JPS59145821A - Method and apparatus for construction of pillar-row pile - Google Patents

Method and apparatus for construction of pillar-row pile

Info

Publication number
JPS59145821A
JPS59145821A JP2032183A JP2032183A JPS59145821A JP S59145821 A JPS59145821 A JP S59145821A JP 2032183 A JP2032183 A JP 2032183A JP 2032183 A JP2032183 A JP 2032183A JP S59145821 A JPS59145821 A JP S59145821A
Authority
JP
Japan
Prior art keywords
piles
pile
auger
construction
cross beams
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2032183A
Other languages
Japanese (ja)
Inventor
Jiro Kawase
川瀬 治郎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sanwa Kizai Co Ltd
Original Assignee
Sanwa Kizai Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sanwa Kizai Co Ltd filed Critical Sanwa Kizai Co Ltd
Priority to JP2032183A priority Critical patent/JPS59145821A/en
Publication of JPS59145821A publication Critical patent/JPS59145821A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/20Bulkheads or similar walls made of prefabricated parts and concrete, including reinforced concrete, in situ

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

PURPOSE:To simplify the fitting work of cross beams by a method in which base piles into which H-shaped steels are inserted and formed at an interval of several numbers of piles by biasing them from the center of the other pile to form an on-site pillar-row pile, excavation is made, the steel material is exposed from the side of the base piles, and the cross beams are fitted. CONSTITUTION:Base piles 14 to be inserted with a steel material, e.g., H-shaped steels 13, etc., are formed at an interval of several numbers of piles by biasing their centers before and hehind from other piles to form a pillar-row pile of on- site filled cement mortar piles or soil cement concrete piles. Afterwards, excavation is made, the side of the base pile 14a exposed is cut off to expose the H- shaped steel inserted, and cross beams such as waling material 15, etc., are fixed to the exposed portion to complete a sheathing wall, etc. The fitting work of the cross beams can thus be simplified.

Description

【発明の詳細な説明】 本発明は山留め壁などに使用される柱列杭の施工法及び
その装置に関する。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a construction method and apparatus for column piles used for retaining walls and the like.

掘削機にアースオーガーを使用し、オーガースクリュー
の回転により土砂を上方に排除しながら削孔し、該オー
ガースクリューを逆転して引き抜く際にスクリュー先端
からセメントミルク、モルタル等を注入して場所詰モル
タル杭を造成する方法は周知のものである。この場合、
セメントミルク、モルタル等と掘削土砂の一部を混合し
てソイルコンクリート杭とすることもある。
An earth auger is used in the excavator, and the auger screw is rotated to remove earth and sand upward while drilling the hole.When the auger screw is reversed and pulled out, cement milk, mortar, etc. is injected from the tip of the screw to create a fill-in-place mortar. Methods of constructing piles are well known. in this case,
Soil concrete piles are sometimes made by mixing cement milk, mortar, etc. with a portion of the excavated soil.

いずれにせよかかる工法で造成した杭を一列に並べて止
水を兼ねた山留め用の地中壁を形成する場合に、第6図
に示すように杭の剛性を増すために一部の杭にH型鋼2
を挿入して親杭1aとして形成し、この親杭1aは他の
杭1に対して1つおき、又は数個おきに配置している。
In any case, when piles created using this construction method are arranged in a row to form an underground wall for retaining the mountain that also serves as a water stop, some of the piles are Type steel 2
are inserted to form parent piles 1a, and these parent piles 1a are arranged every other pile 1 or every few pieces.

(なお、強度的に見てすべてにH型鋼2を挿入する必要
はない。)ところでかかる柱列杭を造成するには、3軸
機、4軸機等多軸オーガーを用いて斜線部分(3個)を
−挙に掘削すれば、単軸オーガーで1本1本ランプさせ
ながら杭を造成する場合に比べて迅速かつ容易に施工す
ることができる。
(In terms of strength, it is not necessary to insert H-shaped steel 2 in all areas.) By the way, in order to create such column row piles, a multi-axis auger such as a 3-axis machine or a 4-axis machine is used to If piles are excavated all at once, construction can be done more quickly and easily than when building piles one by one using a single-shaft auger.

