JPS58199999A - Anchoring method - Google Patents

Anchoring method

Info

Publication number
JPS58199999A
JPS58199999A JP8234182A JP8234182A JPS58199999A JP S58199999 A JPS58199999 A JP S58199999A JP 8234182 A JP8234182 A JP 8234182A JP 8234182 A JP8234182 A JP 8234182A JP S58199999 A JPS58199999 A JP S58199999A
Authority
JP
Japan
Prior art keywords
hole
filling
drilling
filler
bit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP8234182A
Other languages
Japanese (ja)
Other versions
JPS624520B2 (en
Inventor
中野 澄男
進 西田
勝村 健二
修 阪本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taisei Corp
Original Assignee
Taisei Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taisei Corp filed Critical Taisei Corp
Priority to JP8234182A priority Critical patent/JPS58199999A/en
Publication of JPS58199999A publication Critical patent/JPS58199999A/en
Publication of JPS624520B2 publication Critical patent/JPS624520B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Rock Bolts (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

(57)【要約】本公報は電子出願前の出願データであるた
め要約のデータは記録されません。
(57) [Summary] This bulletin contains application data before electronic filing, so abstract data is not recorded.

Description

【発明の詳細な説明】 本発明は、不安定な地山の補強、ゆるみ防止又は、長尺
施工を要求されるロツクゼル)、PCアンカー等を主と
する各種アンカー工法の改良に係るものである。
[Detailed Description of the Invention] The present invention relates to the improvement of various anchor construction methods mainly using PC anchors, PC anchors, etc., which require reinforcement of unstable ground, prevention of loosening, and long length construction. .

最近、トンネル等地下空洞工事や各種法面工事等圧おい
て地山の支保、補強及びゆるみ防止等の目的で、ロツク
ゼルトやPCアンカーが多く利用されている。
Recently, Rotsuzelt and PC anchors have been widely used for the purpose of supporting, reinforcing, and preventing loosening of the ground in underground cavity construction such as tunnels and various types of slope construction.

しかし、軟弱又は、亀裂の発達した不安定な地山にロツ
クゼルトやPCアンカーを設置しようとする場合、最も
一般的な工法では穿孔ビットロッドを抜くと、孔壁が自
立せず、崩れるか荒れて、充填材注入ホースや充填材カ
プセルの挿入及び充填材による定着作業が因業又は、不
可能となる事が多い。
However, when attempting to install a Rotsusert or PC anchor in unstable ground that is soft or has developed cracks, the most common construction method is that when the drilling bit rod is removed, the hole wall does not stand on its own and collapses or becomes rough. In many cases, the insertion of a filler injection hose or filler capsule and the work of fixing the filler are difficult or impossible.

そのため孔壁を支えながら穿孔する為の外管を有する二
重管ケーシング方式や、穿孔に使用したロツPをそのま
まiルト材として用いる自穿孔アンカ一方式等の工法を
採用する。
Therefore, methods such as a double-pipe casing method that has an outer tube for drilling while supporting the hole wall, and a self-drilling anchor one-way method that uses the Rotsu P used for drilling as an iron material are adopted.

しかし二重管ケーシング方式は、作業が大変であり、水
平から上向きで嫁、特に施工が大変で用いられた事例も
ほとんどない。
However, the double-pipe casing method is difficult to work with, and there are very few cases where it has been used, especially since the construction is difficult since it faces upward from horizontal.

また自穿孔アンカ一方式等は、亀裂が発達していて孔壁
自立性が悪くても岩片が硬かったり長孔穿孔になると、
穿孔不可能となった9、穿孔時のロッド疲労によりゼル
ト材としての耐力の信頼性を損じたりする。
In addition, self-drilling anchors of the one-type type can be used even if cracks have developed and the hole wall independence is poor, but if the rock fragment is hard or the hole is drilled into a long hole,
9. It became impossible to drill holes, and the reliability of the yield strength as a selt material was lost due to rod fatigue during drilling.

その上充填材の充填の不確実さの問題点等もある。In addition, there is also the problem of uncertainty in filling the filler.

ところが地山の不安定度が増せば増すほど、増々、施工
法の悪い長尺のロックボルトやPCアンカー等が要求さ
れる。
However, as the instability of the ground increases, long rock bolts and PC anchors that are poorly constructed are increasingly required.

従って、現存のアンカー工法ではロックボルトやPCア
ンカーの要求度が高い地山はど確実な施工が出来にくい
という非常に不合理な現状にある。
Therefore, with the existing anchor construction methods, the current situation is extremely unreasonable as it is difficult to reliably construct the ground where rock bolts and PC anchors are highly required.

