JPH1085904A JP26555296A JP26555296A JPH1085904A JP H1085904 A JPH1085904 A JP H1085904A JP 26555296 A JP26555296 A JP 26555296A JP 26555296 A JP26555296 A JP 26555296A JP H1085904 A JPH1085904 A JP H1085904A
Authority
JP
Japan
Prior art keywords
metal frame
roller conveyor
molding
machine
mold
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP26555296A
Other languages
Japanese (ja)
Other versions
JP3280242B2 (en
Inventor
Atsushi Teranishi
敦史 寺西
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sintokogio Ltd
Original Assignee
Sintokogio Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sintokogio Ltd filed Critical Sintokogio Ltd
Priority to JP26555296A priority Critical patent/JP3280242B2/en
Publication of JPH1085904A publication Critical patent/JPH1085904A/en
Application granted granted Critical
Publication of JP3280242B2 publication Critical patent/JP3280242B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Casting Devices For Molds (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a metallic flask circulated molding and casting line equipment which can execute the molding, laying of the metallic flask, pouring of molten metal, separation of a molding board and the metallic flask, disassemble of the mold, etc., the same as the conventional case while omitting a recovering and transferring line for a molding board carrier. SOLUTION: A roller conveyor 1 which can transfer the upper and the lower metallic flasks 2, 3, and the molding board carrier 4 is provided so as to penetrate a molding machine 5. At the leading end of the roller conveyor 1, a first metallic flask hanging machine 9 and a mold disassembling machine 10 are provided and at the terminal end of the roller conveyor 1, a second metallic flask hanging machine 11 is provided. Further, at the outside metallic flask hanging machine 11, a saving station 12 of the molding board carrier 4 is provided.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、上下金枠に鋳型を
造型し、これを定盤台車に載せて移動させる間に注湯を
行ない鋳造品を取り出した後上下金枠及び定盤台車を循
環使用させる金枠循環造型鋳造ライン設備に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method of molding a mold on upper and lower metal frames, pouring the mold while moving the mold on a platen truck, taking out a casting, and removing the upper and lower metal frames and the platen truck. The present invention relates to a metal frame circulating molding and casting line facility to be circulated and used.

【0002】[0002]

【従来の技術】従来上記のような金枠循環造型鋳造ライ
ン設備は図2に示すように空の上下金枠51,52をロ
−ラコンベヤ53により鋳型造型機54に送り込んで鋳
型を造型し、枠合せステ−ション55で定盤台車56上
に上下金枠51,52を載せ、注湯ステ−ション57で
注湯し、分離ステ−ション58で定盤台車56と上下金
枠51,52を分離し、定盤台車56は定盤台車ライン
59により移動される一方分離された上下金枠51,5
2はばらしステ−ション60に送られて内蔵されている
鋳型のばらしが行なわれて前記ロ−ラコンベヤ53に送
り出されるようになっている。なお、注湯、冷却ライン
61、前記定盤台車ライン59及びロ−ラコンベヤ53
の後半部下方のライン62はレ−ルのラインになってい
る。
2. Description of the Related Art Conventionally, as shown in FIG. 2, the above-mentioned metal frame circulation molding casting line equipment sends empty upper and lower metal frames 51 and 52 to a mold molding machine 54 by a roller conveyor 53 to mold a mold. The upper and lower metal frames 51 and 52 are placed on the platen carriage 56 at the frame aligning station 55, and the molten metal is poured at the pouring station 57. The platen carriage 56 is moved by the platen line 59 while the upper and lower metal frames 51 and 5 are separated.
Numeral 2 is sent to the separating station 60 to release the built-in mold and then to the roller conveyor 53. It should be noted that the pouring and cooling line 61, the platen carrier line 59 and the roller conveyor 53
The line 62 below the second half is a rail line.

