JPH10317725A - Stack shell erecting method for steel tower supported stack - Google Patents

Stack shell erecting method for steel tower supported stack

Info

Publication number
JPH10317725A
JPH10317725A JP14448197A JP14448197A JPH10317725A JP H10317725 A JPH10317725 A JP H10317725A JP 14448197 A JP14448197 A JP 14448197A JP 14448197 A JP14448197 A JP 14448197A JP H10317725 A JPH10317725 A JP H10317725A
Authority
JP
Japan
Prior art keywords
tower
steel tower
tubular body
chimney
winch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP14448197A
Other languages
Japanese (ja)
Other versions
JP3785742B2 (en
Inventor
Tetsuya Hamada
哲也 浜田
Junichi Yokozawa
純一 横沢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
IHI Corp
Original Assignee
IHI Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by IHI Corp filed Critical IHI Corp
Priority to JP14448197A priority Critical patent/JP3785742B2/en
Publication of JPH10317725A publication Critical patent/JPH10317725A/en
Application granted granted Critical
Publication of JP3785742B2 publication Critical patent/JP3785742B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

PROBLEM TO BE SOLVED: To reduce the term of works for erecting a stack shell of a steel tower supported stack. SOLUTION: A steel tower is assembled and installed with the front left undone. Sheaves 4, 5 are fitted to the top of the steel tower 1. A stack shell 7 is manufactured in front of the steel tower 1. A wire rope 10 bound to the tip of the manufactured stack shell 7 is hooked on the sheave 4 of the top of the steel tower 1 to be wound round a drum 12 of a winch 11 on the ground. The winch 11 is driven to erect the stack shell through the wire rope 10 and is stored inside the steel tower 1 through the front opening part of the steel tower 1 and constructed. After that, the wire rope 10 hooked on the sheaves 4, 5 of the top of the steel tower 1 is bound to the steel tower front truss part, and erected by the winch 11 to be fitted to the front of the steel tower 1.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は鉄塔支持型煙突を建
設するときに筒身を架設する工法に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method of constructing a tubular body when constructing a tower-supporting chimney.

【0002】[0002]

【従来の技術】従来、この種鉄塔支持型煙突を建設する
場合は、煙突の建設場所に鉄塔を先に組み立てて施工
し、しかる後、筒身を所要長さに分割して製作したもの
を順次鉄塔の内側へ搬入して積み重ねると共に接続して
継ぎ足して行くことにより筒身の架設を行う工法が採用
されている。又、一方では、長身の筒身を地上で製作
し、これを大型クレーンで吊り上げて鉄塔の内側に入れ
て立てるという工法もある。
2. Description of the Related Art Conventionally, when constructing this type of tower-supporting chimney, it is necessary to first assemble and construct the tower at the chimney construction site, and then divide the tubular body into required lengths. A construction method in which a tubular body is erected by sequentially carrying it into the inside of a steel tower, stacking, connecting, and adding together is adopted. On the other hand, there is a construction method in which a tall tubular body is manufactured on the ground, lifted with a large crane, and placed inside a steel tower to stand up.

【0003】なお、鉄塔支持型煙突の鉄塔は、4本の支
柱間をトラス構造の補強材で連結して堅固に組み立てら
れて、頂部まで登れるように昇降用の梯子が取り付けら
れており、該鉄塔の内側には、1本又は2本の筒身が架
設されて鉄塔に支持されるようにしてある。
[0003] The steel tower of the tower-supporting chimney is rigidly assembled by connecting four columns with reinforcing members of a truss structure, and is provided with a ladder for elevating so as to be able to climb to the top. One or two tubular bodies are installed inside the tower and supported by the tower.

【0004】[0004]

【発明が解決しようとする課題】ところが、上記従来の
架設工法のうち、前者の工法である筒身を小ブロックと
して鉄塔内に入れて上方へ継ぎ足して行く工法の場合、
多くの手数を要し、工期期間が長くなる問題があり、
又、筒身を大型クレーンで吊り上げる工法の場合は、大
型クレーンが必要であると共に、大型クレーンによる作
業に広いスペースが必要で煙突の設置場所の問題があ
る。
However, in the above-mentioned conventional erection method, in the case of the former method, the tubular body is inserted into a steel tower as a small block and added upward,
It takes a lot of trouble and there is a problem that the construction period is long,
In addition, in the case of the method of lifting the cylindrical body with a large crane, a large crane is required, and a large space is required for work by the large crane, and there is a problem of a place for setting a chimney.

