JPS5820809A JP11783381A JP11783381A JPS5820809A JP S5820809 A JPS5820809 A JP S5820809A JP 11783381 A JP11783381 A JP 11783381A JP 11783381 A JP11783381 A JP 11783381A JP S5820809 A JPS5820809 A JP S5820809A
Authority
JP
Japan
Prior art keywords
concrete
block
dam
upstream
blocks
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP11783381A
Other languages
Japanese (ja)
Inventor
Yasushi Kuragami
倉上 靖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
KURAGAMI MITOE
Original Assignee
KURAGAMI MITOE
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by KURAGAMI MITOE filed Critical KURAGAMI MITOE
Priority to JP11783381A priority Critical patent/JPS5820809A/en
Publication of JPS5820809A publication Critical patent/JPS5820809A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B7/00Barrages or weirs; Layout, construction, methods of, or devices for, making same
    • E02B7/02Fixed barrages
    • E02B7/04Dams across valleys
    • E02B7/08Wall dams
    • E02B7/10Gravity dams, i.e. those in which the weight of the structure prevents overturning

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Revetment (AREA)

Abstract

PURPOSE:To eliminate the need for formwork as well as shorten the constructin period of dam by method in which concrete block elements having grooves on both sides are stacked up on the upstream and downstream sides of a river or waterway and then concrete is integrally packed in the spaces between both the concrete blocks. CONSTITUTION:A trench is excavated, base concrete 9 is placed, concrete blocks 1 are stacked up vertically and laterally on the base concrete 9, concrete is plated in the space 10 formed by grooves 4 from which iron bars 5 are projected to construct the block walls A and B on the upstream and downstream sides, and lastly concrete 11 is placed in between them. Thus, the concrete 11 comes to hold the iron bars 6 projecting from the back 7 of the block 1 and both the block walls A and B are integrally combined with the concrete 11.

Description

【発明の詳細な説明】 この発明は、強度の増大と工期の短縮を図った堰堤構築
法に関するものである。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a dam construction method that increases strength and shortens construction period.

従来一般に行われていた堰堤構築法は、通常次の通シで
ある。すなわち、堰堤を構築せんとする場所に1づ床堀
をして基礎を施工し、上流側及び下流側に横150cI
n、縦30譚程度の鋼鉄製板状の型枠をある程度の高さ
まで組立て、その空間部にコンクリートを打設し、この
コンクリートが十分養生してからこの型枠を取シ外し次
の段の型枠を組立て再び同様にコンクリートを打設し、
順次これを繰返し、天端にまで至るという方法であった
。ところで、このような従来例によると、次のような問
題が生じていた。すなわち、堰堤の規模・が犬きくなれ
ばなる程、また工程をはやめようとすればする程型枠の
枚数を多く要し、且つこの型枠の組立てには支柱や鉄筋
の組合せを要し、このためには高度の技術が要求され、
人糞がってかなシの熟練を要するものであって、これが
十分に行われないときには、コンクリート打設時にかけ
るバイブレータによって、型枠がはらんできたシ、この
はらみを防止するためにはバイブレータをあまり強力に
かけなければよいことになるが、これでは堰堤としての
強度を保持子きないことになって、結局理想的な構築法
ではなかったのである。
The conventional method of constructing dams is as follows. In other words, the site where the dam is to be constructed is dug and the foundation is constructed.
n. Assemble a steel plate-shaped formwork with a length of about 30 steps to a certain height, pour concrete into the space, and after the concrete has sufficiently cured, remove this formwork and place it on the next stage. Assemble the formwork and pour concrete again in the same way.
The method was to repeat this step by step until the top was reached. By the way, according to such a conventional example, the following problems have arisen. In other words, the larger the dam is, and the more you try to speed up the process, the more formwork will be required, and the assembly of this formwork will require a combination of supports and reinforcing bars. This requires advanced technology,
Human excrement requires a great deal of skill, and if this is not done well, the vibrators applied during concrete pouring may cause the formwork to embed. Although it would be better not to apply too much force to the dam, this meant that the dam would not have enough strength to maintain it, and in the end it was not an ideal construction method.

