concrete
pile head
hardening
extra
processing method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP15099178A
Other languages
Japanese (ja)
Inventor
Kimio Yamamoto
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kiso Kogyo KK
Original Assignee
Kiso Kogyo KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kiso Kogyo KK filed Critical Kiso Kogyo KK
Priority to JP15099178A priority Critical patent/JPS5578715A/en
Publication of JPS5578715A publication Critical patent/JPS5578715A/en
Pending legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

PURPOSE: To alleviate scraping process of extra-filling concrete in the upper part of planned pile head by injecting water or bentonite stabilizer-solution into laitance part and extrafilling concrete part of fine quality after completion of striking concrete in dug-out hole and before starting of hardening.
CONSTITUTION: After completion of striking concrete in dug-out hole and before commencement of hardening, injector 11 is inserted in laitance part 7 and extra-filling concrete part 6, in which water or bentonite stabilizer-solution is injected with protection layer 12 being left through injector 11 to lower hardening capacity of concrete. Thus process for scraping latence part 7 and extra-filling concrete part of fine quality 6 can be performed with ease and rapidly when pile head is made even after hardening of given pile concrete 5 below the position of planned pile head 4.
COPYRIGHT: (C)1980,JPO&Japio
JP15099178A 1978-12-08 1978-12-08 Processing method for site pile head Pending JPS5578715A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP15099178A JPS5578715A (en) 1978-12-08 1978-12-08 Processing method for site pile head

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP15099178A JPS5578715A (en) 1978-12-08 1978-12-08 Processing method for site pile head

Publications (1)

Publication Number Publication Date
JPS5578715A true JPS5578715A (en) 1980-06-13

Family

ID=15508887

Family Applications (1)

Application Number Title Priority Date Filing Date
JP15099178A Pending JPS5578715A (en) 1978-12-08 1978-12-08 Processing method for site pile head

Country Status (1)

Country Link
JP (1) JPS5578715A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3343961A1 (en) * 1983-12-06 1985-06-20 Gkn Keller Gmbh, 6050 Offenbach Method of producing piles or pile-like bodies
JPH044927U (en) * 1990-04-23 1992-01-17

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5293107A (en) * 1976-02-02 1977-08-05 Takenaka Komuten Co Method of treating head of casttin place concrete pile applying high pressure jet

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5293107A (en) * 1976-02-02 1977-08-05 Takenaka Komuten Co Method of treating head of casttin place concrete pile applying high pressure jet

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3343961A1 (en) * 1983-12-06 1985-06-20 Gkn Keller Gmbh, 6050 Offenbach Method of producing piles or pile-like bodies
JPH044927U (en) * 1990-04-23 1992-01-17

Similar Documents

Publication Publication Date Title
JPS5578715A (en) Processing method for site pile head
JPS5771923A (en) Construction work of continuous underground wall
JPS55116923A (en) Method for construction of pile foundation
JPS573911A (en) Method and apparatus for improving ground
JPS5751323A (en) Method and apparatus for improving soft ground
JPS55165314A (en) Method and device for chemical grouting for improvement of ground
JPS56142922A (en) Treatment of top of in-place concrete pile
JPS56135625A (en) Construction of underwater structure
JPS5555726A (en) Normal plane protection work
JPS557318A (en) Ground improving method and its device
JPS57104713A (en) Repairing of rail truck roadbed
JPS57108329A (en) Formation of basement
JPS55116920A (en) Compound grouting method
JPS55105021A (en) High pressure chemichal liquid grouting method utilizing high frequency vibration pressure
JPS56153012A (en) Creation of agitated mixing pile for poor subsoil
JPS56163318A (en) Settling guider for foundation pile
JPS5771926A (en) Treatment of extra-banking concrete at head of pile driven at site
JPS5545910A (en) Pile pulling method
JPS641826A (en) Lay-out method of wide-headed pile
JPS641823A (en) Consolidation of foundation
JPS5652216A (en) Improving method of construction for subsurface
JPS5520854A (en) Apparatus for solidifying poor soil layer
JPS601906B2 (en) How hydraulic products disintegrate
JPS56115408A (en) Revetment formation method and apparatus therefor
JPS649704A (en) Manufacture of light-weight aerated concrete