JPS58173220A - Construction of foundation pile - Google Patents
Construction of foundation pileInfo
- Publication number
- JPS58173220A JPS58173220A JP5510982A JP5510982A JPS58173220A JP S58173220 A JPS58173220 A JP S58173220A JP 5510982 A JP5510982 A JP 5510982A JP 5510982 A JP5510982 A JP 5510982A JP S58173220 A JPS58173220 A JP S58173220A
- Authority
- JP
- Japan
- Prior art keywords
- casing
- inner tube
- concrete
- erected
- ground
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
- E02D5/38—Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Piles And Underground Anchors (AREA)
Abstract
Description
【発明の詳細な説明】
この発明は現場打ち基礎杭の構築法に関するものであ〕
、現場打ち杭O載荷試験の九め杭上部と土との摩擦力を
生ぜしめないようにすることを目的とする。[Detailed Description of the Invention] This invention relates to a method for constructing cast-in-place foundation piles.
The purpose is to prevent the generation of frictional force between the upper part of the pile and the soil in the O-loading test of cast-in-place piles.
基礎杭は打ち込まれた所要のものを載荷試験して支持力
を測足するが、杭上部は、杭頂部の高さ揃えある匹Fi
地下階の施工の丸め地盤掘削後カットされるので机上1
1には摩擦力が作用しない状態で載荷試験しうるように
基礎杭を構築することが要望される。The bearing capacity of foundation piles is measured by carrying out a loading test on the required piles driven in.
1 on the desk because it will be cut after rounding the ground excavation for basement floor construction.
1 requires that the foundation pile be constructed so that a loading test can be carried out without any frictional force acting on it.
この発明は前記要望に対処すべく、かつ経済的に実施し
うる方法を開発したもので、以下その詳S+を図示し九
実施例によって説明する。In order to meet the above-mentioned needs, the present invention has developed a method that can be implemented economically.The details of the S+ will be explained below with reference to the drawings and nine embodiments.
先ず地盤に整孔ムを掘M後あるいは掘削しなカラ少なく
とも7リクシii7カツトが必要な深さまでケーシング
1を地盤中に嬬込む。次いで゛このクー7ング1内に鉄
筋篭2を挿入する。なおその際鉄筋計のキャップタイヤ
および先端。First, after drilling a hole in the ground, or without digging, the casing 1 is pushed into the ground to a required depth of at least 7 holes. Next, the reinforcing bar cage 2 is inserted into the cooling cage 1. In addition, the cap tire and tip of the rebar gauge.
中間沈下針は全て鉄筋篭2の内側に取付けておく(図示
せず)0次いで先端外周に発泡ウレタン等発泡合成樹脂
の帯状バンキング3を巻き付は九コルゲートパイプ等か
らなる薄肉の内管4をケーシング1の内側で、鉄筋I1
2の外肯に建込む。All the intermediate sinking needles are attached inside the reinforcing bar cage 2 (not shown).Next, a belt-shaped banking 3 made of foamed synthetic resin such as foamed urethane is wrapped around the outer circumference of the tip, and a thin inner pipe 4 made of corrugated pipe or the like is wrapped around the tip. Inside casing 1, reinforcing bar I1
Built on the outer meaning of 2.
次しで整孔ム内に生コンクリート5を打設し。Next, pour fresh concrete 5 into the hole adjustment chamber.
ケーシング1の下部まで生コンクリート5が打設してく
るとケーシング1を略1111@f引上げてバッキング
5の位置をケーシング1が通過するとバッキング5が拡
が〕、生コンクリートが内管4の外11に回るのを止め
る・続いて内管4内に生コンクリートを天端!で打設す
る◎その際内管4とケーシング1との関に生コンクリー
トが落ち込まないようにバッキング6を上部にも設ける
。When the ready-mixed concrete 5 is poured to the bottom of the casing 1, the casing 1 is pulled up approximately 1111@f, and when the casing 1 passes the position of the backing 5, the backing 5 expands], and the ready-mixed concrete reaches the outside 11 of the inner pipe 4.・Next, pour fresh concrete into the inner pipe 4 at the top! ◎ At that time, a backing 6 is also provided at the top to prevent fresh concrete from falling into the junction between the inner pipe 4 and the casing 1.
コンクリートの硬化vk載荷試験するがその際ケーシン
グ1はそのままの状態としてフリクションカットをする
。試験後はケーシング1を引抜いて再使用する。The concrete is subjected to a hardening vk loading test, and at that time, the casing 1 is left as it is and friction cut is performed. After the test, casing 1 is pulled out and reused.