しかも強度をもたせるためには、打設するコンクリート
は、いわばセメントの配合率を高くしたリッチ配合しな
ければならず、この点でも工費はぼう太なものになって
いたのである。しかし、何よりも大きな欠点は、コンク
リートの打設を1段分行い、これが十分養生してから次
の段のコンクリート打設を行うという、非能率極まりな
い方法であった、ということである。このためいきおい
工期は長くなり、特に寒冷地などにおける作業としては
不向きであることも否定でき力い。それのみか、工期が
長く々ることによって人件費も軽視できない程になシ、
型枠枚数もかなりの量を要するなど、要するに投資効率
のきわめて低いものとなっているのである。
Moreover, in order to provide strength, the concrete poured had to be a rich mix with a high cement content, which also increased construction costs. However, the biggest drawback of all was that it was an extremely inefficient method of pouring one stage of concrete and allowing it to cure sufficiently before pouring the next stage of concrete. As a result, the construction period is long, and it cannot be denied that it is unsuitable for work in particularly cold regions. Perhaps that's because the construction period is so long that labor costs cannot be ignored.
In short, the investment efficiency is extremely low, as a considerable number of formworks are required.

そこでこの発明は、両側に上下方向の溝部を形成し、こ
の溝部内に鉄筋を飛出させたコンクリートブロックを堰
堤の上流側、下流側の両表面部に相当する位置に前記溝
部が隣設するように積み重ね、この溝部によ多形成され
る空間部及び上流側、下流側に積み重ねた両コンクリー
トブロック壁の間の空間部にコンクIJ ニドを充填し
、全体を一体化するように、型枠を不要とし、しかも工
期の短縮化を図るようにした堰堤構築法を提供すること
を提供することを目的として開発したものである。
Therefore, in this invention, vertical grooves are formed on both sides, and concrete blocks with reinforcing bars protruding into the grooves are placed adjacent to each other at positions corresponding to the surface areas on both the upstream and downstream sides of the dam. The space formed by this groove and the space between the walls of both concrete blocks stacked on the upstream and downstream sides are filled with concrete block IJ Nido, and the formwork is assembled so as to integrate the whole. It was developed with the aim of providing a dam construction method that eliminates the need for dam construction and shortens the construction period.

次に、この発明にかかる堰堤構築法の実施例を図面にも
とづいて述べる。
Next, an embodiment of the dam construction method according to the present invention will be described based on the drawings.

実施例 1 本実施例を第1図乃至第4図にもとづいて述べると、1
は少なくとも上面2及び下面3を平滑面に形成したコン
クリートブロックであり、4は、このコンクリートブロ
ック1の両側に形成した上下方向の溝部である。5は前
記ブロック1の内部から溝部4に飛出せしめた鉄筋であ
り、6はブロック1の背面7に飛出せしめた鉄筋である
(この鉄筋6は、施工時にブロック1の吊鉄筋としての
作用もする。)。また8はブロック1の正面を指すが、
この正面8と背面7は図示する本実施例においては傾斜
面に形成しである。これは堰堤自体、ある程度の傾斜勾
配をもって構築されるのが通常であるから、この勾配に
合致せしめることを企図したものであり、このためには
、少なくとも正面8側のみが傾斜していればよいことに
なシ、背面T側は垂直面となっていてもかまわない。
Example 1 This example will be described based on FIGS. 1 to 4.
is a concrete block having at least an upper surface 2 and a lower surface 3 formed as smooth surfaces, and 4 is a vertical groove formed on both sides of this concrete block 1. Reference numeral 5 indicates a reinforcing bar that protrudes from the inside of the block 1 into the groove 4, and 6 indicates a reinforcing bar that protrudes from the back surface 7 of the block 1 (this reinforcing bar 6 acts as a suspension reinforcing bar for the block 1 during construction ). Also, 8 refers to the front of block 1,
The front surface 8 and the rear surface 7 are formed into inclined surfaces in the illustrated embodiment. This is because the dam itself is usually constructed with a certain degree of inclination, so it is intended to match this inclination, and for this purpose, at least only the front 8 side needs to be inclined. In particular, the back T side may be a vertical surface.

そして、このコンクリートブロック1を第2図及び第3
図に示すように、まづ床堀(とこぼシ)をしたのち、ベ
ースコンクリート9を打設し、その上に順次積み重ねて
ゆけばよいのであるが、この場合、相隣接するブロック
1の間には、前記溝部4によ多構成される空間部10が
出来上るので、この′空間部10にコンクリートを打設
する。第2図に示すものはいねゆる重ね積み方式のもの
であるが、この場合前記溝部4は、下端のブロック1か
ら上端のブロック1まで貫通することになり、したがっ
てこの溝部4によって形成された空間部10内に打設さ
れるコンクIJ −トは、上下に連通する柱状になるの
である。これを拡大して示したのが第4図であるが、コ
ンクリートブロック1は、堰堤の上流側及び下流側に相
当する位置に積み重ねるのであるから、この第4図のも
のは、第3図のように上流側、下流側の双方に構築され
るのでちる。そして、この上流側及び下流側の両ブロッ
ク壁A、Bの間に、コンクリート11を打設する。
Then, this concrete block 1 is shown in Figures 2 and 3.
As shown in the figure, after first digging the floor, pour the base concrete 9, and stack the blocks one after another on top of it, but in this case, between the adjacent blocks 1. In this step, a space 10 formed by the groove 4 is formed, and concrete is poured into this space 10. The one shown in FIG. 2 is of any kind of stacking type, but in this case the groove 4 penetrates from the block 1 at the lower end to the block 1 at the upper end, so the space formed by the groove 4 is The concrete IJ cast in the section 10 has a columnar shape that communicates vertically. Figure 4 shows an enlarged view of this, but since the concrete blocks 1 are stacked at positions corresponding to the upstream and downstream sides of the dam, the concrete blocks 1 in Figure 4 are similar to those in Figure 3. It is constructed on both the upstream and downstream sides. Then, concrete 11 is poured between both the upstream and downstream block walls A and B.

このようにコンクリート11を打設すると、このコンク
リート11は、ブロック1の背面7に飛出せしめた鉄筋
6を挾持するようになり、両ブロック壁A、Bは、この
コンクリート11と一体化されることになるのである。
When concrete 11 is poured in this way, this concrete 11 comes to sandwich the reinforcing bars 6 protruding from the back surface 7 of block 1, and both block walls A and B are integrated with this concrete 11. That's what happens.

実施例■ 第5図に示す本実施例は、コンクリートブロック1を略
直方体に成型したものを示しである。前記のように堰堤
は上流側及び下流側が、所望の勾配をもって傾斜してい
るのであるが、このような傾斜をもたせるためには、ブ
ロック1′自体の正面部8を必ずしも傾斜せしめて成型
するのではなく、ブロック1自体は直方体に形成し、前
記の傾斜をもたせるためには、床堀したのちに打設する
ベースコンクリート9自体に傾斜を設けるのである。
Example 2 The present example shown in FIG. 5 shows a concrete block 1 molded into a substantially rectangular parallelepiped. As mentioned above, the dam is sloped with a desired slope on the upstream and downstream sides, but in order to create such a slope, the front part 8 of the block 1' itself must be molded to be sloped. Rather, the block 1 itself is formed into a rectangular parallelepiped, and in order to provide the above-mentioned inclination, the base concrete 9 itself, which is poured after the floor excavation, is provided with an inclination.

すなわちベースコンクリート9のうち、最下段のブロッ
ク1と接する゛部分に、堰堤の上流側、下流側に設ける
勾配相当の傾斜を設けるのである。これによって、積み
重ねられたブロック1は、ベースコンクリート9の傾斜
に沿って全体として勾配が生ずるのである。ただし、こ
の場合ペースコンクリート9が傾斜しているために、ブ
ロック1自体を積み重ねていくブロック1が、この積み
重ね時に、傾斜面に沿って、つまり下段のブロック1の
上面2上を上段のブロック1の下面3が低い方向へ滑る
ように移動することが憂慮される。しかし、このことは
上段のブロック1の自重によってかような事態Ω生ずる
ことはないと推測されるが5これをよシ確実に防止する
ためには、図示すように、ブロック1の上面2に凸部1
2を、また下面3の前記凸部12に対応する位置及び形
状の凹部13を形成しておけば、これらが係合して、ス
トッパー作用をなすことになるのである。もっとも、前
′記したものと逆、すなわち、上面2に凹部13を、下
面3に凸部12であってもよいことは勿論である。他は
実施例Iと同様であるから省略する。
That is, a slope corresponding to the slope provided on the upstream and downstream sides of the dam is provided in the portion of the base concrete 9 that contacts the lowermost block 1. As a result, the stacked blocks 1 have an overall slope along the slope of the base concrete 9. However, in this case, since the pace concrete 9 is sloped, the blocks 1 themselves are stacked up along the slope, that is, on the upper surface 2 of the lower block 1, the upper block 1 There is a concern that the lower surface 3 of the device may slide downward. However, it is presumed that such a situation will not occur due to the weight of the upper block 1.5 In order to reliably prevent this, as shown in the figure, the upper surface 2 of the block 1 should be Convex part 1
2 and a recess 13 having a position and shape corresponding to the projection 12 on the lower surface 3, these will engage and act as a stopper. Of course, it is also possible to have the concave portion 13 on the upper surface 2 and the convex portion 12 on the lower surface 3 in the opposite manner to that described above. The rest is the same as in Example I and will therefore be omitted.

実施例■ ・ 第6図に示す本実施例は、いわゆる布積み式に積み重ね
るものを示しであるが、この場合にも、相隣設するブロ
ック1の溝部4により形成される空間部10にコンクリ
ートを打設することにょシ横方向の連結は可能となるが
、上下方向の連結については、ブロック1の上面2の略
中央部に鉄筋5を飛出せしめておき、この鉄筋5を上段
のブロック1の溝部4内に挿入するようになし、そこに
充填するコンクリートで一体化するのである。他は実施
例Iと同様である。
Example ■ - The present example shown in Fig. 6 shows a case where the blocks are stacked in a so-called stacked manner, but in this case as well, concrete is placed in the space 10 formed by the grooves 4 of the adjacent blocks 1. However, for vertical connection, a reinforcing bar 5 is made to protrude approximately at the center of the upper surface 2 of the block 1, and this reinforcing bar 5 is connected to the upper block 1. It is inserted into the groove 4 of the hole, and is integrated with the concrete filled therein. The rest is the same as in Example I.

尚いづれの実施例においても、堰堤には、上流側から下
流側へ慣通する水抜暗■14を堰堤を横断するように設
けることはよく見受けられるところであるが、これのた
めには、第2図に示すように、堰堤の要所に設ければよ
い。
In any of the embodiments, it is common to see that the dam is provided with a drain hole 14 that runs normally from the upstream side to the downstream side so as to cross the dam. As shown in the figure, they can be installed at important points on the dam.

前記のようにこの発明にかかる堰堤構築法によれば、コ
ンクリートブロックの積み重ねとコンクリートの打設に
よって堰堤を構、築してぃくのであるから、従来のよう
に型枠を用いる必要がない。
As described above, according to the dam construction method according to the present invention, the dam is constructed by stacking concrete blocks and pouring concrete, so there is no need to use formwork as in the conventional method.

また、コンクリートブロックの成型は、現場付近におい
て、床堀及びベースコンクリートの打設時に並行的に行
うことができるので、ベースコンクリート打設後、直ち
に積み重ね施工全開始でき、かつ、この積み重ね施工と
ともに上流側、下流側のコンクリ−ト壁の間のコンクリ
ート打設を行うことができ、しかも、このコンクリート
が必ずしも養生する前に次段のブロック積みを行うこと
ができるので、その工期はきわめて短縮される。さらに
、施工後は、ブロックと前記コンクリートは全一体化を
図りうろことになるとともに、プロツークは両側に溝部
を設けであるの□で、上下方向への一体化を図り得て、
全体として堰堤としての強度は十分に図り得る。しかも
、このブロック自体をいわゆるリンチ配合のコンクリー
トで成型すれば、内部に打設するコンクリートはいわゆ
るペアー配合であってもかまわ彦く、このようにすれば
、材料費の節減に資することになる。さらに実施例■の
ように、ブロックを略直方体状に成型したものを用いる
と、上流側、下流側の勾配がどの程度であったとしても
、同一形状のブロックを普遍的に使用できる、等種々の
効果を有するのである。
In addition, since concrete block forming can be carried out near the site in parallel with the pouring of the floor trench and base concrete, all stacking work can be started immediately after the base concrete is placed, and this stacking work can also be carried out upstream along with this stacking work. Concrete can be poured between the side and downstream concrete walls, and the next stage of block laying can be done before this concrete has necessarily cured, so the construction period is extremely shortened. . Furthermore, after construction, the block and the concrete will be completely integrated, and Prozug has grooves on both sides, so it can be integrated in the vertical direction.
Overall, the strength of the dam is sufficient. Moreover, if the block itself is molded with so-called Lynch mix concrete, the concrete cast inside can be of so-called pair mix concrete, which will help reduce material costs. Furthermore, as in Example 2, if a block is formed into a substantially rectangular parallelepiped shape, blocks of the same shape can be used universally, regardless of the slope of the upstream and downstream sides. It has the following effects.

尚一本発明者はこの発明をなす過程にお区で、この発明
に用いられるコンクリートブロックの形状について特に
吟味して研究した。゛その過程で登場したブロックとし
ては、ブロックの一側に凸条を他側にこの凸条に対応す
る凹条をそれぞれ形成したものも存在する。しかし、こ
れではこの凸条と凹条の係合を確実なものにするための
格別の注意を要することなどから作業能率の低下を招く
こと、及びこのような凸条及び凹条の組合せによっては
横方向の連結が強固になシ得ないという結論に達した。
In the process of making this invention, the present inventor particularly examined and researched the shape of the concrete block used in this invention. ``Some blocks that appeared in this process had convex stripes on one side and concave stripes corresponding to the protrusions on the other side. However, this requires special care to ensure the engagement between the protrusions and the grooves, resulting in a decrease in work efficiency, and the combination of the protrusions and grooves The conclusion was reached that the lateral connections cannot be made strong.

また間知面形状のブロックについても検討したが、これ
によると従来指摘されたような不安定性、非作業性の点
でも問題があることがわかった。よってブロックの形状
については、上述のようにしたの:′cある。
We also investigated a block with a cross-shaped surface, but found that it also had problems in terms of instability and non-workability, which had been pointed out in the past. Therefore, the shape of the block was as described above.

【図面の簡単な説明】[Brief explanation of the drawing]

図面はこの発明にかかる堰堤構築法の実施例を示すもの
であり、このうち第1図乃至第4図は実施例1を示して
あり、第1図はコンクリートブロックの平面図(イ)及
び側面図(ロ)、第2図は堰堤の正面図、第3図は第2
図のm−m@断面図、第4図は積み重ねた状態の要部の
拡大図であシ、(イ)は正面図、(ロ)は側面図、内は
平面図、第5図は実施例■を示してあシ、(イ)はコン
クリートブロックの斜視図、←)は積み重ねた状態の断
面図、第6図は実施例■を示してあり、(6)はコンク
リートブロックの斜視図、(ロ)は積み重ねた状態の一
部を切欠した正面図、0)は(ロ)のVl−Vl線断面
図である。 1・・・コンクリートブロック、2・・・コンクl −
)ブロックの上面、3・・・下面、4・・・溝部、5,
5゜6・・・鉄筋、7・・・コンクリートブロックの背
面、8・・・正面、9・・・ベースコンクリート、10
・・・溝部によって形成される空間部、11・・・コン
クリート、12・・・凸部、13・・・凹部、14・・
・水抜暗之。
The drawings show examples of the dam construction method according to the present invention, of which Figures 1 to 4 show Example 1, and Figure 1 shows a plan view (A) and a side view of a concrete block. Figure (B), Figure 2 is the front view of the dam, Figure 3 is the
Figure 4 is an enlarged view of the main parts in the stacked state, (A) is a front view, (B) is a side view, inside is a plan view, and Figure 5 is an enlarged view of the main parts in the stacked state. Example ■ is shown, (A) is a perspective view of concrete blocks, ←) is a cross-sectional view of the stacked state, Figure 6 shows Example ■, (6) is a perspective view of concrete blocks, (B) is a partially cutaway front view of the stacked state, and (0) is a sectional view taken along the line Vl-Vl of (B). 1... Concrete block, 2... Concrete l -
) upper surface of block, 3... lower surface, 4... groove, 5,
5゜6...Reinforcing bar, 7...Back of concrete block, 8...Front, 9...Base concrete, 10
...Space formed by the groove, 11... Concrete, 12... Convex part, 13... Concave part, 14...
・Water removal darkness.

Claims (1)

【特許請求の範囲】[Claims] 両側に上下方向の溝部を形成し、この溝部内に鉄筋を飛
出させたコンクリートブロックを堰堤の上流側、下流側
の両表面部に和尚する位置に前記溝部が隣接するように
積み重ね、この溝部により形成される空間部及び上流へ
下流側に積み重ねた両コンクリートブロック壁の間の空
間部にコンクリートを充填し、全体を一体化するように
したことを特徴とする堰堤構築法。
Vertical grooves are formed on both sides, and concrete blocks with reinforcing bars protruding into the grooves are stacked on both the upstream and downstream surfaces of the dam so that the grooves are adjacent to each other. A dam construction method characterized by filling the space formed by this and the space between both concrete block walls stacked upstream and downstream with concrete to integrate the entire structure.
JP11783381A 1981-07-29 1981-07-29 Construction of dam Pending JPS5820809A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP11783381A JPS5820809A (en) 1981-07-29 1981-07-29 Construction of dam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP11783381A JPS5820809A (en) 1981-07-29 1981-07-29 Construction of dam

Publications (1)

Publication Number Publication Date
JPS5820809A true JPS5820809A (en) 1983-02-07

Family

ID=14721373

Family Applications (1)

Application Number Title Priority Date Filing Date
JP11783381A Pending JPS5820809A (en) 1981-07-29 1981-07-29 Construction of dam

Country Status (1)

Country Link
JP (1) JPS5820809A (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS59152249A (en) * 1983-02-17 1984-08-30 Teijin Ltd Transparent laminate
JPS63284306A (en) * 1987-05-15 1988-11-21 Toda Constr Co Ltd Heat insulating work with precast plate for controlling near-surface temperature of mass concrete
JPH08209660A (en) * 1995-02-02 1996-08-13 Maruei Concrete Kogyo Kk Construction method for erosion and torrent control dam
JPH08209659A (en) * 1995-02-02 1996-08-13 Maruei Concrete Kogyo Kk Construction method for erosion and torrent control dam
JPH08291515A (en) * 1995-04-21 1996-11-05 Takuo Yukimoto Selfsupported sand arrestation lock form
WO2009144693A1 (en) * 2008-05-30 2009-12-03 Biomedy Limited Construction of a tidal wall
JP6348631B1 (en) * 2017-04-03 2018-06-27 丸栄コンクリート工業株式会社 Embankment construction
JP6359750B1 (en) * 2017-12-11 2018-07-18 四万十コンクリート株式会社 Retaining wall stacking block
JP2018178554A (en) * 2017-04-14 2018-11-15 丸栄コンクリート工業株式会社 Establishment of embankment
JP2020159189A (en) * 2020-07-01 2020-10-01 シバタ工業株式会社 Construction method of reinforcement structure for erosion control dam, and reinforcement structure of erosion control dam
JP2023032482A (en) * 2021-08-27 2023-03-09 金森建設株式会社 Reinforcement structure and reinforcement method of erosion control dam

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH049710U (en) * 1990-05-16 1992-01-28

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH049710U (en) * 1990-05-16 1992-01-28

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS59152249A (en) * 1983-02-17 1984-08-30 Teijin Ltd Transparent laminate
JPS63284306A (en) * 1987-05-15 1988-11-21 Toda Constr Co Ltd Heat insulating work with precast plate for controlling near-surface temperature of mass concrete
JPH0531604B2 (en) * 1987-05-15 1993-05-13 Toda Construction
JPH08209660A (en) * 1995-02-02 1996-08-13 Maruei Concrete Kogyo Kk Construction method for erosion and torrent control dam
JPH08209659A (en) * 1995-02-02 1996-08-13 Maruei Concrete Kogyo Kk Construction method for erosion and torrent control dam
JPH08291515A (en) * 1995-04-21 1996-11-05 Takuo Yukimoto Selfsupported sand arrestation lock form
WO2009144693A1 (en) * 2008-05-30 2009-12-03 Biomedy Limited Construction of a tidal wall
JP6348631B1 (en) * 2017-04-03 2018-06-27 丸栄コンクリート工業株式会社 Embankment construction
JP2018178371A (en) * 2017-04-03 2018-11-15 丸栄コンクリート工業株式会社 Establishment of embankment
JP2018178554A (en) * 2017-04-14 2018-11-15 丸栄コンクリート工業株式会社 Establishment of embankment
JP6359750B1 (en) * 2017-12-11 2018-07-18 四万十コンクリート株式会社 Retaining wall stacking block
JP2019105040A (en) * 2017-12-11 2019-06-27 四万十コンクリート株式会社 Stacking block for retaining wall
JP2020159189A (en) * 2020-07-01 2020-10-01 シバタ工業株式会社 Construction method of reinforcement structure for erosion control dam, and reinforcement structure of erosion control dam
JP2023032482A (en) * 2021-08-27 2023-03-09 金森建設株式会社 Reinforcement structure and reinforcement method of erosion control dam

Similar Documents

Publication Publication Date Title
US3195312A (en) Method for erecting precast retaining wall
US4982544A (en) Module and method for constructing sealing load-bearing retaining wall
JPS5820809A (en) Construction of dam
JPH0657767A (en) Construction of precast gravity type retaining wall
JPH11303104A (en) Block for retaining wall and construction method of retaining wall using the same block
US5205675A (en) Precast cribbing wall system
US5072556A (en) Wall assembly construction
KR0178708B1 (en) Manufacturing method of concrete block by using native rock
JP3064841B2 (en) Dam corridor construction method and corridor cell used for this
JPH10306457A (en) Foundation block
JPH06207417A (en) Retaining wall assembly block of precast gravity type
JP3042891U (en) Concrete block for simple construction
JPH0447248Y2 (en)
JP2838485B2 (en) Concrete block
KR102026755B1 (en) Wall structure for rainwater storage tank and construction method thereof
CN214301864U (en) Sump pit and post-cast strip collision node
JP2881235B2 (en) Slope stabilization method and formwork block for slope stabilization
JP2002194754A (en) Block for forming stepped construction joint
JP2549302B2 (en) Basic structure of building
SU1527369A1 (en) Prefabricated dam
JPH0754348Y2 (en) Combination basic block and combination basic
JPS60341Y2 (en) stacked block foundation frame
JP3294715B2 (en) Block structure for retaining wall and method for forming retaining wall
JP3001187B2 (en) Partition wall block and construction method of partition walls using the same
JP2921810B2 (en) Construction structure of retaining wall using retaining wall block