JPH10277688A - Shaft caulking device - Google Patents

Shaft caulking device

Info

Publication number
JPH10277688A
JPH10277688A JP9092356A JP9235697A JPH10277688A JP H10277688 A JPH10277688 A JP H10277688A JP 9092356 A JP9092356 A JP 9092356A JP 9235697 A JP9235697 A JP 9235697A JP H10277688 A JPH10277688 A JP H10277688A
Authority
JP
Japan
Prior art keywords
shaft
holder
head
caulking
base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP9092356A
Other languages
Japanese (ja)
Inventor
Eiju Mori
英寿 森
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Denso Ten Ltd
Original Assignee
Denso Ten Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Denso Ten Ltd filed Critical Denso Ten Ltd
Priority to JP9092356A priority Critical patent/JPH10277688A/en
Publication of JPH10277688A publication Critical patent/JPH10277688A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21JFORGING; HAMMERING; PRESSING METAL; RIVETING; FORGE FURNACES
    • B21J15/00Riveting
    • B21J15/10Riveting machines
    • B21J15/12Riveting machines with tools or tool parts having a movement additional to the feed movement, e.g. spin
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21JFORGING; HAMMERING; PRESSING METAL; RIVETING; FORGE FURNACES
    • B21J9/00Forging presses
    • B21J9/02Special design or construction
    • B21J9/025Special design or construction with rolling or wobbling dies

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Automatic Assembly (AREA)

Abstract

PROBLEM TO BE SOLVED: To easily demount a shaft from a holder by bisecting a holder in the longitudinal direction, driving these respectively in an opposite direction and gradually enlarging a draft. SOLUTION: The device is composed of a base table 91, a holder 13 to hold a shaft 93 placed on the base table 91, a head 94 arranged rotatable on a holder 13 center axis, a rotating means 15 to rotate the head 94, an elevating/lowering means to elevate/lower the head 94 and a caulking pin 95 eccentrically mounted to a head 94 lower part, the holder 13 is bisected in the longitudinal direction, these are respectively drived in the opposite direction 14a and 14b.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は軸かしめ装置に関
し、より詳細には、基板やデッキユニット等が取り付け
られる軸をシャーシにかしめる際に使用される軸かしめ
装置に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a shaft caulking device, and more particularly, to a shaft caulking device used for caulking a shaft on which a substrate, a deck unit, or the like is mounted on a chassis.

【0002】[0002]

【従来の技術】図14は従来のこの種軸かしめ装置を摸
式的に示した裏面図であり、図中91は基台を示してい
る。基台91上部には略円柱または略直方体形状の一体
形ホルダー92が載置され、ホルダー92には穴92a
が形成されており、穴92a内には略棒状金属製の軸本
体93aが挿入されるようになっている。軸本体93a
下部にはボルト穴93bが形成される一方、軸本体93
a上部からは、これより細い形状のかしめ軸93cが延
設されており、これら軸本体93a、かしめ軸93c等
を含んで軸93が構成されている。またホルダー92中
心軸上には略円柱形状をしたヘッド94が回転可能に配
設されており、ヘッド94にはこれを図中W方向に回転
させる回転手段と図中Z方向に昇降させる昇降手段(共
に図示せず)とが付設されている。またヘッド94下部
にはかしめ用ピン95が偏心して取り付けられており、
これら基台91、ホルダー92、ヘッド94、かしめ用
ピン95等を含んで軸かしめ装置90が構成されてい
る。
2. Description of the Related Art FIG. 14 is a rear view schematically showing a conventional shaft caulking device of this kind, and 91 in the figure denotes a base. A substantially columnar or substantially rectangular parallelepiped holder 92 is mounted on the base 91, and a hole 92a is formed in the holder 92.
Are formed, and a substantially rod-shaped metal shaft main body 93a is inserted into the hole 92a. Shaft body 93a
A bolt hole 93b is formed in the lower part, while the shaft body 93 is formed.
From the upper part a, a caulking shaft 93c having a thinner shape is extended, and the shaft 93 includes the shaft main body 93a, the caulking shaft 93c, and the like. A substantially cylindrical head 94 is rotatably disposed on the center axis of the holder 92. The head 94 has a rotating means for rotating the head 94 in the direction W in the drawing and a lifting means for raising and lowering the head 94 in the Z direction in the figure. (Both not shown) are attached. Also, a caulking pin 95 is eccentrically attached to the lower part of the head 94,
The shaft caulking device 90 includes the base 91, the holder 92, the head 94, the caulking pin 95, and the like.

【0003】一方、シャーシ96は主に底面部96aと
3個の側面部96b、96c、96dとにより略箱形状
に折り曲げ形成されており、底面部96aの所定箇所に
は、かしめ軸93cが挿入される複数個の孔96eが開
口されている。また底面部96aの所定箇所には複数個
の縁部96fが延設されており、この縁部96fは側面
部96b、96c、96dの一部を切り欠き、底面部9
6a面に沿って折り曲げることにより形成されている。
On the other hand, the chassis 96 is formed by bending a substantially box shape mainly by a bottom portion 96a and three side portions 96b, 96c and 96d, and a caulking shaft 93c is inserted into a predetermined portion of the bottom portion 96a. A plurality of holes 96e are opened. Further, a plurality of edges 96f are extended at predetermined positions of the bottom surface portion 96a, and the edge portions 96f are formed by cutting out a part of the side surface portions 96b, 96c, and 96d.
It is formed by bending along the 6a plane.

【0004】このように構成された軸かしめ装置90を
用い、シャーシ96に軸93をかしめ付ける場合、まず
ホルダー92の穴92aに軸93を手で挿入する。次
に、シャーシ96を両手で保持した状態で押し下げ、孔
96eにかしめ軸93c上部を挿入した後、ヘッド94
を回転させつつ所定高さ下降させてゆく。すると、かし
め用ピン95によりかしめ軸93c上部が次第に押しつ
ぶされ、図中一点鎖線で示したようなかしめ部93dが
形成される。そして、このかしめ部93d下面と軸本体
93a上端面とにより底面部96aが挟まれ、軸93が
シャーシ96に固定される。次にヘッド94を上昇させ
た後、両手でシャーシ96を持ち上げると、軸93がホ
ルダー92から抜けてシャーシ96が取り出せる。
When the shaft 93 is caulked to the chassis 96 by using the shaft caulking device 90 configured as described above, first, the shaft 93 is manually inserted into the hole 92 a of the holder 92. Next, while holding down the chassis 96 with both hands, push down the caulking shaft 93c into the hole 96e.
Is lowered by a predetermined height while rotating. Then, the upper portion of the caulking shaft 93c is gradually crushed by the caulking pin 95, and a caulking portion 93d is formed as shown by a chain line in the figure. Then, the bottom surface portion 96a is sandwiched between the lower surface of the caulking portion 93d and the upper end surface of the shaft main body 93a, and the shaft 93 is fixed to the chassis 96. Next, after raising the head 94 and lifting the chassis 96 with both hands, the shaft 93 comes off the holder 92 and the chassis 96 can be taken out.

【0005】その後、基板等を軸93上に配置し、ボル
ト穴93bにボルト(図示せず)で締め付けることによ
り、かしめられた軸93を介して基板やデッキユニット
(図示せず)がシャーシ96に取り付け・固定される。
[0005] After that, the board and the like are arranged on the shaft 93 and tightened into the bolt holes 93b with bolts (not shown). Attached and fixed to.

【0006】また、図15は従来の別タイプの軸をかし
める場合を説明するために示した軸近傍部分摸式的断面
図であり、図中92は一体形ホルダー、92aは穴、9
6aはシャーシ底面部、96eは孔をそれぞれ示してい
る。ホルダーの穴92a内には略棒状金属製の軸本体9
9aが挿入されるようになっている。軸本体99a外周
部の所定箇所にはEリング(図示せず)等が挿入される
溝幅wの溝部99cが形成され、軸先端部99bは略円
錐形状に形成される一方、軸本体99a上部からはかし
め軸99dが延設されており、これら軸本体99a、軸
先端部99b、溝部99c、かしめ軸99d等を含んで
別タイプの軸99が構成されている。その他の構成及び
かしめ方法は図14で説明した場合と同様であるので、
ここではその構成及びかしめ方法の詳細な説明は省略す
ることとする。
FIG. 15 is a schematic cross-sectional view of a portion near the shaft shown for explaining a conventional case of caulking another type of shaft. In the drawing, reference numeral 92 denotes an integrated holder, 92a denotes a hole, and 9 denotes a hole.
6a denotes a chassis bottom portion, and 96e denotes a hole. A substantially rod-shaped metal shaft body 9 is provided in the hole 92a of the holder.
9a is inserted. A groove 99c having a groove width w into which an E-ring (not shown) or the like is inserted is formed at a predetermined position on the outer peripheral portion of the shaft main body 99a, and the shaft front end portion 99b is formed in a substantially conical shape. A crimping shaft 99d extends from the shaft, and another type of shaft 99 is configured including the shaft main body 99a, the shaft tip portion 99b, the groove portion 99c, the caulking shaft 99d, and the like. Other configurations and swaging methods are the same as those described with reference to FIG.
Here, the detailed description of the configuration and the swaging method is omitted.

【0007】かしめ作業の品質管理には、かしめ部の高
さ検査、軸心の角度検査、軸のトルク検査、かしめ部と
シャーシ底面部との隙間検査等が行われている。
For quality control of the caulking operation, a height inspection of a caulked portion, an angle inspection of a shaft center, a torque inspection of a shaft, a clearance inspection between a caulked portion and a bottom portion of a chassis, and the like are performed.

【0008】図16は従来のかしめ部の高さ検査及び軸
心の角度検査を説明するために示した軸近傍部分摸式的
断面図であり、図中93aは軸本体、93bはボルト
穴、93cはかしめ軸、93dはかしめ部、96aはシ
ャーシ底面部、96eは孔をそれぞれ示している。底面
部96aに対するかしめ部93dの高さHは1個のかし
め作業が終了の都度、ノギス等を用いて測定する。そし
て高さHが基準値より高いときは、かしめ量が不十分で
あると判断され、再度かしめ作業を継続する。次に所定
個数の軸93を全てシャーシ底面部96aにかしめた
後、シャーシ96を軸かしめ装置90(図14)から取
り外す。次に三次元測定器(図示せず)等を用いてシャ
ーシ底面部96aと軸93とが成す軸心角度αを測定す
る。そしてこれが許容値(例えば90°±1°)内にあ
るか否かを判断し、すべてが許容値内にあれば合格、1
個でも許容値から外れていればこのシャーシ96を不良
品として処理している。なお、図16では軸93の場合
を説明したが、別タイプの軸99の場合でも同様であ
る。
FIG. 16 is a schematic cross-sectional view of a portion near the shaft shown to explain a conventional height test of a caulked portion and a test of an angle of a shaft center. In the drawing, 93a is a shaft main body, 93b is a bolt hole, 93c denotes a caulking shaft, 93d denotes a caulking portion, 96a denotes a chassis bottom portion, and 96e denotes a hole. The height H of the caulking portion 93d with respect to the bottom surface portion 96a is measured using a caliper or the like each time one caulking operation is completed. When the height H is higher than the reference value, it is determined that the swaging amount is insufficient, and the swaging operation is continued again. Next, after all the predetermined number of shafts 93 are caulked to the chassis bottom surface portion 96a, the chassis 96 is removed from the shaft caulking device 90 (FIG. 14). Next, an axis angle α formed by the chassis bottom 96a and the shaft 93 is measured using a three-dimensional measuring device (not shown) or the like. Then, it is determined whether or not this is within an allowable value (for example, 90 ° ± 1 °).
If even the individual pieces are out of the allowable value, the chassis 96 is treated as a defective product. Although the case of the shaft 93 has been described with reference to FIG. 16, the same applies to the case of another type of shaft 99.

【0009】また図示しないが、前記基板やデッキユニ
ットを取り付ける際、前記ボルトを締めるときに軸93
(図14)が回転しないか否かを判断するため、トルク
測定器を用いてトルク検査が行われている。この場合、
シャーシ96を軸かしめ装置90(図14)から一旦取
り外し、三爪チャックを介して軸93とトルクメータと
を接続する。次にシャーシ96を固定する一方、前記ト
ルクメータと軸93とに回転力を付加し、軸93が基準
値以下のトルクで回転しないか、回転するかにより、か
しめ作業の良否が判断される。そして基準値以下で回転
した軸93は軸かしめ装置90に再び取り付けられ、回
転しなくなるまでかしめ作業がやり直される。
[0009] Although not shown, the shaft 93 is tightened when the board or deck unit is mounted.
In order to determine whether (FIG. 14) does not rotate, a torque test is performed using a torque measuring device. in this case,
The chassis 96 is once removed from the shaft caulking device 90 (FIG. 14), and the shaft 93 and the torque meter are connected via a three-jaw chuck. Next, while the chassis 96 is fixed, a torque is applied to the torque meter and the shaft 93, and whether the shaft 93 does not rotate with a torque equal to or less than a reference value or not determines whether or not the caulking operation is good. The shaft 93 rotated below the reference value is attached to the shaft caulking device 90 again, and the caulking operation is repeated until the shaft 93 stops rotating.

【0010】また、図17は従来のかしめ部及びシャー
シ底面部の隙間検査を説明するために示したかしめ部近
傍部分の摸式的断面図であり、図中96aはシャーシ底
面部、96eは孔、93aは軸本体、93bはボルト
穴、93cはかしめ軸、93dはかしめ部、93は軸を
それぞれ示している。かしめ部93dとシャーシ底面部
96aとの間に隙間Gが生じていると、厚さがt(例え
ば0.03mm)の厚みゲージ98を水平方向に挿入し
て最大挿入深さLM を測定し、このLM より換算して隙
間Gを求めている。この隙間検査は、前述のトルク検査
に対する簡便法としてしばしば用いられている。なお、
図17では軸93の場合を説明したが、軸99の場合も
同様である。
FIG. 17 is a schematic cross-sectional view showing a conventional caulking portion and a portion near the caulking portion for explaining a clearance inspection between a caulking portion and a chassis bottom portion. In the drawing, reference numeral 96a denotes a chassis bottom portion, and 96e denotes a hole. , 93a denotes a shaft main body, 93b denotes a bolt hole, 93c denotes a caulking shaft, 93d denotes a caulking portion, and 93 denotes a shaft. When the gap G is formed between the caulking portion 93d and the chassis bottom portion 96a, the thickness is by inserting a thickness gauge 98 of t (e.g., 0.03 mm) in the horizontal direction to measure the maximum insertion depth L M , seeking a gap G in terms than the L M. This gap inspection is often used as a simple method for the aforementioned torque inspection. In addition,
Although the case of the shaft 93 has been described with reference to FIG. 17, the same applies to the case of the shaft 99.

