JPS58153816A - Reinforced cap device for pile head - Google Patents

Reinforced cap device for pile head

Info

Publication number
JPS58153816A
JPS58153816A JP3525782A JP3525782A JPS58153816A JP S58153816 A JPS58153816 A JP S58153816A JP 3525782 A JP3525782 A JP 3525782A JP 3525782 A JP3525782 A JP 3525782A JP S58153816 A JPS58153816 A JP S58153816A
Authority
JP
Japan
Prior art keywords
cap
pile
concrete
hole
pile head
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP3525782A
Other languages
Japanese (ja)
Other versions
JPS6122088B2 (en
Inventor
Hirotsugu Hachisuga
蜂須賀 裕嗣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Haseko Corp
Original Assignee
Hasegawa Komuten Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hasegawa Komuten Co Ltd filed Critical Hasegawa Komuten Co Ltd
Priority to JP3525782A priority Critical patent/JPS58153816A/en
Publication of JPS58153816A publication Critical patent/JPS58153816A/en
Publication of JPS6122088B2 publication Critical patent/JPS6122088B2/ja
Granted legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D9/00Removing sheet piles bulkheads, piles, mould-pipes or other moulds or parts thereof
    • E02D9/005Removing sheet piles bulkheads, piles, mould-pipes or other moulds or parts thereof removing the top of placed piles of sheet piles

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Piles And Underground Anchors (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

PURPOSE:To make easier the chipping work of the pile head by a method in which a through hole to be inserted with a pile through which concrete is to be placed is provided at the central part of a cap, a hole through which the main bar of an iron bar cage is fitted through a coupler is provided at the bottom of the cap, and the cap is attached to the main bar. CONSTITUTION:The main bar 12 is inserted through a sleeve joint 13 into the hole 7 of the bottom plate 3a of a cap 1 and fixed with a bolt 14, and a side plate 8 is fixed to the periphery of the cap 1 by a screw. Then, an iron bar cage 11 fitted with the cap 1 is penetrated into a pile pit 15, and a tremie tube 16 is thrusted through the through hole 2 and set in the iron bar cage 11. Then, through the tremie tube 16, concrete 17 is placed until the cap 1 is buried with the concrete 17 to construct a pile 18. After the concrete is cured, the surrounding ground of the pile head is excavated, and the concrete covering the cap 1 is chipped out to expose the pile head 18a to the outside.

Description

【発明の詳細な説明】 本発明は、杭頭鉄筋キャップ装置に関するものである。[Detailed description of the invention] The present invention relates to a pile cap reinforcing bar cap device.

従来より、場所打ちコンクリート杭の施工の過程で杭頭
を、一定の高さに切りそろえる作業が必要テする。この
作業は杭を破損しないようにコンクリートをはつり、埋
込み鉄筋を所定長さだけ残して切り取るのである。しか
しながらこのはつり作業は手数を要して面倒である上、
コンクリートをはつり取る際に杭鉄筋を損傷させてしま
うことがあった。
Conventionally, during the construction process of cast-in-place concrete piles, it has been necessary to trim the pile heads to a certain height. In this work, concrete is poured so as not to damage the piles, and the embedded reinforcing bars are cut away leaving only a predetermined length. However, this chiseling work is time-consuming and troublesome, and
There were cases where the pile reinforcing bars were damaged when removing concrete.

本発明の目的は、杭頭処理を容易にすることであり、他
の目的は杭鉄筋の損傷をなくすことにある。
The purpose of the present invention is to facilitate pile cap processing, and another purpose is to eliminate damage to pile reinforcing bars.

以下本発明の実施例を図面に基づいて説明する。Embodiments of the present invention will be described below based on the drawings.

第1〜3図において、キャップ1は中央部に厚み方向に
貫通する貫通孔2を設けたドーナツ形状を有しこの例で
は貫通孔を中心として二つに分割可能であるキャップ片
3.3を合体しである。この各キャップ片は底板3aと
天板3bとを内壁板3cで連結してなる断面コ字形状に
形成し、内壁板の両端は合体面3d 、3dとなってい
る。両キャップ片3.3は、合体面3d、3dで互いに
対接し、合体面に設けである孔4,4にボルト5゜5を
挿通し、ナツト6.6で締め付けることによ多結合・し
ている。キャップ片3,3の底板3a。
In Figures 1 to 3, a cap 1 has a donut shape with a through hole 2 in the center that penetrates in the thickness direction, and in this example, a cap piece 3.3 that can be divided into two parts around the through hole. It is a combination. Each cap piece is formed into a U-shaped cross section by connecting a bottom plate 3a and a top plate 3b with an inner wall plate 3c, and both ends of the inner wall plate form combined surfaces 3d, 3d. Both cap pieces 3.3 face each other at the joining surfaces 3d, 3d, and are connected together by inserting bolts 5.5 into holes 4, 4 provided on the joining surfaces and tightening them with nuts 6.6. ing. Bottom plate 3a of cap pieces 3,3.