本発明は、叙上の問題点等を除去するために提案された
ものであって、地質条件の変化や、穿孔長の変化等の影
響を極力受ける事なく、信頼性の高いロックホルトやP
Cアンカーを能率的に施工出来るアンカー工法を提供木
る事を目的とする。
The present invention was proposed in order to eliminate the above-mentioned problems, and it is possible to use highly reliable Rockholt or P
The purpose is to provide an anchor construction method that allows efficient construction of C anchors.

次に本発明の工法に使用する装置について説明する。Next, the equipment used in the construction method of the present invention will be explained.

〈イ〉 穿孔装置 本発明の工法(使用する穿孔装置(1)ハ第1図に示す
ように穿孔機に接続するアダプタ(2)とロッド(3)
およびビット(4)により構成する。
<A> Drilling device Construction method of the present invention (drilling device (1) used) c) An adapter (2) and a rod (3) connected to the drilling machine as shown in Fig. 1
and bit (4).

〈口〉 穿孔機 穿孔機は回転打撃等を行なう例えばヘビードリフタ−な
どの公矧の穿孔機である。
<Mouth> Perforator The perforator is a general perforator such as a heavy drifter that performs rotational impact.

くノ・〉 アダプタ 穿孔機の先端にはアダプタ(2)が接続する。Kuno・〉 Adapter An adapter (2) is connected to the tip of the drilling machine.

アダプタ(2)の周面゛には注入口(51)を有するス
イベル(5)がアダプタ(2)と回転自在に嵌着されて
いる。
A swivel (5) having an injection port (51) is rotatably fitted to the peripheral surface of the adapter (2).

スイベル(5)の注入口(51)はアダプタ(2)の他
端から軸方向に開孔する内孔(21)と連絡している。
The injection port (51) of the swivel (5) communicates with an inner hole (21) that opens in the axial direction from the other end of the adapter (2).

ぐシ ロッド ロッド(3)、は・内部に連続した軸孔(31)を有す
る中空シングルロッドである。
The rod (3) is a hollow single rod with a continuous shaft hole (31) inside.

ロッド(3)の先端には放出孔(42)を有するビット
(4)が取付けである。
A bit (4) having a discharge hole (42) is attached to the tip of the rod (3).

ぐウ ビット ビット(4)には中心から放射方向に車状のチツ7 (
41)を放射方向に複数本設ける。
Guu bit bit (4) has a wheel-shaped chitsu 7 (
41) are provided in the radial direction.

そしてビット(4)の中央には放出孔(42)を開設す
る。
A discharge hole (42) is provided in the center of the bit (4).

放出孔(42)11円形で蝶なく、例えばノ・−ト形に
形成し、少なくとも1本のチップ(41)の内側の端は
ビット(4)の中心にまで達しているよう構成する。
The discharge hole (42) 11 is formed in a round shape, for example, a notebook shape, and the inner end of at least one tip (41) reaches the center of the bit (4).

そのためビット(1)を回転させた場合に、最も憂いチ
ップ(41)は回転の円心からビット(4)縁端までを
カバーすることになり、他のチップ長さの短かいチップ
(41)群が掘削し残した軸心分部を掘削することがで
きる。
Therefore, when the bit (1) is rotated, the most troublesome chip (41) will cover the area from the center of rotation to the edge of the bit (4), and the other chips (41) with short chip length will be It is possible to excavate the shaft center portion left by excavation.

従って、穿孔中及び施工場所によって岩質等が変化して
も同一ビットで能率的に施工する事が可能となる。
Therefore, even if the rock quality changes during drilling and depending on the construction location, it is possible to perform drilling efficiently with the same bit.

またビット(4)の内部には充填材などを送給する軸孔
(43)が開孔してありこの軸孔(43)は前記の放出
孔(42)と連通している。
Further, a shaft hole (43) for feeding a filler and the like is opened inside the bit (4), and this shaft hole (43) communicates with the above-mentioned discharge hole (42).

大径の軸孔(43)から小径の放出孔(42)を連絡す
る通路は充填材などの圧送材の移動抵抗を低減させるた
めに、内壁に斜面(44)を形成しである。
The passage connecting the large-diameter shaft hole (43) to the small-diameter discharge hole (42) has an inclined surface (44) formed on its inner wall to reduce the movement resistance of the pumped material such as the filler.