【0011】[0011]

【発明が解決しようとする課題】上記した従来の軸かし
め装置90においては、一体形ホルダー92の穴92a
に、小形の軸93、99をその都度手で挿入するのが面
倒である。また、かしめ工程中、シャーシ96を水平に
支持すると共に、シャーシ96が回転しないように手等
により保持するのに労力を要する。また、かしめ力によ
り軸本体93a、99aも変形し易く、一体形ホルダー
92から軸93、99を上方に抜き取ることが困難にな
り易い。さらに軸99の場合、前記かしめ力により溝部
99cが押しつぶされて溝幅wが狭くなり易く、前記E
リング等の挿着が難しくなることがある。また、かしめ
工程の終了後、両手でシャーシ96を持ち上げており、
手間を要する。また、かしめ部93dの高さHをノギス
を用いて検査する場合、測定姿勢に無理が生じると共に
目が疲れ易い。また、軸心角度αは所定量の軸93、9
9の全てをシャーシ96にかしめた後に測定しており、
しかも修正が効かないため、無駄が発生し易い。また、
軸93、99の前記トルク検査は、シャーシ96を軸か
しめ装置90から一旦外して前記トルク測定器で測定し
ており、基準値以下の軸93、99は再び装置90に取
り付けてかしめ作業をやり直す必要があり、手間がかか
る。また、前記隙間検査は、隙間ゲージ98を各方向よ
り挿入して最大挿入深さLM を検出しており、面倒であ
るという課題があった。
In the above-described conventional shaft caulking device 90, the hole 92a of the integral holder 92 is provided.
In addition, it is troublesome to manually insert the small shafts 93 and 99 each time. In addition, during the caulking process, it takes time to support the chassis 96 horizontally and to hold the chassis 96 by hand or the like so as not to rotate. In addition, the shaft bodies 93a and 99a are also easily deformed by the caulking force, and it is difficult to pull out the shafts 93 and 99 from the integrated holder 92 upward. Further, in the case of the shaft 99, the groove portion 99c is easily crushed by the caulking force, and the groove width w is likely to be reduced.
It may be difficult to insert a ring or the like. After the caulking process, the chassis 96 is lifted with both hands.
It takes time. In addition, when the height H of the caulked portion 93d is inspected by using a caliper, the measurement posture is excessive and the eyes are easily tired. The axis angle α is a predetermined amount of the axes 93, 9
9 was measured after caulking the chassis 96,
Moreover, since the correction is not effective, waste is likely to occur. Also,
In the torque inspection of the shafts 93 and 99, the chassis 96 is temporarily removed from the shaft caulking device 90 and the torque is measured by the torque measuring device. The shafts 93 and 99 having a reference value or less are attached to the device 90 again and the caulking operation is performed again. It is necessary and takes time. Further, the gap test has detected maximum insertion depth L M is inserted from the direction feeler gauge 98, there is a problem that it is troublesome.

【0012】本発明は上記課題に鑑みなされたものであ
り、ホルダーに軸を自動的に挿着することができ、かし
め工程やトルク検査中にシャーシを機械的に確実に保持
することができ、かしめ工程後にシャーシを機械的に持
ち上げると共に、ホルダーより軸を容易に抜き出すこと
ができ、軸の変形を防止してEリング等の挿着を確実に
行うことができ、かしめ部の高さを正確に検出すること
ができ、隙間を容易に測定することができ、同一工程内
で軸心角度検査及びトルク検査が実施されてかしめ作業
時間を短縮することができる軸かしめ装置を提供するこ
とを目的としている。
SUMMARY OF THE INVENTION The present invention has been made in view of the above-mentioned problems, and a shaft can be automatically inserted into a holder, and a chassis can be securely held mechanically during a caulking process and a torque test. After the caulking process, the chassis can be mechanically lifted, and the shaft can be easily pulled out from the holder. This prevents deformation of the shaft and ensures that the E-ring etc. can be securely inserted. The object of the present invention is to provide a shaft caulking device capable of easily detecting a gap, easily measuring a gap, and performing a shaft angle inspection and a torque inspection in the same process and shortening a caulking operation time. And

【0013】[0013]

【課題を解決するための手段及びその効果】上記目的を
達成するために本発明に係る軸かしめ装置は、基台と、
該基台上に載置される軸保持用のホルダーと、前記ホル
ダー中心軸上に回転可能に配設されるヘッドと、該ヘッ
ドを回転させる回転手段と、前記ヘッドを昇降させる昇
降手段と、前記ヘッド下部に偏心して取り付けられたか
しめ用ピンとを含んで構成された軸かしめ装置であっ
て、前記ホルダーが縦方向に2分割され、これらがそれ
ぞれ反対方向に駆動されるようになっていることを特徴
としている(1)。
In order to achieve the above object, a shaft caulking device according to the present invention comprises a base,
A holder for holding a shaft mounted on the base, a head rotatably disposed on the holder center axis, a rotating unit for rotating the head, a lifting unit for lifting and lowering the head, A shaft caulking device comprising a caulking pin eccentrically attached to a lower portion of the head, wherein the holder is vertically divided into two parts, each of which is driven in the opposite direction. (1).

【0014】上記軸かしめ装置(1)によれば、前記2
分割されたホルダーが相互に押し付けるように駆動され
るので、該ホルダー内に前記軸が保持されて確実にかし
められる一方、かしめ工程後、前記2分割されたホルダ
ーが相互に開くように駆動されると、抜け勾配が次第に
拡がっていくので、前記ホルダーから前記軸を容易に取
り外すことができる。
According to the shaft swaging apparatus (1),
Since the divided holders are driven so as to press against each other, the shaft is held in the holder so as to be securely caulked, while, after the caulking step, the two divided holders are driven so as to open mutually. Then, the draft gradually increases, so that the shaft can be easily removed from the holder.

【0015】また本発明に係る軸かしめ装置は、上記軸
かしめ装置(1)において、中間にボール部を有する所
定長さの検知棒がボール受け部を介して回動可能に支持
され、前記検知棒の上端部は前記基台及び前記ホルダー
を通って軸の下端面に当接する一方、前記検知棒の下部
は接触片に形成された所定形状の孔に挿入され、前記接
触片に前記検知棒下部が接触すると、電気的検出手段が
作動して警報用スイッチが入るようになっていることを
特徴としている(2)。
In the shaft caulking device according to the present invention, in the shaft caulking device (1), a detection rod of a predetermined length having an intermediate ball portion is rotatably supported via a ball receiving portion. An upper end of the rod passes through the base and the holder and abuts on a lower end surface of the shaft, while a lower part of the detection rod is inserted into a hole of a predetermined shape formed in a contact piece, and the detection rod is inserted into the contact piece. When the lower portion comes into contact, the electric detection means is activated and the alarm switch is turned on (2).

【0016】上記軸かしめ装置(2)によれば、前記軸
の軸心に関して該軸の下端面が直角に形成され、前記検
知棒下部側面と前記接触片の孔側面とが所定間隔に設定
されていると、シャーシ面に関する前記軸心の傾きが前
記軸の下端面の傾きとして反映され、該軸の下端面に前
記検知棒の上端部が当接したとき、前記軸の下端面の傾
きに沿って前記検知棒が前記ボール部を回転中心として
回動させられる。そして、前記検知棒下部が前記接触片
に接触すると、前記警報用スイッチが入るので、前記軸
心の傾きが許容値を超えていることを簡単に検知するこ
とができる。また前記軸のかしめ作業終了ごとに、同一
装置内において軸心の傾きを直ちに測定して不良品を早
期に発見することができ、無駄を省くことができる。
According to the shaft caulking device (2), the lower end surface of the shaft is formed at a right angle with respect to the axis of the shaft, and the lower side surface of the detection rod and the side surface of the hole of the contact piece are set at a predetermined interval. The inclination of the axis with respect to the chassis surface is reflected as the inclination of the lower end surface of the shaft, and when the upper end of the detection rod abuts on the lower end surface of the shaft, the inclination of the lower end surface of the shaft is changed. Along with the detection rod is rotated about the ball portion as a rotation center. When the lower part of the detection rod comes into contact with the contact piece, the alarm switch is turned on, so that it is possible to easily detect that the inclination of the axis exceeds an allowable value. Further, every time the caulking operation of the shaft is completed, the inclination of the shaft center can be immediately measured in the same device to detect a defective product at an early stage, and waste can be reduced.

【0017】また本発明に係る軸かしめ装置は、上記軸
かしめ装置(1)または(2)において、前記ホルダー
の下方にパーツフィーダーの供給口部と、軸持ち上げ手
段とが配設されていることを特徴としている(3)。
In the shaft caulking device according to the present invention, in the shaft caulking device (1) or (2), a supply port of a parts feeder and a shaft lifting means are provided below the holder. (3).

【0018】上記軸かしめ装置(3)によれば、前記2
分割されたホルダーが前記駆動手段により水平方向に開
かれ、前記供給口部に供給された1個の軸が前記軸持ち
上げ手段の上昇により持ち上げられ、前記ホルダー間に
挿入される。次にこのホルダーが前記駆動手段により閉
じられると、前記ホルダー内に前記軸が確実に保持され
る。一方、前記軸持ち上げ手段が前記供給口部まで下降
すると、前記パーツフィーダーにより前記軸持ち上げ手
段上へ次の軸が供給される。したがって、これらの軸を
1個づつ前記ホルダー内に自動的、かつ迅速に挿着する
ことができる。
According to the shaft caulking device (3),
The divided holders are opened in the horizontal direction by the driving means, and one shaft supplied to the supply port is lifted by the lifting of the shaft lifting means, and inserted between the holders. Next, when the holder is closed by the driving means, the shaft is securely held in the holder. On the other hand, when the shaft lifting means descends to the supply port, the next shaft is supplied onto the shaft lifting means by the parts feeder. Therefore, these shafts can be automatically and quickly inserted into the holder one by one.

【0019】また本発明に係る軸かしめ装置は、上記軸
かしめ装置(1)〜(3)のいずれかにおいて、前記ホ
ルダーの締め付け手段を備え、該締め付け手段の下部に
トルクメータが着脱可能に接続されていることを特徴と
している(4)。
Further, the shaft swaging apparatus according to the present invention, in any one of the shaft swaging apparatuses (1) to (3), includes a fastening means for the holder, and a torque meter is detachably connected to a lower portion of the fastening means. (4).

【0020】上記した軸かしめ装置(4)によれば、前
記2分割されたホルダーと前記トルクメータとが前記締
め付け手段を介して締め付けられるので、前記ホルダー
内の前記軸と前記トルクメータとが確実に連結される。
その結果、1個の軸のかしめ作業終了ごとに、同一装置
内においてトルクを直ちに測定することができ、トルク
不足の軸が検出されると、即座にこれにかしめ増工程を
施すことができ、作業時間の短縮を図ることができる。
According to the shaft caulking device (4), the holder and the torque meter that are divided into two are tightened via the tightening means, so that the shaft and the torque meter in the holder are securely connected. Linked to
As a result, each time the caulking operation of one shaft is completed, the torque can be immediately measured in the same device, and when the shaft with insufficient torque is detected, the caulking increase process can be immediately performed on this shaft. Work time can be reduced.

【0021】また本発明に係る軸かしめ装置は、上記軸
かしめ装置(1)または(3)において、軸に形成され
たリング挿着用の溝部に嵌入されるリング状突起が、前
記ホルダー内の所定箇所に形成されていることを特徴と
している(5)。
[0021] In the shaft swaging apparatus according to the present invention, in the shaft swaging apparatus (1) or (3), the ring-shaped projection to be inserted into the groove for ring insertion formed on the shaft may have a predetermined shape in the holder. (5).

【0022】上記軸かしめ装置(5)によれば、前記2
分割されたホルダーが閉じられると、前記リング挿着用
の溝部に前記ホルダーの前記リング状突起が嵌入される
ので、かしめ工程の際、該リング状突起の抵抗力により
前記溝部の変形を防止することができる。またかしめ工
程後、前記ホルダーが相互に開く方向へ駆動されるの
で、該ホルダーから前記軸を容易に取り外すことがで
き、これらの結果、前記溝部にリングを確実に挿着する
ことができるようになる。
According to the shaft caulking device (5),
When the divided holder is closed, the ring-shaped projection of the holder is fitted into the groove for inserting and inserting the ring, so that in the caulking step, the deformation of the groove is prevented by the resistance of the ring-shaped projection. Can be. Also, after the caulking step, the holders are driven in a direction to open each other, so that the shaft can be easily removed from the holder, and as a result, a ring can be securely inserted into the groove. Become.

【0023】また本発明に係る軸かしめ装置は、基台
と、該基台上に載置される軸保持用のホルダーと、前記
ホルダー中心軸上に回転可能に配設されるヘッドと、該
ヘッドを回転させる回転手段と、前記ヘッドを昇降させ
る昇降手段と、前記ヘッド下部に偏心して取りつけられ
たかしめ用ピンとを含んで構成された軸かしめ装置であ
って、軸に形成されたリング挿着用の溝部に嵌入される
複数個のプレートが、前記ホルダーに開口された孔を介
して挿脱されるようになっていることを特徴としている
(6)。
Also, the shaft swaging apparatus according to the present invention comprises a base, a holder for holding a shaft mounted on the base, a head rotatably disposed on the center axis of the holder, and A shaft caulking device comprising: a rotating means for rotating a head; a lifting / lowering means for raising / lowering the head; and a caulking pin eccentrically attached to a lower portion of the head, wherein a ring mounted on a shaft is mounted. A plurality of plates fitted into the grooves are inserted and removed through holes opened in the holder (6).

【0024】上記軸かしめ装置(6)によれば、前記ホ
ルダーに開口された孔を通って前記リング挿着用の溝部
に前記プレートが嵌入されるので、かしめ工程の際、該
プレートの抵抗力により前記溝部の変形を防止すること
ができる。またかしめ工程後、前記プレートが外方へ引
き抜かれると、前記ホルダーから前記軸を無理なく上方
へ引き抜くことができ、これらの結果、前記溝部にリン
グを確実に挿着できるようになる。
According to the shaft caulking device (6), the plate is fitted into the groove for inserting the ring through the hole opened in the holder. The deformation of the groove can be prevented. When the plate is pulled out after the caulking step, the shaft can be pulled out from the holder without difficulty, and as a result, a ring can be securely inserted into the groove.

【0025】また本発明に係る軸かしめ装置は、基台
と、該基台上に載置される軸保持用のホルダーと、前記
ホルダー中心軸上に回転可能に配設されるヘッドと、該
ヘッドを回転させる回転手段と、前記ヘッドを昇降させ
る昇降手段と、前記ヘッド下部に偏心して取り付けられ
たかしめ用ピンとを含んで構成された軸かしめ装置であ
って、前記ホルダーに軸を固定するボルトが取り付けら
れる一方、前記軸に前記ボルトが当接する平坦部が形成
され、前記ホルダーの下部にトルクメータが着脱可能に
接続されていることを特徴としている(7)。
Further, the shaft swaging apparatus according to the present invention comprises a base, a holder for holding a shaft mounted on the base, a head rotatably disposed on the center axis of the holder, and What is claimed is: 1. A shaft caulking device comprising: rotating means for rotating a head; lifting means for raising and lowering the head; and a caulking pin eccentrically attached to a lower portion of the head, wherein a bolt for fixing a shaft to the holder is provided. (7), wherein a flat portion where the bolt abuts on the shaft is formed, and a torque meter is detachably connected to a lower portion of the holder (7).

