JPH1030229A - Steel pipe pressing-in method at narrow space portion with upper limitation - Google Patents

Steel pipe pressing-in method at narrow space portion with upper limitation

Info

Publication number
JPH1030229A
JPH1030229A JP20641596A JP20641596A JPH1030229A JP H1030229 A JPH1030229 A JP H1030229A JP 20641596 A JP20641596 A JP 20641596A JP 20641596 A JP20641596 A JP 20641596A JP H1030229 A JPH1030229 A JP H1030229A
Authority
JP
Japan
Prior art keywords
press
steel pipes
casing
excavation
fitting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP20641596A
Other languages
Japanese (ja)
Other versions
JP3204616B2 (en
Inventor
Hirosuke Yokoyama
弘介 横山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yokoyama Kiso Kohji Co Ltd
Original Assignee
Yokoyama Kiso Kohji Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yokoyama Kiso Kohji Co Ltd filed Critical Yokoyama Kiso Kohji Co Ltd
Priority to JP20641596A priority Critical patent/JP3204616B2/en
Publication of JPH1030229A publication Critical patent/JPH1030229A/en
Application granted granted Critical
Publication of JP3204616B2 publication Critical patent/JP3204616B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
  • Earth Drilling (AREA)

Abstract

PROBLEM TO BE SOLVED: To safely shorten the construction period in one process with good work efficiency with the plant of the same heavy machine without dividing the preceding excavation and substitutional excavation process in the fore-stage and the steel pipe pressing-in process in the post-stage when long and large- diameter steel pipes are pressed in at the low-head region of a narrow space having an upper limitation such as under the girder of a bridge. SOLUTION: A full rotation type all casing excavator 6 is set at a low-head region 3 between an upper structure 1 and the ground 2, a grab 7 for excavation and earth removal is concentrically set on it, and preceding excavation and substitutional excavation are conducted. Steel pipes are carried in and set in an excavation hole, the casing chuck of the casing pressing-in device of a casing excavator is set to the expanded state of the contact area with the outer peripheries of the steel pipes, pipe shape maintaining mechanisms are inserted into the steel pipes, a pipe chuck is fastened against the casing chuck via a lower hydraulic cylinder, and the pipes are pressed in with no buckling or no deformation regardless of the fragility of thin steel pipes.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】開示技術は、橋梁の桁下等の上空
制限を有する狭隘空間における軟弱地盤から硬質障害物
を含有する硬質地盤、又は、これらの互層地盤に対して
鋼管や鋼管矢板等(以下鋼管類と略称)を打設する技術
分野に属する。
BACKGROUND OF THE INVENTION The disclosed technology relates to a soft ground in a confined space having an upper limit such as below a bridge girder to a hard ground containing hard obstacles, or a steel pipe, a steel pipe sheet pile, etc. (Hereinafter abbreviated as steel pipes).

【0002】[0002]

【従来の技術】周知の如く、鋼管矢板はその構造上、高
い水平耐力に優れている等の点から近時(特に昭和40
年代後半から)急速に普及し、現今では岸壁や護岸,防
波堤等の港湾,河川構造物ばかりでなく、山間部等の道
路に渡設する橋梁の橋脚基礎用としても広く利用される
等その用途は確実に広がりつつある。
2. Description of the Related Art As is well known, steel pipe sheet piles have recently been used in recent years (particularly in Showa 40) because of their structurally excellent horizontal strength.
It has spread rapidly since the late 1980s, and is now widely used not only for quays, seawalls, breakwaters, and other harbors and river structures, but also for the pier foundations of bridges installed on roads in mountainous areas. Is definitely spreading.

【0003】しかし、該種鋼管矢板の大いなる普及の一
方ではその施工技術において多様化する施工現場状況に
対応しきれないというネックがある。
[0003] However, while the seed steel sheet piles have become very popular, there is a bottleneck in that their construction techniques cannot cope with diversified construction site conditions.

【0004】而して、硬質地盤に対する鋼管矢板の打設
の際には、当該鋼管矢板の地盤に対する圧入に先行して
置換掘削が必須の条件であるにもかかわらず、在来の施
工法では当該置換掘削と鋼管矢板の地盤に対する圧入の
工程はその施工態様が相違するところから、施工機械装
置が異なり、したがって、先行する置換掘削とその後の
鋼管矢板圧入の工程に施工プロセスが二分割されざるを
得ず、各々の重機プラントが同一施工部位に対し、入れ
替り手順を必要とし、その結果、施工能率が低下し、工
期が長くかかり、コスト的に高くつくというデメリット
があった。
[0004] When a steel pipe sheet pile is driven into hard ground, displacement excavation is an essential condition prior to press-fitting the steel pipe sheet pile into the ground. The replacement excavation and the press-fitting process of the steel pipe sheet pile into the ground are different in the construction mode, so the construction machinery is different, and therefore, the construction process is not divided into two processes of the preceding displacement excavation and the subsequent steel pipe sheet pile press-fitting process. However, each heavy equipment plant requires a replacement procedure for the same construction site, resulting in a decrease in construction efficiency, a long construction period, and a high cost.

【0005】而して、一般に在来の鋼管矢板等の鋼管類
圧入施工手段には次の4つの工法があった。
[0005] Conventionally, there are the following four methods for press-fitting steel pipes such as conventional steel pipe sheet piles.

【0006】 振動工法 所定のバイブロハンマーによる鋼管類に対する振動付加
により該鋼管類圧入部位の地盤との摩擦力を低減させて
該鋼管類の圧入を行うものである。
Vibration method A vibration method is applied to steel pipes by applying vibration to the steel pipes with a predetermined vibratory hammer to reduce the frictional force between the steel pipe press-fitting portion and the ground and press-fit the steel pipes.

【0007】 打撃工法 所定のディーゼルハンマーや油圧ハンマーによる鋼管類
に対する強力な打撃を印加することによる高速圧入の施
工を特徴とするものであり、硬質地盤を対象として鋼管
類を圧入する場合には、当該硬質地盤による貫入抵抗を
軽減させるべく、鋼管類の管内にアースオーガーをセッ
トして管内掘削を行うようにするものである。
[0007] Blowing method is characterized by high-speed press-fitting by applying a strong blow to steel pipes by a predetermined diesel hammer or hydraulic hammer. When steel pipes are pressed into hard ground, In order to reduce the penetration resistance due to the hard ground, an earth auger is set in a pipe of steel pipes so as to perform in-pipe excavation.

【0008】 中堀圧入工法 鋼管類の管内をアースオーガーで掘削しながら、油圧に
より静圧を印加して鋼管圧入を行う方法である。
[0008] Nakahori press-in method This is a method in which a steel pipe is press-fitted by applying static pressure by hydraulic pressure while excavating the inside of a steel pipe with an earth auger.

【0009】 掘削建込み工法 当該工法は鋼管に対し予めリバースサーキュレーション
掘削機等により所定の深度まで掘削を行い、孔壁崩壊を
防止して鋼管矢板を建て込んだ後、該孔壁と鋼管との間
隙にモルタルグラウトの充填を行うようにした施工方法
である。
In this method, a steel pipe is excavated in advance to a predetermined depth by a reverse circulation excavator or the like to prevent collapse of a hole wall, and a steel sheet pile is built. This is a construction method in which mortar grout is filled in the gaps.

【0010】[0010]

【発明が解決しようとする課題】しかしながら、上述
の振動工法は鋼管類の圧入可能な地盤であることが前提
条件となり、硬質地盤に対して鋼管類を打設するに際し
ては先行掘削を必要とし、したがって、当該先行掘削と
後段の鋼管類圧入の2工程がプロセス上分割されざるを
得ず、それぞれの専用機械装置(例えば全回転型オール
ケーシング装置を用いて先行掘削を行う等)の入れ替え
作業が発生するという作業能率の低下と工期の長期化、
コストアップが避けられないという欠点がある。
However, the above-mentioned vibration method requires the ground to be capable of press-fitting steel pipes, and requires excavation when driving steel pipes into hard ground. Therefore, the two steps of the preceding excavation and the subsequent steel pipe press-fitting have to be divided in the process, and replacement work of each dedicated mechanical device (for example, preceding excavation using a full-rotation type all casing device) occurs. Work efficiency is reduced and the construction period is lengthened,
There is a disadvantage that cost increase cannot be avoided.

