JPH1179308A - Vertical transport pipe and its assembling method, and garbage contained transport device - Google Patents

Vertical transport pipe and its assembling method, and garbage contained transport device

Info

Publication number
JPH1179308A
JPH1179308A JP25184397A JP25184397A JPH1179308A JP H1179308 A JPH1179308 A JP H1179308A JP 25184397 A JP25184397 A JP 25184397A JP 25184397 A JP25184397 A JP 25184397A JP H1179308 A JPH1179308 A JP H1179308A
Authority
JP
Japan
Prior art keywords
pipe
chute
tube
vertical transport
length
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP25184397A
Other languages
Japanese (ja)
Inventor
Takao Sekikawa
隆雄 関川
Koichi Toyoda
好一 豊田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Subaru Corp
Original Assignee
Fuji Heavy Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fuji Heavy Industries Ltd filed Critical Fuji Heavy Industries Ltd
Priority to JP25184397A priority Critical patent/JPH1179308A/en
Publication of JPH1179308A publication Critical patent/JPH1179308A/en
Pending legal-status Critical Current

Links

Landscapes

  • Refuse Collection And Transfer (AREA)

Abstract

PROBLEM TO BE SOLVED: To improve the assembling ability of a vertical transport pipe in a garbage container transport device. SOLUTION: In this device, an inserted pipe 20 provided between an upper chute pipe 10A and a lower chute pipe 10B can be adjusted in protruding length by altering its inserted length, and since the adjustable range of the protruding length is set longer than a gap between the ends of two chute pipes 10A, 10B, the chute pipes 10A and 10B can be connected through the inserted pipe 20 without moving the upper or lower chute pipe 10A or 10B after fixing by regulating the protruded length of the inserted pipe. In addition, since in the case of connection, one end of the inserted pipe forms an inserting part and rotatable to the chute pipes 10A and 10B inserted, a flange part at the other end can be simply aligned with the bolt holes of the flange of the chute pipe by properly rotating the inserted pipe.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、例えば、高層ビル
に設置され、上層階のごみを効率よく地上に輸送するた
めの垂直輸送管、その組立方法、及びごみ容器輸送装置
に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a vertical transport pipe installed in, for example, a high-rise building for efficiently transporting refuse on an upper floor to the ground, a method of assembling the same, and a refuse container transport apparatus.

【0002】[0002]

【従来の技術】例えば、高層ビルにおけるごみ収集シス
テムとして、パイプ状のシュート管を上下に多数つなげ
て各フロアを上下方向に貫通する垂直輸送管を構成し、
所定のフロアに設置した投入装置から軟質性のごみ容器
(中にごみを収納した円柱状の袋)を投入し、垂直輸送
管の内部を落下させて地上に回収するごみ容器輸送装置
が知られている。
2. Description of the Related Art For example, as a garbage collection system in a high-rise building, a vertical transport pipe which vertically penetrates each floor by connecting a large number of pipe-shaped chute pipes vertically,
2. Description of the Related Art There is known a garbage container transport device in which a soft garbage container (a cylindrical bag containing garbage therein) is loaded from a loading device installed on a predetermined floor, the inside of a vertical transport pipe is dropped and collected on the ground. ing.

【0003】このごみ容器輸送装置は、垂直輸送管内部
を適度に密閉することと、ごみ容器の大きさをシュート
管の内径よりも少し小さくすることにより、ごみ容器の
落下速度を空気抵抗によって適宜に調整するようにして
いる。これにより、ごみ容器の落下速度が調整されて、
地上に衝突時のごみの飛び散りの防止や、衝突音の低下
を図っている。
[0003] In this refuse container transport device, by appropriately sealing the inside of the vertical transport pipe and making the size of the refuse container slightly smaller than the inner diameter of the chute pipe, the falling speed of the refuse container is appropriately controlled by air resistance. To adjust. As a result, the falling speed of the garbage container is adjusted,
The garbage is prevented from scattering at the time of collision on the ground and the collision sound is reduced.

【0004】ところで、このように、垂直輸送管は、適
宜に密閉することが必要であり、シュート管を連結する
に際し、2本のシュート管のそれぞれに形成されている
フランジ部を、この間にシール材を挟み込んだ状態で、
数本のボルトによって締めつける、いわゆるフランジ結
合に連結されるのが一般的である。この場合、長さの長
い2本のシュート管の間に、長さの短いシュート管(以
下「短管」という)を適宜に介装することで、長さの調
整を行っている。なお、短管は、長さが短い点を除い
て、普通のシュート管と同様の構成であるため、シュー
ト管との連結は、2本のシュート管相互を連結する場合
と同様、フランジ結合を行うようになる。
As described above, it is necessary to properly seal the vertical transport pipe, and when connecting the chute pipes, the flange portions formed on each of the two chute pipes are sealed between them. With the material sandwiched,
It is generally connected to a so-called flange connection, which is tightened by several bolts. In this case, the length is adjusted by appropriately interposing a short-length chute tube (hereinafter, referred to as a "short tube") between two long-length chute tubes. Since the short pipe has the same configuration as a normal chute pipe except that the length is short, the connection with the chute pipe is performed by a flange connection similarly to the case where two chute pipes are connected to each other. Will do it.

【0005】[0005]

【発明が解決しようとする課題】しかしながら、上述の
垂直輸送管によると、シュート管の上下方向の位置合わ
せ、及びフランジ結合のためのボルト孔の位置合わせが
煩雑で、多くの組立工数が要求される。
However, according to the above-mentioned vertical transport pipe, the positioning of the chute pipe in the vertical direction and the positioning of the bolt holes for flange connection are complicated, and a large number of assembly steps are required. You.

【0006】すなわち、シュート管の取付けは、上下に
2本のシュート管をそれぞれの所定の位置に固定し、そ
の間に短管を介装することにより行っているが、2本の
シュート管の間隙と短管の長さとが合わない場合には、
いったん固定したシュート管の固定をゆるめて上下方向
に微調整し、2本のシュート管の間に短管を介在せしめ
て位置合わせをし、その後、短管の両端部をそれぞれ2
本のシュート管にフランジ結合する。このため、シュー
ト管の上下方向の位置合わせが煩雑な作業となり、作業
工数も増大する。
That is, the mounting of the chute tube is performed by fixing two chute tubes at predetermined positions at the top and bottom and interposing a short tube between them. And the length of the short pipe do not match,
Once the fixed chute tube is loosened, fine adjustment is made in the vertical direction, a short tube is interposed between the two chute tubes, and positioning is performed.
Flange connection to the chute tube. Therefore, the positioning of the chute tube in the vertical direction is a complicated operation, and the number of man-hours is also increased.

【0007】また、シュート管と短管との連結がフラン
ジ結合であるため、例えば、上方のシュート管のフラン
ジ部に短管の上端部のフランジ部を合わせて両フランジ
部のボルト孔の位置合わせを行った場合、短管の下端部
のフランジ部のボルト孔と、シュート管の上端部のフラ
ンジ部のボルト孔とがずれる場合が多い。これは、各シ
ュート管及び短管の寸法的誤差や上方のシュート管と下
方のシュート管とを、短管の長さ分だけ離して固定する
ため、それぞれのフランジ部のボルト孔の位置を合わせ
るのが困難であるからである。このため、シュート管の
フランジ部のボルト孔の位置合わせ作業は煩雑なものと
なり、その結果、組立工数も増加してしまう。
In addition, since the connection between the chute tube and the short tube is a flange connection, for example, the flange portions at the upper end of the short tube are aligned with the flange portion of the upper chute tube so that the bolt holes of both flange portions are aligned. In many cases, the bolt hole in the flange at the lower end of the short pipe and the bolt hole in the flange at the upper end of the chute are misaligned. This is because the dimensional error of each chute tube and the short tube, and the upper chute tube and the lower chute tube are fixed to be separated by the length of the short tube, so that the positions of the bolt holes of the respective flange portions are adjusted. Because it is difficult. For this reason, the work of positioning the bolt holes in the flange portion of the chute tube becomes complicated, and as a result, the number of assembling steps also increases.