ニガ、ビット(4)の取付部(45)の円面にはネジ山
が刻設してあり、前記の中空シングルロッド(3)と螺
合して接続できるように構成する。
A screw thread is formed on the circular surface of the attachment part (45) of the bit (4), so that it can be screwed and connected to the hollow single rod (3).

次に施工方法について説明する。Next, the construction method will be explained.

くイ〉 穿孔(第1図) 前記構造の穿孔装置(1)を使用して地山を穿孔する。Hole (Figure 1) The ground is bored using the drilling device (1) having the structure described above.

すなわち穿孔機からの回転打撃等はアダプタ(2)及び
ロッド(3)を介してビット(4)へ伝達され穿孔が行
なわれる。
That is, the rotational impact from the drilling machine is transmitted to the bit (4) via the adapter (2) and rod (3) to perform drilling.

同時にスイベル(5)の注入口(51)と接続する送水
ポンプからはエアーまたは穿孔水が供給され、アダプタ
(2)内の内孔(21)及びロツl+(3)の軸孔(3
1)を連絡してビット(4)の放出孔(42)から放出
され、ビット(4)によって穿孔された土砂を孔外へ搬
出し穿孔を進行する。
At the same time, air or drilling water is supplied from the water pump connected to the inlet (51) of the swivel (5), and the inner hole (21) in the adapter (2) and the shaft hole (3) of the rotary l+ (3)
1) is discharged from the discharge hole (42) of the bit (4), and the earth and sand drilled by the bit (4) is carried out of the hole and drilling progresses.

穿孔長が長い場合にはカップリングを介して新たなロッ
ドを接続して所定の穿孔長まで穿孔する。
If the hole length is long, a new rod is connected via a coupling and the hole is drilled to a predetermined hole length.

く口〉 引抜き、充填(第2図) 所定長さの穿孔が終了した後、穿孔装置は直ぐに引抜か
ず穿孔水を供給するために接続してあったスイベル(5
)の注入口(51)に充填材圧送用ポンプを接続する。
Extraction and filling (Fig. 2) After completing the drilling of a predetermined length, the drilling device does not immediately pull out, but instead closes the swivel (5) connected to it to supply drilling water.
) A pump for pressure-feeding the filler is connected to the injection port (51).

この時穿孔内の孔壁はロッド(3) Kよって押えられ
ているので崩壊することがない。
At this time, the hole wall inside the drilled hole is held down by the rod (3) K, so that it does not collapse.

次に充填材圧送用ポンプを作動して穿孔水供給の場合と
同様に充填材を注入口(51)から内孔(21)軸孔(
31)放出孔(42)を通過させ孔内に充填する。
Next, the pump for pumping the filler is activated to feed the filler from the injection port (51) to the inner hole (21) and the shaft hole (
31) Pass through the discharge hole (42) and fill the hole.

充填材圧送用ポンプから注入口(51)を連絡する途中
には圧力計(P)、や流−計(Q)が配置されており、
孔内への圧送圧力や圧送量を管理できるよう構成されて
いる。充填中は圧力計(P)や流量計(Q)によって孔
内の充填状況を把握し、孔壁の崩壊を防止するために穿
孔装置(1)の引抜き速度と充填量のバランスをとりな
がら穿孔装置(1)を少しづつ引抜き孔内に密充填を行
なう。
A pressure gauge (P) and a flow meter (Q) are placed between the filling material pressure pump and the injection port (51).
It is configured so that the pressure and amount of pumping into the hole can be controlled. During filling, the filling status in the hole is monitored using a pressure gauge (P) and a flow meter (Q), and drilling is performed while balancing the drawing speed of the drilling device (1) and the filling amount to prevent collapse of the hole wall. The device (1) is tightly packed into the extraction hole little by little.

このときビット(4)の放出孔(42)の孔径を大きく
形成しであるため高粘度の充填材でも容易に充填できる
At this time, since the discharge hole (42) of the bit (4) is formed to have a large diameter, even a highly viscous filler can be easily filled.

さらにビット(4)に圧送される充填材はビット(4)
内の軸孔(43)内に傾面(44)を形成しであるため
軸孔(43)内をスムーズに放出孔(42)に送られる
Furthermore, the filler material that is pumped to the bit (4) is
Since the inclined surface (44) is formed in the inner shaft hole (43), the inside of the shaft hole (43) is smoothly fed to the discharge hole (42).