【0003】[0003]

【発明が解決しようとする課題】上記のような従来の金
枠循環造型鋳造ライン設備では、金枠が循環移動される
ラインとは別に定盤台車を回収移送させるラインが設け
られるため各種の機器を含めたライン設備が過大にな
り、設備製作費を高くする問題があった。本発明は上記
の問題に鑑みて成されたもので定盤台車の回収移送ライ
ンをなくして従来と同様の鋳型造型、金枠載せ、注湯、
定盤台車と金枠の分離、鋳型のばらし等ができる金枠循
環造型鋳造ライン設備を提供することを目的とする。
In the above-described conventional metal frame circulating molding and casting line equipment, a line for collecting and transferring a platen carriage is provided separately from a line in which the metal frame is circulated and moved. However, there is a problem that the line equipment including the above becomes excessively large and the equipment manufacturing cost is increased. The present invention has been made in view of the above-described problems, and eliminates the transfer line for collecting and transporting the platen trolley.
An object of the present invention is to provide a metal frame circulating molding casting line equipment capable of separating a surface plate carrier and a metal frame, separating a mold, and the like.

【0004】[0004]

【課題を解決するための手段】上記の目的を達成するた
めに本発明における金枠循環造型鋳造ライン設備は、上
下金枠及び定盤台車をそれぞれ移送可能にしたロ−ラコ
ンベヤを鋳型造型機を貫通させて設け、該ロ−ラコンベ
ヤの始端に上下金枠を重ねた状態で吊り上げ吊り下げす
ると共に上金枠のみを吊り上げ及び吊り下げる第1金枠
吊り機と鋳型ばらし機とを配置し、該ロ−ラコンベヤの
終端に上下金枠をそれぞれ吊り上げ及び吊り下げする第
2金枠吊り機を配置し、第2金枠吊り機の外側に、前記
定盤台車を一時的に待避させる待避ステ−ションを設
け、前記ロ−ラコンベヤの始端及び終端を鋳造冷却ライ
ンの終端及び始端に第1トラバ−サ及び第2トラバ−サ
を介してそれぞれ連絡連結可能にしたことを特徴とする
ものである。
SUMMARY OF THE INVENTION In order to achieve the above-mentioned object, a metal frame circulation molding casting line facility according to the present invention comprises a roller molding machine capable of transporting upper and lower metal frames and a surface plate carrier by a molding machine. A first metal frame lifting machine and a mold release machine, which are lifted and suspended in a state where the upper and lower metal frames are stacked on the starting end of the roller conveyor, and also lift and suspend only the upper metal frame, A second metal frame suspender for lifting and suspending the upper and lower metal frames respectively is arranged at the end of the roller conveyor, and an evacuation station for temporarily retracting the surface plate cart outside the second metal frame hoist. And the start and end of the roller conveyor can be connected to the end and start of the casting cooling line via a first traverser and a second traverser, respectively.

【0005】[0005]