【0011】そして、上述,,の打撃工法、中堀
圧入工法、掘削建込み工法においてはいずれも鋼管類圧
入の補助工法として鋼管類の圧入施工と同時に管内の掘
削を行って硬質障害物の撤去を行うために、当該鋼管類
の貫入抵抗の軽減は可能となるメリットがあるものの、
上述の振動工法の態様と同様に先行掘削を必要とし、
置換掘削用機械装置と鋼管類圧入装置の入れ替え作業が
発生し、同様に施工能率の低下と施工期間の長期間とな
り、結果的にコストアップを招くというデメリットがあ
った。
[0011] In the above-mentioned hammering method, Nakabori press-in method, and excavation and construction method, all of the above-mentioned methods are used as auxiliary methods for press-fitting steel pipes. Although there is an advantage that it is possible to reduce the penetration resistance of the steel pipes,
Prior excavation is required as in the case of the above-mentioned vibration method,
Replacement work of the excavating machinery and the steel pipe press-fitting device occurred, and similarly, there was a demerit that the construction efficiency was reduced and the construction period was extended, resulting in an increase in cost.

【0012】又、施工が2工程になることから安全性に
も劣るというマイナス点があった。
[0012] In addition, there is a disadvantage that the safety is inferior because the construction is performed in two steps.

【0013】そして、鋼管類の施工普及には前述橋梁の
桁下等の基礎拡張工事に代表されるような上部構造物に
より著しい高度制限、即ち、上空制限を有する現場(以
下低空頭領域と略称)が増加しており、当該低空頭領域
における施工は上述〜の各施工方法においては大口
径で長尺の鋼管類の打設に対応出来ないという難点があ
った。
In order to spread the use of steel pipes, a site having a remarkable altitude limit, ie, an altitude limit due to an upper structure represented by the above-mentioned foundation expansion work under a bridge girder (hereinafter referred to as a low head area). ) Has increased, and the construction in the low head area has a drawback that the above-described construction methods cannot cope with the installation of a large-diameter long steel pipe.

【0014】特に、の掘削建込み工法においては先行
掘削を前段工程に有した大口径で長尺の鋼管類の打設工
法が対応出来るようにした施工方法であるが、橋梁の桁
下部等の狭隘空間の低空頭領域に対する有効な手立てが
なく、設計通りの施工が出来難いという不具合があっ
た。
In particular, in the excavation and construction method, a method of placing large-diameter and long steel pipes, which has preceding excavation in the preceding step, is applicable. There was a problem that there was no effective means for the low head area of the narrow space, and it was difficult to perform construction as designed.

【0015】これに対処するに、近年鋼管パイラー工法
と称する貫入引抜工法が開発され、低騒音、低振動で低
空頭領域での施工が可能であるような技術が案出されて
はいるが、基本的に前述,,工法と同様に鋼管類
が圧入可能である地盤であることが前提となっており、
又、全工程が前述の如く前工程と後工程の二分割工程に
なることを避けるための施工技術を有しておらず、又、
鋼管類の圧入時に同時併行的に管内掘削を行う手段を有
していないために、ウォータージェットを併用して貫入
抵抗を緩和することは可能ではあるものの、鋼管類の継
手部抵抗や連続打設に起因する地盤圧密効果等の複合条
件により発生する貫入抵抗に対する対処手段が充分には
開発されておらず、確実な施工には実効が伴わないとい
う不都合さがあった。
In order to cope with this, in recent years, a penetration drawing method called a steel pipe pile method has been developed, and a technology has been devised which enables low noise, low vibration, and low-head-space construction. Basically, it is premised that the ground is capable of press-fitting steel pipes as in the above-mentioned construction methods.
In addition, as described above, there is no construction technology to avoid being divided into two steps, a pre-process and a post-process, and
Since there is no means to simultaneously excavate the inside of the pipe at the time of press-fitting steel pipes, it is possible to reduce the penetration resistance by using a water jet together, but it is possible to reduce the joint resistance and continuous casting of steel pipes However, measures to cope with the penetration resistance caused by complex conditions such as the ground consolidation effect caused by the above have not been developed sufficiently, and there has been an inconvenience that reliable construction is not effective.

【0016】[0016]

【発明の目的】この出願の発明の目的は上述従来技術に
基づく振動工法から掘削建込み工法に至る在来工法によ
る前段の先行掘削による置換掘削と後段の鋼管類圧入の
工程の二分割工程による施工能率低下と工期の長期間に
基づく経費増大、安全性の低下、又、近時の鋼管パイラ
ー工法による貫入抵抗に対する対処手段不充分、そし
て、何よりも上空制限を有する狭隘空間部位の低空頭領
域における大口径、長尺の鋼管類の圧入不如意の問題点
を解決すべき技術的課題とし、同一施工装置の同一の重
機プラントにより全施工期間を分割することなく行え、
しかも、騒音振動等の公害対策も充分に果せながら、硬
質地盤の先行掘削の置換掘削と鋼管類の打設を1プロセ
スにて行うようにし、施工能率がアップし、工期の短縮
が行え、安全性が高く、低コストで施工が出来るように
して建設産業における土木技術利用分野に益する優れた
上空制限を有する狭隘空間部位での鋼管類圧入工法を提
供せんとするものである。
The object of the invention of this application is to divide the process into two steps: the replacement excavation by the preceding excavation at the former stage and the press-fitting of the steel pipe at the later stage by the conventional construction method from the vibration method to the excavation and construction method based on the prior art. A low head area in a narrow space part where there are insufficient measures to reduce construction efficiency and increase costs due to a long construction period, a decrease in safety, and the penetration resistance due to the recent steel pipe piler method, and above all, there are restrictions on the sky. It is a technical problem to solve the problem of inadvertent press-fitting of large-diameter, long-sized steel pipes, and can be performed by the same heavy equipment plant with the same construction equipment without dividing the entire construction period,
In addition, the replacement excavation of hard excavation and the excavation of steel pipes are performed in one process, while the pollution countermeasures such as noise and vibration can be sufficiently performed. This improves the construction efficiency and shortens the construction period. It is an object of the present invention to provide a method for press-fitting steel pipes in a narrow space having an excellent sky-restriction, which has a high safety and can be constructed at a low cost and which is advantageous to the field of civil engineering in the construction industry.

【0017】[0017]

【課題を解決するための手段】上述目的に沿い先述特許
請求の範囲を要旨とするこの出願の発明の構成は、前述
課題を解決するために、掘削、及び、排土用グラブを懸
垂した伸縮ショートブームクローラクレーンを周公知の
全回転型オールケーシング掘削機に併設して上空制限を
有する狭隘空間部位の低空頭領域において長尺、大口径
の地盤先行掘削の置換掘削を該全回転型オールケーシン
グ掘削機内部で行え、掘削、及び、排土用グラブにおい
て油圧グラブを用いることにより、鋼管類の管内掘削の
ためのクレーンブームの高度が低減されるばかりでな
く、確実に当該低空頭領域において置換掘削が行え、
又、鋼管類圧入に際しては全回転型オールケーシング掘
削機のケーシングチャック機構の管体外表面に対する接
触部位を拡張し緊締力を増加し、確実に圧入が可能であ
るようにし、又、鋼管類の継手部の抵抗や連続圧入打設
による地盤圧密効果等の複合的条件により多大な抵抗を
発することに対しては鋼管内にクレーンのブームから懸
垂した管体形状維持機構の管体チャック機構を全回転型
オールケーシング掘削機のケーシングチャック機構に対
向して緊締し両者により鋼管類を挾持することにより、
全回転型オールケーシング掘削機の緊締力による薄肉で
脆弱な鋼管類の変形を防止しつつ、全回転型オールケー
シング掘削機の増強した圧入力を鋼管類に印加し、鋼管
の変形を防止するようにして全回転型オールケーシング
掘削機と油圧グラブ、及び、該全回転型オールケーシン
グ掘削機のプラントを以って1プロセスで設計通りに高
能率で置換掘削、鋼管類圧入を行うようにした技術的手
段を講じたものである。
SUMMARY OF THE INVENTION In order to solve the above-mentioned problems, the construction of the invention of the present application, which aims at the above-mentioned objects and which has the scope of the claims set forth above, expands and contracts by hanging a grab for excavation and earth removal. A short-boom crawler crane is attached to a well-known all-rotation all-casing excavator to perform long-distance, large-diameter ground excavation replacement excavation in a low-head area of a narrow space part having a sky limitation. The use of hydraulic gloves for internal, excavation and unloading grabs not only reduces the height of the crane boom for in-pipe excavation of steel tubing, but also ensures replacement drilling in the low head area. Done,
Also, when press-fitting steel pipes, the contact area of the casing chuck mechanism of the all-rotation type all-casing excavator to the outer surface of the pipe body is increased to increase the tightening force so that the press-fitting can be reliably performed. In order to generate a large amount of resistance due to combined conditions such as the resistance of the ground and the consolidation effect of the ground by continuous press-fitting, the pipe chuck mechanism of the pipe shape maintenance mechanism suspended from the boom of the crane in the steel pipe is a full rotation type By tightening and tightening the steel pipes by facing the casing chuck mechanism of the all-casing excavator,
While preventing the deformation of thin and fragile steel pipes due to the tightening force of the all-rotation all-casing excavator, the increased press force of the all-rotation all-casing excavator is applied to the steel pipes to prevent the deformation of the steel pipe. All-rotation type all-casing excavator and hydraulic grab, and technical means for performing displacement excavation and press-fitting of steel pipes with high efficiency as designed in one process using a plant of the all-rotation all-casing excavator It is a thing.

