JPH11286276A - Train operation control system - Google Patents

Train operation control system

Info

Publication number
JPH11286276A
JPH11286276A JP10088901A JP8890198A JPH11286276A JP H11286276 A JPH11286276 A JP H11286276A JP 10088901 A JP10088901 A JP 10088901A JP 8890198 A JP8890198 A JP 8890198A JP H11286276 A JPH11286276 A JP H11286276A
Authority
JP
Japan
Prior art keywords
train
track circuit
kilometer
information
management system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP10088901A
Other languages
Japanese (ja)
Inventor
Makoto Tokumaru
真 徳丸
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Corp
Original Assignee
Mitsubishi Electric Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Corp filed Critical Mitsubishi Electric Corp
Priority to JP10088901A priority Critical patent/JPH11286276A/en
Publication of JPH11286276A publication Critical patent/JPH11286276A/en
Pending legal-status Critical Current

Links

Landscapes

  • Train Traffic Observation, Control, And Security (AREA)

Abstract

PROBLEM TO BE SOLVED: To trace a train normally even in the case of the occurrence of abnormal short circuit or the like of a track circuit by tracing the train on the basis of falling and rising information and kilometer distance information. SOLUTION: A travel kilometer correcting part corrects computed travel distance using timing of a train head part entering a new track circuit to make the falling of the corresponding track circuit, or using timing of a train tail part coming out of a certain track circuit to make the rising of the corresponding track circuit. That is, the entry of the train head part into the track circuit is detected by a relay interlocking device 8, and information is transmitted to a central computer system 1 via transmission devices 6, 4 and the like. In the central computer system 1, the name of the fallen track circuit is detected on the basis of transmitted data, and kilometer distance is computed by a kilometer distance computing table provided in the own device.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明が属する技術分野】この発明は、列車の運行を管
理する列車運行管理システムに関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a train operation management system for managing train operation.

【0002】[0002]

【従来の技術】図4は例えば特開平2−92776号公
報に示された従来の列車運行管理システムを示す構成図
である。 図において、1は列車の追跡,制御,ダイヤ管理を行う
中央計算機システムであって、予め設定されている順序
で運行指令を発生する。2は中央計算機システム1に接
続され、列車の在線位置,列車番号や制御内容や運行状
態などを表示する運行表示装置、3は手動にて進路の制
御を行う手動進路設定装置であって、中央計算機システ
1がダウンしたときなどに運行内容を手動入力する。4
は中央計算機システム1、手動進路設定装置3と後述の
駅処理部における各継電連動装置とを接続する伝送装置
であって、これらの構成要素1〜4で中央処理部5を構
成している。中央処理部5は運行管理センタ側に設けら
れている。
2. Description of the Related Art FIG. 4 is a block diagram showing a conventional train operation management system disclosed in, for example, Japanese Patent Application Laid-Open No. 2-92776. In the figure, reference numeral 1 denotes a central computer system for performing tracking, control, and schedule management of trains, and issues operation commands in a preset order. An operation display device 2 is connected to the central computer system 1 and displays a train location, a train number, control contents, an operation state, and the like. A manual route setting device 3 controls the route manually. The operation contents are manually input when the computer system 1 goes down. 4
Is a transmission device for connecting the central computer system 1, the manual route setting device 3, and each relay interlocking device in the station processing unit described later, and these components 1-4 constitute the central processing unit 5. . The central processing unit 5 is provided on the operation management center side.

【0003】6は中央処理部5の伝送装置4と接続され
た伝送装置、7は伝送装置6と継電連動装置8とを接続
する入出力装置であって、これらの構成要素6〜8で駅
処理部9を構成している。駅処理部9は駅側に設けられ
ている。継電連動装置8は列車の在線位置の検知や進路
出力,進路条件のチェックを行うもので、この継電連動
装置8と中央管理部1との情報伝送が実質的に伝送装置
4、6および入力装置7を介して行われる。
Reference numeral 6 denotes a transmission device connected to the transmission device 4 of the central processing unit 5, and 7 denotes an input / output device for connecting the transmission device 6 and the relay interlocking device 8, and these components 6 to 8 The station processing unit 9 is configured. The station processing unit 9 is provided on the station side. The relay interlocking device 8 detects the location of the train, outputs the route, and checks the route conditions. This is performed via the input device 7.