【発明の実施の形態】以下本発明の実施の形態を図面に
基づいて詳しく説明する。図1において符号1は上金枠
2、下金枠3、及び定盤台車4を移送可能(定盤台車4
は定盤下面を支持)にした中抜のロ−ラコンベヤであっ
て、該ロ−ラコンベヤ1は鋳型造型機5を貫通して配設
されている。該ロ−ラコンベヤ1に対し並列にしてレ−
ルで構成される鋳造冷却ライン6が設けられており、前
記ロ−ラコンベヤ1の始端及び終端は、該鋳造冷却ライ
ン6の終端及び始端に第1トラバ−サ7及び第2トラバ
−サ8を介してそれぞれ連絡連結可能にされている。さ
らに前記ロ−ラコンベヤ1の始端上部には上下金枠2,
3を重ねた状態で吊り上げ及び吊り下げすると共に上金
枠2のみを吊り上げ及び吊り下げる第1金枠吊り機9
が、またロ−ラコンベヤ1の始端下部には上下金枠2,
3内の鋳型を型ばらしする鋳型ばらし機10が配設され
ている。また前記ロ−ラコンベヤ1の終端上部には上下
金枠2,3をそれぞれ別々に吊り上げ及び吊り下げする
第2金枠吊り機11が配設されており、該ロ−ラコンベ
ヤ1の終端外側には前記定盤台車4を一時的に待避させ
る待避ステ−ション12が設けられている。尚図1中に
おいて符号13は注湯ステ−ション,14,14Aは送
り出しシリンダ、15,15Aはクッションシリンダで
ある。
Embodiments of the present invention will be described below in detail with reference to the drawings. In FIG. 1, reference numeral 1 denotes an upper metal frame 2, a lower metal frame 3, and a trolley 4 (the trolley 4).
Is a hollow roller conveyor that supports the lower surface of the platen. The roller conveyor 1 is disposed through a mold making machine 5. The roller is placed in parallel with the roller conveyor 1.
A casting and cooling line 6 is provided. The roller conveyor 1 is provided with a first traverser 7 and a second traverser 8 at the beginning and end of the casting cooling line 6, respectively. Each of them can be communicatively connected to each other. Further, upper and lower metal frames 2 are provided above the starting end of the roller conveyor 1.
The first metal frame lifting machine 9 for lifting and suspending only the upper metal frame 2 while suspending and suspending the upper metal frame 3 in a state where 3 are stacked.
However, the lower and upper metal frames 2,
A mold release machine 10 for releasing the mold in 3 is provided. At the upper end of the roller conveyor 1, a second metal frame hoisting machine 11 for lifting and suspending the upper and lower metal frames 2 and 3 respectively is provided, and on the outer side of the terminal end of the roller conveyor 1. An evacuation station 12 for temporarily evacuation of the trolley 4 is provided. In FIG. 1, reference numeral 13 is a pouring station, 14 and 14A are delivery cylinders, and 15 and 15A are cushion cylinders.

【0006】このように構成されたものは、ロ−ラコン
ベヤ1始端の鋳型ばらし機10の上方(第1金枠吊り機
9の下方)でロ−ラコンベヤ1のラインと一致する高さ
に上金枠2があり、又ロ−ラコンベヤ1の終端は空の状
態にされており、その外側における待避ステ−ション1
2には定盤台車4がその上部に下金枠3を載せた状態に
して待避している。また鋳造冷却ライン6の始端は空の
状態にして、終端は定盤台車4上に鋳型及び鋳造品を内
蔵させた上下金枠2,3が載置された状態にされてい
る。この状態でクッションシリンダ15が伸長されて鋳
型を造型した上金枠2に当接される一方送り出しシリン
ダ14が伸長作動してロ−ラコンベヤ1上の上下金枠
2,3及び定盤台車4とロ−ラコンベヤ1始端の上金枠
2をはさみつけた後クッションシリンダ15を押し戻し
ながら全体を1ピッチ左方向に移動させ、送り出しシリ
ンダ14を元の位置に復帰させる。
[0006] The above structure is such that the upper metal is located above the mold unwinding machine 10 at the beginning of the roller conveyor 1 (below the first metal frame hanging machine 9) and at the same height as the line of the roller conveyor 1. There is a frame 2 and the end of the roller conveyor 1 is empty, and the retracting station 1 outside the roller conveyor 1 is empty.
2, a platen carrier 4 is evacuated with the lower metal frame 3 mounted thereon. In addition, the starting end of the casting cooling line 6 is empty, and the end is in a state where the upper and lower metal frames 2 and 3 containing a mold and a casting are placed on the surface plate carrier 4. In this state, the cushion cylinder 15 is extended and is brought into contact with the upper metal frame 2 on which the mold is formed, while the delivery cylinder 14 is extended and the upper and lower metal frames 2 and 3 on the roller conveyor 1 and the platen carrier 4 are in contact with each other. After the upper metal frame 2 of the start end of the roller conveyor 1 is clamped, the entire cylinder is moved one pitch to the left while pushing back the cushion cylinder 15 to return the delivery cylinder 14 to the original position.