この発IjlIFi以上の構成からな)、基礎杭上部に
ケーシングと円管を使用して7シツクシ曹ン力ツト部分
を確実に施工できる・しかも土庄を受けるケーシングは
引抜きが可能であp、内管は薄肉Oものでよ−ので紗済
的に実施できる。With this construction, the casing and circular pipe are used on the top of the foundation pile to ensure the construction of the 7-socket support section.Furthermore, the casing that receives the foundation pile can be pulled out, and the inner pipe Since it is thin-walled, it can be carried out easily.
第1図、第2図、第Aml、 第4WJ>ヨヒ11Bg
lは施工過程を示し九秦断面図、第4図、第7図は横断
面図である・
ム・・整孔、1・・ケーシング、2・−鉄筋Ill、
J・・バッキング、4・・内管、5・φコンクリート、
6・拳バッキング。
第2図
第1凶
第3図 第4図Figures 1, 2, Aml, 4th WJ> Yohi 11Bg
l shows the construction process, and Figures 4 and 7 are cross-sectional views.
J...Backing, 4.Inner pipe, 5.φ concrete,
6. Fist backing. Figure 2 Figure 1 Figure 3 Figure 4
Claims (1)
中Kll込み1次いてケーシング内に鉄筋および薄肉の
内管を建込み1次いで内管内にコンクリートを打設して
杭上部を造成することを特徴とする基礎杭の構築法。 (2) 載荷試験後ケーシングを撤去する特許請求の
範囲第1Jjl記噴の基礎杭の構築法。[Scope of Claims] (Li) A hole is drilled in the ground, the casing is inserted into the ground, reinforcing bars and a thin-walled inner pipe are built into the casing, concrete is poured into the inner pipe, and the upper part of the pile is placed. (2) A method for constructing a foundation pile, characterized in that the casing is removed after a loading test.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP5510982A JPS58173220A (en) | 1982-04-02 | 1982-04-02 | Construction of foundation pile |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP5510982A JPS58173220A (en) | 1982-04-02 | 1982-04-02 | Construction of foundation pile |
Publications (1)
Publication Number | Publication Date |
---|---|
JPS58173220A true JPS58173220A (en) | 1983-10-12 |
Family
ID=12989579
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP5510982A Pending JPS58173220A (en) | 1982-04-02 | 1982-04-02 | Construction of foundation pile |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPS58173220A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107268610A (en) * | 2017-06-19 | 2017-10-20 | 中铁大桥局第七工程有限公司 | A kind of local antifriction resistance piling strtucture and its construction method |
WO2022160379A1 (en) * | 2021-01-28 | 2022-08-04 | 江苏东合南岩土科技股份有限公司 | Large-diameter cast-in-situ thin-walled prestressed concrete steel pipe pile and construction method therefor |
-
1982
- 1982-04-02 JP JP5510982A patent/JPS58173220A/en active Pending
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107268610A (en) * | 2017-06-19 | 2017-10-20 | 中铁大桥局第七工程有限公司 | A kind of local antifriction resistance piling strtucture and its construction method |
WO2022160379A1 (en) * | 2021-01-28 | 2022-08-04 | 江苏东合南岩土科技股份有限公司 | Large-diameter cast-in-situ thin-walled prestressed concrete steel pipe pile and construction method therefor |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100618597B1 (en) | Cast in place concrete pile using vibro magnetic shovel hammer, and the construction method of this | |
JPH11107273A (en) | Construction method of cast-in-place pile | |
JP2000352296A (en) | Method o constructing passage just under underground structure | |
US3559412A (en) | Method of forming enlarged base encased concrete piles | |
JPS58173220A (en) | Construction of foundation pile | |
JP2884452B2 (en) | Shaft construction method using segments | |
JP7007691B1 (en) | Casting method for spring spacers, reinforcing bar cages and underground piles | |
JPS61109822A (en) | Construction work of pile | |
JPS6160928B2 (en) | ||
JPS58189414A (en) | Construction of sheathing wall | |
JP3179243B2 (en) | Concrete placement method for deep foundation work | |
KR200375610Y1 (en) | Cast in place concrete pile using vibro magnetic shovel hammer | |
JPS5810532B2 (en) | Concrete structure destruction method | |
JPS6128774B2 (en) | ||
JP2881501B2 (en) | Construction method for high strength cast-in-place concrete piles | |
JPS5873619A (en) | Construction work of bulb pile and tremie tube | |
JPS63223213A (en) | In-situ piling work using woven fabric formwork | |
JPH01102125A (en) | Placement of concrete pile at site | |
JPS5869924A (en) | Construction of sheathing wall having upper part consisting of underground continuous wall and lower part of pillar-row pile | |
US918100A (en) | Method of underpinning and supporting walls. | |
JPS5915087A (en) | Underground type storage tank and its constructing method | |
JP2675858B2 (en) | Vertical shaft excavation method | |
US1686660A (en) | Construction of concrete piles | |
JP2881502B2 (en) | Construction method for high strength cast-in-place concrete piles | |