JPS5789013A - Fabrication of marine structure, etc. - Google Patents

Fabrication of marine structure, etc.

Info

Publication number
JPS5789013A
JPS5789013A JP16607080A JP16607080A JPS5789013A JP S5789013 A JPS5789013 A JP S5789013A JP 16607080 A JP16607080 A JP 16607080A JP 16607080 A JP16607080 A JP 16607080A JP S5789013 A JPS5789013 A JP S5789013A
Authority
JP
Japan
Prior art keywords
assembled
dock
crane
working platform
fabrication
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP16607080A
Other languages
Japanese (ja)
Inventor
Takehisa Inoue
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsui Engineering and Shipbuilding Co Ltd
Mitsui Zosen KK
Original Assignee
Mitsui Engineering and Shipbuilding Co Ltd
Mitsui Zosen KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsui Engineering and Shipbuilding Co Ltd, Mitsui Zosen KK filed Critical Mitsui Engineering and Shipbuilding Co Ltd
Priority to JP16607080A priority Critical patent/JPS5789013A/en
Publication of JPS5789013A publication Critical patent/JPS5789013A/en
Pending legal-status Critical Current

Links

Abstract

PURPOSE: To stabilize the work of fabrication of a marine structure, etc., without resorting to floating crane in proper sea region and secure safety by a method in which the heavy main parts of a marine structure, e.g., a seabed oil excavating rig, etc., are assembled in a dry dock for building a new ship and also the remaining parts for high level are assembled in a dry dock for repair work.
CONSTITUTION: For the fabrication of a landing elevator type working platform P, blocks 6 is placed on the bottom of the dock, the working platform 1 is floated from the bottom, and an assembled support plate 4 is placed in place under the working platform 1 and supported by the blocks 6. Then, an unit strut 2a is lifted by a goliath crane 7 and orderly engrafted to the upper part of the support plate 4, and after most part other than parts for high level has been assembled, water is charged intothe dock 5 to float the assembly by the buoyancy of an elevating base 1 and then towed to the repairing dock 5' by a tugboat. Then, the remaining parts of the strut 2 are assembled by operating a tower-shaped horizontal pull-in type crane 9. The crane 9, although its jib 9a can be raised up to the position 9a', can lift only small loads.
COPYRIGHT: (C)1982,JPO&Japio
JP16607080A 1980-11-25 1980-11-25 Fabrication of marine structure, etc. Pending JPS5789013A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP16607080A JPS5789013A (en) 1980-11-25 1980-11-25 Fabrication of marine structure, etc.

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP16607080A JPS5789013A (en) 1980-11-25 1980-11-25 Fabrication of marine structure, etc.

Publications (1)

Publication Number Publication Date
JPS5789013A true JPS5789013A (en) 1982-06-03

Family

ID=15824413

Family Applications (1)

Application Number Title Priority Date Filing Date
JP16607080A Pending JPS5789013A (en) 1980-11-25 1980-11-25 Fabrication of marine structure, etc.

Country Status (1)

Country Link
JP (1) JPS5789013A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110805017A (en) * 2020-01-08 2020-02-18 森诺科技有限公司 Movable offshore self-installation dry type operation environment construction device
CN110805016A (en) * 2020-01-08 2020-02-18 森诺科技有限公司 Movable offshore self-installation dry type operation environment construction process

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110805017A (en) * 2020-01-08 2020-02-18 森诺科技有限公司 Movable offshore self-installation dry type operation environment construction device
CN110805016A (en) * 2020-01-08 2020-02-18 森诺科技有限公司 Movable offshore self-installation dry type operation environment construction process

Similar Documents

Publication Publication Date Title
US4729695A (en) Process for the installation of the enbloc superstructure of an offshore platform, and equipment for carrying it practically
US4746245A (en) Offshore drilling and/or production system
NO771673L (en) FIXED OFFSHORE PLATFORM AND PROCEDURE FOR SETTING UP THE SAME
JPS5789013A (en) Fabrication of marine structure, etc.
US5237949A (en) Floating platform shallow draft hull/deck mating
US4473321A (en) Method of launching a large floatable object from a dock to water and delaunching it
US2873581A (en) Marine platform
JP2606799B2 (en) Installation method of marine platform
JPS59145688A (en) Launching/grounding system for vessel and ocean structure
SU943082A1 (en) Method of constructing self-raising offshore platform
CN215361782U (en) Submersible self-elevating wind power installation platform
GB2314576A (en) Offshore platform assembly
SU1030489A1 (en) Method of installation of support pillars of self-lifting drilling sea platform
JPH06146250A (en) Method of laying shallow sea derrick
RU2085659C1 (en) Method of building seaborne self-lifting platform
SU1070272A1 (en) Method of after-equipment of offshore platforms
SU1142596A1 (en) Self-raising platform
GB2196675A (en) Offshore platform system
JPS58207410A (en) Assembler for prefabricated steel sheet pile cell
JPS58510A (en) Offshore working platform
SU1014786A1 (en) Method of mounting support column of self-raising offshore drilling rig
JPS6062318A (en) Offshore working platform
JPH09287148A (en) Launching equipment for floating caisson
JPS5936054B2 (en) How to assemble a landing lift type offshore work platform
JPS5647391A (en) Barge for transportation and installation of heavy article