【0018】[0018]

【作用】橋梁の桁下等の上空制限を有する狭隘空間部位
の低空頭領域における硬質地盤等に対する大口径、長尺
の鋼管類の打設に際し、周公知の硬質地盤用オールケー
シング施工用の全回転型オールケーシング掘削機とケー
シング内掘削用及び排土用の油圧グラブを懸垂したクレ
ーン台車を組み合わせた同一の重機プラントにより掘削
を行い、鋼管類が圧入自在となるように砂等を投入する
ことにより地盤を改良した後に同プラントにより鋼管類
圧入作業を行い、狭隘空間部位での重機プラント入れ替
えに伴う危険性と工期の長大化を解消し、圧入作業に際
しては同プラントのクレーン台車により懸垂した掘削、
及び、排土用グラブを用いて鋼管類内部地盤を掘削して
圧入抵抗を低減させながら、全回転型オールケーシング
掘削機により鋼管類圧入作業を行い、その際、該掘削機
のケーシングチャック機構の管体外面に対する接触面積
を拡張し、又、鋼管内にクレーンのブームから懸垂した
管体形状維持機構の管体チャック機構を全回転型オール
ケーシング掘削機のケーシングチャック機構に対向して
管体内面に圧着させて両者により鋼管類を挾持すること
により、全回転型オールケーシング掘削機の強力なクラ
ンプ力による薄肉で脆弱な鋼管類の変形を防止しつつ、
全回転型オールケーシング掘削機の増強した圧入力を鋼
管類に印加するようにして、更に、鋼管類の継手部の抵
抗や連続圧入打設による地盤圧密効果等の複合条件に発
生する抵抗を該掘削機の揺動力を用いて低減し、鋼管類
を確実に所定深度まで圧入することが可能であり、大口
径で長尺の鋼管類が圧入される地盤に対する先行掘削に
よる置換掘削と後段の鋼管類圧入が同一の重機プラント
にて行われることにより、橋梁の橋桁下部等の上空制限
を有する狭隘空間部位の低空頭領域において、工程毎に
異なる重機に対し各々その作業領域を考慮して施工設計
を行う煩瑣性と狭隘空間部位の低空頭領域に位置する現
場での重機入れ替えに伴う危険性が著しく低減し、又、
油圧によりグラブの開閉を行う本装置の特性により掘
削、及び、排土時に発生する騒音や振動を可及的に低減
し、充分な公害対策を施しつつ施工計画、施工管理が容
易になり、安全性も高く、施工期間も短縮され、コスト
ダウンが図れるようにしたものである。
[Function] When casting large-diameter, long steel pipes against hard ground in the low head area of a narrow space area with a restriction on the sky above a bridge girder, etc. Excavation is carried out by the same heavy equipment plant that combines a type-all-casing excavator and a crane bogie that suspends hydraulic grabs for excavating and discharging soil in the casing, and the sand is injected so that steel pipes can be pressed in freely. After the improvement, the steel pipe press-fitting work was carried out by the same plant, eliminating the danger and the longer construction period associated with the replacement of heavy equipment plants in confined spaces, and excavation suspended by the crane bogie of the plant during the press-fitting work.
And, while excavating the ground inside the steel pipes using the earth removal grab to reduce the press-in resistance, the steel pipes press-in operation is performed by the all-rotation all-casing excavator, and at this time, the pipe of the casing chuck mechanism of the excavator is used. The area of contact with the outer surface of the body is expanded, and the pipe chuck mechanism of the pipe shape maintenance mechanism suspended from the crane boom in the steel pipe is pressed against the inner surface of the pipe facing the casing chuck mechanism of the all-rotation all-casing excavator By clamping the steel pipes by both, the deformation of thin and fragile steel pipes due to the strong clamping force of the all-rotation all-casing excavator is prevented,
The increased press-in force of the all-rotation all-casing excavator is applied to the steel pipes, and furthermore, the resistance generated in the combined condition such as the resistance of the joints of the steel pipes and the ground consolidation effect due to continuous press-fitting is excavated. It is possible to press-fit steel pipes to a specified depth by using the power of rocking of the machine. Since the press-fitting is performed in the same heavy equipment plant, in the low head area of the narrow space area where there is a restriction on the sky such as the lower part of the bridge girder of the bridge, the construction design is taken into consideration for the different heavy equipment for each process and the work area for each. The complexity involved and the risk associated with the replacement of heavy equipment at the site located in the low head area of the narrow space area is significantly reduced,
Due to the characteristics of this device that opens and closes gloves by hydraulic pressure, noise and vibration generated during excavation and earth removal are reduced as much as possible, and construction planning and construction management are facilitated while taking sufficient pollution countermeasures, ensuring safety. It is highly efficient, the construction period is shortened, and the cost can be reduced.

【0019】[0019]

【発明の実施の形態】次に、この出願の発明の1実施形
態を図面に従って説明すれば以下の通りである。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS One embodiment of the invention of the present application will be described below with reference to the drawings.

【0020】図示形態は橋梁の橋桁1と施工対象の地盤
2との間の上空制限を有する狭隘空間部位の低空頭領域
3における鋼管矢板の鋼管類4の打設の態様である。
The illustrated embodiment shows a mode of placing steel pipes 4 of steel pipe sheet piles in a low head area 3 in a narrow space portion having a space limitation between a bridge girder 1 of a bridge and a ground 2 to be constructed.

【0021】而して、該鋼管類4は所定の大口径で所定
の長尺を有するものであり、図1に示す実施形態の態様
において、5は施工装置としてのプラントであり、主と
して3体よりなり、6は当業者にとり前述周公知の全回
転型オールケーシング掘削機であり、軟質地盤、又は、
硬質地盤2上に設置されており、その中心部上には油圧
式の掘削、及び、排土用グラブ7がセットされて次述伸
縮ショートブームクローラクレーン8の伸縮自在なショ
ートブーム11の先端からワイヤー13の先端に懸垂さ
れているものである。
The steel pipes 4 have a predetermined large diameter and a predetermined length. In the embodiment shown in FIG. 1, reference numeral 5 denotes a plant as a construction device, 6 is a full-rotation type all-casing excavator known to those skilled in the art, and
It is installed on the hard ground 2, and a hydraulic excavation and earth removal grab 7 is set on the center thereof, and the telescopic short boom crawler crane 8 described below extends from the tip of the telescopic short boom 11. The wire 13 is suspended from the tip of the wire 13.

【0022】而して、全回転型オールケーシング掘削機
6に併設して搬入セットされる伸縮ショートブームクロ
ーラクレーン8は地盤2上のクローラ9上に旋回動自在
な操作部10' を有する台車10がそのショートブーム
11をして低空頭領域3内にて所定に伸縮自在、高さ調
節自在にされて設けられており、又、該台車10の後端
部にはウインチ12が設けられてワイヤー13を取り出
し、該伸縮ショートブームクローラクレーン8のショー
トブーム11の先端部に設けられた滑車14を介し掘
削、及び、排土用のグラブ7を全回転型オールケーシン
グ掘削機6の中心部上に懸垂している。
The telescopic short-boom crawler crane 8 which is carried in and set along with the all-rotation type all-casing excavator 6 includes a bogie 10 having an operation part 10 ′ which can turn on a crawler 9 on the ground 2. The short boom 11 is provided so as to be able to expand and contract in a predetermined manner within the low head area 3 and to be adjustable in height. A winch 12 is provided at the rear end of the carriage 10 and a wire 13 is provided. , And excavation via a pulley 14 provided at the tip of a short boom 11 of the telescopic short boom crawler crane 8, and a grab 7 for discharging the earth are suspended above the center of the all-rotation type all casing excavator 6. ing.

【0023】尚、15は鋼管類4の吊り下げ用、及び、
プラント移設の際の全回転型オールケーシング掘削機6
等の吊り下げ用のフックである。
In addition, 15 is for suspending the steel pipes 4 and
All-rotation type all-casing excavator 6 for relocation of plant
It is a hook for hanging.