3aには外周に沿って複数の取付は孔7・・・が設けで
ある。またキャップ片3,3の外側には開口部を覆う側
板8がビス9(第1図鎖線図示)で固定し、キャップ片
肉を閉止している。なお、側板8の取付は方法として第
4図に示すように合体面3d 、3dの外端部に舌片1
0を設け、この舌片にビス(図示せず。)で側板を取り
付けて内部を閉止してもよい。
3a is provided with a plurality of mounting holes 7 along the outer periphery. A side plate 8 covering the opening is fixed to the outside of the cap pieces 3, 3 with screws 9 (shown by chain lines in FIG. 1) to close the cap pieces. The side plate 8 can be attached by attaching a tongue piece 1 to the outer end of the combined surface 3d and 3d as shown in Fig. 4.
0 may be provided, and a side plate may be attached to this tongue piece with screws (not shown) to close the inside.

キャップ1は第1図に示すように杭鉄筋である鉄筋かと
11に連結手段を介して取付は可能である。ここでこの
連結手段について説明する。鉄筋かご11の各主筋12
・・・の上端部には継手として例えばスリーブジヨイン
ト13の後端が被嵌圧着しである。スリーブジヨイント
13の先端開口から、連結ボルト14が螺入可能である
。このボルトはキャップ1の取付は孔7・・・に挿通可
能である。
As shown in FIG. 1, the cap 1 can be attached to a reinforcing bar 11, which is a pile reinforcing bar, via a connecting means. This connecting means will now be explained. Each main bar 12 of the reinforcing bar cage 11
. . . The rear end of a sleeve joint 13, for example, is fitted and crimped as a joint at the upper end. A connecting bolt 14 can be screwed into the opening at the tip of the sleeve joint 13. This bolt can be inserted into the hole 7 when attaching the cap 1.

次に作用を杭の施工とともに説明する。Next, the action will be explained along with the construction of the pile.

予め第1図に示すようにキャップ1を鉄筋かと11の上
端部に取り付けておく。すなわち各主筋12のスリーブ
ジヨイント13′にキャップ底板3aの取付は孔7・・
・を対向させてから、この孔にポル)14を挿入し、こ
れを回すことによりボルトはスリーブジヨイントに螺入
し、その締め付けを行えば、キャップ1はボルト14に
より鉄筋かとの主筋12に固定される。その後、側板8
をキャップ1の外周にビス9・・・で固定し、キャップ
内部を閉止する。
As shown in FIG. 1, the cap 1 is attached to the upper end of the reinforcing bar 11 in advance. In other words, the cap bottom plate 3a is attached to the sleeve joint 13' of each main reinforcing bar 12 through hole 7.
After inserting the pole (pol) 14 into this hole and turning it, the bolt will be screwed into the sleeve joint, and when tightened, the cap 1 will be attached to the main reinforcement 12 of the reinforcing bar by the bolt 14. Fixed. After that, side plate 8
is fixed to the outer periphery of the cap 1 with screws 9, and the inside of the cap is closed.

このようにしておいてから、まずキャップ1を取り付け
た鉄筋かと11を、第5図に示すように地盤に掘削した
杭孔15内に挿入、その後キャップ1の貫通孔?内にコ
ンクリート打設管であるトレミー管16を貫通させ、鉄
筋がと11内にセットする。ついでトレミー管を利用し
てコンクリート17を打設する。この打設は、第6図に
示すようにキャップ1がこのコンクリートによって埋め
込まれるまで行って、杭18を施工する。
After doing this, first insert the reinforcing bar 11 with the cap 1 attached into the pile hole 15 drilled in the ground as shown in FIG. A tremie pipe 16, which is a concrete pouring pipe, is passed through the inside, and reinforcing bars are set inside the pipe 11. Next, concrete 17 is poured using a tremie pipe. This pouring is continued until the cap 1 is embedded in the concrete as shown in FIG. 6, and then the pile 18 is constructed.