【0026】上記軸かしめ装置(7)によれば、前記平
坦部に前記ボルト先端部が当接する態様で該ボルトが締
め込まれると、このボルトを介して前記軸が前記ホルダ
ーに固定されると共に、該ホルダー下部に前記トルクメ
ータが接続されるので、前記軸と前記トルクメータとが
結合される。その結果、1個の軸のかしめ作業終了ごと
に、同一装置内においてトルクを直ちに測定することが
でき、トルク不足の軸が検出されると、即座にこれにか
しめ増工程を施すことができるので、作業時間の短縮を
図ることができる。
According to the shaft caulking device (7), when the bolt is tightened so that the tip end portion of the bolt abuts on the flat portion, the shaft is fixed to the holder via the bolt and Since the torque meter is connected to the lower portion of the holder, the shaft and the torque meter are connected. As a result, the torque can be immediately measured in the same device every time the caulking operation of one shaft is completed, and when the shaft with insufficient torque is detected, the caulking increase process can be immediately performed. Thus, the working time can be reduced.

【0027】また本発明に係る軸かしめ装置は、基台
と、該基台上に載置される軸保持用のホルダーと、前記
ホルダー中心軸上に回転可能に配設されるヘッドと、該
ヘッドを回転させる回転手段と、前記ヘッドを昇降させ
る昇降手段と、前記ヘッド下部に偏心して取り付けられ
たかしめ用ピンとを含んで構成された軸かしめ装置であ
って、前記昇降手段の複数箇所に上下方向に摺動可能の
押え棒が取り付けられ、該押え棒が常時下方に付勢され
ていることを特徴としている(8)。
The shaft swaging apparatus according to the present invention comprises a base, a holder for holding a shaft mounted on the base, a head rotatably disposed on the center axis of the holder, and A shaft caulking device comprising: a rotating means for rotating a head; an elevating means for elevating the head; and a caulking pin eccentrically attached to the lower part of the head. A holding rod slidable in the direction is attached, and the holding rod is constantly urged downward (8).

【0028】上記軸かしめ装置(8)によれば、前記昇
降手段が下降するにつれ、前記押え棒がシャーシに当接
した後、前記押え棒の下方付勢力が作用し、前記シャー
シが所定箇所に押え付けられて水平かつ回転不能に固定
されるので、手で保持することなく、かしめ作業やトル
ク検査を確実に行うことができる。その後、前記昇降手
段が上昇するにつれ、前記押え棒が前記シャーシから離
れるので、該シャーシを取り外すことができる。
According to the shaft caulking device (8), as the lifting / lowering means descends, after the pressing rod comes into contact with the chassis, a downward urging force of the pressing rod acts to move the chassis to a predetermined position. Since it is pressed and fixed so as to be horizontal and non-rotatable, it is possible to reliably perform a caulking operation and a torque test without holding it by hand. Thereafter, as the elevating means moves up, the holding bar is separated from the chassis, so that the chassis can be removed.

【0029】また本発明に係る軸かしめ装置は、上記軸
かしめ装置(1)〜(7)のいずれかにおいて、前記昇
降手段の複数箇所に上下方向に摺動可能の前記押え棒が
取り付けられ、該押え棒が常時下方に付勢されているこ
とを特徴としている(9)。上記軸かしめ装置(9)に
よれば、上記軸かしめ装置(1)〜(7)のいずれか
と、上記軸かしめ装置(8)との相乗効果を得ることが
できる。
Further, in the shaft caulking device according to the present invention, in any one of the shaft caulking devices (1) to (7), the presser bar slidable in a vertical direction is attached to a plurality of positions of the elevating means. The holding bar is always urged downward (9). According to the shaft caulking device (9), a synergistic effect of any of the shaft caulking devices (1) to (7) and the shaft caulking device (8) can be obtained.

【0030】また本発明に係る軸かしめ装置は、基台
と、該基台上に載置される軸保持用のホルダーと、前記
ホルダー中心軸上に回転可能に配設されるヘッドと、該
ヘッドを回転させる回転手段と、前記ヘッドを昇降させ
る昇降手段と、前記ヘッド下部に偏心して取り付けられ
たかしめ用ピンとを含んで構成された軸かしめ装置であ
って、前記複数個の押え棒の下端部に、前記かしめ用ピ
ンの作動を可能とする開口部が形成された1枚の押え板
が取り付けられていることを特徴としている(10)。
Further, the shaft swaging apparatus according to the present invention comprises a base, a holder for holding a shaft mounted on the base, a head rotatably arranged on the center axis of the holder, and A shaft caulking device comprising: rotating means for rotating a head; elevating means for elevating and lowering the head; and a caulking pin eccentrically attached to a lower portion of the head, wherein lower ends of the plurality of pressing rods are provided. A single holding plate having an opening for enabling the operation of the caulking pin is attached to the portion (10).

【0031】上記軸かしめ装置(10)によれば、シャ
ーシが比較的広い面積を有する前記押え板により押えら
れ、かつ前記開口部の存在により前記かしめ用ピンの作
動が阻害されないので、かしめ作業を一層確実に行うこ
とができる。
According to the shaft caulking device (10), since the chassis is pressed by the pressing plate having a relatively large area and the operation of the caulking pin is not hindered by the presence of the opening, the caulking operation is performed. It can be performed more reliably.

【0032】また本発明に係る軸かしめ装置は、上記軸
かしめ装置(9)において、前記複数個の押え棒の下端
部に、前記かしめ用ピンの作動を可能とする前記開口部
が形成された前記1枚の押え板が取り付けられているこ
とを特徴としている(11)。
In the shaft caulking device according to the present invention, in the shaft caulking device (9), the opening for enabling the operation of the caulking pin is formed at a lower end portion of the plurality of pressing rods. The one holding plate is attached (11).

【0033】上記軸かしめ装置(11)によれば、上記
軸かしめ装置(9)と、上記軸かしめ装置(10)との
相乗効果を得ることができる。
According to the shaft caulking device (11), a synergistic effect between the shaft caulking device (9) and the shaft caulking device (10) can be obtained.

【0034】また本発明に係る軸かしめ装置は、基台
と、該基台上に載置される軸保持用のホルダーと、前記
ホルダー中心軸上に回転可能に配設されるヘッドと、該
ヘッドを回転させる回転手段と、前記ヘッドを昇降させ
る昇降手段と、前記ヘッド下部に偏心して取り付けられ
たかしめ用ピンとを含んで構成された軸かしめ装置であ
って、前記昇降手段の複数箇所に、弾性を有する略レ字
形状の爪部材が取り付けられ、該爪部材の先端部が前記
ホルダー側に向いていることを特徴としている(1
2)。
The shaft swaging apparatus according to the present invention comprises a base, a holder for holding a shaft mounted on the base, a head rotatably disposed on the center axis of the holder, and A rotating means for rotating the head, an elevating means for elevating the head, and a shaft caulking device including a caulking pin eccentrically attached to the lower part of the head, wherein a plurality of positions of the elevating means, A substantially rectangular shaped claw member having elasticity is attached, and the tip of the claw member faces the holder side (1).
2).

【0035】上記軸かしめ装置(12)によれば、前記
昇降手段の下降につれ、複数個の前記爪部材も同時に下
降してゆき、該爪部材がシャーシ縁部に当接すると、該
シャーシ縁部の外側方向に撓み、前記先端部が前記シャ
ーシ縁部に沿って下降する。そして該シャーシ縁部の下
部まで下降すると同時に、前記爪部材の弾性力により前
記先端部が前記シャーシ下部に入り込む。その後、前記
昇降手段が上昇すると、前記先端部が前記シャーシを支
持して上方に移動させることができる。
According to the shaft caulking device (12), the plurality of claw members are simultaneously lowered with the lowering of the lifting / lowering means, and when the claw members come into contact with the chassis edge, the chassis edge is moved. , And the tip portion descends along the edge of the chassis. Then, at the same time as lowering to the lower portion of the chassis edge, the tip portion enters the lower portion of the chassis by the elastic force of the claw member. Thereafter, when the lifting / lowering means is raised, the front end portion can support and move the chassis upward.

【0036】また本発明に係る軸かしめ装置は、上記軸
かしめ装置(1)〜(11)のいずれかにおいて、前記
昇降手段の複数箇所に、弾性を有する略レ字形状の前記
爪部が取り付けられ、該爪部の先端が前記ホルダー側に
向いていることを特徴としている(13)。
In the shaft caulking device according to the present invention, in any one of the shaft caulking devices (1) to (11), the resilient, substantially L-shaped claw portion is attached to a plurality of positions of the lifting / lowering means. And the tip of the claw portion faces the holder side (13).

【0037】上記軸かしめ装置(13)によれば、上記
軸かしめ装置(1)〜(11)のいずれかと、上記軸か
しめ装置(12)との相乗効果を得ることができる。
According to the shaft caulking device (13), a synergistic effect of any of the shaft caulking devices (1) to (11) and the shaft caulking device (12) can be obtained.

【0038】また本発明に係る軸かしめ装置は、基台
と、該基台上に載置される軸保持用のホルダーと、前記
ホルダー中心軸上に回転可能に配設されるヘッドと、該
ヘッドを回転させる回転手段と、前記ヘッドを昇降させ
る昇降手段と、前記ヘッド下部に偏心して取り付けられ
たかしめ用ピンとを含んで構成された軸かしめ装置であ
って、前記ヘッドに隙間ゲージが前記ホルダーの中心に
向けて付勢されつつ配設されると共に、前記隙間ゲージ
に押されるマグネット片が前記ヘッドに磁着されている
ことを特徴としている(14)。
Further, the shaft swaging apparatus according to the present invention comprises: a base; a holder for holding a shaft mounted on the base; a head rotatably disposed on the holder center axis; A shaft caulking device comprising: rotating means for rotating a head; elevating means for elevating and lowering the head; and a caulking pin eccentrically attached to a lower portion of the head. (14), wherein a magnet piece pushed by the gap gauge is magnetically attached to the head while being urged toward the center of the head.

【0039】上記軸かしめ装置(14)によれば、前記
隙間ゲージを前記ホルダーの中心方向に付勢しつつ前記
ヘッドを略1回転させると、前記マグネット片の磁着位
置に基づき、前記隙間ゲージの最大侵入深さを容易に測
定することができる。
According to the shaft caulking device (14), when the head is rotated substantially one turn while biasing the gap gauge toward the center of the holder, the gap gauge is determined based on the magnetic position of the magnet piece. The maximum penetration depth can be easily measured.

【0040】また本発明に係る軸かしめ装置は、上記軸
かしめ装置(1)〜(13)のいずれかにおいて、前記
ヘッドに隙間ゲージが前記ホルダーの中心に向けて付勢
されつつ配設されると共に、前記隙間ゲージに押される
マグネット片が前記ヘッドに磁着されていることを特徴
としている(15)。
In the shaft caulking device according to the present invention, in any one of the shaft caulking devices (1) to (13), a clearance gauge is disposed on the head while being biased toward the center of the holder. In addition, a magnet piece pushed by the gap gauge is magnetically attached to the head (15).

【0041】上記軸かしめ装置(15)によれば、上記
軸かしめ装置(1)〜(13)のいずれかと、上記軸か
しめ装置(14)との相乗効果を得ることができる。
According to the shaft caulking device (15), a synergistic effect of any of the shaft caulking devices (1) to (13) and the shaft caulking device (14) can be obtained.

【0042】また本発明に係る軸かしめ装置は、基台
と、該基台上に載置される軸保持用のホルダーと、前記
ホルダー中心軸上に回転可能に配設されるヘッドと、該
ヘッドを回転させる回転手段と、前記ヘッドを昇降させ
る昇降手段と、前記ヘッド下部に偏心して取り付けられ
たかしめ用ピンとを含んで構成された軸かしめ装置であ
って、少なくとも3個の走行用車輪が配設された基体が
下方に付勢され、該基体の所定箇所に取り付けられた支
持部には所定長さの検知棒が回動可能に枢支され、該検
知棒の一端部には常時下方に付勢された検知用車輪が配
設され、前記検知棒他端部の下方には接触端子が配置さ
れ、該接触端子に前記検知棒の他端部が当接すると、電
気的検出手段が作動して警報用スイッチが入るようにな
っていることを特徴としている(16)。
Further, the shaft swaging apparatus according to the present invention comprises a base, a holder for holding a shaft mounted on the base, a head rotatably disposed on the center axis of the holder, and A shaft caulking device including a rotating means for rotating a head, a lifting means for raising and lowering the head, and a caulking pin eccentrically attached to the lower part of the head, wherein at least three traveling wheels are provided. The disposed base is urged downward, and a detection rod of a predetermined length is rotatably supported by a support portion attached to a predetermined portion of the base, and one end of the detection rod is always downward. A detection wheel biased to is provided, a contact terminal is disposed below the other end of the detection rod, and when the other end of the detection rod comes into contact with the contact terminal, an electric detection unit is activated. It is characterized by being activated and turning on the alarm switch Are (16).

【0043】上記軸かしめ装置(16)によれば、前記
検知棒の長さと該検知棒が枢支される位置とに基づい
て、該検知棒の他端部と前記接触端子との間隔が所定距
離に設定されていると、前記検知用車輪がかしめ部上を
走行した際、前記検知棒の他端部が前記接触端子に接触
すると、前記警報用スイッチが入るので、かしめ部の高
さが許容値を超えていることを容易に検知することがで
きる。
According to the shaft caulking device (16), the distance between the other end of the detection rod and the contact terminal is determined based on the length of the detection rod and the position where the detection rod is pivotally supported. When the distance is set, when the detection wheel travels on the caulked portion, the other end of the detection rod contacts the contact terminal, and the alarm switch is turned on. It can be easily detected that the value exceeds the allowable value.

【0044】また本発明に係る軸かしめ装置は、上記軸
かしめ装置(1)〜(15)のいずれかにおいて、少な
くとも3個の走行用車輪が配設された基体が下方に付勢
され、該基体の所定箇所に取り付けられた支持部には所
定長さの検知棒が回動可能に枢支され、該検知棒の一端
部には常時下方に付勢された検知用車輪が配設され、前
記検知棒他端部の下方には接触端子が配置され、該接触
端子に前記検知棒の他端部が当接すると、電気的検出手
段が作動して警報用スイッチが入るようになっているこ
とを特徴としている(17)。
Further, according to the shaft caulking device of the present invention, in any one of the shaft caulking devices (1) to (15), the base provided with at least three traveling wheels is urged downward, A detection rod of a predetermined length is rotatably supported on a support portion attached to a predetermined portion of the base, and a detection wheel constantly biased downward is disposed at one end of the detection rod, A contact terminal is arranged below the other end of the detection rod, and when the other end of the detection rod comes into contact with the contact terminal, an electric detection means is activated to turn on an alarm switch. (17).

【0045】上記軸かしめ装置(17)によれば、上記
軸かしめ装置(1)〜(15)のいずれかと、上記軸か
しめ装置(16)との相乗効果を得ることができる。
According to the shaft caulking device (17), a synergistic effect of any of the shaft caulking devices (1) to (15) and the shaft caulking device (16) can be obtained.

