JPS51148211A - Method of improving poor subsoil - Google Patents

Method of improving poor subsoil

Info

Publication number
JPS51148211A
JPS51148211A JP7246375A JP7246375A JPS51148211A JP S51148211 A JPS51148211 A JP S51148211A JP 7246375 A JP7246375 A JP 7246375A JP 7246375 A JP7246375 A JP 7246375A JP S51148211 A JPS51148211 A JP S51148211A
Authority
JP
Japan
Prior art keywords
improving poor
poor subsoil
subsoil
improving
poor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP7246375A
Other languages
Japanese (ja)
Inventor
Toshinaga Murase
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taiheiyo Cement Corp
Original Assignee
Onoda Cement Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Onoda Cement Co Ltd filed Critical Onoda Cement Co Ltd
Priority to JP7246375A priority Critical patent/JPS51148211A/en
Publication of JPS51148211A publication Critical patent/JPS51148211A/en
Pending legal-status Critical Current

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
JP7246375A 1975-06-14 1975-06-14 Method of improving poor subsoil Pending JPS51148211A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP7246375A JPS51148211A (en) 1975-06-14 1975-06-14 Method of improving poor subsoil

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP7246375A JPS51148211A (en) 1975-06-14 1975-06-14 Method of improving poor subsoil

Publications (1)

Publication Number Publication Date
JPS51148211A true JPS51148211A (en) 1976-12-20

Family

ID=13490013

Family Applications (1)

Application Number Title Priority Date Filing Date
JP7246375A Pending JPS51148211A (en) 1975-06-14 1975-06-14 Method of improving poor subsoil

Country Status (1)

Country Link
JP (1) JPS51148211A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008101389A (en) * 2006-10-19 2008-05-01 Taiyo Kiso Kk Soil improvement method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008101389A (en) * 2006-10-19 2008-05-01 Taiyo Kiso Kk Soil improvement method
JP4662904B2 (en) * 2006-10-19 2011-03-30 大洋基礎株式会社 Ground improvement method

Similar Documents

Publication Publication Date Title
JPS5234509A (en) Subsoil improving method
JPS5235413A (en) Method of improving poor bedrock
JPS5256708A (en) Method of stabilizing poor subsoil
JPS51131116A (en) Method of improving subsoil
JPS5245115A (en) Method of stabilizing poor subsoil
JPS51128109A (en) Method of stabilizing subsoil
JPS5245120A (en) Method of improving poor subsoil
JPS51111715A (en) Method of stabilizing poor subsoil
JPS51117404A (en) Method of stabilizing subsoil
JPS5261312A (en) Method of improving poor subsoil
JPS5261311A (en) Method of improving poor subsoil
JPS5225409A (en) Method of improving poor subsoil
JPS51148211A (en) Method of improving poor subsoil
JPS5214009A (en) Method of improving poor subsoil
JPS51148921A (en) Method of improving poor subsoil
JPS51148918A (en) Method of improving poor subsoil
JPS5279504A (en) Method of improving extremely poor subsoil
JPS5267111A (en) Method of stabilizing poor subsoil
JPS51132613A (en) Method of stabilizing poor subsoil
JPS51121913A (en) Method of hardening poor subsoil
JPS51128110A (en) Method of improving subsoil
JPS51150813A (en) Method of improving subsoil
JPS51133910A (en) Method of improving subsoil
JPS52126909A (en) Method of improving poor subsoil
JPS52135512A (en) Method of improving poor subsoil