【0005】そこで、本発明は、鉄塔支持型煙突の筒身
を多くの時間を要することなく且つ大型クレーンを使用
することなく架設することができるようにしようとする
ものである。
Accordingly, an object of the present invention is to make it possible to install a tubular body of a tower supporting type chimney without requiring much time and without using a large crane.

【0006】[0006]

【課題を解決するための手段】本発明は、上記課題を解
決するために、鉄塔支持型煙突の設置位置に、鉄塔を前
面だけを残して組み立てて設置し、該鉄塔架設後に、該
鉄塔頂部に掛けたワイヤロープの先端を、地上で製作し
た筒身の上端側となる先端部に結着し、該ワイヤロープ
を地上のウインチで巻取ることにより筒身を基端を支点
として起立させ、前面より鉄塔内に筒身を入れて架設
し、しかる後に、地上で組み立てた鉄塔前面トラス部を
鉄塔前面に取り付けるようにする工法とする。
SUMMARY OF THE INVENTION In order to solve the above-mentioned problems, the present invention is to install and install a steel tower with only its front face left at the installation position of a steel tower-supporting chimney. The wire rope hung on the front end is attached to the top end of the tubular body made on the ground, and the wire rope is wound up with a winch on the ground to raise the tubular body with the base end as a fulcrum. The truss will be inserted into the pylon and erected, and then the truss section on the pylon will be attached to the pylon.

【0007】組み立てた鉄塔を利用して筒身を水平状態
から起立させて架設するので、鉄塔の組み立てと並行し
て筒身を製作することができ、鉄塔の組み立てが終了す
ると、該鉄塔を利用して筒身を起立して架設することが
できて、筒身の架設の工期を短縮することができる。
[0007] Since the tubular body is erected from the horizontal state by using the assembled steel tower, the tubular body can be manufactured in parallel with the assembling of the steel tower. When the steel tower is assembled, the steel tower is used. Then, the tube body can be erected and erected, and the construction period of the tube body can be shortened.

【0008】鉄塔前面トラス部を鉄塔を利用してウイン
チで起立させて鉄塔の前面側に取り付けるようにするこ
とにより、前面トラス部の組み付けも短時間に且つ簡易
に行うことができる。
When the truss portion on the front of the tower is raised by a winch using a tower and attached to the front side of the tower, the front truss portion can be assembled in a short time and easily.

【0009】又、地上に作業台を起倒自在に設置して、
筒身や鉄塔を作業台上で製作することにより、製作後、
作業台を昇降装置にて起立させることにより作業台とと
もに鉄塔や筒身を起立させることが楽である。
In addition, a work table is set up and down on the ground so that
By producing the cylinder and the tower on the workbench, after production,
It is easy to erect the tower and the tubular body together with the work table by raising the work table with the elevating device.

【0010】[0010]

【発明の実施の形態】以下、本発明の実施の形態を図面
を参照して説明する。
Embodiments of the present invention will be described below with reference to the drawings.

【0011】図1(イ)(ロ)乃至図4は本発明の実施
の一形態により鉄塔支持型煙突の筒身架設を行う手順を
示すもので、所要長さを有する4本の脚柱2間に前面だ
けを残して補強材3をトラス構造に配設して組み立てて
なる下部鉄塔1aを、煙突の設置場所に固定設置し(図
1(イ))、同様に4本の脚柱2a間に前面だけ残して
補強材3をトラス構造に配設してなり且つ頂部の前後左
右両側部にシーブ4と5を取り付けた上部鉄塔1bを構
成して、該上部鉄塔1bを上記下部鉄塔1a上に載置さ
せ、一体的に継ぎ足して鉄塔1を組み立てるようにする
(図1(ロ))。6は後側2本の脚柱2の下端部に取り
付けたシーブである。
FIGS. 1 (a), 1 (b) to 4 show a procedure for erection of a tower supporting type chimney according to an embodiment of the present invention, in which four pillars 2 having a required length are provided. The lower steel tower 1a, which is assembled by disposing the reinforcing members 3 in a truss structure while leaving only the front surface therebetween, is fixedly installed at the installation location of the chimney (FIG. 1 (a)), and similarly, the four pillars 2a An upper tower 1b having a reinforcing member 3 arranged in a truss structure while leaving only the front surface therebetween and having sheaves 4 and 5 attached to the front, rear, left and right sides of the top is formed, and the upper tower 1b is connected to the lower tower 1a. The steel tower 1 is placed on top and integrally added to assemble the steel tower 1 (FIG. 1 (b)). Reference numeral 6 denotes a sheave attached to the lower ends of the two rear pillars 2.