【0046】[0046]

【発明の実施の形態】以下、本発明に係る軸かしめ装置
の実施の形態を図面に基づいて説明する。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of a shaft swaging apparatus according to the present invention will be described below with reference to the drawings.

【0047】なお、従来例と同一機能を有する構成部品
には同一の符号を付すこととする。図1は実施の形態
(1)に係る軸かしめ装置を示した概略図であり、
(a)は裏面図、(b)は(a)におけるA−A線断面
図である。基台91上には2本の支柱11が立設され、
支柱11には架構12が摺動可能に配設され、架構12
は昇降手段(図示せず)により上下(Z)方向に昇降す
るようになっている。また基台91上には分割形ホルダ
ー13が配設され、ホルダー13は縦方向に2分割され
たホルダー13a、13bより構成されており、ホルダ
ー13内には軸93が挿入される穴13cが形成されて
いる。また分割ホルダー13a、13bにはエアーや油
圧で駆動される駆動手段14a、14bがそれぞれ接続
され、この駆動手段14a、14bが作動すると分割ホ
ルダー13a、13bがそれぞれ反対(図中矢印)方向
に移動するようになっている。このホルダー13中心軸
上における架構12には、図14に示した従来のものと
略同様のヘッド94がW(水平)方向回転可能に配設さ
れ、このヘッド94上部には例えばモーター等の回転手
段15が接続される一方、ヘッド94下部には図14に
示したものと同様のかしめ用ピン95が偏心して取り付
けられている。これらホルダー13、駆動手段14a、
14b、回転手段15、基台91、ヘッド94、かしめ
用ピン95等を含んで軸かしめ装置10が構成されてい
る。
Components having the same functions as those of the conventional example are denoted by the same reference numerals. FIG. 1 is a schematic diagram showing a shaft caulking device according to Embodiment (1),
(A) is a rear view, and (b) is a cross-sectional view taken along line AA in (a). Two columns 11 are erected on the base 91,
A frame 12 is slidably disposed on the column 11, and the frame 12 is
Is raised and lowered in the vertical (Z) direction by lifting means (not shown). A divided holder 13 is provided on the base 91, and the holder 13 is composed of vertically divided holders 13a and 13b. The holder 13 has a hole 13c into which the shaft 93 is inserted. Is formed. Driving means 14a, 14b driven by air or hydraulic pressure are connected to the split holders 13a, 13b, respectively, and when the driving means 14a, 14b operate, the split holders 13a, 13b move in opposite directions (arrows in the figure). It is supposed to. A head 94 substantially the same as the conventional one shown in FIG. 14 is disposed on the frame 12 on the center axis of the holder 13 so as to be rotatable in the W (horizontal) direction. While the means 15 is connected, a caulking pin 95 similar to that shown in FIG. 14 is eccentrically mounted below the head 94. These holder 13, driving means 14a,
The shaft caulking device 10 includes 14b, the rotating means 15, the base 91, the head 94, the caulking pin 95, and the like.

【0048】このように構成された軸かしめ装置10を
用い、シャーシ96に軸93をかしめ付ける場合、まず
分割ホルダー13a、13bを所定量閉じ、穴13cに
軸93を手により挿入した後、駆動手段14a、14b
を締め付け方向に作動させて軸93を保持する。次に、
シャーシ96を両手で保持した状態で押し下げ、孔96
eにかしめ軸93c上部を挿入した後、ヘッド94を回
転させつつ所定高さほど下降させる。すると、かしめ用
ピン95によりかしめ軸93c上部が次第に押しつぶさ
れ、かしめ部93dが形成される。そして、このかしめ
部93d下面と軸本体93a上端面とによりシャーシ底
面部96aが挟まれ、軸93がシャーシ96に固定され
る。次にヘッド94を上昇させると共に、駆動手段14
a、14bを作動させて分割ホルダー13a、13bを
開いた後、手でシャーシ96を持ち上げると、装置10
から取り外せる。
When the shaft 93 is caulked to the chassis 96 by using the shaft caulking device 10 thus configured, first, the divided holders 13a and 13b are closed by a predetermined amount, and the shaft 93 is manually inserted into the hole 13c. Means 14a, 14b
Is operated in the tightening direction to hold the shaft 93. next,
Hold down the chassis 96 with both hands and push it down.
After inserting the upper part of the caulking shaft 93c into e, the head 94 is lowered by a predetermined height while rotating. Then, the upper portion of the caulking shaft 93c is gradually crushed by the caulking pin 95, and the caulking portion 93d is formed. Then, the chassis bottom surface portion 96a is sandwiched between the lower surface of the caulking portion 93d and the upper end surface of the shaft main body 93a, and the shaft 93 is fixed to the chassis 96. Next, the head 94 is raised and the driving means 14
After the split holders 13a and 13b are opened by operating the a and 14b, the chassis 96 is lifted by hand to
Can be removed from

【0049】上記説明から明らかなように、実施の形態
(1)に係る軸かしめ装置10では、2分割されたホル
ダー13a、13bが相互に押し付けるように駆動され
るので、ホルダー13内に軸93が保持されて確実にか
しめられる一方、かしめ工程後、2分割されたホルダー
13a、13bが相互に開くように駆動されると、抜け
勾配が次第に拡がっていくので、ホルダー13から軸9
3を容易に取り外すことができる。
As is clear from the above description, in the shaft crimping device 10 according to the embodiment (1), the holders 13a and 13b divided into two are driven so as to press against each other. Is held and firmly swaged. On the other hand, if the two divided holders 13a and 13b are driven so as to open each other after the swaging step, the draft gradually increases.
3 can be easily removed.

【0050】図2、図3は実施の形態(2)に係る軸か
しめ装置を示した概略図であり、図2は斜視図、図3は
側面図である。略直方体形の台板21上にはY軸方向に
駆動されるテーブル22が配設され、テーブル22上に
は基台91が取り付けられ、基台91上には、図1に示
したものと同様の分割形ホルダー13、駆動手段14
a、14bが配設されている。また台板21上には2本
の支柱23が立設され、支柱23上部には架構24が横
架され、架構24前部にはX軸方向に駆動されるツール
ベース25が配設され、このツールベース25には略板
形状の取り付け板26が取り付けられている。この取り
付け板26には略コの字形状の摺動部27が上下(Z
軸)方向摺動可能に配設され、摺動部27はモーター及
びボールねじ等の昇降手段28により昇降するようにな
っている。また摺動部27下部には図1に示したものと
同様のヘッド94及びかしめ用ピン95が回転可能に配
設され、モータ等の回転手段15により回転するように
なっている。そしてこれらの動作は、台板21上の操作
スイッチ29により操作されるようになっている。これ
ら分割形ホルダー13、駆動手段14a、14b、回転
手段15、昇降手段28、基台91、ヘッド94、かし
め用ピン95等を含んで軸かしめ装置20aが構成され
ている。
FIGS. 2 and 3 are schematic views showing a shaft caulking device according to the embodiment (2), FIG. 2 is a perspective view, and FIG. 3 is a side view. A table 22 driven in the Y-axis direction is provided on a substantially rectangular parallelepiped base plate 21, and a base 91 is mounted on the table 22. The base 91 has the same structure as that shown in FIG. Similar divided holder 13 and driving means 14
a and 14b are provided. Also, two columns 23 are erected on the base plate 21, a frame 24 is laid horizontally on the columns 23, and a tool base 25 driven in the X-axis direction is disposed in front of the frame 24. A substantially plate-shaped mounting plate 26 is mounted on the tool base 25. A substantially U-shaped sliding portion 27 is mounted on the mounting plate 26 in the vertical (Z) direction.
The sliding portion 27 is arranged so as to be slidable in the (axial) direction, and the sliding portion 27 is moved up and down by elevating means 28 such as a motor and a ball screw. A head 94 and a caulking pin 95 similar to those shown in FIG. 1 are rotatably disposed below the sliding portion 27, and are rotated by rotating means 15 such as a motor. These operations are operated by the operation switch 29 on the base plate 21. A shaft caulking device 20a includes the split holder 13, the driving means 14a, 14b, the rotating means 15, the elevating means 28, the base 91, the head 94, the caulking pin 95, and the like.

【0051】このように構成された軸かしめ装置20a
を用い、シャーシ96に軸93をかしめ付ける場合、ま
ず操作スイッチ29を操作してテーブル22、ツールベ
ース25を移動させ、ホルダー13中心軸上にヘッド9
4の中心を合わせる。この後の工程は、図1に示した場
合と略同様であるのでここではその工程の詳細な説明は
省略する。
The shaft caulking device 20a thus configured
When the shaft 93 is caulked to the chassis 96 by using the operation switch 29, the operation switch 29 is first operated to move the table 22 and the tool base 25, and the head 9 is placed on the central axis of the holder 13.
Align the center of 4. Subsequent steps are substantially the same as those shown in FIG. 1, and therefore detailed description of the steps is omitted here.

【0052】上記説明から明らかなように、実施の形態
(2)に係る軸かしめ装置20aでは、実施の形態
(1)のものと同様の効果を得ることができる。
As is clear from the above description, the shaft crimping device 20a according to the embodiment (2) can obtain the same effects as those of the embodiment (1).

【0053】図4は実施の形態(3)に係る軸かしめ装
置の主要部を概略的に示した断面図であり、図中14
a、14bは駆動手段、31a、31bは分割ホルダ
ー、91は基台、93は軸、96はシャーシを示してい
る。図2、図3に示した実施の形態2のものと同様、分
割ホルダー31a、31bは駆動手段14a、14bに
より水平方向に駆動されるようになっている。分割形ホ
ルダ31には軸93を保持する穴31cが形成されると
共に、この下部に連続して検知棒33が上下方向に挿通
される孔31dが形成されており、また基台91にも同
様の目的の孔91aが形成されている。検知棒33の所
定箇所にはボール部33aが形成され、このボール部3
3aはボール受け部34により回動可能に支持されてい
る。また検知棒下部33bは接触片35の孔35a内に
配置され、検知棒下部33bの側面と孔35aの側面と
は所定間隔dに設定されている。これらボール受け部3
4と接触片35とは絶縁板32b、取り付け板32a等
を介してシリンダー等の昇降手段32に取り付けられて
おり、この昇降手段32が作動すると、検知棒33上部
が上昇して軸93下部に当接したり、あるいは下降して
ホルダー31の下方へ移動するようになっている。また
ボール受け部34と接触片35との間には、例えば電池
36a、警報用スイッチとしてのランプ36b等の回路
から構成された電気的検出手段36が接続されており、
検知棒33がボール部33aにおいて回動し、検知棒下
部33bが接触片35に接触すると、ランプ36bが点
灯するようになっている。その他の構成は実施の形態2
のものと同様であるので、ここではその構成の詳細な説
明は省略することとする。これら分割形ホルダー31、
検知棒33、ボール部33a、ボール受け部34、接触
片35、電気的検出手段36等を含んで軸かしめ装置2
0bが構成されている。
FIG. 4 is a sectional view schematically showing a main part of a shaft caulking device according to the embodiment (3).
Reference numerals a and 14b denote driving means, 31a and 31b denote split holders, 91 denotes a base, 93 denotes a shaft, and 96 denotes a chassis. As in the second embodiment shown in FIGS. 2 and 3, the divided holders 31a and 31b are driven in the horizontal direction by driving means 14a and 14b. A hole 31c for holding the shaft 93 is formed in the divided holder 31, and a hole 31d through which the detection rod 33 is vertically inserted is formed continuously below the hole 31c. Is formed. A ball portion 33a is formed at a predetermined position of the detection rod 33.
3a is rotatably supported by a ball receiving portion. The lower detection rod 33b is disposed in the hole 35a of the contact piece 35, and the side surface of the lower detection rod 33b and the side surface of the hole 35a are set at a predetermined distance d. These ball receiving parts 3
4 and the contact piece 35 are attached to an elevating means 32 such as a cylinder via an insulating plate 32b, a mounting plate 32a, and the like. It comes into contact with or descends and moves below the holder 31. Further, between the ball receiving portion 34 and the contact piece 35, an electric detection means 36 composed of a circuit such as a battery 36a and a lamp 36b as an alarm switch is connected,
When the detection rod 33 rotates at the ball portion 33a and the lower part 33b of the detection rod contacts the contact piece 35, the lamp 36b is turned on. Other configurations are described in Embodiment 2.
Therefore, detailed description of the configuration is omitted here. These split holders 31,
A shaft caulking device 2 including a detection rod 33, a ball portion 33a, a ball receiving portion 34, a contact piece 35, an electrical detection means 36, and the like.
0b is configured.

【0054】このように構成された軸かしめ装置20b
を用いる場合、まず分割形ホルダー31を閉じつつ軸9
3を挿入し、検知棒33を下降させた後、軸93をホル
ダー31により完全に保持させる。次に実施の形態
(2)の場合と同様にして軸93をかしめ付ける。次に
ホルダー31を開けて検知棒33を上昇させ、検知棒3
3の上端部を軸93の下端面に当接させる。すると軸9
3の下端面の傾きに応じて検知棒33が回動する。そし
て軸93の軸心が許容値を超えて傾いていると、検知棒
下端部33bが接触片35に接触し、ボール受け部3
4、検知棒33、接触片35とが導通してランプ36b
が点灯する。
The shaft caulking device 20b thus configured
Is used, first, while closing the split holder 31, the shaft 9
3 is inserted, and after the detection rod 33 is lowered, the shaft 93 is completely held by the holder 31. Next, the shaft 93 is swaged in the same manner as in the embodiment (2). Next, the holder 31 is opened, the detection rod 33 is raised, and the detection rod 3
3 is brought into contact with the lower end surface of the shaft 93. Then axis 9
The detection rod 33 rotates according to the inclination of the lower end surface of the detection rod 3. When the axis of the shaft 93 is tilted beyond the allowable value, the lower end portion 33b of the detection rod comes into contact with the contact piece 35, and the ball receiving portion 3
4. The detection rod 33 and the contact piece 35 are electrically connected to each other, so that the lamp 36b
Lights up.

【0055】上記説明から明らかなように、実施の形態
(3)に係る軸かしめ装置20bでは、軸93の軸心に
関して軸93の下端面が直角に形成され、検知棒下部3
3b側面と接触片35の孔35a側面とが所定間隔dに
設定されていると、シャーシ底面部96a面に関する軸
心の傾きが軸93の下端面の傾きとして反映され、軸9
3の下端面に検知棒33の上端部が当接したとき、軸9
3の下端面の傾きに沿って検知棒33がボール部33a
を回転中心として回動させられる。そして、検知棒下部
33bが接触片35に接触すると、ランプ36bが点灯
するので、軸心の傾きが許容値を超えていることを簡単
に検知することができる。また軸93のかしめ作業終了
ごとに、同一装置20b内において軸心の傾きを直ちに
測定して不良品を早期に発見することができ、無駄を省
くことができる。
As is clear from the above description, in the shaft caulking device 20b according to the embodiment (3), the lower end face of the shaft 93 is formed at a right angle with respect to the axis of the shaft 93, and
If the side surface 3b and the side surface of the hole 35a of the contact piece 35 are set at a predetermined distance d, the inclination of the axis with respect to the surface of the chassis bottom surface 96a is reflected as the inclination of the lower end surface of the shaft 93, and
When the upper end of the detection rod 33 contacts the lower end surface of the
The detection rod 33 moves along the inclination of the lower end face of
Is rotated around the rotation center. Then, when the detection rod lower part 33b comes into contact with the contact piece 35, the lamp 36b is turned on, so that it is possible to easily detect that the inclination of the axis exceeds the allowable value. In addition, every time the caulking operation of the shaft 93 is completed, the inclination of the shaft center can be immediately measured in the same device 20b to detect a defective product at an early stage, and waste can be reduced.

