Method of constructing liner for reinforced concrete container wall

Info

Publication number
JPS59142496A
JPS59142496A JP58015858A JP1585883A JPS59142496A JP S59142496 A JPS59142496 A JP S59142496A JP 58015858 A JP58015858 A JP 58015858A JP 1585883 A JP1585883 A JP 1585883A JP S59142496 A JPS59142496 A JP S59142496A
Authority
JP
Japan
Prior art keywords
liner
reinforcing bars
concrete
reinforcing
reinforced concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP58015858A
Other languages
Japanese (ja)
Inventor
時田 能教
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
IHI Corp
Original Assignee
IHI Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by IHI Corp filed Critical IHI Corp
Priority to JP58015858A priority Critical patent/JPS59142496A/en
Publication of JPS59142496A publication Critical patent/JPS59142496A/en
Pending legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E30/00Energy generation of nuclear origin
    • Y02E30/30Nuclear fission reactors

Landscapes

  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

(57)【要約】本公報は電子出願前の出願データであるた
め要約のデータは記録されません。
(57) [Summary] This bulletin contains application data before electronic filing, so abstract data is not recorded.

Description

【発明の詳細な説明】 本発明は鉄筋コンクリート格納容器壁用ライナの構築方
法に係り、特にライナの周囲に予め鉄筋を配設した状態
でライナを4?4築し、剛性の面上と工期短縮を図り得
るライナの構築方法に関するものである。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a method of constructing a liner for a reinforced concrete containment vessel wall, and in particular, the liner is constructed 4-4 with reinforcing bars placed around the liner in advance to improve rigidity and shorten the construction period. The present invention relates to a method of constructing a liner that can achieve the following.

一般に、」ンクリート製の原子炉格納容器の側壁等の内
面には、内部を密封構造とするだめのライナが張設され
ている。
Generally, a liner with a sealed structure is provided on the inner surface of the side wall or the like of a reactor containment vessel made of concrete.

従来、ライナを構築する揚台は、建設現場において鉄筋
」ンクリート壁の部分とライナの部分とを別々に同−塊
所で構築するようにしでいる31例えば、ライナの部分
は溶接によって鋼板を水平方向に接続してリング状に連
結し、その外周面に上下方向に沿ったカットティを設け
て−「下方向に補強を施し、かつ、内周面に周方向に沿
った補強リングを設けて風荷重に対する耐力を高めるよ
うになし、一方、鉄筋コンクリート壁の部分は、ライナ
の補強工程が終了してからライナの周囲に配筋を行なっ
た後、ライナd5よびコンクリート打設用型枠で空間を
作ってコンクリート打設を実施1ノで構築するようにし
ている。
Conventionally, in order to construct a platform for constructing liners, the reinforcing concrete wall part and the liner part were constructed separately at the same site at the construction site. The structure is connected in a ring shape, and a cut tee is provided along the vertical direction on the outer circumferential surface. On the other hand, for the reinforced concrete wall section, after the reinforcing process for the liner was completed, reinforcement was placed around the liner, and then the space was filled with liner d5 and formwork for concrete pouring. I try to construct it in one step by making it and pouring concrete.

したがってライナの補強作業が終了しないど」ンクリ!
ト打設工程に移行できず、長い工期が必要である。
Therefore, the reinforcing work on the liner has not been completed yet!
It is not possible to move on to the pouring process, and a long construction period is required.

本発明はこれらの背景に基づいてなされたもので、その
目的とするところは、ライナの周゛面に少なくとも鉄筋
の一部を配設した状態として、これを積み重ねながらコ
ンクリート打設作業を実施することにより、薄板状のラ
イナの剛性を高めるとともに、コンクリート打設作業に
先立つ配筋作業を簡略化し全体工期の短縮を図ることに
ある。
The present invention has been made based on these backgrounds, and its purpose is to place at least a portion of the reinforcing bars around the periphery of the liner, and to perform concrete pouring work while stacking the reinforcing bars. This aims to increase the rigidity of the thin liner, simplify the reinforcing work prior to concrete pouring work, and shorten the overall construction period.

