JPS57151725A - Underground wall construction work and covering element therefor - Google Patents
Underground wall construction work and covering element thereforInfo
- Publication number
- JPS57151725A JPS57151725A JP3678181A JP3678181A JPS57151725A JP S57151725 A JPS57151725 A JP S57151725A JP 3678181 A JP3678181 A JP 3678181A JP 3678181 A JP3678181 A JP 3678181A JP S57151725 A JPS57151725 A JP S57151725A
- Authority
- JP
- Japan
- Prior art keywords
- elements
- pipes
- coarse aggregate
- underground wall
- wall construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/18—Bulkheads or similar walls made solely of concrete in situ
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
PURPOSE:To obtain an underground wall having good water shielding property by a procedure in which elements are settled in a trench, pipes are inserted into the elements, coarse aggregate is also packed into the elements, heavy water, etc., in the pipes is discharged, the elements and the coarse aggregate are washed with water, and then cement mortar is poured into the pipes. CONSTITUTION:Elements 1 are settled while connecting adjacent couplers 2a and 3a in a deep trench 6. Then, coarse aggregate 7 is charged in the inside of elements 1 and between the elements 1 and the inner wall of the deep trench 6 and also pipes 8 are inserted there. And fresh water is poured into the pipes 8 to wash the elements 1 settled and the coarse aggregate 7 and heavy water is scooped up and removed. Then, cement concrete or mortar is poured through the pipes 8 while the pipes 8 are pulled up little by little.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP3678181A JPS57151725A (en) | 1981-03-14 | 1981-03-14 | Underground wall construction work and covering element therefor |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP3678181A JPS57151725A (en) | 1981-03-14 | 1981-03-14 | Underground wall construction work and covering element therefor |
Publications (1)
Publication Number | Publication Date |
---|---|
JPS57151725A true JPS57151725A (en) | 1982-09-18 |
Family
ID=12479311
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP3678181A Pending JPS57151725A (en) | 1981-03-14 | 1981-03-14 | Underground wall construction work and covering element therefor |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPS57151725A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5972320A (en) * | 1982-10-15 | 1984-04-24 | Takashima Kensetsu Koji Kk | H-wall work |
JPS6065817A (en) * | 1983-09-22 | 1985-04-15 | Asuku Kenkyusho:Kk | Steel material for landslide protection wall |
JPS6178915A (en) * | 1984-09-25 | 1986-04-22 | Fudo Constr Co Ltd | Formation work of underground continuous wall |
JPS61257531A (en) * | 1985-05-09 | 1986-11-15 | Nippon Kokan Kk <Nkk> | Continuous underground wall |
JP2003221826A (en) * | 2002-01-31 | 2003-08-08 | East Japan Railway Co | Continuous underground wall construction method |
JP2014101710A (en) * | 2012-11-21 | 2014-06-05 | Kajima Corp | Continuous wall construction method |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5232164A (en) * | 1975-09-06 | 1977-03-11 | Cosmo Denki Kk | Thermostat apparatus |
JPS5598523A (en) * | 1979-01-19 | 1980-07-26 | Taisei Corp | Installing method for reference pile for constructing continuous underground wall |
-
1981
- 1981-03-14 JP JP3678181A patent/JPS57151725A/en active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5232164A (en) * | 1975-09-06 | 1977-03-11 | Cosmo Denki Kk | Thermostat apparatus |
JPS5598523A (en) * | 1979-01-19 | 1980-07-26 | Taisei Corp | Installing method for reference pile for constructing continuous underground wall |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5972320A (en) * | 1982-10-15 | 1984-04-24 | Takashima Kensetsu Koji Kk | H-wall work |
JPS6065817A (en) * | 1983-09-22 | 1985-04-15 | Asuku Kenkyusho:Kk | Steel material for landslide protection wall |
JPH0368170B2 (en) * | 1983-09-22 | 1991-10-25 | Ask Kenkyusho Kk | |
JPS6178915A (en) * | 1984-09-25 | 1986-04-22 | Fudo Constr Co Ltd | Formation work of underground continuous wall |
JPS61257531A (en) * | 1985-05-09 | 1986-11-15 | Nippon Kokan Kk <Nkk> | Continuous underground wall |
JP2003221826A (en) * | 2002-01-31 | 2003-08-08 | East Japan Railway Co | Continuous underground wall construction method |
JP2014101710A (en) * | 2012-11-21 | 2014-06-05 | Kajima Corp | Continuous wall construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JPS57151725A (en) | Underground wall construction work and covering element therefor | |
DE3263860D1 (en) | Method to assure the mechanical continuity between two adjoining panels of a reinforced concrete wall cast in the earth | |
JPS54100104A (en) | Method of building readyymade breast wall like reinforced concrete buttress | |
JPS5771938A (en) | Outer water-proofing work | |
GB2070668B (en) | Auger drill for the manufacturing of concrete foundation piles | |
JPS57158436A (en) | Method of construction of precast concrete underground room | |
JPS5552424A (en) | Method of installing underground continuous wall constructing standard pile | |
JPS5568919A (en) | Construction of underground continuous wall | |
JPS5496245A (en) | Manhole | |
FR2511058B1 (en) | ASSEMBLY OF PREFABRICATED ELEMENTS CONSTITUTING A WALL FOR THE BUILDING | |
JPS56119019A (en) | Construction of submerged structure | |
JPS55116922A (en) | Jointing method of continuous underground wall | |
JPS57197330A (en) | Moisture-proofing and heat-insulating work for basement | |
SU1495558A1 (en) | Arrangement for forming curve earth foundation in trench | |
JPS56119038A (en) | Construction of underground floor of building for atomic power generation plant | |
JPS5751331A (en) | Construction of continuous underground wall | |
JPS54124021A (en) | Water proof agent for cement mortar or concrete | |
JPS5486913A (en) | Method of coupling precast underground concrete wall | |
JPS573914A (en) | Asphalt mastic continuous wall coupling structure and its construction | |
JPS55122915A (en) | Method for building underground continuous wall | |
GB2011565B (en) | Pipe coupling between two mud such as a mixture of water and sand transporting pipes | |
JPS57127066A (en) | Construction of balcony having handrail wall made of reinforced concrete | |
JPS5552469A (en) | Method of coupling reinforcing iron members of reinforced concrete structure | |
JPS57155424A (en) | Executing method for underground outer wall | |
Britton | When all's said, can it be done? |