・・・およびこれらを相互に連結
する小梁12・・・のうち、2以上の大梁を、例えば第
3図(rl)に示す如く3本の大梁j1.13.11を
小梁12・・・(4木のみ1ツ1示)によって相互に連
結して分割型のデツキビームユニット人を構成する、そ
してきらに、このデツキビームユニットAに対し、同図
(1))に示す如く、複数の配管部柑PAから成る配管
ユニットPを°す°ボート部材13等を使用し°17り
付け°〔おく。
The method of installing piping according to the present invention is to install a large number of large beams and small beams that form the ceiling deck beam of the pressure suppression chamber, that is, as shown in FIG. Among the large beams 11... and the small beams 12... that interconnect them, two or more large beams are connected, for example, three large beams j1, 13, and 11 are connected as small beams as shown in Fig. 3 (rl). 12... (only 4 trees are shown) to form a split-type deck beam unit that is interconnected with each other, and for this deck beam unit A, as shown in (1) in the same figure. As shown, the piping unit P consisting of a plurality of piping parts PA is attached using the boat member 13 or the like.

この配管ユニットPd、hEE力抑1llll室の上部
に配管スヘ*管体を前記デツキビームユニットAの太キ
享に合わせて分割したものであり、仁の配管ユニットP
には11に図示して°ハDいが必要に応じ°C弁などの
I旧(!シ冊が取り付けられる−1にお、このデツキビ
ームユニットAおよび配管ユニットPは工場などにおい
て予め措成し、これを現場まで運般しても良いし、また
現場近くでデツキビームユニット人に配管ユニットPを
取りイ1はても良い、しかし1、何れに[7ても配管ユ
ニットPはデツキビームユニットAを現場に8同する前
に取り付けて訃〈つこのようにして、配管ユニットPを
取り付し)゛たデツキビームユニットAをその分割数に
対応する分だけ構成したら、次いで、このデツキビーム
ユニットA%7.2174図に示すように、すでに溝築
したーリ・ブ1/ツショングーエンバ収容用構槃物1の
両側壁部I A * 1 ))上にm1次段ビしてそれ
らを相互に連結し、さらに配管コ、ニットP回志を互い
に連結する。
This piping unit Pd is a pipe body divided in accordance with the thickness of the above-mentioned deck beam unit A, and the pipe body is divided into the upper part of the hEE force suppression chamber.
The deck beam unit A and piping unit P are installed in advance at the factory etc., as shown in Figure 11. However, it is also possible to transport this to the site, or have a Detsuki Beam unit person near the site take the piping unit P, but in either case [7] the piping unit P is After configuring the deck beam units A corresponding to the number of divisions, install the 8 unit A at the site and install the piping unit P in this way. Beam unit A% 7.2174 As shown in the figure, the m1 secondary stage beam is installed on both side walls I A * 1)) of the structure 1 for housing the beam unit A%7.2174, which has already been constructed. Then connect them to each other, and further connect the piping and knit P turns to each other.

コウシて、デツキビームユニ・ントAのf[H苛オーよ
び配管ユニットPの連結作票を終えたら、抜上よデツキ
ビーム、ユニツ)A上にデツキプレート14を彊り、そ
の上に必要な配筋をjtflt した後、天井用コンカ
+1−115を打設すれば、mカ抑制室Bの天井が形成
され、また圧力抑制室(14にを1そσ)上部に必要な
配管P′が据λ、付けられることになる、以上説明した
ように、本発明による配管据え付は工法は、圧力抑制室
の天井デツキビームを分割型ノテツ;■ビームユニット
にt(?l成し、このデツキビームユニットに予め配管
ユニツ)・を取り付けておいて、デツキビームユニット
の設置により圧力抑制室内に配管を行なうという工法で
、r−)るから、現場における配管作業tよそれら配管
ユニットの連結ff= q程度ですみ、したがって現場
に卦ける配管作票が非常に簡便になり、しかも、このよ
うにデツキビームや配管をユニット化し゛〔いるので、
現場ではブロック式に構格でき、また仮搬入1−1や搬
送用モルレール等の手間のかかる仮設備も不要にするこ
とができるから、配管作業の省力化だけでfk(工期も
その分、短縮すること布できるなどの優れた効果がある
After completing the connecting chart for the deck beam unit A and the piping unit P, place the deck plate 14 on top of the deck beam unit A, and place the necessary arrangements on it. After making the striations, the ceiling concave +1-115 is cast to form the ceiling of the pressure suppression chamber B, and the necessary piping P' is installed above the pressure suppression chamber (14 and σ). As explained above, the method for installing piping according to the present invention is to divide the ceiling deck beam of the pressure suppression chamber into a beam unit, and to install this deck beam unit. This is a construction method in which a piping unit) is installed in advance in the pressure suppression chamber and a deck beam unit is installed to run the piping inside the pressure suppression chamber, so the on-site piping work t and the connection of these piping units ff = q are required. Therefore, the piping forms that can be prepared at the site are extremely simple, and since the deck beams and piping are unitized in this way,
At the site, it can be constructed in a block format, and time-consuming temporary equipment such as temporary transport 1-1 and transport rails can be eliminated, so labor-saving piping work alone can shorten fk (the construction period is shortened accordingly). It has excellent effects such as being able to use cloth,