第1図は本発明に係る原子炉格納容器等の例を示すもの
で、格納容器1の部分は、鉄筋コンクリート壁(以下、
「コンクリート!lJと略′!1′)2の内面にライナ
3を張設した構造とされ、格納容器1の中に原子炉圧力
容器4、これを支持するペデスタル5、格納容器1の内
をドライウェル6およびサプレッションチェンバ7に区
画するダイヤフラムフロア8等が設けられ、また、コン
クリート壁2、ライナ3等はマット9.A、9B上に構
築されるようになっている。
FIG. 1 shows an example of a reactor containment vessel etc. according to the present invention.
It has a structure in which a liner 3 is stretched on the inner surface of the concrete!lJ (abbreviated as '!1') 2, and the reactor pressure vessel 4 is inside the containment vessel 1, the pedestal 5 that supports it, and the inside of the containment vessel 1. A diaphragm floor 8, etc., which partition the dry well 6 and the suppression chamber 7, is provided, and the concrete wall 2, liner 3, etc. are constructed on the mats 9.A, 9B.

以下、本発明を適用した一実施例について、第2図ない
し第4図を参照し℃説明すれば、1’S1」=(第4図
参照)まず、工場などに83いて定盤上等でi9板状の
ライナプレートを第2図に示すように組み立て、第3図
の1からVで示J範囲のライナ3を胸切り状に上下に分
割したリング状ライナ3A−3Fを形成する。
Hereinafter, an embodiment to which the present invention is applied will be explained with reference to Figs. 2 to 4. 1'S1'' = (Refer to Fig. 4) i9 plate-shaped liner plates are assembled as shown in FIG. 2, and ring-shaped liners 3A to 3F are formed by dividing the liner 3 in the range J from 1 to V in FIG. 3 into upper and lower halves.

rS2J :これらリング状ライナ3A〜3Eの外周面
に軸線方向に沿ったカットティ11を周方面に間隔をお
いて複数配設りる、。
rS2J: A plurality of cut tees 11 are arranged along the axial direction on the outer peripheral surface of these ring-shaped liners 3A to 3E at intervals in the circumferential direction.

rs3j :これらカットティ11に、格納容器1の二
Jンクリート壁2内に埋設づべき鉄筋の少なくとも一部
、第2図に示づ周方向の鉄筋12Aと第3図に示す上下
方向の鉄筋12Bとをそれぞれ溶接してリング状ライナ
3A〜3Eを剛M4造とする。。
rs3j: At least part of the reinforcing bars to be buried in the concrete wall 2 of the containment vessel 1, the circumferential reinforcing bars 12A shown in FIG. 2 and the vertical reinforcing bars 12B shown in FIG. are welded to each other to make ring-shaped liners 3A to 3E of rigid M4 construction. .

rS4J : rs3’Jの工程で得られた鉄筋例ライ
ナを工場から格納容器1の構築現場に運搬し、第4図に
示づライナ搭載工程、配筋工程、コンクリート打設工程
に基づいてマット9Bl−に積み上げる。このとぎ、鉄
筋例ライナを構成4ることにより、第3図にR1,R4
,R6,R8,R107゛示す範囲の鉄筋12Bはそれ
ぞれリング状ライナ3A〜3Eの周囲に配設された状態
どなる。
rS4J: Example of reinforcing bars obtained in the process of rs3'J The liner was transported from the factory to the construction site of the containment vessel 1, and mat 9Bl was constructed based on the liner loading process, reinforcement process, and concrete placement process shown in Figure 4. Stack up on −. At this point, by setting the reinforcing bar example liner to configuration 4, R1 and R4 are shown in Fig. 3.
, R6, R8, and R107 are arranged around the ring-shaped liners 3A to 3E, respectively.