圧力計(P)は例えは通常使用される圧力ゲージの他、
電気的な圧力センサーなどを採用することができる。
The pressure gauge (P) is, for example, a commonly used pressure gauge,
An electric pressure sensor or the like can be used.

また流量計(Q) 4インラインで検出する電磁流量計
の他に充填剤の残量から相対的に流量を検出する方法も
使用することができる。
Furthermore, in addition to the electromagnetic flowmeter that detects flowmeter (Q) 4 in-line, it is also possible to use a method that relatively detects the flow rate from the remaining amount of filler.

なお充填材はアンカーの設計強度によって種類が異なる
が例えばモルタルや薬液、合J181:樹脂などである
The type of filler varies depending on the design strength of the anchor, and examples thereof include mortar, chemical solution, and resin.

また充填材を孔内に充填する際にはロッド(3)を回転
させる必要がないので、ロッド(3)の軸孔(31)に
直接充填圧送用ポンプを連絡しロツP(3)を引抜きな
がら孔内の密充填を行なうことも可能である。
Also, when filling the hole with filler material, there is no need to rotate the rod (3), so connect the filling pump directly to the shaft hole (31) of the rod (3) and pull out the rod P (3). However, it is also possible to closely fill the holes.

〈・・〉  ボルトの挿入(第3図) 孔内に充填材の充填が終了した後、孔内にロックボルト
(8)やPCアンカーなどを挿入し孔外に露出するロッ
クボルト(8)の一端を締め付は地山を支持する。
<...> Inserting the bolt (Fig. 3) After filling the hole with the filler material, insert the rock bolt (8) or PC anchor into the hole to remove the rock bolt (8) that is exposed outside the hole. Tighten one end to support the ground.

ロックボルト(8)などの挿入灯人力による他に穿孔機
を使用することができる。
In addition to manual insertion of the lock bolt (8), a drilling machine can also be used.

従って穿孔、充填、ボルトの挿入の各作業を一台の穿孔
装置だけで行なうことができ作業の合理化が図れる。
Therefore, each of the operations of drilling, filling, and inserting bolts can be performed with only one drilling device, and the operations can be streamlined.

0 その他の実施例1 孔内に充填する充填材の粘性が高くなればなるほど流動
性は悪化する。
0 Other Examples 1 The higher the viscosity of the filler filled in the pores, the worse the fluidity.

そのためロッド(3)の軸孔(31)内にコーテングを
施したりビニールホースを配置することでロッド(3)
内を通過する充填剤の移送性を向上させることができる
Therefore, by coating the shaft hole (31) of the rod (3) or placing a vinyl hose, the rod (3)
The transportability of the filler passing through the interior can be improved.

ぐ)その他の実施例2 逆に充填材の粘性が例えばセメントミルクのように低い
場合には、ロツP(7)を順次取りはずして充填をする
際に充填材の逆流が発生する。
G) Other Example 2 Conversely, when the viscosity of the filler is low, such as cement milk, backflow of the filler occurs when the lots P(7) are sequentially removed and filled.

逆流を防止するために、第6図に示すようにロッド(3
)の先端部および途中の軸孔(31)内に例えば鋼球(
71)とコイルスプリング(72)を組み合わせて形成
する逆止弁(7)を設けることもできる。
To prevent backflow, install the rod (3) as shown in Figure 6.
For example, a steel ball (
A check valve (7) formed by combining a coil spring (71) and a coil spring (72) may also be provided.

逆止弁(7)は充填材が逆流方向に移動した時だけ鋼球
(71)が軸孔(31)を閉塞するよう構成しであるた
め充填材の逆流を完全に防止する。
The check valve (7) is configured such that the steel ball (71) closes the shaft hole (31) only when the filler moves in the backward flow direction, thereby completely preventing the filler from flowing back.

ぐ)その他の実施例3 特に充填方向が上向きの場合、孔内に充填された充填材
に孔口からリークしやすい。
G) Other Example 3 Particularly when the filling direction is upward, the filling material filled in the hole is likely to leak from the hole opening.

そこで孔口とロッド(3)の間に既存の構造の7ぞツカ
−を設置したりまたはウェス、粘土、石膏等でコーキン
グしてロッド(3)と地山の間の密閉を保ち孔口からの
リークを防止することができる。
Therefore, between the hole opening and the rod (3), a 7-piece tie of the existing structure is installed, or caulking is done with rag, clay, plaster, etc. to maintain a tight seal between the rod (3) and the ground. leaks can be prevented.