コンクリート養生後、杭頭の囲りの地盤を掘り出して、
キャップ1を覆っているコンクリートをはつり取って、
第7甲に示すように杭頭18aを露出させる。その後、
キャップ1から側板8を取外し、続いてスリーブジヨイ
ント13がら連結ボルト14を抜き取って、キャップを
主筋12より外す。キャップlを取り外した後、スリー
ブジヨイント13の先端開口よりアンカー筋19の下端
のねじ部を螺入し、アンカー筋を主筋12に連結起立さ
せる。
After concrete curing, excavate the ground around the pile cap,
Peel off the concrete covering cap 1,
As shown in No. 7 A, the pile cap 18a is exposed. after that,
Remove the side plate 8 from the cap 1, then remove the connecting bolt 14 from the sleeve joint 13, and remove the cap from the main reinforcement 12. After removing the cap 1, the threaded portion at the lower end of the anchor bar 19 is screwed into the opening at the tip of the sleeve joint 13 to connect the anchor bar to the main bar 12 and make it stand up.

なお、キャップの底板3aと天板3bとを分離し、側板
8を天板又は底板のいずれか一方に一体的に取り付けて
もよい。またキャップは必ずしもキャップ片を合体させ
たものに限られない。
Note that the bottom plate 3a and top plate 3b of the cap may be separated, and the side plate 8 may be integrally attached to either the top plate or the bottom plate. Further, the cap is not necessarily limited to a combination of cap pieces.

例えば第9図に示すキャップ20はキャップ体21と底
板22と支持片23.24とからなる。
For example, a cap 20 shown in FIG. 9 includes a cap body 21, a bottom plate 22, and support pieces 23, 24.

底板22にはボルトが挿通可能の取付は孔22a・・・
が設けてあり、上面に対向して突片25 、26が立設
しである。突片には孔25a 、26gが設けである。
The bottom plate 22 has holes 22a for mounting through which bolts can be inserted.
is provided, and protrusions 25 and 26 are erected to face the upper surface. Holes 25a and 26g are provided in the protrusion.

また支持片23.24は互いに合体し、両端の支持部で
上記突片25.26を挾持し、孔23a 、23aおよ
び孔25a、26aを挿通するボルト(図示せず。)と
ナツトで固定可能であ”′る。そしてキャップ体21を
底板22上に載置することにより、キャップ内が密閉さ
れ、中央に貫通孔か形成される。
Further, the support pieces 23 and 24 are combined with each other, and the protrusion pieces 25 and 26 are held between the support portions at both ends, and can be fixed with bolts (not shown) and nuts inserted through the holes 23a and 23a and the holes 25a and 26a. By placing the cap body 21 on the bottom plate 22, the inside of the cap is sealed and a through hole is formed in the center.

さらに第10図にキャップの他の例を示す。すなわちキ
ャップ27はキャップ体28と底板29とこの底板に取
り付けた支持片30とからなる。
Further, FIG. 10 shows another example of the cap. That is, the cap 27 consists of a cap body 28, a bottom plate 29, and a support piece 30 attached to the bottom plate.

底板29は二つ割で、外周に沿って取付は孔29a・・
・を設けである。また中央部に支持片30が立ち上って
いる。支持片30の両mK孔30m、30aが設けてあ
り、合体する支持片の両端をこの孔30m 、30mを
介してボルトで結合可能である。
The bottom plate 29 is divided into two parts, and there are holes 29a for mounting along the outer periphery.
・This is provided. Further, a support piece 30 stands up at the center. Both mK holes 30m and 30a of the support piece 30 are provided, and both ends of the support pieces to be combined can be connected with bolts through these holes 30m and 30m.

キャップに設ける取付は孔7.22a 、29mは底板
のみでなく、天板にも設けて、ボルト14をキャンプに
貫通状態に取り付けてもよい。この場合には、コンクリ
ート打設時に、ボルト14の頭部を弾性カバーで被覆し
ておく。
The mounting holes 7.22a and 29m provided on the cap may be provided not only on the bottom plate but also on the top plate, and the bolts 14 may be attached to the camp in a penetrating state. In this case, the head of the bolt 14 is covered with an elastic cover during concrete pouring.