rs5J :第3図にIで示す範囲の鉄筋例ライナをマ
ット9B上に搭載し、鉄筋j2Bとマット9Bから上方
に突出させておいた鉄筋13とを溶接等により連結し、 rs6J:第3図に1で示す範囲の鉄筋付ライナ上に■
で示す範囲の鉄筋付ライナを搭載する。以下、鉄筋付ラ
イナ搭載毎に縦方向に鉄筋12Bを順次連結する。
rs5J: Examples of reinforcing bars in the area indicated by I in Fig. 3. The liner is mounted on mat 9B, and reinforcing bars j2B and reinforcing bars 13 protruding upward from mat 9B are connected by welding or the like. rs6J: Fig. 3 ■ On the liner with reinforcing bars in the range shown in 1.
A liner with reinforcing bars in the range shown will be installed. Thereafter, the reinforcing bars 12B are sequentially connected in the vertical direction each time a liner with reinforcing bars is installed.

rS7J:マット9Bから突出させておいた鉄筋14に
、外側に位置する鉄筋のうち第3図にR2で示す範囲の
鉄筋15を連結する。以下、外側の鉄筋を配筋する毎に
鉄筋15を順次連結する。
rS7J: Connect the reinforcing bars 15 in the range indicated by R2 in FIG. 3 among the reinforcing bars located outside to the reinforcing bars 14 projected from the mat 9B. Thereafter, the reinforcing bars 15 are sequentially connected each time the outer reinforcing bars are arranged.

rs8J :第3図に工、■で示づ゛範囲のライナ3の
周囲にコンクリート型枠を配してC1で示す範囲のコン
クリート打設を行ない、 rs9J :続いてC2で示ず範囲のコンクリート打設
を行なう。
rs8J: As shown in Figure 3, a concrete formwork was placed around the liner 3 in the area shown by ■, and concrete was poured in the area shown in C1. rs9J: Next, concrete was poured in the area not shown in C2. Perform the settings.

rsloJ:第3図にR3で示す範囲の鉄筋15を配筋
し、 rsllJ:C3で示J範囲のIJコンクリート打設行
なう。なJj1第4図工程例では、第3図に■およびI
Vで示す範囲の鉄筋付ライナの搭載を[59−1、rs
llJで実施する如くしているが、第3図から明らかな
ように■はR7のi(1に、IVはR9の前にそれぞれ
実施゛づればよい。
rsloJ: Arrange reinforcing bars 15 in the range shown by R3 in Figure 3, and perform IJ concrete placement in the J range shown by rsllJ:C3. In the process example shown in Figure 4, ■ and I are shown in Figure 3.
Installing a liner with reinforcing bars in the range indicated by V [59-1, rs
llJ, but as is clear from FIG. 3, (2) can be implemented before i(1) of R7, and IV can be implemented before R9.

rs12J:第3図にR5で丞り範囲の鉄筋]5の配筋
工程と、 「S13」 :C/l′C−示ずコンクリート1]設工
程と、rs14J:C5で示ずコンクリート打設工程と
、rs15−I:R7で示ザ配筋T稈ど、rs16J:
C6で示すコンクリート打設工程と、rs17J :C
7で示ずコンクリート打設工程とを順次実施する。/i
−お、第4図工程例て・は第3図にVで示ず範囲の鉄筋
付ライナの搭載をここで実施する如くしているが、第3
図から明らかな」:うにC9およびR11より前任意に
実施できるものである。
rs12J: Reinforcement in the area marked R5 in Figure 3] 5 reinforcement process, "S13": C/l'C-not shown concrete 1] installation process, rs14J: concrete placing process not shown in C5 And, rs15-I: R7 shows the reinforcement T culm etc., rs16J:
Concrete pouring process shown in C6 and rs17J:C
Concrete pouring process (not shown in 7) is carried out sequentially. /i
- In the process example in Figure 4, the liner with reinforcing bars is installed in the area not indicated by V in Figure 3.
It is clear from the figure that it can be implemented arbitrarily before C9 and R11.

I’518J:さらに、第3図にR9で示す範囲の鉄筋
15の配筋工程と、 rS19J :C8で示す=lンクリート打設工程と、
1−820J:R11で示づ配筋工程と、rs21J 
:C9で示1コンクリートJ′J設工程と、rs22J
:R12で示ず配筋工程と、rs23.I:C10で示
づコンクリート打設工程とを順次実施すると、第1図に
示した格納容器1の側壁、即ち、コンクリート壁2どラ
イナ3とが完成する。
I'518J: Furthermore, the reinforcement process of reinforcing bars 15 in the range shown by R9 in FIG.
1-820J: Reinforcement process shown by R11 and rs21J
:C9 shows 1 concrete J'J construction process and rs22J
: Reinforcement process not shown in R12, and rs23. By sequentially carrying out the concrete placing process shown by I:C10, the side wall of the containment vessel 1 shown in FIG. 1, that is, the concrete wall 2 and the liner 3 are completed.

なお、第4図に示した工程例ぐは、T〜Vで示ず範囲の
ライナ3を縦および周方向に配される各内側鉄筋12A
、12Bと一体化するようにしたが、外側に位置する鉄
筋15をも含めてライナ3ど一体化覆ることも可能であ
り、また、胴切り状に分割された鉄筋飼ライナの個数は
任意とすることができる。
In addition, the process example shown in FIG.
, 12B, but it is also possible to integrally cover the liner 3 including the reinforcing bars 15 located on the outside, and the number of reinforcing bar liners divided into cut-out shapes is arbitrary. be able to.

以上説明したように、本発明にJ:れば、■鉄筋付ライ
ナを積み上げることによって、構築現場にお(プる配筋
の少なくとも一部を省略することができ、ライナの組立
工程が単純化される。
As explained above, according to the present invention, ■ By stacking liners with reinforcing bars, it is possible to omit at least part of the reinforcing at the construction site, and the liner assembly process is simplified. be done.

■構築現場における配筋T稈の全部または一部を省略し
かつライナは単純に積み上げ連結づるものであるから、
格納容器の側壁の構築をコンクリート打設工程を主とす
る」]程に短縮することができる。
■Since all or part of the reinforcement T-culm at the construction site is omitted and the liner is simply stacked and connected,
The construction of the side walls of the containment vessel can be shortened to the point where the concrete pouring process is the main process.

■ライナを鉄筋によって補強した状態となるため、剛性
が向上して従来必要とされていた屓荷小用補強リング等
の副資材を省略できる。。
■Since the liner is reinforced with reinforcing bars, the rigidity is improved and auxiliary materials such as reinforcing rings for small loads, which were conventionally required, can be omitted. .

等の優れた効果を奏するものである。It has excellent effects such as:

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は本発明に係る原子炉格納容器首の例を示づ一部
を省略した縦断面図、第2図ないし第4図は本発明の]
−程例を示゛づ゛もので、第2図は鉄筋付ライナの要部
を示す斜視図、第3図は格納容器の側壁の王程範凹説明
図、第4図は工程j11′I説明図である。 1・・・・・・格納容器、2・・・・・・鉄筋二コンク
リート壁(コンクリート壁)、3・・・・・・ライナ、
3A〜3F・・・・・・リング状ライナ、11・・・・
・・カットディ、12A。 12B・・・・・・鉄筋、13・・・・・・鉄筋、14
・・・・・・鉄筋、15・・・・・・鉄筋。 出願人 石川島播磨重工業株式会討 第2 ’を属 3 A −−3E
FIG. 1 is a partially omitted vertical cross-sectional view showing an example of the reactor containment vessel neck according to the present invention, and FIGS. 2 to 4 are according to the present invention]
- This is an example of the process. Figure 2 is a perspective view showing the main parts of the liner with reinforcing bars, Figure 3 is an explanatory diagram of the side wall of the containment vessel, and Figure 4 is an explanatory diagram of process j11'I. It is. 1...Containment vessel, 2...Reinforced concrete wall (concrete wall), 3...Liner,
3A to 3F...Ring liner, 11...
...Katdi, 12A. 12B...Reinforcement bar, 13...Reinforcement bar, 14
...Reinforcing bar, 15...Reinforcing bar. Applicant Ishikawajima-Harima Heavy Industries Stock Exchange No. 2' belongs to 3A--3E