【0007】次に第2金枠吊り機11が作動してロ−ラ
コンベヤ1の終端に送られて来た鋳型内臓の上金枠2を
吊り上げた後待避している定盤台車4及び下金枠3が上
金枠2の下方に搬入され第2金枠吊り機11の下降作動
により下金枠3の上部に上金枠2が枠合(型合)せされ
る。次に定盤台車4上に上下金枠2,3が重ねられた状
態で鋳造冷却ライン6の終端に第2トラバ−サ8を介し
て移動された後、鋳造冷却ライン6の終端にある定盤台
車4と、その上部に載置されている。鋳型及び鋳造品内
臓の上下金枠2,3が第1トラバ−サ7によりロ−ラコ
ンベヤ1の始端位置に搬入される。次にクッションシリ
ンダ15Aが伸長作動されて鋳造冷却ライン6の先端に
ある定盤台車4、上下金枠2,3に当接され送り出しシ
リンダ14Aが伸長作動して鋳造冷却ライン6の始端及
び鋳造冷却ライン6上の定盤台車4及び上下金枠2,3
をはさみつけた後クッシションシリンダ15Aを押し戻
しながら全体を1ピッチ右方向へ移動させ、送り出しシ
リンダ14Aを元の位置に復帰させる。
Next, the second metal frame lifting machine 11 is operated to lift the upper metal frame 2 built in the mold sent to the end of the roller conveyor 1 and then retract the platen carrier 4 and the lower metal. The frame 3 is carried in below the upper metal frame 2, and the upper metal frame 2 is framed (molded) on the upper portion of the lower metal frame 3 by the lowering operation of the second metal frame hoisting machine 11. Next, the upper and lower metal frames 2 and 3 are moved to the end of the casting cooling line 6 via the second traverser 8 in a state where the upper and lower metal frames 2 and 3 are overlaid on the surface plate carrier 4, and then set at the end of the casting cooling line 6. It is mounted on a board carriage 4 and an upper part thereof. The upper and lower metal frames 2 and 3 containing the mold and the cast product are carried into the starting position of the roller conveyor 1 by the first traverser 7. Next, the cushion cylinder 15A is extended, and the delivery cylinder 14A is extended by being brought into contact with the platen truck 4 and the upper and lower metal frames 2, 3 at the tip of the casting cooling line 6, and the starting end of the casting cooling line 6 and casting cooling. Surface plate carrier 4 and upper and lower metal frames 2 and 3 on line 6
Then, while pushing the cushion cylinder 15A back, the entirety is moved rightward by one pitch to return the delivery cylinder 14A to the original position.