【0004】次に動作について説明する。中央管理部5
は、通常の状態では中央計算機システム1が予め設定さ
れている手順にしたがって運行指令を発生し、これを伝
送装置4、6および入力装置7を介して各継電連動装置
8に伝送する。各継電連動装置8は中央管理部5からの
指令に基づいて列車の進路を制御する。
Next, the operation will be described. Central Management Department 5
In the normal state, the central computer system 1 generates an operation command according to a preset procedure, and transmits this to each relay interlocking device 8 via the transmission devices 4, 6 and the input device 7. Each relay interlocking device 8 controls the route of the train based on a command from the central management unit 5.

【0005】また、この中央計算機システム1がダウン
した場合には、運行表示装置2に表示された運行内容な
どを見ながら指令員が手動進路設定装置3を操作して、
運行指令を手動介入して各継電連動装置8を直接制御す
る。また各駅処理部9は、中央管理部5から供給される
運行指令に基づいて駅を通る列車の進路制御を行う。
When the central computer system 1 goes down, the commander operates the manual course setting device 3 while watching the operation contents and the like displayed on the operation display device 2.
Each relay interlocking device 8 is directly controlled by manually interposing an operation command. In addition, each station processing unit 9 controls the route of a train passing through the station based on an operation command supplied from the central management unit 5.

【0006】[0006]

【発明が解決しようとする課題】ところで、従来の列車
運行管理システムは以上のように構成されているので、
軌道回路の異常短絡即ち異常落下(軌道回路リレーの閉
成状態)などが原因で、中央計算機システム内でのダイ
ヤと、継電連動装置から中央計算機システムに送られて
くる列車位置情報の対応がつかなくなった場合に、列車
の追跡が正常に行えなくなるという問題点があった。
The conventional train operation management system is configured as described above.
Due to an abnormal short circuit of the track circuit, that is, an abnormal drop (closed state of the track circuit relay), etc., the correspondence between the train schedule in the central computer system and the train position information sent from the relay interlocking device to the central computer system is lost. There is a problem in that when the vehicle stops, the train cannot be tracked normally.

【0007】この発明は上記のような問題点を解消する
ためになされたもので、軌道回路の異常短絡などが起こ
った場合でも、列車追跡を正常に行うことのできる列車
運行管理システムを提供することを目的とする。
SUMMARY OF THE INVENTION The present invention has been made to solve the above problems, and provides a train operation management system capable of normally performing track tracking even when an abnormal short circuit of a track circuit occurs. The purpose is to:

【0008】[0008]

【課題を解決するための手段】請求項1の発明に係る列
車運行管理システムは、軌道交通の運行を計算機を利用
して自動制御する運行管理システムにおいて、軌道回路
の落下およびこう上情報を検出する検出手段と、自列車
の在線するキロ程情報を管理する手段とを備え、上記落
下およびこう上情報と上記キロ程情報に基づいて列車追
跡を行うようにしたものである。
According to a first aspect of the present invention, there is provided a train operation management system for automatically controlling the operation of track traffic using a computer. And a means for managing information on the distance of the train on which the own train is located, and the train is tracked based on the information on the falling and climbing distance and the information on the km.

【0009】請求項2の発明に係る列車運行管理システ
ムは、請求項1の発明において、上記自列車の在線する
キロ程を管理する手段として、車軸に取り付けられた速
度発電機より得られるパルス数をカウントし、キロ程換
算する列車在線キロ程算出部を含む列車走行管理装置を
各列車が備えたものである。
A train operation management system according to a second aspect of the present invention is the train operation management system according to the first aspect, wherein the number of pulses obtained from a speed generator attached to an axle is used as means for managing the distance of the train on which the train is located. Each train is provided with a train travel management device including a train-on-rail-kilometer calculation unit that counts and converts the number of kilometers.

【0010】請求項3の発明に係る列車運行管理システ
ムは、請求項2の発明において、上記列車在線キロ程算
出部が、上記速度発電機から取得した距離情報を軌道回
路落下のタイミングで補正する手段を有するものであ
る。
According to a third aspect of the present invention, in the train operation management system according to the second aspect of the present invention, the train-on-kilometer calculation unit corrects distance information acquired from the speed generator at a timing of a track circuit fall. Means.