しかしこのように多軸オーガーを用いて施工し1   
     た場合、親杭1aと他の杭1とは同径で面位
置が一致しているので、例えば親杭1a内のH型鋼2の
フランジ露出面に切張りのための復起主材などに用いる
鋼材3を固定するには親杭1aのみならず他の杭lの側
部も含めて横方向にモルタル等を削り取らねばならず、
きわめて面倒で手数を要するものであった。
However, in this way, construction using a multi-axis auger 1
In this case, the main pile 1a and the other piles 1 have the same diameter and the same surface position, so for example, the exposed surface of the flange of the H-shaped steel 2 in the main pile 1a is used as the main material for cutting and tensioning. In order to fix the steel material 3 to be used, mortar etc. must be scraped off laterally not only on the main pile 1a but also on the sides of other piles l.
It was extremely troublesome and time-consuming.

本発明の目的は前記従来例の不都合を解消し、多軸のア
ースオーガーを用いて柱列杭を施工する場合にさらに一
層施工の合理化を図ることができる工法と装置を提供す
ることにある。
An object of the present invention is to provide a construction method and device that can eliminate the disadvantages of the conventional example and further streamline construction when constructing column piles using a multi-axis earth auger.

しかしてこの目的は本発明によれば、多数の場所詰モル
タル杭、フィルコンクリート杭等を連続させた柱列杭を
造成するに際し、1本おき若しくは複数本おきに配置さ
れる特定のオーガーロッドを他のオーガーロッドに対し
て前又は後にずらせて設けた多軸アースオーガーを使用
し、H型鋼等の鋼材を挿入すべき親杭は前記特定のオー
ガーロッドにより他の杭に対して前又は後に中心をずら
せて適数本おきにこれを形成し、杭施工後の開削時に該
親杭の側部を削り取って鋼材面を露出させ、この露出部
に腹起材等の横架用鋼材を固定することにより達成され
る。
However, according to the present invention, the purpose of the lever is to use specific auger rods arranged every other or every plurality of column piles when constructing column piles in which a large number of in-place mortar piles, fill concrete piles, etc. are connected. A multi-axis earth auger is used which is offset from the front or rear relative to other auger rods, and the parent pile into which steel materials such as H-type steel are to be inserted is centered in front or rear relative to the other piles using the specific auger rod. Form this at an appropriate number of intervals by shifting the piles, and when excavating after pile construction, scrape off the side of the parent pile to expose the steel surface, and fix the steel material for the horizontal structure, such as recessed timber, to this exposed part. This is achieved by

以下、図面について本発明の実施例を詳細に説明する。Embodiments of the present invention will be described in detail below with reference to the drawings.

まず、本発明装置としての多軸オーガーについて説明す
ると、第1図は本発明装置の実施例を示す側面図、第2
図は同上要部の正面図で、多軸アースオーガーAは通常
の多軸アースオーガーと同じく走行可能な台車4に起伏
自在にリーダーマスト5を設けこのリーダーマスト5の
トップシーブ6から駆動装置7及びこれに連結する複数
の中空オーガーロッド8−1.8−2.8−3を備えた
ものであるが、このオーガーロッド8−1.8−2.8
−3の配置として中間のロッド8−2は他のロッド8−
1.8−3に対して前方又は後方に多少ずらせて位置さ
せる。
First, to explain the multi-axis auger as the device of the present invention, FIG. 1 is a side view showing an embodiment of the device of the present invention, and FIG.
The figure is a front view of the main parts of the same as above, and the multi-shaft earth auger A is equipped with a leader mast 5 which can be raised and lowered on a movable trolley 4, like a normal multi-shaft earth auger. and a plurality of hollow auger rods 8-1.8-2.8-3 connected thereto.
-3 arrangement, the middle rod 8-2 is connected to the other rod 8-
1. Position it slightly shifted forward or backward relative to 8-3.

図示の例ではアースオーガーAは3軸機のものとしたが
、4軸機、6軸機等もあり、上述のごとく位置を前後に
ずらせる特定のオーガーロッドは、これを他のロッドに
対して1本おき、すなわち千鳥状に配置するか、又は2
本、3本おきに配置するかはそれぞれ用途に応じて選択
し得るものである。
In the illustrated example, earth auger A is of a 3-axis machine, but there are also 4-axis machines, 6-axis machines, etc., and as mentioned above, a specific auger rod whose position can be shifted back and forth can be moved relative to other rods. Place every other tree in a staggered manner, or
Whether or not to arrange every third book can be selected depending on the purpose.

また、特定のオーガーロッドに対して他のロッドがその
前後に機械操作により任意に調整できるようにすれば掘
削径に応じた千鳥状配置の柱列壁を一台のオーガーによ
り形成することができる。
In addition, if other rods can be adjusted arbitrarily by mechanical operation before and after a specific auger rod, it is possible to form column walls in a staggered arrangement according to the excavation diameter with a single auger. .

さらに各ロッド8−1〜8−3は内部に空気又は液材の
通路を有し、外面に螺旋状のスクリュー羽根9を有する
ものとしたが、フィルコンクリート杭施工用のアースオ
ーガーにおいてはかかる連続したスクリュー羽根の代わ
りに、第3図に示すように左右に突出する攪拌羽根9“
を適宜間隔で設けたものが用いられる。いずれにせよ、
各ロッド8−1〜8−3の羽根9又は9′の先端は相互
に上下方向でラップさせる。
Furthermore, each of the rods 8-1 to 8-3 has an air or liquid material passage inside and a spiral screw blade 9 on the outside surface, but in the earth auger for constructing fill concrete piles, such a continuous Instead of the screw blades, as shown in Figure 3, there are stirring blades 9" that protrude left and right.
are used at appropriate intervals. in any case,
The tips of the blades 9 or 9' of each rod 8-1 to 8-3 are overlapped with each other in the vertical direction.

なお、図中10は各ロッド8−1〜8−3の中間振れ止
め、11は下部振れ止め、12は各ロッド8−1〜8−
3の先端のオーガーヘッドを示す。
In addition, in the figure, 10 is an intermediate steady rest of each rod 8-1 to 8-3, 11 is a lower steady rest, and 12 is each rod 8-1 to 8-3.
The auger head at the tip of No. 3 is shown.

次に上述のごときアースオーガーAを使用して行なう本
発明工法について説明する。
Next, the construction method of the present invention using the earth auger A as described above will be explained.

ロッド8−1〜8−3を駆動装置7で回転させながら掘
削を行なった場合、第4図(a)で示すように杭孔が形
成され、ロッド8−1〜8−3を引き上げる時にオーガ
ーヘッド12からモルタル等が注入される。
When excavating while rotating the rods 8-1 to 8-3 with the drive device 7, pile holes are formed as shown in FIG. 4(a), and when the rods 8-1 to 8-3 are pulled up, the auger Mortar or the like is injected from the head 12.

次いで、一番端の杭孔αをガイドとしながら更にその横
を掘削すれば同図(b)のように連続した孔が掘られ、
同様の手順で同図(C)に示すように掘り進める。
Next, by using the end pile hole α as a guide and drilling further next to it, a continuous hole will be dug as shown in Figure (b).
Digging is continued in the same manner as shown in Figure (C).

アースオーガーAの特定のロッド8−2で削孔されたも
のは図示のごとく他の孔に対して中心が前方(後方)に
突き出たものとなり、ここにH型鋼等の鋼材13を挿入
して親杭14aとする。このよ、うにして、親杭14a
は他の杭(子杭)14bに対して1本おき若しくは数本
おきに千鳥状に形成される。
The hole drilled with the specific rod 8-2 of the earth auger A has a center that protrudes forward (rearward) relative to other holes as shown in the figure, and a steel material 13 such as an H-shaped steel is inserted into this hole. This is referred to as a parent stake 14a. In this way, the main stake 14a
are formed in a staggered manner every other pile or every few piles with respect to other piles (child piles) 14b.

柱列杭が施工された後で、第5図に示すように開削を行
なうが、所定深度まで掘り下げたところで親杭14aの
側部を削り取って中の鋼材13のフランジ面を露出させ
、ここに切張り用の復起し材などに用いる横架用鋼材1
5を当接して固定する。該網材15にはアースアンカー
16の端部を定着してもよい。
After the column piles have been constructed, excavation is carried out as shown in Fig. 5, and when the excavation has been excavated to a predetermined depth, the sides of the parent piles 14a are scraped off to expose the flange surface of the steel material 13 inside. Horizontal steel material 1 used as recovery material for cutting and tensioning, etc.
5 and fix it. An end portion of an earth anchor 16 may be fixed to the net material 15.