【0024】而して、図1に示す実施形態は、硬質地盤
を対象とした鋼管矢板打設施工において、鋼管類4を圧
入自在なように地盤改良するため置換掘削には当業者に
とり周公知の硬質地盤用オールケーシング工事態様が適
用され、その在来態様においては切削用ビットを先端に
装着したケーシングを全回転型オールケーシング掘削機
6により回転圧入して孔壁を保護しながら対象地盤切削
を行い、同時併工的に併設した台車10により懸垂した
掘削、及び、排土用グラブ7によるケーシング内地盤掘
削、及び、排土を行い、又、所定深度に到達するまで必
要数ケーシングを連結して前述工程を反復しながら対象
地盤掘削を推進する際の重機姿勢図の態様である。
The embodiment shown in FIG. 1 is well known to those skilled in the art for replacing excavation in order to improve the ground so that the steel pipes 4 can be press-fitted in the installation of steel pipe sheet piles for hard ground. In the conventional mode, a casing equipped with a cutting bit at its tip is rotationally press-fitted by a full-rotation type all-casing excavator 6 to cut a target ground while protecting a hole wall. The excavation suspended by the bogie 10 provided in parallel with the simultaneous construction, the ground excavation in the casing by the glove 7 for earth removal, and the earth removal are performed, and the required number of casings are connected until reaching the predetermined depth. It is a mode of the heavy equipment attitude | position figure at the time of promoting target ground excavation while repeating the above-mentioned process.

【0025】しかし、この出願の発明においては前述の
置換掘削工程の際ばかりでなく、構造物として埋設され
る鋼管類4の圧入機としての全回転型オールケーシング
掘削機6を適用し、又、その圧入工程において発生する
圧入抵抗を併設した台車10により懸垂した掘削、及
び、排土用グラブ7によるケーシング内地盤掘削、及
び、排土を行い低減しつつ、必要数鋼管類4の溶接等に
より連結しつつ大口径長尺の鋼管類4の圧入を推進す
る、即ち、図1は該プラントによる中掘併用圧入工法の
施工態様ともなる。
However, in the invention of this application, not only during the above-described displacement excavation step, but also a full-rotation all-casing excavator 6 as a press-fitting machine for steel pipes 4 buried as a structure is applied. Excavation suspended by a trolley 10 provided with a press-in resistance generated in the press-in process, ground excavation in a casing by a glove 7 for earth removal, and earth removal performed by welding, etc. by welding the required number of steel pipes 4 while reducing the earth removal. While the press-fitting of the large-diameter and long-sized steel pipes 4 is promoted, that is, FIG.

【0026】而して、本来置換掘削と鋼管類圧入作業は
相異なる工程であり、それに伴い在来態様の施工法では
各工程で使用される機材も選択的に異ならせていたが、
この出願の発明においては両工程が同一の重機プラント
での施工として一元化され、橋梁の橋桁下部等の上空制
限を有する狭隘空間部位の低空頭領域において施工を計
画する際、各工程毎に使用される重機の形状、寸法を考
慮して各々の作業領域を確保するために、1現場に対し
て多様な施工態様の検討する煩瑣性と狭隘空間部位に位
置する現場への重機プラントの入れ替えに伴う危険性が
著しく低減され、更に鋼管類打設にかかる全工程の施工
管理が容易となり安全性が向上する。
Although the replacement excavation and the steel pipe press-fitting operation are originally different steps, the equipment used in each step is selectively different in the conventional construction method.
In the invention of this application, both processes are unified as construction in the same heavy equipment plant, and are used for each process when planning construction in a low head area of a narrow space part having a sky restriction such as a lower part of a bridge girder. In order to secure each work area in consideration of the shape and dimensions of the heavy equipment, various construction modes must be considered for one site. The risk is remarkably reduced, and furthermore, the construction management of all processes related to the casting of steel pipes is facilitated, and the safety is improved.

【0027】又、低空頭領域3での該プラント5による
施工に際しては、掘削孔に台車10により挿入される機
材、鋼材一切の挿入時鉛直方向の寸法が該領域の高度の
制限を蒙るものであり、更に特にケーシング、鋼管、鋼
管矢板等の鋼管類4は橋桁等既設構造物1と全回転型オ
ールケーシング掘削機6上端との間隙を台車10によっ
て接触事故なく挿入自在な長さに分断されることにな
り、その結果、該間隙が狭隘度の増加に伴いその連結作
業(ケーシングの場合はロックピン等による連結、構造
物となる鋼管及び鋼管矢板等鋼管類の場合は溶接)の発
生頻度が増し、大口径長尺の打設の際はその影響による
工期長大化が特に顕著となるため、この出願の発明にお
いては安全で円滑、且つ、迅速な作業が自在なように、
全回転型オールケーシング掘削機6、掘削、及び、排土
用グラブ7、台車10は稼動時鉛直方向の寸法が可及的
に短尺化され、最適化されている。
Further, when the plant 5 performs construction in the low head area 3, the vertical dimension of the equipment and steel inserted into the excavation hole by the trolley 10 is subject to the limitation of the altitude of the area. In particular, a steel pipe 4 such as a casing, a steel pipe, a steel pipe sheet pile or the like is divided into a gap between the existing structure 1 such as a bridge girder and the upper end of the all-rotation all-casing excavator 6 by a bogie 10 to a length that can be inserted without a contact accident. As a result, the frequency of the connection work (connection with a lock pin in the case of a casing, welding in the case of a steel pipe such as a steel pipe and a steel pipe sheet pile or the like in the case of a steel pipe and sheet pile) is increased as the gap becomes narrower. In the case of large-diameter and long-sized casting, the length of the construction period due to the influence becomes particularly prominent, so that in the invention of this application, safe, smooth, and quick work is free.
The dimensions of the all-rotation all-casing excavator 6, the excavation and earth removal grab 7, and the bogie 10 are as short as possible in the vertical direction during operation and optimized.

【0028】加えて、橋桁等既設構造物1の形状と施工
基盤に対する位置の多様性により、同一現場内でも施工
ポイント毎にその都度大きく異なる低空頭領域3に対し
て最良の作業効率と安全性を確保自在なように、台車1
0の伸縮ショートブームクローラクレーン8は伸縮自在
なショートブーム11を有している。
In addition, due to the diversity of the shape of the existing structure 1 such as a bridge girder and the position with respect to the construction base, even in the same site, the best work efficiency and safety can be obtained for the low head area 3 which is greatly different for each construction point. Trolley 1 so that you can secure
The telescopic short boom crawler crane 8 has a telescopic short boom 11.

【0029】更に、図2においては全回転型オールケー
シング掘削機6の用途を切削ビットを装着した掘削機材
であるケーシングの回転圧入専用から構造物として打設
される該ケーシングと比較すると、一般的に薄肉で脆弱
である鋼管類4の圧入工程用にまで拡張するにあたり、
該鋼管類4の座屈を防止するために、掘削、及び、排土
用グラブ7に替えて管体形状維持機構を台車10により
懸垂して全回転型オールケーシング掘削機6に挿入され
た鋼管類4内に吊り込んだ態様を示すものであり、ま
ず、該全回転型オールケーシング掘削機6のフレーム1
6の周囲には所定数の水平ジャッキ17,17,17…
が配設されており、該機の水平姿勢が保持出来るように
されている。
Further, in FIG. 2, when the application of the all-rotation type all-casing excavator 6 is compared with the casing which is cast as a structure exclusively for rotary press-fitting of a casing, which is an excavating machine equipped with a cutting bit, generally, In expanding to the press fitting process of thin and brittle steel pipes 4,
In order to prevent the steel pipes 4 from buckling, the steel pipes inserted into the all-rotation type all-casing excavator 6 by suspending the pipe shape maintaining mechanism by the bogie 10 instead of the excavation and earth removal grabs 7. 4 shows an embodiment in which the frame 1 of the full-rotation type all-casing excavator 6 is suspended in the frame 1.
A predetermined number of horizontal jacks 17, 17, 17,...
Is provided so that the horizontal attitude of the machine can be maintained.

【0030】そして、該フレーム16の周囲には所定数
のスラストシリンダ18,18…が等間隔に所定数垂立
状に配置されており、各スラストシリンダ18から内側
に向けて一体的に設けられている昇降フレーム19には
チャックシリンダ21が設けられ、リンク22、上部の
ベアリング23、下部のベアリング25を介し鋼管類4
に対しその外側面から当接して緊締力を付与する緊着用
のくさび型のチャック機構としてのケーシングチャック
24は在来態様の全回転オールケーシング掘削機とは異
なり、該鋼管類4の外側面に対する当接面を拡張して緊
締力を確実に増加するように周方向に所定数設けられて
いる。
A predetermined number of thrust cylinders 18 are arranged vertically around the frame 16 at equal intervals, and are integrally provided inward from each thrust cylinder 18. The lifting frame 19 is provided with a chuck cylinder 21, and a steel pipe 4 is provided via a link 22, an upper bearing 23, and a lower bearing 25.
The casing chuck 24 as a fastening wedge-type chuck mechanism for applying a tightening force by contacting the outer surface of the steel tube 4 with the outer surface of the steel pipe 4 is different from the conventional full-rotation all-casing excavator. A predetermined number is provided in the circumferential direction so as to expand the contact surface and surely increase the tightening force.