ただし充填材の粘性が高い場合にはリークの゛−心配が
ないので・ゼツカーなどは不要である。
However, if the viscosity of the filler is high, there is no need to worry about leakage, so there is no need for a zetzker.

本発明は以上説明したようKなるから次のような効果を
期待することができる。
Since the present invention operates as described above, the following effects can be expected.

〈イ〉 穿孔装置(1)によって穿孔された孔内には充
填作業と併わせて削孔装置(1)を引抜きながら密充填
を行なうものである。
<A> The hole drilled by the drilling device (1) is densely filled while the drilling device (1) is being pulled out in addition to the filling operation.

従って充填剖の孔壁はロッド(3)によって支持され、
また充填開始後は充填材によって孔壁が支持される。
The hole wall of the filling hole is therefore supported by the rod (3);
Further, after the filling starts, the pore walls are supported by the filler.

その結果、孔壁は自立が困難な地盤であっても地質に影
響を受けず孔壁の崩壊も発生することなく保持される。
As a result, the hole wall is not affected by the geology and is maintained without collapsing even in the ground where self-supporting is difficult.

そのため常に確実な充填材の充填やロックボルトの1定
着が可能となる。
Therefore, it is possible to always reliably fill the filling material and fix the lock bolt in one place.

〈口゛〉 穿孔終了後、穿孔装置(1)を充填材の充填
用として使用しかつ削孔装置(1)の引抜きと充填作業
を同時進行させるため、従来工法の作業過程に必要であ
った作業時間を大幅に短縮できる。
゛゛〉 After drilling is completed, the drilling device (1) is used for filling with filler material, and the extraction and filling work of the drilling device (1) are performed simultaneously, which is necessary in the work process of the conventional method. Work time can be significantly reduced.

ぐ) ビット(1)は一部のチップ(41)をビット(
4)の回転心までカバーするよう形成し、残りのチップ
(41)群はそれより短かく形成しビット(4)の中心
から偏った位置にチップ(41)群で包囲されたハート
形の放出孔(42)を形成したものである。
bit (1) converts some chips (41) into bit (
4), and the remaining tips (41) are formed to be shorter than that, and a heart-shaped ejection is formed at a position offset from the center of the bit (4) surrounded by the tips (41). A hole (42) is formed therein.

従って放出孔(42)の径を大きく開設できるため、充
填時には粘度の高い充填材でも容易に充填することがで
きる。
Therefore, since the diameter of the discharge hole (42) can be made large, even a highly viscous filler can be easily filled at the time of filling.

Ω 放出孔(42)を大きく開孔すれば従来ならば掘削
残り部分が発生するはずであるが、本願のビットは前記
したようになるから削孔時にはチップ長さの長いチップ
(41)がビット(4)の円心部を掘削するため掘削残
しがなく、硬い岩片部でも穿孔出来る。
Ω Conventionally, if the discharge hole (42) is opened to a large size, there would be a portion left unexcavated, but since the bit of the present application is as described above, the tip (41) with a long tip length is used as the bit during drilling. (4) Since the center of the circle is excavated, there is no excavation left behind, and even hard rock pieces can be drilled.

すなわち本発明に使用したビットは、岩質等の変化に対
し巾広く対応しながら穿孔と充填の両条件を満足させる
ことができるものである。
That is, the bit used in the present invention can satisfy both drilling and filling conditions while being able to respond widely to changes in rock quality and the like.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図:穿孔時の説明 第2図:充填、引抜き時の説明図 第3図°ゼルト挿入時の説明図 二ビット、5:スイベル、7:逆止弁、P:圧力計、Q
:流量計 特許出願人 大成邸設株式会社 代理人 升理士  山  口  朔  生第40 4 41        〆 (
Fig. 1: Explanation during drilling Fig. 2: Explanation during filling and withdrawal Fig. 3: Explanation during insertion of Zelt 2 bits, 5: Swivel, 7: Check valve, P: Pressure gauge, Q
:Flowmeter patent applicant Taisei Teisetsu Co., Ltd. agent Masu Physician Saku Yamaguchi 40th 4th 41st year (

Claims (1)