【0012】上記鉄塔1の組み立て作業と並行して、地
上では筒身7の製作を行う。筒身7の製作は、鉄塔1の
建設場所の近くで行うようにするが、上記鉄塔1の前面
開放側に、鉄塔1よりも長さが長い筒身7を横方向に製
作して支持台8に支持させておくようにする。この際、
筒身7の下端となる一端を、鉄塔1設置場所に固定した
基礎プレート9上に位置させるようにする。地上に横倒
しの状態で製作された筒身7の上端側となる他端側にワ
イヤロープ10を結着し、該ワイヤロープ10を鉄塔1
の頂部に設けたシーブ4に掛けた後、後面側となる2本
の脚柱2の下端部のシーブ6に掛けてウインチ11のド
ラム12に巻き取らせ、ウインチ11の運転によりワイ
ヤロープ10を鉄塔1上のシーブ4,6を介して巻き取
ることにより、鉄塔1を利用して筒身7を下端を中心と
して起立させるようにする(図1(ハ))。この際、必
要に応じて基礎プレート9上に筒身7の下端を係止する
ストッパ装置を設けるようにする。
At the same time as the assembling work of the steel tower 1, a cylindrical body 7 is manufactured on the ground. The tubular body 7 is manufactured near the construction site of the steel tower 1, but a tubular body 7 having a length longer than the steel tower 1 is manufactured in a lateral direction on the open front side of the steel tower 1. 8 to support. On this occasion,
One end serving as the lower end of the tubular body 7 is positioned on the base plate 9 fixed to the installation site of the steel tower 1. A wire rope 10 is attached to the other end, which is the upper end, of the cylindrical body 7 manufactured in a state of being laid on the ground, and the wire rope 10 is attached to the steel tower 1.
After being hung on a sheave 4 provided at the top of the vehicle, the wire rope 10 is wound on a drum 12 of a winch 11 by hanging on a sheave 6 at the lower end of the two pillars 2 on the rear side. By winding through the sheaves 4 and 6 on the steel tower 1, the tubular body 7 is made to rise around the lower end using the steel tower 1 (FIG. 1 (c)). At this time, a stopper device for locking the lower end of the tubular body 7 is provided on the base plate 9 as necessary.

【0013】図2に示す如く、筒身7が起立させられて
鉄塔1の内側に収められると、筒身7の下端を固定して
鉄塔1内に架設し、該筒身7に結着したワイヤロープ1
0を筒身7より取り外すようにする。
As shown in FIG. 2, when the tubular body 7 is erected and housed inside the steel tower 1, the lower end of the tubular body 7 is fixed and installed in the steel tower 1 and attached to the tubular body 7. Wire rope 1
0 is detached from the barrel 7.

【0014】しかる後、近くで上記鉄塔1の組み立て作
業と並行して組み立てた鉄塔前面を覆うための前面トラ
ス部13を鉄塔1の前方へ横倒しの状態で位置させて、
鉄塔1の頂部に取り付けた別のシーブ6に掛けた上記ワ
イヤロープ10の先端側を前面トラス部13の先端(上
端)に結着させるようにし(図3)、ウインチ11の動
作で前面トラス部13を起立させて鉄塔1に連結し、一
体化させるようにする(図4)。この際、前面トラス部
13は、起立時に剛性を持たせるように、2本の鉄柱1
4に2本の鉄柱15を継ぎ足して、これらの間に補強材
3を取り付けた構成とし、起立させたときに、鉄柱14
は鉄塔1の脚柱2に、又、鉄柱15は鉄塔1の脚柱2a
にそれぞれ一体的に取り付けるようにする。
Thereafter, a front truss portion 13 for covering the front surface of the tower 1 assembled in parallel with the assembling operation of the tower 1 is positioned near the tower 1 in a state in which the front truss portion 13 is turned sideways.
The front end of the wire rope 10 hung on another sheave 6 attached to the top of the tower 1 is connected to the front end (upper end) of the front truss portion 13 (FIG. 3). 13 is erected and connected to the tower 1 to be integrated (FIG. 4). At this time, the front truss portion 13 is provided with two iron poles 1 so as to have rigidity when standing.
4, two iron poles 15 are added, and the reinforcing material 3 is attached between them.
Is the pillar 2 of the tower 1, and the pillar 15 is the pillar 2a of the tower 1.
To each other.