【0031】尚、ケーシングチャック24とコーンリン
グ26により構成されるケーシングチャック機構は圧着
挾持した鋼管類4と共に油圧モータ19' を油圧アクチ
ュエ−タとしてギヤ20,20' を介し圧入方向に対し
て垂直方向に360°左右両方向の回動運動を行うこと
が自在で、同時に昇降フレーム19ごとスラストシリン
ダ18のストロークにより上下運動するよう設計されて
いる。
The casing chuck mechanism composed of the casing chuck 24 and the cone ring 26 is perpendicular to the press-fit direction via the gears 20, 20 'using the hydraulic motor 19' as a hydraulic actuator together with the steel pipes 4 clamped and held. It is designed to be able to freely rotate in both directions by 360 ° in the left and right directions, and at the same time, to move up and down by the stroke of the thrust cylinder 18 together with the lifting frame 19.

【0032】周公知の硬質地盤用オールケーシング工で
は全回転型オールケーシング掘削機の前述機構により、
先端に切削ビットを装着したケーシングを地盤に回転圧
入して孔壁を保持しながら切削を行い、同時に併設した
クレーン台車が懸垂したチゼル等の落下の衝撃により岩
盤、硬質障害物を破砕し掘削補助を行いながら掘削、及
び、排土用グラブにてケーシング内掘削を推進するが、
この出願の発明においては先行する硬質地盤の改良を目
的としていた置換掘削作業に適用するばかりでなく、当
該機構の適用範囲を拡張して切削機能を有していない鋼
管類4、即ち、鋼管及び鋼管矢板等の圧入作業工程に適
用する。
In the known all-ground casing for hard ground, the above-described mechanism of the all-rotation type all-casing excavator is used.
A casing equipped with a cutting bit at its tip is rotationally pressed into the ground to perform cutting while holding the hole wall, and at the same time, a crane truck attached to it crushes rock and hard obstacles by the impact of a falling chisel etc. While excavating, and excavation in the casing is promoted by the earth removal grab,
In the invention of this application, the present invention is not only applied to the replacement excavation work aimed at improving the preceding hard ground, but also the scope of the mechanism is expanded so that the steel pipes 4 having no cutting function, that is, steel pipes and Applies to the press-in work process for steel pipe sheet piles.

【0033】又、その際、通常の鋼管を圧入する場合は
圧入方向に対して垂直な360°の回転力を圧入の補助
力として援用しつつ圧入を推進し、鋼管矢板の如く継手
により隣設部位との連結が必要な場合は回転力を使用せ
ず、継手を損傷しない程度の揺動力を付加することで土
砂等の流入による継手内部で発生する圧密を緩和しつつ
圧入を推進する。
At this time, when a normal steel pipe is press-fitted, the press-fitting is promoted while using a 360 ° rotational force perpendicular to the press-fitting direction as an assisting force of the press-fitting, and the steel pipe is inserted adjacently by a joint like a sheet pipe sheet pile. When connection with the parts is required, press-fitting is promoted while reducing consolidation generated inside the joint due to the inflow of earth and sand by applying a swinging force that does not damage the joint without using a rotational force.

【0034】しかし、地盤を改良した後でも実施工にお
いては、切削機能を有していない打設用鋼管類4の圧入
作業に際しては鋼管類継手部の抵抗ばかりでなく、連続
圧入打設による地盤圧密効果等の圧入抵抗の増大する諸
条件の複合により圧入不如意となる障害が多発し、その
際はより強力なチャック力で該鋼管類4を緊締保持しな
ければならないが、必要量のチャック力が該鋼材の強度
を超過する場合には変形を招来するため、該鋼材の脆弱
性がネックとなり、在来態様の全回転型オールケーシン
グ掘削機の仕様ではチャック力と圧入力を充分に印加す
ることが困難であった。
However, even after the ground has been improved, in the construction work, not only the resistance of the joints of the steel pipes but also the ground by continuous press-fitting during the press-fitting of the casting steel pipes 4 having no cutting function. Due to the combination of various conditions such as the consolidation effect and the like that increase the press-in resistance, there are many obstacles which may cause the press-fitting to fail. In this case, the steel pipes 4 must be tightly held with a stronger chucking force. However, if the strength exceeds the strength of the steel material, deformation occurs, so the brittleness of the steel material becomes a bottleneck, and in the specification of the conventional all-rotation all-casing excavator, it is necessary to sufficiently apply the chucking force and the pressure input. Was difficult.

【0035】而して、この出願の発明においては圧入力
を管体強度を越えて増大させる際には該鋼管類4の内部
にはショートブーム11の先端のフック15から懸吊さ
れているワイヤー13にホルダーブラケット27のブラ
ケット本体28の上下に固設したホルダープレート2
9,29' を有して引き上げ自在に挿入セットされてお
り、該ブラケット本体28の下端部にチャックシリンダ
21の数、即ち、ケーシングチャック24の数に相当す
るだけ設けられた油圧シリンダ30,30…がワイヤー
13に平行して張設されている油圧ホース13' により
作動自在にされ、ブラケット本体28に設けられたブラ
ケット31にピン枢支された平行リンク32,32を介
し管体形状維持機構としての管体チャック33が各ケー
シングチャック24に対向して鋼管類4の内壁面に当接
離反自在にされており、その制御は全回転型オールケー
シング掘削機6の図示しない制御装置を介しチャックシ
リンダ21と同期作動する油圧シリンダ30によりケー
シングチャック24と管体形状維持機構としての管体チ
ャック33が同期して鋼管類4の内外壁面からこれを強
固に挾着し、鋼管類4の圧入、及び、引き抜きを行うよ
うにされている。
According to the invention of this application, when the press-in force is increased beyond the strength of the tubular body, a wire suspended from the hook 15 at the tip of the short boom 11 is provided inside the steel tubing 4. 13, a holder plate 2 fixed above and below a bracket body 28 of a holder bracket 27
The hydraulic cylinders 30, 30 are provided at the lower end of the bracket main body 28 so as to correspond to the number of chuck cylinders 21, that is, the number of casing chucks 24. Are made operable by a hydraulic hose 13 'stretched in parallel with the wire 13, and a pipe shape maintaining mechanism is provided via parallel links 32, 32 pivotally supported by pins on a bracket 31 provided on a bracket body 28. The pipe chuck 33 as a member is configured to be capable of coming into contact with and separating from the inner wall surface of the steel pipes 4 in opposition to the casing chucks 24, and is controlled by a control device (not shown) of the all-rotation all casing excavator 6. The casing chuck 24 and the tube chuck 33 as a tube shape maintaining mechanism are synchronized by the hydraulic cylinder 30 that operates in synchronization with 21. The steel pipes 4 are firmly clamped from the inner and outer wall surfaces of the steel pipes 4, and the steel pipes 4 are press-fitted and pulled out.

【0036】又、昇降フレーム19はコッタブラケット
となるコーンリング26をしてケーシングチャック24
を鋼管類4の外表面に圧着緊締させるようにされ、又、
これに併せてチャックシリンダ21がリンク22を介し
該ケーシングチャック24を下降させて両者相俟って該
ケーシングチャック24を鋼管類4の外側面に圧締緊着
させて鋼管類4の強固な圧入力、及び、引き上げ力を印
加するようにされている。
The elevating frame 19 forms a cone ring 26 serving as a cotter bracket to form a casing chuck 24.
To the outer surface of the steel tubing 4 by pressing.
At the same time, the chuck cylinder 21 lowers the casing chuck 24 via the link 22, and together, the casing chuck 24 is pressed and fastened to the outer surface of the steel pipes 4 so that the strong pressure of the steel pipes 4 is maintained. An input and a lifting force are applied.

【0037】したがって、チャック機構はその強大な圧
入力を確実に鋼管類4に印加するために、又、同時に掘
削用ケーシングと比較すると薄肉で脆弱な鋼材である鋼
管及び鋼管矢板が該機構の強硬な緊締力が該鋼管類4の
外周面に偏在的に印加されることにより発生する変形、
及び、座屈を防止するために、在来態様よりも鋼管類4
の外周面との接触面積が拡張されているものである。
Therefore, the chuck mechanism ensures that the strong press input is applied to the steel pipes 4 and at the same time, the steel pipe and the steel pipe sheet pile, which are thin and brittle steel materials as compared with the casing for excavation, are hardened. Deformation caused by uneven tightening applied to the outer peripheral surface of the steel pipes 4,
And, in order to prevent buckling, the steel pipes 4
The contact area with the outer peripheral surface is expanded.