以上のように本発明によれば、はつり作業もキャップを
埋込んだコンクリートのみをはっ゛り取るだけであるの
で、はつり作業が容易でかっ杭頭鉄筋の損傷の問題は全
くない。
As described above, according to the present invention, only the concrete in which the cap is embedded is removed during the chisel work, so the chisel work is easy and there is no problem of damage to the pile head reinforcing bars.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は本発明の一実施例を示すキャップ装置の使用状
態断面図、 第2図は第1図1−1線断面図であって、連結ボルトの
頭部を省略している図、 第3図はキャップ片の斜視図、 第4図は他の実施例の横断面図、 第5〜8図は杭の施工作業を段階的に示す説明図、 第9図はキャップの他の実施例を示す斜視図、第10図
はさらにキャップの他の実施例を示す斜視図である。 1・・・キャップ、2・・・貫通孔、3・・キャップ片
、3a・・底板、7・・・取付は孔、8・・側板、10
・・・舌片、11・・・鉄筋かご、12・・・主筋、1
3・・・スIJ−プジョイント、14・・連結ボルト、
16・・・トレミー’1.18・・・杭、19・・・ア
ンカー筋、20・・・キャップ、21・・・キャップ体
、22・・・底板、22a・・・取付は孔、23.24
・・・支持片、25.26・・・突片、27・・・キャ
ップ、28・・・キャップ体、29・・・・l 底板、29a・・・取付は孔、30・・・支□持片。 以上 (7) 馬1図 第2図      壓4図 単9図 帛10図
FIG. 1 is a sectional view of a cap device in use, showing an embodiment of the present invention; FIG. 2 is a sectional view taken along the line 1-1 in FIG. 1, with the head of the connecting bolt omitted; Figure 3 is a perspective view of the cap piece, Figure 4 is a cross-sectional view of another embodiment, Figures 5 to 8 are explanatory diagrams showing the pile construction work step by step, and Figure 9 is another embodiment of the cap. FIG. 10 is a perspective view showing another embodiment of the cap. 1... Cap, 2... Through hole, 3... Cap piece, 3a... Bottom plate, 7... Mounting hole, 8... Side plate, 10
... Tongue piece, 11 ... Rebar cage, 12 ... Main reinforcement, 1
3... SP joint, 14... Connection bolt,
16... Tremy'1. 18... Pile, 19... Anchor bar, 20... Cap, 21... Cap body, 22... Bottom plate, 22a... Mounting hole, 23. 24
...Support piece, 25.26...Protruding piece, 27...Cap, 28...Cap body, 29...L Bottom plate, 29a...Mounting hole, 30...Support □ Holder. Above (7) Horse 1 Figure 2 Figure 4 Single 9 Figure 10

Claims (1)

【特許請求の範囲】 中央部に厚み方向にコンクリート打設用パイプが挿脱自
在の貫通孔を貫設し、少なくとも底部に複数の取付は孔
を穿設し、内部を閉止可能である杭頭鉄筋キャップと、 杭鉄筋上端部に後端を取り付けた継手と、上記キャップ
の取付は孔に挿入しかつ継手の先端開口部より螺入可能
である連結ボルトと を具備する杭頭鉄筋キャップ装置。
[Scope of Claims] A pile head having a through hole in the center thereof in the thickness direction through which a concrete pouring pipe can be freely inserted and removed, and at least a plurality of mounting holes in the bottom part so that the inside can be closed. A pile head reinforcing bar cap device comprising a reinforcing bar cap, a joint whose rear end is attached to the upper end of a pile reinforcing bar, and a connecting bolt that can be inserted into a hole and screwed into the opening at the tip of the joint to attach the cap.
JP3525782A 1982-03-08 1982-03-08 Reinforced cap device for pile head Granted JPS58153816A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP3525782A JPS58153816A (en) 1982-03-08 1982-03-08 Reinforced cap device for pile head

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP3525782A JPS58153816A (en) 1982-03-08 1982-03-08 Reinforced cap device for pile head

Publications (2)

Publication Number Publication Date
JPS58153816A true JPS58153816A (en) 1983-09-13
JPS6122088B2 JPS6122088B2 (en) 1986-05-30

Family

ID=12436756

Family Applications (1)

Application Number Title Priority Date Filing Date
JP3525782A Granted JPS58153816A (en) 1982-03-08 1982-03-08 Reinforced cap device for pile head