【0008】次にロ−ラコンベヤ1の始端においては定
盤台車4を残し、上下金枠2.3が第1金枠吊り機9に
より吊り上げられ、クッションシリンダ15が伸長作動
した後送り出しシリンダ14が作動して残った定盤台車
4とロ−ラコンベヤ1上の上下金枠2,3及び定盤台車
4全体を1ピッチ左方向に移動させる。これによりロ−
ラコンベヤ1の終端には定盤台車4が移動されてきて待
避ステ−ション12に移動待避される。次に第1金枠吊
り機9が下降作動し上下金枠2,3を下降させ、鋳型ば
らし機10により内蔵されている鋳型をばらして鋳造品
を取出した後第1金枠吊り機9が上金枠2と係合されて
下金枠3を残して上金枠2を吊り上げ前述と同様にして
定盤台車4、上下金枠2,3の全体を1ピッチ左方向に
移動させる。これによりロ−ラコンベヤ1の終端には下
金枠3が移動されてきて第2金枠吊り機11により吊り
上げられた後待避中の定盤台車4が下金枠3の下方に移
動され第2金枠吊り機11が下降作動して定盤台車4上
に下金枠3が載置されその状態で再び待避ステ−ション
12へ移動される。
Next, at the start end of the roller conveyor 1, the upper and lower metal frames 2.3 are lifted by the first metal frame hoisting machine 9, leaving the platen carriage 4, and after the cushion cylinder 15 is extended, the delivery cylinder 14 is moved. The left and right metal frames 2 and 3 on the roller conveyor 1 and the entire surface plate 4 are moved leftward by one pitch. This allows
The platen cart 4 is moved to the end of the laconveyor 1 and is moved and evacuated to the evacuation station 12. Next, the first metal frame hoisting machine 9 descends to lower the upper and lower metal frames 2 and 3, and the mold releasing machine 10 releases the built-in mold to take out a cast product. The upper metal frame 2 is lifted while being engaged with the upper metal frame 2 to leave the lower metal frame 3, and the entire surface plate carrier 4 and the upper and lower metal frames 2, 3 are moved one pitch to the left in the same manner as described above. As a result, the lower metal frame 3 is moved to the end of the roller conveyor 1, and after being lifted by the second metal frame lifting machine 11, the stool 4 being retracted is moved below the lower metal frame 3 to move to the second position. The metal frame lifting machine 11 is lowered and the lower metal frame 3 is placed on the surface plate carrier 4 and is moved to the retreat station 12 again in that state.

【0009】次に第1金枠吊り機9が下降作動して上金
枠2が下降されて前記作動開始前の状態になり、上金枠
2及びロ−ラコンベヤ1上の定盤台車4及び上下金枠
2,3全体が1ピッチ左方向に移動され、前述の作動が
くりかえされる。なお上記の作動中、鋳型造型機5にお
いてはロ−ラコンベヤ1により定盤台車4、下金枠3、
上金枠2が順次搬送されてきて、定盤台車4が搬入され
た場合は鋳型造型が休止され上下金枠2,3が搬入され
た場合にそれぞれの鋳型が造型されるようになってい
る。また注湯ステ−ション13においては上記のように
して定盤台車4上に上下金枠2,3が載置された状態で
順次移動されてきて、上下金枠2,3の鋳型キャビティ
−内に溶湯が注湯されて鋳造が行なわれ鋳造冷却ライン
6の終端に到るまでに溶湯が冷却凝固されて鋳造品を取
り出せる状態になる。
Next, the first metal frame hoisting machine 9 is moved down to lower the upper metal frame 2 to the state before the start of the operation, and the platen trucks 4 on the upper metal frame 2 and the roller conveyor 1 and The entire upper and lower metal frames 2 and 3 are moved leftward by one pitch, and the above operation is repeated. During the operation described above, in the mold making machine 5, the platen carrier 4, the lower metal frame 3,
When the upper metal frame 2 is sequentially conveyed and the surface plate carrier 4 is carried in, the mold molding is stopped, and when the upper and lower metal frames 2 and 3 are carried in, the respective molds are molded. . In the pouring station 13, the upper and lower metal frames 2, 3 are sequentially moved with the upper and lower metal frames 2, 3 being mounted on the surface plate carrier 4 as described above, and the inside of the mold cavities of the upper and lower metal frames 2, 3 is moved. The molten metal is poured into the casting and the casting is performed. By the time the molten metal is cooled and solidified by the time the casting cooling line 6 reaches the end, the casting can be taken out.