【図面の簡単な説明】[Brief explanation of drawings]

trr、 1図(IT)〜((()シ:lこ従来工法の
一例のjJl明図、第2図〜−■4図は本発明に、しる
配管据え付は工法を説明するた、l/)に示17た図で
、2代2図は天井デツキビームの概略平面図、筆3図(
n)はデツ:ヤビーノ、ユニットの斜視図、筆3図(1
)) rl配管ユニットをrlvり付けたデツキビーム
ユニットの斜視図、第41ニア1は圧力抑割宇の概略縦
断面図1である、 1・・・・・・(ザブ1/ツシヨンチエンパ収容用)構
築物、In、1b・・・・・・g111壁m(、j □
・・・・・・原子・カ1格納容器。 ]1・・・・・・大梁、12・・・・・・小1&、A・
・・・・・デツキビームユニット、P・・・・・・Ni
l、<6ユニツト、I3・・・・・・rE 力4QII
llilt室、
trr, Figure 1 (IT) ~ ((() し: l This is an example of the conventional construction method. Figure 2 ~ - ■ Figure 4 is based on the present invention, and the piping installation is to explain the construction method. Figure 17 is shown in Figure 1/), Figure 2 is a schematic plan view of the ceiling deck beam, Figure 3 is a schematic plan view of the ceiling deck beam, Figure 3 is
n) is Detsu: Yabino, perspective view of the unit, brush 3 drawing (1
)) Perspective view of the deck beam unit with the rl piping unit attached to the rlv, No. 41 near 1 is a schematic vertical cross-sectional view of the pressure suppressor, 1... (sub 1/for housing the tension chamber) Construction, In, 1b...g111 Wall m(,j □
...Atomic/K1 containment vessel. ] 1... Large Liang, 12... Elementary 1&, A.
...Detsuki beam unit, P...Ni
l, <6 units, I3...rE Force 4QII
llilt room,

Claims (1)

【特許請求の範囲】[Claims] ・す゛ブ1/ツションブーエンバを収納する圧力抑制室
収納建屋の天井デツキビームを分割型のデツキビームユ
ニツトに精I成し、さらにこのデツキビームユニツトに
対し[[力抑制室の上部に配管部れる配管ユニットを取
りイτjは、前記■力抑制室収納建屋を形成する側壁上
部に前記デツキビームユニ・ントをIIIN次設閘した
後、それらデツキビームユニット及び配管ユニットを相
互に連結することを特徴とする原子炉格納容器圧力抑制
室収納17.It屋内の配管据え付は工法、
・The ceiling deck beam of the pressure suppression chamber storage building that houses the force suppression chamber was refined into a split type deck beam unit, and a piping section was installed on the top of the force suppression chamber for this deck beam unit. After installing the deck beam unit IIIN on the upper part of the side wall forming the force suppression chamber storage building, the deck beam unit and the piping unit are connected to each other. Features of reactor containment vessel pressure suppression chamber storage 17. It is the construction method for indoor piping installation,
JP57136473A 1982-08-05 1982-08-05 Method of fixing pipe in containment building for pressure suppression chamber of reactor container Granted JPS5927291A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP57136473A JPS5927291A (en) 1982-08-05 1982-08-05 Method of fixing pipe in containment building for pressure suppression chamber of reactor container

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP57136473A JPS5927291A (en) 1982-08-05 1982-08-05 Method of fixing pipe in containment building for pressure suppression chamber of reactor container

Publications (2)

Publication Number Publication Date
JPS5927291A true JPS5927291A (en) 1984-02-13
JPH0142399B2 JPH0142399B2 (en) 1989-09-12

Family

ID=15175939

Family Applications (1)

Application Number Title Priority Date Filing Date
JP57136473A Granted JPS5927291A (en) 1982-08-05 1982-08-05 Method of fixing pipe in containment building for pressure suppression chamber of reactor container

Country Status (1)

Country Link
JP (1) JPS5927291A (en)

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5757289A (en) * 1980-09-25 1982-04-06 Ishikawajima Harima Heavy Ind Unit processing method of ceiling deck plate of nuclear reactor building

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5757289A (en) * 1980-09-25 1982-04-06 Ishikawajima Harima Heavy Ind Unit processing method of ceiling deck plate of nuclear reactor building

Also Published As

Publication number Publication date
JPH0142399B2 (en) 1989-09-12

Similar Documents

Publication Publication Date Title
US3514910A (en) Modular building construction
GB1460111A (en) Three-dimensional pre-fabricated structural elements to be assembled in habitation units
US2633610A (en) Prefabricated house
US3470660A (en) Prefabricated building sections and spaced foundation beams
US3716954A (en) Modular building system
US4195453A (en) Modular, multi-floor building
US3527002A (en) Modular building structure
JPS5927291A (en) Method of fixing pipe in containment building for pressure suppression chamber of reactor container
DK0494944T3 (en) Method of erecting buildings and building system for carrying out the procedure
US4660349A (en) Method of erecting a building using preconstructed modular units
JPS59192159A (en) Construction of plant structure
JPS6055168A (en) Anchoring of embedded metal article
JP2996578B2 (en) Fireproof structure of building
JPH04261938A (en) Unit house
JPH05214772A (en) Overhang unit mounting structure and unit building
Gelick Buildings as systems.
JPS60223575A (en) Building for high gathered house
JPS5910885A (en) Method of fixing suppression chamber
EP0134893A2 (en) System for composing heavy structure houses to disassemble
JPH0813770A (en) Meter box forming method for collective housing, meter box unit and its use
SU1201459A1 (en) Twin=branch metal column
JPH0673822A (en) Roof of prefabricated building
JPS62111050A (en) Construction of slab
JPH0138280B2 (en)
JPH06322833A (en) Garage construction of unit building