【0015】上記した実施の形態によると、鉄塔1の組
み立てと並行して筒身7や前面トラス部13の製作を行
い、鉄塔1を組み立てた後に、該鉄塔1を利用して筒身
7をウインチ11により起立させて鉄塔1の内側に立て
るようにし、しかる後、前面トラス部13を、上記筒身
7の起立の場合と同様に、鉄塔1を利用してウインチ1
1により起立させるようにすることから、筒身7の架設
を一気に行うことができて、鉄塔支持型の煙突を短期間
で施工することができる。
According to the above-described embodiment, the tubular body 7 and the front truss portion 13 are manufactured in parallel with the assembling of the steel tower 1, and after the steel tower 1 is assembled, the tubular body 7 is utilized by using the steel tower 1. The truss portion 13 is raised by the winch 11 so as to stand inside the tower 1. Thereafter, the front truss portion 13 is moved to the winch 1 using the tower 1 in the same manner as in the case of the upright state of the tubular body 7.
Since the tube body 7 is erected, the erection of the tubular body 7 can be performed at a stretch, and a tower-supporting chimney can be constructed in a short time.

【0016】なお、本発明は上記実施の形態のみに限定
されるものではなく、たとえば、鉄塔1の組み立てた後
に、鉄塔1を利用して筒身7を起立させることに代え
て、図5に示す如く、地上にピット16を設けると共
に、地上に設置した筒身製作用作業台17の基端部18
を基点として起倒自在に構成し、該作業台17を、ピッ
ト16内に設置した昇降装置19に連結し、該昇降装置
19の伸長作動により作業台17が基端部18を支点と
して回動することにより、該作業台17上の筒身7を起
立させるようにすることができる。この場合は、作業台
17と筒身7とを固縛しておくことが必要である。筒身
7を作業台17とともに起立させて、筒身7を鉄塔1の
内側で固定設置させると、作業台17との固縛を解いた
後、作業台17を昇降装置19により倒し、しかる後、
該作業台17で組み立てた前面トラス部又は別場所で組
み立てて作業台17上に載せた前面トラス部を、作業台
17に固縛させて、上記筒身7の起立の場合と同様にピ
ット16内の昇降装置19により作業台17を起立させ
ることによって前面トラス部13を起立させ、鉄塔1に
一体的に取り付けるようにしてもよい。
The present invention is not limited to the above embodiment. For example, after assembling the steel tower 1, instead of using the steel tower 1 to raise the tubular body 7, FIG. As shown in the figure, a pit 16 is provided on the ground, and a base end portion 18 of a cylinder working table 17 installed on the ground.
The work table 17 is connected to a lifting device 19 installed in the pit 16, and the work table 17 is rotated about the base end portion 18 by the extension operation of the lifting device 19. By doing so, the tubular body 7 on the work table 17 can be raised. In this case, it is necessary to secure the work table 17 and the tubular body 7 in advance. When the tubular body 7 is erected with the worktable 17 and the tubular body 7 is fixedly installed inside the steel tower 1, after the securing with the worktable 17 is released, the worktable 17 is lowered by the elevating device 19, and then ,
The front truss part assembled on the work table 17 or the front truss part assembled on another place and placed on the work table 17 is fastened to the work table 17 and the pit 16 The front truss portion 13 may be erected by erecting the work table 17 by the elevating device 19 in the inside, and may be integrally attached to the steel tower 1.

【0017】このようにすれば、ウインチ11やワイヤ
ロープ10が不要になると共に、筒身7の起立操作をよ
り安定して行うことが可能となって有利である。
In this case, the winch 11 and the wire rope 10 are not required, and the operation of raising the tubular body 7 can be performed more stably.

【0018】又、図6に示す如く、作業台20上で鉄塔
1を組み立て、該鉄塔1の内側に筒身7を予め組み込む
と共に、該鉄塔1と筒身7との間に応力吸収用の緩衝材
21を介在させて、鉄塔1に筒身7を保持させた状態と
し、これをピット16内の昇降装置19により起立させ
るようにすることもできる。
As shown in FIG. 6, a steel tower 1 is assembled on a workbench 20, and a tubular body 7 is pre-installed inside the steel tower 1, and a stress absorbing member is provided between the steel tower 1 and the tubular body 7. The tubular body 7 may be held by the steel tower 1 with the buffer material 21 interposed therebetween, and this may be raised by the elevating device 19 in the pit 16.

【0019】このようにすれば、工期の大幅な短縮が図
れる。
In this way, the construction period can be significantly reduced.

【0020】更に、図5において、作業台17をなくし
て、筒身7をピット16内の昇降装置19で直接起立さ
せるようにすることもできる。
Further, in FIG. 5, the workbench 17 can be omitted, and the cylindrical body 7 can be directly erected by the elevating device 19 in the pit 16.

【0021】更に又、鉄塔前面トラス部13をウインチ
11により起立させることに代えて、前面トラス部13
を分割して鉄塔前面に順次組み付けるようにしてもよ
い。
Further, instead of erecting the tower truss portion 13 with the winch 11, the front truss portion 13
May be divided and sequentially assembled to the front of the tower.

【0022】[0022]

【発明の効果】以上述べた如く、本発明の鉄塔支持型煙
突の筒身架設工法によれば、鉄塔を前面のみを開放して
組み立てた後に、該鉄塔頂部に取り付けたシーブに掛け
て導いたワイヤロープを、地上にて横倒しの状態で製作
した筒身に結着し、ウインチによりワイヤロープを介し
筒身を起立させて鉄塔の前面より鉄塔内に入れて自立さ
せ、しかる後、前面トラス部を鉄塔に組み付けるように
するので、従来の筒身を小ブロックごとに製作して継ぎ
足して行く工法に比して工期の短縮化を図ることができ
ると共に、前面トラス部をウインチによりワイヤロープ
を介し起立させることにより簡単に鉄塔の前面に取り付
けることができ、大型クレーンを使用しないために大型
クレーンの拘束による架設コストの削減が図れる、とい
う優れた効果を奏し得られ、又、筒身を地上で製作して
地上に設けたピット内の昇降装置で直接又は作業台を介
して起立させたり、地上で鉄塔を組み立ててその内側に
筒身を予め組み込んだ状態にしてピット内の昇降装置に
より起立させるようにすることにより、筒身の架設をよ
り円滑に且つ安定よく行うことができ、且つ工期の大幅
な短縮化が図れる、等の優れた効果を奏し得る。
As described above, according to the method of erection of a tower-supporting chimney according to the present invention, after assembling the tower with only its front face opened, the tower is guided by a sheave attached to the top of the tower. Attach the wire rope to the tubular body made sideways on the ground, raise the tubular body via the wire rope with a winch, put it into the tower from the front of the tower, and stand alone, then the front truss part To the tower, so that the construction period can be shortened compared to the conventional method in which the tubular body is manufactured in small blocks and added together, and the front truss part is winched with a wire rope. By standing up, it can be easily attached to the front of the tower, and since there is no need for a large crane, there is an excellent effect that the installation cost can be reduced by restraining the large crane. Obtained, the cylinder body is manufactured on the ground, and it is erected directly or through a workbench by a lifting device in a pit provided on the ground, or a steel tower is assembled on the ground and the cylinder body is previously installed inside it By using the lifting device in the pit, the erection of the tubular body can be performed more smoothly and more stably, and the construction period can be significantly shortened. .

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の鉄塔支持型煙突の筒身架設工法の実施
の一形態を示すもので、(イ)は鉄塔の下部を組み立て
た状態を示す図、(ロ)は(イ)の下部鉄塔部の上方に
上部鉄塔部を組み立てて設置した鉄塔の状態を示す図、
(ハ)は地上で製作した筒身を起立させる状態を示す図
である。
BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 shows an embodiment of a method of erection of a tower supporting chimney according to the present invention, wherein (a) shows a state where a lower part of a tower is assembled, and (b) shows a lower part of (a). Diagram showing the state of the tower installed and assembled upper tower section above the tower section,
(C) is a diagram showing a state in which a tubular body manufactured on the ground is erected.

【図2】図1(ハ)の状態から筒身を起立させた状態を
示す図である。
FIG. 2 is a diagram showing a state in which the tubular body is erected from the state of FIG.

【図3】筒身を自立させた後に、鉄塔の前面トラス部を
起立させる状態を示す図である。
FIG. 3 is a diagram showing a state in which a front truss portion of a steel tower is erected after the tube body is made to stand by itself.

【図4】筒身の架設が終了した状態を示す図である。FIG. 4 is a diagram showing a state in which the installation of the tubular body has been completed.

【図5】本発明の実施の他の形態を示す概略図である。FIG. 5 is a schematic view showing another embodiment of the present invention.

【図6】本発明の実施の更に他の形態を示す概略図であ
る。
FIG. 6 is a schematic view showing still another embodiment of the present invention.

【符号の説明】[Explanation of symbols]

1 鉄塔 4,5,6 シーブ 7 筒身 10 ワイヤロープ 11 ウインチ 13 前面トラス部 16 ピット 17 筒身製作用作業台 19 昇降装置 20 作業台 21 緩衝材 DESCRIPTION OF SYMBOLS 1 Steel tower 4,5,6 sheave 7 Tube body 10 Wire rope 11 Winch 13 Front truss part 16 Pit 17 Tube body working work table 19 Elevating device 20 Work table 21 Buffer material

Claims (5)

【特許請求の範囲】[Claims] 【請求項1】 鉄塔支持型煙突の設置位置に、鉄塔を前
面だけを残して組み立てて設置し、該鉄塔架設後に、該
鉄塔頂部に掛けたワイヤロープの先端を、地上で製作し
た筒身の上端側となる先端部に結着し、該ワイヤロープ
を地上のウインチで巻取ることにより筒身を基端を支点
として起立させ、前面より鉄塔内に筒身を入れて架設
し、しかる後に、地上で組み立てた鉄塔前面トラス部を
鉄塔前面に取り付けるようにすることを特徴とする鉄塔
支持型煙突の筒身架設工法。
1. A tower is assembled and installed at a position where a tower-supporting chimney is installed, leaving only a front surface thereof. The wire rope is wound up with a winch on the ground to raise the tubular body with the base end as a fulcrum, put the tubular body into the steel tower from the front side, and then erected the ground. A method of erection of a tower-supporting chimney with a tubular body, characterized in that the tower truss section assembled in step 1 is attached to the front of the tower.
【請求項2】 地上で組み立てた鉄塔前面トラス部にワ
イヤロープの先端を結着して、ウインチにより鉄塔前面
トラス部を起立させて鉄塔の前面に取り付けるようにす
る請求項1記載の鉄塔支持型煙突の筒身架設工法。
2. The tower supporting type according to claim 1, wherein a tip of a wire rope is attached to the tower front truss section assembled on the ground, and the tower front truss section is raised by a winch and attached to the front of the tower. Chimney cylinder body erection method.
【請求項3】 鉄塔を利用してウインチで筒身を起立さ
せることに代えて、筒身を起立させる位置に設けたピッ
ト内の昇降装置で筒身を起立させるようにする請求項1
記載の鉄塔支持型煙突の筒身架設工法。
3. The cylinder body is raised by a lifting device in a pit provided at a position where the cylinder body is raised, instead of using the steel tower to raise the cylinder body by a winch.
The method of erection of the body of the tower support type chimney described in the above.
【請求項4】 筒身製作用作業台を一端側を基点として
起倒できるように設置し、該作業台を筒身を起立させる
位置に設けたピット内の昇降装置により起倒動作させる
ようにした請求項1又は3記載の鉄塔支持型煙突の筒身
架設工法。
4. A workbench for producing a cylinder body is installed so as to be able to be turned upside down from one end side, and the worktable is moved up and down by an elevating device in a pit provided at a position for erecting the cylinder body. 4. The method for erection of a cylinder of a tower-supporting chimney according to claim 1 or 3.
【請求項5】 鉄塔支持型煙突の設置位置の近くに、一
端を起倒できるように設置した作業台上にて鉄塔と筒身
を並行して製作した後、該鉄塔と筒身との間に応力吸収
用の緩衝材を介在させて鉄塔に筒身を支持させた状態に
し、しかる後、上記作業台を昇降装置で一端を基点とし
て起立させることにより鉄塔と筒身とを一体的に起立さ
せて架設することを特徴とする鉄塔支持型煙突の筒身架
設工法。
5. A steel tower and a tubular body are manufactured in parallel on a workbench which is installed near the installation position of a tower-supporting chimney so that one end thereof can be turned upside down. The tower is supported by the tower with the buffer material for stress absorption interposed therebetween, and then the tower and the barrel are integrally raised by raising the work table with one end as a base point by the lifting device. A method of erection of a tower-supported chimney with a tube body, which is erected.
JP14448197A 1997-05-20 1997-05-20 Steel tower construction method for steel tower supported chimney Expired - Fee Related JP3785742B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP14448197A JP3785742B2 (en) 1997-05-20 1997-05-20 Steel tower construction method for steel tower supported chimney

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP14448197A JP3785742B2 (en) 1997-05-20 1997-05-20 Steel tower construction method for steel tower supported chimney

Publications (2)

Publication Number Publication Date
JPH10317725A true JPH10317725A (en) 1998-12-02
JP3785742B2 JP3785742B2 (en) 2006-06-14

Family

ID=15363323

Family Applications (1)

Application Number Title Priority Date Filing Date
JP14448197A Expired - Fee Related JP3785742B2 (en) 1997-05-20 1997-05-20 Steel tower construction method for steel tower supported chimney

Country Status (1)

Country Link
JP (1) JP3785742B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE202012009679U1 (en) * 2012-10-10 2014-01-13 Maritime Offshore Group Gmbh Device for the production of offshore foundations
CN107327864A (en) * 2017-08-07 2017-11-07 厦门辉煌赵工环保科技有限公司 A kind of chimney cleaning system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE202012009679U1 (en) * 2012-10-10 2014-01-13 Maritime Offshore Group Gmbh Device for the production of offshore foundations
CN107327864A (en) * 2017-08-07 2017-11-07 厦门辉煌赵工环保科技有限公司 A kind of chimney cleaning system

Also Published As

Publication number Publication date
JP3785742B2 (en) 2006-06-14

Similar Documents

Publication Publication Date Title
JPH10317725A (en) Stack shell erecting method for steel tower supported stack
JPH0571225A (en) Temporarily set roof of complete weather type
CN210976318U (en) Beam string mounting structure of spoke type beam string structure roof
JPH06323503A (en) Assembling method for large size suspension type boiler
JP2946074B2 (en) Large roof erection method
JPH04161566A (en) Constructing apparatus for large space building
JP3069835B2 (en) Uchigumi scaffold structure
JP3939237B2 (en) How to construct a girder frame
JPH05133016A (en) Peripheral supporting self-rising type building engineering method
JP2003120037A (en) Construction lifting system for multistoried building
JP2006249742A (en) Reinforced cage building-up method
JPH05286694A (en) Construction method and crane for assembling external type steel tower
JPH09242191A (en) Construction of large span structure
JPH04161565A (en) Construction of large space building
JP2003343094A (en) Demolition method for tower-like structure
KR20050006610A (en) A membrane structure and Lift-up building method of a membrane structure
JPH0321777A (en) Construction method of iron-frame pillar
JP3975401B2 (en) Steel tower raising method
JP2001295372A (en) Construction method of large span roof structure
JP3021199B2 (en) Construction method of chimney inner cylinder and pull jack up device for the construction
JPH0431412Y2 (en)
JPH06101348A (en) Method for constructing tower
JPH07172767A (en) Mast dismantler of tower crane
JPH03235838A (en) Lift up method of construction using temporary pillar
JPH10219629A (en) Windproof and snowproof fence with spike and its folding and erecting method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20040419

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20060217

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20060228

A61 First payment of annual fees (during grant procedure)

Effective date: 20060313

Free format text: JAPANESE INTERMEDIATE CODE: A61

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 3

Free format text: PAYMENT UNTIL: 20090331

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100331

Year of fee payment: 4

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 5

Free format text: PAYMENT UNTIL: 20110331

LAPS Cancellation because of no payment of annual fees