【0038】又、この処置は本説明に用いたくさび型の
チャック機構のみに該当するものではなく、バンド形式
のチャック機構においても同様の仕様変更が行われるこ
とは勿論のことである。
This procedure is not limited to the wedge-type chuck mechanism used in the present description, and it goes without saying that the same specification change is performed in the band-type chuck mechanism.

【0039】更に、周公知の全回転型オールケーシング
掘削機の該ケーシングチャック機構は図示しない脱着自
在なクランプカラーの変更によりチャック対象となる管
体口径変更に対応自在であり、該口径変更用クランプカ
ラーの付け替えにより、打設用鋼管類と該鋼材より大径
を有する置換掘削時使用の切削用ケーシングの双方が同
一の重機プラントで圧入自在である。
Further, the casing chuck mechanism of the known all-rotation type all-casing excavator is capable of responding to a change in the diameter of a pipe to be chucked by changing a detachable clamp collar (not shown). In this way, both the casting steel pipes and the cutting casing having a larger diameter than the steel material and used for displacement excavation can be press-fitted in the same heavy equipment plant.

【0040】又、該鋼管類4の内側の管体形状維持機構
の管体チャック33,33…が該鋼管類4の内側面に当
接してケーシングチャック24,24…と協働して強固
に鋼管類4を挾着緊締するために、単に該ケーシングチ
ャック24のみによる強固な緊締力によっては肉厚の薄
い鋼管類4の座屈現象や変形現象が起きることが避けら
れ、しかも、確実な圧入力や引き抜き力が与えられるよ
うにされているものである。
The tubular chucks 33 of the tubular shape maintaining mechanism inside the steel pipes 4 abut against the inner surface of the steel pipes 4 and cooperate with the casing chucks 24, 24 so as to be strong. In order to clamp and tighten the steel pipes 4, the buckling or deformation of the thin steel pipes 4 is prevented from occurring due to the strong tightening force of the casing chuck 24 alone. An input or pull-out force is provided.

【0041】上述構成のプラント5により橋梁の橋桁1
の下部において橋脚基礎部の拡張工事等を行うに際し、
大口径、長尺の鋼管類4を打設するに際し、伸縮ショー
トブームクローラクレーン8のショートブーム11のフ
ック15を介し全回転型オールケーシング掘削機6を所
定部位に搬入し、又、該伸縮ショートブームクローラク
レーン8のショートブーム11の先端の滑車14を介し
ワイヤー13により該全回転型オールケーシング掘削機
6に同芯的に吊り込みセットした掘削、及び、排土用グ
ラブ7を介し、在来態様同様に該全回転型オールケーシ
ング掘削機6内にセットされる図示しない切削用ビット
付ケーシングにより同芯的にその硬質地盤2を掘削し、
所定の深度まで先行掘削を行った後、該ケーシングを引
き抜きつつ構造物となる鋼管類4が圧入出来る小抵抗の
土砂を置換投入し、次段で圧入する鋼管類4の圧入抵抗
を減少させ、該先行掘削と置換掘削が終了すれば、伸縮
ショートブームクローラクレーン8のショートブーム1
1を介し掘削、及び、排土用のグラブ7を吊り上げて所
定部位に移転し、次いで、該伸縮ショートブームクロー
ラクレーン8のショートブーム11のフック15を介し
鋼管類4を搬入し、掘削部位に同芯的にセットする。
The bridge girder 1 of the bridge is constructed by the plant 5 having the above configuration.
When expanding the pier foundation in the lower part of the building,
When the large-diameter, long steel pipes 4 are driven, the all-rotational all-casing excavator 6 is carried into a predetermined portion via the hook 15 of the short boom 11 of the telescopic short boom crawler crane 8, and the telescopic short boom is used. Excavation suspended and set concentrically to the all-rotation all-casing excavator 6 by a wire 13 via a pulley 14 at the tip of a short boom 11 of a crawler crane 8, and the same manner as in a conventional mode via an earth removal grab 7. The hard ground 2 is concentrically excavated by a casing with a cutting bit (not shown) set in the all-rotation all-casing excavator 6.
After performing the preceding excavation to a predetermined depth, while pulling out the casing, a small resistance earth and sand that can be press-fitted into the steel pipes 4 as a structure is replaced and injected, and the press-in resistance of the steel pipes 4 to be press-fitted in the next stage is reduced, When the preceding excavation and replacement excavation are completed, the short boom 1 of the telescopic short boom crawler crane 8 is used.
Excavating via 1 and lifting the grab 7 for earth removal and transferring it to a predetermined site, and then carrying in the steel pipes 4 via the hook 15 of the short boom 11 of the telescopic short boom crawler crane 8 to enter the excavating site Set concentrically.

【0042】そして、先行掘削、置換掘削が終了する
と、掘削、及び、排土用のグラブ7をショートブーム1
1を介して所定部位に移転させ、フック15を介し鋼管
類4を圧入抵抗の小さい土砂等により置換され、改良さ
れた地盤に臨ませる。
When the preceding excavation and the replacement excavation are completed, the excavation and earth removal grabs 7 are moved to the short boom 1.
The steel pipes 4 are moved to a predetermined site through the hook 1 and are replaced with soil and the like having a small press-in resistance through the hooks 15 to face the improved ground.

【0043】そして、図2に示す様に、全回転型オール
ケーシング掘削機6のフレーム16の水平ジャッキ17
を調節して水平姿勢にし、スラストシリンダ18を介し
各ケーシングチャック24を同期させて鋼管類4の外側
面に近接させ、コーンリング26を介し該ケーシングチ
ャック24を鋼管類4の外周面に拡張的に当接密着させ
る。
As shown in FIG. 2, the horizontal jack 17 of the frame 16 of the all-rotation all-casing excavator 6 is used.
Is adjusted to a horizontal position, the casing chucks 24 are synchronized with each other via the thrust cylinder 18 so as to approach the outer surface of the steel pipes 4, and the casing chucks 24 are extended to the outer peripheral surface of the steel pipes 4 via the cone ring 26. Abut and contact.

【0044】そして、チャックシリンダ21を縮少させ
てケーシングチャック24をコーンリング26の協働に
より、より確実に鋼管類4の外周面に同期的により緊密
に締結状態にして圧入を開始する。
Then, the chuck cylinder 21 is reduced, and the casing chuck 24 is more securely and tightly fastened to the outer peripheral surface of the steel pipes 4 by cooperation of the cone ring 26 to start press-fitting.

【0045】そして、通常の圧入力では推進が不可能と
なった場合は全回転型オールケーシング掘削機6の図示
しない制御装置を介しワイヤー13を介し管体形状維持
機構を鋼管類4内に同芯的に吊下挿入セットし、下部の
油圧シリンダ30,30…を伸長作動させて平行リンク
32,32を介し管体チャック33,33…を外方の対
向するケーシングチャック24に径方向に拡張させて該
鋼管類4の内面に密着させ、該ケーシングチャック24
とで押圧的に鋼管類4の壁面を内外両面から挾着し、当
該ケーシングチャック24、及び、管体チャック33を
協働させて緊締し、適宜圧入力、及び、緊締力を増加し
て鋼管類4を地盤2に圧入打設し、所定深度まで圧入し
ていく。
When the propulsion becomes impossible by the normal press-fitting, the tubular shape maintaining mechanism is concentrically inserted into the steel pipes 4 via the wire 13 via the control device (not shown) of the all-rotation type all casing excavator 6. , And the lower hydraulic cylinders 30, 30,... Are extended to extend the tubular body chucks 33, 33. To bring the casing chuck 24 into close contact with the inner surface of the steel pipes 4.
The casing chuck 24 and the tubular body chuck 33 are cooperated to tighten the wall of the steel pipe 4 from both inside and outside in a pressing manner, and the steel pipe 4 is appropriately pressed and the tightening force is increased to increase the steel pipe. Type 4 is press-fitted into the ground 2 and press-fitted to a predetermined depth.

【0046】そして、鋼管類4を所定回数の溶接を完了
し打設中の杭体延長が所定の設計杭長に達すると、該杭
体の底部を設計深度まで、即ち、該杭体天端を一般的に
現地盤と同位、もしくは、その近傍となる設計位置まで
の圧入を行い打設作業を完了する。
When the steel pipes 4 have been welded a predetermined number of times and the pile length during driving reaches a predetermined design pile length, the bottom of the pile body is moved to the design depth, that is, the top of the pile body. In general, press-fitting is performed to a design position that is at or near the same level as the on-site board, and the casting operation is completed.