【特許請求の範囲】 中空シングルロツP先端に形成する穿孔ビットで地山を
穿孔し、 充填補強材を中空シングルロッドの軸孔を通して穿孔ビ
ット部よプ孔内に充填しつつ中空シングルロッドの引抜
きを行ない、 中空シングルロンドと充填補強材の蓋き代え完了後に、 孔内にアンカー鋼棒の如き、補強部材を挿入して地山を
支保することや各種アンカーを設置する事を特徴とする
、 アンカー工法
[Claims] A drilling bit formed at the tip of the hollow single rod P is used to perforate the ground, and the hollow single rod is pulled out while filling the filling reinforcing material into the hole from the drilling bit part through the shaft hole of the hollow single rod. Anchoring is characterized by inserting a reinforcing member such as an anchor steel rod into the hole to support the ground and installing various anchors after completing the replacement of the hollow single rond and the filling reinforcing material. construction method
JP8234182A 1982-05-18 1982-05-18 Anchoring method Granted JPS58199999A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP8234182A JPS58199999A (en) 1982-05-18 1982-05-18 Anchoring method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP8234182A JPS58199999A (en) 1982-05-18 1982-05-18 Anchoring method

Publications (2)

Publication Number Publication Date
JPS58199999A true JPS58199999A (en) 1983-11-21
JPS624520B2 JPS624520B2 (en) 1987-01-30

Family

ID=13771857

Family Applications (1)

Application Number Title Priority Date Filing Date
JP8234182A Granted JPS58199999A (en) 1982-05-18 1982-05-18 Anchoring method

Country Status (1)

Country Link
JP (1) JPS58199999A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62197599A (en) * 1986-02-25 1987-09-01 株式会社大林組 Self-boring bolt
JPS62197600A (en) * 1986-02-25 1987-09-01 株式会社大林組 Method of reinforcing construction of ground by using self-boring bolt
JP2022181659A (en) * 2021-05-26 2022-12-08 フジモリ産業株式会社 Tunnel rock bolt construction management system and method

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH03141577A (en) * 1989-10-26 1991-06-17 Tokyo Tsuchiya Hanbai Kk Heating sheet and rooftop snow-melting device having heating sheet

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5733696A (en) * 1980-08-04 1982-02-23 Shimizu Construction Co Ltd Lock bolt application of collapsing sandy natural ground

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5733696A (en) * 1980-08-04 1982-02-23 Shimizu Construction Co Ltd Lock bolt application of collapsing sandy natural ground

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62197599A (en) * 1986-02-25 1987-09-01 株式会社大林組 Self-boring bolt
JPS62197600A (en) * 1986-02-25 1987-09-01 株式会社大林組 Method of reinforcing construction of ground by using self-boring bolt
JP2022181659A (en) * 2021-05-26 2022-12-08 フジモリ産業株式会社 Tunnel rock bolt construction management system and method

Also Published As

Publication number Publication date
JPS624520B2 (en) 1987-01-30

Similar Documents

Publication Publication Date Title
RU2600120C2 (en) Device for injection of resin for drilling device for installation of anchor bolts in soil
CN101251017B (en) Subsection retrusive slip-casting method for porthole slurry-stop jackrod
CN101624910A (en) Method for reinforcing concealed tunnel
CN105221170A (en) Breaking surrounding rock resin anchoring adds sleeve pipe total length cement paste anchor dispensing device and Bolting and grouting methods
JPS58199999A (en) Anchoring method
CN107447755A (en) A kind of anchor pole equipment and armature boring construction method
CN208918508U (en) A kind of surface drilling to coal seam breaking roof grouting and reinforcing grouting device
CN214303884U (en) A predetermine inside stock structure for tunnel normal position enlargement engineering
WO1992020902A1 (en) A rock or concrete injection method and a device for performing the method
JP2937661B2 (en) Grout injection method
CN208587134U (en) A kind of casing bit in mine down-hole drilling
JPH06316921A (en) Laying down of injection outer tube under water pressure in the pressurized condition
JPH11200750A (en) Excavation bit for winding hole and execution method using it
US4027490A (en) Self-sinking, axial passage foundation pile and method
JP3195954B2 (en) Drain boring method
JP2553336Y2 (en) Injection fixing type support member
JP2698762B2 (en) Drilling bit and drilling method using the bit
JPH01131715A (en) Ground improving work by horizontal injection of chemical grout
JPH0476110A (en) Installation method for medical fluid injection strainer pipe and strainer pipe therefor
CN216305951U (en) Deep positioning grouting pipe
JP3058111B2 (en) Lock bolt installation method
JP4623863B2 (en) All-casing method and lubricant filling device for all-casing method
WO2023209357A1 (en) A method of installing a cable bolt, a system and components of same
JP2000204899A (en) Self-drilling anchor
JP2003336500A (en) Construction method for lock bolt