【0056】図5は実施の形態(4)に係る軸かしめ装
置の主要部を示した概略図であり、(a)は正面図、
(b)は(a)におけるB−B線断面図である。図中1
4a、14bは駆動手段、31a、31bは分割ホルダ
ー、91は基台、93は軸、96はシャーシを示してい
る。基台91上の所定箇所には、一般的に市販されてい
る略有底円筒形状のパーツフィーダー37が設置され、
パーツフィーダー37における直進フィーダー37aの
先端部には供給口部37bが形成され、この供給口部3
7bは分割ホルダー31a、31bの下方に配設されて
いる。そしてパーツフィーダー37に複数個の軸93が
投入されると、軸93はかしめ軸97c側を上にして直
進フィーダー37a内に一列状に並び、振動により供給
口部37b側に順次送られるようになっている。また分
割ホルダー31a、31b下方の基台91下部には、例
えばシリンダー38aとピストン38bより構成された
軸持ち上げ手段38が配設されている。そして供給口部
37bに送られた軸93は、1個づつピストン38b上
端部で支持されつつ持ち上げられ、分割ホルダー31
a、31b内に供給される。その他の構成は実施の形態
(2)、(3)と同様であるので、ここではその構成の
詳細な説明は省略することとする。これら分割形ホルダ
ー31、パーツフィーダー37、供給口部37b、軸持
ち上げ手段38等を含んで軸かしめ装置20cが構成さ
れている。
FIG. 5 is a schematic view showing a main part of a shaft caulking device according to the embodiment (4), (a) is a front view,
(B) is a sectional view taken along line BB in (a). 1 in the figure
Reference numerals 4a and 14b denote driving means, 31a and 31b denote divided holders, 91 denotes a base, 93 denotes a shaft, and 96 denotes a chassis. At a predetermined position on the base 91, a generally commercially available cylindrical bottomed part feeder 37 is installed.
A supply port 37b is formed at the tip of the linear feeder 37a in the parts feeder 37.
7b is disposed below the divided holders 31a and 31b. Then, when a plurality of shafts 93 are put into the parts feeder 37, the shafts 93 are arranged in a line in the straight advance feeder 37a with the caulking shaft 97c side up, and are sequentially sent to the supply port 37b side by vibration. Has become. Below the base 91 below the divided holders 31a and 31b, a shaft lifting means 38 composed of, for example, a cylinder 38a and a piston 38b is provided. Then, the shafts 93 sent to the supply port 37b are lifted while being supported one by one by the upper end of the piston 38b, and the divided holders 31 are moved.
a, 31b. Other configurations are the same as those of the embodiments (2) and (3), so that detailed description of the configurations will be omitted here. The shaft caulking device 20c includes the split holder 31, the parts feeder 37, the supply port 37b, the shaft lifting means 38, and the like.

【0057】上記説明から明らかなように、実施の形態
(4)に係る軸かしめ装置20cでは、2分割されたホ
ルダー31a、31bが駆動手段14a、14bにより
水平方向に開かれ、供給口部37bに供給された1個の
軸93が軸持ち上げ手段38におけるピストン38bの
上昇により持ち上げられ、分割ホルダー31a、31b
間に挿入される。次にこの分割ホルダー31a、31b
が駆動手段14a、14bにより閉じられると、ホルダ
ー31内に軸93が確実に保持される。一方、軸持ち上
げ手段38のピストン38b上部が供給口部37bまで
下降すると、パーツフィーダー37により軸持ち上げ手
段38上へ次の軸93が供給される。したがって、これ
らの軸93を1個づつホルダー31内に自動的、かつ迅
速に挿着することができる。
As is clear from the above description, in the shaft caulking device 20c according to the embodiment (4), the holders 31a and 31b divided into two parts are opened in the horizontal direction by the driving means 14a and 14b, and the supply port 37b is opened. The shaft 93 supplied to the shaft holder is lifted by raising the piston 38b in the shaft lifting means 38, and the divided holders 31a, 31b
Inserted between. Next, the split holders 31a, 31b
Is closed by the driving means 14a and 14b, the shaft 93 is securely held in the holder 31. On the other hand, when the upper part of the piston 38b of the shaft lifting means 38 descends to the supply port 37b, the next shaft 93 is supplied onto the shaft lifting means 38 by the parts feeder 37. Therefore, these shafts 93 can be automatically and quickly inserted into the holder 31 one by one.

【0058】図6は実施の形態(5)に係る軸かしめ装
置の主要部を概略的に示した断面図であり、図中93は
かしめ後の軸、96はシャーシを示している。軸93を
保持する分割形ホルダー39はホルダー39a、39b
に2分割され、その外側下部にはテーパ部39cが形成
されている。この分割形ホルダー39の下部外周には、
略円筒形状の連結体41が配設されており、この連結体
41上部の内側にはテーパ部39cと同一勾配のテーパ
部41aが形成されており、連結体41下部の内側には
トルクメータ(図示せず)に接続された継ぎ手43が挿
入されるようになっている。また連結体41の外側には
ねじ部41bが形成されており、また連結体41は縦方
向に2分割されている。さらに連結体41の外側には締
め付けリング42が配設されており、この締め付けリン
グ42の内側にはねじ部41bに螺合するねじ部42a
が形成されている。これら連結体41、締め付けリング
42、継ぎ手43等を含んで締め付け手段44が構成さ
れている。その他の構成は実施の形態(2)〜(4)と
同様であるので、ここではその詳細な説明は省略するこ
ととする。これら分割形ホルダー39、締め付け手段4
4、トルクメータ等を含んで軸かしめ装置20dが構成
されている。
FIG. 6 is a cross-sectional view schematically showing a main part of the shaft caulking device according to the embodiment (5), wherein 93 denotes a shaft after caulking, and 96 denotes a chassis. The split holder 39 holding the shaft 93 includes holders 39a and 39b.
And a tapered portion 39c is formed at the lower portion on the outside. On the outer periphery of the lower part of the split holder 39,
A substantially cylindrical coupling body 41 is provided, and a tapered portion 41a having the same gradient as the tapered portion 39c is formed inside the upper portion of the coupling body 41, and a torque meter ( (Not shown) is inserted. Further, a screw portion 41b is formed outside the connecting body 41, and the connecting body 41 is vertically divided into two parts. Further, a tightening ring 42 is provided outside the connecting body 41, and a screw portion 42a screwed into the screw portion 41b is provided inside the tightening ring 42.
Are formed. Tightening means 44 includes the connecting body 41, the tightening ring 42, the joint 43 and the like. Other configurations are the same as those of the embodiments (2) to (4), and therefore, detailed description thereof is omitted here. These divided holder 39 and fastening means 4
4. The shaft caulking device 20d includes a torque meter and the like.

【0059】このように構成された軸かしめ装置20d
を用いる場合、かしめ工程が終了後、分割ホルダー39
a、39bから一旦駆動手段(図示せず)を切り離す。
次に締め付けリング42を分割形ホルダー39上部の外
周に配置すると共に、ホルダー39の下方に継ぎ手43
を配置する。次に連結体41をホルダー39及び継ぎ手
43に被せ、締め付けリング42を連結体41の上方か
ら下方に向けてねじ込んでゆくと、連結体41が締ま
り、ホルダー39を介して軸93とトルクメータとが連
結される。
The shaft caulking device 20d thus configured
When the crimping step is completed, the split holder 39 is used.
The drive means (not shown) is once cut off from a and 39b.
Next, the tightening ring 42 is arranged on the outer periphery of the upper part of the split holder 39, and the joint 43 is located below the holder 39.
Place. Next, the connecting body 41 is put on the holder 39 and the joint 43, and the tightening ring 42 is screwed downward from above the connecting body 41. When the connecting body 41 is tightened, the shaft 93 and the torque meter are connected via the holder 39. Are linked.

【0060】上記説明から明らかなように、実施の形態
(5)に係る軸かしめ装置20dでは、2分割されたホ
ルダー39と継ぎ手43に接続されたトルクメータとが
締め付け手段44を介して締め付けられるので、ホルダ
ー39内の軸93と前記トルクメータとが確実に連結さ
れる。その結果、1個の軸93のかしめ作業終了ごと
に、同一装置20d内においてトルクを直ちに測定する
ことができ、トルク不足の軸93が検出されると、即座
にこれにかしめ増工程を施すことができ、作業時間の短
縮を図ることができる。
As is clear from the above description, in the shaft caulking device 20d according to the embodiment (5), the holder 39 divided into two and the torque meter connected to the joint 43 are tightened via the tightening means 44. Therefore, the shaft 93 in the holder 39 and the torque meter are securely connected. As a result, each time the caulking operation of one shaft 93 is completed, the torque can be measured immediately in the same device 20d. When the shaft 93 with insufficient torque is detected, the caulking increase process is immediately performed. And the working time can be shortened.

【0061】図7は実施の形態(6)に係る軸かしめ装
置の主要部を概略的に示した断面図であり、図中96は
シャーシ、99は別タイプの軸を示している。略円柱形
状の分割形ホルダー45内には軸99が挿入される穴4
5aが形成されると共に、穴45aの側壁からはリング
状突起45bが延設されており、このリング状突起45
bは軸99におけるリング挿着用の溝部99cに嵌入さ
れるようになっている。またホルダー45は縦に2分割
され、ホルダー45c、45dにより構成されている。
その他の構成は実施の形態(1)、(3)のものと同様
であるので、ここではその構成の詳細な説明は省略する
こととする。これら分割形ホルダー45等を含んで軸か
しめ装置20eが構成されている。
FIG. 7 is a sectional view schematically showing a main part of the shaft caulking device according to the embodiment (6). In the figure, reference numeral 96 denotes a chassis, and 99 denotes another type of shaft. The hole 4 into which the shaft 99 is inserted is formed in the substantially cylindrical divided type holder 45.
5a are formed, and a ring-shaped projection 45b extends from the side wall of the hole 45a.
b is adapted to be fitted into a groove 99c of the shaft 99 for ring insertion. The holder 45 is vertically divided into two parts, and is constituted by holders 45c and 45d.
Other configurations are the same as those of the embodiments (1) and (3), and therefore detailed description of the configuration is omitted here. The shaft caulking device 20e includes the split type holder 45 and the like.

【0062】上記説明から明らかなように、実施の形態
(6)に係る軸かしめ装置20eでは、2分割されたホ
ルダー45c、45dが閉じられると、リング挿着用の
溝部99cにホルダー45のリング状突起45bが嵌入
されるので、かしめ工程の際、リング状突起45bの抵
抗力により溝部99cの変形を防止することができる。
またかしめ工程後、分割ホルダー45c、45dが相互
に開く方向へ駆動されるので、分割形ホルダー45から
軸99を容易に取り外すことができ、これらの結果、溝
部99cにリング(図示せず)を確実に挿着することが
できるようになる。
As is clear from the above description, in the shaft swaging apparatus 20e according to the embodiment (6), when the holders 45c and 45d divided into two parts are closed, the ring shape of the holder 45 is inserted into the groove 99c for ring insertion. Since the projection 45b is fitted, the deformation of the groove 99c can be prevented by the resistance of the ring-shaped projection 45b during the caulking step.
Also, after the caulking step, the split holders 45c and 45d are driven in a direction to open each other, so that the shaft 99 can be easily removed from the split holder 45, and as a result, a ring (not shown) is inserted into the groove 99c. It can be inserted securely.

【0063】図8は実施の形態(7)に係る軸かしめ装
置の主要部を概略的に示した断面図であり、図中96は
シャーシ、99は別タイプの軸を示している。略直方体
形状の一体形ホルダー46には穴46aが形成され、穴
46a内には軸99が挿入されるようになっている。一
体形ホルダー46側壁部には、対向する2個の孔46b
が穴46aに貫通して開口され、孔46bには2個のプ
レート47が挿脱可能に挿着されている。プレート47
は溝部99cの幅wと略同様の厚さwに形成されると共
に、プレート47先端部には溝部99cが嵌入される略
半円形状の切り欠き部47aが形成されている。その他
の構成は図2、図3で示した装置20aにおいて、分割
形ホルダー13を一体形ホルダー46に変え、かつ駆動
手段14a、14bを省いたものと同様であるので、こ
こではその構成の詳細な説明は省略することとする。こ
れら一体形ホルダー46、プレート47等を含んで軸か
しめ装置20fが構成されている。
FIG. 8 is a sectional view schematically showing a main part of a shaft caulking device according to the embodiment (7). In the figure, reference numeral 96 denotes a chassis, and 99 denotes another type of shaft. A hole 46a is formed in the substantially rectangular parallelepiped integral holder 46, and a shaft 99 is inserted into the hole 46a. In the side wall portion of the integral holder 46, two opposing holes 46b are formed.
Is opened through the hole 46a, and two plates 47 are removably inserted into the hole 46b. Plate 47
Is formed to have a thickness w substantially equal to the width w of the groove 99c, and a substantially semicircular cutout 47a into which the groove 99c is fitted is formed at the tip of the plate 47. The other structure is the same as that of the device 20a shown in FIGS. 2 and 3 except that the split holder 13 is changed to the integral holder 46 and the driving means 14a and 14b are omitted. Detailed description is omitted. A shaft caulking device 20f is configured to include the integral holder 46, the plate 47, and the like.

【0064】このように構成された軸かしめ装置20f
を用いる場合、まず一体形ホルダー46に軸99を挿入
し、プレート47を孔46bより押し込んでプレート4
7先端部を溝部99c内に嵌入させる。かしめ工程後、
プレート47を引き抜き、シャーシ96を引き上げる
と、軸99が一体形ホルダー47より引き抜ける。
The shaft caulking device 20f thus configured
Is used, first, the shaft 99 is inserted into the integral holder 46, and the plate 47 is pushed in from the hole 46b, so that the plate 4
7 The tip is fitted into the groove 99c. After the caulking process,
When the plate 47 is pulled out and the chassis 96 is pulled up, the shaft 99 is pulled out from the integrated holder 47.

【0065】上記説明から明らかなように、実施の形態
(7)に係る軸かしめ装置20fでは、一体形ホルダー
46に開口された孔46bを通ってリング挿着用の溝部
99cにプレート47が嵌入されるので、かしめ工程の
際、プレート47の抵抗力により溝部99cの変形を防
止することができる。またかしめ工程後、プレート47
が外方へ引き抜かれると、一体形ホルダー46から軸9
9を無理なく上方へ引き抜くことができ、これらの結
果、溝部99cにリングを確実に挿着することができる
ようになる。
As is clear from the above description, in the shaft crimping device 20f according to the embodiment (7), the plate 47 is fitted into the groove 99c for ring insertion through the hole 46b opened in the integral holder 46. Therefore, in the caulking step, the deformation of the groove 99c can be prevented by the resistance of the plate 47. After the caulking process, the plate 47
Is pulled out, the shaft 9 is removed from the integrated holder 46.
9 can be easily pulled out upward, and as a result, the ring can be securely inserted into the groove 99c.

【0066】図9は実施の形態(8)に係る軸かしめ装
置の主要部を概略的に示した断面図であり、図中96は
シャーシ、93は軸を示している。略円柱または略立方
体形状の一体形ホルダー48には軸93が挿入される穴
48aが形成され、また一体形ホルダー48側壁部には
穴48aに通じる複数個のボルト孔48bが形成されて
いる。軸93の側面には複数個の平坦部93eが形成さ
れており、ボルト孔48bに固定ボルト48cを締め込
むと、この固定ボルト48c先端部が平坦部93eに当
接し、軸93と一体形ホルダー48とが確実に固定され
るようになっている。一方、一体形ホルダー48下部に
は例えば平面視略十字形の溝部48dが形成され、この
溝部48d内には継ぎ手49の一端部に形成された平面
視略十字形の突起部49aが着脱可能に挿入されてお
り、継ぎ手49の他端部側にはトルクメータ(図示せ
ず)が接続されるようになっている。その他の構成は図
2、図3で示した装置20aにおいて、分割形ホルダー
13を一体形ホルダー48に変え、かつ駆動手段14
a、14bを省いたものと同様であるので、ここではそ
の構成の詳細な説明は省略することとする。これら一体
形ホルダー48、継ぎ手49、トルクメータ等を含んで
軸かしめ装置20gが構成されている。
FIG. 9 is a sectional view schematically showing a main part of a shaft caulking device according to the embodiment (8). In the figure, reference numeral 96 denotes a chassis, and 93 denotes a shaft. A hole 48a into which the shaft 93 is inserted is formed in the substantially cylindrical or substantially cubic integral holder 48, and a plurality of bolt holes 48b communicating with the hole 48a are formed in the side wall of the integral holder 48. A plurality of flat portions 93e are formed on the side surface of the shaft 93. When the fixing bolt 48c is tightened into the bolt hole 48b, the tip of the fixing bolt 48c contacts the flat portion 93e, and the shaft 93 and the integral holder are formed. 48 are securely fixed. On the other hand, for example, a substantially cross-shaped groove portion 48d in plan view is formed in the lower portion of the integral holder 48, and a substantially cross-shaped projection portion 49a formed in one end portion of the joint 49 is detachably formed in the groove portion 48d. It is inserted, and a torque meter (not shown) is connected to the other end of the joint 49. Another configuration is that in the device 20a shown in FIGS. 2 and 3, the divided holder 13 is changed to an integral holder 48, and the driving means 14
Since it is the same as that in which a and 14b are omitted, a detailed description of the configuration is omitted here. A shaft caulking device 20g includes the integral holder 48, the joint 49, the torque meter and the like.

【0067】上記説明から明らかなように、実施の形態
(8)に係る軸かしめ装置20gでは、平坦部93eに
固定ボルト48c先端部が当接する態様で固定ボルト4
8cが締め込まれると、この固定ボルト48cを介して
軸93が一体形ホルダー48に固定されると共に、一体
形ホルダー48下部に継ぎ手49を介してトルクメータ
(図示せず)が接続されるので、軸93とこのトルクメ
ータとが確実に結合される。その結果、1個の軸93の
かしめ作業終了ごとに、同一装置20g内においてトル
クを直ちに測定することができ、トルク不足の軸93が
検出されると、即座にこれにかしめ増工程を施すことが
できるので、作業時間の短縮を図ることができる。
As is apparent from the above description, in the shaft caulking device 20g according to the embodiment (8), the fixing bolt 4c is arranged so that the tip of the fixing bolt 48c abuts the flat portion 93e.
When the bolt 8c is tightened, the shaft 93 is fixed to the integral holder 48 via the fixing bolt 48c, and a torque meter (not shown) is connected to the lower part of the integral holder 48 via the joint 49. , Shaft 93 and this torque meter are securely connected. As a result, each time the caulking operation of one shaft 93 is completed, the torque can be measured immediately in the same device 20g. When the shaft 93 with insufficient torque is detected, the caulking increase process is immediately performed. Thus, the working time can be reduced.

【0068】図10は実施の形態(9)に係る軸かしめ
装置の主要部を概略的に示した正面図であり、図中13
は分割形ホルダー、15は回転手段、22はテーブル、
26は取り付け板、27は略コの字形状の摺動部、28
は昇降手段、91は基台、93は軸、94はヘッド、9
6はシャーシ、96fは縁部を示している。摺動部27
下部の所定箇所には複数個の摺動軸51aが摺動可能に
配設され、摺動軸51a上部にはストッパー51bが形
成される一方、摺動軸51a下部には摺動軸51aより
太い押え部51cが取り付けられている。またこの押え
部51cと摺動部27下部との間における摺動軸51a
の周囲には、圧縮バネ51dが配設されており、押え部
51cは常時下方に付勢されるようになっている。これ
ら摺動軸51a、ストッパー51b、押え部51c、圧
縮バネ51d等を含んで押え棒51が構成されている。
FIG. 10 is a front view schematically showing a main part of a shaft caulking device according to the embodiment (9).
Is a divided holder, 15 is a rotating means, 22 is a table,
26 is a mounting plate, 27 is a substantially U-shaped sliding portion, 28
Is a lifting means, 91 is a base, 93 is a shaft, 94 is a head, 9
Reference numeral 6 denotes a chassis, and 96f denotes an edge. Sliding part 27
A plurality of sliding shafts 51a are slidably disposed at a predetermined lower portion, and a stopper 51b is formed at an upper portion of the sliding shaft 51a, while a lower portion of the sliding shaft 51a is thicker than the sliding shaft 51a. The holding part 51c is attached. A sliding shaft 51a between the holding portion 51c and the lower portion of the sliding portion 27.
A compression spring 51d is disposed around the holding member 51, and the pressing portion 51c is constantly urged downward. The holding rod 51 includes the sliding shaft 51a, the stopper 51b, the holding part 51c, the compression spring 51d, and the like.

【0069】また摺動部27下部における複数個の所定
箇所には、弾性を有する略レの字形状の金属または合成
樹脂製爪部材52が配設されており、爪部材52の先端
部52aがいずれも分割形ホルダー13側に向くように
爪部材52上部は取り付けられている。その他の構成は
実施の形態(2)の装置20aと同様であるので、ここ
ではその構成の詳細な説明は省略することとする。これ
ら押え棒51、爪部材52等を含んで軸かしめ装置20
hが構成されている。
A plurality of claw members 52 made of metal or synthetic resin having a substantially rectangular shape and having elasticity are provided at a plurality of predetermined locations below the sliding portion 27. In each case, the upper part of the claw member 52 is attached so as to face the divided holder 13 side. The other configuration is the same as that of the device 20a of the embodiment (2), and the detailed description of the configuration is omitted here. The shaft caulking device 20 including these pressing rods 51, claw members 52, and the like
h.

【0070】このように構成された軸かしめ装置20h
を用いる場合、昇降手段28が作動して摺動部27が所
定距離まで次第に下降してゆくと、例えばまず押え部5
1c下部がシャーシ96の底部面96aに当接し、圧縮
バネ51dにより付勢されてシャーシ96が下方に押え
られて固定される。その後、先端部52aが縁部96f
に接して爪部材52が外方に撓り、先端部52aがシャ
ーシ96の縁部96f下方に入り込む。そして、かしめ
工程またはトルク検査工程が行われる。一方、昇降手段
28が作動して摺動部27が所定距離まで次第に上昇し
てゆくと、爪部材52の先端部52aがシャーシ96の
縁部96fに引っ掛かり、押え部51cと先端部52a
との間に保持されつつ、シャーシ96が引き上げられ
る。
The shaft caulking device 20h thus configured
When the lifting / lowering means 28 is operated and the sliding portion 27 is gradually lowered to a predetermined distance, for example, first, the pressing portion 5
The lower portion 1c abuts against the bottom surface 96a of the chassis 96, and is urged by the compression spring 51d to press and fix the chassis 96 downward. Then, the tip 52a is moved to the edge 96f.
, The claw member 52 bends outward, and the tip end portion 52a enters below the edge 96f of the chassis 96. Then, a caulking step or a torque inspection step is performed. On the other hand, when the lifting / lowering means 28 is operated and the sliding portion 27 is gradually raised to a predetermined distance, the tip 52a of the claw member 52 is caught by the edge 96f of the chassis 96, and the pressing portion 51c and the tip 52a.
, The chassis 96 is pulled up.

【0071】上記説明から明らかなように、実施の形態
(9)に係る軸かしめ装置20hでは、昇降手段28を
介して摺動部27が下降するにつれ、押え棒51がシャ
ーシ96に当接した後、押え棒51の下方付勢力が作用
し、シャーシ96が軸93の所定箇所に押え付けられて
水平かつ回転不能に固定されるので、手で保持すること
なく、かしめ作業やトルク検査を確実に行うことができ
る。その後、昇降手段28が上昇するにつれ、押え棒5
1がシャーシ96から離れるので、シャーシ96を取り
外すことができる。
As is clear from the above description, in the shaft caulking device 20h according to the embodiment (9), as the sliding portion 27 is lowered via the lifting / lowering means 28, the presser bar 51 comes into contact with the chassis 96. Thereafter, the downward urging force of the presser bar 51 is applied, and the chassis 96 is pressed against a predetermined portion of the shaft 93 and is fixed horizontally and non-rotatably. Can be done. Thereafter, as the elevating means 28 moves up, the presser bar 5
Since 1 is separated from chassis 96, chassis 96 can be removed.

【0072】また、昇降手段28を介して摺動部27が
下降するにつれ、複数個の爪部材52も同時に下降して
ゆき、爪部材52がシャーシ縁部96fに当接すると、
シャーシ縁部96fの外側方向に撓み、先端部52aが
シャーシ縁部96fに沿って下降する。そしてシャーシ
縁部96fの下部まで下降すると同時に、爪部材52の
弾性力により先端部52aがシャーシ96下部に入り込
む。その後、昇降手段28を介して摺動部27が上昇す
ると、先端部52aがシャーシ96を支持して上方に移
動させることができる。
Further, as the sliding portion 27 is lowered via the lifting / lowering means 28, the plurality of claw members 52 are simultaneously lowered, and when the claw members 52 come into contact with the chassis edge 96f,
The tip portion 52a is bent outward along the chassis edge 96f, and descends along the chassis edge 96f. Then, at the same time as lowering to the lower portion of the chassis edge portion 96f, the tip portion 52a enters the lower portion of the chassis 96 by the elastic force of the claw member 52. Thereafter, when the sliding portion 27 moves up via the elevating means 28, the tip portion 52a can support the chassis 96 and move it upward.

【0073】なお、軸かしめ装置20hでは、分割形ホ
ルダー13を用いた場合について説明したが、別の分割
形ホルダー31、39、45や一体形ホルダー92、4
6、48を用いてもよい。
In the shaft caulking device 20h, the case where the split holder 13 is used has been described. However, the separate holders 31, 39, 45 and the integrated holders 92, 4
6, 48 may be used.

【0074】また、軸かしめ装置20hでは、押え棒5
1と爪部材52とが同時に設置されているので、これら
が別々に設置されているものに比べ、例えばシャーシ9
6の移動における保持力の向上等、相乗効果を高めるこ
とができる。
In the shaft caulking device 20h, the holding rod 5
1 and the claw member 52 are installed at the same time.
The synergistic effect, such as improvement of the holding force in the movement of No. 6, can be enhanced.

【0075】また、押え棒51や爪部材52は、軸かし
め装置20a〜20fに設置されてもよい。
The holding bar 51 and the claw member 52 may be installed in the shaft caulking devices 20a to 20f.

【0076】図11は実施の形態(10)に係る軸かし
め装置の主要部を概略的に示した斜視図であり、図中5
1cは図10に示した押え部である。例えば4個の押え
部51cの下端部には、1枚の略長方形状の押え板53
が取り付けられている。またこの押え板53の所定箇所
には略円形状の開口部53aが形成されており、その形
状はかしめ用ピン95(図10)の作動を阻害しない大
きさに設定されている。その他の構成は実施の形態
(9)に示した装置20hと同様であるので、ここでは
その構成の詳細な説明は省略することとする。これら押
え部51c、押え板53等を含んで、軸かしめ装置20
iが構成されている。
FIG. 11 is a perspective view schematically showing a main part of a shaft caulking device according to the embodiment (10).
Reference numeral 1c denotes a holding portion shown in FIG. For example, one substantially rectangular pressing plate 53 is provided at the lower ends of the four pressing portions 51c.
Is attached. A substantially circular opening 53a is formed at a predetermined position of the holding plate 53, and the shape thereof is set to a size that does not hinder the operation of the caulking pin 95 (FIG. 10). The other configuration is the same as that of the device 20h described in the embodiment (9), and the detailed description of the configuration is omitted here. The shaft caulking device 20 including these holding portions 51c, the holding plate 53, etc.
i are configured.

【0077】上記説明から明らかなように、実施の形態
(10)に係る軸かしめ装置20iでは、開口部53a
の存在により前記かしめ用ピンの作動が阻害されること
がなく、かつシャーシ96(図10)が比較的広い面積
を有する押え板53により押えられるので、かしめ作業
を一層確実に行うことができる。
As is clear from the above description, in the shaft crimping device 20i according to the embodiment (10), the opening 53a
The operation of the caulking pin is not hindered by the presence of the pin, and the chassis 96 (FIG. 10) is pressed by the pressing plate 53 having a relatively large area, so that the caulking operation can be performed more reliably.

【0078】なお、軸かしめ装置20iでは、分割形ホ
ルダー13を用いた場合について説明したが、別の分割
形ホルダー31、39、45や一体形ホルダー92、4
6、48を用いてもよい。また、軸かしめ装置20iで
は、押え棒51と押え板53とを組み合わせた場合につ
いて説明したが、図10で示した爪部材52をさらに組
み合わせてもよい。
Although the case of using the split holder 13 in the shaft swaging apparatus 20i has been described, the separate holders 31, 39, 45 and the integrated holders 92, 4
6, 48 may be used. In the shaft caulking device 20i, the case where the presser bar 51 and the presser plate 53 are combined has been described, but the claw member 52 shown in FIG. 10 may be further combined.

【0079】図12は実施の形態(11)に係る軸かし
め装置の主要部を概略的に示した側面図であり、図中1
3は分割形ホルダー、93は軸、93dはかしめ部、9
4はヘッド、96はシャーシを示している。なお、かし
め用ピンは記載を省略している。ヘッド94は軸かしめ
装置20a、20hで示したものと同様のツールベース
に搭載され、昇降手段及び回転手段(共に図示せず)に
接続されており、Z方向に昇降すると共に、W方向に回
転するようになっている。厚さがt(例えば0.03m
m)の隙間ゲージ54は非磁性の支柱55下部に取り付
けられる一方、支柱55上部はヘッド94下部の半径方
向に摺動可能に配設されており、隙間ゲージ54は支柱
55を介してホルダー13の中心(O)方向に常時付勢
されるようになっている。またヘッド94下部には基準
点56が設定され、この基準点56と支柱側面55aと
の距離が、隙間ゲージ挿入深さLと対応するようになっ
ている。またヘッド94下部にはマグネット片57が摺
動可能に磁着されており、このマグネット片57は支柱
側面56によりO方向へのみ移動させられるようになっ
ている。その他の構成は装置20a、20hで示したも
の同様であるので、ここではその構成の詳細な説明は省
略することとする。これら隙間ゲージ54、支柱55、
基準点56、マグネット片57等を含んで軸かしめ装置
20jが構成されている。
FIG. 12 is a side view schematically showing a main part of a shaft swaging apparatus according to the embodiment (11).
3 is a split holder, 93 is a shaft, 93d is a caulked portion, 9
Reference numeral 4 denotes a head, and 96 denotes a chassis. Note that the description of the caulking pins is omitted. The head 94 is mounted on a tool base similar to that shown by the shaft caulking devices 20a and 20h, and is connected to lifting / lowering means and rotating means (both not shown), and moves up and down in the Z direction and rotates in the W direction. It is supposed to. When the thickness is t (for example, 0.03 m
m) is attached to the lower part of the non-magnetic support 55, while the upper part of the support 55 is slidably disposed in the lower part of the head 94 in the radial direction. Is always urged in the direction of the center (O). A reference point 56 is set below the head 94, and the distance between the reference point 56 and the support side surface 55a corresponds to the gap gauge insertion depth L. A magnet piece 57 is slidably magnetically attached to the lower part of the head 94, and the magnet piece 57 can be moved only in the O direction by the support side surface 56. The other configuration is the same as that shown in the devices 20a and 20h, and therefore, detailed description of the configuration is omitted here. These gap gauges 54, columns 55,
The shaft caulking device 20j includes the reference point 56, the magnet piece 57, and the like.

【0080】このように構成された軸かしめ装置20j
を用いる場合、まず、かしめ部93dの外径と基準点5
6との位置関係を調整した後、ヘッド94を介して支柱
55及び隙間ゲージ54をゆっくりと1回転させる。す
ると隙間ゲージ54の挿入深さに応じて支柱側壁55a
が半径方向に移動し、最大深さLM の位置でマグネット
片57が定着する。したがってLM を測定すると最大深
さが迅速かつ正確に検出できる。
The shaft caulking device 20j thus configured
Is used, first, the outer diameter of the caulked portion 93d and the reference point 5
After adjusting the positional relationship with the support 6, the support 55 and the gap gauge 54 are slowly rotated once through the head 94. Then, according to the insertion depth of the gap gauge 54, the support side wall 55a
There moved radially, the magnet piece 57 is fixed at the position of maximum depth L M. Thus the maximum depth measured to L M can be quickly and accurately detected.

【0081】上記説明から明らかなように、実施の形態
(11)に係る軸かしめ装置20jでは、隙間ゲージ5
4を分割形ホルダー13の中心方向に付勢しつつヘッド
94を略1回転させると、マグネット片57の磁着位置
に基づき、隙間ゲージ54の最大侵入深さLM を容易に
測定することができる。
As is clear from the above description, in the shaft caulking device 20j according to the embodiment (11), the clearance gauge 5
4 when substantially 1 to rotate the head 94 while biasing the center of the segmented holder 13, based on magnetically attracted position of the magnet piece 57, is possible to easily measure the maximum penetration depth L M of the clearance gauge 54 it can.

【0082】なお実施の形態11では分割形ホルダー1
3を用いた場合について説明したが、別の形態のもので
は、一体形ホルダー46、48、92や分割形ホルダー
31、39、45を用いてもよい。
In the eleventh embodiment, the split holder 1
Although the case where 3 is used has been described, in another embodiment, the integrated holders 46, 48 and 92 and the divided holders 31, 39 and 45 may be used.

【0083】また、軸かしめ装置20jと軸かしめ装置
20a〜20iのいずれかとを組み合わせると、それぞ
れの効果を相乗的に高めることができる。
When the shaft caulking device 20j and any of the shaft caulking devices 20a to 20i are combined, the respective effects can be enhanced synergistically.

【0084】図13は実施の形態(12)に係る軸かし
め装置の主要部を示した概略図であり、図中13は分割
形ホルダー、27は装置20aの摺動部、93は軸、9
4はヘッド、96はシャーシを示している。摺動部27
下部には弾性体61を介して略枠形の基体58が取り付
けられ、基体58下部には少なくとも3個の走行用車輪
59が配設されており、弾性体61により、基体58は
常時下方に付勢されている。基体58の所定箇所には支
持部62上部が取り付けられ、支持部62下部には略L
字形状の検知棒63が回動可能に枢支されており、検知
棒63は所定の長さに設定されている。また検知棒63
の一端部には検知用車輪63aが配設され、この検知用
車輪63aはコイルバネ63bにより常時下方に付勢さ
れている。一方、検知棒他端部63cの下方には所定距
離をおいて接触端子64が配置されており、検知用車輪
63a下部の高さが許容値の高さHより高い場合、検知
棒他端部63cが接触端子64に接触するようになって
いる。また接触端子64と支持部62との間には、例え
ば電池65a、警報用スイッチとしてのランプ65b等
の回路から構成された電気的検出手段65が接続されて
おり、検知棒端部63cが接触端子64に接触すると、
ランプ65bが点灯するようになっている。その他の構
成は装置20aの場合と同様であるので、ここではその
詳細な説明は省略することとする。。これら基体58、
走行用車輪59、弾性体61、支持部62、検知棒6
3、検知用車輪63a、コイルバネ63b、接触端子6
4、電気的検出手段65等を含んで軸かしめ装置20k
が構成されている。
FIG. 13 is a schematic view showing a main part of a shaft caulking device according to the embodiment (12), in which 13 is a divided holder, 27 is a sliding portion of the device 20a, 93 is a shaft, 9
Reference numeral 4 denotes a head, and 96 denotes a chassis. Sliding part 27
A substantially frame-shaped base body 58 is attached to the lower part via an elastic body 61, and at least three traveling wheels 59 are disposed below the base body 58. Being energized. An upper portion of the support portion 62 is attached to a predetermined portion of the base body 58, and a substantially L
A detection rod 63 having a character shape is rotatably supported, and the detection rod 63 is set to a predetermined length. The detection rod 63
A detection wheel 63a is disposed at one end of the detection wheel, and the detection wheel 63a is constantly urged downward by a coil spring 63b. On the other hand, the contact terminal 64 is disposed at a predetermined distance below the other end 63c of the detection rod, and when the height of the lower part of the detection wheel 63a is higher than the allowable height H, the other end of the detection rod is provided. 63 c comes into contact with the contact terminal 64. Further, between the contact terminal 64 and the support portion 62, an electric detection means 65 composed of a circuit such as a battery 65a and a lamp 65b as an alarm switch is connected. When contacting the terminal 64,
The lamp 65b is turned on. The other configuration is the same as that of the device 20a, and the detailed description is omitted here. . These substrates 58,
Running wheel 59, elastic body 61, support portion 62, detection rod 6
3, detection wheel 63a, coil spring 63b, contact terminal 6
4. The shaft caulking device 20k including the electric detection means 65 and the like
Is configured.

【0085】このように構成された軸かしめ装置20k
を用いる場合、テーブル22をY軸方向に、あるいはツ
ールベース25をX軸方向に移動させることにより、基
体58は自動的に移動させることができる。一方、軸か
しめ装置10と組み合わせた場合、基体58を手で押し
下げて走行させればよい。
The shaft caulking device 20k thus configured
Is used, the base 58 can be automatically moved by moving the table 22 in the Y-axis direction or the tool base 25 in the X-axis direction. On the other hand, when combined with the shaft caulking device 10, the base 58 may be pushed down by hand and run.

【0086】上記説明から明らかなように、実施の形態
(12)に係る軸かしめ装置20kでは、検知棒63の
長さと検知棒63が枢支される位置とに基づき、検知棒
63の他端部63cと接触端子64とが所定間隔に設定
されていると、検知用車輪63aがかしめ部93d上を
走行し、検知棒63の他端部63cが接触端子64に接
触した際、警報用スイッチとしてのランプ65bが点灯
するので、かしめ部93dの高さが許容値Hを超えてい
ることを簡単に検知することができる。
As is clear from the above description, in the shaft caulking device 20k according to the embodiment (12), the other end of the detection rod 63 is determined based on the length of the detection rod 63 and the position where the detection rod 63 is pivotally supported. When the portion 63c and the contact terminal 64 are set at a predetermined distance, the detection wheel 63a runs on the caulking portion 93d, and when the other end 63c of the detection rod 63 contacts the contact terminal 64, the alarm switch Since the lamp 65b is turned on, it is possible to easily detect that the height of the caulked portion 93d exceeds the allowable value H.

【0087】なお実施の形態(12)では分割形ホルダ
ー13を用いた場合について説明したが、別の形態のも
のでは、一体形ホルダー46、48、92や分割形ホル
ダー31、39、45を用いてもよい。
In the embodiment (12), the case where the divided holder 13 is used has been described. However, in another embodiment, the integrated holders 46, 48, 92 and the divided holders 31, 39, 45 are used. You may.

【0088】また、実施の形態(2)〜(12)に係る
軸かしめ装置20a〜20bはいずれも卓上ロボット型
の場合を説明したが、軸かしめ装置10のような専用機
型であってもよい。
Although the shaft caulking devices 20a to 20b according to the embodiments (2) to (12) have been described as being of the table-top robot type, a special machine type such as the shaft caulking device 10 may be used. Good.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明に係る軸かしめ装置の実施の形態1を概
略的に示した概略図であり、(a)は裏面図、(b)は
(a)におけるA−A線断面図である。
FIG. 1 is a schematic diagram schematically showing a first embodiment of a shaft caulking device according to the present invention, in which (a) is a rear view and (b) is a cross-sectional view taken along line AA in (a). .

【図2】実施の形態2に係る軸かしめ装置を概略的に示
した斜視図である。
FIG. 2 is a perspective view schematically showing a shaft caulking device according to a second embodiment.

【図3】実施の形態2に係る軸かしめ装置を概略的に示
した側面図である。
FIG. 3 is a side view schematically showing a shaft caulking device according to a second embodiment.

【図4】実施の形態3に係る軸かしめ装置の主要部を概
略的に示した断面図である。
FIG. 4 is a sectional view schematically showing a main part of a shaft caulking device according to a third embodiment.

【図5】実施の形態4に係る軸かしめ装置の主要部を示
した概略図であり、(a)は正面図、(b)は(a)に
おけるB−B線断面図である。
FIGS. 5A and 5B are schematic diagrams showing a main part of a shaft caulking device according to a fourth embodiment, where FIG. 5A is a front view and FIG. 5B is a cross-sectional view taken along line BB in FIG.

【図6】実施の形態5に係る軸かしめ装置の主要部を概
略的に示した断面図である。
FIG. 6 is a sectional view schematically showing a main part of a shaft caulking device according to a fifth embodiment.

【図7】実施の形態6に係る軸かしめ装置の主要部を概
略的に示した断面図である。
FIG. 7 is a sectional view schematically showing a main part of a shaft caulking device according to a sixth embodiment.

【図8】実施の形態7に係る軸かしめ装置の主要部を概
略的に示した断面図である。
FIG. 8 is a sectional view schematically showing a main part of a shaft caulking device according to a seventh embodiment.

【図9】実施の形態8に係る軸かしめ装置の主要部を概
略的に示した断面図である。
FIG. 9 is a sectional view schematically showing a main part of a shaft caulking device according to an eighth embodiment.

【図10】実施の形態9に係る軸かしめ装置の主要部を
概略的に示した正面図である。
FIG. 10 is a front view schematically showing a main part of a shaft caulking device according to a ninth embodiment.

【図11】実施の形態10に係る軸かしめ装置の主要部
を概略的に示した斜視図である。
FIG. 11 is a perspective view schematically showing a main part of a shaft swaging apparatus according to a tenth embodiment.

【図12】実施の形態11に係る軸かしめ装置の主要部
を概略的に示した側面図である。
FIG. 12 is a side view schematically showing a main part of a shaft caulking device according to an eleventh embodiment.

【図13】実施の形態12に係る軸かしめ装置の主要部
を示した概略図である。
FIG. 13 is a schematic diagram showing a main part of a shaft caulking device according to a twelfth embodiment.

【図14】従来の軸かしめ装置を摸式的に示した裏面図
である。
FIG. 14 is a rear view schematically showing a conventional shaft caulking device.

【図15】従来の別のタイプの軸をかしめる場合を説明
するために示した軸近傍部分摸式的断面図である。
FIG. 15 is a partial schematic cross-sectional view showing the vicinity of a shaft for explaining another conventional type of caulking a shaft.

【図16】従来のかしめ部の高さ検査及び軸心の角度検
査を説明するために示した軸近傍部分摸式的断面図であ
る。
FIG. 16 is a partial schematic sectional view showing the vicinity of an axis for explaining a conventional height inspection of a caulked portion and an angle inspection of an axis.

【図17】従来のかしめ部及びシャーシ底面部の隙間検
査を説明するために示したかしめ部近傍部分の摸式的断
面図である。
FIG. 17 is a schematic cross-sectional view of a portion in the vicinity of a caulked portion shown for explaining a conventional clearance inspection between a caulked portion and a chassis bottom portion.