【0047】そのため、圧入推進の効率を最大限確保自
在なように相当長を有しているスラストシリンダ18を
介し相当長の打設対象地盤2との離隔を有してケーシン
グチャック機構を配設した全回転型オールケーシング掘
削機6により上述打設対象地盤2近傍の設計位置までの
杭体圧入を自在なように、該鋼管類4の内径を僅少に下
回る外径、及び、掘削、及び、排土用グラブ7が挿入自
在な内径を有する該鋼管類4内に挿入自在なリング状の
嵌合部を有し、又、鋼管類4と同外径を有する図示しな
い圧入補助治具をフック15を介し全回転型オールケー
シング掘削機6内に挿入し、上述の嵌合部を介して治具
と杭体を嵌合し、以降ケーシングチャック24,24…
に緊締された上述治具を介して所定深度まで杭体を圧入
し、その後スラストシリンダ18を逆作動させてチャッ
クシリンダ21を介しコーンリング26を作動させ、ケ
ーシングチャック24を上述圧入補助治具の外側面から
離反させ、該治具をフック15を介し全回転型オールケ
ーシング掘削機6内から引き抜き打設作業を完了し次の
ステップの鋼管類4の圧入に移行する。
For this reason, a casing chuck mechanism is provided with a sufficient distance from the ground 2 to be driven through the thrust cylinder 18 having a considerable length so that the efficiency of the press-in propulsion can be maximized. An outer diameter slightly smaller than the inner diameter of the steel pipes 4, and excavation and discharge so that the pile body can be press-fitted to the design position near the ground 2 to be driven by the all-rotation all-casing excavator 6 described above. A hook-shaped jig (not shown) having a ring-shaped fitting portion insertable into the steel pipes 4 having an inner diameter into which the earth glove 7 can be inserted and having the same outer diameter as the steel pipes 4 is provided. , The jig and the pile body are fitted through the above-mentioned fitting portion, and thereafter, the casing chucks 24, 24.
The pile body is press-fitted to a predetermined depth via the above-mentioned jig tightened, and then the thrust cylinder 18 is operated in reverse to operate the cone ring 26 via the chuck cylinder 21, and the casing chuck 24 is connected to the above-mentioned press-fitting auxiliary jig. The jig is separated from the outer side surface, the jig is pulled out from the inside of the all-rotation all-casing excavator 6 via the hook 15, the driving operation is completed, and the process proceeds to the next step of press-fitting the steel pipes 4.

【0048】上述プロセスの工程を同一の重機プラン
ト、即ち、全回転型オールケーシング掘削機6、及び、
伸縮ショートブームクローラクレーン8のショートブー
ム11、及び、両者間に吊設された掘削、及び、排土用
グラブ7を介して施工することにより、上空制限を対象
にした狭隘空間部位の低空頭領域3における大口径長尺
の鋼管類4の圧入が先行置換掘削と圧入の2工程に分割
することなしに1プロセスで確実に行える。
The steps of the above process are carried out in the same heavy equipment plant, ie, the all-rotation all-casing excavator 6, and
The short boom 11 of the telescopic short boom crawler crane 8 and the excavation suspended between the two, and the construction via the earth removal grab 7, the low head area of the narrow space part targeted for the sky restriction. The press-fitting of the large-diameter long steel pipes 4 in 3 can be surely performed in one process without dividing into two steps of advance replacement excavation and press-fitting.

【0049】尚、この出願の発明の実施態様は上述実施
形態に限るものでないことは勿論であり、例えば、軟弱
地盤に対する中掘併用の鋼管類直接圧入にも適用可能で
あり、又、伸縮ショートブームクローラクレーン8を全
回転型オールケーシング掘削機6の周囲に2台以上設置
してバランス良く掘削、及び、排土用グラブ7や鋼管類
4の吊り下げセットを図り、低空頭領域3における上部
の構造物1に対する干渉を避けることが出来る等種々の
態様が採用可能である。
It should be noted that the embodiments of the invention of this application are not limited to the above-described embodiment, and are applicable to, for example, direct press-fitting of steel tubing combined with excavation to soft ground. Two or more boom crawler cranes 8 are installed around the all-rotation type all-casing excavator 6 to excavate in a well-balanced manner, and to set up the gloves 7 and the steel pipes 4 for unloading, and to set up the upper part in the low head area 3 Various modes can be adopted such that interference with the structure 1 can be avoided.

【0050】更に、施工現場に於てダンプトラックやミ
ニバックホウ等の付帯機器装置類を搬入して仕様に供す
ることは適宜可能である。
Further, it is possible to carry in auxiliary equipment such as a dump truck and a mini backhoe at the construction site and provide it to the specifications as appropriate.

【0051】そして、設計変更的には管体形状維持機構
については油圧モータに代えてピニオン・ラック機構を
用いたりする等可能であることは勿論のことである。
As a design change, it is needless to say that a pinion rack mechanism can be used in place of the hydraulic motor for the pipe shape maintaining mechanism.

【0052】[0052]

【発明の効果】以上、この出願の発明によれば、基本的
にビルの梁出し部分や橋梁の桁下等の上空制限を有する
狭隘部位の低空頭領域において軟質地盤や硬質障害物含
有層やそれらの互層の地盤を対象に大口径で長尺の鋼管
類打設工事を行うに際し、先行掘削と置換掘削の前段の
掘削と後段の鋼管類の圧入を分割した工程にせず、1プ
ロセスの工程とすることが出来、したがって、作業能率
が良く、工期も設計通りに短縮出来、且つ、作業が安全
に行え、結果的に低コストで全施工がワンパスで行える
という優れた効果が奏される。
As described above, according to the invention of this application, the soft ground, the hard obstacle containing layer, and the like can be basically used in the low head area of the narrow part having the upper limit of the sky, such as the projecting part of the building or the bridge girder. When carrying out large-diameter, long-length steel pipe installation work on the ground of these alternate layers, one step of the process is performed without dividing the excavation of the preceding stage of the pre-excavation and replacement excavation and the press-fitting of the subsequent stage of the steel pipes. Therefore, the working efficiency is good, the construction period can be shortened as designed, the work can be performed safely, and as a result, an excellent effect can be achieved at a low cost with one pass of all the construction.

【0053】又、全回転型オールケーシング掘削機を用
いることにより、全工程の作業期間中における騒音や振
動がなく、公害対策に充分に配慮しながら、施工が出来
るという優れた効果が奏される。
Further, by using the all-rotation type all-casing excavator, there is no noise or vibration during the working period of the entire process, and an excellent effect that the construction can be performed with sufficient consideration for pollution control.

【0054】又、全回転型オールケーシング掘削機のケ
ーシング圧入機構において鋼管類の外側に対するケーシ
ングチャックを該鋼管類の外表面に対する圧締用の当接
面積を増大したものとすることにより、鋼管類に対する
圧入用の圧締力を該鋼管類の全外周面に対し、均一にす
ることにより該鋼管類の肉厚が薄くても圧締による圧入
工程における該鋼管類に座屈や変形が起こり難いという
効果も奏される。
In the casing press-fitting mechanism of the all-rotation type all-casing excavator, the casing chuck for the outside of the steel pipes has an increased contact area for pressing against the outer surface of the steel pipes. By making the pressing force for press-fitting uniform over the entire outer peripheral surface of the steel pipes, buckling and deformation of the steel pipes in the press-fitting process by press-fitting are unlikely to occur even if the thickness of the steel pipes is thin. The effect is also achieved.

【0055】又、該ケーシングチャックと共にクランプ
する管体チャックを鋼管類の内部に挿入する管体形状維
持機構として配設したことにより、該ケーシングチャッ
クの緊締力が管体強度を越えるような場合にあっても、
該ケーシングチャックと管体チャックとが相互に内外面
から鋼管類の壁体をクランプすることにより、圧入中に
おける該鋼管類の変形等が生ぜず、鋼管類の管体を初期
状態に維持したまま、設定深度まで圧入することが出来
るという優れた効果が奏される。
In addition, since the tube chuck for clamping together with the casing chuck is provided as a tube shape maintaining mechanism for inserting the inside of steel pipes, when the tightening force of the casing chuck exceeds the strength of the tube. Even so,
Since the casing chuck and the tube chuck mutually clamp the wall of the steel tube from the inner and outer surfaces, the deformation of the steel tube during press-fit does not occur, and the tube of the steel tube is maintained in the initial state. An excellent effect of being able to press-in to the set depth is achieved.

【図面の簡単な説明】[Brief description of the drawings]

【図1】この出願の発明の圧入工法に使用する装置と全
施工態様のうちの前段の先行掘削の態様の概略側面図で
ある。
FIG. 1 is a schematic side view of an apparatus used for a press-fitting method according to the invention of the present application and an aspect of preceding excavation in a preceding stage among all construction aspects.

【図2】鋼管類の圧入態様の機構部の部分断面側面図
(左半分は挾着状態、右半分は離反状態)である。
FIG. 2 is a partial cross-sectional side view of a mechanical portion in a press-fitting mode of steel pipes (a left half is a clamped state, and a right half is a separated state).