【0008】したがって、本発明の目的は、シュート管
の上下方向の位置合わせ、及びシュート管のフランジ部
のボルト孔の位置合わせを簡素に、少ない工数で行うこ
とができるようにした垂直輸送管、その組立方法、及び
ごみ容器輸送装置を提供することにある。
Accordingly, an object of the present invention is to provide a vertical transport pipe capable of performing the positioning of the chute pipe in the vertical direction and the positioning of the bolt holes in the flange portion of the chute pipe in a simple and small man-hour. An object of the present invention is to provide an assembling method and a garbage container transport device.

【0009】[0009]

【課題を解決するための手段】前記目的を達成するため
の、請求項1に係る垂直輸送管の本発明は、建物の各フ
ロアを上下方向に貫通するように配管され、管内に投入
されたごみ容器を下方に導く垂直輸送管において、上下
方向に連結された複数のシュート管と、これらシュート
管のうちの、上下に隣接する上方のシュート管の下端部
と下方のシュート管の上端部との間に介装された差込管
とを備え、該差込管は、前記上方のシュート管の下端部
と前記下方のシュート管の上端部とのうちの一方の端部
に差込結合される挿脱自在の挿入部と、他方の端部にフ
ランジ結合されるフランジ部とを有し、前記一方の端部
に対する前記挿入部の挿入長さを変更することで、前記
一方の端部から前記フランジ部までの突出長さを調整す
るとともに、該突出長さの調整可能範囲が前記シュート
管における前記一方の端部と前記他方の端部との間の間
隙よりも長く設定されていることを特徴とする。
According to a first aspect of the present invention, there is provided a vertical transportation pipe according to the present invention. The vertical transportation pipe is piped so as to vertically penetrate each floor of a building and is inserted into the pipe. In the vertical transport pipe that guides the garbage container downward, a plurality of chute pipes connected in the vertical direction, of these chute pipes, the lower end of the vertically adjacent upper chute pipe and the upper end of the lower chute pipe. And an insertion pipe interposed between the upper and lower chute pipes, the insertion pipe being connected to one end of a lower end of the upper chute pipe and an upper end of the lower chute pipe. Having an insertion portion that can be inserted and removed, and a flange portion that is flanged to the other end portion, by changing the insertion length of the insertion portion with respect to the one end portion, from the one end portion. Adjust the protrusion length up to the flange, and Adjustable range of lengths, characterized in that it is set longer than the gap between the end of the other and the one end of the chute pipe.

【0010】この請求項1の発明によると、上方のシュ
ート管と下方のシュート管との間に介装される差込管
は、その挿入長さを変更することで突出長さを調整する
ことができ、しかもその突出長さの調整可能範囲が2本
のシュート管の端部間の間隙よりも長く設定されている
ので、上方又は下方のシュート管を移動することなく、
差込管の突出長さを調整することにより、上方のシュー
ト管の下端部と下方のシュート管の上端部とを差込管に
よって連結することができる。
According to the first aspect of the present invention, the insertion length of the insertion tube interposed between the upper chute tube and the lower chute tube is adjusted by changing the insertion length. And the adjustable range of the protruding length is set longer than the gap between the ends of the two chute tubes, so that the upper or lower chute tube is not moved,
By adjusting the projecting length of the insertion tube, the lower end of the upper chute tube and the upper end of the lower chute tube can be connected by the insertion tube.

【0011】さらに、この連結に際し、差込管は、一方
の端部が挿入部となっていて、挿入先のシュート管に対
して回転可能であるので、適宜に回転させることで、他
方のフランジ部をシュート管のフランジ部のボルト孔に
簡単に合わせることができる。これにより、上方又は下
方のシュート管を回転させる必要がない。すなわち、差
込管は、シュート管に対して、突出長さ調整可能で、か
つ回転可能に構成されているので、上方と下方とのシュ
ート管を先に位置決め固定した後に、両シュート管を差
込管によって簡単に連結することができる。
Further, in this connection, the insertion tube has an insertion portion at one end and is rotatable with respect to the chute tube into which the insertion tube is inserted. The part can be easily fitted to the bolt hole of the flange part of the chute tube. This eliminates the need to rotate the upper or lower chute tube. That is, since the insertion pipe is configured so that the protruding length can be adjusted and rotatable with respect to the chute pipe, the upper and lower chute pipes are first positioned and fixed, and then both chute pipes are inserted. It can be easily connected by a pipe.

【0012】請求項2に係る垂直輸送管の本発明は、前
記差込管の内径が前記シュート管の内径と同じに設定さ
れるとともに、該差込管の挿入部の挿入先となる前記シ
ュート管の一方の端部に、前記挿入部の外周面が嵌合さ
れる連結部を有することを特徴とする。
According to a second aspect of the present invention, the inner diameter of the insertion pipe is set to be the same as the inner diameter of the chute pipe, and the chute into which the insertion portion of the insertion pipe is inserted is inserted. At one end of the tube, there is provided a connecting portion into which the outer peripheral surface of the insertion portion is fitted.

【0013】この請求項2の発明によると、シュート管
の連結部に差込管の挿入部の外周面を嵌合させること
で、シュート管に差込管を挿入することができ、このと
き、シュート管の内径と、差込管の内径とが同じに設定
されているので、垂直輸送管の内径をほぼ均一にするこ
とができ、ごみ容器の円滑な落下を実現することができ
る。また、連結部に対する挿入部の外周面の嵌合を精度
よく行うときは、この嵌合によって垂直輸送管内部を適
度に密閉することができる。
According to the second aspect of the present invention, the insertion tube can be inserted into the chute tube by fitting the outer peripheral surface of the insertion portion of the insertion tube into the connection portion of the chute tube. Since the inner diameter of the chute pipe and the inner diameter of the insertion pipe are set to be the same, the inner diameter of the vertical transport pipe can be made substantially uniform, and the garbage container can be smoothly dropped. In addition, when fitting the outer peripheral surface of the insertion portion to the connecting portion with high accuracy, the fitting can appropriately seal the inside of the vertical transport pipe.

【0014】請求項3に係る垂直輸送管の本発明は、前
記差込管の挿入部と前記シュート管の連結部との間を密
封するシール部材を備えることを特徴とする。
According to a third aspect of the present invention, there is provided a vertical transport pipe comprising a seal member for sealing between an insertion portion of the insertion pipe and a connecting portion of the chute pipe.

【0015】前記請求項2の嵌合を精度よく行うと、こ
の嵌合によって垂直輸送管内の適度な密閉を実現するこ
とはできるものの、嵌合作業に工数を要し、また、挿入
長さの変更や、ボルト孔を合わせるための回転作業が行
いにくくなる。そこで、請求項3のように、シュート管
の連結部と差込管の挿入部との間をシール部材によって
密封するようにすれば、嵌合をゆるめにすることがで
き、その結果、嵌合作業を短時間で行い、また、挿入長
さの変更や回転を容易に行うことができて作業性が向上
する。
If the fitting of the second aspect is accurately performed, the fitting can achieve a proper sealing in the vertical transport pipe, but the fitting operation requires man-hours, and the insertion length is reduced. It is difficult to perform the change or the rotation work for aligning the bolt holes. Therefore, if the connection between the connecting portion of the chute tube and the insertion portion of the insertion tube is sealed by a sealing member as in claim 3, the fitting can be loosened. Work can be performed in a short time, and the insertion length can be easily changed or rotated, thereby improving workability.