【0011】請求項4の発明に係る列車運行管理システ
ムは、請求項2の発明において、上記列車在線キロ程算
出部が、上記速度発電機から取得した距離情報を軌道回
路こう上のタイミングで補正する手段を有するものであ
る。
According to a fourth aspect of the present invention, in the train operation management system according to the second aspect of the present invention, the train-on-kilometer calculation unit corrects the distance information acquired from the speed generator at a timing above the track circuit. It has means to perform.

【0012】請求項5の発明に係る列車運行管理システ
ムは、請求項1〜4のいずれかの発明において、各列車
が軌道回路の中間に存在する場合、各列車が軌道回路上
のどの場所に存在するかを管理する列車追跡手段を備え
たものである。
According to a fifth aspect of the present invention, there is provided a train operation management system according to any one of the first to fourth aspects, wherein each train is located at any place on the track circuit when each train exists in the middle of the track circuit. It is provided with a train tracking means for managing the existence.

【0013】請求項6の発明に係る列車運行管理システ
ムは、請求項5の発明において、上記列車追跡手段が、
各列車の各駅への着発時刻を予想する際の現時点での列
車の存在位置として上記列車走行管理装置から得られる
列車在線位置を用いるものである。
According to a sixth aspect of the present invention, in the train operation management system according to the fifth aspect of the present invention, the train tracking means includes:
A train location line obtained from the train running management device is used as the current location of the train when estimating the arrival / departure time of each train at each station.

【0014】[0014]

【発明の実施の形態】以下、この発明の一実施の形態を
図について説明する。 実施の形態1.図1はこの発明の実施の形態1を示す構
成図である。図1において、図4と対応する部分には同
一符号を付し、その詳細説明を省略する。図において、
5Aは本実施の形態における中央処理部、10は中央計
算機システム1および伝送装置4に接続され、中央計算
機システム1からの情報を車上に配信するための列車無
線中央装置である。中央処理部5Aは運行管理センタ側
に設けられている。
DESCRIPTION OF THE PREFERRED EMBODIMENTS One embodiment of the present invention will be described below with reference to the drawings. Embodiment 1 FIG. FIG. 1 is a configuration diagram showing Embodiment 1 of the present invention. In FIG. 1, portions corresponding to FIG. 4 are denoted by the same reference numerals, and detailed description thereof will be omitted. In the figure,
Reference numeral 5A denotes a central processing unit in the present embodiment, and reference numeral 10 denotes a train radio central unit connected to the central computer system 1 and the transmission device 4 for distributing information from the central computer system 1 to a vehicle. The central processing unit 5A is provided on the operation management center side.

【0015】9Aは駅側に設けられた駅処理部であっ
て、この駅処理部9Aは、上述の伝送装置6、入出力装
置7および継電連動装置8の外に、伝送装置4に接続さ
れた伝送装置11と、この伝送装置11に接続され、列
車無線中央装置10の情報を伝送路、即ち伝送装置4お
よび11経由で受信して車上へ伝送し、また車上の情報
を受信して伝送路経由で、列車無線中央装置10へ伝送
する列車無線駅装置12とを備えている。
Reference numeral 9A denotes a station processing unit provided on the station side. The station processing unit 9A is connected to the transmission device 4 in addition to the transmission device 6, the input / output device 7, and the relay interlocking device 8 described above. The transmission device 11 connected to the transmission device 11 receives the information of the train radio central unit 10 via the transmission path, that is, the transmission devices 4 and 11, and transmits the information to the vehicle. And a train radio station device 12 for transmitting to the train radio central device 10 via a transmission path.