【0010】[0010]

【発明の効果】本発明は上記の説明から明らかなよう
に、上下金枠及び定盤台車を移送可能にしたロ−ラコン
ベヤを鋳型造型機を貫通させて設け、該ロ−ラコンベヤ
の始端に第1金枠吊り機及び鋳型ばらし機を、またロ−
ラコンベヤの終端に第2金枠吊り機をそれぞれ設けると
共に第2金枠吊り機の外側に定盤台車の待避ステ−ショ
ンをそれぞれ設けた構成の金枠循環造型鋳造ライン設備
としたから従来設置されていた定盤台車の回収移送ライ
ンを省くことができるようになり設備製作費用を大幅に
削減できる。
As is apparent from the above description, according to the present invention, a roller conveyor capable of transporting the upper and lower metal frames and the platen truck is provided so as to penetrate the mold making machine, and a roller conveyor is provided at the starting end of the roller conveyor. 1 The metal frame lifting machine and the mold release machine
Conventionally installed metal frame circulating molding casting line equipment having a configuration in which a second metal frame hoisting machine is provided at the end of the laconveyor and an evacuation station for the surface plate carrier is provided outside the second metal frame hoisting machine. This makes it possible to omit the collection and transfer line for the trolley, which can greatly reduce equipment manufacturing costs.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の実施の形態の概要を示す平面図であ
る。
FIG. 1 is a plan view showing an outline of an embodiment of the present invention.

【符号の説明】[Explanation of symbols]

1 ロ−ラコンベヤ 2 上金枠 3 下金枠 4 定盤台車 5 鋳型造型機 6 鋳造冷却ライン 7 第1トラバ−サ 8 第2トラバ−サ 9 第1金枠吊り機 10 鋳型ばらし機 11 第2金枠吊り機 12 待避ステ−ション DESCRIPTION OF SYMBOLS 1 Roller conveyor 2 Upper metal frame 3 Lower metal frame 4 Surface plate carrier 5 Mold molding machine 6 Casting cooling line 7 1st traverser 8 2nd traverser 9 1st metal frame hanging machine 10 Mold unpacking machine 11 2nd Metal frame suspension machine 12 Evacuation station

─────────────────────────────────────────────────────
────────────────────────────────────────────────── ───

【手続補正書】[Procedure amendment]

【提出日】平成9年1月10日[Submission date] January 10, 1997

【手続補正1】[Procedure amendment 1]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】図面の簡単な説明[Correction target item name] Brief description of drawings

【補正方法】変更[Correction method] Change

【補正内容】[Correction contents]

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の実施の形態を示す一部切り欠き正面図
である。
FIG. 1 is a partially cutaway front view showing an embodiment of the present invention.

【図2】従来の金枠循環造型鋳造ラインを示す平面図で
ある。
FIG. 2 is a plan view showing a conventional metal frame circulation molding casting line.

【符号の説明】 1 ロ−ラコンベヤ 2 上金枠 3 下金枠 4 定盤台車 5 鋳型造型機 6 鋳造冷却ライン 7 第1トラバーサ 8 第2トラバーサ 9 第1金枠吊り機 10 鋳型ばらし機 11 第2金枠吊り機 12 待避ステ−ション[Description of Signs] 1 Roller Conveyor 2 Upper Metal Frame 3 Lower Metal Frame 4 Surface Plate Cart 5 Mold Molding Machine 6 Casting Cooling Line 7 First Traverser 8 Second Traverser 9 First Metal Frame Hanging Machine 10 Mold Separating Machine 11th 2-frame suspension machine 12 Evacuation station