【符号の説明】[Explanation of symbols]

10 軸かしめ装置 13 分割形ホルダー 13a、13b 分割ホルダー 14a、14b 駆動手段 15 回転手段 90 基台 93 軸 94 ヘッド 95 かしめ用ピン DESCRIPTION OF SYMBOLS 10 Axis caulking device 13 Split type holder 13a, 13b Split holder 14a, 14b Driving means 15 Rotating means 90 Base 93 Axis 94 Head 95 Caulking pin

Claims (17)

【特許請求の範囲】[Claims] 【請求項1】 基台と、該基台上に載置される軸保持用
のホルダーと、前記ホルダー中心軸上に回転可能に配設
されるヘッドと、該ヘッドを回転させる回転手段と、前
記ヘッドを昇降させる昇降手段と、前記ヘッド下部に偏
心して取り付けられたかしめ用ピンとを含んで構成され
た軸かしめ装置であって、前記ホルダーが縦方向に2分
割され、これらがそれぞれ反対方向に駆動されるように
なっていることを特徴とする軸かしめ装置。
1. A base, a holder for holding a shaft mounted on the base, a head rotatably arranged on the center axis of the holder, and rotating means for rotating the head. A shaft caulking device comprising a lifting means for raising and lowering the head, and a caulking pin eccentrically attached to the lower part of the head, wherein the holder is vertically divided into two parts, each of which is divided in the opposite direction. A shaft caulking device characterized by being driven.
【請求項2】 中間にボール部を有する所定長さの検知
棒がボール受け部を介して回動可能に支持され、前記検
知棒の上端部は前記基台及び前記ホルダーを通って軸の
下端面に当接する一方、前記検知棒の下部は接触片に形
成された所定形状の孔に挿入され、前記接触片に前記検
知棒下部が接触すると、電気的検出手段が作動して警報
用スイッチが入るようになっていることを特徴とする請
求項1記載の軸かしめ装置。
2. A detection rod of a predetermined length having a ball portion in the middle is rotatably supported via a ball receiving portion, and an upper end of the detection rod passes through the base and the holder and is positioned below a shaft. While contacting the end face, the lower part of the detection rod is inserted into a hole of a predetermined shape formed in the contact piece, and when the lower part of the detection rod comes into contact with the contact piece, the electric detection means is activated and the alarm switch is activated. The shaft caulking device according to claim 1, wherein the shaft caulking device is inserted.
【請求項3】 前記ホルダーの下方にパーツフィーダー
の供給口部と、軸持ち上げ手段とが配設されていること
を特徴とする請求項1または請求項2記載の軸かしめ装
置。
3. The shaft caulking device according to claim 1, wherein a supply port of a parts feeder and a shaft lifting means are provided below the holder.
【請求項4】 前記ホルダーの締め付け手段を備え、該
締め付け手段の下部にトルクメータが着脱可能に接続さ
れていることを特徴とする請求項1〜3のいずれかの項
に記載の軸かしめ装置。
4. The shaft caulking device according to claim 1, further comprising a fastening means for the holder, wherein a torque meter is detachably connected to a lower portion of the fastening means. .
【請求項5】 軸に形成されたリング挿着用の溝部に嵌
入されるリング状突起が、前記ホルダー内の所定箇所に
形成されていることを特徴とする請求項1または請求項
3記載の軸かしめ装置。
5. The shaft according to claim 1, wherein a ring-shaped projection to be fitted into a groove for inserting and inserting the ring formed on the shaft is formed at a predetermined location in the holder. Caulking device.
【請求項6】 基台と、該基台上に載置される軸保持用
のホルダーと、前記ホルダー中心軸上に回転可能に配設
されるヘッドと、該ヘッドを回転させる回転手段と、前
記ヘッドを昇降させる昇降手段と、前記ヘッド下部に偏
心して取り付けられたかしめ用ピンとを含んで構成され
た軸かしめ装置であって、軸に形成されたリング挿着用
の溝部に嵌入される複数個のプレートが、前記ホルダー
に開口された孔を介して挿脱されるようになっているこ
とを特徴とする軸かしめ装置。
6. A base, a holder for holding a shaft mounted on the base, a head rotatably arranged on the center axis of the holder, and a rotating means for rotating the head. What is claimed is: 1. A shaft caulking device comprising a lifting means for raising and lowering a head, and a caulking pin eccentrically attached to a lower portion of the head, wherein a plurality of shafts are fitted into a groove for ring insertion formed on the shaft. Wherein the plate is inserted and removed through a hole opened in the holder.
【請求項7】 基台と、該基台上に載置される軸保持用
のホルダーと、前記ホルダー中心軸上に回転可能に配設
されるヘッドと、該ヘッドを回転させる回転手段と、前
記ヘッドを昇降させる昇降手段と、前記ヘッド下部に偏
心して取り付けられたかしめ用ピンとを含んで構成され
た軸かしめ装置であって、前記ホルダーに軸を固定する
ボルトが取り付けられる一方、前記軸に前記ボルトが当
接する平坦部が形成され、前記ホルダーの下部にトルク
メータが着脱可能に接続されていることを特徴とする軸
かしめ装置。
7. A base, a holder for holding a shaft mounted on the base, a head rotatably provided on the center axis of the holder, and rotating means for rotating the head. A shaft caulking device configured to include an elevating means for elevating and lowering the head, and a caulking pin eccentrically attached to the lower portion of the head, wherein a bolt for fixing the shaft is attached to the holder, and the shaft is attached to the shaft. A shaft caulking device, wherein a flat portion with which the bolt abuts is formed, and a torque meter is detachably connected to a lower portion of the holder.
【請求項8】 基台と、該基台上に載置される軸保持用
のホルダーと、前記ホルダー中心軸上に回転可能に配設
されるヘッドと、該ヘッドを回転させる回転手段と、前
記ヘッドを昇降させる昇降手段と、前記ヘッド下部に偏
心して取り付けられたかしめ用ピンとを含んで構成され
た軸かしめ装置であって、前記昇降手段の複数箇所に上
下方向に摺動可能の押え棒が取り付けられ、該押え棒が
常時下方に付勢されていることを特徴とする軸かしめ装
置。
8. A base, a holder for holding a shaft mounted on the base, a head rotatably disposed on the center axis of the holder, and rotating means for rotating the head. What is claimed is: 1. A shaft caulking device comprising a lifting means for raising and lowering the head, and a caulking pin eccentrically attached to a lower portion of the head, wherein a pressing rod slidable vertically at a plurality of positions of the lifting means. Wherein the presser bar is constantly urged downward.
【請求項9】 前記昇降手段の複数箇所に上下方向に摺
動可能の前記押え棒が取り付けられ、該押え棒が常時下
方に付勢されていることを特徴とする請求項1〜7のい
ずれかの項に記載の軸かしめ装置。
9. The press bar according to claim 1, wherein said press bar is slidable in a vertical direction at a plurality of positions of said elevating means, and said press bar is constantly urged downward. A shaft caulking device according to any of the above items.
【請求項10】 基台と、該基台上に載置される軸保持
用のホルダーと、前記ホルダー中心軸上に回転可能に配
設されるヘッドと、該ヘッドを回転させる回転手段と、
前記ヘッドを昇降させる昇降手段と、前記ヘッド下部に
偏心して取り付けられたかしめ用ピンとを含んで構成さ
れた軸かしめ装置であって、前記複数個の押え棒の下端
部に、前記かしめ用ピンの作動を可能とする開口部が形
成された1枚の押え板が取り付けられていることを特徴
とする軸かしめ装置。
10. A base, a holder for holding a shaft mounted on the base, a head rotatably disposed on the center axis of the holder, and rotating means for rotating the head.
A shaft caulking device comprising a lifting means for raising and lowering the head, and a caulking pin eccentrically attached to the lower portion of the head, wherein the lower ends of the plurality of presser bars are provided with the caulking pin. A shaft caulking device, comprising a single holding plate provided with an opening for enabling operation.
【請求項11】 前記複数個の押え棒の下端部に、前記
かしめ用ピンの作動を可能とする前記開口部が形成され
た前記1枚の押え板が取り付けられていることを特徴と
する請求項9記載の軸かしめ装置。
11. The holding plate having the opening formed therein to enable the operation of the caulking pin is attached to lower ends of the plurality of holding bars. Item 10. A shaft caulking device according to Item 9.
【請求項12】 基台と、該基台上に載置される軸保持
用のホルダーと、前記ホルダー中心軸上に回転可能に配
設されるヘッドと、該ヘッドを回転させる回転手段と、
前記ヘッドを昇降させる昇降手段と、前記ヘッド下部に
偏心して取り付けられたかしめ用ピンとを含んで構成さ
れた軸かしめ装置であって、前記昇降手段の複数箇所
に、弾性を有する略レ字形状の爪部材が取り付けられ、
該爪部材の先端部が前記ホルダー側に向いていることを
特徴とする軸かしめ装置。
12. A base, a holder for holding a shaft mounted on the base, a head rotatably provided on the center axis of the holder, and rotating means for rotating the head.
A shaft caulking device configured to include an elevating means for elevating and lowering the head, and a caulking pin eccentrically attached to the lower portion of the head, wherein a plurality of portions of the elevating means have a substantially rectangular shape having elasticity. Claw members are attached,
A shaft crimping device, wherein a tip of the claw member faces the holder.
【請求項13】 前記昇降手段の複数箇所に、弾性を有
する略レ字形状の前記爪部材が取り付けられ、該爪部材
の先端部が前記ホルダー側に向いていることを特徴とす
る請求項1〜11のいずれかの項に記載の軸かしめ装
置。
13. The claw member having a substantially rectangular shape having elasticity is attached to a plurality of positions of the elevating means, and the tip of the claw member faces the holder. 12. The shaft caulking device according to any one of Items 11 to 11.
【請求項14】 基台と、該基台上に載置される軸保持
用のホルダーと、前記ホルダー中心軸上に回転可能に配
設されるヘッドと、該ヘッドを回転させる回転手段と、
前記ヘッドを昇降させる昇降手段と、前記ヘッド下部に
偏心して取り付けられたかしめ用ピンとを含んで構成さ
れた軸かしめ装置であって、前記ヘッドに隙間ゲージが
前記ホルダーの中心に向けて付勢されつつ配設されると
共に、前記隙間ゲージに押されるマグネット片が前記ヘ
ッドに磁着されていることを特徴とする軸かしめ装置。
14. A base, a holder for holding a shaft mounted on the base, a head rotatably disposed on the center axis of the holder, and rotating means for rotating the head.
A shaft caulking device including a lifting means for lifting and lowering the head, and a caulking pin eccentrically attached to the lower portion of the head, wherein the clearance gauge is urged toward the center of the holder by the head. A shaft caulking device, wherein a magnet piece pushed by the clearance gauge is magnetically attached to the head.
【請求項15】 前記ヘッドに隙間ゲージが前記ホルダ
ーの中心に向けて付勢されつつ配設されると共に、前記
隙間ゲージに押されるマグネット片が前記ヘッドに磁着
されていることを特徴とする請求項1〜13のいずれか
の項に記載の軸かしめ装置。
15. A gap gauge is provided on the head while being urged toward the center of the holder, and a magnet piece pushed by the gap gauge is magnetically attached to the head. A shaft caulking device according to any one of claims 1 to 13.
【請求項16】 基台と、該基台上に載置される軸保持
用のホルダーと、前記ホルダー中心軸上に回転可能に配
設されるヘッドと、該ヘッドを回転させる回転手段と、
前記ヘッドを昇降させる昇降手段と、前記ヘッド下部に
偏心して取り付けられたかしめ用ピンとを含んで構成さ
れた軸かしめ装置であって、少なくとも3個の走行用車
輪が配設された基体が下方に付勢され、該基体の所定箇
所に取り付けられた支持部には所定長さの検知棒が回動
可能に枢支され、該検知棒の一端部には常時下方に付勢
された検知用車輪が配設され、前記検知棒他端部の下方
には接触端子が配置され、該接触端子に前記検知棒の他
端部が当接すると、電気的検出手段が作動して警報用ス
イッチが入るようになっていることを特徴とする軸かし
め装置。
16. A base, a holder for holding a shaft mounted on the base, a head rotatably disposed on the center axis of the holder, and rotating means for rotating the head.
A shaft caulking device comprising a lifting means for raising and lowering the head, and a caulking pin eccentrically attached to the lower portion of the head, wherein a base body provided with at least three traveling wheels is provided at a lower position. A detection rod having a predetermined length is rotatably supported by a support portion which is urged and attached to a predetermined portion of the base, and a detection wheel which is constantly urged downward at one end of the detection rod. Is disposed, and a contact terminal is disposed below the other end of the detection rod. When the other end of the detection rod comes into contact with the contact terminal, the electric detection means is activated and the alarm switch is turned on. A shaft caulking device characterized in that:
【請求項17】 少なくとも3個の走行用車輪が配設さ
れた基体が下方に付勢され、該基体の所定箇所に取り付
けられた支持部には所定長さの検知棒が回動可能に枢支
され、該検知棒の一端部には常時下方に付勢された検知
用車輪が配設され、前記検知棒他端部の下方には接触端
子が配置され、該接触端子に前記検知棒の他端部が当接
すると、電気的検出手段が作動して警報用スイッチが入
るようになっていることを特徴とする請求項1〜15の
いずれかの項に記載の軸かしめ装置。
17. A base on which at least three traveling wheels are disposed is urged downward, and a support rod attached to a predetermined portion of the base has a detection rod of a predetermined length pivotably pivoted. Supported, a detection wheel constantly biased downward is disposed at one end of the detection rod, a contact terminal is disposed below the other end of the detection rod, and a contact terminal is disposed at the contact terminal. 16. The shaft caulking device according to claim 1, wherein when the other end abuts, the electric detection means is activated and a warning switch is turned on.
JP9092356A 1997-04-10 1997-04-10 Shaft caulking device Pending JPH10277688A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP9092356A JPH10277688A (en) 1997-04-10 1997-04-10 Shaft caulking device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP9092356A JPH10277688A (en) 1997-04-10 1997-04-10 Shaft caulking device

Publications (1)

Publication Number Publication Date
JPH10277688A true JPH10277688A (en) 1998-10-20

Family

ID=14052130

Family Applications (1)

Application Number Title Priority Date Filing Date
JP9092356A Pending JPH10277688A (en) 1997-04-10 1997-04-10 Shaft caulking device

Country Status (1)

Country Link
JP (1) JPH10277688A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013000772A (en) * 2011-06-16 2013-01-07 ▲吉▼川鐵工株式会社 Riveting machine and method
JP2017001067A (en) * 2015-06-12 2017-01-05 マツダ株式会社 Detecting method for caulking processing
CN112024809A (en) * 2020-09-10 2020-12-04 东莞市海德智能科技有限公司 Full-automatic spring riveting machine

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013000772A (en) * 2011-06-16 2013-01-07 ▲吉▼川鐵工株式会社 Riveting machine and method
JP2017001067A (en) * 2015-06-12 2017-01-05 マツダ株式会社 Detecting method for caulking processing
CN112024809A (en) * 2020-09-10 2020-12-04 东莞市海德智能科技有限公司 Full-automatic spring riveting machine

Similar Documents

Publication Publication Date Title
JPH10277688A (en) Shaft caulking device
JP3410680B2 (en) Inspection method and apparatus for pressure receiving member
JP3086121B2 (en) Work positioning jig
CN212778955U (en) Automobile framework checking fixture
CN211178988U (en) Automatic detection tool for automobile electric steering column lock control panel
CN217385422U (en) Novel pesticide suspension all-round upset appearance
JP3185295B2 (en) Marking device
JPS61259138A (en) Shearing strength testing machine
CN213714942U (en) Rapid metal plate strength detection device
CN215910607U (en) Glass-frame riser ware motor performance detection device
CN210070808U (en) Detection device for radio frequency single-core connector
CN220062830U (en) Combined switch gauge
JPH0341333A (en) System of dynamic balance tester
CN213022255U (en) PIN needle assembly and endurance test equipment thereof
KR200169536Y1 (en) A zig for testing a LCD module
CN220455357U (en) Detection jig and detection table
CN213301074U (en) Automobile parts depth of parallelism fixed test device
JP3185509B2 (en) Semiconductor device characteristic inspection equipment
CN110319756B (en) Detection tool and detection method for welding flatness of side plate of automobile seat
JPH06246373A (en) Work supporting device
JPH07310641A (en) Defective gap detecting device for ignition plug and ignition plug installing device
JP3619334B2 (en) Automatic chip removal device in machining center
JP2001162495A (en) Minute punch grinding method and device therefor
CN115570442A (en) Numerical control machine tool precision detection system combining virtual reality technology
CN117029612A (en) Rapid and automatic detection tool for size of automobile engine bracket and application method of rapid and automatic detection tool

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20051216

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20060502

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20060912