【0016】請求項4に係る垂直輸送管の本発明は、前
記差込管は前記挿入部を下方に向け、前記フランジ部を
上方に向けた姿勢で連結されることを特徴とし、請求項
5に係る垂直輸送管の本発明は、前記差込管の前記挿入
部を上方に向け、前記フランジ部を下方に向けた状態で
連結されることを特徴とする。
According to a fourth aspect of the present invention, there is provided a vertical transport pipe, wherein the insertion pipe is connected with the insertion portion facing downward and the flange portion facing upward. The present invention of the vertical transport pipe according to the present invention is characterized in that the insertion section of the insertion pipe is connected upward with the flange section directed downward.

【0017】上述の請求項4及び請求項5の発明の作用
については、後述の請求項7、8と合わせて説明する。
The operation of the above-described fourth and fifth aspects will be described together with the seventh and eighth aspects described later.

【0018】請求項6に係る垂直輸送管の組立方法の本
発明は、建物の各フロアを上下方向に貫通するようにシ
ュート管及び差込管を上下方向に連結して構成され、管
内に投入されたごみ容器を下方に導く垂直輸送管の組立
方法において、第1のシュート管を所定位置に垂直に固
定する第Iの工程と、一方の端部に挿入部、他方の端部
にフランジ部を有し、前記第1のシュート管に対する挿
入長さを変更することで前記第1のシュート管の端部か
らの突出長さを調整可能な差込管における、前記挿入部
を前記第Iのシュート管の端部に挿入する第IIの工程
と、前記差込管のフランジ部に対向するフランジ部を有
する第2のシュート管を、所定間隙を介して前記差込管
に対向するように垂直に固定する第IIIの工程と、前
記第1のシュート管の端部から前記差込管を引き出して
前記挿入長さを短くして前記突出長さを長くし、前記シ
ュート管のフランジ部と前記第2のシュート管のフラン
ジ部とをフランジ結合する第IVの工程と、を有するこ
とを特徴とする。
According to a sixth aspect of the present invention, there is provided a method for assembling a vertical transport pipe, wherein a chute pipe and an insertion pipe are vertically connected to each other so as to vertically penetrate each floor of a building, and are inserted into the pipe. A vertical transport pipe assembling method for guiding the waste container downward, a first step of vertically fixing the first chute pipe at a predetermined position, an insertion portion at one end, and a flange portion at the other end. The insertion portion of the insertion tube in which the insertion length of the first chute tube can be adjusted by changing the insertion length with respect to the first chute tube, A second step of inserting the end portion of the chute tube, and a second chute tube having a flange portion facing the flange portion of the plug-in tube so as to face the plug-in tube via a predetermined gap. A third step of fixing the first chute; IV, which pulls out the insertion tube from the end of the tube, shortens the insertion length, increases the protruding length, and flange-connects the flange portion of the chute tube and the flange portion of the second chute tube. And a step of:

【0019】この請求項6の発明によると、前記の請求
項1と同様の作用及び効果を上げることができる。
According to the sixth aspect of the invention, the same operation and effect as those of the first aspect can be obtained.

【0020】請求項7に係る垂直輸送管の本発明は、前
記IIの工程において前記差込管が挿入される前記第1
のシュート管の端部が、上端部であることを特徴とす
る。
The vertical transport pipe according to the present invention is characterized in that in the step (II), the first pipe into which the insertion pipe is inserted is inserted.
The end of the chute tube is an upper end.

【0021】この請求項7の発明によると、第1のシュ
ート管が下方のシュート管ということになり、この第1
のシュート管の上端部に対して差込管を、その挿入部を
下に向けた状態で上方から挿入することになる(請求項
4に相当する)。したがって、上述の第IVの工程、す
なわち差込管を上方に引き上げて差込管のフランジ部を
第2のシュート管の下端部のフランジ部にフランジ結合
する工程を開始するまでの間、差込管を支持しておく必
要がないため作業性が向上する。
According to the seventh aspect of the present invention, the first chute tube is a lower chute tube.
The insertion tube is inserted from above into the upper end of the chute tube with its insertion portion facing downward (corresponding to claim 4). Therefore, until the above-described fourth step, that is, the step of pulling up the insertion tube upward and flange-connecting the flange portion of the insertion tube to the flange portion of the lower end portion of the second chute tube, starts. Since there is no need to support the pipe, workability is improved.

【0022】請求項8に係る垂直輸送管の組立方法の本
発明は、前記IIの工程において前記差込管が挿入され
る前記第1のシュート管の端部が、下端部であることを
特徴とする。
The vertical transport pipe assembling method according to the present invention is characterized in that the end of the first chute pipe into which the insertion pipe is inserted in the step II is a lower end. And

【0023】この請求項8の発明は、差込管の上下方向
の状態が、請求項7と逆になる。
According to the eighth aspect of the present invention, the vertical state of the insertion tube is reversed from that of the seventh aspect.

【0024】この請求項8の発明によると、第1のシュ
ート管が上方のシュート管ということになり、この第1
のシュート管の下端部に対して差込管を、その挿入部を
上に向けた状態で下方から挿入することになる(請求項
5に相当する)。したがって、上述のIVの工程、すな
わち差込管を下方に引き下げて差込管のフランジ部を第
2のシュート管の上端部のフランジ部にフランジ結合す
る工程を開始するまでの間、差込管を例えば仮止めする
等して支持しておく必要があるが、上述のIVの工程時
には、差込管のフランジ部を第1のシュート管の上部の
フランジ部に載せることができるため、差込管の重さを
支える必要がない。したがって、ボルト孔の位置合わせ
のための差込管の回転を容易に行うことができる。
According to the eighth aspect of the present invention, the first chute tube is an upper chute tube.
The insertion tube is inserted from below into the lower end of the chute tube with the insertion portion thereof facing upward (corresponding to claim 5). Therefore, until the start of the above-mentioned step IV, that is, the step of pulling down the insertion tube downward and flange-connecting the flange portion of the insertion tube to the flange portion of the upper end portion of the second chute tube, the insertion tube is started. It is necessary to temporarily fix the plug, for example, at the time of the above-described IV step, since the flange portion of the insertion tube can be placed on the upper flange portion of the first chute tube. There is no need to support the weight of the tube. Therefore, rotation of the insertion tube for alignment of the bolt holes can be easily performed.

【0025】請求項9に係るごみ容器輸送装置の本発明
は、建物の各フロアを上下方向に貫通するように配管さ
れ、管内に投入されたごみ容器を下方に導く垂直輸送管
と、該垂直輸送管に前記ごみ容器を投入すべく所定フロ
アに設置されたごみ投入装置とを備えたごみ容器輸送装
置において、前記垂直輸送管が、請求項1、2、3、
4、又は5記載の垂直輸送管であることを特徴とする。
According to a ninth aspect of the present invention, there is provided a garbage container transport apparatus, comprising: a vertical transport pipe which is piped so as to vertically penetrate each floor of a building and guides a trash container inserted into the pipe downward; A garbage container transport device comprising: a refuse input device installed on a predetermined floor for charging the refuse container into a transport pipe; wherein the vertical transport pipe comprises:
4. The vertical transport pipe according to 4 or 5.