【符号の説明】[Explanation of symbols]

1 上部構造物 3 狭隘空間 6 全回転型オールケーシング掘削機 4 鋼管類 2 地盤 7 掘削、排土用グラブ 8 伸縮ショートブームクローラクレーン 10 台車 24 ケーシングチャック 11 ブーム 33 管体チャック DESCRIPTION OF SYMBOLS 1 Upper structure 3 Narrow space 6 Full-rotation type all casing excavator 4 Steel pipes 2 Ground 7 Excavation and earth removal grab 8 Telescopic short boom crawler crane 10 cart 24 Casing chuck 11 Boom 33 Tube chuck

Claims (5)

【特許請求の範囲】[Claims] 【請求項1】上部構造物による上空制限を有する狭隘空
間部位での鋼管類を圧入装置を介し圧入する施工工法に
おいて、クレーン台車にて懸垂した掘削及び排土用グラ
ブを使用して管内掘削を行い地盤の圧入抵抗を低減しな
がら、全回転型オールケーシング掘削機により鋼管類の
圧入作業を行うようにすることを特徴とする鋼管類圧入
工法。
In a construction method for press-fitting steel pipes through a press-fitting device through a press-fitting device in a confined space having a sky restriction by an upper structure, excavation in a pipe is performed using a digging suspended by a crane bogie and a grab for earth removal. A steel pipe press-fitting method characterized in that a steel pipe press-fitting operation is performed by a full-rotation all-casing excavator while reducing the press-in resistance of the ground.
【請求項2】上部構造物による上空制限を有する狭隘空
間部位での地盤に対する先行掘削を行い、次いで鋼管類
を当該掘削部位に対して圧入装置を介し圧入する施工工
法において、掘削及び排土用グラブを懸垂したクレーン
台車に、全回転型オールケーシング掘削機を併設したプ
ラントにより地盤を鋼管類圧入自在に先行置換掘削し地
盤改良を行い、次いで鋼管類の圧入作業を行うようにす
るとを特徴とする鋼管類圧入工法。
2. An excavation and earth removal method in a construction method in which precedent excavation is performed on the ground in a confined space having a sky restriction by an upper structure, and then steel pipes are press-fitted into the excavation part via a press-fitting device. The plant is equipped with a full-rotation all-casing excavator attached to a crane bogie with a suspended grab, excavating the ground so that the steel pipes can be press-fitted, excavating the ground, improving the ground, and then pressing the steel pipes. Steel pipe press-in method.
【請求項3】上記全回転型オールケーシング掘削機のケ
ーシングチャック機構の管体外表面に対する接触面積を
増大させて該鋼管類の圧入を行うようにすることを特徴
とする特許請求の範囲第1,2項いずれか記載の上空制
限を有する狭隘空間部位での鋼管類圧入工法。
3. The press-fitting of the steel pipes by increasing the contact area of the casing chuck mechanism of the all-rotation type all-casing excavator with respect to the outer surface of the pipe body. Item 6. A method for press-fitting steel pipes in a narrow space having a sky restriction.
【請求項4】上記全回転型オールケーシング掘削機のケ
ーシングチャック機構のチャック力が管体強度を越える
場合は該管体内にブームを介して吊設した管体形状維持
機構の管体チャック機構をして該鋼管類の圧入を行うよ
うにすることを特徴とする特許請求の範囲第3項記載の
上空制限を有する狭隘空間部位での鋼管類圧入工法。
4. When the chucking force of the casing chuck mechanism of the all-rotation all-casing excavator exceeds the strength of the tubular body, a tubular body chucking mechanism of a tubular shape maintaining mechanism suspended from the tubular body via a boom is provided. 4. A method for press-fitting steel pipes in a narrow space having an upper sky restriction according to claim 3, wherein the pipes are press-fitted.
【請求項5】上記管体形状維持機構の管体チャック機構
を各対応する上記全回転型オールケーシング掘削機のケ
ーシングチャック機構に対して同期的に作動するように
することを特徴とする特許請求の範囲第4項記載の上空
制限を有する狭隘空間部位での鋼管類圧入工法。
5. The apparatus according to claim 1, wherein the pipe chuck mechanism of the pipe shape maintaining mechanism is operated synchronously with the corresponding casing chuck mechanism of the all-rotating all-casing excavator. 5. The method for press-fitting steel pipes in a narrow space having a sky restriction according to claim 4.
JP20641596A 1996-07-18 1996-07-18 Steel pipe press-fitting method in narrow space area with sky restriction Expired - Fee Related JP3204616B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP20641596A JP3204616B2 (en) 1996-07-18 1996-07-18 Steel pipe press-fitting method in narrow space area with sky restriction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP20641596A JP3204616B2 (en) 1996-07-18 1996-07-18 Steel pipe press-fitting method in narrow space area with sky restriction

Publications (2)

Publication Number Publication Date
JPH1030229A true JPH1030229A (en) 1998-02-03
JP3204616B2 JP3204616B2 (en) 2001-09-04

Family

ID=16522998

Family Applications (1)

Application Number Title Priority Date Filing Date
JP20641596A Expired - Fee Related JP3204616B2 (en) 1996-07-18 1996-07-18 Steel pipe press-fitting method in narrow space area with sky restriction

Country Status (1)

Country Link
JP (1) JP3204616B2 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007191954A (en) * 2006-01-20 2007-08-02 Giken Seisakusho Co Ltd Pile press-in machine and pile press-in method
JP2012207450A (en) * 2011-03-30 2012-10-25 Giken Seisakusho Co Ltd Device for supporting inner surface of pile, and pile punching method
JP2013142271A (en) * 2012-01-12 2013-07-22 Penta Ocean Construction Co Ltd Steel pipe sheet pile press-in method and press-in device
JP2014169526A (en) * 2013-03-01 2014-09-18 Penta Ocean Construction Co Ltd Steel pipe sheet pile press-in method and press-in device
JP2017031714A (en) * 2015-08-04 2017-02-09 聖 川口 Steel pipe penetration device

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007191954A (en) * 2006-01-20 2007-08-02 Giken Seisakusho Co Ltd Pile press-in machine and pile press-in method
JP2012207450A (en) * 2011-03-30 2012-10-25 Giken Seisakusho Co Ltd Device for supporting inner surface of pile, and pile punching method
JP2013142271A (en) * 2012-01-12 2013-07-22 Penta Ocean Construction Co Ltd Steel pipe sheet pile press-in method and press-in device
JP2014169526A (en) * 2013-03-01 2014-09-18 Penta Ocean Construction Co Ltd Steel pipe sheet pile press-in method and press-in device
JP2017031714A (en) * 2015-08-04 2017-02-09 聖 川口 Steel pipe penetration device

Also Published As

Publication number Publication date
JP3204616B2 (en) 2001-09-04

Similar Documents

Publication Publication Date Title
US4405262A (en) Method for erection of a temporary bridge, and a pile means therefor
CN102803616B (en) For the method and apparatus manufacturing the underwater foundation of building
CN203499551U (en) Rotary pile drilling machine hole bottom hydraulic high-frequency percussion drill
CN109797749A (en) Underwater foundation pit construction device and construction method
JP2008255603A (en) Driving method of inner excavation pile under low and narrow restriction
JP6319935B2 (en) Tubing pile driving method
JP3204616B2 (en) Steel pipe press-fitting method in narrow space area with sky restriction
JP3733533B2 (en) Foundation reinforcement method under pressure of existing structures
JP2019007221A (en) Tubular pile installation method and tubular pile holding device
JP6715663B2 (en) Steel pipe pile construction method
WO2023109014A1 (en) Construction apparatus and construction method for steel pipe pile in bare rock riverbed
JP3169911B2 (en) Heavy weight type steel pipe digging and driving method using the same
JP3753732B1 (en) Foundation pile construction method
CN105625428A (en) Mechanized dam breach pile inserting and damming equipment and method thereof
JPH09302654A (en) Construction method and device for driving steel pipe pile
CN111705815A (en) Hard rock stratum pre-drilling static blasting man-cut pile auxiliary construction method
JPH08184284A (en) Advanced excavation work of guide tunnel at top wall
CN113006010B (en) Method for reinforcing concrete guide wall foundation
CN113026688B (en) System for expanding piles to form wall by using foundation rocks at bottom of concrete guide wall foundation
JP3221895B2 (en) Construction method of large-diameter underground wall body and excavation equipment for burying pipes
CN110306552B (en) Method for breaking hard underwater layer
CN216551893U (en) Double-barrelled trepan steel-pipe pile
CN220394584U (en) Temporary side slope reinforcement system in grading excavation process
JP2784860B2 (en) Rotary reaction force support device for casing driver
CN216275751U (en) A anchor rope structure for excavation supporting

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees