JPS59138637A - Support construction of beam by combined pillar - Google Patents

Support construction of beam by combined pillar

Info

Publication number
JPS59138637A
JPS59138637A JP1308883A JP1308883A JPS59138637A JP S59138637 A JPS59138637 A JP S59138637A JP 1308883 A JP1308883 A JP 1308883A JP 1308883 A JP1308883 A JP 1308883A JP S59138637 A JPS59138637 A JP S59138637A
Authority
JP
Japan
Prior art keywords
supports
sets
struts
opposing surfaces
beams
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP1308883A
Other languages
Japanese (ja)
Other versions
JPH0229823B2 (en
Inventor
省三 中村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SADOJIMA KK
SOSHIN MOKUZAI KK
SOUSHIN MOKUZAI KK
Original Assignee
SADOJIMA KK
SOSHIN MOKUZAI KK
SOUSHIN MOKUZAI KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SADOJIMA KK, SOSHIN MOKUZAI KK, SOUSHIN MOKUZAI KK filed Critical SADOJIMA KK
Priority to JP1308883A priority Critical patent/JPS59138637A/en
Publication of JPS59138637A publication Critical patent/JPS59138637A/en
Publication of JPH0229823B2 publication Critical patent/JPH0229823B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

(57)【要約】本公報は電子出願前の出願データであるた
め要約のデータは記録されません。
(57) [Summary] This bulletin contains application data before electronic filing, so abstract data is not recorded.

Description

【発明の詳細な説明】 ネ究明は社のfλい広い床面4貞や空間を作るための長
尺な梁を支持する工法に関するものである。
[Detailed Description of the Invention] The present study relates to a construction method for supporting long beams to create wide floor surfaces and spaces in the company.

従来、柱のない広い床面積や空間を作るには、長尺の梁
を断面積の大きな所謂太い柱で支持して行なわれている
。しかしながら、現在のように木材資源が不足している
とき、太い柱を使用することは多額の費用を必要とする
ため、建設が次第に困難になりつつある。
Conventionally, in order to create a large floor area or space without pillars, long beams have been supported by so-called thick pillars with large cross-sectional areas. However, when wood resources are currently in short supply, the use of thick pillars requires a large amount of money, so construction is becoming increasingly difficult.

本発明はこの問題点を解消するためになされたもので、
木材資源の不足している現在でも比較的安価で入手の容
易な断面積の小さい所謂細い柱でも長尺の梁を支持する
ことのできる工法を提供せんとするものである。
The present invention was made to solve this problem.
The purpose of the present invention is to provide a construction method that can support long beams even with so-called thin pillars with small cross-sectional areas, which are relatively inexpensive and easily available even at present when wood resources are in short supply.

本発明の一実施例を示す第1図及び第2図により以下説
明する。支持する梁lの厚さ寸法と略同じ間隙を平行な
対向面z、3′及び4′、5′間で保持する、同一断面
積で正方形状の夫々2本の支柱2゜3及び4,5からな
る2組の短支柱6,7を、支持する梁1′の厚さ寸法と
略同じ間隔をおいて、両組支柱6,7の隣合った対向向
2′と47. 3′と5′が前記間隙で平行した2平面
上にあるように平行に配置してなる組合せ支柱8を適当
な方法で立設したのち、両組支柱6,7のそれぞれの対
向面2′。
DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the present invention will be explained below with reference to FIGS. 1 and 2 showing one embodiment. Two pillars 2°3 and 4, each having the same cross-sectional area and square shape, maintain a gap approximately equal to the thickness dimension of the supporting beam l between the parallel opposing surfaces z, 3' and 4', 5'. Two pairs of short columns 6, 7 consisting of 47. After the combined struts 8 are erected in an appropriate manner so that the struts 3' and 5' are arranged in parallel on two planes parallel to each other in the gap, the opposing faces 2' of both struts 6 and 7 are erected. .

3′及び41.  s/間に梁1を間挿して、梁1と組
支柱6.7とをボルト・ナツト9で締付は固定すると共
に、梁1の下部で両組支柱6,7の間に梁1′を −間
挿して、梁1′と両組支柱6,7のそれぞれ隣合、つた
内支柱2,4及び3.5とをボルト・ナツトqで締付は
固定した組合せ支柱8による梁l、1′の支持工法であ
る。
3' and 41. Insert the beam 1 between the beam 1 and the struts 6 and 7, tighten and fix the beam 1 and the struts 6 and 7 with bolts and nuts 9, and insert the beam 1' between the struts 6 and 7 at the bottom of the beam 1. - A beam l formed by a combination strut 8, which is interposed and fixed with bolts and nuts q between the beam 1' and the inner struts 2, 4, and 3.5, respectively adjacent to the beam 1' and the double struts 6 and 7; This is the support method 1'.

この場合、4本の支柱2. 3. 4. 5を方形状に
配設し、長尺の梁l及び1′を支柱21.3及び4゜5
の間で挾持して支柱2,3及び4,5と共に、それぞれ
複数のボルト・ナツト9及び9′で締付は方向が上下交
差するように締付は固定しているため、梁l及び11が
極めて安定よく強固に固定され、細い支柱2.  :3
. 4. 5を使用した組合せ支柱8でも相当長尺の梁
を支持することができるので、141の柱で広い床面積
や空間を形成することができる。又支柱2. 3. 4
. 5は細いものなので、木tyi貸源の不足している
現在でも比較的安価で且つ容易に入手でき、柱のない広
い床面積や空間例えば車庫や倉庫などを極めて簡単に安
価で建設することができる。
In this case, there are four pillars 2. 3. 4. 5 are arranged in a rectangular shape, and the long beams l and 1' are connected to the supports 21.3 and 4°5.
The beams 1 and 11 are clamped together with the pillars 2, 3 and 4, 5, and are tightened with a plurality of bolts and nuts 9 and 9', respectively, so that the directions cross vertically. is extremely stable and firmly fixed, and the thin pillar 2. :3
.. 4. Since the combined support column 8 using 141 columns can also support a fairly long beam, a large floor area and space can be formed with 141 columns. Also, pillar 2. 3. 4
.. 5 is thin, so even today when there is a shortage of wood resources, it is relatively cheap and easy to obtain, and it is possible to construct large floor areas and spaces without pillars, such as garages and warehouses, very easily and inexpensively. can.

上記の一実施例において、梁lを2組の組支柱6.7の
対向面2J、  3/及び41. 5/間で締付は固定
し、梁1′を2組の組支柱6,7の間隙で締付は固定し
たが、締付は固定の箇所をこの逆にしても良い。又梁1
,1′は両方とも長尺のものとしたが、梁l、1′の一
方何れかを2組の組支柱6,7を連結できる程度の長さ
の間挿部材にしても良い。又2組の組支柱6,7をボル
ト・ナラ)9.9’で締付は固定したが、梁1,1′と
組合せ支柱8とが強固に締付は固定できるなら他の適宜
の手段に依っても良い。又各支社2. 3. 4. 5
を同一断面積で正方形状ものにしたが、梁1,1′を固
定できるなら各支柱2. 3. 4. 5の断面積が異
なっても、正方形状でなくとも良い。
In the above embodiment, the beam l is connected to the opposing surfaces 2J, 3/ and 41. of two sets of struts 6.7. 5/, and the beam 1' was tightened and fixed between the two sets of struts 6 and 7, but the tightening may be done in the opposite direction. Mata beam 1
, 1' are both long, but either one of the beams 1 and 1' may be an interposed member having a length sufficient to connect the two sets of struts 6, 7. Also, although the two sets of struts 6 and 7 were tightened with bolts and nuts 9.9', other suitable means may be used as long as the beams 1 and 1' and the strut 8 can be securely tightened. It may depend on Also, each branch office 2. 3. 4. 5
are square shaped with the same cross-sectional area, but if beams 1 and 1' can be fixed, each support column 2. 3. 4. Even if the cross-sectional area of 5 is different, it does not have to be square.

本発明は上記の構成なので次の効果を奏する。Since the present invention has the above configuration, it has the following effects.

ill  l箇所の組合せ支柱の立設により長尺の梁を
支持できるので、広い床面積や空間を極めて簡単に形成
できる。
Since long beams can be supported by erecting the combined supports at ill and l locations, a wide floor area and space can be created extremely easily.

(2)従来の柱と梁との固定工法に比較して極めて簡単
で且つ強固に固定することができる。
(2) Compared to the conventional method of fixing columns and beams, it is extremely simple and can be fixed firmly.

(31各支柱が細いので木材資源の不足している現在で
も比較的安価でしかも容易に入手でき、広い床面積や客
間の建設を安価で且つm3単にできる。
(31) Since each support is thin, it is relatively cheap and easily available even in the current shortage of wood resources, and construction of large floor areas and parlors can be done inexpensively and in just 3 m3.

【図面の簡単な説明】[Brief explanation of drawings]

図面は本発明の一実施例の説明図で、第1図は平面図、
第2図は側面図である。 1、 1・・・梁、2. 3. 4. 5・・・支柱、
z′、31. 4′、5/ 、・・対向面、6.7・・
・組支柱、8・・・組合せ支柱、9、q・・・ボルト・
ナツト 特許出願人  倉真木材株式会社 株式会社佐渡島
The drawings are explanatory diagrams of one embodiment of the present invention, and FIG. 1 is a plan view;
FIG. 2 is a side view. 1, 1...beam, 2. 3. 4. 5... Prop,
z′, 31. 4', 5/,...opposite surface, 6.7...
・Assembled strut, 8... Combined strut, 9, q... Bolt・
Natsuto Patent Applicant Kurama Mokuzai Co., Ltd. Sadoshima Co., Ltd.

Claims (1)

【特許請求の範囲】 1) 支持する梁の厚さと略同じ間隙を平行な対向面間
で保持する2本の支柱からなる短支柱の2組を、適宜の
間隔をおいて両組支柱の隣合った対向面が該間隙で平行
な2平面上にあるように立設された組合せ支柱において
、0■記両組支柱の対向面間に間挿された前記梁を前記
両組支柱で適宜な手段により締付は固示すると共に、固
定された前記梁の上部または下部で前記両組支柱の間に
間挿された間挿部材をtjjJ ’71.3両組支柱の
それぞれ隣合った両支社で適宜な手段により締イ」け1
1J1定することを特徴とする組合せ支柱による梁の支
持工法。 2) 間挿部材が梁であること特徴とする特許請求の範
囲第1項記載の組合せ支柱による梁の支jS工法。
[Scope of Claims] 1) Two sets of short supports, each consisting of two supports that maintain a gap approximately equal to the thickness of the supporting beam between parallel opposing surfaces, are placed adjacent to both sets of supports at an appropriate interval. In a combination strut that is erected so that the opposing surfaces that meet are on two planes parallel to each other in the gap, the beam inserted between the opposing surfaces of the two struts described in 0. The fastening is fixed by means, and the interposed member inserted between the two sets of supports at the upper or lower part of the fixed beam is connected to each adjacent branch of the two sets of supports. Tighten by appropriate means.1
1J1 A method of supporting beams using a combination of supports. 2) The jS construction method for supporting a beam using a combination strut according to claim 1, wherein the interposed member is a beam.
JP1308883A 1983-01-28 1983-01-28 Support construction of beam by combined pillar Granted JPS59138637A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1308883A JPS59138637A (en) 1983-01-28 1983-01-28 Support construction of beam by combined pillar

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1308883A JPS59138637A (en) 1983-01-28 1983-01-28 Support construction of beam by combined pillar

Publications (2)

Publication Number Publication Date
JPS59138637A true JPS59138637A (en) 1984-08-09
JPH0229823B2 JPH0229823B2 (en) 1990-07-03

Family

ID=11823404

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1308883A Granted JPS59138637A (en) 1983-01-28 1983-01-28 Support construction of beam by combined pillar

Country Status (1)

Country Link
JP (1) JPS59138637A (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS50103413U (en) * 1974-01-28 1975-08-26
JPS50138608A (en) * 1974-04-23 1975-11-05
JPS51105114A (en) * 1975-03-13 1976-09-17 Koken Sekkei Kenkyusho Kk TETSUKO TSUKOZO

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS50103413U (en) * 1974-01-28 1975-08-26
JPS50138608A (en) * 1974-04-23 1975-11-05
JPS51105114A (en) * 1975-03-13 1976-09-17 Koken Sekkei Kenkyusho Kk TETSUKO TSUKOZO

Also Published As

Publication number Publication date
JPH0229823B2 (en) 1990-07-03

Similar Documents

Publication Publication Date Title
JPS59138637A (en) Support construction of beam by combined pillar
JPS61126242A (en) Joint box for house skeletal
JP3045043U (en) Construction fittings
JPH0624496Y2 (en) Bundle mounting structure
JPS5957605U (en) Support structure for columns in prefabricated buildings, etc.
JPH0326803Y2 (en)
JPS6217526Y2 (en)
JPS6025484Y2 (en) Fuens
JPH0122042Y2 (en)
JPH0548822B2 (en)
JPS5994543U (en) working pier
JPS58171451U (en) Earthquake-resistant structure of buildings
JPS62288238A (en) Column base support jig
JPS636321Y2 (en)
JPS61126245A (en) Sheletal unit for house
JPH0355711Y2 (en)
JPS63251547A (en) Structure of connection part between principle members
JPH0333843Y2 (en)
JPS59186305U (en) Fixed structure of through columns and girders in houses
JPS59132857U (en) fence body
JPH0762371B2 (en) Composite beam for frame structure
JPS6138056A (en) Floor structure
JPS60148401U (en) assembly storage
JPS611502U (en) simple house
JPS60144438A (en) Anchor structure of unit