【0026】この請求項9の発明によると、ごみ容器輸
送装置の主要構成部材である垂直輸送管について請求項
1〜5で述べた作用及び効果がある。したがって、この
ような垂直輸送管を備えたごみ容器輸送装置において
は、垂直輸送管の組立が容易であり、全体としても組立
が容易になる。
According to the ninth aspect of the present invention, the vertical transport pipe which is a main component of the refuse container transporting apparatus has the functions and effects described in the first to fifth aspects. Therefore, in the garbage container transport device provided with such a vertical transport pipe, the vertical transport pipe is easy to assemble, and the assembly as a whole is also easy.

【0027】[0027]

【発明の実施の形態】以下、図面に沿って、本発明の実
施の形態について説明する。
Embodiments of the present invention will be described below with reference to the drawings.

【0028】〈実施の形態1〉図1に、本発明に係る垂
直輸送管の縦断面図を示す。なお、同図は、主に差込管
とシュート管の連結状態を示すものである。
Embodiment 1 FIG. 1 shows a vertical sectional view of a vertical transport pipe according to the present invention. FIG. 3 mainly shows a connection state between the insertion tube and the chute tube.

【0029】垂直輸送管は、上下2本のシュート管(以
下、上方のシュート管と下方のシュート管とを区別する
必要がある場合には、上方のシュート管を10A、下方
のシュート管を10Bといい、両者を区別する必要がな
い場合には、単にシュート管10というものとする。)
と、差込管20とによって構成されている。
The vertical transport pipe is composed of two upper and lower chute pipes (hereinafter, when it is necessary to distinguish between an upper chute pipe and a lower chute pipe, the upper chute pipe is 10A and the lower chute pipe is 10B. If it is not necessary to distinguish between the two, it is simply referred to as the chute tube 10.)
And the insertion tube 20.

【0030】シュート管10は、パイプ状の本体11
と、その下端部11bに形成された大径のフランジ部1
2と、上端部11aに形成された連結部13とを有す
る。連結部13は、円筒状の部材を先端部11aに嵌合
した後、例えば溶接によって固着することにより形成さ
れており、その内径Dは、後述の差込管20の挿入部2
1の外径よりもわずかに大きく設定されている。
The chute tube 10 has a pipe-shaped main body 11.
And a large-diameter flange portion 1 formed at the lower end portion 11b.
2 and a connecting portion 13 formed on the upper end portion 11a. The connecting portion 13 is formed by fitting a cylindrical member to the distal end portion 11a and then fixing it by welding, for example. The inner diameter D of the connecting portion 13 is the insertion portion 2 of the insertion tube 20 described later.
1 is set slightly larger than the outer diameter.

【0031】差込管20は、円筒状の本体21と、その
上端部に形成された大径のフランジ部22と、下端部に
形成された挿入部21bとを有する。ただし、本実施の
形態1においては、差込管20は、フランジ部22を除
く本体21全体が挿入部21bとなっており、その長さ
は、寸法Hに設定されている。なお、同図に示す差込管
20は、その挿入部21bの長さHが、下方のシュート
管10Bの上端縁から連結部13の上端縁までの長さよ
りも短く設定されており、したがって、垂直輸送管の組
立時に、差込管20の挿入部21bを連結部13に挿入
すると、その全体が連結部の内側に収まり、フランジ部
22が連結部13の上端縁に当接するようになってい
る。
The insertion tube 20 has a cylindrical main body 21, a large-diameter flange portion 22 formed at an upper end thereof, and an insertion portion 21b formed at a lower end thereof. However, in the first embodiment, the insertion tube 20 is configured such that the entire body 21 except for the flange portion 22 is the insertion portion 21b, and the length thereof is set to the dimension H. In the insertion tube 20 shown in the figure, the length H of the insertion portion 21b is set to be shorter than the length from the upper end edge of the lower chute tube 10B to the upper end edge of the connecting portion 13; When the insertion portion 21b of the insertion tube 20 is inserted into the connecting portion 13 during the assembly of the vertical transport pipe, the entirety thereof fits inside the connecting portion, and the flange portion 22 comes into contact with the upper edge of the connecting portion 13. I have.

【0032】この長さHにフランジ部22の厚さを加え
た寸法が、突出可能長さということになり、この突出可
能長さを、下方のシュート管10Bの連結部13の上端
と、上方のシュート管10Aのフランジ部22との間の
間隙h、すなわち、下方のシュート管10Bと上方のシ
ュート管10Aとの間の間隙hよりも大きく設定してい
る。これにより、上方のシュート管10Aと下方のシュ
ート管10Bとの間を、差込管20により、簡単に連結
することができる。さらに、差込管20の内径は、シュ
ート管10の内径と同じに設定してある。
The length obtained by adding the thickness of the flange portion 22 to the length H is referred to as a protrudable length. The protrudable length is determined by the upper end of the connecting portion 13 of the lower chute tube 10B and the upper portion. Is larger than the gap h between the chute tube 10A and the flange portion 22, that is, the gap h between the lower chute tube 10B and the upper chute tube 10A. Thereby, the upper chute pipe 10A and the lower chute pipe 10B can be easily connected by the insertion pipe 20. Further, the inner diameter of the insertion tube 20 is set to be the same as the inner diameter of the chute tube 10.

【0033】シュート管10の連結部13に対する差込
管20の挿入部21bの挿入を、精度のよい嵌合とする
と、これにより、垂直輸送管の内部を適度に密閉するこ
とができるが、この場合には、挿入部21bを抜き差し
しての突出長さ調整や、上方のシュート管10Aのフラ
ンジ部12に対する差込管20のフランジ部22のボル
ト孔位置合わせのための回転が行いにくくなるため、連
結部13に対する差込管20の挿入部21bの嵌合は、
適度にゆるい嵌合(遊嵌)とするとよい。ただし、この
場合には、図1に示すように、連結部13と挿入部21
bとの間を、接着剤や粘着テープ等のシール部材Aで密
封するものとする。
If the insertion portion 21b of the insertion tube 20 is inserted into the connecting portion 13 of the chute tube 10 with high accuracy, the inside of the vertical transport tube can be appropriately sealed. In this case, it is difficult to adjust the protrusion length by inserting / removing the insertion portion 21b or to rotate the flange portion 22 of the insertion tube 20 with respect to the flange portion 12 of the upper chute tube 10A. The fitting of the insertion portion 21b of the insertion tube 20 to the connection portion 13 is as follows.
A moderately loose fit (free fit) may be used. However, in this case, as shown in FIG.
The space between b and b is sealed with a sealing member A such as an adhesive or an adhesive tape.

【0034】差込管20は、下方のシュート管10Bに
対しては、挿入部を連結部13に挿入するいわゆる差し
込み結合とし、また、上方のシュート管10Aに対して
は、フランジ部22をシュート管10Aのフランジ部1
2にボルト(同図では一点鎖線で示す)で締結するいわ
ゆるフランジ結合としている。
The insertion tube 20 is a so-called insertion connection in which an insertion portion is inserted into the connection portion 13 with respect to the lower chute tube 10B, and the flange portion 22 is formed with a chute with respect to the upper chute tube 10A. Flange part 1 of pipe 10A
2 is a so-called flange connection which is fastened by bolts (indicated by a dashed line in the figure).

【0035】したがって、突出長さの調整が容易であ
り、かつ、フランジ結合に際し、差込管20を回転させ
てボルト孔位置を合わせるのが容易である。
Therefore, it is easy to adjust the protruding length and to easily adjust the position of the bolt hole by rotating the insertion tube 20 at the time of flange connection.

【0036】なお、図1における下方のシュート管10
Bの本外11の上部11aには内側に面取り11cを設
け、垂直輸送管内を落下するごみ容器が円滑に通過する
ように、また、垂直輸送管内でごみが飛散した場合に、
このごみが引っ掛からないようにしている。また、差込
管20の挿入部21bの下端には、外側に面取り21c
を設けて、連結部13に対する挿入を容易にしている。
垂直輸送管における、他の差込管近傍についても同様の
構成である。
The lower chute tube 10 in FIG.
A chamfer 11c is provided on the upper part 11a of the outer part 11 of the B, so that the garbage container falling in the vertical transport pipe passes smoothly, and when garbage is scattered in the vertical transport pipe,
This garbage is kept from getting caught. In addition, the lower end of the insertion portion 21b of the insertion tube 20 has an outer chamfer 21c.
Are provided to facilitate insertion into the connecting portion 13.
The same configuration applies to the vicinity of another insertion pipe in the vertical transport pipe.

【0037】なお、差込管の介装を必要としない場合に
は、シュート管10とシュート管10とを直接的にフラ
ンジ結合するものとする。この場合には、例えば一方の
シュート管10は、連結部を有さず、上端部と下端部と
の双方ともにフランジ部12が形成されているものであ
ってもよい。また、シュート管10の長さについては、
必要に応じて設定することができるので、例えば、上端
部と下端部とにフランジ部を有し、普通の長さのシュー
ト管10よりも長さが短いだけのシュート管(以下「短
管」という)を使用するようにしてもよい。この短管
は、普通のシュート管10と組み合わせて、長さ調整に
使用する。すなわち、この短管は、大まかな長さ調整に
使用し、差込管20は、シュート管10又は短管の連結
の際の、長さの微調整に使用するものである。
When the insertion of the insertion pipe is not required, the chute pipe 10 and the chute pipe 10 are directly flange-connected. In this case, for example, one of the chute tubes 10 may have no connecting portion, and the flange portions 12 may be formed on both the upper end and the lower end. Also, regarding the length of the chute tube 10,
Since it can be set as required, for example, a chute tube (hereinafter, referred to as a “short tube”) having a flange portion at an upper end portion and a lower end portion and having a shorter length than the chute tube 10 having a normal length May be used. This short tube is used for adjusting the length in combination with the ordinary chute tube 10. That is, the short pipe is used for roughly adjusting the length, and the insertion pipe 20 is used for fine adjustment of the length when the chute pipe 10 or the short pipe is connected.

【0038】〈実施の形態2〉実施の形態2として、垂
直輸送管の組立方法について説明する。
<Embodiment 2> As Embodiment 2, a method of assembling a vertical transport pipe will be described.

【0039】なお、組立に使用するシュート管は、実施
の形態1で説明したシュート管10A、10B、及び差
込管20とする。
The chute tubes used in the assembly are the chute tubes 10A and 10B and the insertion tube 20 described in the first embodiment.

【0040】第Iの工程として、先ず下方のシュート管
10Bを所定の位置に垂直に固定する。
In the first step, first, the lower chute tube 10B is vertically fixed at a predetermined position.

【0041】次の第IIの工程で、差込管20を挿入す
る。差込管20は、挿入部21bを下方に、また、フラ
ンジ部22を上方に向けた状態で、下方のシュート管1
0Bの連結部13に挿入部21bを上方から挿入する。
このとき、挿入部21bの全体を連結部13に挿入し、
連結部13の上端縁に、差込管20のフランジ部22が
当接するようにする。また、連結部13と挿入部21b
との嵌合状態は、遊嵌とする。これにより、連結部13
に対する差込管20の抜き差し動作を容易にして、突出
長さの調整を容易にするとともに、差込管20の回転動
作も容易にすることができる。
In the next step II, the insertion tube 20 is inserted. The insertion tube 20 is inserted into the lower chute tube 1 with the insertion portion 21b facing downward and the flange portion 22 facing upward.
The insertion portion 21b is inserted into the connecting portion 13 of the OB from above.
At this time, the entire insertion portion 21b is inserted into the connection portion 13,
The flange portion 22 of the insertion tube 20 is in contact with the upper edge of the connecting portion 13. Further, the connecting portion 13 and the insertion portion 21b
Is loosely fitted. Thereby, the connecting portion 13
The insertion and removal operation of the insertion tube 20 with respect to, the adjustment of the protrusion length can be facilitated, and the rotation operation of the insertion tube 20 can also be facilitated.

【0042】第IIIの工程において、差込管20の上
方の所定の位置に上方のシュート管10Aを垂直に固定
する。このとき、下方のシュート管10Bの上端縁、つ
まり連結部13の上端縁と、上方のシュート管10Aの
下端縁との間の間隙がhとなるようにする。この寸法h
は、差込管20の突出長さの調整範囲内に入るように設
定する。また、シュート管10Aの固定の際の回転方向
の位置は、差込管20が下方のシュート管10Bに対し
て差込結合されていることに基づき、任意とすることが
できる。
In the third step, the upper chute tube 10A is vertically fixed at a predetermined position above the insertion tube 20. At this time, the gap between the upper edge of the lower chute tube 10B, that is, the upper edge of the connecting portion 13 and the lower edge of the upper chute tube 10A is set to h. This dimension h
Is set so as to fall within the adjustment range of the protruding length of the insertion tube 20. Further, the position of the chute tube 10A in the rotation direction at the time of fixing can be arbitrarily determined based on the fact that the insertion tube 20 is plugged into the lower chute tube 10B.

【0043】第IVの工程において、差込管20を上方
のシュート管10Aに連結する。差込管20を上方に引
き上げて、そのフランジ部22を上方のシュート管10
Aのフランジ部12に合わせる。このとき、両フランジ
部22、12間には、シール材を介装する。さらに、差
込管20を回転させて、そのフランジ部22のボルト孔
を、上方のシュート管10Aのボルト孔に合わせる。そ
して両フランジ22、12を数本のボルトによって締結
する。これにより、下方のシュート管10B及び上方の
シュート管10Aに対する差込管20の連結を完了す
る。連結後、連結部13と挿入部21bとの間に、シー
ル部材Aを設けることで、垂直輸送管の内部を密閉す
る。
In the fourth step, the insertion tube 20 is connected to the upper chute tube 10A. The insertion tube 20 is pulled up, and its flange portion 22 is moved upward by the chute tube 10.
A with the flange 12 of FIG. At this time, a sealing material is interposed between the two flange portions 22 and 12. Further, the insertion tube 20 is rotated so that the bolt holes of the flange portion 22 are aligned with the bolt holes of the upper chute tube 10A. Then, the two flanges 22 and 12 are fastened with several bolts. Thus, the connection of the insertion tube 20 to the lower chute tube 10B and the upper chute tube 10A is completed. After the connection, a seal member A is provided between the connection portion 13 and the insertion portion 21b to seal the inside of the vertical transport pipe.

【0044】このように、差込管20は、下方のシュー
ト管10Bに対して、突出長さ調整自在、かつ回転自在
であるので、上方のシュート管10Aに連結する際、そ
の連結作業は容易なものとなる。換言すると、差込管2
0によって上下2本のシュート管10を連結することに
より、一般に重量物であるシュート管10は所定の位置
に固定した後は、上下方向に移動させたり、回転させた
りする必要がないのでその連結作業を簡素化することが
できる。
As described above, since the insertion tube 20 is freely adjustable in the protruding length and rotatable with respect to the lower chute tube 10B, the connection operation is easy when connecting to the upper chute tube 10A. It becomes something. In other words, plug-in tube 2
By connecting the upper and lower two chute tubes 10 with each other, the chute tube 10, which is generally heavy, does not need to be moved up and down or rotated after being fixed at a predetermined position. Work can be simplified.

【0045】上述の第Iの工程〜第IVの工程を順次に
行ってシュート管10及び差込管20を次々に連結する
ことにより、建物のフロアを上下方向に貫通する垂直輸
送管を構築することができる。
By sequentially performing the above-described steps I to IV to connect the chute pipe 10 and the insertion pipe 20 one after another, a vertical transport pipe penetrating vertically through the floor of the building is constructed. be able to.

【0046】なお、この組立方法においては、差込管2
0を、その挿入部を下方に、そして、フランジ部22を
上方にした姿勢で、連結する方法について説明したが、
差込管20は、この状態に限らず、上下逆にした状態で
連結することもできる。この場合には、上方のシュート
管10は、その下部に連結部13が配置されるように
し、差込管20は、その連結部13に下方から挿入する
ようになり、挿入後、落下を防止すべくいったん仮止め
することが必要となる。この外の組立工程については、
前記とほぼ同様なので、重複説明は省略する。
In this assembling method, the insertion tube 2
Although the method of connecting 0 in a posture in which the insertion portion is downward and the flange portion 22 is upward has been described,
The insertion pipe 20 is not limited to this state, and may be connected in an upside down state. In this case, the upper chute tube 10 is provided with the connecting portion 13 at its lower portion, and the insertion tube 20 is inserted into the connecting portion 13 from below, thereby preventing the dropping after the insertion. It is necessary to temporarily fix it once. For other assembly processes,
Since it is almost the same as the above, repeated explanation is omitted.

【0047】〈実施の形態3〉実施の形態3では、前述
の構成、及び上述の組立方法に係る垂直輸送管、及びこ
れにごみ容器を投入するごみ投入装置30を主要構成部
分とするごみ容器輸送装置について説明する。
<Third Embodiment> In a third embodiment, a garbage container having the above-described configuration, the vertical transport pipe according to the above-described assembling method, and the garbage charging device 30 for charging the garbage container into the trash container. The transportation device will be described.

【0048】図2は、高層ビルに設置されたごみ容器輸
送装置の、10F(10階)と11F(11階)の部分
を示している。なお、同図に示す、シュート管10B
は、ごみ投入装置30の一部として、これを上下方向に
貫通するようにして組み込まれている。また、本実施の
形態ではシュート管10Aと差込管20との間には、短
管10Cを介装するようにしている。この短管10Cに
は、垂直輸送管の内部を落下するごみ容器の落下速度を
検知するセンサSが設置されており、このセンサの出力
に基づいて、垂直輸送管内部の密閉度を調整し、落下速
度を適宜に制御するようにしている。ただし、センサの
動作や落下速度の制御については、本発明と直接的な関
係はないので説明は省略する。
FIG. 2 shows the 10F (10th floor) and 11F (11th floor) portions of the garbage container transport device installed in a high-rise building. The chute tube 10B shown in FIG.
Is incorporated as a part of the refuse input device 30 so as to penetrate it vertically. In this embodiment, a short pipe 10C is interposed between the chute pipe 10A and the insertion pipe 20. The short pipe 10C is provided with a sensor S for detecting a falling speed of the garbage container falling inside the vertical transport pipe. Based on an output of this sensor, the degree of sealing inside the vertical transport pipe is adjusted. The falling speed is controlled appropriately. However, the operation of the sensor and the control of the falling speed are not directly related to the present invention, and therefore the description is omitted.

【0049】図3〜図6を参照して、ごみ容器輸送装置
の組立方法、及び構成について説明する。
With reference to FIG. 3 to FIG. 6, the assembling method and configuration of the garbage container transport device will be described.

【0050】まず、図3に示すように、ごみ投入装置3
0をキャスタ31を利用して、11Fの所定の位置に搬
入する。
First, as shown in FIG.
0 is carried into a predetermined position on 11F using the casters 31.

【0051】次に、図4に示すように、12Fの床の開
口部F1に、治具51を設置し、この治具51にチェー
ンブロック52を取り付ける。チェーンブロック52か
ら張架したワイヤ53によって、投入装置30を吊り上
げる。
Next, as shown in FIG. 4, a jig 51 is set in the opening F1 of the floor of the 12F, and a chain block 52 is attached to the jig 51. The charging device 30 is lifted by the wire 53 stretched from the chain block 52.

【0052】吊り上げた投入装置30を、図5のよう
に、架台55、56の上に載せる。チェーンブロック5
2からワイヤ54を垂らして、ごみ投入装置30のシュ
ート管10Bの内部を通過させ、さらに、10Fまで垂
らして、シュート管10Aの下部に取り付けた後、ワイ
ヤ54を引き上げて、シュート管10Aを吊り上げる。
シュート管10Aの上部のフランジ部12がシュート管
10Bの下部のフランジ部12に当接するまで吊り上
げ、両フランジ部12、12をボルトで締結してフラン
ジ結合する。
The suspended loading device 30 is placed on the gantry 55, 56 as shown in FIG. Chain block 5
The wire 54 is hung from 2 and passed through the inside of the chute tube 10B of the refuse input device 30. Further, the wire 54 is hung down to 10F and attached to the lower part of the chute tube 10A. Then, the wire 54 is pulled up to lift the chute tube 10A. .
The chute tube 10A is lifted up until the upper flange portion 12 of the chute tube 10B comes into contact with the lower flange portion 12 of the chute tube 10B, and the two flange portions 12, 12 are fastened with bolts to be flanged.

【0053】図6に示すように、ごみ投入装置30の下
部に脚部32、32を取り付け、脚部32、32を介し
て、ごみ投入装置30を床上に設置し、架台55、56
を取り除く。
As shown in FIG. 6, the legs 32, 32 are attached to the lower part of the refuse input device 30, and the refuse input device 30 is installed on the floor via the legs 32, 32.
Get rid of.

【0054】以上では、12Fの場合について説明した
が、同様の一連の作業を、1F、2F、3F……と、順
に上方のフロアに行っていき、それぞれのフロアにおい
て、ごみ投入装置30と、シュート管10Bと、シュー
ト管10Aとを一体に下ユニットを設置する。なお、こ
のユニットは、ごみ投入装置30のシュート管10Bの
下方にシュート管10Aが連結されたことにより、重心
が低くなり、安定した状態を維持することができるた
め、後の短管10Cの取り付け等の作業を安全にかつ円
滑に行うことができる。
In the above description, the case of 12F has been described, but a series of similar operations are sequentially performed on the upper floor in the order of 1F, 2F, 3F,... The lower unit is installed integrally with the chute tube 10B and the chute tube 10A. In this unit, since the chute pipe 10A is connected below the chute pipe 10B of the refuse input device 30, the center of gravity is lowered and a stable state can be maintained. And the like can be performed safely and smoothly.

【0055】ごみ投入装置と一体のシュート管10Bの
上部に差込管20を上方から挿入する。このとき差込管
20は、実施の形態2で説明したように、その挿入部の
前部が挿入され、そのフランジ部がシュート管10Bの
上端縁に当接する。この状態における差込管20の上端
部とシュート管10Aの下端部との間隙は、次に連結さ
れる短管10Cの長さよりも長く設定されている。
The insertion pipe 20 is inserted from above into the upper part of the chute pipe 10B integrated with the refuse input device. At this time, as described in the second embodiment, the insertion tube 20 has the front portion of the insertion portion inserted, and the flange portion abuts on the upper edge of the chute tube 10B. In this state, the gap between the upper end of the insertion tube 20 and the lower end of the chute 10A is set longer than the length of the short tube 10C to be connected next.

【0056】短管10Cを差込管20とシュート管10
Aとの間にセットし、短管10Cの上端部のフランジ部
をシュート管10A下端部のフランジ部にフランジ結合
する。
The short pipe 10C is connected to the insertion pipe 20 and the chute pipe 10
A, and the flange at the upper end of the short pipe 10C is flanged to the flange at the lower end of the chute 10A.

【0057】差込管20を少し引き上げて、その上部の
フランジ部を、短管10C下部のフランジ部に合わせ、
さらに適宜に回転させてボルト孔を合わせた後、数本の
ボルトによってフランジ結合する。
The insertion tube 20 is slightly lifted, and its upper flange is aligned with the lower flange of the short tube 10C.
Further, after the bolt holes are aligned by appropriately rotating, the flanges are joined by several bolts.

【0058】必要に応じ、差込管20とシュート管10
Bとの間をシール部材等によって密封する。
If necessary, the insertion tube 20 and the chute tube 10
B is sealed with a sealing member or the like.

【0059】以上の短管10Cのフランジ結合、差込管
20のフランジ結合を各フロアに渡って行うことによ
り、各フロアに投入装置30を設置し、かつ各フロアを
上下方向に貫通する垂直輸送管を構成することができ
る。最後に、垂直輸送管の上端部及び下端部を閉蓋し
て、垂直輸送管内部を適宜に密閉することができる。
By performing the flange connection of the short pipe 10C and the flange connection of the insertion pipe 20 over each floor, the loading device 30 is installed on each floor and the vertical transportation penetrating each floor in the vertical direction. Tubes can be configured. Finally, the upper end and the lower end of the vertical transport pipe can be closed to properly seal the inside of the vertical transport pipe.

【0060】なお、前記のごみ容器輸送装置によると、
実施の形態1、2で説明した、垂直輸送管の組立の容易
性に基づき、ごみ容器輸送装置全体の組立時の作業性を
良好にして、作業時間を少なくすることが可能となる。
According to the above-mentioned garbage container transport device,
Based on the easiness of assembling the vertical transport pipe described in the first and second embodiments, it is possible to improve the workability at the time of assembling the entire garbage container transport apparatus and reduce the work time.

【0061】[0061]

【発明の効果】以上説明したように、本発明による垂直
輸送管、及びその組立方法によると、によると、差込管
がシュート管に対して、突出長さ調整可能で、かつ回転
可能に構成されているので、上方と下方とのシュート管
を先に位置決め固定した後に、両シュート管を差込管に
よって簡単に連結することができるので、作業性が向上
する。
As described above, according to the vertical transport pipe and the method of assembling the same according to the present invention, according to the present invention, the insertion pipe is configured such that the protrusion length can be adjusted with respect to the chute pipe and can be rotated. Since the upper and lower chute tubes are first positioned and fixed, the two chute tubes can be easily connected by the insertion tube, so that the workability is improved.

【0062】また、本発明に係るごみ容器輸送装置によ
ると、垂直輸送管の組立の容易性に基づき、ごみ容器輸
送装置全体の組立時の作業性を向上させて、作業時間を
短縮することができる。
Further, according to the waste container transport device of the present invention, it is possible to improve the workability of assembling the entire waste container transport device based on the ease of assembling the vertical transport pipe, thereby shortening the work time. it can.

【図面の簡単な説明】[Brief description of the drawings]

【図1】実施の形態1における、シュート管と差込管と
の連結状態を示す縦断面図である。
FIG. 1 is a longitudinal sectional view showing a connection state between a chute tube and an insertion tube in a first embodiment.

【図2】実施の形態3におけるごみ容器輸送装置の構成
の一部を示す図である。
FIG. 2 is a diagram illustrating a part of a configuration of a refuse container transport device according to a third embodiment.

【図3】ごみ投入装置を搬入するようすを示す図であ
る。
FIG. 3 is a view showing a state in which a refuse input device is carried in.

【図4】ごみ投入装置をチェーンブロックで吊り上げた
要旨を示す図である。
FIG. 4 is a view showing a gist of the garbage injecting device suspended by a chain block.

【図5】ごみ投入装置のシュート管に下方から別のシュ
ート管を取り付けるようすを示す図である。
FIG. 5 is a view showing that another chute pipe is attached to the chute pipe of the refuse input device from below.

【図6】シュート管とシュート管との間に短管と差込管
とを介装したようすを示す図である。
FIG. 6 is a view showing a state in which a short pipe and an insertion pipe are interposed between chute pipes.

【符号の説明】[Explanation of symbols]

10 シュート管 10A 上方のシュート管 10B 下方のシュート管 11 本体 11a 上端部 11b 下端部 11c 面取り 12 フランジ部 13 連結部 20 差込管 21 本体 21a 上端部 21b 挿入部 22 フランジ部 30 ごみ投入装置 Reference Signs List 10 chute tube 10A upper chute tube 10B lower chute tube 11 main body 11a upper end portion 11b lower end portion 11c chamfer 12 flange portion 13 connection portion 20 insertion tube 21 main body 21a upper end portion 21b insertion portion 22 flange portion 30 trash injection device

Claims (9)

【特許請求の範囲】[Claims] 【請求項1】 建物の各フロアを上下方向に貫通するよ
うに配管され、管内に投入されたごみ容器を下方に導く
垂直輸送管において、 上下方向に連結された複数のシュート管と、 これらシュート管のうちの、上下に隣接する上方のシュ
ート管の下端部と下方のシュート管の上端部との間に介
装された差込管とを備え、 該差込管は、前記上方のシュート管の下端部と前記下方
のシュート管の上端部とのうちの一方の端部に差込結合
される挿脱自在の挿入部と、他方の端部にフランジ結合
されるフランジ部とを有し、前記一方の端部に対する前
記挿入部の挿入長さを変更することで、前記一方の端部
から前記フランジ部までの突出長さを調整するととも
に、該突出長さの調整可能範囲が前記シュート管におけ
る前記一方の端部と前記他方の端部との間の間隙よりも
長く設定されている、 ことを特徴とする垂直輸送管。
1. A vertical transportation pipe which is piped vertically through each floor of a building and guides a refuse container put in the pipe downward, comprising: a plurality of chute pipes connected in a vertical direction; And an insertion pipe interposed between a lower end of the upper chute pipe and an upper end of the lower chute pipe which are vertically adjacent to each other. A lower end portion and an upper end portion of the lower chute tube, the insertion portion being insertably connected to one end portion of the lower end portion, and a flange portion flanged to the other end portion, By changing the insertion length of the insertion portion with respect to the one end, the protrusion length from the one end to the flange portion is adjusted, and the adjustable range of the protrusion length is the chute tube. The one end and the other end The vertical transport pipe is set to be longer than the gap between the vertical transport pipes.
【請求項2】 前記差込管の内径が前記シュート管の内
径と同じに設定されるとともに、該差込管の挿入部の挿
入先となる前記シュート管の一方の端部に、前記挿入部
の外周面が嵌合される連結部を有する、 ことを特徴とする請求項1記載の垂直輸送装置。
2. An inner diameter of the insertion tube is set to be the same as an inner diameter of the chute tube, and the insertion portion is provided at one end of the chute tube into which an insertion portion of the insertion tube is inserted. The vertical transport device according to claim 1, further comprising a connecting portion to which an outer peripheral surface of the vertical transport device is fitted.
【請求項3】 前記差込管の挿入部と前記シュート管の
連結部との間を密封するシール部材を備える、 ことを特徴とする請求項2に記載の垂直輸送管。
3. The vertical transport pipe according to claim 2, further comprising a seal member that seals between an insertion portion of the insertion pipe and a connecting portion of the chute pipe.
【請求項4】 前記差込管は、前記挿入部を下方に向
け、前記フランジ部を上方に向けた状態で連結される、 ことを特徴とする請求項1〜3に記載の垂直輸送管。
4. The vertical transport pipe according to claim 1, wherein the insertion pipe is connected with the insertion portion facing downward and the flange portion facing upward.
【請求項5】 前記差込管は、前記挿入部を上方に向
け、前記フランジ部を下方に向けた状態で連結される、 ことを特徴とする請求項1〜3に記載の垂直輸送管。
5. The vertical transport pipe according to claim 1, wherein the insertion pipe is connected with the insertion portion facing upward and the flange portion facing downward.
【請求項6】 建物の各フロアを上下方向に貫通するよ
うにシュート管及び差込管を上下方向に連結して構成さ
れ、管内に投入されたごみ容器を下方に導く垂直輸送管
の組立方法において、 第1のシュート管を所定位置に垂直に固定する第Iの工
程と、 一方の端部に挿入部、他方の端部にフランジ部を有し、
前記第1のシュート管に対する挿入長さを変更すること
で前記第1のシュート管の端部からの突出長さを調整可
能な差込管における前記挿入部を前記第Iのシュート管
の端部に挿入する第IIの工程と、 前記差込管のフランジ部に対向するフランジ部を有する
第2のシュート管を、所定間隙を介して前記差込管に対
向するように垂直に固定する第IIIの工程と、 前記第1のシュート管の端部から前記差込管を引き出し
て前記挿入長さを短くして前記突出長さを長くし、前記
シュート管のフランジ部と前記第2のシュート管のフラ
ンジ部とをフランジ結合する第IVの工程とを有する、 ことを特徴とする垂直輸送管の組立方法。
6. A method for assembling a vertical transport pipe which is constructed by vertically connecting a chute pipe and an insertion pipe so as to vertically penetrate each floor of a building, and for guiding a waste container put in the pipe downward. A first step of vertically fixing the first chute tube at a predetermined position; and an insertion portion at one end and a flange portion at the other end.
The insertion portion of the insertion tube whose length of protrusion from the end of the first chute tube can be adjusted by changing the insertion length with respect to the first chute tube is connected to the end of the I-chute tube. And a second step of vertically fixing a second chute tube having a flange portion facing the flange portion of the insertion tube so as to face the insertion tube via a predetermined gap. And pulling out the insertion tube from the end of the first chute tube, shortening the insertion length and increasing the protruding length, the flange portion of the chute tube and the second chute tube And a fourth step of flange-joining the flange portion with the flange portion.
【請求項7】 前記IIの工程において前記差込管が挿
入される前記第1のシュート管の端部が上端部である、 ことを特徴とする請求項6に記載の垂直輸送管の組立方
法。
7. The method for assembling a vertical transport pipe according to claim 6, wherein the end of the first chute pipe into which the insertion pipe is inserted in the step II is an upper end. .
【請求項8】 前記IIの工程において前記差込管が挿
入される前記第1のシュート管の端部が下端部である、 ことを特徴とする請求項6に記載の垂直輸送管の組立方
法。
8. The method for assembling a vertical transport pipe according to claim 6, wherein the end of the first chute pipe into which the insertion pipe is inserted in the step II is a lower end. .
【請求項9】 建物の各フロアを上下方向に貫通するよ
うに配管され、管内に投入されたごみ容器を下方に導く
垂直輸送管と、該垂直輸送管に前記ごみ容器を投入すべ
く所定フロアに設置されたごみ投入装置とを備えたごみ
容器輸送装置において、 前記垂直輸送管が、請求項1〜5に記載の垂直輸送管で
ある、 ことを特徴とするごみ容器輸送装置。
9. A vertical transport pipe which is piped vertically through each floor of a building and guides a refuse container inserted into the pipe, and a predetermined floor for charging the trash container into the vertical transport pipe. A garbage container transport device provided with a refuse input device installed in a garbage container, wherein the vertical transport pipe is the vertical transport pipe according to any one of claims 1 to 5.
JP25184397A 1997-09-17 1997-09-17 Vertical transport pipe and its assembling method, and garbage contained transport device Pending JPH1179308A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP25184397A JPH1179308A (en) 1997-09-17 1997-09-17 Vertical transport pipe and its assembling method, and garbage contained transport device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP25184397A JPH1179308A (en) 1997-09-17 1997-09-17 Vertical transport pipe and its assembling method, and garbage contained transport device

Related Child Applications (1)

Application Number Title Priority Date Filing Date
JP2007019592A Division JP4514761B2 (en) 2007-01-30 2007-01-30 Assembly method of vertical transport pipe

Publications (1)

Publication Number Publication Date
JPH1179308A true JPH1179308A (en) 1999-03-23

Family

ID=17228754

Family Applications (1)

Application Number Title Priority Date Filing Date
JP25184397A Pending JPH1179308A (en) 1997-09-17 1997-09-17 Vertical transport pipe and its assembling method, and garbage contained transport device

Country Status (1)

Country Link
JP (1) JPH1179308A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003061825A (en) * 2001-08-21 2003-03-04 Kajiwara Kogyo Kk Structure for mounting and demounting discharging valve for foodstuffs
JP2009523109A (en) * 2006-01-13 2009-06-18 ジョン、クレメント、プレストン Dust chute

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003061825A (en) * 2001-08-21 2003-03-04 Kajiwara Kogyo Kk Structure for mounting and demounting discharging valve for foodstuffs
JP2009523109A (en) * 2006-01-13 2009-06-18 ジョン、クレメント、プレストン Dust chute

Similar Documents

Publication Publication Date Title
JPS637121A (en) Method and apparatus for installing cable in conduit
NL1014713A1 (en) Method and apparatus for recording a well with nuclear magnetic resonance.
US20080006802A1 (en) Pulley for assisting in the take-up or deployment of a heterogeneous system
JPH1179308A (en) Vertical transport pipe and its assembling method, and garbage contained transport device
ATE19192T1 (en) DEVICE FOR SALIVA COLLECTION.
JP2007182327A (en) Method of assembling vertical transport pipe
US5269172A (en) Processes and apparatus for the prevention, detection and/or repair of leaks or avenues for leaks from above-ground storage tanks
US20040083827A1 (en) Lysimeter methods and apparatus
JP2004068446A (en) Existing pile investigating method and existing pile reinforcing method
EP0360221A3 (en) Method and apparatus for making a sealed anchor in a soil area bordered by an immersed wall, especially a sheet piling wall
KR102241008B1 (en) Apparatus for inspecting and removing foreign substances in steam generator, and system for same
JP3025114B2 (en) Apparatus and method for opening sampling tube
JP2008045332A (en) Hollow tube structure, and formation method for columnar solidified pile
JPH10221225A (en) Soil gas sampling device
CN112539297A (en) Composite flexible pipe laying device
JPH0435799Y2 (en)
JPH0318923Y2 (en)
WO2009141854A1 (en) Filler takeout apparatus for sample column
JPH0660488B2 (en) Sand pile construction method
JPH08311868A (en) Leg installation method for surface structure
JPH0240516Y2 (en)
JPH01256633A (en) Sampling method for wall pipe test piece and device therefor
FIELDS A review of an updated synthesis of noise/annoyance relationships(Final Report)
JP4826499B2 (en) Device for removing packing from sample column
JPS59164989A (en) Device of driving movable neutron flux detecting system

Legal Events

Date Code Title Description
A621 Written request for application examination

Effective date: 20040902

Free format text: JAPANESE INTERMEDIATE CODE: A621

A977 Report on retrieval

Effective date: 20051226

Free format text: JAPANESE INTERMEDIATE CODE: A971007

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20060207

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20060403

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20061219

A521 Written amendment

Effective date: 20070117

Free format text: JAPANESE INTERMEDIATE CODE: A523