Claims (1)

【特許請求の範囲】[Claims] 鉄筋コンクリート格納容器の側壁にライナを内張りする
方法において、リング状ライナの外周面に軸線方向に沿
って補強用カットディを周方向に間隔をおいて複数配設
Jる工程と、前記カットティに前記側壁内に埋設する鉄
筋の少なくとも一部を周方向に沿って一体に配設する工
程と、該鉄筋を取り付けたライナをコンクリート打設現
場で弛の鉄筋と連結した後コンクリートを打設してコン
クリート壁と一体化する工程とを有することを特徴とす
る鉄筋コンクリート格納容器壁用ライナの構築方法。
A method of lining the side wall of a reinforced concrete containment vessel with a liner includes the steps of: arranging a plurality of reinforcing cuts at intervals in the circumferential direction along the axial direction on the outer peripheral surface of a ring-shaped liner; A process of integrally arranging at least a part of the reinforcing bars to be buried in the side wall along the circumferential direction, and connecting the liner with the reinforcing bars attached to the loose reinforcing bars at the concrete placement site, and then pouring concrete. 1. A method for constructing a liner for a wall of a reinforced concrete containment vessel, comprising the step of integrating the liner with the wall.
JP58015858A 1983-02-02 1983-02-02 Method of constructing liner for reinforced concrete container wall Pending JPS59142496A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP58015858A JPS59142496A (en) 1983-02-02 1983-02-02 Method of constructing liner for reinforced concrete container wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP58015858A JPS59142496A (en) 1983-02-02 1983-02-02 Method of constructing liner for reinforced concrete container wall

Publications (1)

Publication Number Publication Date
JPS59142496A true JPS59142496A (en) 1984-08-15

Family

ID=11900494

Family Applications (1)

Application Number Title Priority Date Filing Date
JP58015858A Pending JPS59142496A (en) 1983-02-02 1983-02-02 Method of constructing liner for reinforced concrete container wall

Country Status (1)

Country Link
JP (1) JPS59142496A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5351277A (en) * 1990-04-13 1994-09-27 Hitachi, Ltd. Method of constructing top slab of nuclear reactor container and nuclear reactor container constructed by the method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5351277A (en) * 1990-04-13 1994-09-27 Hitachi, Ltd. Method of constructing top slab of nuclear reactor container and nuclear reactor container constructed by the method

Similar Documents

Publication Publication Date Title
JPS59142496A (en) Method of constructing liner for reinforced concrete container wall
JP3946352B2 (en) Construction method of reactor containment vessel
JPS6321879B2 (en)
JPH08135018A (en) Mixed structure of reinforced concrete column and steel skeleton beam
US6189288B1 (en) Method of construction of elevated annular platform
JP4251597B2 (en) Condenser and its construction method
JP4352071B2 (en) Construction method of reactor containment vessel
JPS59192159A (en) Construction of plant structure
JP2003167086A (en) Construction method for nuclear power generating plant
JP2906438B2 (en) Connection structure between reactor pedestal and reactor shield wall and its installation method
JP3110059B2 (en) Containment vessel construction method for nuclear power plants
JP3345537B2 (en) Diaphragm floor of reinforced concrete containment vessel
JPH0672940B2 (en) Construction method of reactor containment superstructure
JPH04285893A (en) Construction of cylindrical reinforced concrete containment vessel
JPH07113890A (en) Concrete containment
JPS63756B2 (en)
JP3020874B2 (en) Module structure of nuclear power plant and diaphragm floor and method of constructing nuclear power plant
JPH03237391A (en) Storage container constructing method for nuclear power plant
JPH03295496A (en) Top slab building method for nuclear reactor container vessel and nuclear reactor container vessel
JPH09254868A (en) Method for building floating caisson
JPH10132980A (en) Construction work process for reactor housing container made of concrete
JPS5926095A (en) Method of constructing reactor building
JPH09166685A (en) Construction method for ferroconcrete reactor containment
JPS63755B2 (en)
JPS60239698A (en) Method of constructing nuclear reactor housing vessel