なお、親杭14a以外の子杭14bはその外周が露出す
る鋼材のフランジ面とほぼ同じ位置にあるので鋼材15
を取付けるには何ら支障とはならない。
In addition, since the child piles 14b other than the parent pile 14a are located at almost the same position as the flange surface of the steel material whose outer periphery is exposed, the steel material 15
There is no problem in installing it.

以上述べたように本発明は山留め壁などに用いる柱列杭
を施工するに際し、親杭に横架用の鋼材を取付けやすい
ように配慮した施工法と装置であり、従来工法と比べて
施工の合理化を図りまた構造的にも信頼性に富む杭が得
られるものである。
As described above, the present invention is a construction method and device designed to make it easier to attach horizontal steel materials to the parent pile when constructing column piles used for retaining walls, etc., and it is easier to install than conventional construction methods. It is possible to obtain piles that are rationalized and have high structural reliability.

【図面の簡単な説明】[Brief explanation of drawings]

第1図は本発明装置の実施例を示す側面図、第2図は同
上要部の正面図、第3図は他の実施例を示す要部の正面
図、第4図は本発明工法の工程を示す平面的説明図、第
5図は同じく本発明工法の工程を示す側面図、第6図は
従来工法を示す平面図である。 1・・・杭         1a・・・親杭2・・・
H型II        3・・・鋼材4・・・台車 
       5・・・リーダーマスト6・・・トップ
シーブ    7・・・駆動装置8−1.8−2.8−
3・・・オーガーロッド9.9′・・・羽根     
10・・・中間振れ止め11・・・下部振れ止め   
 12・・・オーガーヘッド13・・・鋼材     
   14a・・・親杭14b・・・子杭      
 15・・・横架用鋼材16・・・アースアンカー 出願人    三和機材株式会社 第1図 第2図 第3図
Fig. 1 is a side view showing an embodiment of the device of the present invention, Fig. 2 is a front view of the main parts of the same, Fig. 3 is a front view of the main parts showing another embodiment, and Fig. 4 is a front view of the main parts of the device of the present invention. FIG. 5 is a side view showing the steps of the method of the present invention, and FIG. 6 is a plan view showing the conventional method. 1...Pile 1a...Main stake 2...
H type II 3... Steel material 4... Trolley
5... Leader mast 6... Top sheave 7... Drive device 8-1.8-2.8-
3...Auger rod 9.9'...Blade
10... Intermediate steady rest 11... Lower steady rest
12...Auger head 13...Steel material
14a... Main pile 14b... Child pile
15...Steel material for horizontal structure 16...Earth anchor Applicant: Sanwa Kizai Co., Ltd. Figure 1 Figure 2 Figure 3

Claims (2)

【特許請求の範囲】[Claims] (1)アースオーガーを使用して形成する多数の場所詰
モルタル杭、フィルコンクリート杭等を連続させた柱列
杭を造成するに際し、H型鋼等の鋼材を挿入すべき親杭
は他の杭に対して前又は後に中心をずらせて適数本おき
にこれを形成し、杭施工後の開削時に前記親杭の側部を
削り取って鋼材面を露出させ、この露出部に腹起し材等
の横架用鋼材を固定することを特徴とする柱列杭の施工
法。
(1) When constructing a row of column piles that are a series of many in-place mortar piles, fill concrete piles, etc. formed using an earth auger, the parent pile into which steel materials such as H-shaped steel should be inserted is placed in the other piles. The center of the pile is shifted from the front or rear of the pile at an appropriate number of intervals, and when the pile is excavated after construction, the side part of the parent pile is scraped off to expose the steel surface. A construction method for column piles characterized by fixing horizontal steel materials.
(2)複数本のオーガーロッドを有する多軸アースオー
ガーにおいて、1本おき若しくは複数本おきに配置され
る特定のオーガーロッドを他のオーガーロッドに対して
前又は後にずらせて設けたことを特徴とする柱列杭の施
工装置。
(2) In a multi-axis earth auger having a plurality of auger rods, a specific auger rod arranged every other or every plurality of auger rods is provided shifted forward or backward relative to other auger rods. Construction equipment for column piles.
JP2032183A 1983-02-09 1983-02-09 Method and apparatus for construction of pillar-row pile Pending JPS59145821A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2032183A JPS59145821A (en) 1983-02-09 1983-02-09 Method and apparatus for construction of pillar-row pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2032183A JPS59145821A (en) 1983-02-09 1983-02-09 Method and apparatus for construction of pillar-row pile

Publications (1)

Publication Number Publication Date
JPS59145821A true JPS59145821A (en) 1984-08-21

Family

ID=12023860

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2032183A Pending JPS59145821A (en) 1983-02-09 1983-02-09 Method and apparatus for construction of pillar-row pile

Country Status (1)

Country Link
JP (1) JPS59145821A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS63284309A (en) * 1987-05-13 1988-11-21 Osaka Cement Kk Formation of angular improved ground
JPH03217515A (en) * 1990-01-19 1991-09-25 Kajima Corp Construction of sheathing and cut-off wall

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS544417A (en) * 1977-06-13 1979-01-13 Toshio Enoki Method of sheathing construction
JPS5631941A (en) * 1979-08-23 1981-03-31 Asuku Kenkyusho:Kk Building of underground storage tank
JPS56119028A (en) * 1980-02-22 1981-09-18 Toshima Kensetsu Kk Construction of earth retaining wall
JPS56119029A (en) * 1980-02-23 1981-09-18 Hirose Kozai Sangyo Kk Building-in method for main pile of soil concrete pile in bulge retaining wall

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS544417A (en) * 1977-06-13 1979-01-13 Toshio Enoki Method of sheathing construction
JPS5631941A (en) * 1979-08-23 1981-03-31 Asuku Kenkyusho:Kk Building of underground storage tank
JPS56119028A (en) * 1980-02-22 1981-09-18 Toshima Kensetsu Kk Construction of earth retaining wall
JPS56119029A (en) * 1980-02-23 1981-09-18 Hirose Kozai Sangyo Kk Building-in method for main pile of soil concrete pile in bulge retaining wall

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS63284309A (en) * 1987-05-13 1988-11-21 Osaka Cement Kk Formation of angular improved ground
JPH03217515A (en) * 1990-01-19 1991-09-25 Kajima Corp Construction of sheathing and cut-off wall
JPH0541766B2 (en) * 1990-01-19 1993-06-24 Kajima Construction Corp

Similar Documents

Publication Publication Date Title
JP3211673B2 (en) Simple temporary bridge temporary pier construction method
JPS59145821A (en) Method and apparatus for construction of pillar-row pile
JP2832508B2 (en) Retaining wall structure and retaining method
JP3948655B2 (en) Construction method of retaining wall and underground structure
JPH05287745A (en) Mounting method for wale in column aligning method
JPS6325130B2 (en)
JP2561971B2 (en) Construction method of earth retaining wall for underground structure
JP2000008369A (en) Earth retaining wall forming method in pit excavating construction method
JPS6018769B2 (en) Construction method of underground structure
JPH0448898B2 (en)
JP2650539B2 (en) Construction method of underground diaphragm wall
JPS6272817A (en) Construction of retaining wall concurrently serving as sheathing
JP2729940B2 (en) Drilling rig
JPH09221744A (en) Construction method of earth retaining wall using deep soil mixing consolidation pile and earth retaining wall structure
JP2899669B2 (en) Simple mountain retaining method
JP2977985B2 (en) Underground space construction method
JP2001164550A (en) Improvement method of construction ground for underground structure
JPH07158389A (en) Working face independence method in collapse bedrock tunnel
JP2659612B2 (en) Column type continuous underground wall construction method
JP2791664B2 (en) Simple underground continuous wall method
JP2020143467A (en) Construction method of earth retaining wall
JPS6062333A (en) Excavator
JPS5985022A (en) Underground continuous wall constructing work
JPH03180614A (en) Construction of retaining wall for underground structure
JP2700700B2 (en) Construction method of underground continuous wall based on underground tunnel