【0016】13は列車無線駅装置12に接続され、実
質的に車上と地上間のデータ伝送路となる漏洩同軸ケー
ブル、14,15は漏洩同軸ケーブル13経由で地上と
の情報の授受を行う列車無線車上装置、16,17は中
央計算機システム1から始発処理時に自列車の列車番号
を受信し、列車の走行に伴って、自列車の走行している
キロ程を中央計算機システム1に伝送するためのCPU
からなる自列車の在線するキロ程情報を管理する手段と
しての列車走行管理装置である。ここで、継電連動装置
8、伝送装置6,4および中央計算機システム1等は軌
道回路の落下(軌道回路リレーの閉成状態)およびこう
上(軌道回路リレーの開放状態)情報を検出する検出手
段を構成し、中央計算機システム1、列車無線中央装置
10、列車無線駅装置12、列車無線車上装置14,1
5および列車走行管理装置16,17は列車追跡手段を
構成する。また、列車無線駅装置12、漏洩同軸ケーブ
ル13および列車無線車上装置14,15は実質的に列
車無線装置を構成する。
Reference numeral 13 denotes a leaky coaxial cable which is connected to the train radio station apparatus 12 and serves as a data transmission path between the vehicle and the ground. Reference numerals 14 and 15 exchange information with the ground via the leaky coaxial cable 13. The on-train devices 16 and 17 receive the train number of the own train from the central computer system 1 at the time of the first train processing, and transmit the traveled kilometers of the own train to the central computer system 1 as the train runs. CPU to do
This is a train travel management device as a means for managing information on the kilometers of the train where the train is located. Here, the relay interlocking device 8, the transmission devices 6, 4 and the central computer system 1 etc. detect the drop of the track circuit (closed state of the track circuit relay) and the information on the above (open state of the track circuit relay). Means are constituted, central computer system 1, train radio central unit 10, train radio station device 12, train radio on-board device 14,1
5 and the train running management devices 16 and 17 constitute train tracking means. In addition, the train radio station device 12, the leaky coaxial cable 13, and the train radio on-board devices 14, 15 substantially constitute a train radio device.

【0017】次に動作について説明する。中央管理部5
Aは、通常の状態では中央計算機システム1が予め設定
されている手順に従って運行指令を発生し、これを伝送
装置4,6を介して各継電連動装置8に伝送する。各継
電連動装置8は中央管理部5Aからの指令に基づいて列
車の進路を制御する。また、各駅処理部9Aは通常の状
態では中央管理部5Aから供給される運行指令に基づい
て駅を通る列車の進路制御を行う。
Next, the operation will be described. Central Management Department 5
A, in a normal state, the central computer system 1 generates an operation command according to a preset procedure, and transmits this to each relay interlocking device 8 via the transmission devices 4 and 6. Each relay interlocking device 8 controls the route of the train based on a command from the central management unit 5A. In a normal state, each station processing unit 9A controls the route of a train passing through the station based on an operation command supplied from the central management unit 5A.

【0018】また、各列車は、列車走行管理装置16お
よび17において、列車速度の検知、列車在線キロ程の
算出を行い、また、列車無線車上装置14および15を
それぞれ介して中央計算機システム1からの列車番号の
受信・蓄積、中央計算機システム1からの列番変更情報
の受信・蓄積、走行キロ程の算出、走行キロ程の中央計
算機システム1への伝送を行う。
In each train, the train running control devices 16 and 17 detect the train speed and calculate the number of kilometers on the train, and the central computer system 1 via the train radio devices 14 and 15 respectively. It receives and accumulates train numbers from the central computer system, receives and accumulates column number change information from the central computer system 1, calculates traveled kilometers, and transmits the traveled kilometers to the central computer system 1.

【0019】図2は図1の列車走行管理装置16および
17の内部構成の一例を具体的に示す機能ブロック図で
あり、両者は実質的に同一の構成であるので、ここでは
代表的に列車走行管理装置16の場合を示している。列
車走行管理装置16は、各列車の始発処理時に、指令員
が運行管理センタで入力した列車固有の番号である列車
番号を列車無線を経由して列車無線車上装置14より受
信する列番受信部16aと、受信した列番を蓄積する列
番蓄積部16bと、列車の車軸に取り付けられた速度発
電機(図示せず)によって生成されるパルス数をカウン
トし演算処理することによって走行キロを算出する走行
キロ算出部16cと、中央計算機システム1で算出され
た補正用のキロ程を受信する補正用キロ程受信部16d
と、列車先頭部が新たな軌道回路こ進入し該当する軌道
回路が落下したタイミングを、または、列車最後尾部が
ある軌道回路を抜け、該当する軌道回路がこう上したタ
イミングを利用して、演算した走行距離を補正する走行
キロ補正部16eと、蓄積した列番と補正した走行キロ
を対応づけた送信データを作成し、列車無線車上装置1
4より列車無線を経由して運行管理センタに送信する送
信データ作成部16fとを備える。なお、走行キロ算出
部16cと、補正用キロ程受信部16dと、走行キロ補
正部16eは列車在線キロ程算出部を構成する。
FIG. 2 is a functional block diagram specifically showing an example of the internal configuration of the train running management devices 16 and 17 shown in FIG. 1. Since both have substantially the same configuration, a typical train The case of the travel management device 16 is shown. The train travel management device 16 receives a train number, which is a train-specific number input by the dispatcher at the operation management center, from the train radio on-board device 14 via the train radio at the start processing of each train. The number of pulses generated by a section 16a, a column number storage section 16b for storing the received column number, and a speed generator (not shown) attached to the axle of the train is counted and processed to calculate the traveling kilometer. The traveling kilometer calculating unit 16c to calculate and the correcting kilometer receiving unit 16d to receive the correcting kilometer calculated by the central computer system 1.
Using the timing at which the head of the train enters a new track circuit and the corresponding track circuit drops, or the timing at which the tail track circuit exits the track circuit with the tail end and the corresponding track circuit goes up, The travel-km correction unit 16e that corrects the corrected travel distance and the transmission data that associates the accumulated column number with the corrected travel-km are created, and the train radio device 1
4 includes a transmission data creation unit 16f that transmits the data to the operation management center via the train radio. The traveling kilometer calculation unit 16c, the correction kilometer receiving unit 16d, and the traveling kilometer correction unit 16e constitute a train-on-rail kilometer calculation unit.

【0020】ここで、走行キロ補正部16eは、列車先
頭部が新たな軌道回路に進入し該当する軌道回路が落下
したタイミングを、または、列車最後尾部がある軌道回
路を抜け、該当する軌道回路がこう上したタイミングを
利用して、演算した走行距離を補正する。即ち、列車の
先頭部が軌道回路に進入することを継電連動装置8が検
出し、伝送装置6および4等を経由して中央計算機シス
テム1に情報が伝送される。中央計算機システム1では
伝送されたデータをもとに、落下した軌道回路名称を検
出し、自装置内に保有するキロ程算出テーブルでキロ程
を算出する。
Here, the traveling-km correcting unit 16e determines the timing at which the head of the train enters the new track circuit and the corresponding track circuit drops, or the time at which the tail circuit of the train passes through the track circuit with the tail, and the corresponding track circuit. The calculated traveling distance is corrected using the timing thus calculated. That is, the relay interlocking device 8 detects that the head of the train enters the track circuit, and information is transmitted to the central computer system 1 via the transmission devices 6 and 4 and the like. The central computer system 1 detects the name of the track circuit that has fallen based on the transmitted data, and calculates the kilometer using a kilometer calculation table held in the own device.

【0021】そして、このようにして算出した軌道回路
境界のキロ程を伝送装置4および11、列車無線駅装置
12、漏洩同軸ケーブル13、列車無線車上装置14を
経由し列車走行管理装置16に送信し、これが列車走行
管理装置16内の補正用キロ程受信部16dに受信さ
れ、更に、この受信したデータをもとに走行キロ補正部
16eにおいて走行キロが補正される。列車の最後部が
軌道回路を抜けた場合も、継電連動装置8からの情報を
もとに、同様の処理で走行キロの補正を行う。また、列
車走行管理装置17に付いても同様である。
The kilometer of the track circuit boundary calculated in this way is transmitted to the train traveling management device 16 via the transmission devices 4 and 11, the train radio station device 12, the leaky coaxial cable 13, and the train radio vehicle device 14. This is transmitted and received by the correction kilometer receiving unit 16d in the train travel management device 16, and the traveling kilometer is corrected by the traveling kilometer correction unit 16e based on the received data. Even when the last part of the train passes through the track circuit, the traveling kilometers are corrected by the same processing based on the information from the relay interlocking device 8. The same applies to the train running management device 17.

【0022】次に、図3を参照して、軌道回路の異常落
下(その場所に列車が在線していないにもかかわらず軌
道回路リレーが反応すること、即ち軌道回路リレーの閉
成状態)した場合の中央処理部5Aにおける列車追跡の
動作について説明する。中央計算機システム1は列車の
固有情報である列車蕃号と、継電連動装置8から伝送装
置6および4等を介して中央計算機システム1に伝送さ
れてくる軌道回路落下情報を対応付けて管理しており、
列車先頭の進入を軌道回路の落下で検知している(ステ
ップS1)。
Next, referring to FIG. 3, an abnormal fall of the track circuit (the track circuit relay reacts even though no train is present at the place, that is, the track circuit relay is closed). The operation of train tracking in central processing unit 5A in this case will be described. The central computer system 1 associates and manages a train ban, which is information specific to a train, with track circuit drop information transmitted from the relay interlocking device 8 to the central computer system 1 via the transmission devices 6 and 4 and the like. And
The approach at the head of the train is detected by the fall of the track circuit (step S1).

【0023】全く列車が存在していない区間の軌道回路
が落下した場合軌道回路情報からだけでは、その落下が
どの列車に対応するか判断できなくなる。ここで列車走
行管理装置16、17より中央計算機システム1へ列車
走行実績即ち列車走行管理装置16、17で算出された
キロ程が送信されているため、中央計算機システム1で
はこれをチェックし(ステップS2)、更に、軌道回路
落下情報と、列車走行管理装置16、17からの情報を
照合する。即ち、継電連動装置8から軌道回路キロ程
と、列車走行管理装置16、17からの受信したキロ程
の比較チェックを行い(ステップS3)、両者が一致し
ているか、つまり、同一の軌道回路かどうかを判別し、
同一の軌道回路であれば実質的に同一の列車として判断
し、ステップS5において、列番をシフトし、つまり、
列車を一つ先の軌道回路に進める。 一方、ステップS
4で同一の軌道回路でないと判断されたら、ステップS
6において、不正落下として警報を発生し、列番は進め
ない。
When a track circuit in a section where no train exists at all falls, it is not possible to determine which train corresponds to the fall only from the track circuit information. Here, since the train running results, that is, the kilometers calculated by the train running management devices 16 and 17, are transmitted from the train running management devices 16 and 17 to the central computer system 1, the central computer system 1 checks this (step S2) Further, the track circuit fall information is collated with the information from the train travel management devices 16 and 17. That is, a comparison check is performed between the track circuit kilometer from the relay interlocking device 8 and the kilometer received from the train travel management devices 16 and 17 (step S3). Determine whether
If the track circuits are the same, it is determined that the trains are substantially the same, and in step S5, the column number is shifted,
Advance the train one track ahead. On the other hand, step S
If it is determined in step 4 that the track circuits are not the same, step S
At 6, an alarm is issued as an illegal fall, and the column number is not advanced.

【0024】このように、本実施の形態では、列車走行
管理装置は列車の在線位置をキロ程で管理しているた
め、軌道回路より高い精度で列車の在線位置を管理する
ことができる。また、このキロ程情報を用いて各列車の
各駅への着発時刻を予想することにより、従来よりも高
精度な予想を行うことができる。さらに、速度発電機か
らのパルスカウントによるキロ程算出を行い、軌道回路
の落下時またはこう上時に列車走行管理装置内でキロ程
の補正を行うので、列車の車輪径による累積誤差があっ
ても、これに影響されることはない。
As described above, in this embodiment, since the train traveling management device manages the train location on the order of kilometers, it is possible to manage the train location with higher accuracy than the track circuit. Further, by using this kilometer information to predict the time at which each train arrives and departs at each station, it is possible to make a more accurate prediction than before. Furthermore, since the kilometer is calculated by the pulse count from the speed generator and the kilometer is corrected in the train travel management device when the track circuit falls or goes up, even if there is a cumulative error due to the wheel diameter of the train. , You are not affected by this.

【0025】[0025]

【発明の効果】以上のように、この発明によれば、各列
車がCPUを搭載した列車走行管理装置を搭載し、自列
車が現在走行しているキロ程を列車無線等の通信手段を
利用して、中央計算機システムに送信して、軌道回路落
下およびこう上の情報を補完するので、軌道回路だけの
情報による場合よりも正確に列車を追跡することができ
るという効果がある。
As described above, according to the present invention, each train is equipped with a train traveling management device equipped with a CPU, and the distance that the own train is currently traveling can be measured using communication means such as train radio. Then, the information is transmitted to the central computer system to supplement the information of the track circuit fall and the information above, so that there is an effect that the train can be tracked more accurately than in the case of using only the information of the track circuit.

【0026】また、この発明によれば、列車走行管理装
置により列車の在線位置をキロ程で管理しているため、
たとえ列車の車輪径による累積誤差があっても、これに
影響されることなく、軌道回路だけで管理している場合
より高い精度で列車の在線位置を管理することができる
という効果がある。
Further, according to the present invention, since the train location management device manages the train location on the order of kilometers,
Even if there is a cumulative error due to the wheel diameter of the train, there is an effect that the on-board position of the train can be managed with higher accuracy than the case where the error is managed only by the track circuit, without being affected by this.

【0027】また、この発明によれば、このキロ程情報
を用いて各列車の各駅への着発時刻を予想するので、従
来よりも高精度な予想を行うことができるという効果が
ある。
Further, according to the present invention, the departure / arrival time of each train to each station is predicted by using the kilometer information, so that there is an effect that the prediction can be performed with higher accuracy than before.

【図面の簡単な説明】[Brief description of the drawings]

【図1】 この発明の実施の形態1を示す構成図であ
る。
FIG. 1 is a configuration diagram showing a first embodiment of the present invention.

【図2】 この発明の実施の形態1の要部の具体的回路
構成の一例を示すブロック図である。
FIG. 2 is a block diagram showing an example of a specific circuit configuration of a main part of the first embodiment of the present invention.

【図3】 この発明の実施の形態1の動作説明に供する
ためのフローチャートである。
FIG. 3 is a flowchart for explaining the operation of the first embodiment of the present invention;

【図4】 従来の列車運行管理システムを示す構成図で
ある。
FIG. 4 is a configuration diagram showing a conventional train operation management system.

【符号の説明】[Explanation of symbols]

1 中央計算機システム、4,6,11 伝送装
置、10 列車無線中央装置、12 列車無線駅装
置、13 漏洩同軸ケーブル、14,15列車無線車
上装置、16,17 列車走行管理装置。
1 Central computer system, 4, 6, 11 transmission device, 10 train radio central device, 12 train radio station device, 13 leaky coaxial cable, 14, 15 train radio on-board device, 16, 17 train travel management device.

Claims (6)

【特許請求の範囲】[Claims] 【請求項1】 軌道交通の運行を計算機を利用して自動
制御する列車運行管理システムにおいて、 軌道回路の落下およびこう上情報を検出する検出手段
と、 自列車の在線するキロ程情報を管理する手段とを備え、
上記落下およびこう上情報と上記キロ程情報に基づいて
列車追跡を行うようにしたことを特徴とする列車運行管
理システム。
1. A train operation management system for automatically controlling the operation of track traffic using a computer, comprising: a detecting means for detecting information on a fall of a track circuit and a height above a track circuit; And means,
A train operation management system, wherein a train is tracked on the basis of the information on the fall and the height and the information on the kilometer.
【請求項2】 上記自列車の在線するキロ程を管理する
手段として、車軸に取り付けられた速度発電機より得ら
れるパルス数をカウントし、キロ程換算する列車在線キ
ロ程算出部を含む列車走行管理装置を各列車が備えたこ
とを特徴とする請求項1記載の列車運行管理システム。
2. A train running method including a train-on-kilometer calculation unit that counts the number of pulses obtained from a speed generator attached to an axle and converts the number to kilometer as means for managing the kilometer on which the train is located. The train operation management system according to claim 1, wherein each train includes a management device.
【請求項3】 上記列車在線キロ程算出部は、上記速度
発電機から取得した距離情報を軌道回路落下のタイミン
グで補正する手段を有することを特徴とする請求項2記
載の列車運行管理システム。
3. The train operation management system according to claim 2, wherein said train-on-rail-km calculation unit has means for correcting distance information acquired from said speed generator at a timing when a track circuit falls.
【請求項4】 上記列車在線キロ程算出部は、上記速度
発電機から取得した距離情報を軌道回路こう上のタイミ
ングで補正する手段を有することを特徴とする請求項2
記載の列車運行管理システム。
4. The train-on-kilometer-km calculation unit includes means for correcting the distance information acquired from the speed generator at a timing on a track circuit.
The described train operation management system.
【請求項5】 各列車が軌道回路の中間に存在する場
合、各列車が軌道回路上のどの場所に存在するかを管理
する列車追跡手段を備えたことを特徴とする請求項1〜
4のいずれかに記載の列車運行管理システム。
5. A train tracking means for managing where each train is located on a track circuit when each train is located in the middle of the track circuit.
4. The train operation management system according to any one of 4.
【請求項6】 上記列車追跡手段は、各列車の各駅への
着発時刻を予想する際の現時点での列車の存在位置とし
て上記列車走行管理装置から得られる列車在線位置を用
いることを特徴とする請求項5記載の列車運行管理シス
テム。
6. The train tracking means uses a train location line obtained from the train travel management device as a current location of the train when estimating the arrival / departure time of each train at each station. The train operation management system according to claim 5, wherein
JP10088901A 1998-04-01 1998-04-01 Train operation control system Pending JPH11286276A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP10088901A JPH11286276A (en) 1998-04-01 1998-04-01 Train operation control system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP10088901A JPH11286276A (en) 1998-04-01 1998-04-01 Train operation control system

Publications (1)

Publication Number Publication Date
JPH11286276A true JPH11286276A (en) 1999-10-19

Family

ID=13955866

Family Applications (1)

Application Number Title Priority Date Filing Date
JP10088901A Pending JPH11286276A (en) 1998-04-01 1998-04-01 Train operation control system

Country Status (1)

Country Link
JP (1) JPH11286276A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010228576A (en) * 2009-03-27 2010-10-14 Daido Signal Co Ltd Ctc station device with relay interlocking device monitoring function
JP2012020734A (en) * 2011-08-29 2012-02-02 Nippon Signal Co Ltd:The Device for detecting train position
WO2016166879A1 (en) * 2015-04-17 2016-10-20 株式会社日立製作所 Railroad operation management system
WO2018034001A1 (en) * 2016-08-19 2018-02-22 三菱電機株式会社 Wireless train control system and train position correction method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010228576A (en) * 2009-03-27 2010-10-14 Daido Signal Co Ltd Ctc station device with relay interlocking device monitoring function
JP2012020734A (en) * 2011-08-29 2012-02-02 Nippon Signal Co Ltd:The Device for detecting train position
WO2016166879A1 (en) * 2015-04-17 2016-10-20 株式会社日立製作所 Railroad operation management system
WO2018034001A1 (en) * 2016-08-19 2018-02-22 三菱電機株式会社 Wireless train control system and train position correction method
JPWO2018034001A1 (en) * 2016-08-19 2019-01-10 三菱電機株式会社 Wireless train control system and train position correction method

Similar Documents

Publication Publication Date Title
CN111114592B (en) Mobile block train operation control method and system based on autonomous train positioning
CN102887150B (en) Train control system
EP1705095B1 (en) Block system and method with intrinsic safety for low railroad traffic density lines
KR101037175B1 (en) System and method to control a train whit train operation information analysis apparatus
US11142871B2 (en) Vehicle management system
RU2725332C1 (en) System for decentralized interval control of train movements
CN112706802B (en) Method and device for safety protection of magnetic-levitation train
CN113954930B (en) Automatic unlocking degradation vehicle path method and device based on rear vehicle perception
CN104973093A (en) Method for computing interval of positions for railway vehicle along railway track and corresponding device
KR100283828B1 (en) Train operation management system
CN114684222B (en) Train control method and system based on bidirectional transmission of transponder
JP2006134158A (en) Section traveling time information collecting system and in-vehicle device
JP3983556B2 (en) Train approach warning system
JP2005219707A (en) Train position acquiring system, train position information providing system, and train approach alarm system
JPH11286276A (en) Train operation control system
JP2014133473A (en) Train control system and train control method
JP2000318613A (en) Train monitoring system
RU2446069C1 (en) Train control system
JP5348104B2 (en) Probe information processing apparatus, computer program, information processing system, and link end passage time calculation method
JP2000033875A (en) Vehicle location detection device
JP3519042B2 (en) Warning method for railway
KR100751057B1 (en) Communication based automatic train control system and method
CN112415556B (en) Dynamic detection vehicle positioning system and working method
JP2007058641A (en) Vehicle position management system
KR100603517B1 (en) Method and system for controlling vehicle