Country Status (1)

Country Link
JP (1) JPS58153816A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001011852A (en) * 1999-06-29 2001-01-16 Maeda Corp Reinforced concrete pile for pile foundation work
JP2003105756A (en) * 2001-09-28 2003-04-09 Nishimatsu Constr Co Ltd Pile head treating tool and pile head treating method
CN101832030A (en) * 2010-03-25 2010-09-15 中冶实久建设有限公司 Method for preventing steel pipe column surface from being stained during construction of concrete lift-up method
FR3038627A1 (en) * 2015-07-10 2017-01-13 Soletanche Freyssinet METHOD FOR MANUFACTURING A FOUNDATION COMPRISING A RECEPAGE STEP
CN108708377A (en) * 2018-04-23 2018-10-26 江苏省交通工程集团有限公司 A kind of bridge struction pile pile crown is broken to cut device and application method
CN110258562A (en) * 2019-06-28 2019-09-20 成都明杰科技有限公司 A kind of accessible cleaning plant of discarded stake
JP2022133967A (en) * 2021-03-02 2022-09-14 東急建設株式会社 Pile head connection structure and method for constructing pile head connection structure

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001011852A (en) * 1999-06-29 2001-01-16 Maeda Corp Reinforced concrete pile for pile foundation work
JP2003105756A (en) * 2001-09-28 2003-04-09 Nishimatsu Constr Co Ltd Pile head treating tool and pile head treating method
JP4683800B2 (en) * 2001-09-28 2011-05-18 西松建設株式会社 Pile head treatment tool and pile head treatment method
CN101832030A (en) * 2010-03-25 2010-09-15 中冶实久建设有限公司 Method for preventing steel pipe column surface from being stained during construction of concrete lift-up method
FR3038627A1 (en) * 2015-07-10 2017-01-13 Soletanche Freyssinet METHOD FOR MANUFACTURING A FOUNDATION COMPRISING A RECEPAGE STEP
WO2017009541A1 (en) * 2015-07-10 2017-01-19 Soletanche Freyssinet Method for constructing a foundation including a topping step
CN108708377A (en) * 2018-04-23 2018-10-26 江苏省交通工程集团有限公司 A kind of bridge struction pile pile crown is broken to cut device and application method
CN108708377B (en) * 2018-04-23 2020-05-26 江苏省交通工程集团有限公司 Pile head breaking and shearing device for bridge cast-in-place pile and using method
CN110258562A (en) * 2019-06-28 2019-09-20 成都明杰科技有限公司 A kind of accessible cleaning plant of discarded stake
JP2022133967A (en) * 2021-03-02 2022-09-14 東急建設株式会社 Pile head connection structure and method for constructing pile head connection structure

Also Published As

Publication number Publication date
JPS6122088B2 (en) 1986-05-30

Similar Documents

Publication Publication Date Title
JP2010106433A (en) Slope reinforcing method
JPS58153816A (en) Reinforced cap device for pile head
JPH05118036A (en) Waling material
JP2002061170A (en) Underground outer wall of structure and its construction method
JP2001311166A (en) Construction method for underwater foundation structure
JP3817095B2 (en) Construction method of non-embedded column base of steel reinforced concrete structure
JP2844157B2 (en) Open shield method and concrete box used for it
JP2000212956A (en) Pile head treatment method for prestressed concrete pile
KR940001370Y1 (en) Anchor
JP2545111B2 (en) Column base construction method
JPH0684638B2 (en) Prefabricated underground structure
JP2774661B2 (en) Precast concrete pile
JPS63289145A (en) Method for fixing anchor bolt
JPS607398Y2 (en) Anchor device for underground wall construction
JPH11172670A (en) Steel pipe, steel pipe pile and preparation method of steel pipe pile
JP3681270B2 (en) Joint method of joint pile and SC pile
JPH0332591Y2 (en)
JPH0714433Y2 (en) Connection structure between concrete pile head and footing
JPS61191725A (en) Stress material drawing work
JPH0612036Y2 (en) Fixing material for earth anchor
JPS63165618A (en) Reinforcing bar-fixed structure for pc pile
JPS56153016A (en) Application of reinforced foundation pile
JPS6133934B2 (en)
JPH0826667B2 (en) Anchor for handrail mounting at slab opening and its pre-attachment method
JPH08218395A (en) Joint structure of pile-column foundation