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 上下金枠2,3及び定盤台車4をそれぞ
れ移送可能にしたロ−ラコンベヤ1を鋳型造型機5を貫
通させて設け、該ロ−ラコンベヤ1の始端に上下金枠
2,2を重ねた状態で吊り上げ及び吊り下げすると共に
上金枠2のみを吊り上げ及び吊り下げる第1金枠吊り機
9と、鋳型ばらし機10とを配置し、該ロ−ラコンベヤ
1の終端に上下金枠2,3をそれぞれ吊り上げ及び吊り
下げする第2金枠吊り機11を配置し、該第2金枠吊り
機11の外側に前記定盤台車4を一時的に待避させる待
避ステ−ション12を設け、前記ロ−ラコンベヤ1の始
端及び終端を、鋳造冷却ライン6の終端及び始端に第1
トラバ−サ7及び第2トラバ−サ8を介してそれぞれ連
絡連結可能にしたことを特徴とする金枠循環造型鋳造ラ
イン設備
A roller conveyor 1 capable of transferring upper and lower metal frames 2, 3 and a platen truck 4 is provided through a mold making machine 5, and the upper and lower metal frames 2, 2 are provided at the starting end of the roller conveyor 1. 2 and a first metal frame lifting machine 9 for lifting and hanging only the upper metal frame 2 and a mold releasing machine 10 for lifting and hanging only the upper metal frame 2. A second metal frame suspender 11 for lifting and suspending the frames 2 and 3 respectively is disposed, and an evacuation station 12 for temporarily retracting the surface plate carrier 4 is provided outside the second metal frame suspender 11. The start and end of the roller conveyor 1 are connected to the end and start of the casting cooling line 6 by the first.
A metal frame circulating molding and casting line facility which can be connected to each other via a traverser 7 and a second traverser 8;
JP26555296A 1996-09-13 1996-09-13 Metal frame circulation molding casting line equipment Expired - Fee Related JP3280242B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP26555296A JP3280242B2 (en) 1996-09-13 1996-09-13 Metal frame circulation molding casting line equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP26555296A JP3280242B2 (en) 1996-09-13 1996-09-13 Metal frame circulation molding casting line equipment

Publications (2)

Publication Number Publication Date
JPH1085904A true JPH1085904A (en) 1998-04-07
JP3280242B2 JP3280242B2 (en) 2002-04-30

Family

ID=17418703

Family Applications (1)

Application Number Title Priority Date Filing Date
JP26555296A Expired - Fee Related JP3280242B2 (en) 1996-09-13 1996-09-13 Metal frame circulation molding casting line equipment

Country Status (1)

Country Link
JP (1) JP3280242B2 (en)

Also Published As

Publication number Publication date
JP3280242B2 (en) 2002-04-30

Similar Documents

Publication Publication Date Title
CN101232961B (en) Cope and drag molding device and molding line
CN109967726B (en) Mold release method and mold release device
JP4437765B2 (en) Demolding device for sand mold with poured frame
JP2866593B2 (en) Casting equipment
JP2010172955A (en) Line facility for molding and casting
JP5008344B2 (en) Cast frame conveyor
CN209918883U (en) Open line sand casting apparatus for producing
JP3280242B2 (en) Metal frame circulation molding casting line equipment
KR20090032764A (en) Mold rotation type multi casting method and apparatus thereof
JP2004174567A (en) Flask removal method and apparatus for sand mold with flask after teeming
JP2001198668A (en) Molding and casting line facility
JP2734194B2 (en) Mold cooling device
JP4341021B2 (en) Pattern plate reuse method and frameless mold making machine
JP4573178B2 (en) Unpacking device and method of unsealing sand mold with poured frame
JP2007301608A (en) Conveying equipment for casting mold and molding equipment for casting mold using the same
JP2003326358A (en) Casting method and casting line
CN216176448U (en) Molding line quick replacement mould device
JP4288640B2 (en) Molding line and casting line
CN215033433U (en) Easy-to-demould aluminum ingot casting melting mold
JPS646864B2 (en)
WO1991012104A1 (en) Vertical pour casting process
CN110090944B (en) Mold release method and mold release device
JP2635589B2 (en) Casting manufacturing method
JP2004098110A (en) Mold with molding flask, molding method, molten metal pouring method and molding board carrier
JPH11309560A (en) Method for taking out casting and device therefor

Legal Events

Date Code Title Description
FPAY Renewal fee payment

Year of fee payment: 7

Free format text: PAYMENT UNTIL: 20090222

FPAY Renewal fee payment

Year of fee payment: 7

Free format text: PAYMENT UNTIL: 20090222

FPAY Renewal fee payment

Year of fee payment: 8

Free format text: PAYMENT UNTIL: 20100222

LAPS Cancellation because of no payment of annual fees